A GUIDANCE PACKAGE FOR TEACHERS Course Involved: Graduate Diploma in Technology Education University of Limerick Department of Design & Manufacturing Technology Lecturer/Teacher: Mr. Joseph Lyster Academic Year 2012: Spring Semester Technical Support: Mr. Joe Murray & Mr. Richie Hennessy Notes Prepared by: Mr. Joseph Lyster Available on www.slideshare.net/WT4603 TECHNOLOGY EDUCATION AND WORKSHOP PRACTICE 2: MATERIALS AND CONSTRUCTION: ALL AREAS OF INTEREST UNIT 8: WEEK 11 UNIVERSITY of LIMERICK OLLSCOIL LUIMNIGH

Upload: patrician-secondary-newbridge

Post on 13-Apr-2017

681 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Wt5912 2012 wk11

A GUIDANCE

PACKAGE FOR

TEACHERS

C o u r s e I n v o l v e d : G r a d u a t e D i p l o m a i n T e c h n o l o g y E d u c a t i o n

U n i v e r s i t y o f L i m e r i c k

D e p a r t m e n t o f D e s i g n & M a n u f a c t u r i n g T e c h n o l o g y

L e c t u r e r / T e a c h e r : M r . J o s e p h L y s t e r

A c a d e m i c Y e a r 2 0 1 2 : S p r i n g S e m e s t e r

T e c h n i c a l S u p p o r t : M r . J o e M u r r a y & M r . R i c h i e H e n n e s s y

N o t e s P r e p a r e d b y : M r . J o s e p h L y s t e r

A v a i l a b l e o n w w w . s l i d e s h a r e . n e t / W T 4 6 0 3

TECHNOLOGY EDUCATION AND WORKSHOP PRACTICE 2: MATERIALS AND CONSTRUCTION: ALL AREAS OF INTEREST UNIT 8: WEEK 11

UNIVERSITY of LIMERICK

OLLSCOIL LUIMNIGH

Page 2: Wt5912 2012 wk11

Learning Areas to be Presented

1. Rural/Urban Development and Planning

2. Substructure

3. Superstructure

4. Mechanical Services

5. Heat and Thermal Insulation

6. Building Energy Rating

7. Low-Environmental Impact Design

8. Other Technologies and Building Systems

CONSTRUCTION STUDIES

Page 3: Wt5912 2012 wk11

ONE-OFF

HOUSING RURAL DEVELOPMENT

Page 4: Wt5912 2012 wk11

PLANNING PROCEDURES

Page 5: Wt5912 2012 wk11

SITE SELECTION

UNIVERSITY of LIMERICK

Check the development plan

Reading the landscape

Choosing where to build

Assessing a site’s potential

Linking with the land

Summary & Checklist

Page 6: Wt5912 2012 wk11

CHECK DEVELOPMENT PLAN

UNIVERSITY of LIMERICK

Check with County Council/Local Authorities planning policies & procedures

Policies restricting/permitting development in certain areas e.g.

Greenbelt, Coastal Areas, Rural Housing Control Zone etc.

Scenic Amenity Maps - scenic routes and scenic landscapes;

Heritage maps - Natural Heritage Areas (NHA), Special Protection Areas

(SPA) and candidate Special Area of Conservation

(SAC) and Areas of Geological Interest;

Landscape Character Maps;

Archaeology policies, the Record of Protected Structures and conservation

policies.

Page 7: Wt5912 2012 wk11

READING LANDSCAPE

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 8: Wt5912 2012 wk11

CHOOSING WHERE TO BUILD ON SITE

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 9: Wt5912 2012 wk11

ASSESSING SITES POTENTIAL

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 10: Wt5912 2012 wk11

LINKING WITH THE LAND

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 11: Wt5912 2012 wk11

LINKING WITH THE LAND

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 12: Wt5912 2012 wk11

SITE CONSIDERATIONS

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 13: Wt5912 2012 wk11

DWELLING ORIENTATION

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 14: Wt5912 2012 wk11

DWELLING ORIENTATION

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 15: Wt5912 2012 wk11

DWELLING ORIENTATION

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 16: Wt5912 2012 wk11

DWELLING ORIENTATION

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 17: Wt5912 2012 wk11

DWELLING ORIENTATION

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 18: Wt5912 2012 wk11

DWELLING ORIENTATION

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 19: Wt5912 2012 wk11

SITE BOUNDARIES

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 20: Wt5912 2012 wk11

SITE ENTRANCES

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 21: Wt5912 2012 wk11

BUILDING DESIGN

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 22: Wt5912 2012 wk11

BUILDING DESIGN

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 23: Wt5912 2012 wk11

BUILDING DESIGN

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 24: Wt5912 2012 wk11

BUILDING DESIGN

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 25: Wt5912 2012 wk11

SKETCH DEVELOPMENT: SITE

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 26: Wt5912 2012 wk11

SKETCH DEVELOPMENT: PRE-PLANNING

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 27: Wt5912 2012 wk11

SKETCH DEVELOPMENT: NARROW PLAN DESIGN

UNIVERSITY of LIMERICK Cork Rural Design Guide 2006

Page 28: Wt5912 2012 wk11

LARGE SCALE

DEVELOPMENT URBAN DEVELOPMENT

Page 29: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 30: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 31: Wt5912 2012 wk11

NEIGHBOURHOOD

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 32: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 33: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 34: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 35: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 36: Wt5912 2012 wk11

SITE

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 37: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 38: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 39: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 40: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 41: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 42: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 43: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 44: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 45: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 46: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 47: Wt5912 2012 wk11

HOME

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 48: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 49: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 50: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 51: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 52: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 53: Wt5912 2012 wk11

PICTURING EVENTS

UNIVERSITY of LIMERICK (Urban Design Manual 2006)

Page 54: Wt5912 2012 wk11

KINGSPAN LIGHTHOUSE

UNIVERSITY of LIMERICK (Kingspan 2006)

Page 55: Wt5912 2012 wk11

KINGSPAN LIGHTHOUSE

UNIVERSITY of LIMERICK (Kingspan 2006)

Page 56: Wt5912 2012 wk11

KINGSPAN LIGHTHOUSE

UNIVERSITY of LIMERICK (Kingspan 2006)

Page 57: Wt5912 2012 wk11

KINGSPAN LIGHTHOUSE

UNIVERSITY of LIMERICK

Solar Gain and Shading

(Kingspan 2006)

