Presupuesto de obra civil de rampas de ClaroPartidas UndObras Provisionales
Trazo, replanteo y estacado m2Limpieza en obra diaBaños Portatiles mesGrupo Electrogeno mesCerco Provisional mlCaseta para Oficina-Almacen m2Demolición de losa de concreto m2Demolición de muro de concreto m3
Movimiento de Tierras
Excavación de zanjas o zapatas en Terreno Normal m3
Eliminación de material excedente m3
Relleno compactado c/compactadora con material de préstamo m3
Obras de Concreto Simple
Solado cemento hormigón 1:12 e=2" m2
Poyos para estacionamientos Und
Obras de Concreto Armado
Zapata
Concreto zapata fc=210 kg/cm2 m3
Acero de Zapata Kg
Placa
Concreto Placas fc=2120 Kg/cm2 m3
Acero de Placas Kg
Encofrado de Placas m2
Losa de Discapacitados
Concreto Losa fc=210 kg/cm2 m3
Acero de Losa Kg
Encofrado de Losa m2
Losa de Pampa Vehicular
Concreto Losa fc=210 kg/cm2 m3
Acero de Losa Kg
Revoque y Enlucidos
Tarrajeo Sobrecimiento m2
Bruñado m2
Base imprimante en muros, Placas y vigas m2
Pintura esmalte color , 2 manos m2
Falsa columna de superboard Und
Remover y aplicar pintura Und
Condiciones comerciales1. OC antes de iniciar los trabajos2. Adelanto del 50% de la OC, valorizaciones semanales3. Tiempo de ejecución 28 dias a partir del deposito de adelanto4. No incluye instalaciones electricas
Presupuesto de obra civil de rampas de Claro Primera Valorizacion Valorizacion FinalMetrado Precio ( S/.) Total ( S/.)
78.06 3.15 245.96 80% 196.767 100% 245.958
28.00 75.00 2,100.00 80% 1680.000 100% 2100.000
1.00 340.00 340.00 80% 272.000 100% 340.000
1.00 950.00 950.00 80% 760.000 100% 950.000
68.00 42.00 2,856.00 80% 2284.800 100% 2856.000
25.00 107.00 2,675.00 80% 2140.000 100% 2675.000
52.98 49.53 2,624.10 80% 2099.280 100% 2624.099
3.68 404.00 1,484.70 80% 1187.760 100% 1484.7000.000 0.000
55.29 60.88 3,365.69 80% 2692.552 100% 3365.690
74.64 50.73 3,786.40 80% 3029.121 100% 3786.401
62.41 63.89 3,987.20 80% 3189.760 100% 3987.200
0.000 0.000
17.46 24.01 419.22 80% 335.376 100% 419.220
1.00 750.00 750.00 80% 600.000 100% 750.000
0.000 0.000
0.000 0.000
6.86 293.66 2,015.79 80% 1612.629 100% 2015.786
209.03 3.91 817.18 80% 653.744 100% 817.180
0.000 0.000
5.96 435.15 2,595.39 80% 2076.311 100% 2595.389
465.47 3.95 1,839.63 80% 1471.705 100% 1839.631
62.80 46.48 2,918.48 80% 2334.785 100% 2918.482
0.000 0.000
5.20 316.50 1,645.81 80% 1316.646 100% 1645.808
433.99 3.91 1,696.67 80% 1357.335 100% 1696.669
26.00 53.82 1,399.30 80% 1119.436 100% 1399.295
0.000 0.000
8.32 316.50 2,632.03 80% 2105.621 100% 2632.027
332.20 3.91 1,298.70 80% 1038.964 100% 1298.704
0.000 0.000
45.79 25.26 1,156.66 80% 925.329 100% 1156.661
81.44 21.77 1,772.56 80% 1418.051 100% 1772.563
45.79 4.72 216.13 80% 172.906 100% 216.133
45.79 5.90 270.26 80% 216.205 100% 270.256
1.00 850.00 850.00 80% 680.000 100% 850.000
1.00 1,250.00 1,250.00 80% 1000.000 100% 1250.00049,958.85 39,967.08 49,958.85
GG 7.5% 3,746.91 2,997.53 3,746.91UU 7.5% 3,746.91 2,997.53 3,746.91
55,000.00 43,509.46 55,000.00
Adelanto 27,500.00Primera valorizaciòn 16,009.46Valorizacion Final 11,490.54
OBRA: Emplazamiento Mirador de TalaveraIT
EM
ACTIVIDAD
UN
IDA
D
1.00 CAPÍTULO I. EXCAVACIÓN Y MOVIMIENTO DE TIERRAS.
2.00 M3. RELLENO CON PRODUCTOS DE BANCO.
Relleno con material de préstamo m3
3.00 M2. TENDIDO DE GRAVA TRITURADA.
Piso de ripio de piedra de1/2", capa de 4" m2
4.00 M3. CONCRETO SIMPLE
Solado m2
Concreto ciclopeo m3
5.00 M3. CONCRETO f’c = 210 Kg./cm2
Concreto f´c=210 kg/cm2 m3
6.00 KG. ACERO DE REFUERZO EN ARMADURAS.
KG ACERO KG
7.00 M2. CIMBRA Y DESCIMBRA COMÚN.
Encofrado m2
8.00 LT. GROUT.
Grouting lt
9.00 UNIDAD. DE PORTÓN METÁLICO DE ACCESO 2.50X2.50M.
Puerta metálica contraplacada m2
11.00 UNIDAD BASE DE REGISTRO
Tapa de concreto para registro und
12.00 M3. TIERRA DE CULTIVO PARA PUESTA A TIERRA
TIERRA DE CULTIVO PARA PUESTA A TIERRA m3
Bentonita bls
13.00 UNIDAD BOLSA DE CEMENTO CONDUCTIVO
kit de parres kg
14.00 M2. MURO DE TABIQUE ROJO RECOCIDO.
Muro de Soga con ladrillo KK m2
Muro de Cabeza con ladrillo KK m2
15.00 M2. APLANADO CON MORTERO CEMENTO-ARENA EN MUROS Y PLAFONES.
Tarrajeo de columnas, sobrecimiento, vigas, primario m2
16.00 DISTRIBUCIÓN ELECTRICA
Poste de CAC 12M
Poste de CAC 13M
poste de madera de 12M
Transformador / Trafomix
CANTIDADES ACARREO
PESOS (kg)
PESO PARCIAL (Tn) ACARREO
TRANSPORTE DESDE LIMA
OBRAS CIVILES PESO (Kg)
FIERRO GALVANIZADO PESO (Kg)
TOTAL
Lugar del Emplazamiento de Telecomunicaciones Costo x Kg
Lima Metropolitana S/. 0.05
Lima Provincias , Ancash e Ica S/. 0.15
La Libertad , Lambayeque, Arequipa, Moquegua S/. 0.20
Junin, Huanuco, Huancavelica, Pasco, Ayacucho, Piura, Tumbes, Tacna S/. 0.25
Cajamarca, Apurimac, Cuzco y Puno S/. 0.28
San Martin, Amazonas, Ucayali, Madre de Dios S/. 0.35
Loreto S/. 0.70
TOTAL
TRANSPORTE EN ZONA
OBRAS CIVILES PESO (Kg)
Distancia de Materiales dentro de la zona del emplazamiento Costo x Kg
TRANSPORTE DE MATERIALES CON VEHÍCULO. D<10 KM S/. 0.025
TRANSPORTE DE MATERIALES CON VEHÍCULO. 10 KM<D<50 KM S/. 0.030
TRANSPORTE DE MATERIALES CON VEHÍCULO. D>50 KM S/. 0.035
TOTAL
ACARREO DE MATERIALES DE:El peso del transporte de acarreo se calculará de acuerdo a la siguiente tabl
ITEM DESCRIPCIÓN UNIDAD
1 Concreto armado y simple ( Incluye Acero y encofrado) Tn/M32 Muro de mamposteria (Incluye mortero) Tn/M23 Confitillo Tn/M34 Tierra de Chacra para SPAT del emplazamiento Tn/M35 Estructura Metálica ( de acuerdo al Paking List) Tn
PESO TOTAL DE ACARREOTIEMPO TOTAL DE ACARREO
DESCRIPCIÓN UNIDAD
Transporte con peon Kgx HoraSUB TOTAL SIN I.G.V
ACARREO CON PEON
TIEMPO DE SUBIDA Y BAJADA REALIZADO POR 01 PEON LLEVANDO 30 KG 45.00
NUMERO DE VIAJES REALIZADOS POR EL PEON EN 01 DIA 10.67
CANTIDAD DE KILOGRAMOS ACARREADOS POR EL PEON DE ZONA EN 01 DIA 320.00
JORNAL PAGADO AL PEON DE ZONA EN 01 DIA 70.00
COSTO POR ACARREAR 01 KILOGRAMO A LA OBRA 0.22
ZONAL ZONAL ZONAL ZONAL
ME
TR
AD
O
ho
rmig
on
(M
3)
62.41 1.30
#REF!
0.090.00 0.48 1.1
0.50 1.1
#REF!
#REF!
#REF!
#REF!
#REF!
5,300.00
#REF!#REF!
pie
dra
me
dia
na
(M
3)
pie
dra
gra
nd
e
(M3
)
afir
ma
do
tip
o A
-
1 (
M3
)
#REF!
0.000.000.000.00
#REF! #REF! #REF! #REF!
1800 1800 1700 1600
#REF! #REF! #REF! #REF!
TRANSPORTE DESDE LIMA
#REF! Kg
#REF! Kg
#REF! Kg
Material que proviene
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
TOTAL #REF!
TRANSPORTE EN ZONA
Peso del material que proviene de Lima en Kg
#REF! Kg
S/. 0.00
S/. 0.00
#REF! #REF!
TOTAL #REF!
SUB TOTAL #REF!
Peso Unitario Metrado
2.5 #REF! #REF!0.18 #REF! #REF!1.8 #REF! #REF!1.7 0.00 01 #REF! #REF!
PESO TOTAL DE ACARREO #REF!
TIEMPO TOTAL DE ACARREO 0.5 30 minutos
PRECIO UNITARIO EN S/. Metrado (KgxH) PRECIO EN S/.
S/. 0.22 #REF! #REF!
SUB TOTAL SIN I.G.V #REF!
ACARREO CON PEON
MINUTOS
VIAJES
KILOGRAMOS
NUEVOS SOLES 109.92NUEVOS SOLES
Peso del Transporte desde Lima en Kg
Monto en Nuevos Soles
Sub total de peso
ZONAL ZONAL ZONAL ZONAL LIMA LIMA LIMA ZONALco
nfit
illo
(m
2)
Are
na
Fin
a (
M3
)
Gro
utin
g (
bls
)
ag
ua
(m
3)
0.080
0.10
0.25 0.0102.9 0.0856.5 0.085
0.9 0.4 9.5 0.18
1.0
0.200
0.03 0.22 0.0100.07 0.45 0.010
pie
dra
ch
an
cad
a
(M2
)
Are
na
Gru
esa
(M
3)
Ce
me
nto
Tip
o I
I (b
ls)
Ce
me
nto
Tip
o I
(b
ls)
0.016 0.12 0.004
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1800 1800 1600 1500 3 43 43 1000
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
LIMA LIMA ZONAL LIMA LIMA LIMA ZONAL ZONAL LIMA
1
0.230 0.22 2.57
1.20
0.022 36 0.40.022 54 0.4
Cla
vo c
on
ca
be
za
pre
cio
pro
me
dio
(k
gr)
Ala
mb
re N
eg
ro
N°8
(kg
r)
Ma
de
rNa
cio
na
l p
ara
en
cofr
ad
o
(p2
)
Ala
mb
re n
eg
ro
Re
coci
do
#1
6
(kg
)
Fie
rro
Co
rru
ga
do
P
rom
ed
io (
kgr)
T
OT
AL
lad
rillo
kk
18
h
ue
cos
(un
d)
Ma
de
ra
An
da
mia
je (
p2
)
Tie
rra
de
Cu
ltivo
(M
3)
Do
sis
Qu
ímic
a
Th
org
el (
bls
)
0.022 0.201
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1 1 0.30 1 1.00 3.05 0.30 1600 5
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2.70
LIMA LIMA LIMA LIMA LIMA LIMA LIMA LIMA
kit
pa
rre
s
Be
nto
nita
(b
ls)
Po
ste
CA
C 1
2M
Po
ste
CA
C 1
3M
Po
ste
de
Ma
de
ra
Tra
nsf
orm
ad
or
1
1
1
1
ba
se y
ta
pa
de
re
gis
tro
Pu
ert
a m
eta
lica
co
ntr
ap
laca
da
1
1
1
1
#REF! 1.00 #REF! #REF! #REF! #REF! #REF! #REF!
30 56 1 30 960 1100 380 380
#REF! 56.00 #REF! #REF! #REF! #REF! #REF! #REF!
ANALISI DE P R E C I O S U N I T R I O S SIN I.G.V.
BÚSQUEDA DE SITIOS MANO DE OBRAArquitecto / CivilAbogadoArqueologo
EQUIPO Y HERRAMIENTASBRUJULACAMARAGPSTELEFONOTRANSPORTE INTERNOVIATICOS
OBTENCIÓN DE DOCUMENTOS Y ESTUDIO DE TÍTULOS MANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
SUSCRIPCIÓN DEL CONTRATO MANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
MANO DE OBRAAbogado
LICENCIA DE CONSTRUCCIÓN PARA UN EMPLAZAMIENTO DE TELECOMUNICACIONES, SISTEMA DE DISTRIBUCIÓN ELÉCTRICA, ADECUACIONES E IMPLEMENTACIONES
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
OBTENCIÓN DE CERTIFICADO DE PARAMETROS URBANISTICOS (CPU)MANO DE OBRATramitador
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
MANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
MANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
INGRESO DE CARTA DE CONSULTA Y SEGUIMIENTO ANTE LA AUTORIDAD DE SERNANP
INGRESO DE SOLICITUD Y SEGUIMIENTO ANTE LA AUTORIDAD NACIONAL DEL AGUA (ANA)
ESTUDIO TEORICO DE RADIACIONES NO IONIZANTESEQUIPO Y HERRAMIENTASESTUDIO TEORICO DE RADIACIONES NO IONIZANTES
CERTIFICADO DE LA DIRECCIÓN GENERAL DE ASUNTOS SOCIOAMBIENTALESMANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
MANO DE OBRACadistaTramitadorAbogadoArqueologo x dia
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
MANO DE OBRAELABORACIÓN DEL EXPEDIENTE Y OBTENCIÓN DEL DICTAMEN DEL DGACAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
TRAMITACIÓN PARA LA OBTENCIÓN DEL CERTIFICADO DE INEXISTENCIA DE RESTOS ARQUEOLÓGICOS (CIRA) Y PMA
ELABORACIÓN E INGRESO DEL EXPEDIENTE Y OBTENCIÓN DEL DICTAMEN DEL ORGANISMO REGULADOR DE AERONAUTICA CIVIL O FUERZA AEREA
MANO DE OBRAELABORACIÓN DE ESTUDIO DE IMPACTO AMBIENTAL A NIVEL MINISTERIALAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
MANO DE OBRAELABORACIÓN DE ESTUDIO DE IMPACTO AMBIENTAL A NIVEL MINISTERIALAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
MANO DE OBRACadistaArquitecto / Civil
ELABORACIÓN Y SEGUIMIENTO DE EXPEDIENTE ANTE RESPUESTA NEGATIVA ENVIADA POR SERNANP
ELABORACIÓN Y SEGUIMIENTO DE EXPEDIENTE ANTE RESPUESTA NEGATIVA ENVIADA POR LA AUTORIDAD NACIONAL DEL AGUA
ANTEPROYECTO PARA UN EMPLAZAMIENTO DE TELECOMUNICACIONES, SISTEMA DE DISTRIBUCIÓN ELÉCTRICA, ADECUACIONES E IMPLEMENTACIONES
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOHERRAMIENTAS DE GABINETEVIATICOSPASAJE IDA & VUELTA
MANO DE OBRAPeonTopografo
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOHERRAMIENTAS DE GABINETEVIATICOSTEODOLITOPASAJE IDA & VUELTA
EVALUACIÓN ESTRUCTURAL DE EDIFICACIÓN EXISTENTEMANO DE OBRAArquitecto / Civil
EQUIPO Y HERRAMIENTASHERRAMIENTAS DE GABINETE
MANO DE OBRAIngeniero ElectronicoIngeniero ElectricistaArquitecto / CivilCadista
EQUIPO Y HERRAMIENTASHERRAMIENTAS DE GABINETE
LEVANTAMIENTO TOPOGRAFICO PARA EMPLAZAMIENTOS NUEVOS EN ZONAS RURALES
PROYECTO PARA UN EMPLAZAMIENTO DE TELECOMUNICACIONES, SISTEMA DE DISTRIBUCIÓN ELÉCTRICA, ADECUACIONES E IMPLEMENTACIONES
TRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
MANO DE OBRAIngeniero Electricista
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
ESTUDIO DE RESISTIVIDADEQUIPO Y HERRAMIENTASESTUDIO DE RESISTIVIDAD
ESTUDIO DE SUELOSEQUIPO Y HERRAMIENTASESTUDIO DE SUELOS
ESTUDIO DE LINEA DE VISTAEQUIPO Y HERRAMIENTASESTUDIO DE SUELOS
Gestión ante concesionarias para obtención de suministro eléctrico- Energia Provisional
PROYECTO DE REFORZAMIENTO DE EDIFICACIÓNMANO DE OBRAArquitecto / CivilCadista
EQUIPO Y HERRAMIENTASHERRAMIENTAS DE GABINETE
INFORME PRIVADO DEL ARQUEOLOGOMANO DE OBRAInforme privado del arqueologoArqueologo
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
MANO DE OBRACadistaTramitadorAbogadoArqueologo
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
TRAMITACIÓN PARA LA OBTENCIÓN DEL CERTIFICADO DE INEXISTENCIA DE RESTOS ARQUEOLÓGICOS (CIRA)
MANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
PLAN DE MONITOREO ARQUEOLÓGICOMANO DE OBRAArqueologo
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
MANO DE OBRATramitador
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
MANO DE OBRAELABORACIÓN DE ESTUDIO DE IMPACTO AMBIENTAL A NIVEL MINISTERIALAbogado
EQUIPO Y HERRAMIENTAS
ELABORACIÓN E INGRESO DEL EXPEDIENTE Y OBTENCIÓN DEL DICTAMEN DEL ORGANISMO REGULADOR DE AERONAUTICA CIVIL O FUERZA AEREA
INGRESO DE CARTA DE CONSULTA Y SEGUIMIENTO ANTE LA AUTORIDAD DE SERNANP
ELABORACIÓN Y SEGUIMIENTO DE EXPEDIENTE ANTE RESPUESTA NEGATIVA ENVIADA POR SERNANP
TRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
RESOLUCIÓN DE CONFLICTOS POR CONTINGENCIA SOCIALMANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
RESOLUCIÓN DE CONFLICTOS POR CONTINGENCIA MUNICIPALMANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
OBTENCIÓN DE CERTIFICADO DE PARAMETROS URBANISTICOS (CPU)MANO DE OBRATramitador
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
ESTUDIO DE IMPACTO AMBIENTALMANO DE OBRA
ELABORACIÓN DE ESTUDIO DE IMPACTO AMBIENTALIngeniero Ambiental
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
MANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
MANO DE OBRAELABORACIÓN DE ESTUDIO DE IMPACTO AMBIENTAL A NIVEL MINISTERIALAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
MANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOS
INGRESO DE SOLICITUD Y SEGUIMIENTO ANTE LA AUTORIDAD NACIONAL DEL AGUA (ANA)
ELABORACIÓN Y SEGUIMIENTO DE EXPEDIENTE ANTE RESPUESTA NEGATIVA ENVIADA POR LA AUTORIDAD NACIONAL DEL AGUA
OBTENCIÓN DE CONFORMIDAD DE OBRA POR LA CONSTRUCCIÓN DE UN EMPLAZAMIENTO DE TELECOMUNICACIONES, SISTEMA DE DISTRIBUCIÓN O UTILIZACIÓN ELÉCTRICA, ADECUACIONES E IMPLEMENTACIONES, ETC
PASAJE IDA & VUELTA
RESOLUCIÓN DE CONTRATOSMANO DE OBRAAbogado
EQUIPO Y HERRAMIENTASTRANSPORTE INTERNOVIATICOSPASAJE IDA & VUELTA
ALQUILER DE DÍA DE CAMIONETAEQUIPO Y HERRAMIENTASCAMIONETA PICK UP DOBLE CABINA 4 X 4
Items
1.00 OBRAS PRELIMINARES Y PROVISIONALES
1.03
MANO DE OBRAPeso total a transportar
1.05 Caseta provisional para guardianía y almacén (sólo en sites en zona rural)MANO DE OBRACapatazOperarioOficial
Agua llevada en cisterna a pie de obra para sites en zona rural. No aplica en ciudades.
