Project Management Presented To Prof. Rohit Bhatia Presented By Ashok Kumar Nitin Srivastava Tarun Jaiswal Vikash Kr. Singh The tallest building in the world Burj Kha lif a 

Upload: nidhi-somani

Post on 07-Apr-2018

270 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 1/24

Project Management 

Presented To

Prof. Rohit Bhatia

Presented By

Ashok Kumar

Nitin Srivastava

Tarun Jaiswal

Vikash Kr. Singh

The tallest building in the world Burj Khalifa 

Page 2: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 2/24

My friends... We are seeing the city with the

biggest growing rate in the world... 

It is also tangible proof of Dubai's growing role in a changing

world. In fewer than 30 years, this city has transformed itself from a

regional centre to a global one. This success was not based on oil

reserves, but on reserves of human talent, ingenuity and initiative.

Page 3: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 3/24

Former name: Burj Dubai• Location:  Dubai, United Arab Emirates

• Status: Complete

• Groundbreaking:  January 2004

• Constructed: 2004-2010

• Opening: 4 January 2010

• Use:  Mixed-use

• Height: 828 m (2,717 ft)

• Technical details

Floor count- 160 habitable floors plus 46 maintenance levels in the spire

and 2 parking levels in the basement 

• Floor area: 464,511 m2 (5,000,000 sq ft)

Cost: $1.5 billion

Project Management 

Project Facts

Page 4: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 4/24

Companies involved 

Architect(s): Adrian Smith at SOM Structural engineer

Bill Baker at SOM 

Samsung C&T,Besix and Arabtec

Supervision Consultant Engineer & Architect of Record Hyder Consulting

Construction Project Manager Turner

Construction

Contractor- Grocon

Planning Bauer AG and Middle East Foundations

Lift contractor Otis

VT consultant Lerch Bates 

Developer: 

Project Management 

Page 5: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 5/24

  According to the three main

criteria of the Council on Tall

Buildings and Urban Habitat

(CTBUH) Burj Khalifa is the

tallest building in the world .The CTBUH ranks the world’s 

tallest buildings based on

‘Height to Architectural Top,’ ‘Height to Highest Occu-

pied Floor’ and ‘Height to

Tip.’ 

Project Management 

Page 6: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 6/24

Burj Khalifa formerly known as Burj Dubai, is a skyscraper in Dubai,United Arab Emirates, and the tallest man-made structure ever built, at

828 m (2,717 ft).

Construction began on 21 September 2004, with the exterior of the

structure completed on 1 October 2009. The building officially opened on 4January 2010.

The total cost for the Burj Khalifa project was about US$1.5 billion; and for

the entire new "Downtown Dubai", US$20 billion.

The price of office space at Burj Khalifa had US$4,000 per sq ft and that the

Armani Residences, also in Burj Khalifa, were selling for US$3,500 per sq

ft.

Project Management 

History

Page 7: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 7/24

  Emaar Properties announced on 9 June

2008 that construction of Burj Khalifa

was delayed by upgraded finishes and

would be completed only in September

2009. An Emaar spokesperson said "The

luxury finishes that were decided on in2004, when the tower was initially

conceptualized, is now being replaced by

upgraded finishes. The design of the

apartments has also been enhanced tomake them more aesthetically attractive

and functionally superior.” A revised

completion date of 2 December 2009 was

then announced. However, Burj Khalifa

was opened on 4 January 2010.

Project Management 

Delay 

Page 8: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 8/24

• The Burj Khalifa's water system will supply an average of about946,000 litres of water per day. At the peak cooling times, the tower

will require approximately 10,000 tonnes of cooling per hour,

which is equivalent to the capacity provided by 10,000 tonnes (10.2

million kg) of melting ice in one day.

• The building has a condensate collection system, which uses the hot

and humid outside air, combined with the cooling requirements of 

the building and will result in a significant amount of condensationof moisture from the air. The condensed water will be collected and

drained into a holding tank located in the basement car park, this

water will then be pumped into the site irrigation system for use on

the Burj Khalifa park.

