Working with VT&C. Resources. Activation DH Network ACAPS Preparedness: Development guidelines (8 hours) Instruction focal point (4 hours) Briefing volunteers (2 hours) Deployment Around 1,5 hours a day (1 hour on standby/Skype, 0,5 hours answering questions in google doc). SBTF - PowerPoint PPT Presentation

TRANSCRIPT

Working with VT&C

  

 

Resources

Activation DH Network

ACAPSPreparedness:•Development guidelines (8 hours)•Instruction focal point (4 hours)•Briefing volunteers (2 hours)

Deployment•Around 1,5 hours a day (1 hour on standby/Skype, 0,5 hours answering questions in google doc).

SBTF•2 coordinators, 34 volunteers of which 8 team leaders•Deployment – 5 days

  

 

OUTPUT – SURVEY OF SURVEYS

• 71 reports• Not all assessments• Database of resources• https://docs.google.com/spreadsheet/ccc?key=0AuJdjyzXdz8tdFBQd1QyWWdRZndEN1

9xX1o3ZXpwcEE#gid=14

OUTPUT – POPULATION DATA

• Population per province/district• Number of IDPs/Refugees• Database of all sources• https://docs.google.com/spreadsheet/ccc?

key=0AikmHjO1VwoddGkyODVvOUhrb29rSzU3NFB4OEZERkE#gid=14

OUTPUT – EVENTS DATABASE

• 330 humanitarian and political events from between 2012 and 2005

• Large number of incidents/small scale events• https://docs.google.com/spreadsheet/ccc?

key=0AikmHjO1VwoddE1nYU54TllvRDZIenZxYWs0M09ObVE#gid=24

OUTPUT – INDICATORS

• Number of indicators collected: around 100

• Social, Economic, Population, Territory, Water and Sanitation, Health, Ranking in indexes

• https://docs.google.com/spreadsheet/ccc?key=0AikmHjO1VwoddDVaNEI3dUs4MXp4ZmwtM25zM2ZDU3c#gid=22

OUTPUT – MAPS

OUTPUT – GENERAL STRUCTURE

• Instruction documents• Google Spreadsheet templates• Webscrapper

ACKNOWLEDGEMENT VOLUNTEERS

• Certificates• Twitter• ACAPS Newsletter• Publication of report