Peon
MATERIALESClavosCalamina 0.8x1.8mCerradura Cantol blindada 1000COLA SINTETICA Madera Huayruro o TornilloPintura esmalteTRIPLAY LUPUNA 4X8X6 MM Vidrio crudo incoloro simple
EQUIPO Y HERRAMIENTASHerramientas Manuales
1.08 Cerco provisional con plásticoMANO DE OBRACapatazOperarioPeon
MATERIALESClavosPlasticoMadera Huayruro o Tornillo
EQUIPO Y HERRAMIENTASHerramientas Manuales
1.20 Demolición de piso de cemento pulido (espesor hasta 0.10m)MANO DE OBRACapatazOperarioPeon
EQUIPO Y HERRAMIENTASCOMPRESORA NEUMATICA DIESEL 250PCM-87HP MARTILLO NEUMATICO 25-29 KG SIN PUNTA Herramientas Manuales
1.23 Depósito provisional de agua de construcciónMANO DE OBRACapatazOperario
MATERIALESDepósito provisional de agua de construcción
EQUIPO Y HERRAMIENTASHerramientas Manuales
1.26 Desmontaje de estructura metálica curva con tijeralesMANO DE OBRACapatazOperario
EQUIPO Y HERRAMIENTASHerramientas Manuales
1.30 Guardianía de obra, turno nocheMANO DE OBRAPeon
1.32 Picado de concreto para anclar columnasMANO DE OBRACapatazOperarioPeon
EQUIPO Y HERRAMIENTASCOMPRESORA NEUMATICA DIESEL 250PCM-87HP
MARTILLO NEUMATICO 25-29 KG SIN PUNTA Herramientas Manuales
Picado y resane de pared MANO DE OBRACapatazOperarioPeon
MATERIALESArena FinaCemento Portland tipo I
EQUIPO Y HERRAMIENTASCOMPRESORA NEUMATICA DIESEL 250PCM-87HP MARTILLO NEUMATICO 25-29 KG SIN PUNTA Herramientas Manuales
Rotura, picado y resane de piso, acabado similar al existenteMANO DE OBRACapatazOperarioPeon
MATERIALESArena FinaPiso ceramico de 45x45Pegamento x25kgArena gruesaCemento Portland tipo I
EQUIPO Y HERRAMIENTASCOMPRESORA NEUMATICA DIESEL 250PCM-87HP MARTILLO NEUMATICO 25-29 KG SIN PUNTA Herramientas Manuales
1.74 Trazo, replanteo y estacado sin aparatosMANO DE OBRACapatazOperario Peon
MATERIALESHormigonCemento Portland tipo ITiza bolsa de 40 kgOcre rojoCordelPintura esmalte
EQUIPO Y HERRAMIENTASHerramientas Manuales
Limpieza y despalmeMANO DE OBRACapatazPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
1.75 Trabajos en altura (andamiaje)EQUIPO Y HERRAMIENTASAndamios
2.00 Movimiento de tierras
2.01b Corte en Roca dura con martilloMANO DE OBRACapatazOperario OficialPeon
EQUIPO Y HERRAMIENTASCOMPRESORA NEUMATICA DIESEL 250PCM-87HP MARTILLO NEUMATICO 25-29 KG SIN PUNTA Herramientas Manuales
2.01e Corte en Terreno NormalMANO DE OBRACapatazPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
2.04a Excavación de zanjas o zapatas en Roca dura con quemadoresMANO DE OBRACapatazOperarioOficialPeon
EQUIPO Y HERRAMIENTASCOMPRESORA NEUMATICA DIESEL 250PCM-87HP MARTILLO NEUMATICO 25-29 KG SIN PUNTA Herramientas Manuales
2.04d Excavación de zanjas o zapatas en roca sueltaMANO DE OBRACapatazOperario OficialPeon
EQUIPO Y HERRAMIENTASCOMPRESORA NEUMATICA DIESEL 250PCM-87HP MARTILLO NEUMATICO 25-29 KG SIN PUNTA Herramientas Manuales
2.04e Excavación de zanjas o zapatas en Terreno NormalMANO DE OBRACapatazPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
Corte inicial en Terreno NormalMANO DE OBRACapatazPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
2.08
Relleno compactado c/compactadora con material de préstamo
CapatazOperador de equipoPeon
MATERIALESAfirmadoAgua
EQUIPO Y HERRAMIENTASCOMPACTADOR VIB. TIPO PLANCHA 4HPHerramientas Manuales
Compactacion de terreno naturalMANO DE OBRACapatazPeon
MATERIALESAgua
EQUIPO Y HERRAMIENTASCOMPACTADOR VIB. TIPO PLANCHA 4HPHerramientas Manuales
Demolición masiva MANO DE OBRACapatazOperador de equipoPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
2.00Eliminación de material excedente
MANO DE OBRACapatazPeon
EQUIPO Y HERRAMIENTASCAMION VOLQUETE DE 10 m3Herramientas Manuales
Eliminación de material excedente al relleno a pie de obra (manual)MANO DE OBRACapatazPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
3.00 Obras de concreto simple
3.01 Cimiento corrido con C: 1:10 + 30% PG (Cemento Tipo I)MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESAceite de motor
AguaCemento Portland tipo IGasolina de 90 octanosGrasa MultipleHormigonPIEDRA GRANDE
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Herramientas Manuales
3.06 Solado cemento hormigón 1:12 e=2"MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESHORMIGONCemento Portland tipo IGasolina de 90 octanosAceite de motorGrasa MultipleAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Herramientas Manuales
Encofrado sobrecimientoMANO DE OBRACapatazOperarioOficial
MATERIALESMadera para enconfradoClavosAlambre Negro N 8
EQUIPO Y HERRAMIENTASHerramientas Manuales
Contrapiso de 2"MANO DE OBRACapatazOperarioOficialOperador de equipoPeon
MATERIALESCemento Portland tipo IGasolina de 90 octanosAceite de motorGrasa MultipleArena GruesaRegla de maderaAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Herramientas Manuales
4.00 PRUEBAS EN GENERAL DEL SISTEMA DE TIERRA, AISLAMIENTO, TABLEROS ELECTRICOS, ARTEFACTOS DE ALUMBRADO, ETC.
MANO DE OBRAOficialIngeniero Electricista
EQUIPO Y HERRAMIENTASTELUROMETROHerramientas Manuales
PRUEBAS EN GENERAL DEL SISTEMA DE TIERRA, AISLAMIENTO, TABLEROS ELECTRICOS, ARTEFACTOS DE ALUMBRADO, ETC.
5.00 Obras de concreto armado
5.01a Concreto Columnas fc=2120 Kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.01b Encofrado de Columnas MANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
5.01c Acero de Columnas MANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
S/C a Concreto Muro de contención fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
S/C b Encofrado de Muro de contenciónMANO DE OBRACapatazOperarioPeon
MATERIALES
Madera para enconfradoPetroleoClavosAlambre Negro N 8
S/C c Acero de Muro de contenciónMANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
5.02 a Concreto Vigas y Dinteles fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.02 b Encofrado de Vigas y DintelesMANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
5.02 c Acero de Vigas y DintelesMANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
5.04 a Concreto Losa maciza armada fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"
Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.04 b Encofrado de Losa maciza armadaMANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
5.04 c Acero de Losa maciza armadaMANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
5.05 a Concreto Base de G.E. / tanque de D2 / pozo de drenaje D2 fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipo
OficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.05 b Encofrado de Base de G.E. / tanque de D2 / pozo de drenaje D2 MANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
5.05 c Acero de Base de G.E. / tanque de D2 / pozo de drenaje D2MANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
5.06 a Concreto Escalera fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.06 b Encofrado de EscaleraMANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
5.06 c Acero de EscaleraMANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
5.06 d Tarrajeo PulidoMANO DE OBRACapatazOperarioPeon
MATERIALESArena FinaCemento Portland tipo IClavosMadera para enconfradoAguaRegla de madera
EQUIPO Y HERRAMIENTASHerramientas Manuales
5.08a Dado de concreto fc=175 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.08b Encofrado de Dado de concretoMANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
5.11 a Concreto Sobrecimiento fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.11 b Encofrado de SobrecimientoMANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
5.11 c Acero de SobrecimientoMANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
5.12 a Concreto zapata fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosAceite de motorGrasa MultipleCemento Portland tipo IPiedra Chancada de 3/4"
Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolinaHerramientas Manuales
5.11 c Acero de ZapataMANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
Acero de Dado y/o SardinelMANO DE OBRACapatazOperarioOficial
MATERIALESAcero corrugado FY=4200 KG/CM2 GRADO 60Alambre Negro N 16
EQUIPO Y HERRAMIENTASCizallaHerramientas Manuales
5.12 b Encofrado de Sobrecimiento
MANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
Concreto en sardinel fc=210 kg/cm2MANO DE OBRACapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASMezcladora de concreto de 16 p3 Vibradora de gazolina
Concreto en losa aligerada fc=210 kg/cm2MANO DE OBRA
CapatazOperarioOperador de equipoOficialPeon
MATERIALESGasolina de 90 octanosCemento Portland tipo IPiedra Chancada de 1/2"Arena GruesaMadera para enconfradoAgua
EQUIPO Y HERRAMIENTASHerramientas ManualesMezcladora de concreto de 16 p3 WincheVibradora de gazolina
Encofrado de sardinelesMANO DE OBRACapatazOperarioPeon
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
Encofrado de losa aligeradaMANO DE OBRACapatazOperarioOficial
MATERIALESMadera para enconfradoPetroleoClavosAlambre Negro N 8
EQUIPO Y HERRAMIENTASHerramientas Manuales
6.00 MURO DE LADRILLO KK
6.03 Muro de soga con ladrillo KKMANO DE OBRACapatazOperarioPeon
MATERIALESArena GruesaCemento Portland tipo IClavosMadera para enconfradoAguaLADRILLO ARCILLA KING KONG 18 HUECOS (TIPO IV) 9x12.5x23cm
EQUIPO Y HERRAMIENTASHerramientas Manuales
Muro de cabeza con ladrillo KKMANO DE OBRACapatazOperarioPeon
MATERIALESArena Gruesa
Cemento Portland tipo IClavosMadera para enconfradoAguaLADRILLO ARCILLA KING KONG 18 HUECOS (TIPO IV) 9x12.5x23cm
EQUIPO Y HERRAMIENTASHerramientas Manuales
Muro de soga con ladrillo panderetaMANO DE OBRACapatazOperarioPeon
MATERIALESArena GruesaCemento Portland tipo IClavosMadera para enconfradoAguaLADRILLO ARCILLA PANDERETA 10x12x24cm
EQUIPO Y HERRAMIENTASHerramientas Manuales
7.00 TARRAJEOS
7.14 Tarrajeo SobrecimientoMANO DE OBRACapatazOperarioPeon
MATERIALESArena FinaCemento Portland tipo IClavosMadera para enconfradoAguaRegla de madera
EQUIPO Y HERRAMIENTASHerramientas Manuales
7.05 Tarrajeo de apoyos y sardinelesMANO DE OBRACapatazOperarioPeon
MATERIALESArena FinaCemento Portland tipo IClavosMadera para enconfradoAguaRegla de madera
EQUIPO Y HERRAMIENTASHerramientas Manuales
7.08 Tarrajeo de columnas y vigasMANO DE OBRACapatazOperarioPeon
MATERIALESArena FinaCemento Portland tipo IClavosMadera para enconfradoAguaRegla de madera
EQUIPO Y HERRAMIENTASHerramientas Manuales
7.11 Tarrajeo de muros de contención en exteriorMANO DE OBRA
CapatazOperarioPeon
MATERIALESArena FinaCemento Portland tipo IClavosMadera para enconfradoAguaRegla de madera
EQUIPO Y HERRAMIENTASHerramientas Manuales
7.15 Solaqueado de muros de albañilería armadaMANO DE OBRACapatazOperarioPeon
MATERIALESArena FinaCemento Portland tipo IAgua
EQUIPO Y HERRAMIENTASHerramientas Manuales
8.00 COBERTURAS
8.05 Cobertura con plancha translúcida Fibraforte e=1.75mmMANO DE OBRACapatazOperarioPeon
MATERIALESplancha translúcida Fibraforte e=1.75mm
EQUIPO Y HERRAMIENTASHerramientas Manuales
9.00 PISOS
9.07Piso de cemento pulido e=2" con Aditivo Impermeabilizante y PlastificanteMANO DE OBRACapatazOperarioOficialPeon
MATERIALESArena FinaArena GruesaCemento Portland tipo IAguaAditivo impermeabilizante y plastificante Chemaplast Regla de madera
EQUIPO Y HERRAMIENTASHerramientas Manuales
9.14 Piso de ripio con piedra de 1/2", capa de 4"MANO DE OBRACapatazOperarioPeon
MATERIALESPiedra Chancada de 1/2"
EQUIPO Y HERRAMIENTASHerramientas Manuales
11.00 CARPINTERIA METALICA Y CERRAJERIA
11.22 Concertina de acero inoxidable de diámetro 18"MANO DE OBRACapataz
OperarioPeon
MATERIALESConcertina de acero inoxidable de diámetro 18"Acero perfiles angularesGalvanizado en caliente de acero
EQUIPO Y HERRAMIENTASHerramientas Manuales
11.73
MANO DE OBRAMaestro en EEMMMontajistaPeon
MATERIALESAcero perfiles tubularesAcero planchasCandado marca YaleBisagra de Fe 6"x6" Chapa de parche de tres golpes marca Yale
EQUIPO Y HERRAMIENTASHerramientas Manuales
11.85
MANO DE OBRAMaestro en EEMMMontajistaPeon
MATERIALESAcero perfiles angularesGalvanizado en caliente de acero
EQUIPO Y HERRAMIENTASHerramientas Manuales
Puerta acanalada con plancha doblada e=1.5mm y perfiles cuadrados de 2"x2"x1.5"mm con marco de plancha doblada de 3/32"
Soporte de cableado para exteriores de 300 A 500mm construido en acero galvanizado en caliente - Incluye suministro e instalación
11.11 Instalación Candado Multi- LockMANO DE OBRACapatazOperario
MATERIALESCandado Multi- Lock
EQUIPO Y HERRAMIENTASHerramientas Manuales
Candado marca Yale de 2"MANO DE OBRACapatazOperario
MATERIALESCandado marca Yale de 2"
EQUIPO Y HERRAMIENTASHerramientas Manuales
entel
MANO DE OBRAMaestro en EEMMMontajistaPeon
MATERIALESAcero perfiles HGalvanizado en caliente de acero
EQUIPO Y HERRAMIENTAS
Provisión y Montaje Estructura de Acero SEMI PESADA O MENOR galvanizado por inmersión en caliente
Herramientas Manuales
entel
MANO DE OBRAMaestro en EEMMMontajistaPeon
MATERIALESAcero perfiles H
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazOperario
MATERIALESPernos HILTI 1/2"x4"Sikadur 31
EQUIPO Y HERRAMIENTASTALADROCOMPRESORA NEUMATICA DIESEL 250PCM-87HP Herramientas Manuales
Provisión y Montaje Estructura de Acero SEMI PESADA O MENOR galvanizado por inmersión en caliente (Aplica en soportes Varios y refuerzos de torre)
Pernos HILTI 1/2"x4" / Adhesivo epóxico HILTI - HIT HY 150 (12 perforaciones de hasta 10cm por juego)
13.00 PINTURAS
13.08 Pintura al barnizMANO DE OBRACapatazOperario
MATERIALESBarnizLija de pared
EQUIPO Y HERRAMIENTASHerramientas Manuales
Base anticorrosiva en carpintería metálica, 2 manos de pintura al sopleteMANO DE OBRACapatazOperario
MATERIALESPintura anticorrosiva
EQUIPO Y HERRAMIENTASHerramientas Manuales
Base imprimante en muros, columnas y vigasMANO DE OBRACapatazOperario
MATERIALESImprimante (30 kg)Lija de pared
EQUIPO Y HERRAMIENTASHerramientas Manuales
13.11 Pintura esmalte color , 2 manosMANO DE OBRACapatazOperario
MATERIALESPintura esmalteLija de pared
EQUIPO Y HERRAMIENTASHerramientas Manuales
13.11Pintura esmalte color , 2 manos, Base imprimante en muros, columnas y vigasMANO DE OBRACapatazOperario
MATERIALESImprimante (30 kg)Pintura esmalteLija de pared
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazOperario
MATERIALESPintura esmalteLija de acero
EQUIPO Y HERRAMIENTAS
Pintura esmalte en carpintería metálica, 2 manos al soplete,Base anticorrosiva en carpintería metálica, 2 manos de pintura al soplete
Herramientas Manuales
13.12
MANO DE OBRACapatazOperario
MATERIALESPintura anticorrosivaPintura esmalteLija de acero
EQUIPO Y HERRAMIENTASHerramientas Manuales
14.00 OTRAS OBRAS
14.01Aditivo acelerante de fragua Chema Struct (01 gal por m3 - concreto f'c=210 kg/cm2)MANO DE OBRACapatazOperario
MATERIALESAditivo acelerante de fragua Chema Struct (01 gal por m3 - concreto f'c=210 kg/cm2)
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazPeonOperario
Pintura esmalte en carpintería metálica, 2 manos al soplete,Base anticorrosiva en carpintería metálica, 2 manos de pintura al soplete
Fabricación e instalación de polímeros para RF de 4mm de espesor y 3.1 m de altura, conformado por resinas, monoestierno y pintura macropoxi 690, etc.
MATERIALESCerramiento de polimero con accesorios
EQUIPO Y HERRAMIENTASHerramientas Manuales
Pegamento epóxico para pegar concreto nuevo con el existenteMANO DE OBRACapatazPeonOperario
MATERIALESSikadur 32
EQUIPO Y HERRAMIENTASHerramientas Manuales
14.16 Aditivo Grouting - NS Grout e=2"MANO DE OBRACapatazPeonOperario
MATERIALESSikagrout
EQUIPO Y HERRAMIENTASHerramientas Manuales
14.16 Junta de dilatación de tecnopor de 1" entre columnas del cerco y del G.E.MANO DE OBRACapatazOperario
MATERIALEStecnopor de 1"x0.5cm
EQUIPO Y HERRAMIENTASHerramientas Manuales
14.18 Limpieza final de la obraMANO DE OBRACapatazPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
14.18 Pozo sumidero de 0,60x0,80MANO DE OBRACapatazOperario
MATERIALESMaterial para un Pozo sumidero
EQUIPO Y HERRAMIENTASHerramientas Manuales
15.00 INSTALACION SANITARIA
Red de desagüe PVC SAP 4"MANO DE OBRACapatazPeon
Operario
MATERIALESPEGAMENTO P/TUBO PVCTUBO PVC DESAGUE SAL 4" X 3 m
EQUIPO Y HERRAMIENTASHerramientas Manuales
Red de desagüe PVC SAP 2"MANO DE OBRACapatazPeonOperario
MATERIALESPEGAMENTO P/TUBO PVCTUBO PVC DESAGUE SAL 2" X 3 m
EQUIPO Y HERRAMIENTASHerramientas Manuales
Drenaje de equipos de aire acondicionado. Incluye concreto a lo largo de la tuberíaMANO DE OBRACapatazPeonOperario
MATERIALESPEGAMENTO P/TUBO PVCconcreto sobre tuberiaTUBO PVC DESAGUE SAL 2" X 3 m
EQUIPO Y HERRAMIENTASHerramientas Manuales
Pintura al latex con base de imprimanteMANO DE OBRACapatazOperarioPeon
MATERIALESImprimante (30 kg)Lija de maderaPintura Latex
EQUIPO Y HERRAMIENTASHerramientas Manuales
Enchape cerámico en piso 45x45MANO DE OBRACapatazOperarioPeon
MATERIALESPiso ceramico de 45x45Pegamento x25kgFraguax 1kgCucetas de 3mm x 100 und
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazOperarioPeon
Canaleta Drywall e=8mm 0.20x0.10m para acometidas eléctricas en edificios. Incluye base imprimante y pintura esmalte 2 manos.
MATERIALESCLAVOS RAMSET P/FIJACION SERIE 1500 1"TORNILLO GRABBER WAFER HEAD SELF DRILLING #8X1/2" PTA. BROCATORNILLO GRABBER SELF DRILLING #6X1 1/4" PTA. BROCAPLANCHA DE YESO DE 1/2" 1.22X2.44M MASILLA PARA JUNTASCINTA P/JUNTA EXTERIOR FIBRA DE VIDRIO 2"X300'FULMINANTE RAMNSET CAL 22 VERDE TIROXTIROESQUINERO PLASTICO RECTO 1 1/4"X8'Madera Huayruro o TornilloRIEL METALICO 90X32MM(3 5/8"X 1 1/4") E=0.90MM L=3.00MPARANTE METALICO 89X50MM(3 5/8"X 2") E=0.90MM L=3.00MImprimante (30 kg)Pintura esmalteESQUINERO METALICO 32MM(1 1/4") E=0.45MM L=2.40M
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazOperarioPeon
MATERIALESCLAVOS RAMSET P/FIJACION SERIE 1500 1"TORNILLO GRABBER WAFER HEAD SELF DRILLING #8X1/2" PTA. BROCATORNILLO GRABBER SELF DRILLING #6X1 1/4" PTA. BROCAFibrablock 2" 2.4x0.6FULMINANTE RAMNSET CAL 22 VERDE TIROXTIROESQUINERO PLASTICO RECTO 1 1/4"X8'LANA DE FIBRA DE VIDRIO 3 1/2" (R11) - 0.61X2.44MMadera Huayruro o Tornillo
EQUIPO Y HERRAMIENTASHerramientas Manuales
Panel acústico en muros con fibrablock 2" + lana de vidrio 2"+ fibrablock 2". Incluye bastidores de madera tornillo (horizontal y vertical) elem sujecc acces y acab.
MANO DE OBRACapatazOperarioOficialPeon
MATERIALESCLAVOS RAMSET P/FIJACION SERIE 1500 1"TORNILLO GRABBER WAFER HEAD SELF DRILLING #8X1/2" PTA. BROCATORNILLO GRABBER SELF DRILLING #6X1 1/4" PTA. BROCAPLANCHA DE YESO DE 1/2" 1.22X2.44M MASILLA PARA JUNTASCINTA P/JUNTA EXTERIOR FIBRA DE VIDRIO 2"X300'FULMINANTE RAMNSET CAL 22 VERDE TIROXTIROESQUINERO PLASTICO RECTO 1 1/4"X8'Madera Huayruro o TornilloRIEL METALICO 90X32MM(3 5/8"X 1 1/4") E=0.90MM L=3.00MPARANTE METALICO 89X50MM(3 5/8"X 2") E=0.90MM L=3.00MAcero perfiles tubularesESQUINERO METALICO 32MM(1 1/4") E=0.45MM L=2.40M
EQUIPO Y HERRAMIENTASHerramientas Manuales
Tabique Drywall para exteriores e=12mm (Incluye columnas metálicas)MANO DE OBRACapatazOperarioOficialPeon
MATERIALESCLAVOS RAMSET P/FIJACION SERIE 1500 1"TORNILLO GRABBER WAFER HEAD SELF DRILLING #8X1/2" PTA. BROCATORNILLO GRABBER SELF DRILLING #6X1 1/4" PTA. BROCAPLANCHA DE YESO DE 1/2" 1.22X2.44M MASILLA PARA JUNTASCINTA P/JUNTA EXTERIOR FIBRA DE VIDRIO 2"X300'FULMINANTE RAMNSET CAL 22 VERDE TIROXTIROESQUINERO PLASTICO RECTO 1 1/4"X8'Madera Huayruro o Tornillo
Tabique Drywall : Muro e=0.25m para tableros eléctricos y caja bornera: Incluye plancha de drywall e=12mm y estructura metálica para soporte de tableros.
