No. URAIAN SATUAN VOLUME

(Rp)

A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m

- Btg 12,500 28,000.00

- Kg 25,000 1,406.00

- Pasir beton M3 0.0050 255,400.00

- M3 0.0090 211,100.00

- M3 0.0720 2,640,000.00

- Kg 0.0600 23,400.00

- Residu Kg 0.4000 8,100.00

- Pekerja Oh 0.4000 42,000.00

- Oh 0.2000 65,000.00

- Oh 0.0200 75,000.00

- Mandor Oh 0.0200 80,000.00

Jumlah

Dibulatkan

A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m

HARGA SATUAN

Dolken Kayu Ø 8-10 / 400 cm

Semen Portland

Koral Beton 2/3

Kayu balok terentang

Paku Biasa 2" - 5"

Tukang Kayu

Kepala Tukang

- Btg 12,500 28,000.00

- Kg 25,000 1,406.00

- Lbr 12,000 62,900.00

- Pasir beton M3 0.0050 255,400.00

- M3 0.0090 211,100.00

- M3 0.0720 2,640,000.00

- Kg 0.0600 23,400.00

- Meni Besi Kg 0.4500 30,400.00

- Pekerja Oh 0.4000 42,000.00

- Oh 0.2000 65,000.00

- Oh 0.0200 75,000.00

- Mandor Oh 0.0200 80,000.00

Jumlah

Dibulatkan

A-03

Dolken Kayu Ø 8-10 / 400 cm

Semen Portland

Seng Gelombang BJLS-30

Koral Beton 2/3

Kayu balok terentang

Paku Biasa 2" - 5"

Tukang Kayu

Kepala Tukang

1 M' Pagar SementaraKawat Duri Tinggi 1,80 m

- Btg 10,000 28,000.00

- Kg 20,000 1,406.00

- Kawat Duri Kg 25,000 63,500.00

- Pasir beton M3 0.0050 255,400.00

- M3 0.0090 211,100.00

- Kg 0.0600 23,400.00

- Pekerja Oh 0.3000 42,000.00

- Oh 0.2000 65,000.00

- Oh 0.0200 75,000.00

- Mandor Oh 0.0200 80,000.00

Jumlah

Dibulatkan

A-04

- M3 0.0120 1,870,500.00

- Kg 0.0200 23,400.00

Dolken Kayu Ø 8-10 / 400 cm

Semen Portland

Koral Beton 2/3

Paku Biasa 2" - 5"

Tukang Kayu

Kepala Tukang

1 M2 Pengukuran Dan Pasang Bouwplank

Kayu kaso 5/7

Paku Biasa 2" - 5"

