what happens? 2013.02.072013.03.20 unexpected noisy alarm due to fan fail broken fuse parts noisy...
TRANSCRIPT
What happens?
QuickTime™ and aH.264 decompressor
are needed to see this picture.
2013.02.07 2013.03.20
QuickTime™ and aH.264 decompressor
are needed to see this picture.
QuickTime™ and aH.264 decompressor
are needed to see this picture.
Unexpected noisy alarm due to fan fail
Broken fuse parts
Noisy alarm is still there due to fan fail
NIM modules can not be put into the 1st and 12th slots.
no 항 목’13.1Q
2Q 3Q 4Q ‘14.1Q 2Q 3Q 4Q
2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
1 License Agreement
2 100 x 100 Fabrication and QC Validation
- Rebuild equipments/utility for GEM Foil
- Prepare raw materials(FCCL, mixed chemical)
- develop the prototype
- QC validate the prototype @KOREA
- QC validate the prototype @CERN
3 100 x 100 Routine and standard production , 300 x 300 R&D
- 100 x 100 routine & standard production
- develop the prototype of 300 x 300
- QC validate the prototype @KOREA/CERN
4 300 x 300 Routine and standard production , 500 x 500 R&D
- 300 x 300 routine & standard production
- develop the prototype of 500 x 500
- QC validate the prototype @KOREA/CERN
Production start: Oct. 2013
Production start: March. 2014
no 항 목’13.1Q
2Q 3Q 4Q ‘14.1Q 2Q 3Q 4Q
2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
1 License 계약 체결
2 100 x 100 제작 및 QC 검증
- GEM Foil 제작환경 구축 (System/Utility 재구축 ) - 원재료 확보 (FCCL 및 chemical for kapton etch)
- 시제품 제작 - 한국 CMS( 시립대 ) QC 검증 with 100x100 시제품 - 100x100 시제품 CERN QC 검증
3 100 x 100 제품 양산 및 300 x 300 R&D
- 100x100 양산 ( 한국 CMS/CERN 요청물량 )
- 300x300 시제품 제작
- 한국 CMS/CERN 300x300 시제품 QC 검증
4 300 x 300 양산 및 500 x 500 R&D
- 300x300 양산 ( 한국 CMS/CERN 요청물량 )
- 500x500 시제품 제작
- 한국 CMS/CERN 500x500 시제품 QC 검증
Production start: 2013. 9 월
Production start: 2014. 11 월
GEM
pro
duct
ion
plan
내부용
외부용