RIEL METALICO 90X32MM(3 5/8"X 1 1/4") E=0.90MM L=3.00MPARANTE METALICO 89X50MM(3 5/8"X 2") E=0.90MM L=3.00MAcero perfiles tubularesESQUINERO METALICO 32MM(1 1/4") E=0.45MM L=2.40M
EQUIPO Y HERRAMIENTASHerramientas Manuales
Falso cielo tipo ArmstrongMANO DE OBRACapatazOperarioOficialPeon
MATERIALESBaldosa fissurePrincipal suprafine Secundario suprafinePerimetral suprafine
EQUIPO Y HERRAMIENTASHerramientas Manuales
Inodoro Sifon JetMANO DE OBRACapatazOperarioPeon
MATERIALESPERNO DE ANCLAJE P/APARATO SANITARIO (PAR)ASIENTO P/INODORO MOPLEN BLANCO NACIONALInodoro Sifon JetTUBO ABASTO ALUMINIO TRENZADO 1/2'' M x 5/8'' H x 35cm P/INODOROAnillo de CeraMASILLA ELASTICA PARA JUNTAS SANITARIAS (300 ml )
EQUIPO Y HERRAMIENTASHerramientas Manuales
lavatorio con pedestalMANO DE OBRACapatazOperarioPeon
MATERIALESTRAMPA TIPO P BRONCE CROMADA DE 1 1/4"LAVATORIO CON PEDESTALTUBO PROLONGACION DESAGUE BRONCE CROMO 1 1/4 x 5"C/TUERCA (P.)TUBO ABASTO ALUMINIO TRENZ. 1/2'' M x 1/2" H x40cm P/LAVAT/LAV/BIDETMASILLA ELASTICA PARA JUNTAS SANITARIAS (300 ml )
EQUIPO Y HERRAMIENTASHerramientas Manuales
UrinarioMANO DE OBRACapatazOperarioPeon
MATERIALES
PERNO DE ANCLAJE P/APARATO SANITARIO (PAR)TRAMPA TIPO P BRONCE CROMADA DE 1 1/4"URINARIO BAMBY BLANCO STANDARDDESAGUE MULTIPLE DE LAVADERO/LAVATORIO/BIDET C/TAPONVALVULA ANGULAR P/URINARIO FUTURAMASILLA ELASTICA PARA JUNTAS SANITARIAS (300 ml )
EQUIPO Y HERRAMIENTASHerramientas Manuales
Difusor de duchaMANO DE OBRACapatazOperarioPeon
MATERIALES
Difusor de ducha con brazo strettoCinta teflon
EQUIPO Y HERRAMIENTASHerramientas Manuales
Mezcladora de ac/af para duchaMANO DE OBRACapatazOperarioPeon
MATERIALES
Mezcladora de ac/af para duchaCinta teflon
EQUIPO Y HERRAMIENTASHerramientas Manuales
Monomando de lavatorioMANO DE OBRACapatazOperarioPeon
MATERIALES
Monomando de LavatorioCinta teflon
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cerradura tipo manija para bañoMANO DE OBRACapatazOperarioPeon
MATERIALES
Cerradura tipo manija para bañoMadera Huayruro o Tornillo
EQUIPO Y HERRAMIENTASHerramientas Manuales
PapeleraMANO DE OBRACapatazOperario
MATERIALES
Papelera ceramicaMASILLA ELASTICA PARA JUNTAS SANITARIAS (300 ml )
EQUIPO Y HERRAMIENTASHerramientas Manuales
ToalleraMANO DE OBRACapatazOperario
MATERIALESToallera ceramica
MASILLA ELASTICA PARA JUNTAS SANITARIAS (300 ml )
EQUIPO Y HERRAMIENTASHerramientas Manuales
Jabonera en DuchaMANO DE OBRACapatazOperario
MATERIALESJabonera en ducha
EQUIPO Y HERRAMIENTASHerramientas Manuales
Dispensador de jabon liquidoMANO DE OBRACapatazOperario
MATERIALESDispensador de Jabon Liquido
MASILLA ELASTICA PARA JUNTAS SANITARIAS (300 ml )
EQUIPO Y HERRAMIENTASHerramientas Manuales
Luminaria de falso techoMANO DE OBRACapatazOperario
MATERIALESLuminaria de falso techo
EQUIPO Y HERRAMIENTASHerramientas Manuales
Vidrio incoloro de 4mm
MANO DE OBRACapatazOperarioPeon
MATERIALESVidrio crudo incoloro simple
EQUIPO Y HERRAMIENTASHerramientas Manuales
Marco de ventana de maderaMANO DE OBRACapatazOperarioOficial
MATERIALESMadera Huayruro o TornilloClavosLaca
EQUIPO Y HERRAMIENTASHerramientas Manuales
S/C OBRAS ELECTRICAS
Tubería 80 mm(3")Ø PVC-PMANO DE OBRACapatazOperarioPeon
MATERIALESPEGAMENTO P/TUBO PVCTUBO PVC ELECTRICO SAP 3" X 3 mUNION PVC ELECTRICA SAP 3"
EQUIPO Y HERRAMIENTASHerramientas Manuales
1.60
Tubería 50 mm (2")Ø PVC-PMANO DE OBRACapatazOperarioPeon
MATERIALESPEGAMENTO P/TUBO PVCTUBO PVC ELECTRICO SAP 2" X 3 mUNION PVC ELECTRICA SAP 2"
EQUIPO Y HERRAMIENTASHerramientas Manuales
1.60
Tubería 40 mm (1.5")Ø PVC-PMANO DE OBRACapatazOperarioPeon
MATERIALESPEGAMENTO P/TUBO PVCTUBO PVC ELECTRICO SAP 1.5" X 3 mUNION PVC ELECTRICA SAP 1.5"
EQUIPO Y HERRAMIENTASHerramientas Manuales
Tubo Conduit F°G° D=1 1/2"MANO DE OBRACapatazOperarioPeon
MATERIALESPEGAMENTO P/TUBO PVCTubo Conduit F°G° D=1 1/2"
EQUIPO Y HERRAMIENTASHerramientas Manuales
Tubería 25 mm (1")Ø PVC-PMANO DE OBRACapatazOperarioPeon
MATERIALESPEGAMENTO P/TUBO PVCTUBO PVC ELECTRICO SAP 1" X 3 mUNION PVC ELECTRICA SAP 1"
EQUIPO Y HERRAMIENTASHerramientas Manuales
Tubería 20 mm (3/4")Ø PVC-PMANO DE OBRACapatazOperarioPeon
MATERIALESPEGAMENTO P/TUBO PVCTUBO PVC ELECTRICO SAP 3/4" X 3 mUNION PVC ELECTRICA SAP 3/4"
EQUIPO Y HERRAMIENTASHerramientas Manuales
Curva 50 mmØ PVC-PMANO DE OBRACapatazOperario
MATERIALESPEGAMENTO P/TUBO PVCCurva 50 mm(2")Ø PVC-P
EQUIPO Y HERRAMIENTASHerramientas Manuales
Curva 40 mm(1.5")Ø PVC-PMANO DE OBRACapatazOperario
MATERIALESPEGAMENTO P/TUBO PVCCurva 40 mm(1.5")Ø PVC-P
EQUIPO Y HERRAMIENTASHerramientas Manuales
Curva Conduit FoGo D=1 1/2"MANO DE OBRACapatazOperario
MATERIALESPEGAMENTO P/TUBO PVCCurva Conduit FoGo D=1 1/2"
EQUIPO Y HERRAMIENTASHerramientas Manuales
Curva 80 mmØ PVC-PMANO DE OBRA
CapatazOperario
MATERIALESPEGAMENTO P/TUBO PVCCurva 80 mm(3")Ø PVC-P
EQUIPO Y HERRAMIENTASHerramientas Manuales
Curva 25 mm(1")Ø PVC-PMANO DE OBRACapatazOperario
MATERIALESPEGAMENTO P/TUBO PVCCurva 25 mm(1")Ø PVC-P
EQUIPO Y HERRAMIENTASHerramientas Manuales
Curva 20 mm(3/4")Ø PVC-PMANO DE OBRACapatazOperario
MATERIALESPEGAMENTO P/TUBO PVCCurva 20 mm(3/4")Ø PVC-P
EQUIPO Y HERRAMIENTASHerramientas Manuales
Terminales dobles a compresión de Cu estañado para cables D=50 mm2
MANO DE OBRACapatazOperario
MATERIALESTerminales dobles a compresión de Cu estañado para cables D=50 mm2
EQUIPO Y HERRAMIENTASHerramientas Manuales
Terminales de cobre a compresión para cables D=25 mm2MANO DE OBRACapatazOperario
MATERIALESTerminales de cobre a compresión para cables D=25 mm2
EQUIPO Y HERRAMIENTASHerramientas Manuales
Terminales de cobre a compresión para cables D=10 mm2MANO DE OBRACapatazOperario
MATERIALESTerminales de cobre a compresión para cables D=10 mm2
EQUIPO Y HERRAMIENTASHerramientas Manuales
Terminales de cobre a compresión para cables D=4 mm2MANO DE OBRACapatazOperario
MATERIALESTerminales de cobre a compresión para cables D=4 mm2
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable 1 x 4mm2 THWMANO DE OBRACapatazOficialPeonOperario
MATERIALESCable 1 x 4mm2 THW
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable 1 x 6mm2 THWMANO DE OBRACapatazOficialPeonOperario
MATERIALESCable 1 x 6mm2 THW
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable 1 x 10mm2 THWMANO DE OBRACapatazOficialPeon
Operario
MATERIALESCable 1 x 10mm2 THW
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable 1x25 mm2 THW MANO DE OBRACapatazOficialPeonOperario
MATERIALESCable 1x25 mm2 THW
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable 2x25 mm2 THWMANO DE OBRACapatazOficialPeonOperario
MATERIALESCable 2x25 mm2 THW
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable 1 x 25 mm2 TWMANO DE OBRACapatazOficial
PeonOperario
MATERIALESCable 1 x 25 mm2 TW
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable 1 x 50 mm2 TWMANO DE OBRACapatazOficialPeonOperario
MATERIALESCable 1 x 50 mm2 TW
EQUIPO Y HERRAMIENTASHerramientas Manuales
Caja de pase metálica de F°G°, tipo pesado de 150x150x100mm MANO DE OBRACapatazOperario
MATERIALESCaja de pase metálica de F°G°, tipo pesado de 150x150x100mm
EQUIPO Y HERRAMIENTASHerramientas Manuales
Caja de pase metálica de F°G°, tipo pesado de 200x200x150mmMANO DE OBRACapatazOperario
MATERIALESCaja de pase metálica de F°G°, tipo pesado de 200x200x150mm
EQUIPO Y HERRAMIENTASHerramientas Manuales
Salida para puntos de luz en generalMANO DE OBRACapatazPeonOperario
MATERIALES
Curva 20 mm(3/4")Ø PVC-PUNION PVC ELECTRICA SAP 3/4"TUBO PVC ELECTRICO SAP 3/4" X 3 mCINTA AISLANTE ELECTRICACAJA DE PASE OCTOGONAL F.G. LIVIANA 4"Cable 14 AWG TW
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazPeonOperario
MATERIALESAlambre Negro N 16Cable 12 AWG TWUNION PVC ELECTRICA SAP 3/4"TUBO PVC ELECTRICO SAP 3/4" X 3 m
Salida para tomacorrientes dobles bipolar, con espiga a tierra, placa de aluminio anodizado de dos huecos, dados Magic-Ticino 15A - 250V
CINTA AISLANTE ELECTRICACAJA ELECTR RECTANG FO.GO.4X2 1/8 DADO TOMACORRIENTE MAGIC PLACA DE ALUMINIO 2 ABERTURAS
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazPeonOperario
MATERIALESAlambre Negro N 16Cable 12 AWG TWUNION PVC ELECTRICA SAP 3/4"TUBO PVC ELECTRICO SAP 3/4" X 3 mCINTA AISLANTE ELECTRICACAJA ELECTR RECTANG FO.GO.4X2 1/8 DADO TOMACORRIENTE MAGIC PLACA DE ALUMINIO 2 ABERTURAS A PRUEBA DE AGUA
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazPeonOperario
MATERIALESAlambre Negro N 16Cable 14 AWG TWUNION PVC ELECTRICA SAP 3/4"
Salida para tomacorrientes dobles bipolar, con espiga a tierra, a prueba de agua, placa de aluminio anodizado de dos huecos, dados Magic-Ticino 15A - 250V
Interruptores de luz simple, a prueba de agua, con placa de aluminio anodizado de dos huecos, dados interruptor Magic-Ticino.
TUBO PVC ELECTRICO SAP 3/4" X 3 mCINTA AISLANTE ELECTRICACAJA ELECTR RECTANG FO.GO.4X2 1/8 DADO INTERRUPTOR MAGIC PLACA DE ALUMINIO DE INTERRUPTOR SIMPLE A PRUEBA DE AGUA
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazPeonOperario
MATERIALESAlambre Negro N 16Cable 14 AWG TWUNION PVC ELECTRICA SAP 3/4"TUBO PVC ELECTRICO SAP 3/4" X 3 mCINTA AISLANTE ELECTRICACAJA ELECTR RECTANG FO.GO.4X2 1/8 DADO INTERRUPTOR MAGIC PLACA DE ALUMINIO DE INTERRUPTOR DOBLE A PRUEBA DE AGUA
EQUIPO Y HERRAMIENTASHerramientas Manuales
Varilla de cobre electrolítico de 2.40m x 3/4"DMANO DE OBRACapatazPeonOperario
MATERIALESVarilla de cobre electrolítico de 2.40m x 3/4"D
EQUIPO Y HERRAMIENTASHerramientas Manuales
Interruptores de luz doble, a prueba de agua, con placa de aluminio anodizado de dos huecos, dados interruptor Magic-Ticino.
Dósis química Thorgel, Ecogel, etc.MANO DE OBRACapatazPeonOperario
MATERIALESDósis química Thorgel, Ecogel, etc.
EQUIPO Y HERRAMIENTASHerramientas Manuales
Producto SGM , bajar resistividadMANO DE OBRACapatazPeonOperario
MATERIALESSGM , bajar resistividad
EQUIPO Y HERRAMIENTASHerramientas Manuales
Agua para sistema de puesta a tierraMANO DE OBRACapatazOperarioPeon
MATERIALESAgua
EQUIPO Y HERRAMIENTASHerramientas Manuales
Bentonita sódicaMANO DE OBRACapatazOperarioPeon
MATERIALESBentonita sódica
EQUIPO Y HERRAMIENTASHerramientas Manuales
Soldadura CadweldMANO DE OBRACapatazOperarioPeon
MATERIALESSOLDADURA EXOTERMICA DE 115 GR. THERMOWELDCHISPERO USA / 38-0309-00MOLDE
EQUIPO Y HERRAMIENTASHerramientas Manuales
Base y tapa de registroMANO DE OBRACapatazOperario
MATERIALESBase y tapa de registro
EQUIPO Y HERRAMIENTASHerramientas Manuales
Tierra de cultivoMANO DE OBRACapatazOperarioPeon
MATERIALESTierra de cultivo
EQUIPO Y HERRAMIENTASHerramientas Manuales
Cable de cobre desnudo estañado 50 mm2 para interconexión.MANO DE OBRACapatazOperarioPeon
MATERIALESCable de cobre desnudo estañado 50 mm2 para interconexión
EQUIPO Y HERRAMIENTASHerramientas Manuales
Barra MGB para tierra, platina de cobreMANO DE OBRACapatazOperarioPeon
MATERIALESBarra MGB para tierra, platina de cobre
EQUIPO Y HERRAMIENTASHerramientas Manuales
Barra AC para tierra, platina de cobreMANO DE OBRACapatazOperarioPeon
MATERIALESBarra AC para tierra, platina de cobre
EQUIPO Y HERRAMIENTASHerramientas Manuales
Nicho para barra ACMANO DE OBRACapatazOperarioPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
Nicho para cajatoma y caja de mediciónMANO DE OBRACapatazOperarioPeon
EQUIPO Y HERRAMIENTASHerramientas Manuales
Reja de protección para caja toma ó caja de mediciónMANO DE OBRACapataz
OperarioPeon
MATERIALESAcero perfiles angularesPintura anticorrosiva
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazPeonOperario
MATERIALESBRAQUETE BPL-A-111, CON LAMPARA FLUORESCENTE COMPACTA PL/EC DE 11W
EQUIPO Y HERRAMIENTASHerramientas Manuales
MANO DE OBRACapatazPeonOperario
MATERIALESARTEFACTO "AHR", 2x36W, PARA ADOSAR CON EQUIPO DE ALTO FACTOR DE POT
EQUIPO Y HERRAMIENTASHerramientas Manuales
BRAQUETE BPL-A-111, CON LAMPARA FLUORESCENTE COMPACTA PL/EC DE 11W Y DIFUSOR PRIMÁTICO, CASCO DE PLANCHA ANODIZADA, CON EMPAQUETADURA HERMÉTICA DE JOSFEL O SIMILAR.
ARTEFACTO "AHR", 2x36W, PARA ADOSAR CON EQUIPO DE ALTO FACTOR DE POTENCIA, LUZ DE DÍA DE JOSFEL O SIMILAR
MANO DE OBRACapatazOperario
MATERIALESInterruptor 3x150 Amp de caja moldeadacable vulcanizado 2x2.5mm2
EQUIPO Y HERRAMIENTASHerramientas Manuales
01 ITM 3x(28-40A) NS100N 85KA 220VAC Schneider Electric 01 ITM 2x32A C60N 20KA 220VAC Shneider Electric 01 Barra de Tierra cobre de 3x30mm Reserva para 01 TVSS
01 ITM 3x(22-32A) NS100N 85KA 220VAC Schneider Electric 02 ITM 2x16A C60N 20KA 220VAC Schneider Electric 03 ITM 2x32A C60N 20KA 220VAC Schneider Electric 01 ITM 2x10A C60N 20KA 220VAC Schneider Electric 01 ITM 2x20A C60N 20KA 220VAC Schneider Electric 04 ID 2P 25A 30mA diferenciales 01 Rele de Sub/sobre corrientes RCI Telemecanique 01 Rele de 14 pines bobina de 220vac Telemecanique 01 Interruptor Horario Analogico de 100H Telemec.
04 Porta fusibles DF 32A con fusible DFde 2A 02 Transformador de corriente de 100/5A Circutor 01 Voltimetro cuadrado de 72x72 0-300V Camsco
Acometida Eléctrica Provisional - Incluye instalación provisional de hasta 60 ml aprox. de cable vulcanizado 2x2.5mm2 e Interruptor 3x150 Amp de caja moldeada (no incluye los suministros del cable ni del interruptor)
TABLERO DE INTERRUPTOR GENERAL "TG" (o TIG) 2Ø,220VAC.60HZTablero Adosado 450X450X150mm Medidas Acabado IP-54 Las Estructuras mas el cuerpo seran fabricadas con Plancha LAF de 1,5mm y las mandiles con plancha LAF de 1.5mm , Acabado: sera sometido a tratamiento de Fosfatizado con base de epoxica y acabado con esmalte, La Puerta Fabricado de plancha de 2 mm. Acabado RAL 7032 BEIGE
TABLERO DE DISTRIBUCIÓN "TDO" IP-55 2Ø,220VAC.60HZTablero Adosado 800X600X200mm Medidas Acabado IP-54 Las Estructuras mas el cuerpo seran fabricadas con Plancha LAF de 1,5mm y las mandiles con plancha LAF de 1.5mm , Acabado: sera sometido a tratamiento de Fosfatizado con base de epoxica y acabado con esmalte, La Puerta Fabricado de plancha de 2 mm. Acabado RAL 7032 BEIGE
01 Lampara y portalampras HARMONY con led Rojo XB4BVM4 Cuerpo Metalico Ø22mm, Directo 220vac, 100,000 horas de vida util .Telemecanique Merli Gerin.
01 Conmutador Voltimetrico fase/fase Bremas 01 Amperimetro cuadrado de 72x72 0-50A Camsco 01 Conmutador Amperimetrico 2 Polos / 2 Trafos Bremas 01 Canaleta Ranuradas de 45x45mm 01 Cable THW Nº12 - Indeco 01 Cable THW Nº4 - Indeco 28 Borneras de (6mm²) Llegrand 10 Topes para Borneras 03 Borneras de (8mm²) Llegrand 01 Borneras de Tierra (8mm²) Llegrand 01 Borneras de (50mm²) Llegrand 06 Aisladores de 0.5/400 de resina Epoxica 01 Barras de cobre derivacion 3x8mm Reserva para 01 TVSS
Lugar del Emplazamiento de Telecomunicaciones
Lima Metropolitana Lima Provincias , Ancash e IcaLa Libertad , Lambayeque, Arequipa, Moquegua Junin, Huanuco, Huancavelica, Pasco, Ayacucho, Piura, Tumbes, Tacna
ANALISI DE P R E C I O S U N I T R I O S SIN I.G.V.
