New Energy Testing Center was established in 2009 which aimed at testing and certification for
new energy products. This Testing Center covers an area about 3000 square meters and contains four
laboratories, High Power Product‘s Lab, Environment Test Lab, EMC Test Lab and Electrical Safety
Lab. It has 1MW global power grid environment, advanced testing equipments and test analysis
team rich in experience. Besides it is in accordance with the requirements of ISO/IEC 17025.
Quality policy
Scientific & just, accurate & reliable, normative, customer satisfaction
Testing must be done according to the following principle, test method should be scientific,
behavior must be just to ensure results are accurate and reliable, good specification and satisfied
testing service to clients.
Quality object
Do not have any conclusive mistake in the test report.
Accuracy rate is more than 95.5%.
Customer satisfaction is more than 80%.
Testing completion rate is more than 95% every month.
Laboratory qualification
From now on New Energy Testing Center has obtained the authorization from UL, VDE, TUV
and other certification authorities. These authorities also test and carry out projects in it, such as
solar power and electrical quality test items of NESC, CQC certification item of CCIC Southern
Electronic Product Testing (Shen Zhen) Co. LTD, Nuclear power plant high-capacity battery energy
storage system prototype identification of China General Nuclear Power Group Technology Institute,
CGC certification item of Shen Zhen Academy of Metrology & Quality inspection, SAA
certification item of Bureau Veritas.
UL Laboratory Authorization
The authorized standards are as follow:
UL 1741-2010:Inverters, Converters, Controllers and Interconnection System Equipment for Use with Distributed Energy Resources
IEEE1547:IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems
IEEE1547-1 IEEE Standard Conformance Test Procedures for Equipment Interconnecting
Distributed Resources with Electric Power Systems
UL2202 Electric Vehicle (EV) Charging System Equipment
UL Subject 2594 EV Cord Sets& Charging Stations
UL2231-1 Personnel Protection Systems for Electric Vehicle (EV) Supply Circuits: General Requirements
UL2231-2 Personnel Protection Systems for Electric Vehicle (EV) Supply Circuits: Particular Requirements for Protection Devices for Use in Charging Systems
TUV Laboratory Authorization
The authorized standards are as follow:
IEC 62109-1:Safety of power conversion equipment for use in photovoltaic power systems—Part 1-general requirements
DIN V VDE V 0126-1-1:2006-02 Automatic disconnection device between a generator and the public low-voltage grid
VDE-AR-N4105:2011-08 Power generation systems connected to the low-voltage distribution network
IEC/EN 61851-1:2011 Electric vehicle conductive charging system —Part 1: General requirements
IEC_69_186_CD_2010 (IEC61851-23) Electric vehicle conductive charging system-part23:d.c. electric vehicle charging station
VDE laboratory Authorization
The authorized standards are as follow:
IEC62109-1:Safety of power conversion equipment for use in photovoltaic power systems—Part 1-general requirements
DIN V VDE V 0126-1-1:2006-02 Automatic disconnection device between a generator and the public low-voltage grid
Testing process
Confirm test requirment
Receive testing
sample
Confirm sample status
Test plan
Doing test
Tracking record during test
Complete the test
Raw data preparation
Audit raw test data
Write test report
Audit test report
Approve the test
report
Test report controlled
Send test report to
client
Receive test order
Feedback to client
Return the sample
Feedback to client
Reconfirm test data
Rewrite
Y
Y
N
N
N
Y
N
Y
Certification process
The applicant provide product
information & quote
Estimate certification cost &
provide certification scheme
Sign service contact
apply
Confirm application
Test standard Test ability Test itemSample
requirement
Prepare sample according to the
requirement
Provide sample and documents
Product predictionReview technical
documents
Witness test
Provide project number, follow
up test schedules
Complete the test
Pass or not
Equipment
requirement
Factory inspection
requirment
Factory inspection guidance
Determine checking date
Accompanying to review
Review of qualified
Issue the
certificate
Certificate
maintennance
N
Y
2. Scope of service
Cooperating organization
Certification authorities
Testing organization
3. Main testing platform
Electrical diagram for small capacity products’ testing platform
1. full-automatic test, only needs to press a button, avoiding the artificial mistake.
2. Saving the test time, the standard test item is excellent.
3. The test report can trace back and storage.
4. Match the test request of IEEE1547, 1547.1, UL1741, VDE0126, CEI-021, GB/ T 19939, and CGC/
GF001: 2009A.
Electrical diagram for big capacity products’ testing platform
1、Voltage 480VAC, frequency 60Hz, rated power 500kW.
2、there are three kinds of work mode, grid-connected charging,grid-connected discharging, and isolated
power system operation.
1、Voltage 380VAC, frequency 50Hz, rated power 500kW.
2、there are three kinds of work mode, grid-connected charging,grid-connected discharging, and isolated
power system operation.
4. Main equipment resources
Power analyzer HIOKI 3390 power quality analyzer Fluke 1760
AC/DC withstand voltage/insulation
resistance tester TOS9201
Leakage current tester TOS3200
Lighting surge tester SKS-0506
Instrument for measuring partial
discharge KPD2050
Simulated electric network power supply
Chroma 61512+A615103
Simulated PV-array supply
TC.P.32.800.400.S
Islanding tester ACLT-48500 UL Rain & water spray library
HALT equipment Salt spray test chamber RSC-012
Vibration table for four tone
DC-4000-40
Vibration table for four tone
DC-1000-15
High power DC source manufactured by BYD High power AC source manufactured by BYD
High-low temperature test
chamber EBS-SDJ620
Low temperature test
chamber DW-216
High temperature test
chamber STU4-10
Walk-in high-low temperature test chamber
5. News and information
Visit by certification authority
BYD&UL sign MOU
Group photos of leaders of both parties
Award UL250KW inverter certificate Post UL mark on BYD inverter
Christopher Flueckiger visited and communicated UL standard
VDE chairman Wilfried Jaeger visited BYD, signed long term cooperation agreement
and awarded certificate
Sign long term cooperation agreement Conference field
Vice president of TUV Greater China Holger Kunz visited BYD and issued C100D
certificate
UL MEIHUA certification Co.LTD visited to BYD
Leaders of both parties talk in the
award ceremony
Holger Kunz represent TUV issued C100
certificate to BYD
Communicate the UL certification The two sides talked friendly
Field testing
The test of BSG250K- U isolated photovoltaic inverter contains 40 test items according to the
standard UL1741 and IEEE1547, the typical items are over voltage test, under voltage test, over
frequency test, under frequency test, islanding detection, temperature rise test, overload test,
voltage/insulation resistance, rainfall test, and EMI test and so on.
The test of BSG500KTL-E non-isolated photovoltaic inverter contains 50 test items according to the
standard VDE0126-1-1 and IEC62109, the typical items are over voltage test, under voltage test,
over frequency test, under frequency test, islanding detection, DC injection test, Single fault test,
temperature rise test, dust prevention test, voltage/insulation resistance, EMC test and so on.