zamostnakristyna portfolio en 2015

40
KRISTÝNA ZÁMOSTNÁ portfolio 2015

Upload: kristyna

Post on 22-Jul-2016

217 views

Category:

Documents


3 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Zamostnakristyna portfolio en 2015

KRISTÝNA ZÁMOSTNÁportfolio 2015

Page 2: Zamostnakristyna portfolio en 2015
Page 3: Zamostnakristyna portfolio en 2015

Kristýna Zámostná

22/2/1990 in Prague, Czech [email protected]+420 604 557 398

EDUCATION:

Czech Technical University in Prague, Czech Republic, Faculty of Architecture, master degreeEcole nationale supérieure d’architecture Paris - Val de Seine, Paris, France, study exchange ErasmusCzech Technical University in Prague, Czech Republic, Faculty of Architecture, bachelor degreeHigh-School Jan Neruda, bilingual Czech-French study programme, Prague, Czech Republic

WORK EXPERIENCES:

Renzo Piano Building Workshop, Paris, France, Renzo Piano Foundation Internship Programti2 architekti, Pragueatelier Nuance, Pragueatelier Vltava, Prague

WORKSHOPS:

Les Jeunes ont la parole “Que vois-tu?”, Louvre Museum in Paris, study and presentation of an artwork in relation with the scenography of spaceModélisation des surfaces, Les Grands Ateliers de l’Isle d’Abeau near Lyon, France, realisation of a spheric structure from carton, work in program RhinocerosCASUA - creation of a concept of the architectural exhibition in the new building of Faculty of architecture

LANGUAGES:

fluent, certificate of French Ministry of National Education 2009 - level C1good, First Certificate in English 2007basic knowledge

PC:

MS Office, Adobe Photoshop, InDesign, AutoCAD, Rhinoceros 3D, VRaybasic knowledge: Adobe Illustrator, Revit, SketchUp

INTERESTS:

digital and classical photography, tap dance, hiking, travelling, litterature

borne-mailphone

since 20122012-20132009-20122003-2009

09/2014-02/201510/2013, 07/2014

2011, 201302-06/2012

201220122011

frenchenglishgerman

Page 4: Zamostnakristyna portfolio en 2015
Page 5: Zamostnakristyna portfolio en 2015

The main topic of the thesis is to design social and educational center along with improving public space. The plot is situated on crossing streets Patočkova adn Bělohorská in Prague - Břevnov.

The content of the library of samizdat and exile in Prague is pri-marily to present the “forbidden” to public and a care of archival documents. It is possible to organize lectures, conferences, workshops, literary evenings and thematical exhibitions of exiled artists.

URBANISMThe idea is to accentuate the real entrance to the Břevnov monastery and strengthen importance of the historical road to Prague and a connector between two monasteries - Břevnov and Strahov.

The main entrance is determined by an axis from old Břevnov to the main gate and to the entrance to the St. Margaret Basilica. The tram station is moved from the crossing next to the monas-tery entrance. Two new pedestrian crossings are created next to the monastery entrance and on the road Patočkova linking the monastery garden with the park behind the library.

Institut of Anticommunism -- library of samizdat and exile

studio Tomáš HradečnýCTU FA 2014/2015 - diploma project

Page 6: Zamostnakristyna portfolio en 2015

±0,000

±0,000

+2,560

+2,560

±0,000

+4,480

+2,560

+5,760

+8,960 +8,960

+13,440 +13,440

4th floor

3rd floor

2nd floor

ground floor

Page 7: Zamostnakristyna portfolio en 2015

The volume creates a bridge across the road Patočkova with certain visual limitation, a “gate”. The space around monastery is delimited by the building = “wall”. The narrow line determines two areas - city and monastery. The bulding has two entrances - one for visitors, one for employees and importation of docu-ments - way of user and way of book. The volume follows the hight of roof ridge of building along the street Bělohorská.

ARRANGEMENTThe building arrangement is based on two entrances. The main from the building U Kaštanu to the entrance hall opened on two levels with a gallery. The hall is a place for organizing exhibitions adn events. It is possible to open the hall to the park. A part of the hall is an auditorium for 90 individuals.

The second entrance is situated from the driveway from the monastery. The offices and care of the documents is in the groundfloor including a room for desinfection, control center for the archive, restauration and digitalisation. In the communication cores there are the small lifts for books, which distributes books to the study rooms.

The access to study rooms is by the communication cores from the main hall. The study rooms are situated in whole 3rd floor.

