e« c. jacka from lynd . a krupp
Post on 24-Apr-2022
21 Views
Preview:
TRANSCRIPT
K E R R A D D I S O N M I N E S L I M I T E D (FOR INTER-OFFICE U S E O N L Y ) Q £- - <j) '
4
820166 E« C . Jacka From Lynda Krupp __.
Po£tlandCanal P r o j e c t - Assessment Work ___Date A_ugu_s t __6t h 3 __ 1,970
With r e f e r e n c e t o you r memo d a t e d August 4 t h t o Mr. 5 i r o l a , who i s on v a c a t i o n u n t i l August 1 7 t h , p l e a s e be a d v i s e d t h a t no f u r t h e r work i s pla n n e d f o r the Bern 1 - 6 and 9 - 11 i n c l u s i v e and t h a t t h e s e c l a i m s w i l l now be a l l o w e d t o l a p s e on August 1 2 t h , 1970.
Regards,
Lynda Krupp.
L J K / s e l
R.D.S. B.C.B. I.D.B. M.D.R. j.H.F.
K E R R A D D I S O N M I N E S L I M I T E D (FOR INTER-OFFICE USE ONLY)
To Wi M. S i r o l a F r o m Ev C; Jacke
Subject Portland. Canal.-Project Date August- 4, 19-70
It is noted that assessment work is required to be f i l e d on 9 claims, v i z . Bern 1 - 6 and 9 - 11, on August 12th. What action is contemplated with reference to these claims?
E C J : l f r E. C. Jacka
yJ.H.S. V 4M.HV R.D.S. B.C.B. l.D.B. M.D.R. J.H.F.
• • • .' JUL 15 WO
Vancouver Geochemical Laboratories 1 51970 1521 PEMBERTON AVENUE NORTH VANCOUVER, B.C., CANADA TELEPHON|^4^^J^2 | y '
GEOCHEMICAL ANALYTICAL REPORT P«. PCNLK. v • I.M.H./
REPORT No 70^8-003 ...DATE flB* l 2 » 1 9 7 0
Mr, J , Umd Kerr Addison Mines Ltd, SAMPLES SUBMITTED BY 7* .T**"* COMPANY
SHIPPED VIA JISB!:.|| ... FROM ?.0COa*« <ggg g
REPORT O N * ; ^ . " ^ . ; * » C u * ...DATE SAMPLES ARRIVED * ™
J.H.S.
COPIES OF THIS REPORT SENT T O : TRANSMITTED BY:
m Kerr Addison Mines Ltd., mail i i 1^5 i xxi^ v.Pei^er St. , Vaneouver,B.C. (2) • - - - - -
(3) - • : SAMPLES SIFTED OR GROUND TO MESH WEIGHT USED
FINAL VOLUME M * i ___ ALIQUOT USED :.
M E T H O D O F A N A L Y S I S : lostraaentel * Atomic Absorption
EXTRACTION: *?Wfc. „???1 - ~~
DETECTION: 1 —9&
Techtron kkk and AA5
SAMPLES A S S I G N M E N T : (*) PREPARED SAMPLES:
(b) REJECTS:
f i l e d discarded
a t i , ANALYST(S) __ ...... TYPIST
SUPERVISING CHEMIST CHECKED BY C^CJ^MaJ
COSTS: SHIPPING CHARGE $. SAMPLE PREPARATION $ ANALYSIS $. OTHER $
TO T A L
U20
%m 10.20
R.D.S. B.C.B. I.D.B. M.D.R. J.H.F.
S P E C I A L I Z I N G I N T R A C E E L E M E N T A N A L Y S I S
Vancouver Geochemical Laboratories Ltd. 1521 PEMBERTON AVENUE NORTH VANCOUVER, B.C. CANADA TELEPHONE 604-988-2172
70-8-003 COMPANY M * * REPORT No PAGE OF „.*
MARKING 14b 0*2 MARKING =j OT E j ?o * * 5 85 UI ' JUN 1 519
2 % 86 4INES LI 0.
3 3 12
k 6 *»5
5 to 50
J 70 - 6
REMARKS
All values are reported in parts pur million unless specified otherwise. A!l values are believed to be correct to the best knowledge of the analyst based on the method and instruments used.
MAR - 3 1970 K E R R A D D I S O N MINES LIMITED
105 - 1112 WEST PENDER STREET V A N C O U V E R I. B .C
March 2, 1970
4 . fi> e
Mr. Wilf C h r i s t i a n , Box 321,
Fort S t . James, B.C.
Dear Hi3.fi
Enclosed please f i n d the following data:
1) Form A*s f o r Tod 1 - 6 M.C.'s i n c l u s i v e 2) Photocopy, B i l l of Sale of Mineral Claim which i s signed
fay our Mr. R. D. Stewart (Secretary)
3) Photocopy, B.C. Mining Receipt #43252 E i n the amount of $9*00 i n payment of recording the B i l l of Sale.
I hope you w i l l f i n d these documents i n order and that you w i l l be able to do something b e n e f i c i a l with them.
You w i l l be interested to know that Mr. S i r o l a i s presently undergoing some test work i n the Lions Gate Hospital for his r e c u r r i n g heart problems. He was moved from the Intensive Care Unit to a regular room today but at the moment, we do not expect him back i n the o f f i c e for a few weeks at best. If you have any questions regarding the coming f i e l d season, f e e l free to contact either Fred Chow or myself.
Best regards,
Yours s i n c e r e l y ,
LJK/sel E n d .
cc/ Mr. E. C. Jecka,.y Toronto O f f i c e .
Lynda Krupp, (Mrs. W.)
K E R R A D D I S O N M I N E S L I M I T E D (FOR INTER-OFFICE U S E ONLY)
To .W.^..K fc..Si.rola J rom. E. C. Jacka
Subject Tod...ir£..-..M.i.nftra.l.Xlftj.iUS Date t9k***nA*k.W.9..
Further to your l e t t e r dated February 10, 1970, enclosed please f i n d a B i l l of Sale In favour of Wilfred C h r i s t i a n , together with the Form A's for 6 claims, v i z . Tod 1-6. Please check that the B i l l s of Sale are In order and then record same with the mining recorder at Prince Rupert.
E C J : l f r E n d s .
Form No. 47. Bill of Sale of Mineral Claim.
BILL OF SALE OF MINERAL CLAIM KNOW A L L M E N BY THESE PRESENTS
That
Kerr Addison Mines L i m i t e d , 405 F i d e l i t y L i f e B u i l d i n g , 1112 West Pender S t r e e t , VANCOUVER 1, B . C .
Free Miner's Certificate No. 77784
Issued at V i c t o r i a , A p r i l 10, 1969 , for and in consideration
of the sum of F Ive Dollars ($5.00 ) of lawful
money of Canada, to 11 in hand paid, the receipt whereof is hereby acknowledged,
DO BY THESE PRESENTS bargain, sell, assign, and transfer unto
W i l f r e d C h r i s t i a n , Box 321, FORT ST, JAMES, B . C .
Free Miners' Certificate No. 80383
Issued at , 19 69 , i t s heirs, executors,
administrators, and assigns, A L L Its right, title, and interest in and to
Minera l Claims Tod No. 1 - Tod No. 6 i n c l u s i v e .
Record Nos. 34554 * 3^559 i n c l u s i v e .
Situated approximately 23 miles north and east of Stewart, B . C . , head of Tod
Creek f lowing north to Bowser River and Lake a r e a .
located the 20th day of August , A.D . 19 9̂ ,
recorded at Pr ince Rupert
upon the 2nd day of September , A .D . 19 69 , and
hereby covenant that Kerr Addison Mines Limited has a good title to the mineral claims
aforesaid and right to transfer the same.
IN WITNESS WHEREOF ha hereunto set hand and seal this
day of , A.D . 19 , at
WITNESS:
[Seal.]
[Seal.]
[Seal.]
-[Seal.]
K E R R A D D I S O N M I N E S L I M I T E D ,
To
Subject-
FEB 12 1970
.Li..C.̂ .Jack.a.„ From WjJM*JS3*pJ 1a \
(FOR INTER-OFFICE U S E ONLY)
Tod 1 - 6 M.C. Ts, Skeena M.D., A l i c e Arm A r e a , B.C.
