    Table of Content for Project Report

    Project : IDEO Wutthakat (S11)Date: 09/08/14

    ITEM DISCUSSION INFO. NOTE

    1.

    Project Introduction ANANDA1.1.

    General information

    1.1.1. Concept Idea, layout , customer group, room type,no. of room, Area

    1.1.2. Designer &contractor

    Main contractor, MEP contractor,structural designer, architecturaldesigner, interior designer, landscapedesigner

    1.1.3. Cost & Budget Construction cost, design fee, specialconsultant fee

    1.1.4. Precast concrete No. of precast member

    1.2. Project development Conventional to Precast concrete, why &

    how?1.3. Site Environment Nearby location, canal, temple,

    infrastructure, Road

    1.4.

    Construction schedule Start, finish, master plan

    2. Structural Design BE1TECH Design report

    2.1. Structural system

    2.1.1.Gravity system Foundation, column, wall, slab

    2.1.2.Lateral system Shear wall Lift core, stair core etc.

    2.1.3.Structural response 1st, 2nd, 3rdMode

    2.1.4.Loading criteria Seismic, Wind, Live load, Superimposed,Partition

    3.

    Architectural Design PLAN/ANANDA Design report

    3.1.

    Design consideration 3.2. Room type Type 1, 2, 3

    3.3. Parking Layout

    4. Material HELIX/GEL

    4.1.

    Concrete Strength, age, slump, slab, wall, post-tension slab, transfer floor, foundation

    4.2. Reinforcement Steel reinforcement, strength

    4.3. Grouting

    4.4. Mechanical splice

    4.5. Cement padding

    4.6.

    Post-install system

    4.7. Sealant

    4.8.

    Water proofing5. Precast Production GEL

    5.1.About GEL GEL company

    5.2.

    Plant layout Stock yard, construction, curing etc.

    5.3. Production line

    5.4.

    Production capacity

    5.5. Quality control

    5.6. Product tolerance

    5.7. Mock up

    5.8. Transportation

    6.

    Erection HELIX

    6.1. Planning Erection planning, team set-up, floor

    sequence6.2. Quality control Pre-erection/post-erection

    6.3. Erection tolerance

    6.4. Erection time Wall, slab, shear wall, faade

    6.5.

    Machine & equipment Which machine, How

  • 8/11/2019 140809 - Report-content ENG

    2/2

    6.6. Labour Team member

    6.7.Yarding & storage

    6.8.

    Site traffic

    7. Precast Connection HELIX

    7.1. Type

    7.2. Installation method

    7.3. Installation time

    8. MEP System MINERVA

    8.1. Electrical

    8.2.

    Sanitary

    8.3. Mechanical

    8.4. Ventilation & Aircondition

    8.5. OTTV RTTV

    9. Safety HELIX

    9.1.

    Safety plan & protocol

    9.2. Equipment Crane, Rigging

    9.3. Fall protection

    10.Drafting MINERVA/HELIX/GEL

    10.1.Shop drawing

    10.2.

    Production drawing10.3.Erection drawing

    11.

    Project evaluation MINERVA/ANANDA

    11.1.Conventional VS Precast Cost, time, quality

    11.2.Structural point of view

    11.3.Architectural point of view

    12.Problem & solution Problem and solution in construction MINERVA

    12.1.

    Structural

    12.2.Architectural

    12.3.MEP

    13.Observation andRecommendation

    How can we improve the product?Design, Construction, Cost, Time

    THANIT

    13.1.

    Topic 113.2.

    Topic 2

    13.3.Topic 3