20150825 suv li

Upload: charzree

Post on 08-Jul-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 20150825 Suv Li

    1/18

    2015.08.25 (Tue)

    Suvli P/S

    1. Pump House

    2015.08.25 (Tue)

    Suvli P/S

    1. Pump House

    Existing pump was

    under repair work

    by end user.

    2015.08.25 (Tue)

    Suvli P/S

    1. Pump House

    No. 6 new pump

     

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    2/18

    2015.08.25 (Tue)

    Suvli P/S

    No. 7 new pump

    2015.08.25 (Tue)

    Suvli P/S

    Coupling may need to be

    clearned.

    2015.08.25 (Tue)

    Suvli P/S

    Water leakage from

    most of all inlet covers.

    Also, much leakage from

    existing pumps.

    Therefore, floor drainage

    pumps are critical to

    carry out works in pump

    room.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    3/18

    2015.08.25 (Tue)

    Suvli P/S

    Drain sump and drainage

    pumps.

    Right side pump is

    out of servise.

    2015.08.25 (Tue)

    Suvli P/S

    Only left side drainage

    pump is working.

    Capacity is so far enough

    against leaking water

    amount.

    Drainage pump is operated

    manually.

    2015.08.25 (Tue)

    Suvli P/S

     

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    4/18

    2015.08.25 (Tue)

    Suvli P/S

    Discharge pipeline

    No.8 (right end) is closed.

    2015.08.25 (Tue)

    Suvli P/S

    Existing compensator

    will be cut from the

    pointed part.

    2015.08.25 (Tue)

    Suvli P/S

    Connection point of

    exisitng compensator.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    5/18

    2015.08.25 (Tue)

    Suvli P/S

    Support of existing

    compensator will be cut

    as red line of the photo.

    Support will be re-used.

    Support beam shall be

    extended.

    2015.08.25 (Tue)

    Suvli P/S

    Existing No.8 compensator

    is abandoned.

    Support beam of this

    compensator will be cut

    and used for extension.

    2015.08.25 (Tue)

    Suvli P/S

    New compensator

    at storage.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    6/18

  • 8/19/2019 20150825 Suv Li

    7/18

    2015.08.25 (Tue)

    Suvli P/S

    2. Compensator 

    Flow meter chamber 

    2015.08.25 (Tue)

    Suvli P/S

    2. Compensator 

    Flow meter chamber 

    There is gap between

    pipe and chamber.

    2015.08.25 (Tue)

    Suvli P/S

    2. Compensator 

    Flow meter chamber 

    There is gap between

    pipe and chamber.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    8/18

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    Incoming connection point

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    Entrance room

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    Next room from entrance.

     

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    9/18

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    LV & Transformer room

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    LV & Transformer room

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    HV room

     

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    10/18

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    HV room

    Door is very small andnot enough to carry

    panels into room.

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    Outside cable trench

    (electric room side)

    2015.08.25 (Tue)

    Suvli P/S

    3. Electric room

    Outside cable trench

    (pump room side)

     

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    11/18

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    Fence is installed.

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    Pad lock at entrance.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    12/18

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    Wooden boxes inside

    storage are covered by

    vinyl sheet.

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    2 x 20ft containers

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    Inside container 

     

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    13/18

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    Inside container 

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    Lighting

    Pole was existing.

    Ortex prepared lamp

    and cable, they said.

    2015.08.25 (Tue)

    Suvli P/S

    4. Storage

    Compensators are kept

    out of strage area.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    14/18

    2015.08.25 (Tue)

    Suvli P/S

    5. Site office

    Right side container is

    Kubota site office.

    Container is not new,

    but renovated.

    2015.08.25 (Tue)

    Suvli P/S

    5. Site office

    Room at right hand side.

    2 desks, 2 chairs and

    air conditioner is insatlled.

    2015.08.25 (Tue)

    Suvli P/S

    5. Site office

    Bathroom

     

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    15/18

  • 8/19/2019 20150825 Suv Li

    16/18

    2015.08.25 (Tue)

    Suvli P/S

    5. Site office

    Bathroom

    Drain of toilet isconnected.

    2015.08.25 (Tue)

    Suvli P/S

    5. Site office

    Room at left hand side.

    2015.08.25 (Tue)

    Suvli P/S

    5. Site office

    Room at left hand side.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    17/18

    2015.08.25 (Tue)

    Suvli P/S

    6. Discharge works

    Discharge pipeline.

    Left side pipe is painted.(for pump No. 6 & 7)

    2015.08.25 (Tue)

    Suvli P/S

    6. Discharge works

    Flanges for air valves.

    2015.08.25 (Tue)

    Suvli P/S

    6. Discharge works

    Flange for siphon breaker

    valves.

    余 白

    余 白

    余 白

  • 8/19/2019 20150825 Suv Li

    18/18

    2015.08.25 (Tue)

    Suvli P/S

    6. Discharge works

    2015.08.25 (Tue)

    Suvli P/S

    6. Discharge works

    Left side canal.

    Concrete work is done.

    2015.08.25 (Tue)

    Suvli P/S

    6. Discharge works

    Right side canal.

    Concrete work not yet done.

    余 白

    余 白

    余 白