Page 58: Wt5912 2012 wk11

KINGSPAN LIGHTHOUSE

UNIVERSITY of LIMERICK (Kingspan 2006)

Page 59: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 60: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 61: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 62: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Beddington Zero Energy Development

Page 63: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 64: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 65: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 66: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 67: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 68: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 69: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 70: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 71: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 72: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 73: Wt5912 2012 wk11

GLOBAL EXAMPLES INCLUDING THOSE WITH

BIOMIMICRY INSPIRATION

UNIVERSITY of LIMERICK

Page 74: Wt5912 2012 wk11

TO GROUND

FLOOR LEVEL SUBSTRUCTURE

Page 75: Wt5912 2012 wk11

TRIAL HOLE

Trial Hole: 1m² x 1.5m Deep

Page 76: Wt5912 2012 wk11

SITE LEVEL AND PROFILING

Site Level and Profiling

Page 77: Wt5912 2012 wk11

SITE LEVEL AND PROFILING

Page 78: Wt5912 2012 wk11

SITE LEVEL

Page 79: Wt5912 2012 wk11

FOUNDATIONS

Majority of buildings

Continuous strip

Reinforced concrete

Rests on the soil

Depth and Width

Soil type and

Building load

Page 80: Wt5912 2012 wk11

TRADITIONAL STRIP

Traditional Strip foundation

Most commonly used

Usual 1050 X 350mm

Suitable for –

Average – Good bearing

capacity soils

Not suitable for –

Very soft clays

Silt

Peat

Badly made – up - ground

Page 81: Wt5912 2012 wk11

STEPPED STRIP

Stepped Strip foundation

Sloping sites

Reduce excavation

Step depths

112mm or 225mm

Overlap of concrete

Minimum 300mm

Not less than depth

of concrete foundation

Page 82: Wt5912 2012 wk11

WIDE STRIP

Wide Strip foundation

Not common

Reinforced

Transverse reinforcement

Resist tensions

Wider than 900mm

Suitable for –

Ground with low bearing capacity

Expensive

Page 83: Wt5912 2012 wk11

DEEP STRIP

Deep Strip foundation

Rests on suitable strata

Excavate 900mm or more

Trench filled within 150mm

of ground level

Width depends on depth

Page 84: Wt5912 2012 wk11

RAFT FOUNDATION

Raft foundation

Suitable for –

Low load bearing soils

Soft natural ground

Very soft clays

Silt

Peat

Made – up – ground

Average – Good bearing capacity soils instead of strip foundations

Page 85: Wt5912 2012 wk11

RAFT FOUNDATION

Raft foundation

Concrete slab

Reinforced slab

Up to 300mm thick

Whole building area

Pavement

All Loads transmitted

Slab thicker under load bearing walls

Page 86: Wt5912 2012 wk11

PILE FOUNDATION

Carry and transfer loads

Sub-soils of poor bearing capacity

Deeper soil and rock of a high bearing capacity

Avoids excessive excavation

Pile Foundation

Page 87: Wt5912 2012 wk11

PILE FOUNDATION

Made from

Wood

Steel

Concrete

Placed in ground

Driven

Drilled

Jacked

Page 88: Wt5912 2012 wk11

MACHINERY

Equipment

To clear site

Hymac’s

JCB’s

To remove / move materials

Tractors

Trailers

Dumpers

Heavy Machinery

Page 89: Wt5912 2012 wk11

SITE ENTRANCE

Images courtesy of: Mr John Joyce

Site Entrance

Page 90: Wt5912 2012 wk11

BUCKET TYPES

1050 mm bucket

External – cavity leaf

wall foundations

350 mm bucket

Internal – single leaf

wall foundations

Large bucket

Used to clear site’s topsoil

Images courtesy of: Mr John Joyce

Site Clearance

Page 91: Wt5912 2012 wk11

CLEARANCE/EXCAVATION

Perimeter trenches dug with 1050 mm bucket

Internal trenches dug with 350 mm bucket

Images courtesy of: Mr John Joyce

Site Clearance/Excavation

Page 92: Wt5912 2012 wk11

CLEARANCE/EXCAVATION

Open Timbering Close Timbering

Excavation

Page 93: Wt5912 2012 wk11

CLEARANCE/EXCAVATION

Excavation

Page 94: Wt5912 2012 wk11

CLEARANCE/EXCAVATION

Mild steel bars

Provide tensile strength

Min. 25mm from surface

Prevents rusting

Adequate depth to support

Spacers

Position reinforcing bars

Provide the necessary cover Images courtesy of: Mr John Joyce

Excavation/Foundation Preparation

Page 95: Wt5912 2012 wk11

LAYING FOUNDATION

Cement trucks pull in on site

Concrete poured directly into trench

Filled up level with tops of pegs

Levelled roughly with shovels

Top of wooden

peg to which the

foundation will

be levelled to

Images courtesy of: Mr John Joyce

Laying Foundation

Page 96: Wt5912 2012 wk11

LAYING FOUNDATION

Tapered off level with tamping board

Images courtesy of: Mr John Joyce

Laying Foundation

Page 97: Wt5912 2012 wk11

LAYING FOUNDATION

Images courtesy of: Mr John Joyce

Laying Foundation

Page 98: Wt5912 2012 wk11

RISING WALLS

Images courtesy of: Mr John Joyce

Foot/Rising Walls

Page 99: Wt5912 2012 wk11

RISING WALLS

Images courtesy of: Mr John Joyce

Foot/Rising Walls

Page 100: Wt5912 2012 wk11

RISING WALLS

Images courtesy of: Mr John Joyce

Foot/Rising Walls Provision for Services

Page 101: Wt5912 2012 wk11

HARDCORE

Foot/Rising Walls Hard-core fill

Page 102: Wt5912 2012 wk11

FOUNDATION INSULATION

Images courtesy of: Mr John Joyce

Foot/Rising Walls Radon/DPC/Insulation

Page 103: Wt5912 2012 wk11

PROVISION OF SERVICES

Foot/Rising Walls Plumbing

Images courtesy of: Mr John Joyce

Page 104: Wt5912 2012 wk11

SUBFLOOR

Subfloor

Page 105: Wt5912 2012 wk11

EXTERNAL WALLS

External Walls

Page 106: Wt5912 2012 wk11

STANDARD

BUILDING

SYSTEMS SUPERSTRUCTURE

Page 107: Wt5912 2012 wk11

FLOORS

Types of Ground Floor

Construction

Solid Concrete Floor

Suspended Timber Floor

Precast Concrete Floor

Page 108: Wt5912 2012 wk11

FLOORS

Solid Concrete Floor

Page 109: Wt5912 2012 wk11

FLOORS

Solid Concrete Floor

Page 110: Wt5912 2012 wk11

FLOORS

Solid Concrete Floor

Page 111: Wt5912 2012 wk11

FLOORS

Solid Concrete Floor

Page 112: Wt5912 2012 wk11

FLOORS

Suspended Timber Floor

Page 113: Wt5912 2012 wk11

FLOORS

Suspended Timber Floor

Page 114: Wt5912 2012 wk11

FLOORS

Precast Concrete Floor

Page 115: Wt5912 2012 wk11

FLOORS

Precast Concrete Floor

Page 116: Wt5912 2012 wk11

FLOORS

Hollow Block Wall Raft Foundation

Positioning of Radon:

Page 117: Wt5912 2012 wk11

ENTRY

Wheel Chair Access

Technical Guidance Document M

Page 118: Wt5912 2012 wk11

Primary Types of

Residential Construction in

Ireland

Concrete Cavity

Inner/Outer Block Leaf(s)

Timber Frame

Inner Timber Frame/ Outer Block Leaf

Page 119: Wt5912 2012 wk11

Strength and stability

Weather resistance

Fire resistance

Thermal insulation

Sound insulation

Functions of external walls

Page 120: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity

Page 121: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity

Page 122: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity

Page 123: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Cill Detail

Page 124: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Cill Detail

Page 125: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Cill Detail

Page 126: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Steel Lintel Detail

Page 127: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Steel Lintel Detail

Page 128: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Pre-Stressed Concrete Lintel Detail

Page 129: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Comparative Lintel Detail

Steel Lintel Steel Brick Tray Lintel +

Pre-Stressed Concrete

Lintel

Pre-stressed

Concrete Lintel

Page 130: Wt5912 2012 wk11

CONCRETE CAVITY BUILDING SYSTEM

External Concrete Cavity: Pre-Stressed Concrete Lintel Detail

Page 131: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

External Leaf Construction: Timberframe – Window Detail

Page 132: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe

Construction: Floor Level

Page 133: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: Floor Level

Page 134: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: External Wall

Page 135: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: External Wall

Page 136: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: External Wall

Page 137: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: External Wall

Page 138: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: External Wall

Page 139: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: Closing Around Openings/ Lintel-Header

Page 140: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: Cill Detail

Page 141: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

External Leaf Construction: Timberframe – Cill Detail

Page 142: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe

Construction: External Wall

Page 143: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe

Construction: Combined Floors

Page 144: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: Gable Chimney

Page 145: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: Party Wall

Page 146: Wt5912 2012 wk11

TIMBER-FRAME BUILDING SYSTEM

Timberframe Construction: Party Wall

Page 147: Wt5912 2012 wk11

FIRST FLOOR CONSTRUCTION

Internal First floor: Floor Detail

Solid Bridging Herringbone Strutting

Page 148: Wt5912 2012 wk11

FIRST FLOOR CONSTRUCTION

Internal First floor: Floor Detail

Page 149: Wt5912 2012 wk11

FIRST FLOOR CONSTRUCTION

Internal Construction: First Floor – Web Truss

Page 150: Wt5912 2012 wk11

FIRST FLOOR CONSTRUCTION

Internal Construction: First Floor – Web Truss

Page 151: Wt5912 2012 wk11

FIRST FLOOR CONSTRUCTION

Internal First floor: Floor/Stud Partition Detail

Page 152: Wt5912 2012 wk11

FIRST FLOOR CONSTRUCTION

Internal First floor: Floor/Stud Partition Detail

Page 153: Wt5912 2012 wk11

STAIRS

Internal

Construction: Stairways

Page 154: Wt5912 2012 wk11

STAIRS

Internal

Construction: Stairways

Page 155: Wt5912 2012 wk11

STAIRS

Internal

Construction: Stairways

Page 156: Wt5912 2012 wk11

STAIRS

Internal

Construction: Stairways

Page 157: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss

Page 158: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss

Page 159: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss

Page 160: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss

Page 161: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss

Page 162: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss

Page 163: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss – Around Chimney

Page 164: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss – Around Chimney

Page 165: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof

Construction: Pre-Fabricated Truss –

Around Chimney

Page 166: Wt5912 2012 wk11

WATER CISTERN SUPPORT

Roof Construction: Water Cistern Location/Support

Page 167: Wt5912 2012 wk11

WATER CISTERN SUPPORT

Roof Construction: Water Cistern Location/Support

Page 168: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss – Gable Ladder

Page 169: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss Roof – Eaves/Rafters/Joists