Project Management 

Water supply system 

Page 9: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 9/24

To wash the 24,348 windows, a horizontal track has been installed

on the exterior of Burj Khalifa at levels 40, 73 and 109. Each track 

holds a 1,500 kg bucket machine which moves horizontally and

then vertically using heavy cables. Above level 109, up to tier 27

traditional cradles from davits are used. Under normal conditions,when all building maintenance units will be operational, it will take

36 workers three to four months to clean the entire exterior facade.

Unmanned machines will clean the top 27 additional tiers and theglass spire. The cleaning system was developed in Australia at a

cost of A$8 million.

Project Management 

Maintenance 

Page 10: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 10/24

 

Burj Khalifa park 

• Burj Khalifa is surrounded by an 11 ha (1,200,000 sq ft) park. Thedesign of the park is also inspired by the core design concepts of BurjKhalifa which is based on the symmetries of the desert flower, Hymenocallis. The park has six water features, gardens, palm linedwalkways, and flowering trees.[69] At the centre of the park and thebase of Burj Khalifa is the water room, which is a series of pools and

water jet fountains. In addition the railing, benches and signsincorporate images of Burj Khalifa and the Hymenocallis flower.

• The plants and the shrubbery will be watered by the buildings'scondensation collection system,that uses water from the coolingsystem. The system will provide 15,000,000 imp gal (68,000,000 L)annually.WET designers, who also developed the Dubai Fountain,

developed the park's six water features. 

Project Management 

Page 11: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 11/24

• Burj Khalifa, formerly known asBurj Dubai, is a skyscraper in

Dubai, United Arab Emirates, andthe tallest man-made structureever built, at 828 m.

• The design incorporates ideas fromtraditional Islamic architecture,

while the open petals of a desertflower were the inspiration for thetower’s base. 

• Burj Khalifa will be home to 1,044luxury apartments, 49 floors of 

offices and eventually a 160-room Armani-branded hotel. Around12,000 people are expected to liveand work in the tower, which is partof a 500-acre development.

Project Management 

Page 13: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 13/24

• Purpose 

• Burj Khalifa has been designed to be the centrepiece of a large-scale, mixed-usedevelopment that will include 30,000 homes, nine hotels such as The AddressDowntown Burj Khalifa, 3 hectares (7.4 acres) of parkland, at least 19 residentialtowers, the Dubai Mall, and the 12-hectare (30-acre) man-made Burj Khalifa Lake.

• The building has returned the location of Earth's tallest free-standing structure to

the Middle East — where the Great Pyramid of Giza claimed this achievement foralmost four millennia before being surpassed in 1311 by in England. LincolnCathedral

• The decision to build Burj Khalifa is reportedly based on the government's decisionto diversify from an oil-based economy to one that is service- and tourism-oriented. According to officials, it is necessary for projects like Burj Khalifa to bebuilt in the city to garner more international recognition, and hence investment.

"He (Sheikh Mohammed bin Rashid Al Maktoum) wanted to put Dubai on the mapwith something really sensational," said Jacqui Josephson, a tourism and VIPdelegations executive at Nakheel Properties.

Project Management 

Page 14: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 14/24

• Opening ceremony 

• The opening ceremony of Burj Khalifa was held on 4 January 2010.[85] The ceremony featured adisplay of 10,000 fireworks, light beams projected on and around the tower, and further sound,light and water effects.[86] Using the 868 powerful stroboscope lights that are integrated into thefacade and spire of the tower, different lighting sequences were choreographed, together withmore than 50 different combinations of the other effects.

