Корпоративная презентация Группы Интегра · 2016-03-19 · edc...

38
TURBODRILLS Integra Group of Companies 2014

Upload: others

Post on 13-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

TURBODRILLS

Integra Group of Companies

2014

Page 2: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

2 AGENDA DRILLING TOOLS

1. Integra Group company structure, Products &Services

2. VNIIBT-Drilling Tools company history, structure, manufacturing centers & products

3. Patents & Quality management system

4. SIBERTURBINE R&D

5. SIBERTURBINE product line & International experience

6. Summary and Q&A session

Page 3: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

3

Head office Moscow, Russia

INTEGRA is one of the leading companies in the oilfield services sector of

the Russian market

Established in March 2004

Employees — nearly 9000 people

Branches

Turkmenistan,

Uzbekistan,

Kazakhstan

Experience Venezuela

Tools supply USA

Tools supply China,

Vietnam

INTEGRA GROUP

DRILLING TOOLS

Page 4: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

INTEGRA GROUP 4

Companies of Integra Group provide full range of solutions for

oil&gas exploration and production

Well logging Well planning

and design Well drilling

and workover Well services Completion

and production

services

Products and Services

Manufacturing, sale and rental of downhole motors

and drilling tools Manufacturing and sale of completion equipment

PCP pumps

Directional drilling (MWD, LWD)

Drill bit service

Open and cased hole logging, perforation, mud

logging

Exploration & Development drilling

Turn key well construction IPM

Primary & Remedial cementing

Coiled tubing services Workover

Slickline equipment manufacturing, sales and

services, well testing

FDP and reservoir consulting services

DRILLING TOOLS

Page 5: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

Under brand name our products present in international oil & gas market

HISTORY OF

VNIIBT-DRILLING TOOLS Ltd.

Since 2005 we are incorporated into Integra Group of Companies.

was established in 2003 from Perm Branch of the Russian Research Institute of Drilling Technologies (VNIIBT) founded on November 26, 1963

1966: First time in the world developed and tested downhole positive displacement motor (PDM) with multi-lobe power section

1979: Commercial manufacturing of geared turbodrills started. Drilling depth record was established in 1983 when Kola superdeep well was drilled using geared turbodrill

1980-1984: during this period 4 licenses were sold to Drillex company transferring PDM technology

1963 2013

DRILLING TOOLS

5

Page 6: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

6 MANUFACTURING FACILITIES

Head office Manufacturing sites

Kotovo

Coring tools

Fishing tools

Milling tools

Jars

Perm

Rotor&Stator

Test&Assembly

Pavlovsk

Turbines

Bearing

sections

Distance from Perm: to Pavlovsk – 100 km, to Kotovo 2000 km

DRILLING TOOLS

40%

OTHER

Share in the Russian

market

Page 7: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

7 DRILLING TOOLS RENTAL &

SERVICING

4 Service centers 3 Representative offices

Nizhnevartovsk

SSK

Slavneft

Gazpromneft

281 PDMs

23 Jars

Sorochinsk

Rosneft

Gazpromneft

247 PDMs

9 Turbines

51 Jars

Perm

EDC

171 PDMs

57 Turbines

18 Jars Krasnoyarsk

Rosneft

14 PDMs

Usinsk

Lukoil

34 PDMs

9 Jars Nefteyugansk

Rosneft

SSK

46 PDMs

33 Turbines

5 Jars

Overall Russian rental fleet is over 900 tools* (*end of 2013)

Usinsk workshop

is under

construction

UAE workshop is

in planning stage

DRILLING TOOLS

40%

OTHER

Share in the Russian

market

Page 8: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

8 DRILLING TOOLS RENTAL &

SERVICING

Overall Russian rental fleet is over 90 Turbodrills* (*end of 2013)

DRILLING TOOLS

40%

TURBODRILLS1

88

1

1 6

26

1 9

73

1 5

46

1 5

93

2 0

23

1 3

02

1 3

32

1 6

85

2 1

12

2 0

50

1 7

02

1 5

86

1 4

52

1 7

05

1 8

46

1 5

89

1 4

55

1 5

79

1 6

98

15

10

12

14

8178

32282884 3127

15521496

2803

4817

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MTB

F, h 0

1 000

2 000

3 000

4 000

5 000

6 000

7 000

8 000

9 000

10 000

Op

era

tio

n t

ime

, h

Operation time 2013 Operation time 2014

MTBF 2013 MTBF 2014

Page 9: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

Quality system of VNIIBT-Drilling Tools Ltd. is certified in accordance with ISO

9001:2008 and API (American Petroleum Institute)

