7.1 Data Perencanaan
Ukuran pondasi Pile Cap = 1,20 x 1,20 m
Tebal pelat pondasi (h) = 350 mm
Diameter tulangan = Ø16 mm
Diameter sengkang = Ø8 mm
Dimensi tiang bor pile = 300 mm
Keliling tiang bor pile (Ktp) = 94,2 cm
Luas tiang poer (Atp) = 706 cm2
Nilai Conus (Cn) = 10 kg/cm2
Nilai Friction (Frict) = 2,50 kg/cm2
Gambar pembebanan pada pondasi
56
![Page 2: BAB VII Pondasi.docx](https://reader036.vdocuments.pub/reader036/viewer/2022082422/55cf943f550346f57ba09d72/html5/thumbnails/2.jpg)
Direncanakan pondasi strauss dengan Ø30 cm, panjang 6 m dan jumlah 5
pile.
Perhitungan jarak pile dan dimensi footplat
S = 2,0 sampai 3D, dipakai 2,0 D maka :
= 2,0 . 30
= 60 cm
D = d = 30 cm
Gambar Rencana Pile Cap
57
![Page 3: BAB VII Pondasi.docx](https://reader036.vdocuments.pub/reader036/viewer/2022082422/55cf943f550346f57ba09d72/html5/thumbnails/3.jpg)
Gambar Rencana Pondasi
58
![Page 4: BAB VII Pondasi.docx](https://reader036.vdocuments.pub/reader036/viewer/2022082422/55cf943f550346f57ba09d72/html5/thumbnails/4.jpg)
7.2 Pembebanan Pondasi
Beban – beban :
Beban kolom : dari analisa SAP = 192000 kg
Kolom pond. : 0,4 m x 0,4 m x 1,50 m x 2400 kg/m3 = 576 kg
Urugan tanah : 1,20 m x 1,20 m x 1,50 m x 1300 kg/m3 = 2808 kg
Pelat pondasi : 1,35 m x 1,35 m x 0,35 m x 2400 kg/m3 = 1210 kg
Stroussh : ¼ x 3,14 x (0,30 m) 2 x 6 m x 2400 kg/m 3 x 3 = 3052 kg
N = 199646 kg
= 199,646 ton
Menghitung beban tiap tiang
Qm = Nn
= 199,646
3
= 66,55 ton
Kapasitas kelompok berdasarkan tiang tunggal
Qult = (Qfrict + Qkonus) / Sf
Qfrict = . . D. L
= 2,50 kg/cm2 . 3,14 .30 cm .600 cm
= 141300 kg = 141,3 ton
Qkonus = . Atp
= 10 Kg/cm2 . 706 cm2
= 7060 Kg = 7,06 ton
Qult = (141,3 ton + 7,06 ton) / Sf
= 148,36 ton / 2
Qult = 74,18 ton > 66,55 ton (Aman)
59
![Page 5: BAB VII Pondasi.docx](https://reader036.vdocuments.pub/reader036/viewer/2022082422/55cf943f550346f57ba09d72/html5/thumbnails/5.jpg)
Kapasitas tiang berdasarkan group
Qgroup = Qult x Jumlah Pile Stroussh
= 74,18 ton x 3
= 222,54 ton > 199,646 (Aman)
7.3 Penulangan Penulangan Pile Cap (Poer)
Mu = 60874 Kg = 608740 KNmm (dari hitungan SAP)
K =
M
φ . b⋅d2
=608740 kNmm
0,8 . 1200 mm×(300 mm)2
= 0,00704 kN/mm2 = 0,0070 kg/cm2 = 0,00070 Mpa
k = 0,8 fy ( 1 – 0,588 fyfc
)
0,00070 = 0,8 . 240 ( 1 – 0,588 24025
)
0 = 0,00070 - 192 + 1083,82
Dengan rumus ABC didapatkan :
1,2 =
−b±√b2−4⋅a⋅c2⋅a
1,2 =
−(−192)±√(−192 )2−4⋅1083,8⋅0,00070 2⋅1083,8
= 0,088
60
![Page 6: BAB VII Pondasi.docx](https://reader036.vdocuments.pub/reader036/viewer/2022082422/55cf943f550346f57ba09d72/html5/thumbnails/6.jpg)
As = . b . d
= 0,088 . 1000 mm . 300 mm
= 26400 mm2
Maka digunakan 16 – 75 = 26810 mm2
Catatan :
Karena B dan L Pile Cap sama yaitu 1,20 m, maka tulangan arah memanjang
sama dengan tulangan arah melebar yaitu 16 – 750 (As = 26810 mm2)
7.4. Perhitungan Penulangan Stroussh
Mu = 60874 / 3 = 20292 Kg
Pu = 66550 Kg
K225 σ ’b = 75 Kg/cm2 nt = 21
U 32 σ ’a = 1850 Kg/cm2
Ø0 =σ ' a
n σ ' b =
185021 x 75
= 1,174
e01 = MN
= 2029266550
= 0,30 m
e02 = 1
30ht =
130
0,30 = 0,01 m min 0,02 m
e0 = e01 + e02 = 0,30 + 0,02 = 0,32 m
e0ht
= 0,320,3
= 1,06 dari tabel : C = 7,70 (PBI Hal
113)
e1 = C (lk
100 ht) 2 ht = 7,70 (
6,00100 x 0,30
) 2 x 0,30 = 0,09 m
e2 = 0,15 ht = 0,15 x 0,30 = 0,045 m
61
![Page 7: BAB VII Pondasi.docx](https://reader036.vdocuments.pub/reader036/viewer/2022082422/55cf943f550346f57ba09d72/html5/thumbnails/7.jpg)
e = e0 + e1 + e2 = 0,32 + 0,09 + 0,045 = 0,455 m
ea = e + ½ ht – 0,05 = 0,455+ 0,015 - 0,05 = 0,42 m
Nea = 66550 x 0,42 = 27951 kgm
h = ht – 5 = 30 – 5 = 25 cm
Ca =
h
√ n x Neab x σa
=
25
√ 21 x279510,3 x1850
= 2532,52
= 0,77
Dengan menggunakan cara-n biasa :
Untuk Ca = 0,77 ~ 0,78 dari tabel didapat :
δ = 0,2 ø = 0,360
Ø’ = 0,417 ; ζ= 0,824 ; n ω = 1,957
Perhitungan Tulangan :
eah
= 0,420,25
= 1,68 dari tabel Hal 100 didapat i = 1,99
i A = ω b h = 1,6821
x 30 x 25 = 60 cm2
A = 60
1,99 = 30,15 x 4 = 120,6 mm2
Maka digunakan tulangan 6 ø 16 As = 120,6 mm2
Perencanaan SengkangMerencanakan sengkang dengan menggunakan batang tulangan 8.
Perhitungan sengkang menggunakan ketentuan – ketentuan menurut SKSNI
T15 – 1991 – 03 pasal 3.16.10 ayat 5, maka menggunakan jarak spasi sengkang
yang ditentukan nilai – nilai terkecil sebagai berikut.
16 diameter tulangan pokok (16) = 256 mm
48 diameter tulangan geser (8) = 384 mm
62
![Page 8: BAB VII Pondasi.docx](https://reader036.vdocuments.pub/reader036/viewer/2022082422/55cf943f550346f57ba09d72/html5/thumbnails/8.jpg)
dimensi terkecil kolom = 266 mm
½ d = ½ . 300 mm = 150 mm
nilai terkecil adalah 150 mm, maka digunakan tulangan sengkang spiral
8 – 150 mm.