Rend 2.00 und S/. 707.50
HH 1.00 4.00 S/. 34.38 S/. 137.50HH 1.00 4.00 S/. 34.38 S/. 137.50HH 1.00 4.00 S/. 34.38 S/. 137.50 S/. 412.50
Dia 1.00 S/. 5.00 S/. 5.00Dia 1.00 S/. 5.00 S/. 5.00Dia 1.00 S/. 10.00 S/. 10.00Dia 1.00 S/. 15.00 S/. 15.00Dia 1.00 S/. 80.00 S/. 80.00Dia 3.00 S/. 60.00 S/. 180.00 S/. 295.00
Costo Directo S/. S/. 707.50
Rend 0.50 und S/. 830.00
HH 1.00 16.00 S/. 34.38 S/. 550.00 S/. 550.00
Dia 2.00 S/. 80.00 S/. 160.00Dia 2.00 S/. 60.00 S/. 120.00 S/. 280.00
Costo Directo S/. S/. 830.00
Rend 0.50 und S/. 830.00
HH 1.00 16.00 S/. 34.38 S/. 550.00 S/. 550.00
Dia 2.00 S/. 80.00 S/. 160.00Dia 2.00 S/. 60.00 S/. 120.00 S/. 280.00
Costo Directo S/. S/. 830.00
Rend 0.50 undS/. 1,380.00
HH 2.00 32.00 S/. 34.38 S/. 1,100.00 S/. 1,100.00
Dia 2.00 S/. 80.00 S/. 160.00Dia 2.00 S/. 60.00 S/. 120.00 S/. 280.00
Costo Directo S/. S/. 1,380.00
Rend 1.00 und S/. 200.00
HH 1.00 8.00 S/. 7.50 S/. 60.00 S/. 60.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 140.00
Costo Directo S/. S/. 200.00
Rend 1.00 und S/. 415.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 140.00
Costo Directo S/. S/. 415.00
Rend 1.00 und S/. 415.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 140.00
Costo Directo S/. S/. 415.00
Rend 1.00 und S/. 1,500.00
UND 1.00 S/. 1,500.00 S/. 1,500.00 S/. 1,500.00
Costo Directo S/. S/. 1,500.00
Rend 1.00 und S/. 415.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 140.00
Costo Directo S/. S/. 415.00
Rend 1.00 und S/. 5,451.80
HH 1.00 8.00 S/. 9.60 S/. 76.80HH 2.00 16.00 S/. 7.50 S/. 120.00HH 1.00 8.00 S/. 34.38 S/. 275.00dia 12.00 12.00 S/. 275.00 S/. 3,300.00 S/. 3,771.80
Dia 12.00 S/. 80.00 S/. 960.00Dia 12.00 S/. 60.00 S/. 720.00 S/. 1,680.00
Costo Directo S/. S/. 5,451.80
Rend 1.00 und S/. 2,915.00
UND 1.00 S/. 2,500.00 S/. 2,500.00HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 2,775.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 140.00
Costo Directo S/. S/. 2,915.00
Rend 1.00 und S/. 9,915.00
UND 1.00 S/. 9,500.00 S/. 9,500.00HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 9,775.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 140.00
Costo Directo S/. S/. 9,915.00
Rend 1.00 und S/. 9,915.00
UND 1.00 S/. 9,500.00 S/. 9,500.00HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 9,775.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 140.00
Costo Directo S/. S/. 9,915.00
Rend 1.00 undS/. 771.80
HH 1.00 8.00 9.60 S/. 76.80HH 1.00 8.00 34.38 S/. 275.00 S/. 351.80
Dia 1.00 S/. 80.00 S/. 80.00Und 1.00 S/. 120.00 S/. 120.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 420.00
Costo Directo S/. S/. 771.80
Rend 1.00 und S/. 705.84
HH 1.00 8.00 13.74 S/. 109.92HH 1.00 8.00 18.24 S/. 145.92 S/. 255.84
Dia 1.00 S/. 80.00 S/. 80.00Und 1.00 S/. 120.00 S/. 120.00Dia 1.00 S/. 60.00 S/. 60.00Dia 1.00 S/. 30.00 S/. 30.00Und 1.00 S/. 160.00 S/. 160.00 S/. 450.00
Costo Directo S/. S/. 705.84
Rend 0.50 und S/. 2,870.00
HH 5.00 80.00 34.38 S/. 2,750.00 S/. 2,750.00
Und 1.00 S/. 120.00 S/. 120.00 S/. 120.00
Costo Directo S/. S/. 2,870.00
Rend 1.00 und S/. 2,855.40
HH 1.00 8.00 S/. 34.38 S/. 275.00HH 2.00 16.00 S/. 34.38 S/. 550.00HH 4.00 32.00 S/. 34.38 S/. 1,100.00HH 3.00 24.00 S/. 9.60 S/. 230.40 S/. 2,155.40
Dia 1.00 S/. 120.00 S/. 120.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 3.00 S/. 60.00 S/. 180.00Und 2.00 S/. 160.00 S/. 320.00 S/. 700.00
Costo Directo S/. S/. 2,855.40
Rend 1.00 und S/. 850.00
HH 1.00 16.00 S/. 34.38 S/. 550.00 S/. 550.00
Dia 1.00 S/. 80.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00 S/. 60.00
und 1.00 S/. 160.00 S/. 160.00 S/. 160.00
Rend 1.00 und S/. 600.00
UND 1.00 S/. 600.00 S/. 600.00 S/. 600.00
Costo Directo S/. S/. 600.00
Rend 1.00 und S/. 3,000.00
UND 1.00 S/. 3,000.00 S/. 3,000.00 S/. 3,000.00
Costo Directo S/. S/. 3,000.00
Rend 1.00 und S/. 3,000.00
UND 1.00 S/. 3,000.00 S/. 3,000.00 S/. 3,000.00
Costo Directo S/. S/. 3,000.00
Rend 0.50 und S/. 2,934.40
HH 4.00 64.00 S/. 34.38 S/. 2,200.00HH 4.00 64.00 S/. 9.60 S/. 614.40 S/. 2,814.40
Dia 1.00 S/. 120.00 S/. 120.00 S/. 120.00
Costo Directo S/. S/. 2,934.40
Rend 1.00 und S/. 1,525.00
UND 1.00 S/. 950.00 S/. 950.00HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 1,225.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 1,525.00
Rend 1.00 und S/. 1,046.80
HH 1.00 8.00 S/. 9.60 S/. 76.80HH 2.00 16.00 S/. 7.50 S/. 120.00HH 1.00 8.00 S/. 34.38 S/. 275.00HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 746.80
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 1,046.80
Rend 1.00 und S/. 1,245.00
HH 3.00 24.00 S/. 34.38 S/. 825.00 S/. 825.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 3.00 S/. 60.00 S/. 180.00Und 1.00 S/. 160.00 S/. 160.00 S/. 420.00
Costo Directo S/. S/. 1,245.00
Rend 1.00 und S/. 5,265.00
HH 15.00 120.00 S/. 34.38 S/. 4,125.00 S/. 4,125.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 15.00 S/. 60.00 S/. 900.00Und 1.00 S/. 160.00 S/. 160.00 S/. 1,140.00
Costo Directo S/. S/. 5,265.00
Rend 1.00 und S/. 480.00
HH 3.00 24.00 S/. 7.50 S/. 180.00 S/. 180.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 480.00
Rend 1.00 und S/. 5,575.00
UND 1.00 5,000.00 S/. 5,000.00HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 5,275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 5,575.00
Rend 1.00 und S/. 575.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 575.00
Rend 1.00 und S/. 575.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 575.00
Rend 1.00 und S/. 360.00
HH 1.00 8.00 S/. 7.50 S/. 60.00 S/. 60.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 360.00
Rend 1.00 und S/. 3,580.00
UND 1.00 S/. 3,000.00 S/. 3,000.00HH 1.00 8.00 S/. 35.00 S/. 280.00 S/. 3,280.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 3,580.00
Rend 1.00 und S/. 575.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 575.00
Rend 1.00 und S/. 10,075.00
UND 1.00 S/. 9,500.00 S/. 9,500.00HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 9,775.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 10,075.00
Rend 1.00 undS/. 575.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00
Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 575.00
Rend 1.00 und S/. 575.00
HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 275.00
Dia 1.00 S/. 80.00 S/. 80.00Dia 1.00 S/. 60.00 S/. 60.00Und 1.00 S/. 160.00 S/. 160.00 S/. 300.00
Costo Directo S/. S/. 575.00
Rend 1.00 und S/. 550.00
Und 1.00 S/. 550.00 S/. 550.00 S/. 550.00
Costo Directo S/. S/. 550.00
OBRAS PRELIMINARES Y PROVISIONALES
Rend 1.00 glb S/. 2,100.00
S/. 14,000.00 S/. 0.15 2,100.00
Costo Directo S/. S/. 2,100.00
Rend 15.00 m2 S/. 1,399.10
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73HH 1.00 0.53 S/. 15.28 S/. 8.15
HH 2.00 1.07 S/. 13.74 S/. 14.66 S/. 33.70
KG 0.50 S/. 2.91 S/. 1.46Und 0.73 S/. 14.81 S/. 10.80UN 0.05 S/. 62.63 S/. 3.13GL 0.01 S/. 13.56 S/. 0.19P2 4.22 S/. 4.40 S/. 18.58GL 1.15 S/. 30.00 S/. 34.59PZ 0.36 S/. 34.50 S/. 12.25P2 0.12 S/. 1.80 S/. 0.22 S/. 81.21
% 5.00 S/. 33.70 S/. 1.69 S/. 1.69
Costo Directo S/. S/. 116.59Area de almacen (12m2) S/. 1,399.10
Rend 100.00 m2 S/. 8.47
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 18.24 S/. 1.46HH 2.00 0.16 S/. 13.74 S/. 2.20 S/. 3.83
KG 0.05 S/. 2.91 S/. 0.15m2 1.05 S/. 2.00 S/. 2.10P2 0.50 S/. 4.40 S/. 2.20 S/. 4.45
% 5.00 S/. 3.83 S/. 0.19 S/. 0.19
Costo Directo S/. S/. 8.47
Rend 75.00 m2 S/. 10.47
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95HH 2.00 0.21 S/. 13.74 S/. 2.93 S/. 5.11
HM 0.11 34.20 3.76HM 0.11 12.20 1.34
% 5.00 S/. 5.11 0.26 S/. 5.36
Costo Directo S/. S/. 10.47
Rend 1.00 glb S/. 621.60
HH 0.10 0.80 S/. 21.89 S/. 17.51HH 1.00 8.00 S/. 18.24 S/. 145.92 S/. 163.43
und 1.00 S/. 450.00 S/. 450.00 S/. 450.00
% 5.00 S/. 163.43 S/. 8.17 S/. 8.17
Costo Directo S/. S/. 621.60
Rend 8.00 m2 S/. 21.45
HH 0.10 0.10 S/. 21.89 S/. 2.19HH 1.00 1.00 S/. 18.24 S/. 18.24 S/. 20.43
% 5.00 S/. 20.43 S/. 1.02 S/. 1.02
Costo Directo S/. S/. 21.45
Rend 1.00 dia S/. 109.92
HH 1.00 8.00 S/. 13.74 S/. 109.92 S/. 109.92
Costo Directo S/. S/. 109.92
Rend 3.00 m3 S/. 200.07
HH 0.10 0.27 21.89 S/. 5.84HH 2.00 5.33 18.24 S/. 97.28HH 2.00 5.33 13.74 S/. 73.28 S/. 176.40
HM 0.32 34.20 S/. 10.94
HM 0.32 12.20 S/. 3.90% 5.00 S/. 176.40 S/. 8.82 S/. 23.67
Costo Directo S/. S/. 200.07
Rend 1.00 glb S/. 251.65
HH 0.10 0.80 21.89 S/. 17.51HH 1.00 8.00 18.24 S/. 145.92HH 0.50 4.00 13.74 S/. 54.96 S/. 218.39
m3 0.20 S/. 35.40 S/. 7.08bls 0.50 S/. 15.66 S/. 7.83 S/. 14.91
HM 0.16 34.20 S/. 5.47HM 0.16 12.20 S/. 1.95
% 5.00 S/. 218.39 S/. 10.92 S/. 18.34
Costo Directo S/. S/. 251.65
Rend 3.00 m2 S/. 148.50
HH 0.10 0.27 21.89 S/. 5.84HH 1.00 2.67 18.24 S/. 48.64HH 0.50 1.33 13.74 S/. 18.32 S/. 72.80
m3 0.20 S/. 35.40 S/. 7.08m2 1.05 S/. 24.00 S/. 25.20Bls 0.35 S/. 16.00 S/. 5.60m3 0.30 S/. 37.00 S/. 11.10bls 1.00 S/. 15.66 S/. 15.66 S/. 64.64
HM 0.16 34.20 S/. 5.47HM 0.16 12.20 S/. 1.95
% 5.00 S/. 72.80 S/. 3.64 S/. 11.06
Costo Directo S/. S/. 148.50
Rend 250.00 m2 S/. 3.15
HH 0.10 0.00 21.89 S/. 0.07HH 1.00 0.03 S/. 18.24 S/. 0.58HH 3.00 0.10 S/. 13.74 S/. 1.32 S/. 1.97
m3 0.01 S/. 35.50 S/. 0.22bls 0.02 S/. 15.66 S/. 0.28und 0.02 S/. 17.00 S/. 0.34Kg 0.01 S/. 8.00 S/. 0.08rll 0.00 S/. 5.00 S/. 0.01gln 0.01 S/. 30.00 S/. 0.15 S/. 1.08
% 5.00 S/. 1.97 S/. 0.10 S/. 0.10
Costo Directo S/. S/. 3.15
Rend 20.00 m2 S/. 6.69
HH 0.10 0.04 21.89 S/. 0.88HH 1.00 0.40 S/. 13.74 S/. 5.50 S/. 6.37
% 5.00 S/. 6.37 S/. 0.32 S/. 0.32
Costo Directo S/. S/. 6.69
Rend 1.00 glb S/. 360.00
HM 120.00 3.00 360.00 S/. 360.00
Costo Directo S/. S/. 360.00
Movimiento de tierras
Rend 10.00 m3 S/. 95.16
HH 0.20 0.16 S/. 21.89 S/. 3.50HH 2.00 1.60 S/. 18.24 S/. 29.18HH 1.00 0.80 S/. 15.28 S/. 12.22HH 2.00 1.60 S/. 13.74 S/. 21.98 S/. 66.89
HM 0.43 S/. 34.20 S/. 14.56HM 0.85 S/. 12.20 S/. 10.37% 5.00 S/. 66.89 S/. 3.34 S/. 28.27
Costo Directo S/. S/. 95.16
Rend 3.00 m3 S/. 50.73
HH 0.20 0.53 S/. 21.89 S/. 11.67HH 1.00 2.67 S/. 13.74 S/. 36.64 S/. 48.31
% 5.00 S/. 48.31 S/. 2.42 S/. 2.42
Costo Directo S/. S/. 50.73
Rend 6.00 m3 S/. 141.99
HH 0.20 0.27 S/. 21.9 S/. 5.8HH 2.00 2.67 S/. 18.2 S/. 48.64HH 1.00 1.33 S/. 15.3 S/. 20.37HH 2.00 2.67 S/. 13.7 S/. 36.64 S/. 111.49
HM 0.43 S/. 34.2 S/. 14.56HM 0.85 S/. 12.2 S/. 10.37% 5.00 S/. 111.5 S/. 5.57 S/. 30.50
Costo Directo S/. S/. 141.99
Rend 15.00 m3 S/. 71.75
HH 0.20 0.11 S/. 21.9 S/. 2.3HH 2.00 1.07 S/. 18.24 S/. 19.46HH 1.00 0.53 S/. 15.3 S/. 8.15HH 2.00 1.07 S/. 13.74 S/. 14.66 S/. 44.60
HM 0.43 S/. 34.2 S/. 14.56HM 0.85 S/. 12.2 S/. 10.37% 5.00 S/. 44.6 S/. 2.23 S/. 27.16
Costo Directo S/. S/. 71.75
Rend 2.50 m3 S/. 60.88
HH 0.20 0.64 S/. 21.89 S/. 14.01HH 1.00 3.20 S/. 13.74 S/. 43.97 S/. 57.98
% 5.00 S/. 57.98 S/. 2.90 S/. 2.90
Costo Directo S/. S/. 60.88
Rend 3.00 m3 S/. 50.73
HH 0.20 0.53 S/. 21.89 S/. 11.67HH 1.00 2.67 S/. 13.74 S/. 36.64 S/. 48.31
% 5.00 S/. 48.31 S/. 2.42 S/. 2.42
Costo Directo S/. S/. 50.73
Rend 15.50 m3S/. 63.89
HH 0.20 0.10 S/. 21.89 S/. 2.26HH 1.00 0.52 S/. 18.24 S/. 9.41HH 2.00 1.03 S/. 13.74 S/. 14.18 S/. 25.86
m3 1.05 S/. 23.50 S/. 24.68m3 0.12 S/. 1.83 S/. 0.22 S/. 24.89
HM 0.52 S/. 22.95 S/. 11.84% 5.00 S/. 25.86 S/. 1.29 S/. 13.14
Costo Directo S/. S/. 63.89
Rend 100.00 m2 S/. 3.06
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 13.74 S/. 1.10 S/. 1.27
m3 0.12 S/. 2.91 S/. 0.35 S/. 0.35
HM 0.06 S/. 22.95 S/. 1.38% 5.00 S/. 1.27 S/. 0.06 S/. 1.44
Costo Directo S/. S/. 3.06
Rend 3.00 m3S/. 217.22
HH 0.20 0.53 S/. 21.89 S/. 11.67HH 1.00 2.67 S/. 18.24 S/. 48.64HH 4.00 10.67 S/. 13.74 S/. 146.56 S/. 206.87
% 5.00 S/. 206.87 S/. 10.34 S/. 10.34
Costo Directo S/. S/. 217.22
Rend 30.00 m3S/. 59.24
HH 0.10 0.03 S/. 21.89 S/. 0.58HH 4.00 1.07 S/. 13.74 S/. 14.66 S/. 15.24
HM 0.23 S/. 188.00 S/. 43.24% 5.00 S/. 15.24 S/. 0.76 S/. 44.00
Costo Directo S/. S/. 59.24
Rend 10.00 m3 S/. 48.01
HH 0.10 0.08 S/. 21.89 S/. 1.75HH 4.00 3.20 S/. 13.74 S/. 43.97 S/. 45.72
% 5.00 S/. 45.72 S/. 2.29 S/. 2.29
Costo Directo S/. S/. 48.01
Obras de concreto simple
Rend 25.00 m3 S/. 160.79
HH 0.20 0.06 S/. 21.89 S/. 1.40HH 2.00 0.64 S/. 18.24 S/. 11.67HH 1.00 0.32 S/. 18.24 S/. 5.84HH 1.00 0.32 S/. 15.28 S/. 4.89HH 8.00 2.56 S/. 13.74 S/. 35.17 S/. 58.98
GL 0.00 S/. 47.91 S/. 0.19
M3 0.16 S/. 1.83 S/. 0.30BL 2.90 S/. 15.66 S/. 45.41gln 0.12 S/. 14.80 S/. 1.78UN 0.00 S/. 25.00 S/. 0.00M3 0.78 S/. 35.50 S/. 27.69M3 0.52 S/. 32.00 S/. 16.64 S/. 92.01
hm 0.32 S/. 25.13 S/. 8.04% 3.00 S/. 58.98 S/. 1.77 S/. 9.81
Costo Directo S/. S/. 160.79
Rend 100.00 m2 S/. 24.01
HH 0.20 0.02 S/. 21.89 S/. 0.35HH 2.00 0.16 S/. 18.24 S/. 2.92HH 1.00 0.08 S/. 18.24 S/. 1.46HH 2.00 0.16 S/. 15.28 S/. 2.44HH 8.00 0.64 S/. 13.74 S/. 8.79 S/. 15.97
m3 0.07 S/. 35.50 S/. 2.31bls 0.15 S/. 15.66 S/. 2.37gal 0.03 S/. 14.80 S/. 0.44gal 0.00 S/. 47.91 S/. 0.05lb 0.00 S/. 25.00 S/. 0.05m3 0.01 S/. 1.83 S/. 0.01 S/. 5.24
hm 0.08 S/. 25.13 S/. 2.01% 5.00 S/. 15.97 S/. 0.80 S/. 2.81
Costo Directo S/. S/. 24.01
Rend 16.00 m2
HH 0.20 0.10 S/. 21.89 S/. 2.19HH 1.00 0.50 S/. 18.24 S/. 9.12HH 1.00 0.50 S/. 15.28 S/. 7.64 S/. 18.95
p2 3.35 S/. 4.00 S/. 13.40kg 0.16 S/. 2.91 S/. 0.47kg 0.26 S/. 2.43 S/. 0.63 S/. 14.50
% 5.00 S/. 18.95 S/. 0.95 S/. 0.95
Costo Directo S/. S/. 34.39
Rend 100.00 m2
HH 0.30 0.02 S/. 21.89 S/. 0.53HH 3.00 0.24 S/. 18.24 S/. 4.38HH 1.00 0.08 S/. 15.28 S/. 1.22HH 1.00 0.08 S/. 18.24 S/. 1.46HH 6.00 0.48 S/. 13.74 S/. 6.60 S/. 14.18
bls 0.39 S/. 15.66 S/. 6.15gln 0.03 S/. 14.80 S/. 0.44gln 0.00 S/. 47.91 S/. 0.05kg 0.00 S/. 25.00 S/. 0.05m3 0.04 S/. 37.00 S/. 1.56p2 0.06 S/. 2.60 S/. 0.16m3 0.11 S/. 1.83 S/. 0.20 S/. 8.61
hm 0.08 S/. 25.13 S/. 2.01% 5.00 S/. 14.18 S/. 0.71 S/. 2.72
Costo Directo S/. S/. 25.51
PRUEBAS EN GENERAL DEL SISTEMA DE TIERRA, AISLAMIENTO, TABLEROS ELECTRICOS, ARTEFACTOS DE ALUMBRADO, ETC.