Date Feb. 10/70 |
S i n c e we do not c o n t e m p l a t e any a d d i t i o n a l work en t h i s group, i t i s our f e e l i n g t h a t they s h o u l d be t r a n s f e r r e d back t o W i l f C h r i s t i a n who was the o r i g i n a l s t a k e r . I t i s j u s t p o s s i b l e t h a t W i l f may be a b l e t o s e l l t h e s e c l a i m s and I t h i n k t h a t the t r a n s f e r back t o him makes f o r good r e l a t i o n s between the company and t h e p r o s p e c t o r .
W. M. S i r o l a .
NOV 19 1969 T O :
Kerr Addison Mines Lisa ted,
4X)5 • 1112 We«t Pender Street,
Vancouver, B. C.
Gfertifirat* nf Aaaag
C O A S T E L D R I D G E PROFESSIONAL SERVICES DIVISION
W A R N O C K H E R S E Y I N T E R N A T I O N A L L I M I T E D 1 2 5 E A S T 4 T H A V E . V A N C O U V E R 1 0 . B . C . . C A N A D A
c ̂ ferebjj Certify; that the following are the results of assays made by us upon submitted
M A R K E D
504
G O L D
O U N C E S P E R T O N
V A L U E P E R T O N
10.15
S I L V E R
O U N C E S P E R T O N
42.8 0.3
Lead jgb) P E R
C E N T .
45.66
Copper (Cu P E R
C E N T .
4.94
Zinc (Zn> P E R
C E N T .
HL3I
P H O N E : ( 6 0 4 ) 8 7 6 - 4 1 1 1 T E L E X : 0 4 - 5 0 3 5 3 C A B L E A D D R E S S :
E L D R 1 C O
F I L E N D . A.3-R.1-69-8637
D A T E 3 e p t B 2 6 t 1969
samples
P E R C E N T .
a t JU s)
KERR A"
P E R C E N T .
E P 2 9 B 6 9
P E R C E N T .
/cr Gold calculated at $ — per ounce
Note. Rejects retained one week. Pulps retained one month. Pulps and rejects may be stored for a maximum of one year by special arrangement.
Unless it is specifically stated otherwise, gold and silver values reported on these sheets have not been adjusted to compensate for losses and gain inherent in the fire assay process.
Provincial Assayer
K E R R A D D I S O N M I N E S L I M I T E D / 2) (FOR INTER-OFFICE USE ONLY)
To Si rola From fc*.J&iutaXIMMflfa
Subject |H^l§l^ [.^>|.Pr»J.fCt Date N.OV«pfa« t .10j„.Jiafia.
Thank you for your memo of November 6th pointing out my err o r
concerning the number of our Bern claims.
PMK:lfr Paul M. Kavanagh
K E R R A D D I S O N M I N E S L I M I T E D (FOR INTER-OFFICE U S E ONLY)
To
Subject.
P_jL__M_.___Kavanagh From W. M. S i r o l a
J.H.S. P.M.K.'
P o r t l a n d C a n a l Pro.j e c t -•9^Mgnth__Cos_t._5 N_D_y.*._„ 6 / 6 9__
Your notes i n d i c a t e d 13 claims s t a k e d i n two groups; t h i s s h o u l d r e a d 15 c l a i m s , t h e r e b e i n g 9 Bern c l a i m s and 6 Tod c l a i m s s t a k e d by W i l f C h r i s t i a n . Both groups a r e on Todd Creek
3
W. M. S i r o l a .
WM5/lk
go 1969 K E R R AuUISON MINES LIMITED
(FOR INTER-OFFICE U S E O N L Y )
To. J!fc*__E*_JL«__JackB. From -Lynda -Krupp
Subject P o r t l a n d C a n a l P r o j e c t - To_d___$1___-__6 ̂ M i n e r a l .Cla ims. Date Dc±nhBi._2SZfiJL
E n c l o s e d p l e a s e f i n d t h e Form A's
f o r t h e above mentioned c l a i m s . These c l a i m s a r e i n the name o f
K e r r A d d i s o n Mines L i m i t e d .
Lynda Krupp.
L J K / s e l E n c l .
KERR AUDISON MINES LIMITED <FOR INTER-OFFICE U S E ONLY)
To.
Subject.
W. M. S i r o l a .MrjL_.E.„iIjl._1Jacka From
P o r t l a n d C a n a l P r o j e c t -.Bern-l„-„„6„&_.9„-„l Date S e p t . 24/69
H e r e w i t h the Form A's f o r the above c l a i m s . P l e a s e note t h a t Bern 7 t o B have been e x c l u d e d , l a r g e l y because they were g e o l o g i c a l l y u n f a v o u r a b l e .
The work program f o r t h i s c l a i m group w i l l be de t e r m i n e d t h i s f a l l .
W. M. S i r o l a .
AH.S. J R.D.S. B.C.B. I.D.B. G.M.H. ; P.K. I
WM5/lk E n c l .
TO: W. M. SIROLA
FROM: J. C. LUND
SUBJECT: PORTLAND CANAL PROJECT - EXPLORATION REPORT, Period Ending August 31st, 1969.
J.H.S. P.M.W R.D.5. B.C.B. I.D.B. G.M.H. P.K.
Poor weather conditions continued to hamper exploration
t h i s period. The month of August had a r a i n f a l l of over 20 inches.
A l l crews were brought i n by August 29th i n preparation f o r c l o s i n g
camp f o r the season.
Party A (Wilf C h r i s t i a n and Cap Cornwell) located and
staked 6 claims on a copper-bearing breccia about 3 miles south of
the Bern claims. Chalcopyrite occurs as masses between fragments
in a quartz-carbonate breccia across a maximum width of 30 feet and
estimated length of 100 to 150 f e e t . The Breccia occurs i n a north-
south f a u l t that cuts a small intensely a l t e r e d and p y r i t i z e d
i n t r u s i v e rock and pinches i n both d i r e c t i o n s from i t s maximum 30-foot
width. Further work i s needed to determine the extent and importance
of the m i n e r a l i z a t i o n .
D r i l l core found on the outcrop from some early work
showed a 45-foot i n t e r s e c t i o n of about \% copper. The l o c a t i o n end
hence i n c l i n a t i o n of t h i s d r i l l hole could not be ascertained.
Following staking of the above claims, Party A was put
into the Kinsbuck area to check on anomalous a i l t sample #A-69-2B5
(500 ppm Cu). No apparent cause f o r the high s i l t could be found
and the streams werB reeampled. Results of resampling f a i l e d to
- 2 -
reproduce the o r i g i n a l 500 ppm.
5ampling on the west side of Kinsbuck Lake has turned
up a marked anomalous zone. The samples from three small streams
flowing i n t o Kinsbuck Lake gave the following r e s u l t s f o r copper:
2150, 2000, and 650 ppm. These anomalous samples come from an area
underlain by volcanic rocks that are cut by numerous d i o r i t e dykes.
Wilf has also found a small occurrence here of what we believe to
be complex 5b-As-Pb minerals. I expect to have a d e f i n i t e i d e n t i f
i c a t i o n on these mberals at a l a t e r date. (Accompanying map shows
s i l t s i t e s and assay r e s u l t s . ) This sampling was done on t h e i r
l a s t campsite, consequently, r e s u l t s were not back from the lab i n
time f o r follow-up work before the season closed. This needs to be
checked out.
Party B continued to prospect the Donahue Creek area.
This p a r t i c u l a r area has many small copper occurrences i n quartz
veins. The l a i g e s t occurrence i s a 2-foot wide quartz vein with
f a i r l y massive chelcopyrite occurring on the face c f a 300 to 400-foot
v e r t i c a l c l i f f near i t s top. An E.M. l i n e was run along the top of
the c l i f f with negative r e s u l t s . This i s a p r o l i f i c aree f o r capper
however the occurrences found seem to be confined to quartz veins.
An examination of the aeromag data shows nothing.