Page 170: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss Roof – Gable

Ladder/Spandrel

Page 171: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss – Hip End

Page 172: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss – Hip End

Page 173: Wt5912 2012 wk11

PRE-FABRICATED TRUSS ROOF

Roof Construction: Pre-Fabricated Truss – Fink Truss

Page 174: Wt5912 2012 wk11

TARDITIONAL CUT ROOF CONSTRUCTION

Roof Construction: Traditional Cut Roof

Page 175: Wt5912 2012 wk11

TARDITIONAL CUT ROOF CONSTRUCTION

Page 176: Wt5912 2012 wk11

TARDITIONAL CUT ROOF CONSTRUCTION

Roof Construction: Traditional Cut Roof – Roof Layout

Page 177: Wt5912 2012 wk11

TARDITIONAL CUT ROOF CONSTRUCTION

Roof

Construction: Traditional Cut Roof –

Hip

Page 178: Wt5912 2012 wk11

TARDITIONAL CUT ROOF CONSTRUCTION

Roof Construction: Traditional Cut Roof – Birds Mouth/Box Dormer

Page 179: Wt5912 2012 wk11

TARDITIONAL CUT ROOF CONSTRUCTION

Roof Construction: Traditional Cut Roof – Dormer

Page 180: Wt5912 2012 wk11

TARDITIONAL CUT ROOF CONSTRUCTION

Roof

Construction: Traditional Cut Roof –

Conversion

Page 181: Wt5912 2012 wk11

ON-SITE ROOFING

Roof Construction: Pre-Fabricated Truss

Page 182: Wt5912 2012 wk11

ON-SITE ROOFING

Roof Construction: Pre-Fabricated Truss

Page 183: Wt5912 2012 wk11

ON-SITE ROOFING

Roof Construction: Pre-Fabricated Truss

Page 184: Wt5912 2012 wk11

ON-SITE ROOFING

Roof Construction: Pre-Fabricated Truss

Page 185: Wt5912 2012 wk11

EXTERNAL RENDER

External Leaf Construction: Corner Brick, Block & Scratch Coat

Page 186: Wt5912 2012 wk11

MECHANICAL

SYSTEMS BUILDING SERVICES

Page 187: Wt5912 2012 wk11

Department of Design & Manufacturing Technology

Syllabus Outline: 1. Services and External Works – Mechanical services,

electricity, wastewater treatment, sewage, etc…

2. Heat and Thermal Effects In Buildings – Construction

type, Insulation, material conductivity, air tightness etc…

3. Illumination In Buildings – Natural Light, glazing, LUX,

heat transfer, dwelling orientation etc…

4. Sound In Buildings – Insulation etc…

BUILDING SERVICES

Page 188: Wt5912 2012 wk11

Water Systems • Direct Cold Water System

• Indirect Cold Water Systems

• Direct Hot Water Systems

• Indirect Hot Water (Vented/Un-vented)

• Solar Water Heating System

• Geothermal Water Heating System

• Boilers: • Oil-Fired

• Gas-Fired

• Solid Fuel

• Wood – Chip

• etc...

Page 189: Wt5912 2012 wk11

WATER SYSTEMS

•Direct Cold Water System

Page 190: Wt5912 2012 wk11

WATER SYSTEMS

•Indirect Cold Water System

Page 191: Wt5912 2012 wk11

WATER SYSTEMS

•Direct Hot Water System

Page 192: Wt5912 2012 wk11

WATER SYSTEMS

•Indirect Hot Water System

Page 193: Wt5912 2012 wk11

WATER SYSTEMS

•Water Cistern/Tank

Page 194: Wt5912 2012 wk11

WATER SYSTEMS

Indirect Hot Water System with Two Pipe

Radiator System

Page 195: Wt5912 2012 wk11

WATER SYSTEMS

Indirect Hot Water System with Two Pipe Radiator

System

Page 196: Wt5912 2012 wk11

WATER SYSTEMS

Indirect Hot Water

System with Two Pipe

Radiator System

Page 197: Wt5912 2012 wk11

WATER SYSTEMS

Indirect Hot Water

System with Two

Pipe Radiator

System

Page 198: Wt5912 2012 wk11

WATER SYSTEMS

Page 199: Wt5912 2012 wk11

WATER SYSTEMS

•Two Pipe Radiator

System

Page 200: Wt5912 2012 wk11

WATER SYSTEMS

•Indirect Hot Water

System with Two Pipe

Radiator System

Page 201: Wt5912 2012 wk11

WATER SYSTEMS

•Solar/Woodchip

Page 202: Wt5912 2012 wk11

WATER SYSTEMS

•Solar Hot Water System with Two Pipe

Radiator System

Page 203: Wt5912 2012 wk11

WATER SYSTEMS

Page 204: Wt5912 2012 wk11

WATER SYSTEMS

Page 205: Wt5912 2012 wk11

WATER SYSTEMS

Page 206: Wt5912 2012 wk11

WATER SYSTEMS

Page 208: Wt5912 2012 wk11

WATER SYSTEMS

Page 209: Wt5912 2012 wk11

WATER SYSTEMS

How the evacuated tube works; Sunlight enters through the outer glass tube, hits the absorber – where energy is

converted to heat Heat is transferred to liquid inside inner tube- vacuum between tubes prevents

heat loss. The hot liquid rises to the top of the copper tube where it transfers heat to the

pipework coming from the cylinder, this pumps through the cylinder heating water.

The liquid is cooled as it transfers the heat and flows back down to be reheated.

Cylinder Specifications. The cylinder is insulated to meet the building regs in TGD L1.4.4.2 with 75mm

thick CFC free factory applied insulation and has its pipes coming from the tank insulated to 1m from the tank.

The cylinder has, as needed by 1.4.3.3 of TGD L, a thermostat which can turn off supply of heat when desired storage temperature is reached.

It will be fitted by a qualified person as required by 1.2.7. Back up Boiler.

The back up boiler is an electric boiler which will be powered by our windmill in ideal circumstances, it will also be connected to the grid as an extra back up and also as the windmill is required to be connected to the grid.

Page 210: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Wastewater Systems

Page 211: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Page 212: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Page 213: Wt5912 2012 wk11

WASTEWATER SYSTEMS

•Backfill/Positioning/Rodding Eye

Page 214: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Manhole

Page 215: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Page 216: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Page 217: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Page 218: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Traps/Pipes

Page 219: Wt5912 2012 wk11

WASTEWATER SYSTEMS

• Wastewater is removed from the dwelling by a system of pipe work

which carries the waste fluids away from the appliances.

• Purpose of pipe work – Transport fluids, Control leakage, Resist deposits

of solids, Resist blockages

• Waste pipes are commonly - Ø32mm for hand basins, Ø40mm for

bath/shower, Ø100mm from toilet (w.c)

• Ø100mm for discharge stack

• Ø40mm/Ø32mm pipes from the showers and sinks have a slope of

18/90mm/m, with a max length of 3 metres to the stack

• Ø100mm pipes from the toilets with a slope of 9mm/m, with a max

length of 6 metres to the stack, a macerator unit will be used if the

distance exceeds 6 metres.

• Two hundred mm minimum centre line radius at the bottom of the stack

for a gradual turn.

• The stack (Ø100mm) has to be 900mm minimum above the window in

this case as it is within three metres of the window.

Wastewater

Page 220: Wt5912 2012 wk11

WASTEWATER SYSTEMS

• Drainage pipes are laid in a bed of 10mm aggregate covered in 40mm of

crushed stone and the trench is backfilled with the excavated clay. 300mm

cover should be provided to protect the pipe.

• Soak pit used to take the grey water from the kitchen sink, dishwasher and

the washing machine.

• Use of “P” traps to prevent odours entering the house, with a seal depth of

75mm minimum.

• Air admittance valve can be used to combat incorrect installation and design

by providing a source of air when a vacuum may be generated and

syphonage can occur.

• A wastewater Puraflo Liquid Effluent Treatment System can be easily

integrated with a new or even existing septic tank and is constructed to meet

building regulations.