The 4th floor is determined only for the automatic archive. The access for individuals is possible only for technical reason or during an excursion.

construction scheme - steel sceleton, Vierendeel beams, cantilevered corridors

functional scheme

WAY OF BOOK

ARCHIVE, CARE OF ARCHIVAL DOCUMENTS

STUDY ROOMS

ENTRANCE HALL

TECHNICAL EQUIPMENT

WAY OF USER

Page 8: Zamostnakristyna portfolio en 2015
Page 9: Zamostnakristyna portfolio en 2015

FACADEThe cladding of the light façade is made from raw steel with anticorrosive treatment in contast with glass filling. The façade suggests an opposite tectonics - closed layer of archive - ir-regular line of study rooms - opened ground floor. The central line is a transcription of binary encrypting (1 - 0, black - white) of a quote by philosopher Jan Patočka. It is a transition between fragility and solidity, censorship and information era.

longitudinal section

south elevation

east elevation

cross section

west elevationnorth elevation

Page 10: Zamostnakristyna portfolio en 2015
Page 11: Zamostnakristyna portfolio en 2015

kořeny stavbyZAN Brožová & Hájek

ZS 2009/2010

kořeny stavbyZAN Brožová & Hájek ZS 2009/2010

Page 12: Zamostnakristyna portfolio en 2015
Page 13: Zamostnakristyna portfolio en 2015
Page 14: Zamostnakristyna portfolio en 2015
Page 15: Zamostnakristyna portfolio en 2015

The new mountain hut is placed near the site of the old Kežmarok hut in High Tatras, which burned in the 70s‘. The site is accessi-ble only on foot on the hiking trails from Ždiar, Tatranské Matliare or from the Plesnivec hut. It is situated on the crossroad of this trails by the Great White Tarn with a large amount of beautiful views on the mountains.

The only thing people need in mountains is a basic shelter, a cabin, made ideally from local materials, with basic equipment, where they can hide themselves from a bad weather.

The simple block volume of this hut made from wood is placed into a foil covering, an envelope from ETFE foil inflated cushions, a self-cleaning resistant material, replacing the thermal insulati-on. The rounded form of coat is an advantage in local weather conditions. The internal supporting structure is from steel, the hut stands on two rows of inclined steel columns anchored to the concrete footings. The whole construction is reinforced by the steel ropes leading from the coats‘ construction. In methaphore the solid form sits firmly on the ground and the coat is fixed by the ropes as an flying inflated balloon.

The hut is accessible from the red hiking trail on a lightweight footbridge made from the expanded metal and a railing from a steel ropes net as a safety net. The footbridge is suspended on steel ropes anchored to steel construction. The main entrance is situated in the 3rd floor with a direct access to the common room or to the staircase leading to the dorms. The common room is at the same time a sheltered terrace, opened to the interspace. The kitchen is opened to the common space, separated just with the bar. The 2nd floor is determined only for guests‘ rooms. In the 1st floor there is an accomodation for employees and technical management.

nex Kežmarok Hutstudio Stempel & Beneš

CTU FA 2013/2014

2nd floor3rd floor

cross section

Page 16: Zamostnakristyna portfolio en 2015
Page 17: Zamostnakristyna portfolio en 2015

The ruins of castle Týřov from the 13th century is situated in the National nature reserve Týřov in Czech Republic on the west from Prague. The area is subject of dual protection - environ-mental and monumental.

CONCEPTThe principle of the project is accessibility to the area to public and its regulation, access to the educational element, crossing the forbidden border and creating of a balance between the ruins and environment.The project creates two ways to the castle - one for the tourists crossing the river on a boat and one for the professionals on the original way from the 13th century accesible only with a guide.

The common purpose of the ways is the castle Týřov, meeting point of tourists and professionals. The castle breaks up from the end od the 1st wrld war, when the surroundings belonging to Fürstenbergs were divided among new owners or to the state property.

CASTLEThe current state of the ruins will be stabilized and conservated by traditional materials and technologies. The new objects come from the original castle volume, present its inverse imprint and permit the view of the 13th century inhabitants. The objects are not invasive to the original construction.

CONSTRUCTIONA common unit of all the new objects is a construction element - a wooden beam/column. The used technique is traditional carpentry.

