UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 1
Wisconsin Public Utility InstituteGas: What’s in the Pipeline?
Making the Switch to Gas: Utility Infrastructure Needs and a Case Study of a Coal‐to‐Gas Plant Conversion
Jeff Pollei, UW‐Madison
Agenda
Campus Overview and Utility Summary
Evolution of Heating Plants
CSHP Plant History
CSHP Legal History
CSHP Rebuild Project
Plant Dispatching
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 2
Founded in 1848
12 Schools/Colleges
Enrollment of 42,099
>18,500 Employees and Faculty
20.6 Million GSF on 935 Acre Main Campus (>27.0 Million Total)
University of Wisconsin Overview
Campus Overview (Before March 2012)
Walnut Street Heating Plant (WSHP)• 600,000 PPH Steam (Nat. Gas)• 11,000 Tons Chilled Water (Electric) • 9,000 Tons Chilled Water (Steam)
West Campus Cogeneration Facility (WCCF)• 400,000 PPH Steam• 20,000 Tons Chilled Water (Electric)• 100 MW Combustion T/G (Nat. Gas)• 68 MW Extraction/Condensing T/G
Charter Street Heating Plant (CSHP)• 500,000 PPH Steam (Coal)• 300,000 PPH Steam (Nat. Gas)• 26,000 Tons Chilled Water (Steam)• 9.7 MW Back Pressure T/G
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 3
Campus Overview
Campus Overview (January 2015)
Walnut Street Heating Plant (WSHP)• 600,000 PPH Steam (Nat. Gas)• 11,000 Tons Chilled Water (Electric) • 9,000 Tons Chilled Water (Steam)
West Campus Cogeneration Facility (WCCF)• 400,000 PPH Steam• 30,000 Tons Chilled Water (Electric)• 100 MW Combustion T/G (Nat. Gas)• 68 MW Extraction/Condensing T/G
Charter Street Heating Plant (CSHP)• 900,000 PPH Steam (Nat. Gas‐New)• 300,000 PPH Steam (Nat. Gas‐Existing)• 26,000 Tons Chilled Water (Steam)• 9.7 MW Back Pressure T/G
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 4
Steam Summary
• 2,100,000 PPH Total (2014)
• 1,800,000 PPH Firm
• 1,316,000 PPH Peak
Chilled Water Summary
• 76,000 Tons Total (2015)
• 67,500 Tons Firm
• 64,000+ Tons Peak
Electrical Summary
• 71 MW Peak
Campus Utility Summary
Evolution of Heating Plants
Radio Hall 1887 – 1908
Ag Bulletin 1889 – 1908
Service Building Annex 1908 – 1958
Charter Street Heating Plant 1958 – Present
Walnut Street Heating Plant 1975 – Present
West Campus Cogeneration Plant 2005 – Present
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 5
Evolution of Heating Plants
Main Campus
Radio Hall 1887 – 1908
Evolution of Heating Plants
Agriculture Campus
Ag Bulletin 1889 – 1908
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 6
Evolution of Heating Plants
Campus Aerial, ca. 1900
Evolution of Heating Plants
Central Heating Plant
Service BuildingAnnex1908 – 1958
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 7
Evolution of Heating Plants
Present Configuration
Walnut Street Heating Plant (WSHP)
West Campus Cogeneration Facility (WCCF)
Charter Street Heating Plant (CSHP)
Evolution of Heating Plants
Walnut Street Heating Plant (WSHP)
West Campus Cogeneration Facility (WCCF)
Charter Street Heating Plant (CSHP)
Present Configuration
3.5 + Miles Walkable Tunnel190 + Steam Pits? Miles of Inaccessible Box Conduits
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 8
CSHP Plant History
Constructed in 1958
Three 100,000 PPH Spreader Stoker Boilers Manufactured in 1953, Purchased Second Hand From Hudson Motors
One 200,000 PPH Spreader Stoker Boiler Installed in 1964
One 300,000 PPH Gas/Oil Boiler Installed in 1970
Baghouse Constructed in 1985
Chilled Water Plant Building Additions in 1965 & 1973
9.7 MW Back Pressure Steam T/G Installed in 1995
CSHP Legal History
Sierra Club Files Open Records Request in 2006
Sierra Club Indicates Filing of Lawsuit in December 2006
Sierra Club Files Lawsuit in May 2007
On November 7, 2007, the US District Court for Western District of Wisconsin Issued a Decision Finding That Three of Five Projects Between 1996 and 2004 Violated the Clean Air Act’s NSR Provisions
