长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
WORKPLACE SAFETY AND HEALTHPRACTICES AWARD 2011
Silent Black Balls (SB2)
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
Capellla, Singapore
MRT Stations & Tunnel @ Hillview & Cashew The Wharf ResidenceMarina Business Financial Centre
Resort World, Singapore
In Singapore, we act as the main contractor in construction projects for both private and public sectors
Over 50 years of experience in Singapore's construction industry
Listed as Tiong Seng Holdings Limited in 2010
Holds the highest A1 grading from Singapore’s Building & Construction Authority (“BCA”)
– Applies to both general building & civil engineering projects– Qualifies us to undertake public sector construction projects with unlimited contract
value
Holds BCA’s General Builder Class 1 with specialist builder license for Piling works, Ground Support & Stabilization, Structural Steel & Precast Concrete Works
A leader in technologies & capabilities– Expertise in pre-casting– Specialization in fabrication and supply of pre-cast mould and steelwork fabrication– Usage of advanced formwork systems– Usage of innovative systems such as BIM & Cobiax technologies
COMPANY INTRODUCTION
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
background
Land to house businesses and population
Land for transportation
Land
Professionals
Skilled Workforce
General Workforce
People
Coarse and Fine Aggregate
Cement
Steel
Constr. Materials
Singapore Scarce in
Taller buildings and deeper basements
More infrastructuresMore Foreign professionals, skilled and unskilled workers
Import construction and raw materials including
water
Increase
Productivity
Improve
Competency
Reduce Structure Dead Weight
…………….
Reduction in Foundation Requirements
Reduction in Constr. Materials incl. concrete &
rebar
Reduction in Inertia Force due to Seismic
Excitation…………….
Reduction in Structure Dead Load
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
Silent black ball – sb2
Reduction in Structural Dead LoadTECHNOLOGY
Basic ideaCobiax system (www.cobiax.com) originated from Switzerland and was first brought into the Singapore market in 2009 and first execution in 2010.
Taking inspiration from nature, the system helps optimize building structures thru the introduction of void formers. At the same time, optimizing the slab’s thickness and quantity of building material to be handled
ImplementationCobiax void formers, is designed and positioned in appropriate zones of flat slabs contribute to dead weight reduction without modifying flexural strength and load transfer to supports
Properties and Benefits - OverviewFast
•Optimize foundation design – reducing volume of piling works•Reduce formwork placement time due to flat slabs with no beams
Productive•Simplify site logistics by reducing the volume of concrete and rebar used•Reduce co-ordination issues by eliminating beams
Green•Reduce Carbon footprint of the building•Reduce transport movement due to optimized building material usage
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
Silent black ball – sb2
Before
Risk/ Exposure Level before control
Noise - 85 to 90 dBA
Vibration - Longer Exposure
Traffic Control - For Concrete/Rebar Delivery
After
Risk/ Exposure Level after control
Noise Reduction - 70 to 75 dBA
Vibration - Shorter Exposure
Traffic Control - Fewer Trips of Delivery
Less fatigue for concreting worker
Benefits
Change of Bored Pile to Raft Foundation
Reduction of concrete volume
Reduction of rebar quantity
Reduction of numbers of concrete mixer truck trips
Improve floor construction cycle times
Volume gain – height reduction
Promote recycling / reuse of plastics
Cost Cost Savings
Time is reduced by 30%, Productivity increased by 30%
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
Silent black ball – sb2
Comprehensive Protection
SB2 provides comprehensive protection by:Replacing bored piles with raft foundation as the foundation system*
Reducing concrete and rebar usage requirement
o Eliminate approximately 200 nos. of bored piles
• Eliminate toppling hazards of heavy piling plants and machinery
• Eliminate Collapse of load tests
• Eliminate noise and vibration generated due to bored pile operation
In general, workers who are likely to be exposed to hazards are provided with protection by reducing their prolonged exposure to concrete, noise and vibration.
Original Site Condition
Collapse of Load Test of other site
COBIAX VOID FORMERS
o Reduce 890m3 of concrete volume which result in
• Lesser time and energy used for placing concrete
• Shorter worker’s time exposure to noise and reduce
deafness probability.
• Reduce 186,000 kg of CO2 produce
• Reduce 148 concrete truck trips
o Reduce 300 tons of rebar which result in:
• Shorter time to place rebar
• Reduce 12 rebar trailer trips
o Promote recycling / reuse of plastics
* Based upon case study of actual project, may vary depending on different project design requirements
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
Silent black ball – sb2
Ease of Set-up and Use
It is currently used in majority of Tiong Seng projects and have gained wide acceptance from workers who are first hand installing the SB2, from consultants who are invited to witness site demonstrations and from subcontractors who are to carry out interfacing works.`
Design substitution control of SB2 to the conventional work process is very simple and easy to implement.
It comes in cage modules with the void balls for easy mobility. It can easily be modified to suit site requirements and conditions
Off-Site FabricationAssembly of cobiax void formers into the positioning cagesDelivery to site
On-Site InstallationErection of slab formworkFixing of bottom rebar Installation of SB2 modules and M&E piping concurrentlyFixing of top rebar
Robust to Handle
Modular & Easy to Check
Casting as usual
Easy to Modify
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
Silent black ball – sb2
Wide scope of applicationSB2 our best practice, being a modular concept, is suitable for
In-situ application
Precast module
Infrastructure works such as bridges & flyovers
Use in combination with other building techniques such as post-tensioning and composite structures.
Life Cycle CostSince the SB2 void formers are made of recycled plastic material, the company reaps the many benefits by using cost effective material which does not only remove the non-working dead load but also maintains the bi-axial strength of the structural slab.
InnovationSB2 is a best practice due to its
light-flat-biaxial concept that reduce noise level during casting
have many cost benefits mainly on concrete, reinforcement steel and the elimination of wire chair and piling
due to its resource effectiveness through reduction in concrete, carbon dioxide emissions, optimize construction time, productivity and promote sustainability.
Pre-Stressing
Precast
Flyover
长成工程(私人)有限公司TIONG SENG CONTRACTORS (PTE) LTD
Silent black ball – sb2
•Noise level due to piling & concreting
•Stress level to workers due to continuous large volume of casting
•Manpower deployment
•Quantity of material usage
•Energy consumption
•Level of safety hazard during piling and testing
•Eliminate noise and safety hazard due to piling
•Noise Level due to concreting
•Stress level to worker as concrete volume reduced
•Requirement of manpower deployment
•Usage of construction materials
•Consumption of energy