- M3 0.0070 2,071,700.00

- Pekerja Oh 0.1000 42,000.00

- Oh 0.1000 65,000.00

- Oh 0.0100 75,000.00

- Mandor Oh 0.0050 80,000.00

Jumlah

Dibulatkan

A-05

- Btg 12,500 28,000.00

- M3 0.1800 2,640,000.00

- Paku Biasa Kg 0.8500 23,400.00

- Besi Strip Kg 11,000 26,800.00

- Kg 350,000 1,406.00

- M3 0.1500 233,400.00

- Pasir beton M3 0.1000 255,400.00

Kayu papan albasia

Tukang Kayu

Kepala Tukang

1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester

Dolken Kayu Ø 8-10 / 400 cm

Kayu Balok terentang

Semen Portland

Pasir Pasang

- M3 0.1500 211,100.00

- Bata Merah Bh 300,000 775.00

- Seng Plat m' 0.2500 15,815.00

- M2 20,000 35,900.00

- M2 0.0800 87,400.00

- Bh 0.1500 94,500.00

- Lbr 0.0600 140,000.00

- Pekerja Oh 20,000 42,000.00

- Oh 20,000 65,000.00

- Oh 10,000 65,000.00

- Oh 0.3000 75,000.00

- Mandor Oh 0.0500 80,000.00

Jumlah

Dibulatkan

A-06

Koral Beton2/3

Kawat harmonika

Kaca Polos 3mm

Kunci Tanam

Plywood 120 x 240 x 0,4 cm

Tukang Kayu

Tukang Batu

Kepala Tukang

1 M2 Pembuatan Gudang Semen dan Alat-alat

- Btg 17,000 28,000.00

- M3 0.2100 2,640,000.00

- Paku Biasa Kg 0.3000 23,400.00

- Kg 105,000 1,406.00

- Pasir Beton M3 0.0300 255,400.00

- M3 0.0500 211,100.00

- Lbr 15,000 62,900.00

- Pekerja Oh 10,000 42,000.00

- Oh 20,000 65,000.00

- Oh 0.2000 75,000.00

- Mandor Oh 0.0500 80,000.00

Jumlah

Dibulatkan

A-07

Dolken Kayu Ø 8-10 / 400 cm

Kayu balok terentang

Semen Portland

Koral Beton 2/3

Seng Gelombang BJLS 30

Tukang Kayu

Kepala Tukang

1 M2 Pembuatan Bedeng Buruh

- Btg 12,500 28,000.00

- M3 0.1860 2,640,000.00

- Paku Biasa Kg 0.3000 23,400.00

- Kg 180,000 1,406.00

- Pasir Beton M3 0.0300 255,400.00

- M3 0.0500 211,100.00

- Lbr 15,000 62,900.00

- Pekerja Oh 10,000 42,000.00

- Oh 20,000 65,000.00

- Oh 0.2000 75,000.00

- Mandor Oh 0.0500 80,000.00

Jumlah

Dibulatkan

A-08 1 M2 Membersihkan Lapangan dan Perataan

- Pekerja Oh 0.1000 42,000.00

- Mandor Oh 0.0500 80,000.00

Dolken Kayu Ø 8-10 / 400 cm

Kayu balok terentang

Semen Portland

Koral Beton 2/3

Seng Gelombang BJLS 30

Tukang Kayu

Kepala Tukang

Jumlah

Dibulatkan

A-09

- M3 0.1500 205,500.00

- M3 0.0900 196,000.00

- M3 0.0100 233,400.00

- Pekerja Oh 10,000 42,000.00

- Mandor Oh 0.0500 80,000.00

Jumlah

Dibulatkan

A-10

- Pekerja Oh 66,670 42,000.00

- Mandor Oh 0.3330 80,000.00

Jumlah

Dibulatkan

A-11 1 M3 Bongkaran Dinding Tembok Bata Merah

- Pekerja Oh 66,670 42,000.00

- Mandor Oh 0.0330 80,000.00

Jumlah

Dibulatkan

1M2 Pembuatan Jalan Sementara

Batu Belah 15/20

Batu Pecah 5/7

Pasir Pasang

1 M3 Bongkaran Beton Bertulang

A-12

- Lbr 0.9860 199,200.00

- Btg 0.5250 264,000.00

- Pasir Beton M3 0.0740 255,400.00

- Koral 2/3 M3 0.1460 211,100.00

- Kg 450,000 1,406.00

- Pekerja Oh 0.3750 42,000.00

- Oh 0.1250 65,000.00

- Oh 0.0120 75,000.00

- Mandor Oh 0.0190 80,000.00

Jumlah

Dibulatkan

A-13 1 M¹ Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'