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 9
CSHP Legal History
US District Court for Western District of Wisconsin Findings
Project
Routine Maintenance, Repair or Replacement (RMRR)FindingsNature and Extent
Purpose Frequency CostDescriptionDuration (Days) RMRR
Like-Kind Replacement
Applicable Test
CAA Modification
1Boiler 4 Rear Wall
Replacement (73 WaterwallTubes and Casing)
45Maintain Pressure Integrity
One or Two Times in
Boiler Life, Not Routine
$97,300 Yes N/A N/A No
2Boiler 4 Side Wall
Replacement (67 WaterwallTubes and Casing)
<45Increase
Availability and Reliability
Two or Three Times in
Boiler Life, Not Routine
$77,000 No YesActual to Projected
ActualNo
3 Boiler 1, 2 and 3 Economizer Replacement 183
Increase Availability and
Reliability
Two Times in Boiler Life, Not Routine
$788,899 No No Actual to Potential Yes (1)
4 Boiler 1 Stoker Feeder Replacement 81
Increase Boiler Efficiency,
Availability and Reliability
Two Times in Boiler Life, Not Routine
$90,700 No No Actual to Potential Yes (1)
5
Boiler 4 Stoker Feeder Replacement and Boiler 1, 2
and 3 Generating Bank/ Superheater Replacement
274 (9 mo.)
Increase Boiler Efficiency,
Productivity, Availability and
Reliability
Two Times in Boiler Life, Not Routine
$1,712,348 No No Actual to Potential Yes (1)
(1) Modified without preconstruction PSD permit so CSHP is subject to best available control technology (BACT) and must apply forrevised operating permit.
CSHP Legal History
Sierra Club Files Open Records Request in 2006
Sierra Club Indicates Filing of Lawsuit in December 2006
Sierra Club Files Lawsuit in May 2007
On November 7, 2007, the US District Court for Western District of Wisconsin Issued a Decision Finding That Three of Five Projects Between 1996 and 2004 Violated the Clean Air Act’s NSR Provisions
On November 21, 2007, Sierra Club and State of Wisconsin Announce a Consent Decree to Transition Charter Street and 12 Other Coal‐Burning Facilities
• 15% Coal Reduction at CSHP Beginning 1/1/08
• Feasibility Study for CSHP and CHPP By 7/2008
• Lookback Study for 12 Other Coal‐Burning Facilities By 12/2008 (Eight Univ. of Wisconsin Institutions)
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 10
CSHP Comprehensive Heating Plant Study, July 2008 Four Options Analyzed
• Option 1 – BACT on Existing Coal Boilers, New Gas Boiler
• Option 2 – Integrated Gasification Combined Cycle Including Six Gasifiers and Two 350,000 PPH Syngas Fired Boilers
• Option 3 – Two 350,000 PPH Gas/Oil Boilers
• Option 4 – Two 350,000 PPH Hybrid Biomass CFB Boilers
Notes: - Options 2, 3 and 4 Retire Existing Coal Boilers and Include Back Pressure Steam Turbine Cogeneration
- Options 2 and 4 Capable of Burning Biomass and Fossil Fuels
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 11
CSHP Rebuild Project
Original Project Scope
• Two 225,000 PPH Packaged Gas/Oil Boilers
• One 350,000 PPH Biomass Boiler w/AQCS and Solid Fuel Handling
• Offsite Rail and Bike Path
• 20 MW Back Pressure Steam Turbine Cogeneration
• Balance of Plant Upgrades
• Decommissioning of All Four Coal Fired Boilers
• $250.6 Million Project Cost
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 12
2010 Conceptual
CSHP Rebuild Project
Concept Diagrams
CSHP Rebuild Project
Concept Diagrams
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 13
CSHP Rebuild Project
Project Budget (Enumerated at $250,600,000)Phase A – Packaged Boilers
Phase B – Biomass Boiler, AQCS and Solid Fuel Handling
Phase C – Offsite Rail and Bike Path
Phase D – Steam Turbine Generator
Phase E – Balance of Plant
$ 20,000,000
111,600,000
4,400,000
12,200,000
36,000,000
Overhead and Contractor Fee
Owners Costs
16,000,000
50,400,000
200,200,000
Total Project Cost 250,600,000
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 14
Original Project Scope
• Two 225,000 PPH Packaged Gas/Oil Boilers
• One 350,000 PPH Biomass Boiler w/AQCS and Solid Fuel Handling
