Page 1: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

WATER(desalınatıon plant, water treatment, pıpelıne,

pumpıng statıon, reservoır)overvıew

Engineering for a Better Future

Page 2: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

2 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

ENKA’s involvement in water treatment and conveyance projects began in 1970. Over theyears, ENKA built and continued to undertake the water related projects in Turkey andabroad.

The presentation covers the selected projects ın the following order :

DESALINATION PLANTS

WATER / WASTE WATER TREATMENT PLANTS

WATER INTAKE STRUCTURES

PUMPING STATIONS

RESERVOIRS AND STORAGE TANKS

WATER PIPELINES AND DISTRIBUTION SYSTEMS

Presentation Outline

Page 3: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

3 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Project Location Country Client Commence Date

Completion Date

Elazığ - Uluova Irrigation Project Elazığ Turkey State Hydraulic Works - DSİ May-1977 Oct-1979

Makkah Water Pipeline Makkah Saudi Arabia Ministry of Public Works and Housing -Directorate of Mina Projects July-1977 Nov-1977

Wasia Water Treatment Plant Wasia Saudi Arabia Ministry of Agriculture and Water Oct-1979 May-1982

Riyadh Water Treatment and Distribution System New Areas, Part 5, Al Badiah Contract Riyadh Saudi Arabia Ministry of Agriculture and Water Sep-1980 May-1982

Riyadh Water Transmission System, Pump Stations 5 and 6 Riyadh Saudi Arabia Saline Water Conversion Corporation Mar-1981 July-1983

Ras Lanuf New Town Project Ras Lanuf Libya Secretariat of Heavy Industries, Brega and Ras Lanuf Higher Committee Feb-1981 May-1985

Tasluja Water Pipeline and Pumping Station - EPCC Tasluja Iraq State Organization for Construction Industries Mar-1982 Dec-1983

Diyarbakır Province Sewage System Diyarbakır Turkey İller Bankası Genel Müdürlüğü Apr-1982 Apr-1986Al Medinah Housing (Water Supply & Sewage Systems) Al Medinah Saudi Arabia Ministry of Public Works and Housing Apr-1982 Feb-1988

Kerbela Water Pipeline and Pumping Station - EPCC Kerbela Iraq State Organization for Construction Industries

May-1982 Nov-1983

Diyarbakır Province Drinking Water Supply System Diyarbakır Turkey İller Bankası Genel Müdürlüğü May-1982 May-1986

Al Khafji Phase 2 Desalination Plant Al Khafji Saudi Arabia Saline Water Conversion Corporation Oct-1982 Feb-1986

Makkah-Taif Water Transmission System, Reservoirs, Makkah Taif Saudi Arabia Saline Water Conversion Corporation Aug-1983 Mar-1986

Amman Service Reservoirs – Contracts 2 & 3 Amman Jordan Amman Water & Sewerage Authority Oct-1983 Apr-1986

Extension of Riyadh Distribution System Secondary Distribution Systems Stage 1 Part 2 & Part 3 Riyadh Saudi Arabia Ministry of Agriculture and Water Nov-1983 Feb-1986

Al Jubail - Riyadh, Line C, RWC (Reservoirs) Riyadh Saudi Arabia Saline Water Conversion Corporation Feb-1984 Apr-1988

New Battaliyah Water Stormwater Facilities Al Hofuf Saudi Arabia Ministry of Municipal and Rural Affairs July-1984 May-1985

Water Supply Project for Sudair Region, Water Distribution System Phase 1 Contract C Sudair Saudi Arabia Ministry of Agriculture and Water July-1984 Apr-1986

Nahrawan Industrial Estate Water Supply Scheme & Water Treatment Plant Nahrawan Iraq State Organization for Industrial

Development Aug-1984 June-1986

Selected Projects (*sorted by commence dates)

Page 4: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

4 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Project Location Country Client Commence Date