Rend 1.00 m3 S/. 457.10
HH 1.00 8.00 S/. 15.28 S/. 122.24HH 1.00 8.00 S/. 34.38 S/. 275.00 S/. 397.24
dia 1.00 S/. 40.00 S/. 40.00% 5.00 S/. 397.24 S/. 19.86 S/. 59.86
Costo Directo S/. S/. 457.10
Obras de concreto armado
Rend 10.00 m3 S/. 435.15
HH 0.20 0.16 S/. 21.89 S/. 3.50HH 2.00 1.60 S/. 18.24 S/. 29.18HH 2.00 1.60 S/. 18.24 S/. 29.18HH 1.00 0.80 S/. 15.28 S/. 12.22HH 12.00 9.60 S/. 13.74 S/. 131.90 S/. 206.00
gln 0.03 S/. 14.80 S/. 0.44gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 9.00 S/. 15.66 S/. 140.94m3 0.80 S/. 31.50 S/. 25.20m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 194.30
hm 0.80 S/. 25.13 S/. 20.10hm 0.80 S/. 5.55 S/. 4.44% 5.00 S/. 206.00 S/. 10.30 S/. 34.84
Costo Directo S/. S/. 435.15
Rend 10.00 m2 S/. 46.48
HH 0.10 0.08 S/. 21.89 S/. 1.75HH 1.00 0.80 S/. 18.24 S/. 14.59HH 1.00 0.80 S/. 13.74 S/. 10.99 S/. 27.34
p2 4.24 S/. 4.00 S/. 16.96gln 0.05 S/. 10.50 S/. 0.53kg 0.31 S/. 2.91 S/. 0.90kg 0.31 S/. 2.43 S/. 0.75 S/. 19.14
Costo Directo S/. S/. 46.48
Rend 260.00 Kg S/. 3.95
HH 0.10 0.00 S/. 21.89 S/. 0.07HH 1.00 0.03 S/. 18.24 S/. 0.56HH 1.00 0.03 S/. 15.28 S/. 0.47 S/. 1.10
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.10 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.95
Rend 11.00 m3 S/. 416.89
HH 0.20 0.15 S/. 21.89 S/. 3.18HH 2.00 1.45 S/. 18.24 S/. 26.53HH 2.00 1.45 S/. 18.24 S/. 26.53HH 1.00 0.73 S/. 15.28 S/. 11.11HH 12.00 8.73 S/. 13.74 S/. 119.91 S/. 187.27
gln 0.27 S/. 14.80 S/. 4.00gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 9.00 S/. 15.66 S/. 140.94m3 0.80 S/. 31.50 S/. 25.20m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 197.86
hm 0.73 S/. 25.13 S/. 18.34hm 0.73 S/. 5.55 S/. 4.05% 5.00 S/. 187.27 S/. 9.36 S/. 31.76
Costo Directo S/. S/. 416.89
Rend 12.00 m2 S/. 38.75
HH 0.10 0.07 S/. 21.89 S/. 1.46HH 1.00 0.67 S/. 18.24 S/. 12.16HH 1.00 0.67 S/. 13.74 S/. 9.16 S/. 22.78
p2 3.50 S/. 4.00 S/. 14.00gln 0.05 S/. 10.50 S/. 0.53kg 0.27 S/. 2.91 S/. 0.79kg 0.27 S/. 2.43 S/. 0.66 S/. 15.97
Costo Directo S/. S/. 38.75
Rend 280.00 Kg S/. 3.87
HH 0.10 0.00 S/. 21.89 S/. 0.06HH 1.00 0.03 S/. 18.24 S/. 0.52HH 1.00 0.03 S/. 15.28 S/. 0.44 S/. 1.02
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.02 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.87
Rend 20.00 m3 S/. 316.50
HH 0.20 0.08 S/. 21.89 S/. 1.75HH 2.00 0.80 S/. 18.24 S/. 14.59HH 2.00 0.80 S/. 18.24 S/. 14.59HH 1.00 0.40 S/. 15.28 S/. 6.11HH 12.00 4.80 S/. 13.74 S/. 65.95 S/. 103.00
gln 0.15 S/. 14.80 S/. 2.22gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 9.00 S/. 15.66 S/. 140.94m3 0.80 S/. 31.50 S/. 25.20m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 196.08
hm 0.40 S/. 25.13 S/. 10.05hm 0.40 S/. 5.55 S/. 2.22% 5.00 S/. 103.00 S/. 5.15 S/. 17.42
Costo Directo S/. S/. 316.50
Rend 9.00 m2 S/. 53.82
HH 0.10 0.09 S/. 21.89 S/. 1.95HH 1.00 0.89 S/. 18.24 S/. 16.21HH 1.00 0.89 S/. 13.74 S/. 12.21 S/. 30.37
p2 5.41 S/. 4.00 S/. 21.64gln 0.05 S/. 10.50 S/. 0.53kg 0.24 S/. 2.91 S/. 0.70kg 0.24 S/. 2.43 S/. 0.58 S/. 23.45
Costo Directo S/. S/. 53.82
Rend 270.00 Kg S/. 3.91
HH 0.10 0.00 S/. 21.89 S/. 0.06HH 1.00 0.03 S/. 18.24 S/. 0.54HH 1.00 0.03 S/. 15.28 S/. 0.45 S/. 1.06
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.06 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.91
Rend 22.00 m3 S/. 306.67
HH 0.20 0.07 S/. 21.89 S/. 1.59HH 2.00 0.73 S/. 18.24 S/. 13.27HH 2.00 0.73 S/. 18.24 S/. 13.27HH 1.00 0.36 S/. 15.28 S/. 5.56HH 12.00 4.36 S/. 13.74 S/. 59.96 S/. 93.64
gln 0.15 S/. 14.80 S/. 2.22gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 9.00 S/. 15.66 S/. 140.94m3 0.80 S/. 31.50 S/. 25.20
m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 196.08
hm 0.40 S/. 25.13 S/. 10.05hm 0.40 S/. 5.55 S/. 2.22% 5.00 S/. 93.64 S/. 4.68 S/. 16.95
Costo Directo S/. S/. 306.67
Rend 12.00 m2 S/. 40.41
HH 0.10 0.07 S/. 21.89 S/. 1.46HH 1.00 0.67 S/. 18.24 S/. 12.16HH 1.00 0.67 S/. 13.74 S/. 9.16 S/. 22.78
p2 4.09 S/. 4.00 S/. 16.36gln 0.05 S/. 10.50 S/. 0.53kg 0.14 S/. 2.91 S/. 0.41kg 0.14 S/. 2.43 S/. 0.34 S/. 17.63
Costo Directo S/. S/. 40.41
Rend 285.00 Kg S/. 3.85
HH 0.10 0.00 S/. 21.89 S/. 0.06HH 1.00 0.03 S/. 18.24 S/. 0.51HH 1.00 0.03 S/. 15.28 S/. 0.43 S/. 1.00
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.00 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.85
Rend 22.00 m3 S/. 296.05
HH 0.20 0.07 S/. 21.89 S/. 1.59HH 2.00 0.73 S/. 18.24 S/. 13.27HH 2.00 0.73 S/. 18.24 S/. 13.27
HH 1.00 0.36 S/. 15.28 S/. 5.56HH 12.00 4.36 S/. 13.74 S/. 59.96 S/. 93.64
gln 0.15 S/. 14.80 S/. 2.22gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 8.40 S/. 15.66 S/. 131.54m3 0.80 S/. 31.50 S/. 25.20m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 186.68
hm 0.36 S/. 25.13 S/. 9.05hm 0.36 S/. 5.55 S/. 2.00% 5.00 S/. 93.64 S/. 4.68 S/. 15.73
Costo Directo S/. S/. 296.05
Rend 12.00 m2 S/. 37.25
HH 0.10 0.07 S/. 21.89 S/. 1.46HH 1.00 0.67 S/. 18.24 S/. 12.16HH 1.00 0.67 S/. 13.74 S/. 9.16 S/. 22.78
p2 3.30 S/. 4.00 S/. 13.20gln 0.05 S/. 10.50 S/. 0.53kg 0.14 S/. 2.91 S/. 0.41kg 0.14 S/. 2.43 S/. 0.34 S/. 14.47
Costo Directo S/. S/. 37.25
Rend 290.00 Kg S/. 3.83
HH 0.10 0.00 S/. 21.89 S/. 0.06HH 1.00 0.03 S/. 18.24 S/. 0.50HH 1.00 0.03 S/. 15.28 S/. 0.42 S/. 0.99
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 0.99 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.83
Rend 10.00 m3 S/. 427.53
HH 0.20 0.16 S/. 21.89 S/. 3.50HH 2.00 1.60 S/. 18.24 S/. 29.18HH 2.00 1.60 S/. 18.24 S/. 29.18HH 1.00 0.80 S/. 15.28 S/. 12.22HH 12.00 9.60 S/. 13.74 S/. 131.90 S/. 206.00
gln 0.15 S/. 14.80 S/. 2.22gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 8.40 S/. 15.66 S/. 131.54m3 0.80 S/. 31.50 S/. 25.20m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 186.68
hm 0.80 S/. 25.13 S/. 20.10hm 0.80 S/. 5.55 S/. 4.44% 5.00 S/. 206.00 S/. 10.30 S/. 34.84
Costo Directo S/. S/. 427.53
Rend 6.00 m2 S/. 69.99
HH 0.10 0.13 S/. 21.89 S/. 2.92HH 1.00 1.33 S/. 18.24 S/. 24.32HH 1.00 1.33 S/. 13.74 S/. 18.32 S/. 45.56
p2 5.71 S/. 4.00 S/. 22.84gln 0.05 S/. 10.50 S/. 0.53kg 0.20 S/. 2.91 S/. 0.58kg 0.20 S/. 2.43 S/. 0.49 S/. 24.43
Costo Directo S/. S/. 69.99
Rend 285.00 Kg S/. 3.85
HH 0.10 0.00 S/. 21.89 S/. 0.06HH 1.00 0.03 S/. 18.24 S/. 0.51HH 1.00 0.03 S/. 15.28 S/. 0.43 S/. 1.00
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.00 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.85
Rend 11.00 m2 S/. 27.25
HH 0.10 0.07 S/. 21.89 S/. 1.59HH 1.00 0.73 S/. 18.24 S/. 13.27HH 0.67 0.49 S/. 13.74 S/. 6.70 S/. 21.55
m3 0.02 S/. 35.40 S/. 0.86bls 0.18 S/. 15.66 S/. 2.82Kg 0.02 S/. 2.91 S/. 0.06p2 0.20 S/. 4.00 S/. 0.80m3 0.01 S/. 1.83 S/. 0.01p2 0.03 S/. 2.60 S/. 0.07 S/. 4.62
% 5.00 S/. 21.55 S/. 1.08 S/. 1.08
Costo Directo S/. S/. 27.25
Rend 22.00 m3 S/. 296.05
HH 0.20 0.07 S/. 21.89 S/. 1.59HH 2.00 0.73 S/. 18.24 S/. 13.27HH 2.00 0.73 S/. 18.24 S/. 13.27HH 1.00 0.36 S/. 15.28 S/. 5.56HH 12.00 4.36 S/. 13.74 S/. 59.96 S/. 93.64
gln 0.15 S/. 14.80 S/. 2.22gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 8.40 S/. 15.66 S/. 131.54m3 0.80 S/. 31.50 S/. 25.20m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 186.68
hm 0.36 S/. 25.13 S/. 9.05hm 0.36 S/. 5.55 S/. 2.00% 5.00 S/. 93.64 S/. 4.68 S/. 15.73
Costo Directo S/. S/. 296.05
Rend 16.00 m2 S/. 32.40
HH 0.10 0.05 S/. 21.89 S/. 1.09HH 1.00 0.50 S/. 18.24 S/. 9.12HH 1.00 0.50 S/. 13.74 S/. 6.87 S/. 17.08
p2 3.35 S/. 4.00 S/. 13.40gln 0.05 S/. 10.50 S/. 0.53kg 0.26 S/. 2.91 S/. 0.76kg 0.26 S/. 2.43 S/. 0.63 S/. 15.31
Costo Directo S/. S/. 32.40
Rend 12.00 m3 S/. 387.39
HH 0.20 0.13 S/. 21.89 S/. 2.92HH 2.00 1.33 S/. 18.24 S/. 24.32HH 2.00 1.33 S/. 18.24 S/. 24.32HH 1.00 0.67 S/. 15.28 S/. 10.19HH 12.00 8.00 S/. 13.74 S/. 109.92 S/. 171.67
gln 0.15 S/. 14.80 S/. 2.22gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 8.40 S/. 15.66 S/. 131.54m3 0.80 S/. 31.50 S/. 25.20m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 186.68
hm 0.67 S/. 25.13 S/. 16.75hm 0.67 S/. 5.55 S/. 3.70% 5.00 S/. 171.67 S/. 8.58 S/. 29.04
Costo Directo S/. S/. 387.39
Rend 16.00 m2 S/. 32.40
HH 0.10 0.05 S/. 21.89 S/. 1.09HH 1.00 0.50 S/. 18.24 S/. 9.12HH 1.00 0.50 S/. 13.74 S/. 6.87 S/. 17.08
p2 3.35 S/. 4.00 S/. 13.40gln 0.05 S/. 10.50 S/. 0.53kg 0.26 S/. 2.91 S/. 0.76kg 0.26 S/. 2.43 S/. 0.63 S/. 15.31
Costo Directo S/. S/. 32.40
Rend 265.00 Kg S/. 3.93
HH 0.10 0.00 S/. 21.89 S/. 0.07HH 1.00 0.03 S/. 18.24 S/. 0.55HH 1.00 0.03 S/. 15.28 S/. 0.46 S/. 1.08
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.08 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.93
Rend 25.00 m3 S/. 293.66
HH 0.20 0.06 S/. 21.89 S/. 1.40HH 2.00 0.64 S/. 18.24 S/. 11.67HH 2.00 0.64 S/. 18.24 S/. 11.67HH 1.00 0.32 S/. 15.28 S/. 4.89HH 12.00 3.84 S/. 13.74 S/. 52.76 S/. 82.40
gln 0.15 S/. 14.80 S/. 2.22gln 0.01 S/. 47.91 S/. 0.44Kg 0.02 S/. 25.00 S/. 0.46bls 8.40 S/. 15.66 S/. 131.54m3 0.80 S/. 31.50 S/. 25.20
m3 0.50 S/. 37.00 S/. 18.50p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 186.68
hm 0.67 S/. 25.13 S/. 16.75hm 0.67 S/. 5.55 S/. 3.70% 5.00 S/. 82.40 S/. 4.12 S/. 24.57
Costo Directo S/. S/. 293.66
Rend 270.00 Kg S/. 3.91
HH 0.10 0.00 S/. 21.89 S/. 0.06HH 1.00 0.03 S/. 18.24 S/. 0.54HH 1.00 0.03 S/. 15.28 S/. 0.45 S/. 1.06
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.06 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.91
Rend 280.00 Kg S/. 3.87
HH 0.10 0.00 S/. 21.89 S/. 0.06HH 1.00 0.03 S/. 18.24 S/. 0.52HH 1.00 0.03 S/. 15.28 S/. 0.44 S/. 1.02
Kg 1.05 S/. 2.60 S/. 2.73Kg 0.03 S/. 2.43 S/. 0.06 S/. 2.79
dia 0.01 1.55 0.01% 5.00 S/. 1.02 S/. 0.05 S/. 0.06
Costo Directo S/. S/. 3.87
Rend 16.00 m2 S/. 32.40
HH 0.10 0.05 S/. 21.89 S/. 1.09HH 1.00 0.50 S/. 18.24 S/. 9.12HH 1.00 0.50 S/. 13.74 S/. 6.87 S/. 17.08
p2 3.35 S/. 4.00 S/. 13.40gln 0.05 S/. 10.50 S/. 0.53kg 0.26 S/. 2.91 S/. 0.76kg 0.26 S/. 2.43 S/. 0.63 S/. 15.31
Costo Directo S/. S/. 32.40
Rend 20.00 m3 S/. 296.38
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 4.00 1.60 S/. 18.24 S/. 29.18HH 1.00 0.40 S/. 18.24 S/. 7.30HH 1.00 0.40 S/. 15.28 S/. 6.11HH 8.00 3.20 S/. 13.74 S/. 43.97 S/. 87.44
gln 0.03 S/. 14.80 S/. 0.44bls 9.00 S/. 15.66 S/. 140.94m3 0.90 S/. 31.50 S/. 28.35m3 0.42 S/. 37.00 S/. 15.54p2 2.00 S/. 4.00 S/. 8.00m3 0.18 S/. 1.83 S/. 0.33 S/. 193.60
hm 0.50 S/. 25.13 S/. 12.57hm 0.50 S/. 5.55 S/. 2.78 S/. 15.34
Costo Directo S/. S/. 296.38
Rend 18.00 m3 S/. 311.06
HH 0.20 0.09 S/. 21.89 S/. 1.95HH 4.00 1.78 S/. 18.24 S/. 32.43HH 1.00 0.44 S/. 18.24 S/. 8.11HH 1.00 0.44 S/. 15.28 S/. 6.79HH 8.00 3.56 S/. 13.74 S/. 48.85 S/. 98.12
gln 0.03 S/. 14.80 S/. 0.44bls 9.00 S/. 15.66 S/. 140.94m3 0.90 S/. 31.50 S/. 28.35m3 0.45 S/. 37.00 S/. 16.65p2 1.20 S/. 4.00 S/. 4.80m3 0.18 S/. 1.83 S/. 0.33 S/. 191.51
% 5.00 S/. 98.12 S/. 4.91hm 0.36 S/. 25.13 S/. 8.94hm 0.36 S/. 15.76 S/. 5.60hm 0.36 S/. 5.55 S/. 1.97 S/. 21.42
Costo Directo S/. S/. 311.06
Rend 15.00 m2 S/. 32.07
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73HH 1.00 0.53 S/. 13.74 S/. 7.33 S/. 18.22
p2 3.00 S/. 4.00 S/. 12.00gln 0.05 S/. 10.50 S/. 0.53kg 0.22 S/. 2.91 S/. 0.64kg 0.28 S/. 2.43 S/. 0.68 S/. 13.85
Costo Directo S/. S/. 32.07
Rend 14.00 m2 S/. 42.61
HH 0.10 0.06 S/. 21.89 S/. 1.25HH 1.00 0.57 S/. 18.24 S/. 10.42HH 1.00 0.57 S/. 15.28 S/. 8.73 S/. 20.41
p2 5.15 S/. 4.00 S/. 20.60gln 0.05 S/. 10.50 S/. 0.53kg 0.12 S/. 2.91 S/. 0.35kg 0.05 S/. 2.43 S/. 0.12 S/. 21.60
% 3.00 S/. 20.41 S/. 0.61 S/. 0.61
Costo Directo S/. S/. 42.61
MURO DE LADRILLO KK
Rend 9.00 m2 S/. 51.93
HH 0.10 0.09 S/. 21.89 S/. 1.95HH 1.00 0.89 S/. 18.24 S/. 16.21HH 0.50 0.44 S/. 13.74 S/. 6.11 S/. 24.27
m3 0.03 S/. 37.00 S/. 1.07bls 0.20 S/. 15.66 S/. 3.19Kg 0.00 S/. 2.91 S/. 0.01p2 0.41 S/. 4.00 S/. 1.64m3 0.01 S/. 1.83 S/. 0.01mll 0.04 S/. 526.21 S/. 20.52 S/. 26.45
% 5.00 S/. 24.27 S/. 1.21 S/. 1.21
Costo Directo S/. S/. 51.93
Rend 6.00 m2 S/. 82.17
HH 0.10 0.13 S/. 21.89 S/. 2.92HH 1.00 1.33 S/. 18.24 S/. 24.32HH 0.50 0.67 S/. 13.74 S/. 9.16 S/. 36.40
m3 0.06 S/. 37.00 S/. 2.07
bls 0.25 S/. 15.66 S/. 3.92Kg 0.00 S/. 2.91 S/. 0.01p2 0.41 S/. 4.00 S/. 1.64m3 0.01 S/. 1.83 S/. 0.01mll 0.07 S/. 526.21 S/. 36.31 S/. 43.96
% 5.00 S/. 36.40 S/. 1.82 S/. 1.82
Costo Directo S/. S/. 82.17
Rend 9.00 m2 S/. 50.18
HH 0.10 0.09 S/. 21.89 S/. 1.95HH 1.00 0.89 S/. 18.24 S/. 16.21HH 0.50 0.44 S/. 13.74 S/. 6.11 S/. 24.27
m3 0.03 S/. 37.00 S/. 1.07bls 0.20 S/. 15.66 S/. 3.05Kg 0.04 S/. 2.91 S/. 0.12p2 0.41 S/. 4.00 S/. 1.64m3 0.01 S/. 1.83 S/. 0.01mll 0.04 S/. 470.00 S/. 18.80 S/. 24.70
% 5.00 S/. 24.27 S/. 1.21 S/. 1.21
Costo Directo S/. S/. 50.18
TARRAJEOS
Rend 10.00 m2 S/. 25.26
HH 0.10 0.08 S/. 21.89 S/. 1.75HH 1.00 0.80 S/. 18.24 S/. 14.59HH 0.33 0.26 S/. 13.74 S/. 3.63 S/. 19.97
m3 0.02 S/. 35.40 S/. 0.86bls 0.16 S/. 15.66 S/. 2.49Kg 0.02 S/. 2.91 S/. 0.06p2 0.20 S/. 4.00 S/. 0.80m3 0.01 S/. 1.83 S/. 0.01p2 0.03 S/. 2.60 S/. 0.07 S/. 4.29
% 5.00 S/. 19.97 S/. 1.00 S/. 1.00
Costo Directo S/. S/. 25.26
Rend 12.00 m2 S/. 21.77
HH 0.10 0.07 S/. 21.89 S/. 1.46HH 1.00 0.67 S/. 18.24 S/. 12.16HH 0.33 0.22 S/. 13.74 S/. 3.02 S/. 16.64
m3 0.02 S/. 35.40 S/. 0.86bls 0.16 S/. 15.66 S/. 2.49Kg 0.02 S/. 2.91 S/. 0.06p2 0.20 S/. 4.00 S/. 0.80m3 0.01 S/. 1.83 S/. 0.01p2 0.03 S/. 2.60 S/. 0.07 S/. 4.29
% 5.00 S/. 16.64 S/. 0.83 S/. 0.83
Costo Directo S/. S/. 21.77
Rend 8.00 m2 S/. 30.50
HH 0.10 0.10 S/. 21.89 S/. 2.19HH 1.00 1.00 S/. 18.24 S/. 18.24HH 0.33 0.33 S/. 13.74 S/. 4.53 S/. 24.96
m3 0.02 S/. 35.40 S/. 0.86bls 0.16 S/. 15.66 S/. 2.49Kg 0.02 S/. 2.91 S/. 0.06p2 0.20 S/. 4.00 S/. 0.80m3 0.01 S/. 1.83 S/. 0.01p2 0.03 S/. 2.60 S/. 0.07 S/. 4.29
% 5.00 S/. 24.96 S/. 1.25 S/. 1.25
Costo Directo S/. S/. 30.50
Rend 9.50 m2 S/. 26.36
HH 0.10 0.08 S/. 21.89 S/. 1.84HH 1.00 0.84 S/. 18.24 S/. 15.36HH 0.33 0.28 S/. 13.74 S/. 3.82 S/. 21.02
m3 0.02 S/. 35.40 S/. 0.86bls 0.16 S/. 15.66 S/. 2.49Kg 0.02 S/. 2.91 S/. 0.06p2 0.20 S/. 4.00 S/. 0.80m3 0.01 S/. 1.83 S/. 0.01p2 0.03 S/. 2.60 S/. 0.07 S/. 4.29
% 5.00 S/. 21.02 S/. 1.05 S/. 1.05
Costo Directo S/. S/. 26.36
Rend 25.00 m2 S/. 9.66
HH 0.10 0.03 S/. 21.89 S/. 0.70HH 1.00 0.32 S/. 18.24 S/. 5.84HH 0.33 0.11 S/. 13.74 S/. 1.45 S/. 7.99