- Lbr 0.4340 14,900.00

- Kg 67,860 18,300.00

- Kg 0.0424 18,300.00

- Baut bh 40,000 600.00

1 M¹ Pagar beton Pracetak ( 5 x 50 x 213 ) cm

Panel Beton Pracetak

Kolom Beton Pracetak

Semen abu - abu

Tukang Batu

Kepala Tukang

Kawat ram ayam

Besi siku L 50.50.5

Besi pelat (1,2 x 3) mm

- Kg 25,000 1,406.00

- Pasir beton M3 0.0050 255,400.00

- M3 0.0090 211,100.00

- Pekerja Oh 0.3750 42,000.00

- Oh 0.1250 65,000.00

- Oh 0.0120 75,000.00

- Mandor Oh 0.0190 80,000.00

Jumlah

Dibulatkan

A-14 1 M2 Pagar BRC lengkap dengan tiang

- Lbr 0.4340 171,300.00

- Kg 20,000 1,406.00

- Kawat Duri Kg 25,000 63,500.00

- Pasir beton M3 0.0050 255,400.00

- M3 0.0090 211,100.00

- Pekerja Oh 0.3750 42,000.00

- Oh 0.1250 65,000.00

Semen Portland

Koral Beton 2/3

Tukang Batu

Kepala Tukang

BRC lengkap dengan tiang

Semen Portland

Koral Beton 2/3

Tukang Batu

- Oh 0.0120 75,000.00

- Mandor Oh 0.0190 80,000.00

Jumlah

Dibulatkan

A-15 1 M2 Steiger Werk / perancah dari Bambu

- btng 10,000 25,000.00

- Tali ijuk kg 0.2500 23,400.00

- Pekerja org 0.2500 42,000.00

- org 0.0170 65,000.00

- org 0.0020 75,000.00

- Mandor org 0.0130 80,000.00

Jumlah

Dibulatkan

A-16 1 M' Cerucuk Bambu

- btng 12,500 25,000.00

- Pekerja org 0.5000 42,000.00

- Mandor org 0.0250 80,000.00

Jumlah

Dibulatkan

Kepala Tukang

Bambu Ø 6 - 10 (600) cm

Tukang kayu

Kepala tukang

Bambu Ø 7 -10 (400) cm

HARGA

(Rp)

35,000.00

3,515.00

1,277.00

1,899.90

190,080.00

1,404.00

3,240.00

16,800.00

13,000.00

1,500.00

1,600.00

269,315.90

269,316.00

35,000.00

3,515.00

75,480.00

1,277.00

1,899.90

190,080.00

1,404.00

13,680.00

16,800.00

13,000.00

1,500.00

1,600.00

355,235.90

355,236.00

28,000.00

2,812.00

158,750.00

1,277.00

1,899.90

1,404.00

12,600.00

13,000.00

1,500.00

1,600.00

222,842.90

222,843.00

22,446.00

468.00

14,501.90

4,200.00

6,500.00

750.00

400.00

49,265.90

49,266.00

35,000.00

475,200.00

19,890.00

29,480.00

49,210.00

35,010.00

25,540.00

31,665.00

23,250.00

3,953.75

71,800.00

6,992.00

14,175.00

8,400.00

84,000.00

130,000.00

65,000.00

22,500.00

4,000.00

1,135,065.75

1,135,066.00

47,600.00

554,400.00

7,020.00

14,763.00

7,662.00

10,555.00

94,350.00

42,000.00

130,000.00

15,000.00

4,000.00

927,350.00

927,350.00

35,000.00

491,040.00

7,020.00

25,308.00

7,662.00

10,555.00

94,350.00

42,000.00

130,000.00

15,000.00

4,000.00

861,935.00

861,935.00

4,200.00

4,000.00

8,200.00

8,200.00

30,825.00

17,640.00

2,334.00

42,000.00

4,000.00

96,799.00

96,799.00

280,014.00

26,640.00

306,654.00

306,654.00

280,014.00

2,640.00

282,654.00

282,654.00

196,411.20

138,600.00

18,899.60

30,820.60

63,270.00

15,750.00

8,125.00

900.00

1,520.00

474,296.40

474,296.00

6,466.60

124,183.80

775.92

2,400.00

3,515.00

1,277.00

1,899.90

15,750.00

8,125.00

900.00

1,520.00

166,813.22

166,813.00

74,344.20

2,812.00

158,750.00

1,277.00

1,899.90

15,750.00

8,125.00

900.00

1,520.00

265,378.10

265,378.00

25,000.00

5,850.00

10,500.00

1,105.00

150.00

1,040.00

43,645.00

43,645.00

31,250.00

21,000.00

2,000.00

54,250.00

54,250.00

B. ANALISA HARGA SATUAN PEKERJAAN TANAH

No.