Týřov - center of environmental and heritage preservation

studio Tomáš HradečnýCTU FA 2013/2014

proposed acces to the castle

SKRYJE

BROUMY

TÝŘOVICE

KARLOVA VES

LOWER CASTLEENTRANCEPROFESSIONAL PUBLICSCHOOLSWORKSHOPS

UPPER CASTLEPUBLICRESTVIEW

BRIDGECASTLE ENTRANCE

SHELTER

OBSERVATION TOWER

HŘEBEČNÍKY

NPR TÝŘOV

Page 18: Zamostnakristyna portfolio en 2015
Page 19: Zamostnakristyna portfolio en 2015
Page 20: Zamostnakristyna portfolio en 2015
Page 21: Zamostnakristyna portfolio en 2015

reconversion of the industrial zone Les Ardoines, Ile de France

studio Donato Severo & Patrick YiuENSA Paris - Val de Seine 2012/2013

Kristýna Zámostná, Victoria Bailey, Adil Mnaouare, Pierre-Yves Froger

The urban project on the Paris suburb near the Seine. The zone of Les Ardoines, situated in the town of Vitry sur Seine, is indus-tralised and cutted of the rest of the town. It is a vaste space between the railway and the river with an advantage of the po-tential zone of the shores, makong a large barrier between the town and the river. After analysing all the territory we choose to work in a group of 4 on the north part of the area and create there a new bulding principle following the current one.

watergreen belts

existingproposedgreen belts

normal time

inondation

buildings

Page 22: Zamostnakristyna portfolio en 2015
Page 23: Zamostnakristyna portfolio en 2015

cross section

longitudinal sectionplan of the new urban block

Page 24: Zamostnakristyna portfolio en 2015
Page 25: Zamostnakristyna portfolio en 2015

The cultural pavilon for the expositions of young contemporary artists is located on the Seine. For coming and discovering an unknown art it is necessary to enter to an unnatural environne-ment. The necessity of breathing in the water creates the forme of the pavilon - simple, based on the linking among the foam bubbles is realised like an inflatable structure. It is a temporary building, relocalisable on the water or on the land.The visitors can travers among the bubbles with different fonc-tions - main hall with projection, exhibition space and relax space. The inflatable structure makes the possibility to return to the childhood and the inflatable castles or nearly to walk on the water.

cultural pavilon on the Seine, Parisstudio Marc Dilet

ENSA Paris - Val de Seine 2012/2013

B’

B

A

section A-A’

section B-B’

plan view

A’

Page 26: Zamostnakristyna portfolio en 2015
Page 27: Zamostnakristyna portfolio en 2015

The gallery building contributes to the cultural development of Prague 5. The object is placed on the border of two different public spaces. It follows the row of front facades of Smíchov market hall and the National house and so completes the cur-rently unfinished square. The concept is based on the contrast between two places. The volume of new buidling is divided into two parts. Simple and raw plastered cube finishes block of houses and is especially intended for the exhibition space and service. All the vertical movement is abstracted into a glassed part, a front facade working for the square and making clear sign, of which direction to go.

gallery of contemporary art in Smíchov, Praguestudio Stempel & Beneš

CTU FA 2011/2012 - study for the bachelor’s project

typical floor

ground floor longitudinal section

cross section

Page 28: Zamostnakristyna portfolio en 2015
Page 29: Zamostnakristyna portfolio en 2015
Page 30: Zamostnakristyna portfolio en 2015
Page 31: Zamostnakristyna portfolio en 2015

The rehabilitation of the estate of the medieval monastery Emauzy in Prague in the area called Slovany.The monastery which is not a real monastery, the garden which is not a real garden. Edification of the spiritual place and at the same time its humanization. The street full of common concerns and another mysterious world behind the wall. And the wall is expanding... it is just a seeming barrier, come closer, it will give you its hand...

kindergarten, theatre café and residential building Slovany, Prague

studio Jan AulíkCTU FA 2010/2011

ground floor

section - Trojická street

view from Trojická street

Page 32: Zamostnakristyna portfolio en 2015
Page 33: Zamostnakristyna portfolio en 2015

Kristýna Zámostná, Klára Melounová, Petr Šuma

The competition workshop for the realisation of an exhibition system in the Faculty of Architecture in Prague.

workshop CASUAapril 2011

plan view

section

Page 34: Zamostnakristyna portfolio en 2015
Page 35: Zamostnakristyna portfolio en 2015

interior study - office space for Alza company in Prague

collaboration with ti2 architektioctober 2013

existing state without existing partitions

new volumenew volume

Page 36: Zamostnakristyna portfolio en 2015
Page 37: Zamostnakristyna portfolio en 2015

fotographies

Page 38: Zamostnakristyna portfolio en 2015
Page 39: Zamostnakristyna portfolio en 2015
Page 40: Zamostnakristyna portfolio en 2015