• Wastewater flows from the home into a watertight primary/ septic tank

Wastewater

Page 221: Wt5912 2012 wk11

WASTEWATER SYSTEMS

• Capacity of the tank is calculated using the formula C = (180P+2000)

• The solids settle and the liquid effluent flows by gravity into a pumping chamber.

• The pumping chamber is fitted at least 0.5m from the septic tank. The septic

tank outlet is connected to the pumping chamber using a 100mm diameter pipe

at a gradient of 1 in 100. The peat filter is located 7 metres from the septic tank.

• The liquid effluent is pumped intermittently into the Puraflo modules and

distributed evenly onto the biofibrous peat filter.

• A combination of biological, chemical and physical processes treat the

wastewater as it filters through the biofibrous peat in the modules.

• Treated liquid emerges from the Puraflo unit for dispersal into the ground

through a soil polishing filter.

• High level of treatment achieved, energy efficient, low running costs, consistent

operational efficiency, minimal maintenance required, odour-free wastewater

treatment, Bord na Móna warranty, service agreements and call-out service,

alarm system included if the level of waste water in the pumping chamber

becomes to high and it is installed by Bord na Móna Environmental Ltd.

Bord Na Mona Puraflo System

Page 222: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Bord Na Mona

Puraflo System

(Hickey 2006)

Page 223: Wt5912 2012 wk11

WASTEWATER SYSTEMS

• A unit for a single house has two modules of total area 5m2, which can

serve up to 6 people.

• An area is prepared and levelled to create an even surface on which to

place concrete blocks and lintels to support the modules. Broken stone

approximately 25–50mm is filled level with the top of the concrete

blocks and lintels over are placed over this area to a depth of 200mm

approx.

• I chose this as it only uses an intermittent pump so it only pumps the

water on a “needed basis”, unlike other new systems which constantly

need a power supply, this saves on the cost and usage of electricity and a

power loss would not disrupt the system like it could do with others.

• The Puraflo system is Irish Agrément certified & EPA compliant.

Bord Na Mona

Puraflo System

Page 224: Wt5912 2012 wk11

WASTEWATER SYSTEMS

(Hickey, 2006)

Bord Na Mona

Puraflo System

Page 225: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Bord Na Mona

Puraflo System

Page 226: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Soak Pit

Page 227: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Manhole

Page 228: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Biocycle Treatment

Page 229: Wt5912 2012 wk11

WASTEWATER SYSTEMS

• Mechanical Aeration Waste Water Treatment System

• Given the layout and considerations of the dwelling . I decided to go with

a 12,000 litre Biocycle treatment unit. This system is highly efficient and

has a long de-sludge interval period.

• It is environmental and user friendly.

• The unit will cater for all foul waste included waster containing household

detergent. These detergents do not affect the functionality of the unit.

• The unit consists of 4 chambers

Biocycle Treatment

Page 230: Wt5912 2012 wk11

WASTEWATER SYSTEMS

1 Primary- Big chamber to allow for retention of sludge. Sludge broke

down with anaerobic bacteria.

2 Aeration- Aerobic bacteria break down the effluent by a culture of

bacteria within a process known as submerged aerated biological

filtration. Oxygen, to support the degradation processes, is introduced by

a small air pump.

3 Clarification- The clarification chamber is designed to provide

quiescent conditions allowing any bacterial flocs remaining in the

effluent to settle out.

4 Pump- The large pump chamber allows the treated effluent to be

stored before it is pumped to the polishing filter or surface irrigation

system. The pump is operated intermittently to ensure low energy usage.

Biocycle Treatment

Page 231: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Advantages:

EN 12566-3 accredited (new standard for wastewater treatment systems)

97.5% reduction in BOD5 (Biological Oxygen Demand)

97% reduction in S.S. (Suspended Solids)

Unrivalled sludge storage

Low electrical running costs

Life span in excess of 60 years

• Brac Greywater recycling system RGE – 250

This system is perfectly designed for a family of 5. The RGW-250 is the popular tank, designed for homes with up

to 6 people who want to save money on their water bill, while helping the environment.

• How it works...

Greywater from showers, baths, sinks and the washing machine go directly into the Brac Systems holding tank.

Here the water is filtered and ready for delivery to toilets.

• Advantages

Two thirds of our water is used to shower, bathe and do laundry; another third is used to flush the toilet.

By reusing some water to flush toilets, the Brac System saves 35 to 40% of a household’s annual water

consumption.

Extends a household’s water supply, thus lessening its’ impact on the environment.

Reduces the risk of water shortages in hot climates where wells tend to dry up.

Biocycle Treatment

Page 232: Wt5912 2012 wk11

WASTEWATER SYSTEMS

Biocycle Treatment

Page 233: Wt5912 2012 wk11

WASTEWATER SYSTEMS

(Hickey, 2006)

Biocycle Treatment

Page 234: Wt5912 2012 wk11

HOW TO

CALCULATE

HEAT LOSS U-VALUES

Page 235: Wt5912 2012 wk11

U-VALUES

The U-Value question is not a compulsory question but it is contained within the options question, usually Question 5 on the paper. The question generally contains 3 parts – A, B, and C. A. Generally requires the visual manipulation (Section view sketch +Labelling!!!), the tabulation of data in logical and functional order, and the calculation of a U-Value for the material data given. B. There are variations to this part. The typical variations are the calculation of oil used with subsequent calculation of cost loss, the sizing of insulation omitted from the initial question or insulation required achieved the required U-value standard, the size of glazing units with their impact on the U-Value performance, and there are variations to the afore mentioned but nothing too different. C. This part generally requires a recommendation to improve or show the difference between different systems presented in the question. Sketches and notes usually apply and it serves to show you have an understanding for the area at hand.

Page 236: Wt5912 2012 wk11

U-VALUES

•The U-Value question can require work but it is as hard as you make it!!! It is an achievable question that with a bit of practice can be attempted by all pupils. •It is a step by step style question with the variation on part B and C of the question that can also be well prepared as there are about 4 different variations that can be asked of you in these part. •The question requires the understanding of U-Values and the ability of students to use the data correctly to show visual, arithmetic, data comprehension/manipulation/tabulation and procedural capabilities.

Page 237: Wt5912 2012 wk11

U-VALUES

Do not be intimidated by the mathematical problems

presented in this question. The application of simple

arithmetic is all that is required i.e. - / + / ÷ / x

You will need a calculator as decimalisation is required, so be competent and comfortable in the use of your calculator.

Always re-check your calculations!!!

