3 technip brazil solid local foundations for profitable growth · angra tender rovs ... 3_technip...
TRANSCRIPT
Technip Brazil: Solid Local Foundations for Profitable Growth
Paulo Veronesi, Subsea Commercial Director, BrazilInvestor Day in Brazil, October 4, 2011
2
Key Aspects of Brazil�’s Economy
One of the world�’s largest economies193 million inhabitants over 8.5 million km²
2010 nominal GDP: US$2.1 trillion (Ranked 8th globally)
World’s seventh-largest oil consumer(1)
Driven by natural resources
~40% of stock market capitalization (IBOVESPA index)
2.1 mb/d oil production
US$74 billion of agricultural exports(2)
Forthcoming sports events trigger significant investments
Soccer World Cup in 2014 and Olympic Games in 2016
Source: Brazilian National Petroleum Agency (ANP), CIA World Factbook, IHS Global Insight, MDIC(1) Domestic oil demand of ~2 mb/d(2) From November 2009 to October 2010
Investor Day in Brazil, October 4, 2011
1 2681 716
2 137
4 900
1 000
2 000
3 000
4 000
5 000
2000 2005 2010 2020
3
Focus on the Oil Industry
Source: BP Statistical Review of World Energy 2011, Bradesco Corretora, Petrobras, PFC Energy.
Brazil�’s oil production is estimated to double by 2020
CAGR:5.3%
CAGR:8.7%
Expected oil production(Thousand barrels per day) Diversified customer base
National company:
98.5% of Brazilian production
~14 billion boe of proved oil reserves
Other operators
�…
Investor Day in Brazil, October 4, 2011
Worldwide new discoveries 2005 - 2010(33,989 million bbl)
Brazil�’s Leadership in Deepwater
Investor Day in Brazil, October 4, 2011
Deepwater accounts for 50% of worldwide discoveries over the last 5 years
Development of these reserves will demand additional capacity from the supply chain
Deepwater discoveries(300 - 1,500 meters)
Deepwater discoveries in Brazil represent 1/3 of worldwide discoveries in the last 5 years
Source: Petrobras, PFC Energy
4
5
Development of Conventional & Pre-salt Fields
Progressive development (since 1974)Reserves: ~16bn boe proved reserves2011e production : ~2,058 kboe/d
2015 objective: maintain production2011 - 2015 investments: US$64bn
Conventional environmentShallow to deepwaterInstalled flexible pipes: ~5,000km Field depletion
Fast track develomentReserves: ~13 to 15bn boe(1)
2011e production: ~42 kboe/day(2)
2015 objective: rapid production ramp-up
2011 - 2015 investments: US$53bn
Challenging environmentDeep to ultra deepwaterRemote areaCorrosive fluidOil with associated gas
Source: Petrobras 2011-2015 Business Plan(1) Lula, Cernambi fileds, Iara, Guara and Parque das Baleias blocks; including 5bn boe transfer right(2) Pre-Salt and transfer of rights
Investor Day in Brazil, October 4, 2011
Conventional field (Campos) Pre-salt development (Santos)
6
6
Risers
Export lines
(1) Integrated Production Bundle
Flexible riser & jumper
Rigid riser/flowline/exportIPB flexible pipeFlexible flowline
IPB(1)
Infield flowlines
Jumpers
Field Development Solutions in Brazil
Investor Day in Brazil, October 4, 2011
Visibility on FPSO Delivery Schedule
4
7
98
2012 2013 2014 2015
Guara Pilot 2 - Cidade de Sao Paulo
Lula NE - Cidade de Paraty
Guara Norte Franco 1 - CessaoOnerosa
Baleia Azul - Cidade de Anchieta
Parque das Baleias - P-58 Cernambi Sul BMS-9 or 11 - P-67 (Replicante 2)
... Roncador Module 4 - P-62 Baleia Azul - Post-salt BMS-9 or 11 - P-66 (Replicante 1)
… OSX-4 to 7 OSX-8 to OSX-10
Peregrino II …
…
FPSO Delivery Schedule (Petrobras, OGX, Statoil)
28 FPSO�’s to be delivered by 2015
7 Investor Day in Brazil, October 4, 2011
Tendering Activity Driven by FPSO Deliveries
8 Investor Day in Brazil, October 4, 2011
Flexible Supply Long Term Charters EPIC Rigids Logistics Bases
Baleia Azul / Espardate Normand Progress Deep Capixaba Vitória Logistics Base