(Rp) (Rp)

B-01

- Oh

- Oh

Dibulatkan

B-02

- Oh

- Oh

Dibulatkan

B-03

- Oh

- Oh

Dibulatkan

URAIAN

SATUAN

VOLUME

HARGA SATUAN

HARGA

1 M3 Galian Tanah Biasa sedalam 1 m

Pekerja

0.4000

42,000.00

16,800.00

Mandor

0.0400

80,000.00

3,200.00

Jumlah

20,000.00

20,000.00

1 M3 Galian Tanah Biasa Sedalam 2 m

Pekerja

0.5260

42,000.00

22,092.00

Mandor

0.0520

80,000.00

4,160.00

Jumlah

26,252.00

26,252.00

1 M3 Galian Tanah Biasa Sedalam 3 m

Pekerja

0.7350

42,000.00

30,870.00

Mandor

0.0730

80,000.00

5,840.00

Jumlah

36,710.00

36,710.00

B-04

- Oh

- Oh

Dibulatkan

B-05

- Oh

- Oh

Dibulatkan

1 M3 Galian Tanah Keras Sedalam 1 m

Pekerja

0.6250

42,000.00

26,250.00

Mandor

0.0620

80,000.00

4,960.00

Jumlah

31,210.00

31,210.00

1 M3 Galian Tanah Lumpur Sedalam 1 m

Pekerja

0.8230

42,000.00

34,566.00

Mandor

0.0830

80,000.00

6,640.00

Jumlah

41,206.00

41,206.00

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

No.

(Rp) (Rp)

C-01

- M3 ###

- Kg ###

- M3

- Oh ###

- Oh

- Oh

- Oh

Dibulatkan

C-02

- M3 ###

- Kg ###

- M3

URAIAN

SATUAN

VOLUME

HARGA SATUAN

HARGA

1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps

Batu Belah

205,500.00

226,050.00

Semen Portland

1,406.00

284,012.00

Pasir Pasang

0.4850

233,400.00

113,199.00

Pekerja

42,000.00

63,000.00

Tukang Batu

0.6000

65,000.00

39,000.00

Kepala Tukang

0.0600

75,000.00

4,500.00

Mandor

0.0750

80,000.00

6,000.00

Jumlah

735,761.00735,761.00

Pasang Pondasi Batu kali adk 1pc :

Batu Belah

205,500.00

226,050.00

Semen Portland

1,406.00

229,178.00

Pasir Pasang

0.5200

233,400.00

121,368.00

- Oh ###

- Oh

- Oh

- Oh

Dibulatkan

C-03

- M3 ###

- Kg ###

- M3

- Oh ###

- Oh

- Oh

- Oh

Dibulatkan

C-04

- M3 ###

Pekerja

42,000.00

63,000.00

Tukang Batu

0.6000

65,000.00

39,000.00

Kepala Tukang

0.0600

75,000.00

4,500.00

Mandor

0.0750

80,000.00

6,000.00

Jumlah

689,096.00689,096.00

Pasang Pondasi Batu kali adk 1pc :

Batu Belah

205,500.00

226,050.00

Semen Portland

1,406.00

191,216.00

Pasir Pasang

0.5440

233,400.00

126,969.60

Pekerja

42,000.00

63,000.00

Tukang Batu

0.6000

65,000.00

39,000.00

Kepala Tukang

0.0600

75,000.00

4,500.00

Mandor

0.0750

80,000.00

6,000.00

Jumlah

656,735.60656,736.00

Pasang Pondasi Batu Kosong (aanstampin

Batu Belah

205,500.00

246,600.00

- M3

- Oh

- Oh

- Oh

- Oh

Dibulatkan

Pasir Urug

0.3000

175,300.00

52,590.00

Pekerja

0.7800

42,000.00

32,760.00

Tukang Batu

0.3900

65,000.00

25,350.00

Kepala Tukang

0.0390

75,000.00

2,925.00

Mandor

0.0390

80,000.00

3,120.00

Jumlah

363,345.00363,345.00

NO SAT

M3 769.5

Kg ### 23.4 46.8

Kg ### 16.5

Kg ### 27.7 83.1

Kg ### 1.2 387.6

M3 225 117

M3 200 156

Oh ### 55 266.8

Oh 70 24.5

Oh ### 70 109.2

Oh ### 70 98

Oh 80 26.48

Oh 85 14.45

URAIAN

VOLUME

HRG.SAT

JUMLAH

D-17r2

1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15

Kayu papan terentang

0.2700

2,850,000

Paku Biasa 2" - 5"