Party C worked the South Kshwan River area with v i r t u a l l y
negative r e s u l t s . A l i t t l e copper was found and Pb-Zn f l o a t i n a
stream draining north from Mt. Evindson. The sides of the va l l e y
are near v e r t i c a l and d i f f i c u l t to scale, consequently the source
of f l o a t was not found. The small amount of f l o a t does not suggest
extensive m i n e r a l i z a t i o n . S i l t s from t h i s area show s l i g h t l y anomalous
Cu and Pb but values are not high enough to be important.
I spent 2 days on the Bern claims mapping geology. Karl
Huska took s i l t samples from the toe of the snowfield on the upper part
of t h B claims. A sketch of geology and geochem r e s u l t s i s enclosed.
The Bern claims cover a small, very a l t e r e d i n t r u s i o n
that has invaded volcanic rocks of the Hazelton Group. These are
mainly coarse, purple agglomerates and l i t h i c t u f f s with some lavas.
The i n t r u s i o n i s l e u c o c r a t i c rock about 1000 feet i n diameter now
alt e r e d beyond recognition to a greenish p y r i t i z e d mass. Areas of
mineralization c o n s i s t i n g mainly of massive coarse p y r i t e and i n some
places chalcopyrite, occur where the i n t r u s i v e rock i s highly
fractured or brecciated, and along easterly f a u l t s zones of extensive
py r i t e veining are scattered throughout the i n t r u s i o n . Amount of
copper seen i s small and considerable mare work including d e t a i l e d
geological mapping i s needed to see i f there i s a d r i l l target.
Geophysics would not be h e l p f u l - an I.P. would respond to the
disseminated p y r i t e and the type of mineralization expected would not
necessarily be picked up by the E.M. Diamond d r i l l i n g would be the
most e f f e c t i v e exploration t o o l when and i f a target can be found.
Analysis of the geochem f o r a l l the areas covered w i l l
be completed t h i s f a l l and those s i l t s which should be checked w i l l
- 4 -
te sc heduled f o r follow-up work next season
(signed)
John C. Lund
X L / I k
I
PORTLAND CflVAC P*OJ€cT
38 samp St fr
a i d C t*. tJct-fH.?.
0et-n 1 B e r n 3
SEP - 5 1969
BONDAR-CLEGG & COMPANY LTD. geologists • geochemists
C E R T I F I C A T E O F A S S A Y
1112 West Pender S t r e e t
Vancouver, B.C.
1500 PEMBERTON AVENUE, NORTH VANCOUVER. B.C. Phone 988-5315
Report No.:
Date Rec'd:
A-29-2S0
August 20, 1969
[ I.O.B. 6.M.H. P.K.
Date Completed: August 22, 1969 1=5 (3 nMrttf|J that the following are the results of assays made by us upon the herein described PTe samples.
NOTE: Rejects retained two weeks Pulps retained three months unless otherwise arranged.
Gold & Silver values reported on these sheets have not been adjusted to compensate loses and gains inherent in fire assay methods. Gold calculated at S . 3.5 . 0 0 p e r ounce
KERR'aDOIUON 1 MINESlLTD^
Registered Assayer, Province of British Colunibia
SEP - 2 1969 ) 4 J.H.S.
P.MJL R.D.S. B.C.B. t.0.8. S.M.R P.K.
TO i W. M. SIROLA
FROM: J . C. LUND
SUBJECT: PORTLAND CANAL PROJECT - Exploration Report, Period Ending August 15th, 1969.
The past two weeks have been most exasperating.
Since August 4th we have had about 14 inches of r a i n ; low cloud
and fog have hung to the mountains and above 4,000 feet the
mountains are draped i n a fresh white blanket of snow. Wc have
had two requests from f i e l d crews: Party A (Wilf &. Cap) i n Todd
Creek asked when Christmas dinner would a r r i v e and Party B requests
dogteam and snow shoes to complete t h e i r traverses. At the 3,500-foot
elevation i n Todd Creek where Party A are, they report as of Aug. 17th
3" to 4" of fresh snow and as Wilf says, even the goats are leaving.
Needless to say, under these conditions we have been unable to move
crews when and where des'ired. The forecast c a l l s f o r continued r a i n .
l i t t l e success. Rich-looking Pb f l o a t was found but the source could
not be located. Narrow shears associated with northerly s t r i k i n g dykes
cuttin g a r g i l l i t e s carry galena and chalcopyrite and i n some cases,
t e t r a h e d r i t e . Maximum width on massive mineralization i s 6 inches.
Quartz-healed breccia zones up to 8 feet wide have been found but
carry only sparse m i n e r a l i z a t i o n .
Party A was moved b r i e f l y to Strohn Creek near Meziadin
Lake to examine a reported quartz monzonite plug. Thick tangled tag
Party A continued to work the B i t t e r Creek area with
- 2
alder and d e v i l s club combined with heavy rain prevented moving f a r
from t h e i r camp. The plug was not located. On one stream a p o s i t i v e
test f o r Cu was traced as far as topography permitted but the source
not located. The country i s precipitous and with the low fog hanging
close to slopes, i t i s d i f f i c u l t to traverse. From here t h i s crew was
moved to Todd Creek to check out reported i n t r u s i o n s . They have
located small pods and lenses of quartz-barite carrying a l i t t l e galena
and chalcopyrite but these are not extensive. Two more days w i l l
be spent here then they w i l l be moved back to K i t s a u l t to check on
geochem anomalies near Kinsbuck Lake.
Party B completed 6 l i n e s over Anomaly #1 with the JEM
1800-3600 cps unit when the instrument ceased to work. The one cable was
shorting and batteries were dead. The cable has been fixed and new
ba t t e r i e s ordered. Small disturbances show up on the EM p r o f i l e s with
a maximum range to any p r o f i l e of -3 to +6 over a distance of 400 f e e t .
( P r o f i l e s are attached to th i s r e p o r t ) . A p r o f i l e was run over the
Eden deposit (250,000 tons) and the Bonanza deposit - these were
compared with those on Anomaly #1. The maximum range over these deposits
were -14 to +18 and +9 to 8 r e s p e c t i v e l y . If these can be used as a
measure of the importance of the readings on Anomaly #1, then the
l a t t e r would seem i n s i g n i f i c a n t . I f we consider depth of b u r i a l we
can see from the experimental p r o f i l e s that as depth increases, the
p r o f i l e becomes more and more negative. The p r o f i l e over Anomaly #1 i s
mostly p o s i t i v e . In any case, when weather permits, we w i l l rerun Line 22
y - 3 - i
and possibly 3D at 200-foot spacing as before but readings at 50 f e e t .
This crew did further work on Donahus Creek. They
located narrow discontinuous lenses of chalcopyrite mineralization
disseminated in schistose volcanic rocks associated with small shear
zones. These are not extensive - the occurrence i s s i m i l a r to that
an Mt. Clashmare, A gossan on the east side of the south branch of
Donahue c a r r i e d f a i r l y massive chalcopyrite over a length of 40 feet and
reported width of 18 inches. The occurrence i s on a c l i f f face and
not e a s i l y reached. Scott feels a rope and good weather i s necessary
to examine i t properly. We have the rope but not the weather. The
ridge has been fogged i n and I have not examined i t . Float heavily
mineralized with chalcopyrite was found further up Donahue Creek. This
also requires good weather to reach the c l i f f s from which i t i s believed
to have f a l l e n . These two s i t u a t i o n s w i l l be examined at the f i r s t
opportunity. I should add that there i s no d e f l e c t i o n on the aeromag
tape i n t h i s area.
Scott &. Doug were put i n to the west Bonanza Creek area to
check out a s e r i e s of copper s i l t anomalies. They found discontinuous
scattered areas of chalcopyrita mineralization i n the schistose volcanic
rocks. They had not completed the examination as of the 15th.
< Party C completed the Sutton River area. The only mineral
i z a t i o n found had been staked on May of t h i s year. It consisted of
disseminated chalcopyrite with aome galena i n argillaceous sedimentary
rocks. It i s exposed on a c l i f f 500 feet above the v a l l e y f l o o r .
Mineralization does not appear extensive.
They continued to explore the south Georgia River area.
Soma disseminated chalcopyrite in black a r g i l l i t e occurs adjacent to
the contact with a granodiorite i n t r u s i o n . This has not been found to
be extensive. They are now working south of the Kshwan River east of
Hastings Arm.