m3 0.00 S/. 35.40 S/. 0.14bls 0.07 S/. 15.66 S/. 1.13Kg 0.00 S/. 1.83 S/. 0.00 S/. 1.27
% 5.00 S/. 7.99 S/. 0.40 S/. 0.40
Costo Directo S/. S/. 9.66
COBERTURAS
Rend 14.00 m2 S/. 40.53
HH 0.10 0.06 S/. 21.89 S/. 1.25HH 1.00 0.57 S/. 18.24 S/. 10.42HH 0.50 0.29 S/. 13.74 S/. 3.93 S/. 15.60
m2 1.05 S/. 23.00 S/. 24.15 S/. 24.15
% 5.00 S/. 15.60 S/. 0.78 S/. 0.78
Costo Directo S/. S/. 40.53
PISOS
Rend 14.00 m2 S/. 38.29
HH 0.10 0.06 S/. 21.89 S/. 1.25HH 1.00 0.57 S/. 18.24 S/. 10.42HH 0.50 0.29 S/. 15.28 S/. 4.37HH 1.00 0.57 S/. 13.74 S/. 7.85 S/. 23.89
m3 0.01 S/. 35.40 S/. 0.32m3 0.06 S/. 37.00 S/. 2.07bls 0.48 S/. 15.66 S/. 7.55m3 0.01 S/. 1.83 S/. 0.03gln 0.10 S/. 22.00 S/. 2.20p2 0.40 S/. 2.60 S/. 1.04 S/. 13.21
% 5.00 S/. 23.89 S/. 1.19 S/. 1.19
Costo Directo S/. S/. 38.29
Rend 40.00 m2 S/. 10.48
HH 0.10 0.02 S/. 21.89 S/. 0.44HH 1.00 0.20 S/. 18.24 S/. 3.65HH 1.00 0.20 S/. 13.74 S/. 2.75 S/. 6.83
m3 0.11 S/. 31.50 S/. 3.31 S/. 3.31
% 5.00 S/. 6.83 S/. 0.34 S/. 0.34
Costo Directo S/. S/. 10.48
CARPINTERIA METALICA Y CERRAJERIA
Rend 15.00 ml S/. 79.82
HH 0.10 0.05 S/. 21.89 S/. 1.17
HH 1.00 0.53 S/. 18.24 S/. 9.73HH 1.00 0.53 S/. 13.74 S/. 7.33 S/. 18.22
ml 1.05 S/. 45.00 S/. 47.25kg 3.00 S/. 3.03 S/. 9.08Kg 3.00 S/. 1.45 S/. 4.35 S/. 60.68
% 5.00 S/. 18.22 S/. 0.91 S/. 0.91
Costo Directo S/. S/. 79.82
Rend 1.00 m2 S/. 602.98
HH 0.10 0.80 S/. 21.89 S/. 17.51HH 1.00 8.00 S/. 18.24 S/. 145.92HH 2.00 16.00 S/. 13.74 S/. 219.84 S/. 383.27
Kg 25.00 S/. 3.98 S/. 99.50Kg 22.50 S/. 2.21 S/. 49.73und 0.38 S/. 25.00 S/. 9.43und 1.51 S/. 9.00 S/. 13.58und 0.38 S/. 75.00 S/. 28.30 S/. 200.55
% 5.00 S/. 383.27 S/. 19.16 S/. 19.16
Costo Directo S/. S/. 602.98
Rend 30.00 ml S/. 56.86
HH 0.10 0.03 S/. 21.89 S/. 0.58HH 1.00 0.27 S/. 18.24 S/. 4.86HH 1.00 0.27 S/. 13.74 S/. 3.66 S/. 9.11
Kg 10.56 S/. 3.03 S/. 31.98Kg 10.56 S/. 1.45 S/. 15.31 S/. 47.29
% 5.00 S/. 9.11 S/. 0.46 S/. 0.46
Costo Directo S/. S/. 56.86
Rend 5.00 und S/. 114.96
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 32.69
und 1.00 S/. 79.00 S/. 79.00 S/. 79.00
% 10.00 S/. 32.69 S/. 3.27 S/. 3.27
Costo Directo S/. S/. 114.96
Rend 30.00 und S/. 30.99
HH 0.10 0.03 S/. 21.89 S/. 0.58HH 1.00 0.27 S/. 18.24 S/. 4.86 S/. 5.45
und 1.00 S/. 25.00 S/. 25.00 S/. 25.00
% 10.00 S/. 5.45 S/. 0.54 S/. 0.54
Costo Directo S/. S/. 30.99
Rend 50.00 kg S/. 10.37
HH 0.10 0.02 S/. 21.89 S/. 0.35HH 1.00 0.16 S/. 18.24 S/. 2.92HH 1.00 0.16 S/. 13.74 S/. 2.20 S/. 5.47
Kg 1.05 S/. 2.70 S/. 2.84Kg 1.05 S/. 1.45 S/. 1.52 S/. 4.36
% 10.00 S/. 5.47 S/. 0.55 S/. 0.55
Costo Directo S/. S/. 10.37
Rend 50.00 kg S/. 8.85
HH 0.10 0.02 S/. 21.89 S/. 0.35HH 1.00 0.16 S/. 18.24 S/. 2.92HH 1.00 0.16 S/. 13.74 S/. 2.20 S/. 5.47
Kg 1.05 S/. 2.70 S/. 2.84 S/. 2.84
% 10.00 S/. 5.47 S/. 0.55 S/. 0.55
Costo Directo S/. S/. 8.85
Rend 30.00 und S/. 26.59
HH 0.10 0.03 S/. 21.89 S/. 0.58HH 1.00 0.27 S/. 18.24 S/. 4.86 S/. 5.45
UND 1.00 S/. 14.00 S/. 14.00KG 0.04 S/. 48.74 S/. 1.95 S/. 15.95
HM 0.10 15.00 1.50HM 0.10 34.20 3.42% 5.00 S/. 5.45 S/. 0.27 S/. 5.19
Costo Directo S/. S/. 26.59
PINTURAS
Rend 30.00 m2 S/. 8.80
HH 0.10 0.03 S/. 21.89 S/. 0.58HH 1.00 0.27 S/. 18.24 S/. 4.86 S/. 5.45
gln 0.08 S/. 36.00 S/. 2.99pl 0.07 S/. 1.40 S/. 0.09 S/. 3.08
% 5.00 S/. 5.45 S/. 0.27 S/. 0.27
Costo Directo S/. S/. 8.80
Rend 40.00 m2 S/. 6.32
HH 0.10 0.02 S/. 21.89 S/. 0.44HH 1.00 0.20 S/. 18.24 S/. 3.65 S/. 4.09
gln 0.05 S/. 40.50 S/. 2.03 S/. 2.03
% 5.00 S/. 4.09 S/. 0.20 S/. 0.20
Costo Directo S/. S/. 6.32
Rend 40.00 m2 S/. 4.72
HH 0.10 0.02 S/. 21.89 S/. 0.44HH 1.00 0.20 S/. 18.24 S/. 3.65 S/. 4.09
bls 0.02 S/. 18.00 S/. 0.36pl 0.05 S/. 1.40 S/. 0.07 S/. 0.43
% 5.00 S/. 4.09 S/. 0.20 S/. 0.20
Costo Directo S/. S/. 4.72
Rend 50.00 m2 S/. 5.90
HH 0.10 0.02 S/. 21.89 S/. 0.35HH 1.00 0.16 S/. 18.24 S/. 2.92 S/. 3.27
gln 0.08 S/. 30.00 S/. 2.40pl 0.05 S/. 1.40 S/. 0.07 S/. 2.47
% 5.00 S/. 3.27 S/. 0.16 S/. 0.16
Costo Directo S/. S/. 5.90
Rend 25.00 m2 S/. 9.69
HH 0.10 0.03 S/. 21.89 S/. 0.70HH 1.00 0.32 S/. 18.24 S/. 5.84 S/. 6.54
bls 0.02 S/. 18.00 S/. 0.36gln 0.08 S/. 30.00 S/. 2.40pl 0.05 S/. 1.40 S/. 0.07 S/. 2.83
% 5.00 S/. 6.54 S/. 0.33 S/. 0.33
Costo Directo S/. S/. 9.69
Rend 40.00 m2 S/. 8.57
HH 0.10 0.02 S/. 21.89 S/. 0.44HH 1.00 0.20 S/. 18.24 S/. 3.65 S/. 4.09
gln 0.14 S/. 30.00 S/. 4.20pl 0.05 S/. 1.60 S/. 0.08 S/. 4.28
% 5.00 S/. 4.09 S/. 0.20 S/. 0.20
Costo Directo S/. S/. 8.57
Rend 20.00 m2 S/. 14.89
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 8.17
gln 0.05 S/. 40.50 S/. 2.03gln 0.14 S/. 30.00 S/. 4.20pl 0.05 S/. 1.60 S/. 0.08 S/. 6.31
% 5.00 S/. 8.17 S/. 0.41 S/. 0.41
Costo Directo S/. S/. 14.89
OTRAS OBRAS
Rend 50.00 gln S/. 34.93
HH 0.10 0.02 S/. 21.89 S/. 0.35HH 1.00 0.16 S/. 18.24 S/. 2.92 S/. 3.27
gln 1.05 S/. 30.00 S/. 31.50 S/. 31.50
% 5.00 S/. 3.27 S/. 0.16 S/. 0.16
Costo Directo S/. S/. 34.93
Rend 10.00 m2S/. 291.20
HH 0.10 0.08 S/. 21.89 S/. 1.75HH 1.00 0.80 S/. 13.74 S/. 10.99HH 1.00 0.80 S/. 18.24 S/. 14.59 S/. 27.34
m2 1.05 250.00 262.50 S/. 262.50
% 5.00 S/. 27.34 S/. 1.37 S/. 1.37
Costo Directo S/. S/. 291.20
Rend 8.00 m2 S/. 170.34
HH 0.10 0.10 S/. 21.89 S/. 2.19HH 1.00 1.00 S/. 13.74 S/. 13.74HH 1.00 1.00 S/. 18.24 S/. 18.24 S/. 34.17
kg 2.00 67.23 134.46 S/. 134.46
% 5.00 S/. 34.17 S/. 1.71 S/. 1.71
Costo Directo S/. S/. 170.34
Rend 1.00 m2 S/. 530.41
HH 0.20 1.60 S/. 21.89 S/. 35.02HH 1.00 8.00 S/. 13.74 S/. 109.92HH 1.00 8.00 S/. 18.24 S/. 145.92 S/. 290.86
kg 90.00 S/. 2.50 S/. 225.00 S/. 225.00
% 5.00 S/. 290.86 S/. 14.54 S/. 14.54
Costo Directo S/. S/. 530.41
Rend 100.00 ml S/. 3.82
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 1.63
ml 1.05 S/. 2.00 S/. 2.10 S/. 2.10
% 5.00 S/. 1.63 S/. 0.08 S/. 0.08
Costo Directo S/. S/. 3.82
Rend 1.00 glb S/. 133.80
HH 0.10 0.80 S/. 21.89 S/. 17.51HH 1.00 8.00 S/. 13.74 S/. 109.92 S/. 127.43
% 5.00 S/. 127.43 S/. 6.37 S/. 6.37
Costo Directo S/. S/. 133.80
Rend 1.00 glb S/. 276.60
HH 0.10 0.80 S/. 21.89 S/. 17.51HH 1.00 8.00 S/. 18.24 S/. 145.92 S/. 163.43
glb 1.05 S/. 100.00 S/. 105.00 S/. 105.00
% 5.00 S/. 163.43 S/. 8.17 S/. 8.17
Costo Directo S/. S/. 276.60
INSTALACION SANITARIA
Rend 20.00 ml S/. 16.60
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 13.74 S/. 5.50
HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 13.67
gal 0.01 S/. 132.00 S/. 1.32pza 0.35 S/. 2.66 S/. 0.93 S/. 2.25
% 5.00 S/. 13.67 S/. 0.68 S/. 0.68
Costo Directo S/. S/. 16.60
Rend 25.00 ml S/. 15.45
HH 0.10 0.03 S/. 21.89 S/. 0.70HH 1.00 0.32 S/. 13.74 S/. 4.40HH 1.00 0.32 S/. 18.24 S/. 5.84 S/. 10.93
gal 0.01 S/. 132.00 S/. 1.32pza 0.35 S/. 7.58 S/. 2.65 S/. 3.97
% 5.00 S/. 10.93 S/. 0.55 S/. 0.55
Costo Directo S/. S/. 15.45
Rend 25.00 ml S/. 20.70
HH 0.10 0.03 S/. 21.89 S/. 0.70HH 1.00 0.32 S/. 13.74 S/. 4.40HH 1.00 0.32 S/. 18.24 S/. 5.84 S/. 10.93
gal 0.01 S/. 132.00 S/. 1.32ml 1.05 S/. 5.00 S/. 5.25pza 0.35 S/. 7.58 S/. 2.65 S/. 9.22
% 5.00 S/. 10.93 S/. 0.55 S/. 0.55
Costo Directo S/. S/. 20.70
Rend 36.00 m2
HH 0.10 0.02 S/. 21.89 S/. 0.49HH 1.00 0.22 S/. 18.24 S/. 4.05HH 1.00 0.22 S/. 13.74 S/. 3.05 S/. 7.59
bls 1.50 S/. 18.00 S/. 27.00pl 0.07 S/. 1.40 S/. 0.09gln 0.05 S/. 24.28 S/. 1.21 S/. 28.31
% 5.00 S/. 7.59 S/. 0.38 S/. 0.38
Costo Directo S/. S/. 36.28
Rend 8.00 m2
HH 0.10 0.10 S/. 21.89 S/. 2.19HH 1.00 1.00 S/. 18.24 S/. 18.24HH 0.25 0.25 S/. 13.74 S/. 3.44 S/. 23.86
m2 1.05 S/. 24.00 S/. 25.20Bls 0.25 S/. 16.00 S/. 4.00Kg 0.20 S/. 4.00 S/. 0.80bls 0.02 #N/A #N/A #N/A
% 5.00 S/. 23.86 S/. 1.19 S/. 1.19
Costo Directo S/. #N/A
Rend 25.00 ml S/. 37.04
HH 0.20 0.06 S/. 21.89 S/. 1.40HH 1.00 0.32 S/. 18.24 S/. 5.84HH 1.00 0.32 S/. 13.74 S/. 4.40 S/. 11.63
cto 0.01 S/. 26.00 S/. 0.34cto 0.08 S/. 15.00 S/. 1.20cto 0.13 S/. 16.00 S/. 2.08pl 0.10 S/. 45.00 S/. 4.50kg 0.90 S/. 2.00 S/. 1.80pza 0.03 S/. 30.00 S/. 0.84cto 0.01 S/. 30.00 S/. 0.39pza 0.01 S/. 5.20 S/. 0.04p2 0.07 S/. 4.40 S/. 0.31pza 0.17 S/. 20.00 S/. 3.40pza 0.40 S/. 15.00 S/. 6.00bls 0.08 S/. 18.00 S/. 1.44gln 0.08 S/. 30.00 S/. 2.40pza 0.01 S/. 11.00 S/. 0.09 S/. 24.83
% 5.00 S/. 11.63 S/. 0.58 S/. 0.58
Costo Directo S/. S/. 37.04
Rend 12.00 m2S/. 139.68
HH 0.20 0.13 S/. 21.89 S/. 2.92HH 2.00 1.33 S/. 18.24 S/. 24.32HH 1.00 0.67 S/. 13.74 S/. 9.16 S/. 36.40
cto 0.01 S/. 26.00 S/. 0.34cto 0.08 S/. 15.00 S/. 1.20cto 0.26 S/. 16.00 S/. 4.16pl 1.50 S/. 45.00 S/. 67.50cto 0.01 S/. 30.00 S/. 0.39pza 0.01 S/. 5.20 S/. 0.04m2 1.00 S/. 5.83 S/. 5.83p2 5.00 S/. 4.40 S/. 22.00 S/. 101.46
% 5.00 S/. 36.40 S/. 1.82 S/. 1.82
Costo Directo S/. S/. 139.68
Rend 12.00 m2S/. 123.79
HH 0.20 0.13 S/. 21.89 S/. 2.92HH 1.00 0.67 S/. 18.24 S/. 12.16HH 1.00 0.67 S/. 15.28 S/. 10.19HH 0.25 0.17 S/. 13.74 S/. 2.29 S/. 27.56
cto 0.01 S/. 26.00 S/. 0.34cto 0.08 S/. 15.00 S/. 1.20cto 0.26 S/. 16.00 S/. 4.16pl 0.73 S/. 45.00 S/. 32.83kg 1.80 S/. 2.00 S/. 3.60pza 0.03 S/. 30.00 S/. 0.84cto 0.01 S/. 30.00 S/. 0.39pza 0.01 S/. 5.20 S/. 0.04p2 0.14 S/. 4.40 S/. 0.60pza 0.35 S/. 20.00 S/. 7.00pza 0.80 S/. 15.00 S/. 11.93Kg 8.00 S/. 3.98 S/. 31.84pza 0.01 S/. 11.00 S/. 0.09 S/. 94.85
% 5.00 S/. 27.56 S/. 1.38 S/. 1.38
Costo Directo S/. S/. 123.79
Rend 12.00 m2 S/. 151.65
HH 0.20 0.13 S/. 21.89 S/. 2.92HH 1.00 0.67 S/. 18.24 S/. 12.16HH 1.00 0.67 S/. 15.28 S/. 10.19HH 0.25 0.17 S/. 13.74 S/. 2.29 S/. 27.56
cto 0.01 S/. 26.00 S/. 0.34cto 0.08 S/. 15.00 S/. 1.20cto 0.26 S/. 16.00 S/. 4.16pl 0.73 S/. 45.00 S/. 32.83kg 1.80 S/. 2.00 S/. 3.60pza 0.03 S/. 30.00 S/. 0.84cto 0.01 S/. 30.00 S/. 0.39pza 0.01 S/. 5.20 S/. 0.04p2 0.14 S/. 4.40 S/. 0.60
pza 0.35 S/. 20.00 S/. 7.00pza 0.80 S/. 15.00 S/. 11.93Kg 15.00 S/. 3.98 S/. 59.70pza 0.01 S/. 11.00 S/. 0.09 S/. 122.71
% 5.00 S/. 27.56 S/. 1.38 S/. 1.38
Costo Directo S/. S/. 151.65
Rend 12.00 m2
HH 0.20 0.13 S/. 21.89 S/. 2.92HH 1.00 0.67 S/. 18.24 S/. 12.16HH 1.00 0.67 S/. 15.28 S/. 10.19HH 0.25 0.17 S/. 13.74 S/. 2.29 S/. 27.56
m2 1.05 S/. 4.24 S/. 4.45ml 1.05 S/. 3.64 S/. 3.82ml 1.05 S/. 0.70 S/. 0.74ml 1.05 S/. 0.30 S/. 0.32 S/. 9.32
% 5.00 S/. 27.56 S/. 1.38 S/. 1.38
Costo Directo S/. S/. 38.25
Rend 2.00 Und
HH 0.10 0.40 S/. 21.89 S/. 8.76HH 1.00 4.00 S/. 18.24 S/. 72.96HH 0.25 1.00 S/. 13.74 S/. 13.74 S/. 95.46
pza 2.00 S/. 9.54 S/. 19.08pza 1.00 S/. 12.00 S/. 12.00pza 1.00 S/. 260.00 S/. 260.00pza 1.00 S/. 12.96 S/. 12.96pza 1.00 S/. 7.57 S/. 7.57cja 0.04 S/. 172.12 S/. 6.02 S/. 317.63
% 5.00 S/. 95.46 S/. 4.77 S/. 4.77
Costo Directo S/. S/. 417.86
Rend 4.00 Und
HH 0.10 0.20 S/. 21.89 S/. 4.38HH 1.00 2.00 S/. 18.24 S/. 36.48HH 0.25 0.50 S/. 13.74 S/. 6.87 S/. 47.73
pza 1.00 S/. 20.54 S/. 20.54pza 1.00 S/. 218.00 S/. 218.00pza 1.00 S/. 7.82 S/. 7.82pza 2.00 S/. 8.14 S/. 16.28cja 0.04 S/. 172.12 S/. 6.02 S/. 268.66
% 5.00 S/. 47.73 S/. 2.39 S/. 2.39
Costo Directo S/. S/. 318.78
Rend 4.00 Und
HH 0.10 0.20 S/. 21.89 S/. 4.38HH 1.00 2.00 S/. 18.24 S/. 36.48HH 0.25 0.50 S/. 13.74 S/. 6.87 S/. 47.73
pza 2.00 S/. 9.54 S/. 19.08pza 1.00 S/. 20.54 S/. 20.54pza 1.00 S/. 80.00 S/. 80.00pza 1.00 S/. 28.00 S/. 28.00pza 1.00 S/. 80.00 S/. 80.00cja 0.04 S/. 172.12 S/. 6.02 S/. 233.64
% 5.00 S/. 47.73 S/. 2.39 S/. 2.39
Costo Directo S/. S/. 283.76
Rend 4.00 Und
HH 0.10 0.20 S/. 21.89 S/. 4.38HH 1.00 2.00 S/. 18.24 S/. 36.48HH 0.25 0.50 S/. 13.74 S/. 6.87 S/. 47.73
pza 1.00 S/. 75.00 S/. 75.00pza 0.50 S/. 1.47 S/. 0.74 S/. 75.74
% 5.00 S/. 47.73 S/. 2.39 S/. 2.39
Costo Directo S/. S/. 125.85
Rend 2.00 Und
HH 0.10 0.40 S/. 21.89 S/. 8.76HH 1.00 4.00 S/. 18.24 S/. 72.96HH 0.25 1.00 S/. 13.74 S/. 13.74 S/. 95.46
pza 1.00 S/. 170.00 S/. 170.00pza 0.50 S/. 1.47 S/. 0.74 S/. 170.74
% 5.00 S/. 95.46 S/. 4.77 S/. 4.77
Costo Directo S/. S/. 270.96
Rend 6.00 Und
HH 0.10 0.13 S/. 21.89 S/. 2.92HH 1.00 1.33 S/. 18.24 S/. 24.32HH 0.25 0.33 S/. 13.74 S/. 4.58 S/. 31.82
pza 1.00 S/. 65.00 S/. 65.00pza 0.50 S/. 1.47 S/. 0.74 S/. 65.74
% 5.00 S/. 31.82 S/. 1.59 S/. 1.59
Costo Directo S/. S/. 99.14
Rend 10.00 Und
HH 0.10 0.08 S/. 21.89 S/. 1.75HH 1.00 0.80 S/. 18.24 S/. 14.59HH 0.25 0.20 S/. 13.74 S/. 2.75 S/. 19.09
pza 1.00 S/. 58.00 S/. 58.00p2 0.50 S/. 4.40 S/. 2.20 S/. 60.20
% 5.00 S/. 19.09 S/. 0.95 S/. 0.95
Costo Directo S/. S/. 80.25
Rend 20.00 Und
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 8.17
pza 1.00 S/. 15.00 S/. 15.00cja 0.01 S/. 172.12 S/. 1.72 S/. 16.72
% 5.00 S/. 8.17 S/. 0.41 S/. 0.41
Costo Directo S/. S/. 25.30
Rend 20.00 Und
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 8.17
pza 1.00 S/. 18.00 S/. 18.00cja 0.01 S/. 172.12 S/. 1.72 S/. 19.72
% 5.00 S/. 8.17 S/. 0.41 S/. 0.41
Costo Directo S/. S/. 28.30
Rend 15.00 Und
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73 S/. 10.90
pza 1.00 S/. 15.00 S/. 15.00 S/. 15.00
% 5.00 S/. 10.90 S/. 0.54 S/. 0.54
Costo Directo S/. S/. 26.44
Rend 15.00 Und
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73 S/. 10.90
pza 1.00 S/. 15.00 S/. 15.00cja 0.01 S/. 172.12 S/. 1.72 S/. 16.72
% 5.00 S/. 10.90 S/. 0.54 S/. 0.54
Costo Directo S/. S/. 28.16
Rend 8.00 Und
HH 0.10 0.10 S/. 21.89 S/. 2.19HH 1.00 1.00 S/. 18.24 S/. 18.24 S/. 20.43
cja 1.00 S/. 95.00 S/. 95.00 S/. 95.00
% 5.00 S/. 20.43 S/. 1.02 S/. 1.02
Costo Directo S/. S/. 116.45
Rend 50.00 p2
HH 0.10 0.02 S/. 21.89 S/. 0.35HH 1.00 0.16 S/. 18.24 S/. 2.92HH 0.50 0.08 S/. 13.74 S/. 1.10 S/. 4.37
p2 1.05 S/. 1.80 S/. 1.89 S/. 1.89
% 5.00 S/. 4.37 S/. 0.22 S/. 0.22
Costo Directo S/. S/. 6.48
Rend 40.00 ml
HH 0.20 0.04 S/. 21.89 S/. 0.88HH 1.00 0.20 S/. 18.24 S/. 3.65HH 1.00 0.20 S/. 15.28 S/. 3.06 S/. 7.58
p2 2.00 S/. 4.40 S/. 8.80kg 0.13 S/. 2.91 S/. 0.38gl 0.10 S/. 15.00 S/. 1.50 S/. 10.68
% 5.00 S/. 7.58 S/. 0.38 S/. 0.38
Costo Directo S/. S/. 18.64
OBRAS ELECTRICAS
Rend 18.00 ml S/. 38.25
HH 0.10 0.04 S/. 21.89 S/. 0.97HH 1.00 0.44 S/. 18.24 S/. 8.11HH 1.00 0.44 S/. 13.74 S/. 6.11 S/. 15.19
gal 0.00 S/. 132.00 S/. 0.07pza 0.35 S/. 55.82 S/. 19.54pza 0.34 S/. 7.95 S/. 2.70 S/. 22.31
% 5.00 S/. 15.19 S/. 0.76 S/. 0.76
Costo Directo S/. S/. 38.25
Rend 20.00 ml S/. 25.89
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 18.24 S/. 7.30HH 1.00 0.40 S/. 13.74 S/. 5.50 S/. 13.67
gal 0.00 S/. 132.00 S/. 0.07pza 0.35 S/. 27.98 S/. 9.79pza 0.34 S/. 4.95 S/. 1.68 S/. 11.54