Completion Date

Istanbul Sewerage Project (1st Stage) Civil Works, Mechanical and Electrical Works for Yenikapı Pre-treatment Plant & Pumping Stations İstanbul Turkey

General Directorate of Istanbul Water and Sewerage Administration - İSKİ

Sept-1984 Aug-1988

Nazilli Waste Water Treatment Plant Aydın Turkey Province Bank Turkey Oct-1984 May-1988

Water Supply Project for Nifi and Surrounding Villages, Contract A-2 Nifi Saudi Arabia Ministry of Agriculture & Water Oct-1984 Apr-1986

Water Lines in Fanateer, Defii and Mutrafiah, Contract No. 570-C11 Jubail Saudi Arabia

Royal Commission for Jubailand Yanbu Feb-1985 Sept-1986

Al Rass Water Supply & Treatment Systems Al Rass SaudiArabia Ministry of Agriculture & Water Apr-1985 Mar-1988

Water Works Improvements Jeddah, 4 Reservoirs and Associated Works Jeddah SaudiArabia Ministry of Agriculture & Water May-1985 Apr-1986

Kahramanmaraş Sewage System Network, Collectors and Drinking Water Network System Kahramanmaraş Turkey İller Bankası Genel Müdürlüğü May-1985 May-1987

Construction of Al Rass Water Supply&Treatment Systems Contract No. 2B Al Rass Saudi Arabia Ministry of Agriculture & Water Nov-1985 July-1987

Brega New Town Project Water Reservoirs and Piping Works Marsa El Brega LibyaSecretariat of Heavy Industries, Brega and Ras Lanuf Higher Committee

June-1986 Aug-1993

Sekköy Dam Water Line for Yeniköy Thermal Power Plant Muğla Turkey Turkish Electricity Authority July-1986 June-1989

Derna Al-Bumba Water Project Derna Libya The Popular Committee of Al-Gabar - Al-Akhdar Dec-1986 Mar-1996

Çanakkale Water Treatment Plant Çanakkale Turkey Province Bank Turkey Mar-1987 Aug-1992

Benghazi Water Reservoir Benghazi Libya Great Man-Made River Authority July-1988 Apr-1991

Afşin Elbistan B Thermal Power Plant, Amendment 15 New Raw Water Supply System Kahramanmaraş Turkey Electricity Generation Co. Inc. Jan-2006 Aug-2007

Derna Desalination Plant Derna Libya General Electricity Company of Libya Aug-2006 Aug-2010

Soussa Desalination Plant Soussa Libya General Electricity Company of Libya Aug-2006 Aug-2010

Zawia Desalination Plant Zawia Libya General Electricity Company of Libya July-2006 Feb-2012

Zuara Desalination Plant Zuara Libya General Electricity Company of Libya Mar-2007 Nov-2010

Selected Projects (*sorted by commence dates)

Page 5: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

5 of 31

DESALINATION PLANTS

Page 6: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

6 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Single purpose desalination plant to produce 5 milliongallons per day desalted water by the evaporation ofArabian Gulf water based on MSF process andtransmission of potable water to the distributionterminals in the town of Al Khafji and related officebuildings and housing compound.

Scope:

All civil works of the desalination plant. Turn-keyconstruction of sea water intake, outfall andtreatment facilities.

Turn-key construction of product water pipelineand facilities for fuel oil supply, storage andhandling.

Turn-key construction of control buildings,laboratory facilities, maintenance shop, warehouse,office buildings, mosque and housing compoundincluding HVAC and fire protection systems.

CO

NT

RA

CT

ING

Commencement : October 1982 Completion : February 1986 Location : Al Khafji - Saudi Arabia Client : Saline Water Conversion Corporation

Al Khafji Phase 2 Desalination Plant-Saudi Arabia

Page 7: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

7 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement,construction, commissioning and start-up of a 2 x20.000 m3/day Water Production Plant with twotype of fuel, Heavy Fuel Oil (HFO) and Light FuelOil (LFO), complete with all Balance of Plant (BOP)systems. Heavy fuel oil (HFO) is used as main fuelfor MED Desalination Plant operation whereas;light fuel oil (LFO) are used as back-up fuels.