Besi Beton

2,970,000

Kawat BetonSemen PortlandPasir Beton

0.5200

Koral Beton 2/3

0.7800

PekerjaTukang Batu

0.3500

Tukang KayuTukang BesiKepala Tukang

0.3310

Mandor

0.1700

Jumlah

5,069,380

Dibulatkan

5,069,380

M3

Kg ### 23.4 93.6

Ltr 40.5 -

Kg ### 16.5

Kg ### 27.7 49.86

Kg ### 1.2 387.6

M3 225 117

M3 200 156

M3 396

Btg ### 15 300

Oh ### 55 401.5

Oh 70 24.5

Oh ### 70 231

1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15

Kayu papan terentang

0.4000

2,850,000

1,140,000

Paku Biasa 2" - 5"Minyak BekistingBesi Beton

2,970,000

Kawat BetonSemen PortlandPasir Beton

0.5200

Koral Beton 2/3

0.7800

Kayu Balok Terentang

0.1500

2,640,000

Dolken Ø-8-10/4mPekerjaTukang Batu

0.3500

Tukang Kayu

Oh ### 70 147

Oh 80 45.6

Oh 85 21.25###

###

M3 912

Kg ### 23.4 74.88

Kg ### 16.5

Kg ### 27.7 62.33

Kg ### 1.2 387.6

M3 225 117

M3 200 156

Tukang BesiKepala Tukang

0.5700

Mandor

0.2500Jumla

hDibulatkan

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15

Kayu papan terentang

0.3200

2,850,000

Paku Biasa 2" - 5"

Besi Beton

2,970,000

Kawat BetonSemen PortlandPasir Beton

0.5200

Koral Beton 2/3

0.7800

M3 369.6

Btg ### 15 240

Oh ### 55 327.8

Oh 70 24.5

Oh ### 70 196

Oh ### 70 98

Oh 80 36.4

Oh 85 17.68###

D-29

M3 712.5

Kg ### 23.4 70.2

Ltr ### 40.5 48.6

Kg ### 16.5

Kg ### 27.7 83.1

Kg ### 1.2 387.6

M3 225 117

Kayu Balok Terentang

0.1400

2,640,000

Dolken Ø-8-10/4mPekerjaTukang Batu

0.3500

Tukang KayuTukang BesiKepala Tukang

0.4550

Mandor

0.2080Jumla

hDibulatkan

6,413,000

1 M3 Tangga Beton Tulang (90 kg besi + bekisting)

Kayu papan terentang

0.2500

2,850,000

Paku Biasa 2" - 5"Minyak BekistingBesi Beton

1,485,000

Kawat BetonSemen PortlandPasir Beton

0.5200

M3 200 156

M3 277.2

Btg ### 15 210

Oh ### 55 308

Oh 70 24.5

Oh ### 70 161

Oh ### 70 98

Oh 80 32.4

Oh 85 17.17

3

M3

Kg ### 23.4 93.6

Ltr ### 40.5 81

Koral Beton 2/3

0.7800

Kayu Balok Terentang

0.1050

2,640,000

Dolken Ø-8-10/4mPekerjaTukang Batu

0.3500

Tukang KayuTukang BesiKepala Tukang

0.4050

Mandor

0.2020

Jumlah

4,188,720

Dibulatkan

4,189,000

1 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg Besi + Bekisting )Kayu Terentang

0.4000

2,850,000

1,140,000

Paku Biasa 2" - 5"Minyak Bekisting

Kg ### 16.5

Kg ### 27.7 83.1

M3 151.1 15.87

Lbr ### 151.1 528.9

Btg ### 15 900

Kg ### 1.2 387.6

M3 225 117

M3 200 156

Oh ### 55 286

Oh 70 24.5

Oh ### 70 231

Oh 80 29.2

Oh ### 85 90.1

Besi Beton Polos

1,485,000

Kawat Beton

Kayu Balok Terentang

0.1050

Plywood Tebal 9 mmDolken kayu Galam o - 8-10/4 mSemen PortlandPasir Beton

0.5200

Koral Beton 2/3

0.7800

PekerjaTukang Batu

0.3500

Tukang KayuKepala Tukang

0.3650

MandorJumlah

5,648,816

Dibulatkan

5,649,000