yogesh electrical engg
TRANSCRIPT
YOGESH KUMAR.S
E mail: [email protected] Mobile: +91 9629992889
ELECTRICAL ENGINEER PROFILEA challenging assignment in the Oil & Gas industry to utilize acquired skills & knowledge in project execution and
achieve predefined objectives
EXECUTIVE SYNOPSIS
Resourceful Electrical Engineer with 5 years of rich project experience in diverse sectors in the Middle East and India.
Extensive experience covering onshore, Oil & Gas and high rise commercial & residential and Industry projects delivering consistently outstanding performances.
Possess technical expertise and hands on experience in project management, site supervision and working in high work pressure environment
Proficient in planning, executing and completing jobs on time, within budgets and adhering to specifications.
Well versed in study & analysis of drawings, material take off, mobilizing materials and coordinating with clients to maintain project progress.
Adept in leading, motivating and monitoring multinational teams eliciting superior performances. Dedicated, results driven professional with excellent communication, coordination, planning and execution
skills.KEY STRENGTH
Site/Project Management, Client/Consultant facing, Meeting presentation, Knowledge in Auto CAD, Project Planning, and Schedule preparation by using primavera p6, Productivity reports submission, Manpower and material forecast depend up on the schedules. Two week/four week look ahead schedules preparation as per priority basis, S curve preparation and highly focused on Quality and EHS standard.PROFESSIONAL EXPERIENCE
CONTROL & APPLICATIONS EMIRATES, ABU DHABI, UAE Electrical Engineer (Dec 2012 - Dec 2014)
Company Brief: Control And Application Emirates (CAE) is a leading E&I, MEP, EPC & maintenance contractor servicing the Oil &Gas and energy sector (on shore) in the Middle East. Web address. www.caeme.comKey Responsibilities: Lead the team and provide direction & control in executing all electrical works including. Laying, jointing and termination of HV & LV cables for Substation and building electrification. Supervise the preparation and revise shop drawings ensuring adherence to project specifications. Monitor all works at site and assure compliance with approved methods, drawings and achievement of
schedules. Ensure optimum utilization of all resources including manpower, equipment and materials to keep costs within
budgeted limits. Coordinate with client, consultant, subcontractors, vendors and service providers for meeting all predefined
milestones. Prepare as built drawings of all completed installations. Preparation of Method statement and Task risk Assessment for all activities involved in the project Ensuring fulfilment of all inspection & test requirements at all stage as per the QCP and contract Requirements
and maintained Identifying potential skills & training needs among the team members, providing opportunity for enhancing
their skills & career growth and appraising performance. Ensure compliance to all safety and quality regulations during all stages of the project. Lead the Team to Closure of Project MCCR (Mechanical Check Completion Record) as Per QA/QC Procedure. Preparation of Project Reconsolidation. Preparation of construction dossiers.Project Management
Yogesh kumar. S: Page 1 of 3
Handle the complete projects from quotation stage to the finalization and payment collection stage successfully. Coordinate technical aspects of projects, supervise site and report progress to manager. Manage resource requirement by identifying all the required resources for the project and the availability of
resources. Create project plans-discuss with management for approvals. Identify-collate specific information on project
milestone-timelines to be shared among various functional teams. Discuss various risk elements and mitigation strategies involved in the project during Team Review Meetings.
Track-monitor project progress as per timelines in the project schedule. Highly capable in Man/Sub-contractor/Vendor Management. Maintain project cost control and analyse the causes of variances against the budget. Manage Sub contractor billing and account receivables as per project milestones.