9 QUALITY DRILLING TOOLS

Page 10: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

Currently our Company has 92 patents to inventions, useful models and industrial samples

10 PATENTS DRILLING TOOLS

VNIIBT-Drilling tools was the first one in the world who developed

the multilobe PDM and geared Tubodrill

Page 11: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

VNIIBT-Drilling Tools, Kotovo branch

Packers

Fishing tools

Coring equipment

Drill string components

Casing accessories

Sidetracking system

Shock absorbers

Jars

Milling tools

VNIIBT-Drilling Tools

PDM

Turbodrills

PC pumps

Multi-phase pumping units

Down hole tools rentals and services

Coring services

11 PRODUCTS

Design & Engineering

Testing complex

Commercial

manufacturing

Servicing and spare parts

In 2013 our Company produced 536 PDM , 11 turbodrills, and 1345 Power sections

SIBERTURBINE SIBERMOTOR

SIBERJAR

DRILLING TOOLS

Page 12: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

12 DRILLING TOOLS

TURBODRILLS

Unique experience in design and production of turbodrills since 1965

Since company foundation we have designed, produced and put in

opearations over 30 models and 60 modifications of turbodrills

including geared turbodrills

Kola super-deep well (SG-3, 12 263m deep) was drilled with

turbodrills of VNIIBT

Today our Company is

capable to produce over 100

turbodrills per year.

Turbodrills in Russian service fleet count 90 ps.

Main users of turbodrills in Russia: Rosneft, Surgutneftegas,

Orenburgneft, Tatneft

Page 13: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

TURBODRIILS

MANUFACTURING DRILLING TOOLS

Modern machining centers

4 service centers to

perform maintenance of

turbodrills

High-precision investment

casting of turbines

Unique test bench

(Dynamometer) to

measure turbine stages

power characteristics

13

Page 14: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

14 ADVANTAGES OF

TURBODRILLS

1 Right selection of turbodrill:

bit to rock drilled

type and size of the turbodrill

according to selected bit type

and size

turbodrill characteristics

based on flow parameters

turbodrills equipped with

stabilizers and centralizers

2 Right operational parameters:

correct selection of drilling

parameters

compliance with operations

manual requirements

in time maintenance

3 High-quality maintenance :

compliance with requirements

of parts and spares replacement

compliance with requirements

of repair manuals

Available power:

-RPM

-Torque

Formation:

-Soft

-Hard

-Tough

Bit type:

-Roller bit

-PDC

-Impregnated

-Pump flow rate and

pressure in the

circulation system

DRILLING TOOLS

Page 15: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

15 HIGH SPEED TUBODRILL

SIBERTURBINE HS is a high speed turbodrill for

the optimal performance while drilling hard and

highly abrasive formations with impregnated bits

The use of special configuration provides for improved

power characteristics with minimum pressure loss

HS

The hydrodynamic principle of fluid circulating in turbine

stages energy conversion allows to achieve unprecedented

output rotating frequency, up to 2000 RPM

Our experience shows that in specific conditions ROP

was 2-3 times higher with this technology compared to

standard

This significantly reduces well construction time The main competitive advantage is a

patented design of the turbine stage blading

DRILLING TOOLS

Page 16: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

16 MAIN ADVANTAGES OF

TURBODRILLS

Modern turbodrills have

combination of high speed and

torque that is effective in operations

with impregnated bits when drilling

through extremely hard rocks

All turbodrill parts are manufactured of steel

that allows to use turbodrills in wells with up to

250°С downhole temperature

Turbodrill PDM

Rotation speed, rpm

750

600

450

300

150

Turbodrill PDM

Temperature, °С

250

200

150

100

50

DRILLING TOOLS

Page 17: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

17

PDM Turbodrill

MAIN ADVANTAGES OF

TURBODRILLS

Turbodrill

Mechanical output

PDM

Operation time in well

Bearings with PDC inserts provides downhole

operation for over 400 circulation hours without

need to pull out BHA

Absence of direct contact between turbine

rotor and stator improves their life time and

provides for stable output parameters for

longer operations time

Low vibration level by means of co-axial rotation of

turbodrill shafts provides for smooth well bore of high

quality and more power delivered for rock cutting

DRILLING TOOLS

Page 18: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

18 MAIN ADVANTAGES OF

TURBODRILLS

Weight on bit with turbodrill is not defined by differential pressure, but by the maximum rate of

penetration

Depending on main turbodrill parameters to calculate in field conditions:

Q – mud flow rate

Р – pressure loss on turbine

n – shaft rpm

ρ – mud density

М – shaft torque

Q2/Q1 = n2/n1

(Q2/Q1)2 = M2/M1

(Q2/Q1)2 = P2/P1

ρ2/ ρ1 = n1 = n2 = const

ρ2/ ρ1 = M2/M1

ρ2/ ρ1 = P2/P1

Recalculation formulas:

To avoide turbine sludging, rig has to be equipped with good mud cleaning system

It is possible to pump LCM materials through turbodrills

When losses are expected it is recommended to use circulating sub that guides LCM

materials to the annular space bypassing the turbodrill

DRILLING TOOLS

Page 19: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

HIGH SPEED SIBERTURBINE

DESIGN (HS)

Torsion

shaft

Lower TC radial

bearing

Stator

Rotor

PDС axial bearing

Turbine stage

Upper TC radial

bearing

Bearing section

Turbine

section

Top sub with shaft

locking mechanism

Place of centralizer

19

DRILLING TOOLS

Page 20: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

20

Main specifications

Product code ST675AHS.T5 ST475AHS.T1

Housing OD, mm 172/178 122

Overall length, m 10.3 8.1

Length to bend, mm 2200 1576

Bend angles 0- 2 0 - 2,5

Weight, kg 1480 550

Connection threads: - top sub - bit box

5 1/2 FH 4 1/2 REG

3 1/2 REG NC 38

Turbine stages type Т5-178 Т1-120

Number of stages, pcs 144 150

Flow rate, m3/s 0,028-0,032 0,012–0,016

Pressure drop, MPa 7,6 – 9,6

4,0 - 6,4

No-load RPM 1890 - 2160 1860-2480

Stall torque, Nm: 2415 - 3150 520-920

Max power, kWt 178 59

WOB, ton 10 5

Life time, hours 1200 1200

HS SIBERTURBINE

SPECIFICATIONS DRILLING TOOLS

Page 21: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

21 ST475HS

POWER CHARACTERISTICS

Relation between turbodrill

torque to shaft rpm

Relation between turbodrill pressure

drop to shaft rpm

DRILLING TOOLS

Page 22: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

22

Relation between turbodrill

torque to shaft rpm

Relation between turbodrill pressure

drop to shaft rpm

ST675HS

POWER CHARACTERISTICS DRILLING TOOLS

Page 23: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

CONTINUOUS IMPROVEMENT 23

Turbodrills design using

computer programs for 3-D

modeling

Turbine stage design modelling

special hydrodynamic software

Use of new technologies in

development and manufacturing

Gain all experience in

actual wells drilled

High-precision wax casting of

turbine stages and quality control

on specially designed test stand

A unique experience in design and manufacturing of turbodrills since 1965

Specially designed thrust bearing

to ensure highest reliability

Loads and shaft dynamics

modelling

DRILLING TOOLS

Page 24: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

24

Used in Turbodriils 127 and 178 mm

Dia for drilling in Siberia and

Tatarstan

SIBERTUBINE 4 ¾” and

6 ¾” OD

1965 Ball multi-row thrust

bearing

2012 PDC bearings with stages

made in USA

2001 Use PDC inserts manufactured

in China reliable supplier

1999 PDC bearings development of

its own production with inserts

made in Russia

Used in 127 and 178 mm Dia for

drilling in Siberia, Orenburg region,

Tatarstan, China and Kazakhstan

was used in the USSR on all

standard turbodrills

CONTINUOUS IMPROVEMENT

Development history of turbodrills thrust bearing

DRILLING TOOLS

Page 25: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

OPERATION RESULTS

HIGH SPEED TURBINE&IMPREG

Best result of using turbodrill 178 mm Dia in China

ROP before

using turbine

ROP with

turbine Turbodrill drilling time

ROP was increased more than 2 times

DRILLING TOOLS

25

Page 26: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

26 OPERATION RESULTS

HIGH SPEED TURBINE&IMPREG

Turbodrill line ST675HS (TSSh-178). China, Daqing

Interval: 2900 – 3628m.

