update on millikan library research john clinton case bradford v 20 may 2003 structural monitoring...

20
Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Post on 23-Jan-2016

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Update on Millikan Library Research

John Clinton

Case Bradford V

20 May 2003

Structural Monitoring Group Meeting

Page 2: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Recent Work:

• Movies

• Hysterisis Plots

• Transfer Functions

• ModeShape Fitting

Page 3: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Movies

• 3 Recorded Data sets from USGS array– M3.8 April ‘98 Alhambra @ 7km– M4.8 Sept ’01 Yorba Linda @ 41km– M5.4 Feb ’03 Big Bear @ 120km

Any others - M5.1Anza ‘01, M5.1Big Bear ‘01, Hector Mines ’99, local earthquakes?

Page 4: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

22 Feb 03 Big Bear M5.4 at 120km

Primarily 1st Mode resonance in both E-W and N-S directions

Yorba Linda event similar – Basin waves dominate ground motion.

Ref:

www.ecf.caltech.edu/~jclinton/research

Page 5: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

• small, local earthquake

• simple short period pulse as main energy input

• little excitation of basin waves

• initially 2nd EW mode excited. After ~15s, slow emergence of 1st mode EW resonance.

26 Apr 98 Alhambra M3.8 at 7km

Page 6: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

26 Apr 98 Alhambra M3.8 at 7km

2nd mode response EW

1st mode response NS

At initial S-wave pulse

Page 7: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

26 Apr 98 Alhambra M3.8 at 7km

1st mode response EW

1st mode response NS

About 15s after initial S-wave

Page 8: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Time-Series for GSA and Millikan USGS Array (EW Channels, Displacement)

No 2nd mode on 8,9 Floors 1st mode only appears later (long period excitation at GSA?)

Page 9: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Hysterisis Plots

• Attempting to recreate bi-linear stiffnesses Prof. Iwan showed last time

• Same method – plot relative inter-floor displacement versus force of floors above

• Problem: – No bilinear stiffnesses– No damping in real data, lots in forced

vibrations

Page 10: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

22 Feb 03 Big Bear M5.4 at 120km

• EW channels

• note: little or no `loop’

• also no change in stiffness

• removing part of displacement due to tilt may change shape, but will not affect damping

Page 11: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Forced Vibration

EW Channels

22 Feb 03 Big Bear

Page 12: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

22 Feb 03 Big Bear

Forced Vibration

NS Channels

Page 13: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Transfer Functions

• Utilise new data for old method

• Old Method: SDOF * GSA = MIK?

• New Data: – USGS array for MIK– CRP for GSA

Page 14: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Yorba Linda EventMIK (9th Floor) Roof USGS

EW

NS

Page 15: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Yorba Linda Event

EW

NS

MIK (9th Floor) length of USGS record vs full length of excitation

Page 16: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Yorba Linda Event

1st Floor Roof

EW

NS

5th Floor

Page 17: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Alhambra Event

1st Floor Roof

EW

NS

5th Floor

Page 18: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Alhambra Event – 2nd Mode Modeling5th Floor 1st Mode EW 5th Floor 2nd Mode EW

EW

NS

Page 19: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Miscellaneous Notes

• Triggering and timing on USGS

• Missing Data

• Fixed USGS FBAs?

• PWP meters?

• ETABS model or Millikan in near future

Page 20: Update on Millikan Library Research John Clinton Case Bradford V 20 May 2003 Structural Monitoring Group Meeting

Maybe some CRP noise levels if time…..