Also do not be intimidated by the Units that apply to the different variants. Once you have learnt them and consistently use them correctly whilst practising the question it should not be a problem. If you don’t apply the unit to the calculations you will lose valuable marks!!

Page 238: Wt5912 2012 wk11

U-VALUES

Content: What are we calculating?

In the case of this question the area of U-Values apply to

the external envelope of the building i.e. The external wall

structure, the foundation structure, and the roof structure.

External wall structure:

Block cavity construction and timberframe construction,

glazing etc...

Roof Structure: Flat and Pitched with Ceiling, etc...

Page 239: Wt5912 2012 wk11

U-VALUES

U-Values are essentially the measure of heat lost through the fabric of the buildings external envelope.

Under current building regulations 2007 Technical Guidance Document L on The Conservation of Fuel and Energy it is stated that buildings by standard should be built to achieve a U-value of at least 0.220 W/m²⁰K.

This is achieved by adhering to the building codes and standards where sustainability and material selection combined with an efficient construction process all serve to limit the impact on the environment.

When we lose heat we lose money€€€€ but most concerning is that to replace heat and energy loss we expend further energy resources creating a greater demand and in turn showing further disrespect for our environment.

Page 240: Wt5912 2012 wk11

U-VALUES

Typical Heat Loss Percentages

Page 241: Wt5912 2012 wk11

U-VALUES

Aim: The aim is to make you the student aware of the relevant U-values that can be achieved from a combination of materials that form the external envelope of a building.

In doing so you will begin to realise the difference between materials and their ability to resist heat/energy loss. The influence of insulation will be a key factor and it is advised that you take time to investigate different insulation products.

Page 242: Wt5912 2012 wk11

U-VALUES

In terms of the question what should we know?

The Materials Presented i.e. block, timber, etc.

1. U-Value =Thermal Transmittance (W/m² ⁰k)

2. R = Resistance (m² ⁰k/W)

3. r = Resistivity N/A

4. k = Conductivity (W/m⁰k)

5. T = Thickness (m = metres)

W = Watts, m = metres, ⁰k = degree Kelvin ( or alternatively ⁰C = degree Celsius)

Page 243: Wt5912 2012 wk11

U-VALUES

Terms & Definitions: Definitions are very important and they are often over looked by students. In understanding a definition you can make sense of the data presented to you in the question.

It will enable you to visualise the process a lot easier and understand the thermal data difference between relevant materials so you can form a guess estimate by where you can measure the outcome of your work through out the question. It is basically a level of common sense that will serve to build your competence in the question.

Page 244: Wt5912 2012 wk11

U-VALUES

Thermal Transmittance (U-Value)

Unit Value = W/m² ⁰k

Definition: A measure of the rate at which heat passes through a particular element of a building when unit temperature difference is maintained between the ambient air temperatures on each side. The U-Value takes into account the resistances of various materials, the surface resistances and the cavity.

Page 245: Wt5912 2012 wk11

U-VALUES

Thermal Resistance (R)

Unit Value = m² ⁰k/W

Definition: A measure of a materials ability to resist the flow of heat energy. The higher the R-Value the greater the resistance of the material.

Page 246: Wt5912 2012 wk11

U-VALUES

Thermal Conductivity (k)

Unit Value = W/m⁰k

Definition: A measure of a materials ability to conduct heat energy.

When comparing insulation products the k-value is used as the comparative benchmark as the lesser the k-value the better the product in terms of performance. However the constituents of the insulation material is always the greatest debate in terms of its availability, embodied energy and impact on the environment.

Page 247: Wt5912 2012 wk11

U-VALUES

Example of a typical Question: As Presented

Page 248: Wt5912 2012 wk11

U-VALUES

Page 249: Wt5912 2012 wk11

U-VALUES

Step 1: Make a Sketch of the information given and label !!!

Step 2: Tabulate all data as shown

Page 250: Wt5912 2012 wk11

U-VALUES

Step 2: Continued.

When filling in the material thickness column it is

important that you convert the data to metres (m) as the

question gives it in millimetres (mm). This catches alot of

students out so ensure to do this before you fill the table in.

Example: Block = 100mm, so 100÷1000= 0.1m, this is the

value that is input into the table. You divide all thickness

and width data by 1000 to convert from mm to m.

Page 251: Wt5912 2012 wk11

U-VALUES

Step 3: Calculations

Formula 1: R = T/k, you may have to manipulate this formula to

find data so here is a tip if switching formula’s around confuses

you!!!

R²=T⁸/k⁴, note the numbers in the power position. 2 = 8/4, so if i wanted to find T then 8=4x2 (T=k x R) and if you follow the numbers in the power position as shown below then you can see how this can guide you correctly.

T⁸=k⁴xR² (8=4x2). This is just a simple method to avoid confusion.

Remember R = Resistance, k= Conductivity, and T = Thickness (m)

Also in the event of a resistivity value being given you may apply this formula, “remember resistivity = r”, R = T x r

Page 252: Wt5912 2012 wk11

U-VALUES

Step 3: Continued.

Once the R- Column is complete the you get the sum of

that column to calculate the R- total.

Step 4: Calculating U-Value

U-Value = 1/R total

Indicate all Unit values!!!

Page 253: Wt5912 2012 wk11

U-VALUES

To attempt the part B questions please refer to the exam

solutions for guidance as follows.