On August 4th, I staked 9 claims on a large gossan area
on UppKr Todd Creek. From a b r i e f examination of the claimB before
poor weather chased us out, i t appears that an intensely a l t e r e d
and bracciated l e v c o c r a t i c i n t r u s i o n has invaded Hazelton Group volcanic
rocks. These con s i s t of bedded t u f f s , agglomerate, and lavas. There
does not appear to be an extensive development of hornfels as one
might expect. In f a c t , the agglomerates are f a i r l y unaltered.
Mineralization i s mainly massive to coarse c r y s t a l l i n e
p y r i t e i n areas of c r i s s - c r o s s i n g veins trending westerly and northwesterly
and as disseminated p y r i t e cubes throughout the i n t r u s i o n . Chalcopyrite
i s present but notabundant. A massive vein of chalcopyrite 2 inches
wide by several feet long occurs i n one place, i n another outcrop i t
may be with p y r i t e . The streams draining the occurrence have been s i l t e d
and samples sent i n . Outcrop i s almost continuous but the upper or
westerly part runs under a g l a c i e r . It would be an easy matter to put
one or two winkie d r i l l holes down to see what the copper content might
be - c e r t a i n l y on the surface i t w i l l be low. Samples have been taken
f o r assay f a r Cu, Ag, Au.
1
Stan Maurer axxived on the 5th of August to complete
tho aeromag survey southeast of B.C. Moly. At that time the Prince
Rupert weather report was for c l e a r weather and a high pressure area
moving northward was to keep i t that way. After 6 days of r a i n and
a short course to me in operating the mag gear, Stan l e f t for
Vancouver. It does not look l i k e t h i s survey w i l l get done.
GEOCHEMISTRY:
On t h i s l a s t batch of s i l t s we have been having some
problems with the f i e l d k i t s , p a r t i c u l a r l y noticeable with Party B
where there i s carisiderable widespread copper in the rocks throughout
the area. To better i l l u s t r a t e the problem, I have l i s t e d below the
samples, nature of the t e s t , and lab r e s u l t s .
Samplei Nta. F i a l d Test Lab Test
B69-232 . Pink (+) 57 ppm 231 Green (-) 133 ppm 230 « 170 ppm 24B Pink (+) 65 ppm 227 " 61 ppm 222 Green (-) 105 ppm 225 " 122 ppm 214 « 100 ppm 244 Pink (+) 70 ppm
pH of streams i s i n the 5 - 7 range. I t appears that i n
the range 50 to 70 ppm the f i e l d t e s t i s s e n s i t i v e ; above t h i s there
i s no reactio n .
- 6 -
PLANS FOR NEXT PERIODi
1) Check out geochemical anomalies.
2) Examine the copper showing on Donahue Creek.
3} Continue exploration south of the Kshwan River and the South
Portland Canal area.
4} Weather permitting, complete the EM survey on Anomaly #1.
5) Close camp at the end of the month. Arrangements have been made
to ship out the gear on Sept. 2nd.
6} A l l the crew except Wilf and Cap w i l l leave here Sept. 1st.
7) Complete a map on the Todd Creak^if weather permits.
(signed)
John C. Lund.
JCL/ik
UG IS
TO: W. M. SIROLA
FROM: J. C. LUND
SUBJECT: PORTLAND CANAL PROJECT - Exploration Report, Period Ending July 31st, 1969.
J.H.S. P.M.K. R.D.S. B.C.B. I.O.B. G.M.H. P.K.
Exploration continued t h i s period with l i t t l e success.
Party B located scattered chalcopyrite along a north-northwesterly
shear zone on Mt. Clashmore. This, however, was confined to a
2 to 4-foot wide zone possibly 100 feet long. The mineralization
died out both to the northwest and southeast.
I examined a gossan area on Todd Creek that c a r r i e d a
l i t t l e c h alcopyrite. Mors work i s anticipated here. Party C
located chalcopyrite and galena over an area , on
the Sutton River but found i t was already held as of May, 1969.
Party A located high grade Ag-Pb f l o a t on a t r i b u t a r y of
Roosevelt Creek but could not locate the source. The boulder was
12" x 18" in s i z e .
Weather during t h i s period remained unsettled. I understand
low clouds, fog, with periods of r a i n and an occasional sunny day i s
t y p i c a l of the weather i n t h i s region. It c e r t a i n l y remained true
to form th i s period.
Party A completed exploration east of the K i t s a u l t River.
Wilf has produced an excellent geological map of the area but did not
f i n d any miner a l i z a t i o n . The area i s underlain by HezeltDn group
volcanic and underlying sedimentary rocks. These appear to be intruded
by a basic rock co n s i s t i n g e s s e n t i a l l y of augite phenoerysts i n a
dark green groundmass. It has been c a l l e d an augite porphyrite in
older government reports. On July 25th this crew was moved to
B i t t e r and Roosevelt Creeks to check the western slopes of the
Cambria Range. The country i s extremely rugged in Upper B i t t e r
Creek and Wilf and Cap were unable to prospect much of the area.
On a t r i b u t a r y of Roosevelt Creek they found widely
spaced quartz veins that carry chalcopyrite. These are narrow
and widely spaced - they are of no economic i n t e r e s t .
Party B continues to explore thr 5outh Portland Canal
area. On the western slopes of Mt. Clashmore there i s scattered
occurrences of disseminated chalcopyrite in a pde green c h l o r i t i c
volcanic rock. On the northwest side there i s exposed disseminated
and blebs of chalcopyrite in a narrow f a u l t zone. The exposure i s
about 100 feet long and possibly 2 feet wide. The area was c a r e f u l l y
examined on the surface and aeromagnetameter tapes checked. There
i s no i n d i c a t i o n that a bigger deposit may occur here. 5ome lead
and copper f l o a t was found i n the south branch of Donahue* Creek.
Further work i s anticipated here.
Three long EM traverses were made on a reconnaissance basis.
There was some v a r i a t i o n but no d i s t i n c t crossovers. On July 27th (
Party B was moved to Anomaly #1 to do an EM survey with the JEM
1800 - 3600 machine. This work has yet to be completed.
Party C checked a magnetic anomaly between the Sutton and
East Georgia River. It was caused by a strongly magnetic dyke rock.
Gn the Sutton River they located an occurrence of chalcopyrite and
galena but found i t was already staked, - staking date, May, 1969.
They checked out an area south o f the Georgia River with no success.
Exploration on th i s northern area is almost completed.
I located a f a i r l y extensive p y r i t i c zone on the west side
of Upper Todd Creek that c a r r i e s a l i t t l e c h a l c o p y r i t e . The rock
hosting the p y r i t e looks l i k e an a l t e r e d , and i n places brecciated
int r u s i o n invading purple volcanic agglomerates t u f f s and flaws.
The c r i s s - c r o s s i n g veins of p y r i t e are up to 6 H across and are
generally coarsely c r y s t a l l i n e . The disseminated p y r i t e i s i n cubic
form. Further work w i l l be done and the area staked next period.
PLAN5 FOR NEXT PERIOD:
Much of th i s coming period w i l l be spent checking s i l t anomalies and
cleaning up unexplored corners in the south and north Portland Canal
areas.
Party A w i l l be m oved to the Todd Creek area to check on reported
i n t r u s i o n s .
The geochem anomaly indicated by s i l t s #B69 - to B69- occurs on
the southeast slopes of Mt. Courtney. This area w i l l be checked
thoroughly.
Weather permitting, an aeromsg survey w i l l be flown southeast of
B.C. Moly.
(signed)
John C. Lund.
JC£/lk
JUL 31 1969
•ft
TO: W.M.SIROLA
FROM i J.C.LUND
SUBJECT: PORTLAND CANAL PROJECT - Exploration Report, Period Ending July 15th. 1969.
Work during th i s period was hindered fay adverse weather.
Low cloud, fog, wind and r a i n prevailed during the i n t e r v a l July 6
to July 15 and i t was not possible to reach crews to move them when
and where wanted.
On July 5th the helicopter was grounded when the super
charger started making a peculiar noise. The machine was not oper
ative again u n t i l July 11th. Apparently Trans West had sent a new
bJLower via C P . A i r express AOG to ensure that i t would get d e l i v e r y
p r i o r i t y . However, i t was held by C P . A i r f o r three days before
being shipped. It would aeem that i t doesn't matter whether you
have an AOG stamp or not CP,A. w i l l bump i t as they please.