P-58 FPSO Baleia Azul Field Skandi Vitória BC-10 Phase 2Fluid Logistics Base Contract with Brazil
Supply
P-62 FPSO Roncador Field Sunrise 2000 Shallow Capixaba Additional LogisticsContract
Guara/Lula NE Flowlines, Jumpers & Gas Export Lines Skandi Niteroi Guara/Lula North East Export
Pipelines …
… Deep Constructor Lula NE/Cernambi - 18" Rigid Gas Export
6 Flex-lay Vessels Guara Norte/Cernambi/ Lula
Central/Lula AltoInfield & Export System
… Cabinas 24’’Gas Export
…
Technip Wins
Bids in Progress
Awarded Projects
Brazilian Business Environment is Complex
Regulatory framework
States and federal systems with different jurisdictions
Management of resources and logistics
Decision processes
Tax system
Environmental requirements
Understanding local specificities is key to success
9 Investor Day in Brazil, October 4, 2011
Technip in Brazil: 35 Years of Operations
2011Garoupa Platform
1st flexible pipe installed100m water depth
Roncador Subsea Field Development & P-52 Platform
1,800m water depth
1977
2007
P-58/P-62 Brazilian FPSOsAngra Porto logistics base
2009
1st IPB in Brazil (Papa-Terra)1st Brazilian PLSV: Skandi Vitória
2010
1st Flexible manufacturing plant: Flexibras1986
2001Acquisition of
UTC Engineering
1995
1st LTC with PetrobrasSunrise
Tupi Gas Export2nd Brazilian PLSVSkandi Niteroi
Unique experience to understand local specificities
~20 people
~3,200 people
~2,000 people
10 Investor Day in Brazil, October 4, 2011
Technip in Brazil Today
Market leader across the full value chain
~3,200 people
All business segmentsSubsea
Onshore/Offshore
Full range of services Engineering to operations
Conceptual studies to LSTK EPC contracts
P-56 - 1st Semi-sub built in Brazil
PLSV Skandi Niteroi
Repar Hydrogenation unit
11 Investor Day in Brazil, October 4, 2011
Continuous Investment In Local Capabilities
People
Assets
Critical Logistics
On-Site R&D
Largest integrated O&G services capabilityNumber of local employees from ~1,500 in 2003 to ~3,200 in 201197% of total workforce is Brazilian
Port of Angra, located next to pre-salt fields78,000 square meters350 meters berthChannel access
Only flexlay vessels with Brazilian flag: Skandi Vitória & Skandi NiteroiState-of-the-art flexible manufacturing facilityHigh-end flexible manufacturing plant under construction
Brazilian R&D center for pre-salt & ultra deepwaterClose collaboration with key clients
Product qualificationProprietary internal test centerWorld class equipment
12 Investor Day in Brazil, October 4, 2011
0
0,5
1
1,5
2
2,519
99
2001
2003
2005
2007
2009
2011
TRCF Goal
Strong Commitment to Health, Safety and Environment (HSE)
13
PULSE programMore than 200 managers and supervisors trained in Brazil (end 2010)Specific sessions organized on projects with clients
FOCOS program �– Vitóriamanufacturing plant
Development of safe behaviourBased on observation by co-workersMore than 5,500 observations to date
Project CONSERVARWaste management Reduction of energy and water consumptionManagement of CO2 footprint
Total Recordable Case FrequencyPer 200,000 hours worked
Investor Day in Brazil, October 4, 2011
Sustainable and Responsible Presence in Brazil
Increasing project local contentEnergizing Brazilian economy through long-term presence and extensive local supplier network
Promoting local employment: 97% of employees are Brazilian
Fostering cross-center collaboration and skills transfer
Supporting local communities“Projeto Brilhante”: large-scale training program launched in 2007 to help underprivileged find employment at Technip
Participation in the construction of local buildings and infrastructures, charity events, donations for health causes…
Reducing Technip�’s impact on the environmentWorldwide health, safety and environment program