Page 254: Wt5912 2012 wk11

U-VALUES

Page 255: Wt5912 2012 wk11

U-VALUES

Page 256: Wt5912 2012 wk11

U-VALUES

Page 257: Wt5912 2012 wk11

U-VALUES

Page 258: Wt5912 2012 wk11

U-VALUES

Page 259: Wt5912 2012 wk11

U-VALUES

Page 260: Wt5912 2012 wk11

U-VALUES

Page 261: Wt5912 2012 wk11

U-VALUES

Page 262: Wt5912 2012 wk11

U-VALUES

Page 263: Wt5912 2012 wk11

U-VALUES

Page 264: Wt5912 2012 wk11

U-VALUES

Page 265: Wt5912 2012 wk11

U-VALUES

Page 266: Wt5912 2012 wk11

U-VALUES

Page 267: Wt5912 2012 wk11

U-VALUES

Page 268: Wt5912 2012 wk11

U-VALUES

Page 269: Wt5912 2012 wk11

U-VALUES

Page 270: Wt5912 2012 wk11

U-VALUES

Page 271: Wt5912 2012 wk11

U-VALUES

Page 272: Wt5912 2012 wk11

U-VALUES

Page 273: Wt5912 2012 wk11

U-VALUES

Page 274: Wt5912 2012 wk11

U-VALUES

Page 275: Wt5912 2012 wk11

U-VALUES

Page 276: Wt5912 2012 wk11

U-VALUES

Page 277: Wt5912 2012 wk11

U-VALUES

Page 278: Wt5912 2012 wk11

U-VALUES

Page 279: Wt5912 2012 wk11

U-VALUES

Page 280: Wt5912 2012 wk11

U-VALUES

Page 281: Wt5912 2012 wk11

U-VALUES

Page 282: Wt5912 2012 wk11

U-VALUES

Page 283: Wt5912 2012 wk11

U-VALUES

Page 284: Wt5912 2012 wk11

U-VALUES

Page 285: Wt5912 2012 wk11

U-VALUES

Page 286: Wt5912 2012 wk11

U-VALUES

Page 287: Wt5912 2012 wk11

U-VALUES

Page 288: Wt5912 2012 wk11

U-VALUES

Page 289: Wt5912 2012 wk11

U-VALUES

Page 290: Wt5912 2012 wk11

U-VALUES

Page 291: Wt5912 2012 wk11

U-VALUES

Page 292: Wt5912 2012 wk11

U-VALUES

Page 293: Wt5912 2012 wk11

U-VALUES

Page 294: Wt5912 2012 wk11

U-VALUES

Page 295: Wt5912 2012 wk11

LOW-

ENVIRONMENTAL

IMPACT PASSIVE DESIGN

Page 296: Wt5912 2012 wk11

PASSIVE/LOW-ENVIRONMENTAL IMPACT

Orientation

Page 297: Wt5912 2012 wk11

PASSIVE/LOW-ENVIRONMENTAL IMPACT

Orientation

Page 298: Wt5912 2012 wk11

PASSIVE/LOW-ENVIRONMENTAL IMPACT

Notes on Glazing

Page 299: Wt5912 2012 wk11

PASSIVE/LOW-ENVIRONMENTAL IMPACT

Room Layout & Solar Gain

Page 300: Wt5912 2012 wk11

PASSIVE/LOW-ENVIRONMENTAL IMPACT

Thermal Mass/Space

Heating

Page 301: Wt5912 2012 wk11

PASSIVE/LOW-ENVIRONMENTAL IMPACT

Materials etc...

Page 302: Wt5912 2012 wk11

PASSIVE/LOW-ENVIRONMENTAL IMPACT

Materials etc...

Page 303: Wt5912 2012 wk11

MECHANICAL VENTILATION & HEAT

RECOVERY (MVHR)

• MHRV-popular means of dealing with dampness and avoidable heat loss

• Cost effective, health beneficial and an efficient solution to saving energy

• MHRV works in the following way:

1. First set of ducts (red) collect moist, stale air from hotspots

2. Stale contaminated air travels through the HRV unit and released outdoors

3. Second set of ducts (blue) takes clean fresh air from outside

4. Both air streams pass through heat transfer exchanger where heat from the stale

air is used to warm the fresh incoming air. Air streams do not intersect. HRV unit

retains up to 95% of the heat emitted from the warm stale air

5. Above processes allow for clean filtered air to be distributed throughout the building

• MHRV offers year round comfort and has the ability to keep living areas at a warm

constant temperature

• Health benefits: alleviate symptoms of asthma, cold and hay-fever by removing airborne

pollution and irritants

• MHRV can also extract smoke and cooking odours

• Requires minimum maintenance and leads to increased security and noise reduction as

well as aesthetic enhancement

• New MHRV systems operate at 95% efficiency compared to 65% efficiency of older

systems

Mechanical Ventilation & Heat Recovery (MVHR)

Page 304: Wt5912 2012 wk11

MECHANICAL VENTILATION & HEAT

RECOVERY (MVHR)

Mechanical Heat Recovery Ventilation (MHRV)

Page 305: Wt5912 2012 wk11

MECHANICAL VENTILATION & HEAT

RECOVERY (MVHR)

Mechanical Heat Recovery Ventilation (MHRV)

Page 306: Wt5912 2012 wk11

MECHANICAL VENTILATION & HEAT

RECOVERY (MVHR)

Mechanical Heat Recovery

Ventilation (MHRV)

Page 307: Wt5912 2012 wk11

MECHANICAL VENTILATION & HEAT

RECOVERY (MVHR)

Mechanical Heat Recovery

Ventilation (MHRV)

Page 308: Wt5912 2012 wk11

MECHANICAL VENTILATION & HEAT

RECOVERY (MVHR)

Mechanical Heat Recovery

Ventilation (MHRV)

Page 309: Wt5912 2012 wk11

GREY/RAINWATER SYSTEMS

Rainwater Harvesting

Page 310: Wt5912 2012 wk11

GREY/RAINWATER SYSTEMS

Grey Water Harvesting

Page 311: Wt5912 2012 wk11

GREY/RAINWATER SYSTEMS

Rain Water/Grey Water Harvesting

Page 312: Wt5912 2012 wk11

GREY/RAINWATER SYSTEMS

Tank Sizing

Page 313: Wt5912 2012 wk11

ELECTRICAL SYSTEMS

Components of Electrical System

Page 314: Wt5912 2012 wk11

ELECTRICAL SYSTEMS

Ring Main

Page 315: Wt5912 2012 wk11

ELECTRICAL SYSTEMS

Radial Lighting Control

Page 316: Wt5912 2012 wk11

ELECTRICAL SYSTEMS

Distribution Board/Fuse Box

Page 317: Wt5912 2012 wk11

A GUIDE TO

TEACHING

BER

BUILDING ENERGY

RATING (BER)

Page 318: Wt5912 2012 wk11

BER

T4 Recommendation

Page 319: Wt5912 2012 wk11

BER

T4 Recommendation

Page 320: Wt5912 2012 wk11

BER

T4 Recommendation

Page 321: Wt5912 2012 wk11

BER

• Building Energy Rating (BER) grades the energy efficiency of a building

• A Dwelling with a high rating will save the owner/ occupier money in energy costs.

Page 322: Wt5912 2012 wk11

BER

• New dwellings that

apply for planning

permission on/after

1st. January 2007.

BER required for:

• All existing buildings

offered for sale or rent

from 1st. January 2009.

Page 323: Wt5912 2012 wk11

BER

Page 324: Wt5912 2012 wk11

BER

• Thermal insulation of the building envelope.