• The event began with a short film which depicted the story of Dubai and the evolution of BurjKhalifa. The displays of sound, light, water and fireworks followed.[86] The portion of the show

consisting of the various pyrotechnic, lighting, water and sound effects was divided into three. Thefirst part was primarily a light and sound show, which took as its theme the link between desertflowers and the new tower, and was co-ordinated with the Dubai Fountain and pyrotechnics. Thesecond portion, called 'Heart Beat', represented the construction of the tower in a dynamic lightshow with the help of 300 projectors which generated a shadow-like image of the tower. In thethird act, sky tracers and space cannons enveloped the tower in a halo of white light, whichexpanded as the lighting rig on the spire activated.[86] 

• The ceremony was relayed live on a giant screen on Burj Park Island, as well as several television

screens placed across the Downtown Burj Khalifa development. Hundreds of media outlets fromaround the world reported live from the scene.[86] In addition to the media presence, 6,000 guestswere expected.[87] 

Project Management 

Page 15: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 15/24

The following is a breakdown of floors

Floors Use 

160 and above Mechanical

156-159 Communication and broadcast

155 Mechanical

139 –154 Corporate suites

136 –138 Mechanical

125 –135 Corporate suites

124  At the Top observatory

123 Sky lobby

122  Atmosphere restaurant111 –121 Corporate suites

109 –110 Mechanical

77 –108 Residential

Cont…. 

Project Management 

Floor plans 

Page 16: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 16/24

Floors Use 76 Sky lobby

73 –75 Mechanical

44 –72 Residential

43 Sky lobby

40 –42 Mechanical

38 –39 Armani Hotel suites

19 –37 Armani Residences

17 –18 Mechanical

9 –16 Armani Residences1 –8 Armani Hotel

Ground Armani Hotel

Concourse Armani Hotel

B1 –B2 Parking, mechanical

Project Management 

Floor plans 

Page 17: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 17/24

• At 828 metres (2,716.5ft), Burj Khalifa is 320

metres taller than Taipei 101, which at 508

metres (1,667 ft) had held the record for the

world’s tallest building measured to the

architectural top since 2004, the year the

project was announced.

Project Management 

j

Page 18: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 18/24

• Burj Khalifa employs a record-breaking 330,000cubic metres of concrete, 39,000 metric tonnes of steel rebar and 142,000 square metres of glass;

and it took 22 million man hours to build. Otherworld records for Burj Khalifa include the highestoccupied floor in the world, at over 550 metres(1,800 ft); the highest outdoor observation deck

in the world – At the Top on Level 124; and thetallest service elevator, which travels to a heightof 504 metres (1,654 ft).

Project Management 

j

Page 19: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 19/24

• Mr. Mohamed Alabbar, Chairman, EmaarProperties, said that with the unveiling of thefinal height of Burj Khalifa, the world now had anew reference point for high-rise developments.

“Burj Khalifa is an example of collaboration on aglobal scale, and the tremendous positive energythat can be generated when people from all overthe world come together to work towards a

common goal. Thousands of professionals andskilled workers from around the world worked onthis once-in-a-lifetime project.”

Project Management 

P j M

Page 20: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 20/24

• “More than 60 of the world’s leading

consultants including South Korea’s Samsung

Corporation and New York-based Turner

Construction International realised the design

for Burj Khalifa of Chicago-based Skidmore,

Owings and Merrill (SOM),” he said.

Project Management 

P j M

Page 21: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 21/24

• Burj Khalifa employed the latest advances in

wind engineering, structural engineering,

structural systems, construction materials and

methods. All design considerations took into

account the 12,000 people who will live and

work in the tower. The handover to residents

of the various components of Burj Khalifa willbegin in February.

Project Management 

P j M

Page 22: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 22/24

• With a total built-up area of about 6 million sq ft,Burj Khalifa features nearly 2 million sq ft of residential space and over 300,000 sq ft of primeoffice space, in addition to the area occupied by

the keenly awaited Armani Hotel Dubai and theArmani Residences. The tower also featuresmodern lifestyle amenities including clubs, healthand fitness facilities, gourmet restaurants and the

124th floor observation deck, 'At the Top.' BurjKhalifa is the focal point of the 500-acre ‘mega-project’ by Emaar Properties, described as thenew heart of Dubai.

Project Management 

P j t M t

Page 23: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 23/24

Project Management 

Comparison 

P j t M t

Page 24: Burj Khalifa (2)

8/3/2019 Burj Khalifa (2)

http://slidepdf.com/reader/full/burj-khalifa-2 24/24

Project Management 

Comparison