ヤンゴン mr. tun - 公益財団法人地球環境戦略研究 … htainbin final disposal site,...
TRANSCRIPT
1 2
3
Htainbin FDS( 150) AcreHtainbin FDS( 150) AcreHtawe Chaung FDS ( 55 ) AcreHtawe Chaung FDS ( 55 ) Acre
Dala FDS ( 3.86 ) Acre Dala FDS ( 3.86 ) Acre
6
Hlawger FDS ( 1.98 ) AcreHlawger FDS ( 1.98 ) Acre
5
Kyuchaung FDS ( 24.86 ) AcreKyuchaung FDS ( 24.86 ) Acre
4
Seikkyi-Khanaungto FDS ( 1) Acre Seikkyi-Khanaungto FDS ( 1) Acre
Existing Used Main ( 2 ) Final Disposal Sites
& ( 4 ) Temporary Small FDS
Existing Used Main ( 2 ) Final Disposal Sites
& ( 4 ) Temporary Small FDS
4
Htainbin Final Disposal Site, Tender Invited, Propose Location of (800) TPD
Can dispose Domestic Waste of YCDC area,Sanitary Landfill Facilities, Bio-Gas to Electricity or CNG
Htainbin Final Disposal Site, Tender Invited, Propose Location of (800) TPD
Can dispose Domestic Waste of YCDC area,Sanitary Landfill Facilities, Bio-Gas to Electricity or CNG
Total Area= 150 AcreUsed Area= 70 Acre Total Area= 150 AcreUsed Area= 70 Acre
Remarks
1. Daily Disposed = 800 ‐TPD2. Tender invited at 20123. Proposed Companies = 43 ‐No4. Pre selected = 5 ‐No5. Final Full Proposal = ( 07‐ 08‐ 2013)6. Pre selected = 2 No, ( 05‐09‐2013)7. Winner List on going8. Sanitary Landfill Facility9. Out put = Electricity or 92% CNG
Remarks
1. Daily Disposed = 800 ‐TPD2. Tender invited at 20123. Proposed Companies = 43 ‐No4. Pre selected = 5 ‐No5. Final Full Proposal = ( 07‐ 08‐ 2013)6. Pre selected = 2 No, ( 05‐09‐2013)7. Winner List on going8. Sanitary Landfill Facility9. Out put = Electricity or 92% CNG
Htawe Chaung Final Disposal Site Tender Invited, Propose Location of (600) TPD
Incineration Plant, WTE
Htawe Chaung Final Disposal Site Tender Invited, Propose Location of (600) TPD
Incineration Plant, WTE
Total Area= 55.77 AcreUsed Area= 47.4 AcreTotal Area= 55.77 AcreUsed Area= 47.4 Acre
Proposed Area of Incineration Plant From JICA , ( Hazardous Waste- 100 TPD from SEZ )
Remarks
1. Daily Disposed = 600 –TPD( domestic)2. Hazardous waste = 100 ‐ TPD3. Tender invited at 20124. Proposed Companies = 43 ‐No5. Pre selected = 6 ‐No6. Final Full Proposal = ( 07‐ 08‐ 2013)7. Pre selected = 2 No, ( 05‐09‐2013)8. Winner List on going9. Incineration Plant Facility10. Out put = Electricity
Remarks
1. Daily Disposed = 600 –TPD( domestic)2. Hazardous waste = 100 ‐ TPD3. Tender invited at 20124. Proposed Companies = 43 ‐No5. Pre selected = 6 ‐No6. Final Full Proposal = ( 07‐ 08‐ 2013)7. Pre selected = 2 No, ( 05‐09‐2013)8. Winner List on going9. Incineration Plant Facility10. Out put = Electricity
NO
Location of FDS site
Constructed Year
Planned Capacity
Site ( Plant) Area
Dispose Ton Per Day( Current)
Remark
1 HtainBin 2002 - 150- AcreUsed- 70 Ac
847 Open Dumping
2 HtweiChaung
2001 - 147 – AcreUsed-47.4 Ac
612 OpenDumping
3 Dala 2003 - 1.3- Acre 10 Low Landfill Temporary site
4 SeikkyiKhanaung
To
2003 - 0.25 - Acre 5 Low Landfill Temporary site
5 Mingalardon 2003 - 0.91 - Acre 25 Low Landfill Temporary site
6 Shwe PyiThar
2005 - 1 - Acre 50 Low Landfill Temporary site
23-Oct-13 6
Existing Used Main ( 2 ) Final Disposal Sites & ( 4 ) Temporary Small FDS
Existing Used Main ( 2 ) Final Disposal Sites & ( 4 ) Temporary Small FDS
Daily Waste Generated = 1690 TPD
Collected by PCCD = 1550 TPD Recyclable Waste from HH = 85.84 TPD Kantawmin Area ( themselves ) = 30 TPD Illegal Dumping ( but weekly, monthly = 24.16 TPD
check and collected)
Industrial Zone Waste Collected = 109 TPD( on call system and polluter pay principal)