% 5.00 S/. 13.67 S/. 0.68 S/. 0.68
Costo Directo S/. S/. 25.89
Rend 20.00 ml S/. 21.98
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 18.24 S/. 7.30HH 1.00 0.40 S/. 13.74 S/. 5.50 S/. 13.67
gal 0.00 S/. 132.00 S/. 0.07pza 0.35 S/. 18.65 S/. 6.53pza 0.34 S/. 3.05 S/. 1.04 S/. 7.63
% 5.00 S/. 13.67 S/. 0.68 S/. 0.68
Costo Directo S/. S/. 21.98
Rend 15.00 ml S/. 24.13
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73HH 1.00 0.53 S/. 13.74 S/. 7.33 S/. 18.22
gal 0.00 S/. 132.00 S/. 0.07pza 0.34 S/. 14.50 S/. 4.93 S/. 5.00
% 5.00 S/. 18.22 S/. 0.91 S/. 0.91
Costo Directo S/. S/. 24.13
Rend 25.00 ml S/. 15.51
HH 0.10 0.03 S/. 21.89 S/. 0.70HH 1.00 0.32 S/. 18.24 S/. 5.84HH 1.00 0.32 S/. 13.74 S/. 4.40 S/. 10.93
gal 0.00 S/. 132.00 S/. 0.07pza 0.35 S/. 10.08 S/. 3.53pza 0.34 S/. 1.28 S/. 0.44 S/. 4.03
% 5.00 S/. 10.93 S/. 0.55 S/. 0.55
Costo Directo S/. S/. 15.51
Rend 30.00 ml S/. 12.41
HH 0.10 0.03 S/. 21.89 S/. 0.58HH 1.00 0.27 S/. 18.24 S/. 4.86HH 1.00 0.27 S/. 13.74 S/. 3.66 S/. 9.11
gal 0.00 S/. 132.00 S/. 0.07pza 0.35 S/. 7.00 S/. 2.45pza 0.34 S/. 0.95 S/. 0.32 S/. 2.84
% 5.00 S/. 9.11 S/. 0.46 S/. 0.46
Costo Directo S/. S/. 12.41
Rend 65.00 und S/. 6.16
HH 0.10 0.01 S/. 21.89 S/. 0.27HH 1.00 0.12 S/. 18.24 S/. 2.24 S/. 2.51
gal 0.00 S/. 132.00 S/. 0.07und 0.35 S/. 10.00 S/. 3.50 S/. 3.57
% 3.00 S/. 2.51 S/. 0.08 S/. 0.08
Costo Directo S/. S/. 6.16
Rend 75.00 und S/. 4.96
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95 S/. 2.18
gal 0.00 S/. 132.00 S/. 0.07und 0.35 S/. 7.56 S/. 2.65 S/. 2.71
% 3.00 S/. 2.18 S/. 0.07 S/. 0.07
Costo Directo S/. S/. 4.96
Rend 40.00 und S/. 8.65
HH 0.10 0.02 S/. 21.89 S/. 0.44HH 1.00 0.20 S/. 18.24 S/. 3.65 S/. 4.09
gal 0.00 S/. 132.00 S/. 0.07und 0.35 S/. 12.50 S/. 4.38 S/. 4.44
% 3.00 S/. 4.09 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 8.65
Rend 60.00 und S/. 11.27
HH 0.10 0.01 S/. 21.89 S/. 0.29HH 1.00 0.13 S/. 18.24 S/. 2.43 S/. 2.72
gal 0.00 S/. 132.00 S/. 0.07und 0.35 S/. 24.00 S/. 8.40 S/. 8.47
% 3.00 S/. 2.72 S/. 0.08 S/. 0.08
Costo Directo S/. S/. 11.27
Rend 75.00 und S/. 3.50
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95 S/. 2.18
gal 0.00 S/. 132.00 S/. 0.07und 0.35 S/. 3.39 S/. 1.19 S/. 1.25
% 3.00 S/. 2.18 S/. 0.07 S/. 0.07
Costo Directo S/. S/. 3.50
Rend 75.00 und S/. 3.12
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95 S/. 2.18
gal 0.00 S/. 132.00 S/. 0.07und 0.35 S/. 2.32 S/. 0.81 S/. 0.88
% 3.00 S/. 2.18 S/. 0.07 S/. 0.07
Costo Directo S/. S/. 3.12
Rend 75.00 und S/. 11.39
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95 S/. 2.18
und 1.00 S/. 9.15 S/. 9.15 S/. 9.15
% 3.00 S/. 2.18 S/. 0.07 S/. 0.07
Costo Directo S/. S/. 11.39
Rend 75.00 und S/. 8.94
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95 S/. 2.18
und 1.00 S/. 6.70 S/. 6.70 S/. 6.70
% 3.00 S/. 2.18 S/. 0.07 S/. 0.07
Costo Directo S/. S/. 8.94
Rend 75.00 und S/. 6.74
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95 S/. 2.18
und 1.00 S/. 4.50 S/. 4.50 S/. 4.50
% 3.00 S/. 2.18 S/. 0.07 S/. 0.07
Costo Directo S/. S/. 6.74
Rend 75.00 und S/. 5.24
HH 0.10 0.01 S/. 21.89 S/. 0.23HH 1.00 0.11 S/. 18.24 S/. 1.95 S/. 2.18
und 1.00 S/. 3.00 S/. 3.00 S/. 3.00
% 3.00 S/. 2.18 S/. 0.07 S/. 0.07
Costo Directo S/. S/. 5.24
Rend 100.00 ml S/. 6.10
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 15.28 S/. 1.22HH 1.00 0.08 S/. 13.74 S/. 1.10HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 3.96
ml 1.05 S/. 1.93 S/. 2.03 S/. 2.03
% 3.00 S/. 3.96 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 6.10
Rend 100.00 ml S/. 7.13
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 15.28 S/. 1.22HH 1.00 0.08 S/. 13.74 S/. 1.10HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 3.96
ml 1.05 S/. 2.91 S/. 3.06 S/. 3.06
% 3.00 S/. 3.96 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 7.13
Rend 100.00 ml S/. 9.13
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 15.28 S/. 1.22HH 1.00 0.08 S/. 13.74 S/. 1.10
HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 3.96
ml 1.05 S/. 4.82 S/. 5.06 S/. 5.06
% 3.00 S/. 3.96 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 9.13
Rend 100.00 ml S/. 11.42
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 15.28 S/. 1.22HH 1.00 0.08 S/. 13.74 S/. 1.10HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 3.96
ml 1.05 S/. 7.00 S/. 7.35 S/. 7.35
% 3.00 S/. 3.96 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 11.42
Rend 100.00 ml S/. 21.55
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 15.28 S/. 1.22HH 1.00 0.08 S/. 13.74 S/. 1.10HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 3.96
ml 1.05 S/. 16.64 S/. 17.47 S/. 17.47
% 3.00 S/. 3.96 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 21.55
Rend 100.00 ml S/. 10.58
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 15.28 S/. 1.22
HH 1.00 0.08 S/. 13.74 S/. 1.10HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 3.96
ml 1.05 S/. 6.20 S/. 6.51 S/. 6.51
% 3.00 S/. 3.96 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 10.58
Rend 100.00 ml S/. 23.50
HH 0.10 0.01 S/. 21.89 S/. 0.18HH 1.00 0.08 S/. 15.28 S/. 1.22HH 1.00 0.08 S/. 13.74 S/. 1.10HH 1.00 0.08 S/. 18.24 S/. 1.46 S/. 3.96
ml 1.05 S/. 18.50 S/. 19.43 S/. 19.43
% 3.00 S/. 3.96 S/. 0.12 S/. 0.12
Costo Directo S/. S/. 23.50
Rend 20.00 und S/. 27.32
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 8.17
und 1.05 S/. 18.00 S/. 18.90 S/. 18.90
% 3.00 S/. 8.17 S/. 0.25 S/. 0.25
Costo Directo S/. S/. 27.32
Rend 20.00 und S/. 31.52
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 8.17
und 1.05 S/. 22.00 S/. 23.10 S/. 23.10
% 3.00 S/. 8.17 S/. 0.25 S/. 0.25
Costo Directo S/. S/. 31.52
Rend 5.00 und S/. 89.04
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 13.74 S/. 21.98HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 54.67
und 3.00 S/. 2.32 S/. 6.97pza 1.00 S/. 0.95 S/. 0.95pza 1.50 S/. 7.00 S/. 10.50pza 0.10 S/. 3.05 S/. 0.31pza 1.00 S/. 1.40 S/. 1.40ml 9.00 S/. 1.40 S/. 12.60 S/. 32.73
% 3.00 S/. 54.67 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 89.04
Rend 5.00 und S/. 113.71
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 13.74 S/. 21.98HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 54.67
Kg 0.02 S/. 2.43 S/. 0.05ml 7.00 S/. 1.80 S/. 12.60pza 1.00 S/. 0.95 S/. 0.95pza 3.00 S/. 7.00 S/. 21.00
pza 0.10 S/. 3.05 S/. 0.31pza 1.00 S/. 1.50 S/. 1.50pza 2.00 S/. 7.00 S/. 14.00pza 1.00 S/. 7.00 S/. 7.00 S/. 57.40
% 3.00 S/. 54.67 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 113.71
Rend 5.00 undS/. 125.71
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 13.74 S/. 21.98HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 54.67
Kg 0.02 S/. 2.43 S/. 0.05ml 7.00 S/. 1.80 S/. 12.60pza 1.00 S/. 0.95 S/. 0.95pza 3.00 S/. 7.00 S/. 21.00pza 0.10 S/. 3.05 S/. 0.31pza 1.00 S/. 1.50 S/. 1.50pza 2.00 S/. 7.00 S/. 14.00pza 1.00 S/. 19.00 S/. 19.00 S/. 69.40
% 3.00 S/. 54.67 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 125.71
Rend 5.00 und S/. 117.01
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 13.74 S/. 21.98HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 54.67
Kg 0.02 S/. 2.43 S/. 0.05ml 3.50 S/. 1.40 S/. 4.90pza 1.00 S/. 0.95 S/. 0.95
pza 3.00 S/. 7.00 S/. 21.00pza 0.10 S/. 3.05 S/. 0.31pza 1.00 S/. 1.50 S/. 1.50pza 2.00 S/. 7.00 S/. 14.00pza 1.00 S/. 18.00 S/. 18.00 S/. 60.70
% 3.00 S/. 54.67 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 117.01
Rend 5.00 und S/. 118.01
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 13.74 S/. 21.98HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 54.67
Kg 0.02 S/. 2.43 S/. 0.05ml 3.50 S/. 1.40 S/. 4.90pza 1.00 S/. 0.95 S/. 0.95pza 3.00 S/. 7.00 S/. 21.00pza 0.10 S/. 3.05 S/. 0.31pza 1.00 S/. 1.50 S/. 1.50pza 2.00 S/. 7.00 S/. 14.00pza 1.00 S/. 19.00 S/. 19.00 S/. 61.70
% 3.00 S/. 54.67 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 118.01
Rend 20.00 und S/. 179.05
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 0.50 0.20 S/. 13.74 S/. 2.75HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 10.92
pza 1.00 S/. 167.80 S/. 167.80 S/. 167.80
% 3.00 S/. 10.92 S/. 0.33 S/. 0.33
Costo Directo S/. S/. 179.05
Rend 20.00 und S/. 68.88
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 0.50 0.20 S/. 13.74 S/. 2.75HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 10.92
und 1.00 S/. 57.63 S/. 57.63 S/. 57.63
% 3.00 S/. 10.92 S/. 0.33 S/. 0.33
Costo Directo S/. S/. 68.88
Rend 20.00 und S/. 62.10
HH 0.10 0.04 S/. 21.89 S/. 0.88HH 0.50 0.20 S/. 13.74 S/. 2.75HH 1.00 0.40 S/. 18.24 S/. 7.30 S/. 10.92
kg 1.00 S/. 50.85 S/. 50.85 S/. 50.85
% 3.00 S/. 10.92 S/. 0.33 S/. 0.33
Costo Directo S/. S/. 62.10
Rend 15.00 m3 S/. 16.83
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73HH 0.50 0.27 S/. 13.74 S/. 3.66 S/. 14.56
m3 1.00 S/. 1.83 S/. 1.83 S/. 1.83
% 3.00 S/. 14.56 S/. 0.44 S/. 0.44
Costo Directo S/. S/. 16.83
Rend 1.00 tm S/. 948.07
HH 0.10 0.80 S/. 21.89 S/. 17.51HH 2.00 16.00 S/. 18.24 S/. 291.84HH 2.00 16.00 S/. 13.74 S/. 219.84 S/. 529.19
tm 1.00 S/. 403.00 S/. 403.00 S/. 403.00
% 3.00 S/. 529.19 S/. 15.88 S/. 15.88
Costo Directo S/. S/. 948.07
Rend 18.00 Und S/. 37.33
HH 0.10 0.04 S/. 21.89 S/. 0.97HH 1.00 0.44 S/. 18.24 S/. 8.11HH 1.00 0.44 S/. 13.74 S/. 6.11 S/. 15.19
pto 1.00 S/. 15.85 S/. 15.85pto 0.03 S/. 32.20 S/. 1.06pto 0.02 S/. 239.00 S/. 4.78 S/. 21.69
% 3.00 S/. 15.19 S/. 0.46 S/. 0.46
Costo Directo S/. S/. 37.33
Rend 15.00 Und S/. 29.86
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73 S/. 10.90
und 1.00 S/. 18.64 S/. 18.64 S/. 18.64
% 3.00 S/. 10.90 S/. 0.33 S/. 0.33
Costo Directo S/. S/. 29.86
Rend 15.00 Und S/. 59.72
HH 0.10 0.05 S/. 21.89 S/. 1.17HH 1.00 0.53 S/. 18.24 S/. 9.73HH 1.00 0.53 S/. 13.74 S/. 7.33 S/. 18.22
m3 1.05 S/. 39.00 S/. 40.95 S/. 40.95
% 3.00 S/. 18.22 S/. 0.55 S/. 0.55
Costo Directo S/. S/. 59.72
Rend 30.00 ml S/. 20.43
HH 0.10 0.03 S/. 21.89 S/. 0.58HH 1.00 0.27 S/. 18.24 S/. 4.86HH 0.50 0.13 S/. 13.74 S/. 1.83 S/. 7.28
ml 1.05 S/. 12.32 S/. 12.94 S/. 12.94
% 3.00 S/. 7.28 S/. 0.22 S/. 0.22
Costo Directo S/. S/. 20.43
Rend 10.00 und S/. 165.49
HH 0.10 0.08 S/. 21.89 S/. 1.75HH 1.00 0.80 S/. 18.24 S/. 14.59HH 0.50 0.40 S/. 13.74 S/. 5.50 S/. 21.84
und 1.00 S/. 143.00 S/. 143.00 S/. 143.00
% 3.00 S/. 21.84 S/. 0.66 S/. 0.66
Costo Directo S/. S/. 165.49
Rend 10.00 und S/. 137.49
HH 0.10 0.08 S/. 21.89 S/. 1.75HH 1.00 0.80 S/. 18.24 S/. 14.59HH 0.50 0.40 S/. 13.74 S/. 5.50 S/. 21.84
und 1.00 S/. 115.00 S/. 115.00 S/. 115.00
% 3.00 S/. 21.84 S/. 0.66 S/. 0.66
Costo Directo S/. S/. 137.49
Rend 4.00 und S/. 56.24
HH 0.10 0.20 S/. 21.89 S/. 4.38HH 1.00 2.00 S/. 18.24 S/. 36.48HH 0.50 1.00 S/. 13.74 S/. 13.74 S/. 54.60
% 3.00 S/. 54.60 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 56.24
Rend 3.00 und S/. 74.98
HH 0.10 0.27 S/. 21.89 S/. 5.84HH 1.00 2.67 S/. 18.24 S/. 48.64HH 0.50 1.33 S/. 13.74 S/. 18.32 S/. 72.80
% 3.00 S/. 72.80 S/. 2.18 S/. 2.18
Costo Directo S/. S/. 74.98
Rend 3.00 und S/. 141.64
HH 0.10 0.27 S/. 21.89 S/. 5.84
HH 1.00 2.67 S/. 18.24 S/. 48.64HH 0.50 1.33 S/. 13.74 S/. 18.32 S/. 72.80
Kg 18.00 S/. 3.03 S/. 54.50gln 0.30 S/. 40.50 S/. 12.15 S/. 66.65
% 3.00 S/. 72.80 S/. 2.18 S/. 2.18
Costo Directo S/. S/. 141.64
Rend 5.00 undS/. 181.31
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 13.74 S/. 21.98HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 54.67
und 1.00 S/. 125.00 S/. 125.00 S/. 125.00
% 3.00 S/. 54.67 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 181.31
Rend 5.00 und S/. 211.31
HH 0.10 0.16 S/. 21.89 S/. 3.50HH 1.00 1.60 S/. 13.74 S/. 21.98HH 1.00 1.60 S/. 18.24 S/. 29.18 S/. 54.67
und 1.00 S/. 155.00 S/. 155.00 S/. 155.00
% 3.00 S/. 54.67 S/. 1.64 S/. 1.64
Costo Directo S/. S/. 211.31
Rend 1.00 glbS/. 1,178.33
HH 0.10 0.80 S/. 21.89 S/. 17.51HH 1.00 8.00 S/. 18.24 S/. 145.92 S/. 163.43
und 1.00 S/. 290.00 S/. 290.00und 60.00 S/. 12.00 S/. 720.00 S/. 1,010.00
% 3.00 S/. 163.43 S/. 4.90 S/. 4.90
Costo Directo S/. S/. 1,178.33
S/. 3,400.00
S/. 5,500.00
Costo x Kg Total tn
S/. 0.01 45,000.00 S/. 450.00 45.00
menor S/. 0.05 45,000.00 S/. 2,250.00 45.00
S/. 0.10 45,000.00 S/. 4,500.00 45.00
S/. 0.15 45,000.00 S/. 6,750.00 45.00
S/. 0.20 45,000.00 S/. 9,000.00 45.00
Peso del material que proviene de Lima en Kg
INCIDENCIA
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%
100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%
100% S/. 705.84100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 2,870.00100%100%100%100%100%100%100%100%100%100%100%
100% S/. 2,855.40100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%
100% S/. 850.00100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 600.00100%100%100%100%100%100%100%100%100%
100% S/. 3,000.00100%100%100%100%100%100%100%100%
100% S/. 3,000.00100%100%
100%100%100%100%100%100%100%100%100%100%
100% S/. 2,934.40100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%
100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 109.92100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100% S/. 3.15100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 6.69100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%
100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 60.88100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 50.73100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 63.89100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 3.06100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 217.22100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100% S/. 59.24100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100% S/. 160.79100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 24.01100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%
100%100%
100% S/. 435.15100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 46.48100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 3.95100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 316.50100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%