Arrangement: Bit 215,9K705 (Smith) + ST675HS

Operation time = 330 hours, of them mechanical drilling time =

293,5 hours

Penetration = 728 m

Mean ROP = 2,48 m/hour

Mean ROP of the same interval with previous technology and rock

bit – 1.5 m/hour

Turbodrill with impregnated bit saved 8

drilling days

DRILLING TOOLS

Page 27: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

27 OPERATION RESULTS

HIGH SPEED TURBINE&IMPREG

Turbodrill line 2ST675HS (2TSSh-178Т) Dolan-Erdniev field,

Kalmykia

Intervals: 4899 – 4977m. 5069 – 5157m

Arrangement: Bit 215,9 DDR3560-A1 (ReedHycalog) + 2ST675HS +

KLS215,9 (integral spiral blade stabilizer) + UBT178 (drill collars)

(54,5 m)

Drilling time = 96 hours, time of circulation = 150 hours. Penetration

= 166 m. Q=23-24 l/sec. Р=23-24MPa

Mean ROP = 1,73 m/hour

Mean ROP with previous technology was 0,5 m/hour

Turbodrill with impregnated bit

saves 9,8 drilling days

DRILLING TOOLS

Page 28: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

28

DRILLING TOOLS

OPERATION RESULTS

HIGH SPEED TURBINE&IMPREG

Turbodrill line 2ST675HS (2TSSh-178Т). Zhanazhol field,

Kazakhstan, Great Wall

Interval: 2740 – 3192m

Arrangement: Bit 215,9 К707 (Smith) + 2ST675HS + UBT159 (9 m) +

stabilizer KLS 215,9 + UBT 159 (213 m)

Drilling time = 134,3 hours, circulation = 145,8 hours. Penetration =

452m. Q = 25-32 l/sec. Р = 15-22 MPa

Mean ROP = 3,37 m/hour

Mean ROP when drilling in same interval by PDMs

was 1,7 m/hour

Turbodrill with impregnated bit saves 7

drilling days

Page 29: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

29

DRILLING TOOLS

OPERATION RESULTS

HIGH SPEED TURBINE&IMPREG

Turbodrill with impregnated bit

saves 2,2 drilling days

Turbodrill ST962AHS.TV2 (TO3-240)

Uighur region, China

Drilling interval: 4386 – 4406m

Arrangement: Bit 311 TI3205 (China) + ST962AHS.TV2 + UBT229

Running time = 152,7 h

Mud flow-rate =50-55 l/sec

Operation pressure =24-30 MPa

Penetration = 130 m

Mean ROP = 0,97 m/hour

Mean ROP of an analogous interval with previous technology 0,7

m/hour

Page 30: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

30

All parts of the bearing section are oil filled

Relit (TC)-face seals provides reliable sealing

GEARED TUBODRILL

GR

DRILLING TOOLS

SIBERTURBINE GR is turbodrill with planetary gear reducer, is the only real alternative to

drill high-temperature wells and in cases when high-value torque PDC bits are used

