US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator / Sustainability Program Manager Operations Division Technical Operations Branch Portland District

Upload: anika-fifield

Post on 15-Dec-2015

221 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

US Army Corps of Engineers

BUILDING STRONG®

US Army Corps of EngineersSpill Response at Hydropower Projects

Ken Duncan

Environmental Compliance Coordinator / Sustainability Program Manager

Operations Division

Technical Operations Branch

Portland District

Page 2: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 2

NWD Corps Missions

Navigation Flood Damage Reduction Restoring Ecosystems Hydropower Wetland / Waterway Regulation Recreation

Page 3: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 3

Page 4: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 4

Page 5: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 5

Major Oil Sources:

Kaplan RunnerUp to 7,000 gal.

Page 6: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 6

Governors (Up to 4000 gallons)

Page 7: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 7

Transformers (Up to 16,000 gallons each)

Page 8: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 8

Oil Storage Rooms(Up to 200,000 gallons per dam)

Page 9: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 9

Navigation Locks

Page 10: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 10

Navigation Locks(Up to a 1000 gallons)

Page 11: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 11

Surface Flows – Dam Myths

Page 12: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 12

Fishways

Page 13: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 13

Oil Spill Prevention

Containment Systems Sumps / Oil Water Separators SPCC Plans

Page 14: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 14

Spill Preparedness

Training Drills Partnering w/ EPA, WDOE, DEQ District IMT support

► Operations, Planning, Safety, PAO

Contractor Response Using USCG BOAs

Page 15: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 15

Spill Response - Reporting

Commanders Intent: “Projects shall report the potential or known quantity of materials spilled, as quickly as possible, and update immediately if information changes.”

Corps policy is to report every spill. POC at each Project is the Control Room

► Listed in GRPs

Page 16: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 16

Mid-Columbia Challenges

Corps needs to know about spills to protect the fish ladders

Navigation Locks Mid-Columbia GRP

Page 17: US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Spill Response at Hydropower Projects Ken Duncan Environmental Compliance Coordinator

BUILDING STRONG®PORTLAND DISTRICT 17

Questions?

Contact Info:

Ken Duncan

503-808-4323

[email protected]