Commencement: August 2006 Completion : August 2010 Location : Derna - Libya Client : General Electricity Company of Libya

Main Work Item Unit QuantityConcrete m3 14,200Structural Steel ton 650Cabling km 170Mech. Equipment ton 4,800Engineering Hours hrs 81,000Document Qty. pcs 1,296

CO

NT

RA

CT

ING

Derna Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

Page 8: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

8 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement,construction, commissioning and start-up of a 2 x20.000 m3/day Water Production Plant with twotype of fuel, Heavy Fuel Oil (HFO) and Light FuelOil (LFO), complete with all Balance of Plant (BOP)systems. Heavy fuel oil (HFO) is used as main fuelfor MED Desalination Plant operation whereas;light fuel oil (LFO) are used as back-up fuels.

Commencement : August 2006 Completion : August 2010 Location : Soussa - Libya Client : General Electricity Company of Libya

Main Work Item Unit Quantity

Concrete m3 11,500Structural Steel ton 460Cabling km 147Mech. Equipment ton 4,000

Engineering Hours hrs 65,000

Document Qty. pcs 1,144

CO

NT

RA

CT

ING

Soussa Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

Page 9: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

9 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement,construction, commissioning and start-up of a 4 x20.000 m3/day Water Production Plant with threetype of fuel, Heavy Fuel Oil (HFO), NG and LightFuel Oil (LFO), complete with all Balance of Plant(BOP) systems. NG is planned to be used as mainfuel for MED Desalination Plant operationwhereas; heavy fuel oil (HFO) are used as back-upfuels.

Commencement : July 2006 Completion : February 2012 Location : Zawia - Libya Client : General Electricity Company of Libya

Main Work Item Unit Quantity

Concrete m3 8,098Structural Steel ton 486Cabling km 340Mech. Equipment ton 7,900

Engineering Hours hrs 48,900

Document Qty. pcs 1,123

CO

NT

RA

CT

ING

Zawia Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

Page 10: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

10 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

The Project consisted of engineering, procurement,construction, commissioning and start-up of a 2 x20.000 m3/day Water Production Plant with twotype of fuel, Heavy Fuel Oil (HFO), and Light FuelOil (LFO), complete with all Balance of Plant (BOP)systems. HFO is planned to be used as main fuelfor MED Desalination Plant operation whereas;light fuel oil (LFO) are used as back-up fuels.

Commencement : March 2007 Completion : November 2010 Location : Zuara - Libya Client : General Electricity Company of Libya

Main Work Item Unit Quantity

Concrete m3 4,764Structural Steel ton 341Cabling km 185Mech. Equipment ton 4,800

Engineering Hours hrs 28,300

Document Qty. pcs 720

CO

NT

RA

CT

ING

Zuara Desalination Plant Project (Sea Water Thermal (Med-tvc) Plant) - Libya

Page 11: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

11 of 31

WATER TREATMENT PLANTS

Page 12: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

12 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Architectural, civil and structural design, andconstruction and erection of a water treatmentplant of 200,000 m³ per day capacity. Laying of3,000 tons of ductile iron pipes. Civil and buildingworks for coolers, softeners, filters, sludge disposalplant, chemical handling buildings, pump houses,administration buildings, workshops and stores. Allmechanical and electrical installation works of theabove mentioned units including insulation andpainting.