“Projeto Conservar”: waste management, reduction of energy and water consumption and CO2 footprint
Social Activities team on Technip office rooftop
14 Investor Day in Brazil, October 4, 2011
EPCI
Flexibles LTCEPCI
Detailed EngineeringFPSOs P-58 / P-62
EPC Diesel HDTRPBC - Refinery
Subsea Offshore Onshore
Basic & Detailed EngineeringWHP 1&2
Engineering Frame Agreement
Engineering Frame AgreementOlefines Plant Revamp
Basic Engineering LNG plant
FEEDAmmonia Plant
Close Collaboration with Diversified Client Base
Engineering Frame Agreement
15 Investor Day in Brazil, October 4, 2011
BC-10 Ph II EPCI
Subsea Track Record & Ongoing Projects
Track recordReel-Lay: PIP for Canapu with Deep BlueS-Lay: Tupi gas exportJ-Lay: PDET hybrid riserFlex-Lay: manufacturing & installationP-52 Subsea full field development
P-52 Development
Ongoing projectsIntegrated Production Bundle (IPB) Papa TerraTUPI Pilot: 1st flexible pipes for Pre-SaltSeveral flexible supply contractsLong-term chartersAngra logistics base TUPI
16 Investor Day in Brazil, October 4, 2011
Track recordAnitápolis fertilizer plantColombo projectP-51/52/56 Semi-submersible production platform FLNG FEED
Ongoing projectsCubatao refineryOlefin plants revamping and expansionP-58 & P-62 1st Brazilian FPSOs: flagship engineering service contract with over 90% local content
Onshore/Offshore Track Record & Ongoing Projects
P-58 & P-62 FPSOs
RPBC
P-56 Semi-sub Production Platform
17 Investor Day in Brazil, October 4, 2011
Enhanced flexible capabilities & capacity to serve a fast growing high-end subsea market
Construction and acquisition of best located assets
35 years experience working in Brazil
Pro-actively developing local resources, from people to production capabilities
Technip: An Experienced Local Company
Regulatory challenges
Resources bottlenecks
Access / logistic constraints
Technology for the pre-salt development
Expertise in project management, planning and interfaces management
Project execution
18 Investor Day in Brazil, October 4, 2011
Today�’s Resource and Asset Base
Engineering and Project Management E, P, C, Commissioning and Installation servicesCorporate services
Rio de Janeiro
Flexible pipe & umbilical manufacturingLogistics baseR&D test center
Vitória
Marine assets
LogisticsPort of Angra
19 Investor Day in Brazil, October 4, 2011
Marine assets support baseMacae
5 flexible pipelay vessels, including Deep Constructor & Skandi Niteroi
Fleet of ROVs
Marine assets
Possible Resource and Asset Base in 2015 to Meet Pre-Salt Market
Engineering and Project Management E, P, C, Commissioning and Installation servicesCorporate services
Rio de Janeiro
Flexible pipe & umbilical manufacturingLogistics baseR&D test center
Vitória
High-end flexible manufacturingplant
New Plant
20 Investor Day in Brazil, October 4, 2011
Marine assets support baseMacae
LogisticsPort of Angra
5 flexible pipelay vessels, depending on Petrobras tenderFleet of ROVs
Marine assets
…
Vertically Integrated Model Built in Brazil on Unmatched Local Content
Global IndustriesTechnip in Brazil*FEED: Front End Engineering Design
Rigid Reel-Lay
Rigid J-Lay
Rigid S-Lay
Concept
Project Engineering & Procurement
Upstream Engineering
Pre-FEED* and FEED
Offshore fielddevelopmentstudies
Innovativetechnologysolutions for platform and subsea challenges
R&D, Proprietary Software & Hardware
Execution
Manufacturing
Rigid S-Lay
PROJECT
MANAGEMENT
Flexible risers and flowlines
Rigid pipeline welding/spooling
Umbilicals
InstallationFlexible-Lay
Umbilical-Lay
Associatedconstruction
Heavy lift for Subseainfrastructure
Offshore topsideinstallation
Support, Diving & Logistics
Group Support21 Investor Day in Brazil, October 4, 2011
www.technip.com
Thank you