vernal pools - mad scientist 2 09
TRANSCRIPT
Specialists in Ecological & Wetland
Consulting
www.madscientistassociates.netOEC 2009 Vernal Pool Workshop
MAD Scientist & Associates LLC
Established in 1998
Mark A. Dilley Chris S. DilleyFounder and Co-OwnerCo-Owner
www.madscientistassociates.net
MAD Scientist & Associates LLC
Technical StaffMark A. Dilley, M.S., P.W.S.• Professional Wetland Scientist• Certified Ecologist• B.S. in Natural Resources, OSU• M.S. in Environmental Science, OSU
J. David Strong• Environmental Scientist
Kashmira Asnani, M.S.• Ecologist
www.madscientistassociates.net
Vernal Pool Construction
www.madscientistassociates.net
Alternate Title:
Mark vs. the Pizza!!
What Makes A Wetland?3 Parameters:
Hydrophytic vegetation• Obligate wetland (OBL)• Facultative (FACW, FAC, FACU)• Obligate upland (UPL)
Hydric soils• Low chroma• Mottles
Wetland hydrology• Inundation• Saturation• Other indicators
May be sparse in
some vernal pools!
Wetland Hydrologywww.madscientistassociates.net
Hydric Soil
Site Selection“Location, Location, Location!”•Avoid existing wetlands!•Consider the neighbors (mosquitoes and flooding may not be appreciated!)•Avoid areas with livestock•Adjacent upland habitat and nearby wetlands are a plus (many would argue a necessity!)
www.madscientistassociates.net
Site Selection(continued)
www.madscientistassociates.net
•Consider (and adjust for) factors that will influence hydrologic regime (frequency and duration of flooding), including sunlight exposure, soil permeability, annual precipitation and evaporation, transpiration, and water depth.•Be cautious with sites that have a high water table!
Topography/Landscape Position
•Look for areas where water would naturally collect (floodplains, valleys)•Flat areas (<3% slope) make for easier/less expensive pool development•Embankment pools on hillsides are possible
www.madscientistassociates.net
Soils•Drained hydric soils are ideal•Silt loams, silty clay loams (fine textured soils) are generally suited to pool construction (permeability rates <0.2 in/hr; can check with simple equipment)•Drainage class of somewhat poorly drained to poorly drained •Liners, while not recommended, can be used in areas that drain too rapidly ($$$)
www.madscientistassociates.net
Sizing•Gaps in forest community as small as15’ x 15’ can suffice (tree removal is generally discouraged)•Vernal pools do not require a large watershed, due to the low storage volume•Typical sizes range from several hundred square feet to 3 or more acres
www.madscientistassociates.net
Site Preparation
•Invasive species removal•Trash clean up•Mark areas, trees to avoid•Determine, clear and mark route of ingress and egress•Mark pool, berm, and soil disposal locations
www.madscientistassociates.net
Earthwork•Remove and stockpile topsoil (seedbank and rooting medium)•Excavate shallow depression (1’-2’; use laser-guided equipment if possible; go deeper to allow for addition of topsoil)•If constructing a berm, dig, fill and compact core trench before building berm (in layers) on top •Use gentle slopes (15:1 or greater) •Install spillway (and control structure, if desired)
www.madscientistassociates.net
Earthwork(continued)
•Spread topsoil across wetland•Mini-excavator and small bulldozer will typically suffice•Look for competent operators
TNT can make vernal pool construction a blast!!!
www.madscientistassociates.net
Planting
•Seed and mulch (include cover crop)•Plugs = instant wetland plants!•Container grown trees and shrubs •For a variety of reasons, you may wish to avoid planting woody species on berms•Don’t forget the buffer!
www.madscientistassociates.net
Accessorizing•Add structure in the form of logs, rocks, leaf litter, small high spots of soil, and “specimen” plants•Do not let anyone convince you that tires are vernal pool accessories!
www.madscientistassociates.net
Example Projects and Lessons Learned
Heritage Park Phase II
Boyer Nature Preserve Vernal Pool Mitigation Area
www.madscientistassociates.net
Heritage Park Phase II, Westerville, OH
Vernal Poolwww.madscientistassociates.net
Gray Treefrog (Hyla chrysoscelis or H. versicolor)
On-site Mitigation Wetland #1Soon After Construction
www.madscientistassociates.net
On-site Mitigation Wetland #1First Year - 2003
www.madscientistassociates.net
Lesson Learned: Seed banks work!!
On-site Mitigation Wetland #1First Year - 2003
www.madscientistassociates.net
N. Leopard Frog (Rana pipiens)American Toad (Bufo americanus americanus)
Spring 2004 – AmphibiansHeritage Park Mitigation Wetlands
www.madscientistassociates.net
Lesson Learned: Build it and they will come!
Boyer Nature Preserve
Mitigation Opportunity
• Concerns of long-term neighbors regarding loss of spring peepers• Probably a loss of habitat issue• City was advised to look for opportunities to
create vernal pools as replacement habitat
• FACT promoted local mitigation at this preserve to off-set impacts within the local watershed
Draft Master Plan
The Vernal Pool Site
Covered in Amur honeysuckle
PreparationWetland delineationInvasive species removal (FACT volunteers and others)
Site Preparation
Vernal Pool Excavation
Seeding and Planting
Lesson Learned: Plugs are a reliable way to jump-start the plant community
Adaptive ManagementIssues
Lesson Learned: Properly size culverts or avoid altogether
Three Years Later…
Young American Toad
No spring peepers – yet!
Some satisfied vernal pool customers!!