coe summary 2011.pdf

Upload: allan-roelen-bacaron

Post on 14-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 COE Summary 2011.pdf

    1/5

  • 7/30/2019 COE Summary 2011.pdf

    2/5

  • 7/30/2019 COE Summary 2011.pdf

    3/5

  • 7/30/2019 COE Summary 2011.pdf

    4/5

  • 7/30/2019 COE Summary 2011.pdf

    5/5

    kW MWCompany Generating Facility

    List of Generation Companies Issued with Certifi cate of Endorsement (CoE) by DOE

    as of December 2011

    CoE

    Type

    of

    Plant

    Commissioning

    DateClassification

    Installed Capactiy

    LocationBuyer of

    Electricity

    TOTAL INSTALLED CAPACITY (MW): 85.9

    120 TRANS ASIA Coal-Fired c new 135 Calaca, Batangas Luzon Grid/WESM 01/01

    121 UNISAN BIOMASS CORP biomass r new 11.2 Quezon Province QUEZELCO 01/02

    122 UDENNA Diesel d Existing 116 Subic Olongapo 01/03

    123 Hacienda Bio-Energy Waste waster h Existing 125 Bukidnon 03/01

    124 PETRON CORP Fuel Fired Existing 70 Batangas Luzon Grid 03/02

    125 King Energy Corporation Diesel d new 3.2 Bukidnon FIBECO 31-Oct-11 04/01

    126 SMI Power Corp. Coal-Fired c new 500 Davao Del Sur 07/01

    127 Sunwest Water & Electric Company hydro hexisting

    1.5 Catanduanes Nov-10 06/02

    128 Sunwest Water & Electric Company hydro hExisting

    2.1 Catanduanes Feb-11 06/01

    129 Masinloc Power Partners Co. Ltd. Coal-Fired c Existing 600 Masinloc, Zambales 07/02

    130 Bicol Hydropower Corporation Hydri r new 960 Naga City 08/01

    131 San Ramon Power Inc. Coal-Fired c new 100 San Ramon, Zamboanga City ZAMCELCO 11/01

    132 Energy World Corporation Ltd Gas-Turbine new 300 Pagbilao Quezon WESM 11/01

    133 GNPower Mariveles Coal Plant Ltd.Co

    Coal-Fired cnew

    600 Mariveles, Bataan 11/11

    2439

    Legend

    c- coal n- natural gas

    h- hydro r- renewable

    g- geothernal d- diesel

    o- oil-based

    TOTAL INSTALLED CAPACITY (MW):

    2011