• Heat gains through glazed openings.

• Ventilation and air permeability.

• Domestic hot water system and control.

• Space heating control and energy required.

• Lighting and internal heat gains.

Page 325: Wt5912 2012 wk11

BER

What does BER measure?

• The BER measures energy use per square meter (floor area) of the dwelling per year.

•Measurement Unit

kWh/m2/yr

Kilo watt /

hour

1 kWh of

electricity costs

18 cent

Page 326: Wt5912 2012 wk11

BER

Energy Labelling

Domestic Appliances

Energy labelling informs the consumer of costs.

Page 327: Wt5912 2012 wk11

BER

Page 328: Wt5912 2012 wk11

BER

Page 329: Wt5912 2012 wk11

BER

Energy Costs and BER

Cost comparasions based on average energy costs for 2007 in a 250m2 dwelling

Page 330: Wt5912 2012 wk11

BER

A dwelling built to the 2007/08 building regulations

should achieve a:

•B or C rating

Page 331: Wt5912 2012 wk11

BER

• No obligatory minimum standard applies.

• BER must be produced by a registered BER Assessor.

• BER is valid for 10 years unless changes are made to the building.

• The BER is independant of how the occupants behave in the building.

• An advisory report must accompany a BER certificate

Page 332: Wt5912 2012 wk11

BER

New build: To advise owners on how to use the

features in the building to

maximise energy efficiency

Existing buildings: To advise owners on the options for

upgrading of building to maximise

its energy efficiency

Page 333: Wt5912 2012 wk11

BER

Calculating

the BER

Download from: http://www.seai.ie/Your_Building/BER/BER_Asse

ssors/Technical/DEAP/

DEAP Computer Software

Page 334: Wt5912 2012 wk11

BER

Page 335: Wt5912 2012 wk11

BER

1. Dimensions: • The internal dimensions of the building envelope.

• New dwellings can be measured from the plans.

Page 336: Wt5912 2012 wk11

BER

Page 337: Wt5912 2012 wk11

BER

3. Air Permeability

• Sealing of the building envelope.

• Blower door testing required on new dwellings.

• Required to be 10 m3/(h.m2) for new dwellings @ 50 pa.

Page 338: Wt5912 2012 wk11

BER

• Ceiling/Roof U-Value

4. Building elements (fabric heat losses)

• Wall U-Value

• Floor U-Value • Door & Window U-Values

• Thermal bridging factor typical 0.11 W/m2K

Page 339: Wt5912 2012 wk11

BER

5. Glazed area heat losses and gains

• Glazed area sizes.

• Orientation.

• Glazed unit U-Values

- Glazing

- Frame

• Solar transmittance.

Page 340: Wt5912 2012 wk11

BER

6. Details of the hot water system

Instant or storage system.

Insulation on pipe work.

Level of Insulation on storage cylinder

Temperature and time controls.

Page 341: Wt5912 2012 wk11

BER

7. Boiler and space heating details

Boiler efficiency %

Fuel used

Heating controls

Radiator’s or under floor heating

Page 342: Wt5912 2012 wk11

BER

7. Boiler and space heating details contd.

Insulation on pipe work.

Temperature and time controls.

Weather compensation controls.

Page 343: Wt5912 2012 wk11

BER

8. Renewable energy used, e.g.

• Solar photovoltaic

• Wind power

• Geothermal energy

• Solar Water heating

Page 344: Wt5912 2012 wk11

BER

9. Lighting provision in the dwelling.

• The percentage of energy efficient light fittings in the dwelling.

Page 345: Wt5912 2012 wk11

BER

The heating requirements for the dwelling will depend on:

10. Net space heat demand.

• The living area %.

• The total volume.

Living area is assumed to be heated to 21oC and the rest of the dwelling heated to 18oC.

Page 346: Wt5912 2012 wk11

BER

11. Thermal mass category of the building ranging from:

• Thermally massive construction. e.g.

concrete block with hollowcore.

• Thermally light construction e.g. timber frame

Page 347: Wt5912 2012 wk11

BER

Download the DEAP software from:

http://www.seai.ie/Your_Building/BER/BER_Assessors/Technical/DEAP/

Install the software as per instructions.

Use the software to do a sample rating on the sample dwelling

using the data supplied.

Vary the inputs to improve the rating.

Energy rating worked example

Page 348: Wt5912 2012 wk11

BER

Page 349: Wt5912 2012 wk11

BER

Page 350: Wt5912 2012 wk11

BER

Page 351: Wt5912 2012 wk11

OTHER

LEARNING

AREAS ADDITIONAL AREAS

Page 352: Wt5912 2012 wk11

• Construction industry roles - the key people involved in creating a house

• Safety on site - the importance of managing safety, accident rates, training, risk

assessment, safety statements etc.

• Social impact of planning - how planning can improve (and worsen) the lives of

ordinary people

• Natural construction materials (NB sustainable forestry sources etc.)

• Manufactured construction materials (NB waste, embodied energy etc.)

• Eco’ construction materials (NB waste, embodied energy etc.)

• Structural systems (concrete cavity) (NB airtightness, insulation)

• Windows & doors (modern designs only e.g. triple glazed)

• Energy sources: on grid energy

• Structural systems (timber frame cavity) (NB airtightness, insulation)

• Structural systems (Steel frame cavity) (NB airtightness, insulation)

• Structural systems (straw bale) (NB airtightness, insulation)

• Structural systems (SIP) (NB airtightness, insulation)

• Structural systems (ICF) (NB airtightness, insulation)

CONSTRUCTION STUDIES ADDITIONAL AREAS

Page 353: Wt5912 2012 wk11

Department of Design & Manufacturing Technology

• Energy sources: off grid energy

• Energy performance of houses - house design & energy consumption - looking at

ordinary houses to explore factors that impinge on energy performance (use real

world examples)

• Passive design (e.g. passivhaus standards)

• Zero carbon housing

• Building energy rating - the purpose and process - comparing examples water

sources & treatment in Ireland (use real world Irish examples)

• Grey water supply (e.g. bord na mona rainsava)

• Hot water supply (boiler & solar)

• Drainage (municipal treatment of wastewater - use a real world example)

• Drainage (additional measures for one-off treatment - e.g. puraflow/ reed bed

etc.)

• Air flow, ventilation, m.v.h.r

• Airtightness, air pressure testing etc.

• Sound - insulation details

CONSTRUCTION STUDIES ADDITIONAL AREAS