Projects INTEGRATED GAS DEVELOPMENT PROJECT (DEC 2012 - SEP 2013)
Client : ADGAS, DAS ISLAND (OFFSHORE) Main Contractor : Hyundai Heavy Industries co., LTD. Construction testing and commissioning of all electrical systems on 33/11KV 16 MVA transformer substation, associated distribution transformer, HV cable laying, 33KV MDB, PCC, MCC, instrument panel, DCS system, ESD system, VFDs, UPS, MOVs and various motors.Designation : Electrical Engineer
Ruwais Refinery Expansion Project EPC 4 – Tankage & Piping (OCT 2013 – SEP 2014)Client : TAKREER Abu Dhabi Oil Refining Company Main Contractor : DAEWOO E&C – Erection testing & commissioning of power transformers, MDBs, SMDBs, FDBs, PCCs, MCCs, AFFCPs, DG sets and HV/LV motors Designation : Electrical Engineer
Ruwais Sulphur Handling terminal-2, Abu Dhabi, UAE. (OCT 2014 – DEC 2014)Client : GASCO Main Contractor : Al Jaber energy services Designation : Projects Control & Planning Engineer
Buhasa 11/3.3 KV SWGR Replacement Project, Abu Dhabi, UAE. (OCT 2014 – DEC 2014)Client : Abu Dhabi Gas Industries Ltd. (GASCO) Main Contractor : Control and Application Emirates. Designation : Projects Control Engineer
ZADCO-Satah Development Project(OCT 2014 – DEC 2014)Client : Zakum Development Company (ZADCO)Main Contractor : GCC. Scope of work : Electrical work for light and power, F & G system, lightning protection system, telecom system, CCTV system Designation : Projects Control Engineer
ASAB-1 MAIN CONTROL BUILDING REFURBISHMENT E&I WORKS (OCT 2014 – DEC 2014)Client : GASCOMain Contractor : ACTCO Designation : Project Control Engineer
ZIRKU FACILITIES - EPC FOR POWER UPGRADE (OCT 2014 – DEC 2014)Client : Zakum Development Company (ZADCO)Main Contractor : ABB SpA-PA Div Designation : Projects Control Engineer
REHABILATATION OF ELECTRICAL DISTRIBUTION SUPERVISORY SYSTEM (EDSS) AT NEB FIELDS(OCT 2014 – DEC 2014)Client : Abu Dhabi Company for Onshore Oil Operations (ADCO)Main Contractor : Control and Application Emirates. Designation : Projects Control Engineer
SRI LAKSHMI VINAYAGAYAR ENTERPRISES, CHENNAI
Yogesh kumar. S: Page 2 of 3
Design Engineer – (Oct 2009 to Nov 2012)Company Brief: A leading Manufacturer, Supplier of LT & HT Panels & Contractor doing the projects in the Mall, Villas, Industrial, Commercial and the high rise, Multi-storeyed building and power plants.Key Responsibilities: Operation and maintenance of Electrical panels, PLC based automation system. Planning, monitoring & controlling all site activities including manpower planning, resource planning & material
planning and finalization of responsibility matrix for site engineers Attending site coordination meeting with client on regular basis for reviewing site progress & resolving
problems. Making correspondences on regular basis with Client to build Customer relationship and sort out any disputes
(technical or commercial) at site. Preparing Commercial offer for Tender. Preparing Quotation & BOQ For LT Electrical Panels Preparation of Detail Drawings for Single Line Diagram, and Control Schemes, Cable Schedules, Cable Layout etc Designing Panel Layout and Power Diagram Cost Estimation and Technical Scrutiny. Procurement of Transformer, MCC, PLC Panels, Control Desk, All types of Cables etc. Inventory, inspect, monitor, document and report the cost and performance of each piece of equipment Accepts responsibility in multifunctional area Preparing Stock list.EDUCATION
B.E. (Electrical and Electronics) from Prathyusha Institute of Technology And Management, Tiruvallur, certificate Aggregate of 63 %, (2009).
Higher secondary (HSC), from S.M.S Vimal Mat Hr. Sec School with Aggregate of 58 %, (2005). Secondary School leaving certificate from State Board of Tamil Nadu, with Aggregate of 74 %, (2003).COMPUTER SKILLS
AutoCAD (2D) – Drafting PC Schematic EL Automation - Electrical Designing PPM Concepts - Project planning and Management Microsoft Project 2010 Primavera P6V7 MS Office 2013TRAINING / CERTIFICATIONS
ADGAS Das Island Permit to Work system, Abu Dhabi DAEWOO, Takreer Permit to Work system, Abu Dhabi Master Diploma in Electrical Cad(MDEC) Final Year Project Certification in ETPS(Ennore Thermal Power Station)PERSONAL PROFILE
Date of Birth : 22 March 1987 Gender : Male Marital Status : Married Languages Known : Tamil, English Nationality : Indian Address : 4/706, Teachers Colony 1st Street, Poonganagar, Tiruvallur-602001. PASSPORT NUMBER : K5820505 & EXPIRE - OCT 2022 India Mobile no : 919629992889DECLARATION
I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars
YOGESH KUMAR.S
Yogesh kumar. S: Page 3 of 3