Vancouver Island Helicopterswae brought i n to move crews
on July 7th, when i t was apparent that our own machine would not be
fi x e d within the next two days end aleo the weather had cleared
s u f f i c i e n t l y to move crews.
Party A completed work i n the White and F l a t River areas
with no encouragement and were moved south into the Jade Lake area.
They are continuing to work southward from Jade Lake following the
volcanic-sedimentary contact,From his work Wilf has found two sed
imentary units separated by a volcanic u n i t . Ths volcanic rocks
con s i s t of flaws and agglomerates conformably and i n places grading
into the underlying volcanic sediments and sedimentary rocks. Nick
Carter of the B.C. Dept. of Mines f e e l s that there i s a d i s t i n c t
d ifference between the upper Bowser sediments and the lower sedim
entary unit which he f e e l s i s part of the Hazelton Group. Whether
t h i s has any s i g n i f i c a n c e economically may be questionable. The
s i l v e r and copper bel t s i n the K i t s a u l t River area would be i n
Hazelton rocks, the Moly deposits to the south would ba i n the
Bowser rocks. Party A have found nothing during this period.
Party B continues to work the Bonanza River drainages.
They also checked out an aeromag anomoly U. of Carney Lake east
of the Hidden Creek Mine (Anomoly #4). Anomoly #4 was caused by a
fine grained d i o r i t e plug cutting argillaceous sediments. The
d i o r i t e i s a clean rock with no sulphides associated with i t . I t
did however carry disseminated magnetite that attracted the magnet
rather strongly.
Four E.M. traverses are to be run over parts of the
Bonanza basin on a reconnaissance basis designed to cross a major
N-South f a u l t near a small d i o r i t i c i n t r u s i o n . Nothing of i n t e r e s t
has been found by Party B.
Party C further explored the Brown Mtn molybdenum showing
near i t s base but found nothing further. Because of low cloud we
were unable to move them in t o the Sutton River to check f o r a
passible NE extension to the mi n e r a l i z a t i o n . This w i l l be done next
period. They examined the East Georgia River with no success.
I made a reconnaissance t r i p along the eastern margin of
the mountains batween B e l l Moly and Megiadrin Lake. The topography
f l a t t e n s somewhat but there would be only a small area that could be
flown with s t r a i g h t l i n e s . Any aeromag work would have to be on
contour. The r i v e r s are f a s t flawing and generally f a i r l y deep.
Much of the ground i s heavily wooded. Gravel bars or swamps would
provide the only landing spots for s e t t i n g crews i n f o r follow up
work.
I made a second reconnaissance t r i p south to the Mass
River. During t h i s t r i p I looked at a small quartz d i o r i t e plug
intruding Bowser sediments. The plug occurs on the south east side
of Hoan Creek at about the 4,500 f t . e l e v a t i o n . I t i s cut by north
easterly quartz veins that c a r r i e s rosettes of molybdenite. The
quartz veins are f a i r l y widely spaced and grade i s low. The intruded
rock i s hornfelsed and i n places i s criss-crossed by quartz veins,
some of which carry molybdenite. This showing was staked and dropped
by B e l l Molybdenum. No work has been done on i t .
Plans for next Period:
1} Continue exploration on the three f r o n t s .
2) Fly an areomagnatic survey over the area between B.C.
Moly and the Mass River to the south east. This should be done
ei t h e r t h i s coming period or f i r s t part of the following period.
(signed)
John C. Lund.
JCL/ejh
P. M- Ztf
JUL .41969
TO: W. M. SIROLA
FROM: J . C. LUND
SUBJECT: Portland Canal Project - Exploration Report, Period Ending June 30th. 1969.
Work continued i n three areas: a) the north K i t s a u l t ,
b) south Portland Canal, and c) the north Portland Canal. Weather
during the period was mixed. Low cloud and early morning mists
hindered free movement by the helicopter and crews occasionally had
to wait f o r a day to be moved. About 6 man-days were l o s t because of
r a i n .
Party A continues to work the north K i t s a u l t River s e c t i o n .
Work has been concentrated along sedimentary - volcanic contacts. The
area i s underlain by a n d e s i t i c t u f f s and lavas that are o v e r l a i n by
arg i l l a c e o u s sediments. The sediments include some sandstones and a
basal f o s s i l i f e r o u s calcareous u n i t . Near the White River g l a c i e r , the
sediments are intensely folded with numerous small f a u l t s d i s s p l a c i n g
the units along the a x i a l plane of some of these t i g h t f o l d s . Cutting
bath sediments and volcanics axe l i g h t coloured f i n e granular a c i d i c
dykes and s i l l s . The s i l l s i n part follow bedding i n the folded sediments.
No mineralization has been found associated with these dykes. Party A
examined a sma 1 quartz d i o r i t e plug near the White River that has some
MoS2 on f r a c t u r e s . This occurrence i s at present held by KBnnco. It
i s sparsely mineralized with p y r i t e and MoS2. Nothing of i n t e r e s t
has been found by Party A.
m 2 -
Party B checked out an aeromag anomaly on the southwest
branch of Bonanza Creek and one on the northwest branch of Bonanza
Creek (Anomaly #2 and Anomaly #3). Number 2 anomaly appears to be
caused by magnetite i n a fine-grained phase of a large granodiorite
mass. It occurs near the contact with volcanic rocks at the i n t e r s e c t i o n
of a northerly and a northwesterly f a u l t . The magnetite occurs with
epidote i n f i n e v e i n l e t s cutting the finer-grained i n t r u s i o n . One
v e i n l e t up to 1/4" wide of massive magnetite was seen. There i s no
evidence of any copper mineral. The int r u s i o n i s cut by westerly
s t r i k i n g , steeply dipping andesite dykes. Snow i n the creek prevented
a good examination of the v a l l e y f l o o r .
Anomaly #3 occurs on the south slopes of Mt. Clashmore
northeast of Bonanza Lake, This area marks the i n t e r s e c t i o n of the
Bonanza Creek f a u l t with a prominent north-south f a u l t . An i n t r u s i o n
that forms Nt• Clarkmore cuts both sedimentary rocks and c h l o r i t i c s c h i s t s .
Small amounts of chalcopyrite with p y r i t e and/or pyrrhot i t e have been
found i n several places. More d e t a i l e d examination, including some
E.M. traverses w i l l be done here. The anomaly i s believed caused by
a highly magnetic rock picked up i n the anomalous zone. There does not
appear to be any r e l a t i o n between the anomaly and the small copper
occurrences so far located. This party also located a small d i o r i t e
plug, carrying small rosettes of molybdenite and disseminated p y r i t e .
Main a l t e r a t i o n i s s e r i c i t e . M i n e r alization i s sparse. Party B w i l l
continue to work t h i s area.
- 3 -
Party C located a quartz monzanite i n t r u s i o n carrying
rosettes and coatings of MoS2 on widely spaced f r a c t u r e s . The
fractures average possibly one to three fractures every 6 feetj not
a l l fractures are mineralized. The Mo52 occurs on two sets of fractures
along a major northerly break and along a 100-foot wide fracture zone
running northeast. Mineralization i s sparse but t h i s party w i l l continue
to examine the area c a r e f u l l y . The occurrence i s at the toe of a g l a c i e r
on the south slope of Brown Mountain, North of Ashwood Lake. I spent
two days on the showing.
AerQmaq Survey;
Correlation of eeromag tapes with known geology i s continuing.
In the south region, the following has been found:
1) At l e a s t one mag high south of Donahue Creek c o r r e l a t e s with an area
underlain by ser p i n t i n e and s e r p i n t i n i z e d rock that i s strongly magnetic.
2} The g r a n i t i c rocks tend to have a high magnetic background and produce an
i r r e g u l a r p r o f i l e on the tapes,
3) Schistose volcanic rocks produce a law even magnetic p r o f i l e .
4) Volcanic rocks produce a ©month p r o f i l e with a s l i g h t l y higher background
than the s c h i s t s .