Commencement : October 1979

Completion : May 1982

Location : Wasia – Saudi Arabia

Client : Ministry of Agriculture and Water

CO

NT

RA

CT

ING

Wasia Water Treatment Plant- Saudi Arabia

Page 13: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

13 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Construction works of “Yenikapı” Pretreatment Plant& Pumping Stations in the framework of IstanbulSewerage Project (1st Stage). Contract consisted ofconstruction of a coarse screen house, a pumpingstation (influent); pretreatment plant, a pumpingstation (effluent), incoming inceptor, sewers andforce mains; fabrication and laying of overflowsystems and connecting pipes; construction of roadsand firefighting.

ENKA also undertook the supply and installation ofall electrical and mechanical parts of a coarse screenhouse, sewage pretreatment plant and 2 a pumpingstations, which have 5 pumps with a total capacity of12,5m³/sec.

Commencement : September 1984 Completion : August 1988 Location : İstanbul- Turkey Client : General Directorate of Istanbul Water &

Sewerage Administration – İSKİ

CO

NT

RA

CT

ING

Istanbul Sewerage Project, Yenikapı Pretreatment Plant and Pumping Stations- Turkey

Page 14: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

14 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Scope 1: Design and construction of a water treatment plant. Main works comprise softener building, pumping station, fuel storage tanks, waste water station, wells, administration building and electromechanical works.

Commencement : April 1985 Completion : March 1988 Location : Al Rass - Saudi Arabia Client : Ministry of Agriculture and Water

CO

NT

RA

CT

ING

Scope 2 : Pipe-laying for transmission and distribution network.

Commencement : November 1985 Completion : July 1987 Location : Al Rass - Saudi Arabia Client : Ministry of Agriculture and Water

Al Rass Water Supply and Treatment Systems- Saudi Arabia

Page 15: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

15 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Ras Lanuf New Town Contracts 11 and 12 is a housingcomplex project.Scope: Storm Water Drainage System and WaterSupply System, 17 km long pipeline with a diameter of400 mm was used to bring water from the nearbyindustrial area of the ARC to the a/m reservoir.The networks consists of a main network around theresidential areas and second networks inside theapartment blocks.Sewage Treatment Plant and Irrigation Systemcomprise complete sewage water treatment facilitiesincluding restricted effluent reuse for irrigationpurpose outside the residential areas.

Waste water is collected from the residential areasthrough gravity sewers to the 4 pumping stations andthen pumped to the treatment plant, which is anactivated sludge process using mechanical and surfaceaerators. 2 water reservoirs (200,000 m³). Thereservoirs foundation lays on a compacted gravel bed.The reservation is abed and walls are made of wateringconcrete. The necessary circulation and post treatmentof water is arranged with two circulation pumps,chlorine dosing and residual chlorine metering. C

ON

TR

AC

TIN

G

Commencement : February 1981 Completion : May 1985 Location : Ras Lanuf – Libya Client : Secretariat of Heavy Industries, Brega

and Ras Lanuf Higher Committee

Ras Lanuf New Town Project (Water Supply and SewageSystems) - Libya

Page 16: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

16 of 31

WATER INTAKE STRUCTURES

Page 17: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

17 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

CO

NT

RA

CT

ING

Project covered the turn-key construction of sea waterintake structures in offshore and in onshore scopes.These structures designed to feed 80.000 m3/day seawater to the desalination plant in one operational andone standby configuration.

Offshore: 2 x 1000 m HDPE water pipeline with dia. of 1.4 m 2 x 1000 m HDPE chlorination pipeline 2 x precast concrete head With precast concrete weight blocks of pipeline

Onshore: 2 x concrete water basin 2 x coarse screening machine 2 x rotary screening machine With stop logs and sea water valves

Contract Date : August 2006 Completion : August 2010 Location : Derna - Libya Client : General Electricity Company of Libya

Derna desalınatıon plant Sea water ıntake structure –Libya

Page 18: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

18 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

CO

NT

RA

CT

ING

Project covered the turn-key construction of sea waterintake structures in offshore and in onshore scopes.These structures designed to feed 80.000 m3/day seawater to the desalination plant in one operational andone standby configuration.

