    Q.1

    No.of Gears machined ( ready to be put in heat treatment)

    No.of Shafts machined ( ready to be put in heat treatment)

    No. Of Assemblies (these are from the heat treatment which have been loaded shi

    !otal Gear "o#es

    !otal Gear "o#es $ith %&' eciency taen into account

    !he capacity can be increased in the followin* manner

    1. Number of *ear sets + Number of shafts, so convertin* to - and S to *ear hobbshavin* machines can be done for every /& shifts

    . !he e#tra shafts that have been produced can bewith e#tra *ears manufactured by the shifts in step 1

  • 7/24/2019 Vikramaditya 14P178

    2/8

    0ornin* Shifts venin* Shift Ni*ht shift !otal

    90 90 78 258

    56 56 48 160

    22 19 22 63

    63

    53.55 53(approx)

  • 7/24/2019 Vikramaditya 14P178

    3/8

    Gear "o# 0anufacturin* 2ost

    S.No 3tem

    1 Gear Blanks

    2 Cost of Gear Shaft lanks

    3 Grear !o"s#n$4 Gear Box %sse&l' #t

    5 ther *ools an+ ,ons"&ales

    6 pa,ka$#n$ &ater#al

    !otal 2ost 4rice of Gear "o#

    Sellin* 4rice of the Gear "o#

    5nits Sold in 617/1

    2losin* Stoc of year

    !otal 5nits manufactured in 617/1*otal -n#ts to e &an"fa,t"re+ #n 201415

    !otal 2ost of 0anufacturin*

    /ork#n$ ho"rs per +a' (450450390).85

    1 $ear ox 4 $ears 2 $ear shafts

    0onthly 2apactiy of -1 8 (169:;(&

  • 7/24/2019 Vikramaditya 14P178

    4/8

    2ost S.No

    2400 1

    2800 2a

    6000 800 ,

    340 +

    160 3

    1&66 a

    6666 4

    5

    11700 6

    1125 7

    12825 814580 9

    160312500 10

    11

    1096

    17&6 G" for *ear

    1700 GB for shaft

    2275 GB for $ear

    2725 GB for shaft

    3425 GB for $ear

    2275 GB for shaft

    2130 GB for $ears

    1710 GB for shafts

    6075 GB for $ear ox

    16200

    14580 1620 495

    1215

    2apacity forentire plant

    (,apa,#t')(-n#ts&anf)

    Capa,#t'-n#ts &anf,los#n$ sto,k

  • 7/24/2019 Vikramaditya 14P178

    5/8

    >actor 2urrent

    Sales eal#at#on 256500000 291600000

    a ater#al Cost 66690000 75816000

    Bo"$t o"t #te&s 87210000 99144000e:e,t#ons 1333800 1516320

    pa,k#n$ &ater#al ,osts 2052000 2332800

    anpoer

    ;#re,t 11760000 11760000

  • 7/24/2019 Vikramaditya 14P178

    6/8

    Q.1 (4art 1)

    No.of Gears machined ( ready to be put in heat treatment)

    No.of Shafts machined ( ready to be put in heat treatment)

    No. Of Assemblies (these are from the heat treatment which have been loaded shi

    !otal Gear "o#es

    !otal Gear "o#es $ith %&' eciency taen into account

    4art

    !he capacity can be increased in the followin* manner

    1. !he number of *ear sets of *ear bo# is less compared to the shafts needed for a *

    the shafts e#tra that have been produced can be used alon* the e#tra *ears that we

  • 7/24/2019 Vikramaditya 14P178

    7/8

    0ornin* venin* SNi*ht shift

    90 90 78

    56 56 48

    22 19 22

    63

    53.55

    e can choose after every /& shifts to convert - and S to *eart hobbin* and

    in this shi

  • 7/24/2019 Vikramaditya 14P178

    8/8

    shavin* machines