5) C h l o r i t i c s c h i s t s are s i m i l a r to volcanic rocks.
6) 5edimentary rocks i n the Anyox area have a background about 75 gammas
higher than volcanic rocks.
- 4 -
The above observations are based on the geology provided
by the f i e l d crew, helicopter traverses and the geology as mapped by
the Government. As we gain further information from the f i e l d party,
the picture may change.
The north area i s d i f f i c u l t to analyze because of tha highly
i r r e g u l a r p r o f i l e s produced by much of the survey.
PlansM,fp.y..,n.ext Periodi
1) Party A w i l l be moved to the area south of Kshwan River.
2) Party B w i l l continue to examine the Bonanza Creek area.
3) Party C w i l l continue to work the Sutton River and East Georgia River
area.
(signed)
John C. Lund.
JCL/lk
j m n 17 1969n Be . 4 K E R R A D U I S O N M I N E S L I M I T E D
(FOR INTER-OFFICE U S E ONLY) JLH.S.
P- M. Kavanagh From W ML. S i r o l a
/
.Portland. Can a 1 P r o j e c t Date. ...J.un&.J..6/_6_g_.
E n c l o s e d h e r e w i t h i s a p r i n t of t h e ae r o m a g n e t i c p r o f i l e s over the Anyex Mine. I t i s a t e x t b o o k example of the k i n d of performance we l o o k f o r w i t h t h i s equipment.
John mentions t h a t a t l e a s t two d i s t i n c t a n o m a l i e s o c c u r i n the s o u t h a r e a but he has not i n c l u d e d p r o f i l e s t h e r e o f .
A p p a r e n t l y the n o r t h a r e a i s mare d i f f i c u l t t o i n t e r p r e t .
I w i l l l e a v e f o r t h i s p r o j e c t tomorrow and I e x p e c t t o be t h e r e a t l e a s t t h r e e days.
W. M. S i r o l a
WMS/lk E n d .
> s
Speed — — npH
JUN 24 1969
TO: W. M. SIROLA
FROM: J . C. LUND
SUBJECT: Exploration Report - Portland Canal Project, Period Ending June 15th, 1969.
j.H.S. }
P.M.KT
R.D.S.
8.C.B. I.D.B. GM.H. P.K.
Despite low l y i n g fog and r a i n , a l l crews were put
into the f i e l d June 1st. The weather cleared on June 4th and has
remained hot and sunny.
Party A (Wilf C h r i s t i a n and Cap Cornwall) were put
into the east branch of the Kshwan River north east of Hastings Arm.
Much snow s t i l l remains above the 2500-foot elevation, hence prospecting
i s l i m i t e d to the lower v a l l e y s . Topography here i s extremely rugged
i n part and t h i s combined with f a s t running streams and heavy under
brush maker; exploration d i f f i c u l t , p-arty A i s at present at th" toe
of the K i t s a u l t G l a c i e r . They have been i n what i s considered good
geology but have found l i t t l e other than a trace of cha l c o p y r i t e . Rocks
encountered are ande s i t i c volcanic rocks and argill a c e o u s sediments that
have been cut by d i o r i t e and quartz d i o r i t e . There i s a number of quartz,
and q u a r t z - c a l c i t e veins but other than a l i t t l e p y r i t e , these are
barren. As snow conditions permit, they w i l l work south along the
sedimentary volcanic contact west of the K i t s a u l t River.
Party B (Scott Boyd and Doug Fraser) have been working the
South Canal area, along Donahue Creek. Traversing i s rough because of
underbrush, steep c l i f f s and f a s t running creeks but work has been
progressing s a t i s f a c t o r i l y . Rocks encountered to date include g r a n i t i c ,
a n d a s i t i c volcanic rocks, c h l o r i t i c d i o r i t e and d i o r i t e dykes (?).
Some copper occurs along occasional shear zone but nothing of s i g n i f i
cance has been found.
Party C i s working.the North Canal area s t a r t i n g with
the Georgia River v a l l e y . Some pyrrhotite with p y r i t e and chalcopyrite
have been found i n quartz veins but these can be considered hardly more
than traces of ch a l c o p y r i t e . Rocks h&re are mainly volcanic with a
quartz monzonite dyke-like intrusions c u t t i n g them.
Both Party B and C w i l l be checking aeromag anomalies next
period.
The aeromag survey wen- very w e l l . Fred Young, the p i l o t ,
did an excellent job of keeping or maintaining constant altitude. The
weather was perfect. A complete study of the aeromag tapes hasn't been
completed. There are at l e a s t two i n t e r e s t i n g anomalies i n the south
region. Party B ran a ground magcrometer survey over one to define
i t and we ran three E.M. l i n e s across the anomaly. There was very l i t t l e
v a r i a t i o n i n the E.M. readings. Several s o i l samples were c o l l e c t e d
across the area. Some copper was found i n a s l i g h t l y schistose rock
but otherwise rock examined was barren. Very l i t t l e magnetic rock was
found.
A l i n e across the Anyox deposit from east to west and one
from north to south was flown. These Show up the Anyox deposit vary
d i s t i n c t l y .
Stan Maurer and the mag gear complete with boom, was shipped
d i r e c t l y from the camp here to Fred's camp by a Trans P r o v i n c i a l A i r
Services Cessna 180. Considering the possible tie-up that could
evolve by shipping part of the gear by truck and the r e s t by a i r , I
f e l t i t best to have him f l y d i r e c t to L i t t l e Salmon Lake. 5tan l e f t
here June 12th.
PLANS FOR NEXT PERIOD;
Keep Party A i n the K i t s a u l t River area prospecting contact areas
between the volcanic and sedimentary rocks.
Continue prospecting and checking anomalies i n both the south and
north canal areas.
(signed)
John C. Lund.
JCL/lk
ft* 1 6 1969 K E R R A L L I S O N M I N E S L I M I T E D
(FOR INTER-OFFICE U S E ONLY) * he. 3
.fjt„M.-..J<a.yanaS_b_ From. W?..M.. S i r o l a _ _ . /
-Pux.tXan.d-.Qaaa.1 . P r o j e c t . - Radio Communication Date... June 13/69_
John Lund can be r e a c h e d t h r o ugh Vancouver Radio by a s k i n g f o r Ford Radio on c h a n n e l s 1 o r 7. John would be l i s t e n i n g out from 8:00 t o 9:00 A.M. and 7:00 t o 8:00 P.M. Vancouver time on f r e q u e n c i e s o f 6790 or 4573.5 K c ' s .
W. M. S i r o l a .
WMS/lk
K E R R A D D I S O N M I N E S L I M I T E D JUN -4196S (COR I N T E R - O F F I C E U * E O N L Y )
To
Subject.
From.
Portland Canal jact - 6i>noral Info Date
4 Jep June 3/69
The fallowing message was received by WMS from "Ford" Radio in the Portland Canal Area.
Message was received on 5SB channel 6790 - Vancouver on June 2/69 evening.
1) Proposed radio schedula:
8:00 - 9:00 A.M.
7:00 - 8:00 P.M.
Send 12 f e l t pens - '7y^t^C6? Z-^
Send 2 only #490 Eveready Batteries f a r PRT-20
Send 1 only Hydrometer
/ ftt* IM.
Send 3 only topographic maps - 103-P (1" » 4 miles) -^iC^-<^>^^<V^-<>-5S<^
/ l k
J k - 2 1969
TO:
FROM;
SUBJECT:
M. SIROLA
J. C. LUND
Exploration Report - Portland Canal Project, Period Ending May 31st, 1969.
The crew l e f t Vancouver via CP.A. f o r Stewart on
May 26th at 7:30 A.M. and arr i v e d i n Stewart at about 10:30 A.M.
The helicopter a r r i v e d i n Stewart on the 24th of May.
Movement of f u e l and camp gear went as scheduled. There
was a delay i n t r a n s f e r r i n g our gear from the Northland ship to the
barge i n Rupert. This may r e s u l t i n an increased charge on the barge *
I won't know u n t i l we get North Arm Transportation i n v o i c e . Northland
informed Sid Jacks, the North Arm Transportation manager i n Rupert,
that the barge could put alongside the ship at 1:30 P.M. to transfer
the gear. It was not u n t i l between 7:15 P.M. and 7:45 P.M. that the
transfer was made. We drank a l o t of coffee that afternoon.