• Offsite Rail and Bike Path
• 20 MW Back Pressure Steam Turbine Cogeneration
• Balance of Plant Upgrades
• Decommissioning of All Four Coal Fired Boilers
• $250.6 Million Project Cost
Revised Project Scope
• Four Two 225,000 PPH Packaged Gas/Oil Boilers
• One 350,000 PPH Biomass Boiler w/AQCS and Solid Fuel Handling
• Offsite Rail and Bike Path
• 20 MW Back Pressure Steam Turbine Cogeneration
• Balance of Plant Upgrades
• Decommissioning of All Four Coal Fired Boilers
• $188.3250.6 Million Project Cost
CSHP Rebuild Project
Revised Project Scope
• Four Two 225,000 PPH Packaged Gas/Oil Boilers
• One 350,000 PPH Biomass Boiler w/AQCS and Solid Fuel Handling
• Offsite Rail and Bike Path
• 20 MW Back Pressure Steam Turbine Cogeneration
• Balance of Plant Upgrades
• Decommissioning of All Four Coal Fired Boilers
• $188.3250.6 Million Project Cost
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 15
CSHP Rebuild Project
November 2010
CSHP Rebuild Project
February 2011
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 16
CSHP Rebuild Project
May 2011
CSHP Rebuild Project
July 2011
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 17
CSHP Rebuild Project
July 2011
CSHP Rebuild Project
October 2011
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 18
CSHP Rebuild Project
January 2012
CSHP Rebuild Project
February 2012
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 19
CSHP Rebuild Project
March 2012
CSHP Rebuild Project
April 2012
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 20
CSHP Rebuild Project
May 2012
CSHP Rebuild Project
May 2012
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 21
CSHP Rebuild Project
May 2012
CSHP Rebuild Project
August 2012
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 22
CSHP Rebuild Project
September 2012
Plant Dispatching
MG&E Sp‐3
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 23
Plant Dispatching
MG&E Sp‐3
• Generation Credit
• $0.12329 per kW per Day
• Special Terms & Provisions
• UW Owns a Share of WCCF (100% Chilled Water, 25% Thermal)
• WCCF Generators are Operating, Chillers Receive Station Service, No Demand
• WCCF Off (Available), On‐Peak, 8,500 Btu/kWh Heat Rate (Daily or FOM Gas)
• WCCF Off (Available), Off‐Peak, Sp‐3, No Demand
• WCCF Off (Not Available), Real‐Time LMP Plus 10%
Plant Dispatching
MG&E LS‐1
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 24
Plant Dispatching
MG&E LS‐1 + IGD‐1 Distribution ($0.0343/Therm)
Plant Dispatching
Cooling Season Dispatch Order (Current)
• WCCF (1) 20,000 Tons (Electric) No Demand
• CSHP 26,000 Tons (Steam) + Cogeneration
• WSHP 9,000 Tons (Steam)
• WSHP 11,000 Tons (Electric) Plus Demand
Notes: (1) In 2015, an additional 10,000 tons will be available at WCCF. This capacity is subject to demand charges.
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 25
Plant Dispatching
Heating Season Dispatch Order (Current)
• Firm Capacity (Unaffected by Electric “Blips”)
• CSHP (1) 300,000 PPH + Cogeneration
• WCCF (2) 200,000 PPH (15% Dispatch Benefit)
• WCCF (3) 200,000 PPH (15% Dispatch Benefit)
• Non‐Firm Capacity (Electric “Blips” Can Cause Boiler Trips)
• WSHP/CSHP 1,050,000 PPH
Notes: (1) In 2014, an additional 450,000 PPH of firm capacity will be available at CSHP (2) UW is responsible for uneconomic dispatch costs when WCCF is not selected by MISO (<25 MW)(3) UW takes additional steam when WCCF is selected by MISO
Plant Dispatching
MG&E Sp‐3
Current
MG&E Proposed2013 Rate Case
UW‐Madison September 13, 2012
CSHP Rebuild Project and Campus Utility Infrastructure Requirements 26
Plant Dispatching
Cooling Season Dispatch Order (Future?)
• WCCF (1) 20,000 Tons (Electric) No Demand
• WCCF 10,000 Tons (Electric) Plus Demand
• WSHP 11,000 Tons (Electric) Plus Demand
• CSHP 26,000 Tons (Steam) + Cogeneration ?
• WSHP 9,000 Tons (Steam)
Heating Season Dispatch Order (Future?)
• Same as Previous
Questions