Offshore: 2 x 500 m HDPE water pipeline with dia. of 1.4 m 2 x 500 m HDPE chlorination pipeline 2 x precast concrete head With precast concrete weight blocks of pipeline

Onshore: 2 x concrete water basin 2 x coarse screening machine 2 x rotary screening machine With stop logs and sea water valves

Contract Date : August 2006 Completion : June 2010 Location : Soussa - Libya Client : General Electricity Company of Libya

SOUSSA desalınatıon plant Sea water ıntake structure– Libya

Page 19: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

19 of 31

PUMPING STATIONS

Page 20: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

20 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

CO

NT

RA

CT

ING

Construction of the civil engineering works andsupply, delivery and installation of the associatedelectrical and mechanical equipment of waterpumping stations as listed below:

Dahman Judaim Zawia Zahra

The pumping stations incorporates with surgeequipment, drainage system and electrical controlroom.

Contract Date : June 2007

Completion : July 2010

Location : Zawia-Libya

Client : General Electricity Company of Libya

ZAWIA PUMPING STATIONS - Libya

Page 21: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

21 of 31

RESERVOIRS and STORAGE TANKS

Page 22: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

22 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

CO

NT

RA

CT

ING

Project covered the turn-key construction of 2,666 villas , 2schools, 2 supermarkets, 2 clinics, 2 post offices, recreationalfacilities, 2 service shops, 2 cultural centers. All theinfrastructure works such as sewerage system, storm waterdrainage, irrigation and fire fighting network, potable waternetwork, water tanks have been performed in the frameworkof this turn-key contract. The total length of the pipes layedis 118,673 m.

Scope: Sewer Network Storm Water Drainage Network Fire and Irrigation Network Potable Water Network

Commencement : May 1986 Completion : August 1993 Location : Marsa El Brega - Libya Client : Secretariat of Heavy Industries, Brega and Ras

Lanuf Higher Committee

Brega New Town Project Water Reservoirs and Piping Works - Libya

Page 23: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

23 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

CO

NT

RA

CT

ING

Construction of the civil engineering works andsupply, delivery and installation of the associatedelectrical and mechanical equipment of circularearthfill holding reservoir with a capacity of 4,7million m3. The reservoir comprises anembankment with 9 m. Height and 1 km. of crestdiameter, inlet and outlet works and a spillway.The circular earthfill embankment incorporatesan internal sand/gravel system drainage systemand has internal slopes lined with a syntheticgeomembrane of 150,000 m2.

Scope: The inlet works, outlet works andspillway are constructed of reinforced concrete.Water is discharged into the reservoir through 3submerged discharge valves, each with adiameter of 2,000 mm, and a weight of 30 tons,supplied and installed by ENKA. Manufacturingand installation of polyurethane coated buriedsteel pipework, with diameters varying between2,000 and 4,000 mm lined at site by cementmortar and cathodically protected andinstallation of 8 owner-supplied large valves areincluded. The project also includes installation ofa prestressed cylindrical concrete by-passpipeline of 4 m diameter and 1,800 m long.

Commencement : July 1988

Completion : April 1991

Location : Benghazi-Libya

Client : Great Man-Made River Authority

Benghazi Water Reservoir - Libya

Page 24: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

24 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

CO

NT

RA

CT

ING

Construction of the civil engineering works and supply, delivery and installation of the associated electrical andmechanical equipment of cylindirical water tanks with a capacity of:

2 x 20.000 m3 5 x 10.000 m3 1 x 5.000 m3 1 x 2.500 m3

The steel tanks incorporates an internal level control system with instruments and valves, drainage system.