100% S/. 53.82100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 3.91100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 306.67100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%
100% S/. 40.41100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 3.85100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 296.05100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100% S/. 32.40100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 387.39100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100% S/. 32.40100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 3.93100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 293.66100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%
100% S/. 3.91100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 3.87100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100% S/. 51.93100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 82.17100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100% S/. 25.26100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100% S/. 21.77100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 30.50100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 10.48100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100% S/. 79.82100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 602.98100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 30.99100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 10.37100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%
100%100%
100% S/. 8.80100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 4.72100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100% S/. 5.90100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 530.41100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100% S/. 16.60100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100% 3.1496062992126
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100% S/. 25.89100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 21.98100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 21.55100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 125.71100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100% S/. 37.33100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100% S/. 59.72100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
100%100%100%100%100%100%100%
100%100%100%100%100%100%100%100%100%100%
100%100%100%100%
100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
distancia en km tn-km promedion
500% 225.00 S/. 2.00 menor 10 km 2.00
7000% 3150.00 S/. 0.71 entre 10 y 70km 0.71
30000% 13500.00 S/. 0.33 mayores a 70km
0.4256000% 25200.00 S/. 0.27 mayores a 70km
30000% 13500.00 S/. 0.67 mayores a 70km
Detalle UNDCapataz HHOperario HHTopografo HHOperador de equipo HHOficial HHPeon HHMaestro en EEMM HHSoldador HHMontajista HHIngeniero Electronico HHIngeniero Electricista HHArquitecto / Civil HHAbogado HHArqueologo HHArqueologo x dia DIACadista HHTramitador HHIngeniero Ambiental HHInforme privado del arqueologo UNDPlan de monitoreo arqueologico UNDELABORACIÓN DE ESTUDIO DE IMPACTO AMBIENTAL A NIVEL MINISTERIAL UNDELABORACIÓN DE ESTUDIO DE IMPACTO AMBIENTAL UNDESTUDIO DE SUELOS UNDESTUDIO DE RESISTIVIDAD UNDESTUDIO DE LINEA VISTA UNDELABORACIÓN DEL EXPEDIENTE Y OBTENCIÓN DEL DICTAMEN DEL DGAC UNDESTUDIO TEORICO DE RADIACIONES NO IONIZANTES UNDTecnico de taller HH
Precio (S/.) FuenteS/. 21.89 Grupo CostosS/. 18.24 Grupo CostosS/. 18.24 Grupo CostosS/. 18.24 Grupo CostosS/. 15.28 Grupo CostosS/. 13.74 Grupo CostosS/. 21.89 Grupo CostosS/. 18.24 Grupo CostosS/. 18.24 Grupo CostosS/. 34.38S/. 34.38S/. 34.38S/. 34.38S/. 34.38
S/. 275.00S/. 9.60S/. 7.50
S/. 35.00S/. 950.00
S/. 5,000.00S/. 9,500.00S/. 3,000.00S/. 3,000.00
S/. 600.00S/. 1,750.00S/. 2,500.00S/. 1,500.00
S/. 14.00
Detalle UNDAceite de motor glnAcero corrugado FY=4200 KG/CM2 GRADO 60 KgAcero perfiles angulares KgAcero perfiles H KgAcero perfiles tubulares KgAcero planchas KgAditivo impermeabilizante y plastificante Chemaplast glnAditivo acelerante de fragua Chema Struct (01 gal por m3 - concreto f'c=210 kg/cm2) glnAfirmado m3Agua m3Alambre Negro N 16 KgAlambre Negro N 8 kgAnillo de Cera pzaArena Fina m3Arena Gruesa m3ARTEFACTO "AHR", 2x36W, PARA ADOSAR CON EQUIPO DE ALTO FACTOR DE P undASIENTO P/INODORO MOPLEN BLANCO NACIONAL pzaBaldosa fissure m2Base y tapa de registro undBarniz glnBarra AC para tierra, platina de cobre undBarra MGB para tierra, platina de cobre undBentonita sódica tmBisagra de Fe 6"x6" undBRAQUETE BPL-A-111, CON LAMPARA FLUORESCENTE COMPACTA PL/EC DE 11 undCable de cobre desnudo estañado 50 mm2 para interconexión mlCable 1 x 4mm2 THW mlCable 1 x 6mm2 THW mlCable 1 x 10mm2 THW mlCable 1x25 mm2 THW mlCable 2x25 mm2 THW mlCable 14 AWG TW mlCable 12 AWG TW mlCable 1 x 25 mm2 TW mlCable 1 x 50 mm2 TW mlcable vulcanizado 2x2.5mm2 undCAJA DE PASE OCTOGONAL F.G. LIVIANA 4" pzaCAJA ELECTR RECTANG FO.GO.4X2 1/8 pzaCaja de pase metálica de F°G°, tipo pesado de 150x150x100mm undCaja de pase metálica de F°G°, tipo pesado de 200x200x150mm undCaja de pase metálica de F°G°, tipo pesado de 300x300x150mm undCalamina 0.8x1.8m undCandado marca Yale undCandado Multi- Lock undCemento Portland tipo I blsCerradura Cantol blindada 1000 undCerradura tipo manija para baño pzaCerramiento de polimero con accesorios m2Chapa de parche de tres golpes marca Yale undCINTA P/JUNTA EXTERIOR FIBRA DE VIDRIO 2"X300' pzaCinta teflon pza
CINTA AISLANTE ELECTRICA pzaCHISPERO USA / 38-0309-00 ptoClavos kgCLAVOS RAMSET P/FIJACION SERIE 1500 1" ctoCOLA SINTETICA GLConcertina de acero inoxidable de diámetro 18" mlconcreto sobre tuberia mlCordel rllCrucetas de 3mm x 100 und blsCurva 80 mm(3")Ø PVC-P undCurva 50 mm(2")Ø PVC-P undCurva 40 mm(1.5")Ø PVC-P undCurva 25 mm(1")Ø PVC-P undCurva 20 mm(3/4")Ø PVC-P undCurva Conduit FoGo D=1 1/2" undDADO TOMACORRIENTE MAGIC pzaDADO INTERRUPTOR MAGIC pzaDepósito provisional de agua de construcción undDESAGUE MULTIPLE DE LAVADERO/LAVATORIO/BIDET C/TAPON pzaDifusor de ducha con brazo stretto pzaDispensador de Jabon Liquido pzaDósis química Thorgel, Ecogel, etc. undESQUINERO METALICO 32MM(1 1/4") E=0.45MM L=2.40M pzaESQUINERO PLASTICO RECTO 1 1/4"X8' pzaFraguax 1kg KgFULMINANTE RAMNSET CAL 22 VERDE TIROXTIRO ctoFibrablock 2" 2.4x0.6 plGasolina de 90 octanos glnGalvanizado en caliente de acero KgGrasa Multiple KgHormigon m3Imprimante (30 kg) blsInodoro Sifon Jet pzaInterruptor 3x150 Amp de caja moldeada undJabonera en ducha pzaLaca glnLADRILLO ARCILLA KING KONG 18 HUECOS (TIPO IV) 9x12.5x23cm mllLADRILLO ARCILLA PANDERETA 10x12x24cm mllLANA DE FIBRA DE VIDRIO 3 1/2" (R11) - 0.61X2.44M m2LAVATORIO CON PEDESTAL pzaLija de madera plLija de pared plLija de acero plLuminaria de falso techo undMadera Huayruro o Tornillo p2Madera para enconfrado p2MASILLA ELASTICA PARA JUNTAS SANITARIAS (300 ml ) cjaMASILLA PARA JUNTAS kgMaterial para un Pozo sumidero glbMezcladora de ac/af para ducha pzaMOLDE ptoMonomando de Lavatorio pzaOcre rojo KgPapelera ceramica pza
PARANTE METALICO 89X50MM(3 5/8"X 2") E=0.90MM L=3.00M pzaPegamento x25kg BlsPEGAMENTO P/TUBO PVC galPerimetral suprafine mlPERNO DE ANCLAJE P/APARATO SANITARIO (PAR) pzaPernos de 1/2"x1 1/2" A325 con tuercas undPernos de 5/8"x2" A325 con tuercas undPernos HILTI 1/2"x4" undPetroleo glnPiedra Chancada de 1/2" m3Piedra Chancada de 3/4" m3PIEDRA GRANDE M3PIEDRA MEDIANA m3Pintura esmalte glnPintura anticorrosiva glnPintura Latex glnPiso ceramico de 45x45 m2PLACA DE ALUMINIO 2 ABERTURAS pzaPLACA DE ALUMINIO 2 ABERTURAS A PRUEBA DE AGUA pzaPLACA DE ALUMINIO DE INTERRUPTOR SIMPLE A PRUEBA DE AGUA pzaPLACA DE ALUMINIO DE INTERRUPTOR DOBLE A PRUEBA DE AGUA pzaPLANCHA DE YESO DE 1/2" 1.22X2.44M plplancha translúcida Fibraforte e=1.75mm m2Plastico m2Principal suprafine mlRegla de madera p2RIEL METALICO 90X32MM(3 5/8"X 1 1/4") E=0.90MM L=3.00M pzaSecundario suprafine mlSikadur 31 kgSikadur 32 kgSikagrout kgSOLDADURA EXOTERMICA DE 115 GR. THERMOWELD ptoSGM , bajar resistividad kgtecnopor de 1"x0.5cm mlTerminales dobles a compresión de Cu estañado para cables D=50 mm2 undTerminales de cobre a compresión para cables D=25 mm2 undTerminales de cobre a compresión para cables D=10 mm2 undTerminales de cobre a compresión para cables D=4 mm2 undTierra de Cultivo m3Tiza bolsa de 40 kg undToallera ceramica pzaTORNILLO GRABBER SELF DRILLING #6X1 1/4" PTA. BROCA ctoTORNILLO GRABBER WAFER HEAD SELF DRILLING #8X1/2" PTA. BROCA ctoTUBO PVC DESAGUE SAL 4" X 3 m pzaTUBO PVC DESAGUE SAL 2" X 3 m pzaTRAMPA TIPO P BRONCE CROMADA DE 1 1/4" pzaTRIPLAY LUPUNA 4X8X6 MM PZTUBO ABASTO ALUMINIO TRENZ. 1/2'' M x 1/2" H x40cm P/LAVAT/LAV/BIDET pzaTUBO ABASTO ALUMINIO TRENZADO 1/2'' M x 5/8'' H x 35cm P/INODORO pzaTUBO PROLONGACION DESAGUE BRONCE CROMO 1 1/4 x 5"C/TUERCA (P.) pzaTUBO PVC ELECTRICO SAP 3" X 3 m pzaTUBO PVC ELECTRICO SAP 2" X 3 m pzaTUBO PVC ELECTRICO SAP 1.5" X 3 m pzaTubo Conduit F°G° D=1 1/2" ml
TUBO PVC ELECTRICO SAP 1" X 3 m pzaTUBO PVC ELECTRICO SAP 3/4" X 3 m pzaURINARIO BAMBY BLANCO STANDARD pzaUNION PVC ELECTRICA SAP 3/4" pzaUNION PVC ELECTRICA SAP 1" pzaUNION PVC ELECTRICA SAP 1.5" pzaUNION PVC ELECTRICA SAP 2" pzaUNION PVC ELECTRICA SAP 3" pzaVALVULA ANGULAR P/URINARIO FUTURA pzaVarilla de cobre electrolítico de 2.40m x 3/4"D pzaVidrio crudo incoloro simple p2Z aditivos desmoldante gln
Precio (S/.) FuenteS/. 47.91
S/. 2.60 Grupo CostosS/. 3.03 Grupo CostosS/. 2.70S/. 3.98 Grupo CostosS/. 2.21 Grupo Costos
S/. 22.00S/. 30.00S/. 23.50
S/. 1.83S/. 2.43 Grupo CostosS/. 2.43 Grupo CostosS/. 7.57
S/. 35.40 Grupo CostosS/. 37.00 Grupo Costos
S/. 155.00S/. 12.00
S/. 4.24S/. 18.64S/. 36.00 Grupo Costos
S/. 115.00S/. 143.00S/. 403.00
S/. 9.00S/. 125.00
S/. 12.32S/. 1.93S/. 2.91S/. 4.82S/. 7.00
S/. 16.64S/. 1.40S/. 1.80S/. 6.20
S/. 18.50S/. 12.00
S/. 1.40S/. 1.50
S/. 18.00S/. 22.00S/. 38.00S/. 14.81S/. 25.00S/. 79.00S/. 15.66 Grupo CostosS/. 62.63S/. 58.00
S/. 250.00S/. 75.00S/. 30.00
S/. 1.47
S/. 3.05S/. 32.20
S/. 2.91 Grupo CostosS/. 26.00S/. 13.56S/. 45.00
S/. 5.00S/. 5.00S/. 4.00
S/. 24.00S/. 10.00
S/. 7.56S/. 3.39S/. 2.32
S/. 12.50S/. 7.00S/. 7.00
S/. 450.00S/. 28.00S/. 75.00S/. 15.00S/. 57.63S/. 11.00
S/. 5.20S/. 4.00
S/. 30.00S/. 45.00S/. 14.80
S/. 1.45S/. 25.00S/. 35.50 Grupo CostosS/. 18.00
S/. 260.00S/. 290.00
S/. 15.00S/. 15.00
S/. 526.21 Grupo CostosS/. 470.00
S/. 5.83S/. 218.00
S/. 1.40S/. 1.40S/. 1.60
S/. 95.00S/. 4.40 Grupo CostosS/. 4.00
S/. 172.12S/. 2.00
S/. 100.00S/. 170.00S/. 239.00
S/. 65.00S/. 8.00
S/. 15.00
S/. 15.00S/. 16.00
S/. 132.00S/. 0.30S/. 9.54S/. 4.00S/. 6.00
S/. 14.00S/. 10.50S/. 31.50 Grupo CostosS/. 31.50 Grupo CostosS/. 32.00S/. 32.00S/. 30.00 Grupo CostosS/. 40.50S/. 24.28S/. 24.00
S/. 7.00S/. 19.00S/. 18.00S/. 19.00S/. 45.00S/. 23.00
S/. 2.00S/. 3.64S/. 2.60
S/. 20.00S/. 0.70
S/. 48.74S/. 67.23
S/. 2.50S/. 15.85S/. 50.85
S/. 2.00S/. 9.15S/. 6.70S/. 4.50S/. 3.00
S/. 39.00S/. 17.00S/. 18.00S/. 16.00S/. 15.00
S/. 2.66S/. 7.58
S/. 20.54S/. 34.50
S/. 8.14S/. 12.96
S/. 7.82S/. 55.82S/. 27.98S/. 18.65S/. 14.50
S/. 10.08S/. 7.00
S/. 80.00S/. 0.95S/. 1.28S/. 3.05S/. 4.95S/. 7.95
S/. 80.00S/. 167.80
S/. 1.80S/. 48.45
Detalle UNDMezcladora de concreto de 16 p3 hmVibradora de gazolina hmMalla para cernir m2Nivel topografico diaCizalla diaWinche hmCOMPRESORA NEUMATICA DIESEL 250PCM-87HP HMMARTILLO NEUMATICO 25-29 KG SIN PUNTA HMCAMION VOLQUETE DE 10 m3 HMTELUROMETRO diaTALADRO HMBRUJULA DiaCAMARA DiaGPS DiaTELEFONO DiaTRANSPORTE INTERNO DiaANDAMIOS HMVIATICOS DiaPASAJE IDA & VUELTA UndHERRAMIENTAS DE GABINETE UndTEODOLITO diaCAMIONETA PICK UP DOBLE CABINA 4 X 4 diaCOMPACTADOR VIB. TIPO PLANCHA 4HP HM
Precio (S/.) FuenteS/. 25.13 Grupo Costos
S/. 5.55 Grupo CostosS/. 12.00S/. 30.00
S/. 1.55S/. 15.76S/. 34.20S/. 12.20
S/. 188.00S/. 40.00S/. 15.00
S/. 5.00S/. 5.00
S/. 10.00S/. 15.00S/. 80.00
S/. 3.00S/. 60.00
S/. 160.00S/. 120.00
S/. 30.00S/. 550.00
S/. 22.95
Metrado
Trazo y replanteo 17.4 1.3 22.629.24 6 55.44
78.06
Demolicion de losa de concreto 8.83 6 52.98
Demolicion de muro de concreto 0.25 6 2.45
ExcavacionZapatas rampa de discapacitados 4 1 1.3Cimentación de arranque de la rampa 1 0.6 1.3Zapata de rampa vehicular 1 8.83 1.2Rampa vehicular 1 8.83 1.5
Relleno con material de prestamoZapatas rampa de discapacitados 4 0.8 1.3Zapata de rampa vehicular 1 8.83 1Rampa vehicular 1 8.83 1.5
SoladoZapatas rampa de discapacitados 4 1 1.3Cimentación de arranque de la rampa 1 0.6 1.3Zapata de rampa vehicular 1 8.83 1.3
Concreto en zapatasZapatas rampa de discapacitados 4 1 1.3Cimentación de arranque de la rampa 1 0.6 1.3Zapata de rampa vehicular 1 8.83 1.2
Acero en zapatasAcero de1/2 1 10 5.98
1 13 11.479
Concreto en Placas 1 2 0.21 1.48 0.21 1.05 0.21 0.75 0.21 2.6 0.2
Encofrado de Placas 1 2 0.21 1.48 0.2
1 1.05 0.21 0.75 0.21 2.6 0.2
Acero11.98411.98411.98411.98416.692
Losa de discapacitados 20 0.2Encofrado de la losa de discapacitados 20 1Acero en la losa de discpacitados 16.692 1
Losa de rampa vehicular 9.24 6Acero en rampa vehicular 1 5.992
Escalera ProvisionalParante rectangular de 4x4x4.5mm 2 1.5 13.6Tubo rectangular de 200x75x6mm 2 3.15 26Tubo rectangular de 200x75x6mm 2 1 26Tubo rectangular de 250x75x6mm 8 1 30Angulo 2x3/16 8 2.4 3.56Planchas Estriadas 3/16 8 1 0.2Planchas Estriadas 3/16 1 1.2 1.2Fierro de 2 pulg 6 1.1 15.91Fierro de 2 pulg 1 7.24 15.91Fierro de 1 pulg 1 28.96 4Fierro de 1 pulg 1 28.96 4Accesorios del 10%
Baranda Metalica longitud 79.08 24.6011894
3.675
0.95 4.940.7 0.546
0.95 10.06626 39.735
55.2872
0.5 2.080.5 4.415
6 39.73562.4105
5.20.78
11.47917.459
0.4 2.080.7 0.5460.4 4.2384
6.8644
59.8149.227209.027
1.3 0.521.3 0.38481.3 0.2731.3 0.195
8.83 4.59165.9644
1.3 61.3 4.44
1.3 3.151.3 2.25
8.83 46.95662.796
2.6 31.15841.924 23.0572161.365 16.358160.975 11.6844
22.958 383.214936465.473112
1.3 5.21.3 2626 433.992
0.15 8.31655.44 332.19648
40.8163.8
52240
68.35236.61 58.57636.61 52.7184
105.006115.1884
115.84115.84
112.812081327.79818
1945.46206tramo 13.58tubo de 3 1 13.58 6.36 86.3688tubo de 3 10 0.82 6.36 52.152tubo de 1 10 0.1 2.25 2.25tubo de 1 1/2 3 13.58 3.35 136.479pl 1/4 10 0.014 47.1 6.594Accesorios del 10% 28.38438
334.08415324.6011894