The barge arr i v e d at Fords Cove May 27th at high t i d e but
the t i d e was only a 16-foot tide and the barging dock at Fords Cove
could not be used. A l l the gear had to be slung to shore by h e l i c o p t e r .
Weather was good during the unloading and the move didn't take long.
May 28th to 30th was spent building camp. Rain, low clouds
and wind had moved i n but we were able to put the crews out on June 1st.
(continued - Page 2)
Arrangements have been made with Granduc Mines Ltd.
geologist E r i c Ostensoe to use t h e i r radio as an o u t l e t to Stewart.
They have a 2768 frequency and a d a i l y standby time and are w i l l i n g
to paes on any messages.
(signed)
John C. Lund.
JCL/lk
P. K. K
". . . :- C . . . - Por t ! . i \ . :.. roj , .. rch 24, i. '
U .. : f r < . . . . . . four ........ ..... af . fs a . i.. to3 .. .; ..•.. r co;t£r&et which you enclosed with your meraoraitsium of Ha rch 14̂ and which
v."2 w i l l expect you to return one of the copies to t h i s o f f i c e
tfr P- H« Kevanagh
K E R R A L I S O N -MINES L I M I T E D ^ (FOR INTER-OFFICE u i Z ONLY) V V ^ " ^
-P_*--iYL..Ka_vanagh From W. M. S i r o l a c c M w i ft , 0
P o r t l a n d C a n a l P r o i e c x - • " •" ' --;
£ r e s z a c,tor_I.5-_Aar_e_ejTLe.at.... . Date i-ebruary 17, 1969.
E n c l o s e d a r e 4 c o p i e s o f our P r o s p e c t o r s Agreement w i t h W i l f r e d C h r i s t i a n . The agreement c a l l s f a r a term of 5 months a t a s a l a r y o f $600.00 p e r month. Would you k i n d l y s i g n t h e documents and r e t u r n a l l 4 c o p i e s t o t h i s o f f i c e f o r W i l f ' s s i g n a t u r e We w i l l t h e n r e t u r n one copy t o you and d i s t r i b u t e t h e o t h e r s as r e q u i r e d .
*Xc<*fifCS sOt/t £+»/2( 6# &l
W. M." S i r o l a .
WMS/lk E n d . (4)
To
Subject-
flPR " 3 1969 K E R R A D D I S O N M I N E S L I M I T E D
(FOR INTEB-OFF1CE U S E ONLY) 0~fj Q
P C
P. H. K a v a n a g a F r o m W. H. S i r o l a fa
Portland Canal Project - Helicopter Contract Bntp *E*iLJLt_
Enclosed please f i n d the f i r s t copy of t h i s contract
which has been signed by yourself and Mr. James of Transwest ^
Helicopters.
W. M. S i r o l a .
WMS/lk
Encl.
THIS AGREEMENT made t h i s 14th day of March i n the year of our Lord one thousand nine hundred and s.ixtx rsnina, _ _ __, ^
BETWEEN: KERR ADDISON MINES LIMITED, i n ) A r v r N , | U 405 - 1112 West Pender St., l" ^PR ^ ^ 6 9 Vancouver 1, B. C. KERR ADDISON MINES LTD,
Per. ( h e r e i n a f t e r c a l l e d 'the C h a r t e r e r 1 )
OF THE ONE PART
A N D : TRANSWEST HELICOPTERS (1965) LTD., Vancouver A i r p o r t , i n the P r o v i n c e of B r i t i s h Columbia
( h e r e i n a f t e r c a l l e d fthe Operator')
OF THE OTHER PART:
WHEREAS:
(a) The C h a r t e r e r i s d e s i r o u s of o b t a i n i n g the use of a h e l i c o p t e r f o r the t r a n s p o r t a t i o n of personnel and equipment i n the a d m i n i s t r a t i o n of i t s a f f a i r s i n the Province of B r i t i s h Columbia.
(b) The Operator i s the l i c e n s e d o p e r a t o r of h e l i c o p t e r s w i t h a base at Vancouver, B 0C.
(c) The Operator i s w i l l i n g to supply to the C h a r t e r e r , f o r i t s e x c l u s i v e use, one G3B1 h e l i c o p t e r w i t h crew and to operate and maintain such a i r c r a f t on the terms and c o n d i t i o n s h e r e i n s e t f o r t h .
WITNESSETH THAT i n c o n s i d e r a t i o n of the f o r e g o i n g r e c i t a l s and of the terms and c o n d i t i o n s h e r e i n a f t e r contained, the P a r t i e s hereto agree one w i t h the other as f o l l o w s : 1. The Operator w i l l p r o v i d e one G3B1 H e l i c o p t e r ( h e r e i n a f t e r c a l l e d 'the H e l i c o p t e r * ) i n the f i r s t - c l a s s c o n d i t i o n and d u l y c e r t i f i e d airworthy by the Department of Transport, t o g e t h e r with the necessary spare p a r t s , f o r e x c l u s i v e use by the C h a r t e r e r i n the a d m i n i s t r a t i o n of i t s a f f a i r s f o r the p e r i o d commencing on or about May 15th, 1969 and not l a t e r than, the 1st day of June , J 96_9_ f o r a p e r i o d of 3 months„
2. The H e l i c o p t e r w i l l be a v a i l a b l e to the C h a r t e r e r on the date s p e c i f i e d at the Operator's base i n Hazel ton, B#C.
3. The Operator w i l l f u r n i s h f o r the o p e r a t i o n of the H e l i c o p t e r , one ( l ) q u a l i f i e d P i l o t and one ( l ) q u a l i f i e d A i r Engineer, competent to maintain same. Such p e r s o n n e l s h a l l , n o t w i t h s t a n d i n g anything to the c o n t r a r y h e r e i n contained, be and continue to be deemed to be, during the currency of the Agreement, employees of the Operator.
4. The Operator's P i l o t and A i r Engineer w i l l at a l l times during the currency of t h i s Agreement c a r r y out and observe and abide by the orders, d i r e c t i o n s , and r e g u l a t i o n s given or made by the C h a r t e r e r i n res p e c t to the work to be done by the H e l i c o p t e r as long as same s h a l l
- 2 -
be i n compliance with the p r o v i s i o n s of the A e r o n a u t i c s Act and Regul a t i o n s thereunder, SUBJECT HOWEVER, to the p r o v i s o contained i n Clause 13 t h e r e o f , i t being at a l l times understood and agreed t h a t unless otherwise agreed by the P a r t i e s hereto i n w r i t i n g , a l l f l i g h t s of the h e l i c o p t e r hereunder e x c e p t i n g t e s t f l i g h t s s h a l l be made only at the d i r e c t i o n s or under the a u t h o r i t y of such o f f i c e r s or r e p r e s e n t a t i v e s of the C h a r t e r e r as the C h a r t e r e r s h a l l designate i n w r i t i n g from time to time.
5. The Operator's P i l o t and A i r Engineer w i l l , from the day of assumption of t h e i r r e s p e c t i v e d u t i e s hereunder and during the currency of t h i s Agreement, devote t h e i r f u l l time and a t t e n t i o n to t h e i r d u t i e s and w i l l do a l l t h i n g s i n t h e i r r e s p e c t i v e powers to promote the C h a r t e r e r ' s work.
5 (a) The Operator's P i l o t and A i r E n g i n e e r w i l l be s u b j e c t to the approval of the C h a r t e r e r both i n i t i a l l y and at a l l times d u r i n g the c h a r t e r p e r i o d .
5 (b) The Operator w i l l , a t a l l times, use every reasonable means w i t h i n i t s power to m a i n t a i n complete s e c r e c y i n r e s p e c t to a l l the C h a r t e r e r ' s o p e r a t i o n s hereunder, and to e f f e c t such maintenance of secrecy by i t s o f f i c e r s and s e r v a n t s .