Contract Date : June 2007

Completion : July 2010

Location : Zawia-Libya

Client : General Electricity Company of Libya

ZAWIA WATER STORAGE TANKS - Libya

Page 25: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

25 of 31

WATER PIPELINES and DISTRIBUTIONSYSTEMS

Page 26: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

26 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Zawia water network consist of:

125.805 meter of pipeline•DN600 54.636m•DN500 22.629m•DN450 1.576m•DN400 9.256m•DN350 35.511m•DN200 2.197m

CO

NT

RA

CT

ING

Contract Date : June 2007

Completion : July 2010

Location : Zawia - Libya

Client : General Electricity Company of Libya

ZAWIA WATER PIPELINE and DISTRIBUTION NETWORK –LIBYA

Page 27: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

27 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

In the Diyarbakır Province Sewage System which weundertook in 1977, 15 km long collector was completedin an extremely hard rocky (basalt) area. Theconstruction was carried in the city.

Key figures : Excavation: 380,479 m³ Concrete: 13,064 m³ Pipelaying: 104,102 m

Commencement : April 1982

Completion : April 1986

Location : Diyarbakır - Turkey

Client : Province Bank Turkey

CO

NT

RA

CT

ING

Diyarbakır Province Sewage System - Turkey

Page 28: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

28 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Construction of the water supply system of DiyarbakırProvince consisting of 67 km pipeline

Key figures: Excavation: 83,000 m³ Concrete: 530 m³ Pipelaying: 67,742 m

Commencement : May 1982

Completion : May 1986

Location : Diyarbakır - Turkey

Client : Province Bank Turkey

CO

NT

RA

CT

ING

Diyarbakır Province Drinking Water Supply System - Turkey

Page 29: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

29 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Al Medinah Al Munawwarah Housing project wascomposed of 2,084 villas on an area of 2,150,000 m2and related infrastructure works such as potable waterand rain water systems, sewage system and irrigationnetwork.

Infrastructure works:

Storm Drainage System: Pipe laying: 12,445 m Pipe diameters: 1,050 mm, 750 mm, 600

mm, 300 mm

Water Supply System: Pipe laying: 28,000 m Pipe diameters: 200 mm, 150 mm, 50 mm

Irrigation System: Pipe laying: 6,468 m Pipe diameters: 225 mm, 110 mm, 63 mm

Sanitary Sewerage System: Pipe laying: 24,432 m Pipe diameters: 330 mm, 250 mm, 200 mm,

160 mm.

CO

NT

RA

CT

ING

Al Medinah Al Munawwarah Housing (Water Supply andSewage Systems) - Saudi Arabia

Commencement : April 1982 Completion : February 1988 Location : Al Medinah - Saudi Arabia Client : Ministry of Public Works and Housing

Page 30: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

30 of 31Phone : +90 (212) 376 10 00 (pbx)Fax : +90 (212) 272 88 69Web: www.enka.com E-mail: [email protected]

Address:Balmumcu Mah., Zincirlikuyu Yolu No: 10Besiktas, Istanbul, Turkey 34349

Turn-key construction of the sewage system networkand collectors of the city of Kahramanmaraş includingmanufacturing of pipes with dia. Between 100-1,200mm. Contact also included drinking water network of200 km consisting of 100-800 mm dia pipes.

Key figures: Excavation: 1,580,000 m³ Pipe Manufacturing and Laying: 565,390 m³ Filling: 1,239,420 m³ Concrete: 46,081m³

Commencement : May 1985

Completion : May 1987

Location : Kahramanmaraş - Turkey

Client : Province Bank Turkey

CO

NT

RA

CT

ING

Kahramanmaraş Sewage System Network, Collectors and Drinking Water Network System- Turkey

Page 31: WATER - Enka İnşaat ve Sanayi A.Ş. · WATER (desalınatıon plant, water treatment, pıpelıne, pumpıng statıon, reservoır) overvıew 2019 Engineering for a . Better Future

İNŞAAT VE SANAYİ A.Ş.Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349

Beşiktaş / İstanbulTel: +90 (212) 376 10 00 (pbx)

Fax: +90 (212) 272 88 69Web: www.enka.com