RPM is decelerated multiply due to a special planetary

gear reducer that is able to withstand extremely high loads

Additionally downhole torque increases multiply which is

passed downhole to drive highly aggressive PDC bits

Page 31: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

31 GEARED TUBODRILL

Upper

sealing

Upper axial

bearing

Planetary gear

reducer

Adjustable

bent housing

Transmission

Lower axial

bearing

Lower

sealing

Turbine section

Lower radial

bearing

Torque

Shaft rpm

Geared turbodrill

Turbodrill

Upper radial

bearing

Gear&Bearing section

DRILLING TOOLS

Page 32: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

32 GR SIBERTURBINE

SPECIFICATIONS

Main specifications

Product code ST962GR.TS ST675GR.T2/T5

Housing OD, mm 240 178/180

Overall length, m 13.3 13.8

Length to bend, mm 2374 2110

Bend angles 0- 3 0- 3

Weight, kg 3207 2700

Connection threads: - top sub - bit box

6 5/8 FH

6 5/8 REG

5 1/2 FH

4 1/2 REG

Turbine stages type 3TS1-240 T2/T5-178

Number of stages, pcs 109 118/45

Flow rate, m3/s 0,04-0,065 0,028-0,038

Pressure drop, MPa 4.0-8.0 6.4-10.5

No-load RPM 240-400 423-575

Stall torque, Nm: 10150-26810 7360-13550

Max power, kWt 275 203

WOB, ton 25 25

Life time, hours 1200 1200

DRILLING TOOLS

Page 33: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

33 ST962GR

POWER CHARACTERISTICS

Relation between turbodrill

torque to shaft rpm

Relation between turbodrill pressure

drop to shaft rpm

DRILLING TOOLS

Page 34: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

34 ST675GR

POWER CHARACTERISTICS

Relation between turbodrill

torque to shaft rpm

Relation between turbodrill pressure

drop to shaft rpm

DRILLING TOOLS

Page 35: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

35

1965 first design of geared turbodrill ТRМ-195 bearing section consists of three different parts

Drilling Kola super-deep borehole SG-3 depth of 12,263 m

Work in Western Siberia for 30 years

1990 first design of geared turbodrill ТR-240 bearing section consists of single part

1994 developed a new planetary gear for size 240

mm provides greater load capacity

1997 developed a new design bearing section for

size 240 mm improved protection system oil from mud

2009 development of multi-row design with ball

thrust bearings

provides greater durability

2000 developed a new design of turbodrills with

ajustable bent housing provides for drilling directional wells

CONTINUOUS IMPROVEMENT DRILLING TOOLS

Page 36: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

36 OPERATION RESULTS

GEARED TURBINE&PDC

GR Turbodrill with PDC bit saves 2.1 driling days

Geared turbodrill line ST675GR (ТRО5-178) Orenburgneft,

March 2009 Interval : 1200 – 1740 m

Arrangement : PDC bit FMHX 215,9 + turbodrill ST675GR + DC UBT165

(9 m) + stabilizer KLS 215 + DC UBT165 (40 m) + Jar + DC UBT165 (59

m) + TBPK

Drilling time = 24,3 hours

Penetration = 540 m

ROP = 22.2 m/hour.

Geared turbodrill line ST675GR (ТRО5-178) Rosneft-Drilling

Nefteyugansk, July 2009 Interval: 1295 – 2763m.

Arrangement: PDC bit FD266SM 215,9 + TRO5-178 + UBT 178 +

lightweight drillpipe LBT

Drilling time = 38,2 hours

Penetration = 1468 m

ROP = 38.3 m/hour

GR Turbodrill with PDC bit saves 1.8 drilling days

DRILLING TOOLS

Page 37: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

37

Turbodrill saves 2.8 drilling days

Geared turbodrill line ST962GR (ТRО-240). Rosneft, March

2010 Arrangement: Bit FX55 295,3 + ST962GR + UBT203 (8m) + KLS292

Interval: 305-1100 m

Drilling time = 17,6 hours

Penetration = 795 m

ROP = 45.2 m/hour

Geared turbodrill line ST962GR (ТR-240) Rosneft,

March 2010 Interval: 245 – 1170m

Arrangement: Bit FX55 295,3 + ST962GR + UBT203 (9,5 m) + KLS 292 +

UBT203

Drilling time = 23 hours

Penetration = 925 m

ROP = 40.2 m/hour

Turbodrill saves 3.2 drilling days

DRILLING TOOLS

OPERATION RESULTS

GEARED TURBINE&PDC

Page 38: Корпоративная презентация Группы Интегра · 2016-03-19 · EDC 171 PDMs 57 Turbines 18 Jars Krasnoyarsk Rosneft 14 PDMs Usinsk Lukoil 34 PDMs

SUMMARY AND CONTACT 38

VNIIBT Drilling Tools Ltd./INTEGRA-Drilling tools

24 Karpinskogo Str., Perm, 614022, Russia

Phone: + 7 (342) 211 13 11

Fax: + 7 (342) 280 17 67

Email: [email protected]

www.integra.ru

www.vniibt-bi.ru

INTEGRA-Drilling Tools have long history and experience in manufacturing and services provision with its in-house downhole drilling technologies and we are ready to supply, rent and provide services to Oman market with high tech most powerful turbodrills

High performance positive displacement motors manufactured by INTEGRA-Drilling Tools can also be used in different wells and with any type of drill bits, both under standard and harsh drilling conditions such as high depth, high temperature, aggressive muds

With our integrated QMS we provide excellent service quality ensuring fit for purpose technology is utilized downhole in wells of our customers

DRILLING TOOLS