aalborg industries presentation scrubber
TRANSCRIPT
© AALBORG INDUSTRIES 1
Exhaust Gas Cleaning
WWW.AALBORG-INDUSTRIES.COM PRESENTATION series | © AALBORG INDUSTRIES | JUL 2010 EXHAUST GAS CLEANING1
SO2 Reduction From ShippingOlav Knudsen, Head of R&D, Exhaust Gas Cleaning
© AALBORG INDUSTRIES 2
SO2 reduction requirements
0
1
2
3
4
5
2005 2010 2015 2020 2025
Year
Sulfu
r con
tent
[%]
ECA
Global
0102030405060708090
100
0 2 4 6
Fuel S [%]
Rem
oval
[%]
"0.1 %"
"0.5 %"
"1.0 %"
2010
20152020
© AALBORG INDUSTRIES 2
© AALBORG INDUSTRIES 3
SO2 reduction requirements
0
1
2
3
4
5
2005 2010 2015 2020 2025
Year
Sulfu
r con
tent
[%]
ECA
Global
0102030405060708090
100
0 2 4 6
Fuel S [%]
Rem
oval
[%]
"0.1 %"
"0.5 %"
"1.0 %"
2010
20152020
© AALBORG INDUSTRIES 3
© AALBORG INDUSTRIES 4
Situation today Environmental impact
CO2
CO2 + H2O ↔ H2CO3
H2CO3 ↔ H+ + HCO3-
HCO3- ↔ H+ + CO3
--
CO2 + H2O ↔ H2CO3
H2CO3 ↔ H+ + HCO3-
HCO3- ↔ H+ + CO3
--
H2SO4 ↔ H+ + HSO4-
HSO4- ↔ H+ + SO4
--
H2SO4 ↔ H+ + HSO4-
HSO4- ↔ H+ + SO4
--
PMPM
H2SO4 (sulphuric acid)
SO2PM
PM
SO2 + H2O + ½ O2
© AALBORG INDUSTRIES 5
CO2
CO2 + H2O ↔ H2CO3
H2CO3 ↔ H+ + HCO3-
HCO3- ↔ H+ + CO3
--
CO2 + H2O ↔ H2CO3
H2CO3 ↔ H+ + HCO3-
HCO3- ↔ H+ + CO3
--
H2SO4 ↔ H+ + HSO4-
HSO4- ↔ H+ + SO4
--
H2SO4 ↔ H+ + HSO4-
HSO4- ↔ H+ + SO4
--
Situation with scrubber Environmental impact
© AALBORG INDUSTRIES 6
Discharge water criteria
© AALBORG INDUSTRIES 7
Discharge water criteria in ports and estuaries
pH ≥ 6.5 for the overboard discharge (dilution okay)
Limit on dissolved oil (PAH)
Nitrate: Max. 12 % of NOx in exhaust gas or max. 60 mg/liter
Limit on soot particles (turbidity)
No maximum sulfate level
© AALBORG INDUSTRIES 8
Technology history
~1000 Inert Gas Systems sold since 1972
~3000 Inert Gas Generators sold with scrubber section
© AALBORG INDUSTRIES 9
Technology history
~1000 Inert Gas Systems sold since 1972
~3000 Inert Gas Generators sold with scrubber section
© AALBORG INDUSTRIES 10
Tests with MAN Diesel
© AALBORG INDUSTRIES 10
© AALBORG INDUSTRIES 11
Test results(FW)
Influence of NaOH addition
0
10
20
30
40
50
60
70
80
90
100
0 0.2 0.4 0.6 0.8 1 1.2 1.4
mole NaOH / mole Fuel Sulfur
SO2 trapp
ing efficiency (%
)
Jet
Venturi
© AALBORG INDUSTRIES 11
© AALBORG INDUSTRIES 12
Test results
PM emission ‐ Jet scrubber, 100% MCR
0
10
20
30
40
50
60
70
80
90
100
0 10 20 30 40 50 60Test No.