6. The Operator w i l l , d u r i n g the c u r r e n c y of t h i s agreement, comply w i t h a l l the requirements of the Department of T r a n s p o r t and the A i r T r a n s p o r t Board, r e l a t i n g to the o p e r a t i o n and maintenance of the H e l i c o p t e r , and w i l l d e f r a y a l l expenses i n c i d e n t a l t h e r e t o except as h e r e i n p r o v i d e d :
7. The Operator w i l l , d u r i n g the currency of t h i s agreement, insure and keep insured the H e l i c o p t e r a g a i n s t the f o l l o w i n g r i s k s i n the f o l l o w i n g minimum amounts r e s p e c t i v e l y :
Passenger L i a b i l i t y - $200,000. per passenger s e a t .
P u b l i c L i a b i l i t y ) _ | 2 5 Q Aggregate P r o p e r t y Damage ) ? fe& &
8. The l i a b i l i t y of the Operator and the P i l o t and A i r Engineer f o r the a r i s i n g out of any i n j u r y or death s h a l l be l i m i t e d to the maximum amount of passenger l i a b i l i t y i nsurance agreed to be maintained by the Operator as above, and the C h a r t e r e r w i l l indemnify the Operator from and a g a i n s t payment of any amounts i n excess t h e r e o f which, i n consequence of f i n a l judgment of a competent Court, the Operator or i t s P i l o t and A i r Engineer may be ordered to pay.
9. The Operator w i l l a t a l l times h e r e a f t e r keep the C h a r t e r e r indemnified a g a i n s t a l l l i a b i l i t y which may be imposed upon the Charterer f o r l o s s or damage to p r o p e r t y , or r e s u l t i n g from b o d i l y i n j u r y to or death of any person or persons (other than a passenger or passengers being c a r r i e d i n or upon or e n t e r i n g or g e t t i n g on to or a l i g h t i n g from the H e l i c o p t e r ) , a r i s i n g from the use of o p e r a t i o n of the H e l i c o p t e r under t h i s Agreement.
10. The Charterer may i n s u r e i t s e l f against any r i s k imposed upon i t hereunder independently of insurance a g a i n s t such r i s k c a r r i e d by i t
- 3 -
as a f o r e s a i d , but a l l premiums and charges i n c i d e n t a l to t h i s clause s h a l l be p a i d by the C h a r t e r e r .
11. The Operator w i l l d u r i n g the currency of the agreement c a r r y and continue to c a r r y Workmen's Compensation on i t s P i l o t and Engineer under the p r o v i s i o n s of the Workmen's Compensation Act of B r i t i s h Columbia, and s h a l l indemnify the C h a r t e r e r i n r e s p e c t of any l o s s from i t s f a i l u r e to do so,
12. The Operator w i l l , d u r i n g p e r i o d s when the H e l i c o p t e r i s not engaged i n o p e r a t i o n s hereunder, c a r r y out such r e p a i r s and maintenance thereof at the hands of i t s A i r Engineer as s h a l l be n e c essary to keep the H e l i c o p t e r i n airworthy c o n d i t i o n , and the C h a r t e r e r s h a l l so arrange and a l l o c a t e work and d u t i e s to be performed by the Operator's P i l o t hereunder th a t reasonable time s h a l l be a f f o r d e d f o r t h i s purpose.
13. The C h a r t e r e r w i l l l a y out f o r the Operator from time to time and i f p o s s i b l e i n advance, a programme of work to be c a r r i e d out by the H e l i c o p t e r , and w i l l d e s i g n a t e to the P i l o t the time, the general route of f l i g h t to be used, and the extent t h e r e o f , PROVIDED HOWEVER, and i t i s hereby understood and agreed t h a t the Operator's P i l o t s h a l l have the r i g h t at a l l times to decide on the c o m p o s i t i o n s weight and stowage of any cargo to be c a r r i e d by the H e l i c o p t e r and of s u i t a b i l i t y of weather c o n d i t i o n s f o r f l i g h t and of a l t i t u d e and speeds of f l i g h t and i f l a n d i n g s are to be made, the l o c a l i t i e s t h e reof to be chosen.
14. The C h a r t e r e r w i l l supply at no expense to the Operator, a l l of the g a s o l i n e and o i l r e q u i r e d on each o p e r a t i o n .
15. The C h a r t e r e r w i l l f u r n i s h the P i l o t and A i r E n g i n e e r of the Operator and any other of the Operator's p e r s o n n e l r e q u i r e d on the o p e r a t i o n w i t h f r e e board and l o d g i n g s i m i l a r to th a t of the C h a r t e r e r ' s own crew f o r the term of the C o n t r a c t .
16. The C h a r t e r e r w i l l , at no cost to the Operator, move the Operator's p e r s o n n e l , equipment, parts and spares r e q u i r e d on the o p e r a t i o n , from the end of normal means of t r a n s p o r t a t i o n to and from the o p e r a t i o n a l bases e
17. The C h a r t e r e r w i l l pay to the Operator by way of remuneration f o r the use of the H e l i c o p t e r and crew and the s e r v i c e s agreed to be rendered hereunder by the Operator, the f o l l o w i n g amounts: -
The a p p l i c a b l e r a t e s and charges as s p e c i f i e d i n the approved t a r i f f s c h e d u l e s , provided with t h i s c o n t r a c t 0
18. The C h a r t e r e r agrees to pay to the Operator on the r e n d e r i n g of the account monthly, the amount earned by the Operator f o r such month, s u b j e c t to the terms of the Contract*
19. Hours flown s h a l l be computed from the time t h a t the H e l i c o p t e r takes o f f u n t i l the engine i s shut o f f on l a n d i n g .
20. When p r a c t i c a b l e at the c o n c l u s i o n of each f l y i n g day, the Operator s h a l l have the hours flown c e r t i f i e d by the r e p r e s e n t a t i v e of the C h a r t e r e r and each s h a l l r e t a i n a copy.
- 4 -
21. The Operator s h a l l , i n a d d i t i o n , cause to be kept i n the log book of the H e l i c o p t e r , e n t r i e s of a l l f l i g h t s made hereunder w i t h p a r t i c u l a r s of times of t a k e - o f f and l a n d i n g , and s h a l l d u r i n g the currency of t h i s Agreement not l a t e r than the 15th day of each month, f u r n i s h the C h a r t e r e r with p a r t i c u l a r s of a l l f l y i n g time c a r r i e d out hereunder by the H e l i c o p t e r d u r i n g the p r e c e d i n g month, duly v e r i f i e d i n such manner as the C h a r t e r e r may reasonably r e q u i r e .
22o In the event th a t the H e l i c o p t e r s h a l l become u n s e r v i c e a b l e from any cause whatsoever, the Operator s h a l l do e v e r y t h i n g r e a s o n a b l y p o s s i b l e e i t h e r t o r e p a i r same or to r e p l a c e i t w i t h i n a p e r i o d of
f i v e (5) #»Xtt5te>WKx£Mi days a f t e r the date of such u n s e r v i c e a b i l i t y and i n the event of the Operator's f a i l u r e to do so the C h a r t e r e r may t e r m i n a t e t h i s Agreement and adjustments of the charges f o r such H e l i c o p t e r s h a l l be made, i n c l u d i n g p r o r a t i o n of the minimum monthly charge f o r the month i n which such event occurs. 23. I t i s agreed th a t a copy of the Operator's c h a r t e r t a r i f f cont a i n i n g r u l e s , r e g u l a t i o n s and t o l l s , f i l e d w i t h and approved by the A i r Transport Board, has been d e l i v e r e d to the C h a r t e r e r and i s accepted by the C h a r t e r e r as forming a p a r t of t h i s Agreement except where the r u l e s , r e g u l a t i o n s and t o l l s have been amended by t h i s Agreement.
24. I t i s understood and agreed t h a t t h i s Agreement and e v e r y t h i n g h e r e i n c o n t a i n e d i s personal to the Operator and not a s s i g n a b l e i n any r e s p e c t , without approval of the C h a r t e r e r .
25. T h i s Agreement and e v e r y t h i n g h e r e i n contained s h a l l ensure to the b e n e f i t of and be b i n d i n g upon the p a r t i e s h e r e t o , t h e i r and each of t h e i r r e s p e c t i v e successors and a s s i g n s .
SIGNED, SEALED AND DELIVERED
by:
^eJt
TRANSWEST HELICOPTERS (1965) LTD.,
top related