PM trapp
ing efficiency [%
]PM emission with Jet scrubber
© AALBORG INDUSTRIES 12
© AALBORG INDUSTRIES 13
Test results
0
10
20
30
40
50
60
70
80
90
100
0 50 100 150 200 250 300 350 400Pressure drop venturi [mmWC]
PM trapp
ing efficiency (%
)
PM emission with Venturi scrubber
© AALBORG INDUSTRIES 13
© AALBORG INDUSTRIES 14
© AALBORG INDUSTRIES 15
Advantages Hybrid EGC system
Running on SW at open sea whenever possible
(lowest costs, ease of operation)
Zero discharge whenever required
(ports, estuaries, sensitive area’s)
Ability to cope with low alkalinity waters (Baltic, estuaries, rivers)
No switching between MGO/HFO -> maximum fuel savings
Compact water cleaning, lowest possible FW/NaOH consumption
Maximum flexibibility
© AALBORG INDUSTRIES 16
Technical data Tor Ficaria
Technical dataYear built 2006 Length 199,8 metersWidth 26,50 metersSpeed 22,5 knotsCargo capacity 3,831 lane metersMAN B&W type 9L60 MC-C (21MW) Classification LRS
© AALBORG INDUSTRIES 17
EGC installed on Tor Ficaria
Technical data:In operation since May 2010Height 10.5 MetersLength 8.2 MetersDiameter 4.6 MetersWeight empty 24TWeight with water 32TExhaust gas 192,000 Kg/hMaterial SS alloysPM Scrubbing Jet + venturiSea water pump 200KW/1000m3/h
Length
Diameter
Hei
ght
© AALBORG INDUSTRIES 18
DFDS Tor Ficaria- world largest scrubber on a vessel
WWW.AALBORG-INDUSTRIES.COM PRESENTATION series | © AALBORG INDUSTRIES | JUL 2010 EXHAUST GAS CLEANING18
© AALBORG INDUSTRIES 19
DFDS Tor FicariaFunnel - modification
Before During After
WWW.AALBORG-INDUSTRIES.COM PRESENTATION series | © AALBORG INDUSTRIES | FEB 2010 EXHAUST GAS CLEANING19
© AALBORG INDUSTRIES 20
DFDS Tor Ficaria- world largest scrubber on a vessel
© AALBORG INDUSTRIES 21
DFDS Tor Ficaria- world largest scrubber on a vessel
WWW.AALBORG-INDUSTRIES.COM PRESENTATION series | © AALBORG INDUSTRIES | JUL 2010 EXHAUST GAS CLEANING21
© AALBORG INDUSTRIES 22 series | © AALBORG INDUSTRIES | JUL 2010 EXHAUST GAS CLEANING
DFDS Tor Ficaria- world largest scrubber on a vessel
22
© AALBORG INDUSTRIES 23
Switching between SW and FW- Operation on FW in sensitive areas
SW
NaOH
Scrubber
Exhaust gas
No discharge water No Environmental Impact Assessment (IEA) to local EPA
Low engine power low NaOH consumption
© AALBORG INDUSTRIES 24
Switching between SW and FW- Operation on SW at open sea
SW
Scrubber
Exhaust gas
Slowly cleaning of the accumulated water at open sea only a relative small water cleaning unit is required.
Sludge for disposal at land
Brine
© AALBORG INDUSTRIES 25
Switching between SW and FW- Operation on SW at open sea
SW
Scrubber
Exhaust gas
No NaOH consumption
Slowly filling up the tank again to prepare it for arrival to a sensitive area Only a relative low FW flow is required.
FW supply
© AALBORG INDUSTRIES 26
Results Tor Ficaria- Summary
Sulfur emission after scrubber below the 0.1 % sulfur limit in 2015 with HFO
pH level of discharge water at 3 – 5 depending on exhaust gas and water flow
Below limit on dissolved oil in discharge water (PAH)
Below limit on soot particles in discharge water (Turbidity)
More than 1300 hours of operation
Valuable data for further optimization
© AALBORG INDUSTRIES 27
Savings in fuel costs
Date
USD
/ton
fuel
350.00
400.00
450.00
500.00
550.00
600.00
650.00
700.00
750.00
01.1
0.09
01.1
1.09
01.1
2.09
01.0
1.10
01.0
2.10
01.0
3.10
01.0
4.10
0.1% Cargoes CifNWE
Roterdam 380 CST
© AALBORG INDUSTRIES 28
A Day with a Scrubber
Gothenburg (SE)
Brevik (NO)
Immingham (UK)
---- Fresh Water (no discharge)
---- Salt Water
---- Offline
5
4
3
2
1
140kg/hFW<0.05%2400l/h (2.2%)5.
---SW0.22%3900l/h (2.2%)4.
105kg/hFW<0.05%1800l/h (2.2%)3.
---SW0.17%2500l/h (2.2%)2.
70kg/hFW<0.05%1200l/h (2.2%)1.
NaOH kg/hModeS. Eq(%)Fuel Spec.Nr.
© AALBORG INDUSTRIES 29
Pay Back Time
© AALBORG INDUSTRIES 30
ConclusionsScrubbers well-known from land based installations and Inert Gas Systems.
Maximum cost savings and flexibility with hybrid EGC System
Far largest EGC system in continuous operation on Tor Ficaria - 21 MW MAN B&W
Short pay back time 1-2 years