contoh tugas rab_2.pdf
TRANSCRIPT
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
NO. URAIAN BAHAN SATUAN HARGA (Rp) KETERANGAN
A TIMBUNAN DAN GALIAN
1 pasir pasang progo m3 100.000,00Rp
2 pasir pasang krasak m3 97.000,00Rp
3 pasir beton m3 135.000,00Rp
4 pasir kasar m3 100.000,00Rp
5 pasir ayak m3 150.000,00Rp
6 pasir urug m3 70.000,00Rp
7 pasir urug m3 90.000,00Rp
8 tanah urug m3 53.000,00Rp
B BAHAN PEREKAT
1 kapur padam kg 6.500,00Rp
2 kapur pasang m3 85.000,00Rp
3 kapur lokal sak 11.000,00Rp
4 lem kayu lt 37.400,00Rp
5 PC 40 kg holcim sak 54.000,00Rp
6 PC holcim kg 1.350,00Rp
7 PC 40 kg nusantara sak 50.000,00Rp
8 PC nusantara kg 1.250,00Rp
9 PC tiga roda sak 52.000,00Rp
10 PC tiga roda kg 1.300,00Rp
11 PC gresik sak 51.200,00Rp
12 PC gresik kg 1.280,00Rp
13 Seal tape bh 92.570,00Rp
14 semen warna kg 2.500,00Rp
C BATU / BATU CETAKAN
1 bata merah bh 720,00Rp 5 x 10 x 22
2 batu belah hitam 15/20 cm m3 128.000,00Rp
3 batu belah putih 15/20 cm m3 85.000,00Rp
4 batu belah putih 15/20 cm m3 90.000,00Rp
5 batu pecah 2/3 m3 200.000,00Rp
6 batu pecah 2/3 m3 210.000,00Rp
7 batu pecah3/4 m3 200.000,00Rp
8 batu pecah 3/4 m3 210.000,00Rp
9 batu split 1/2 m3 200.000,00Rp
10 batu alam andesit alur lurus m2 105.000,00Rp 10x40x1,5
11 batu alam andesit alur lurus m2 110.000,00Rp 15x30x1.5
12 batu alam andesit alur lurus m2 110.000,00Rp 20x20x1.5
13 batu alam andesit alur lurus m2 120.000,00Rp 20x40x1,5
14 batu alam andesit alur lurus m2 120.000,00Rp 30x30x1.5
15 batu alam andesit alur lurus m2 130.000,00Rp 30x60x1.5
16 batu alam andesit alur lurus m2 140.000,00Rp 40x40x1.5
17 batu alam andesit polos bakar m2 100.000,00Rp 10x40x1,5
18 batu alam andesit polos bakar m2 100.000,00Rp 15x30x1.5
19 batu alam andesit polos bakar m2 100.000,00Rp 20x20x1.5
20 batu alam andesit polos bakar m2 105.000,00Rp 20x40x1,5
21 batu alam andesit polos bakar m2 110.000,00Rp 30x30x1.5
22 batu alam andesit polos bakar m2 120.000,00Rp 30x60x1.5
DAFTAR HARGA BAHAN
23 batu alam andesit polos bakar m2 135.000,00Rp 40x40x1.5
24 batu alam andesit alur lurus minimalis m2 110.000,00Rp 15x30x1.5
25 batu alam andesit alur lurus minimalis m2 120.000,00Rp 20x40x1,5
26 batu alam andesit alur lurus variasi 1 m2 110.000,00Rp 15x30x1.5
27 batualam andesit alur lurus variasi 1 m2 120.000,00Rp 20x40x1,5
28 batu alam andesit alur lurus variasi 2 m2 110.000,00Rp 15x30x1.5
29 batu alam andesit alur lurus variasi 2 m2 120.000,00Rp 20x40x1,5
30 batu alam andesit alur cacing m2 120.000,00Rp 15x30x1.5
31 batu alam andesit alur cacing m2 125.000,00Rp 15x30x1.5
32 batu alam andesit alur catur m2 120.000,00Rp 15x30x1.5
33 batu alam andesit alur catur m2 125.000,00Rp 20x40x1,5
34 batu alam andesit agonal variasi 1 m2 120.000,00Rp 15x30x1.5
35 batu alam andesit agonal variasi 1 m2 125.000,00Rp 20x40x1,5
36 batu alam andesit agonal variasi 2 m2 120.000,00Rp 15x30x1.5
37 batu alam andesit agonal variasi 2 m2 125.000,00Rp 20x40x1,5
38 batu alam andesit napoli m2 95.000,00Rp 10x20x1.5
39 batu alam andesit napoli m2 115.000,00Rp 15x30x1.5
40 batu alam andesit napoli m2 125.000,00Rp 20x40x1,5
41 batu alam andesit susun sirih polos m2 90.000,00Rp 3x20x1,5
42 batu alam andesit susun sirih polos m2 95.000,00Rp 3x30x1.5
43 batu alam andesit susun sirih polos m2 100.000,00Rp 3x40x1.5
44 batu alam andesit susun sirih polos m2 105.000,00Rp 3x50x1.5
45 batu alam andesit susun sirih polos m2 115.000,00Rp 3x60x1.5
46 Keramik Roman 40x40 m2 104.000,00Rp
47 Keramik Roman 40x40 bh 17.333,33Rp
48 Keramik Roman 20x20 Gol A m2 87.000,00Rp
49 Keramik Roman 20x20 Gol A bh 3.480,00Rp
50 Keramik Roman 20x20 Gol B m2 90.000,00Rp
51 Keramik Roman 20x25 Gol A m2 84.000,00Rp
52 Keramik Roman 20x25 Gol A bh 4.200,00Rp
53 Keramik Roman 20x25 Gol B m2 90.000,00Rp
54 Keramik Mulia 20X20 Rustic Model m2 46.000,00Rp
55 Keramik Mulia 10x20 cm m2 35.000,00Rp
56 Keramik Mulia 20xx20 cm m2 35.000,00Rp
57 Keramik Mulia 20x25 cm m2 37.500,00Rp
58 Keramik Mulia 30x30 cm m2 35.000,00Rp
59 Keramik Mulia 30X30 White m2 45.500,00Rp
60 Keramik Mulia 30x30 Rustic Model m2 46.000,00Rp
61 Keramik Mulia 40x40 Glossy White m2 56.000,00Rp
62 Keramik Mulia 40x40 Glossy Cream m2 63.000,00Rp
63 Keramik Mulia 40x40 Glossy Marble m2 52.000,00Rp
64 Keramik Granito 40x40 Silver warna m2 208.000,00Rp
65 Keramik Granito 40x40 Group Gold Warna m2 202.500,00Rp
66 Keramik 30x30 cm m2 45.000,00Rp
67 Keramik motif 20x20 cm m2 47.500,00Rp
68 Keramik motif 25x25 cm dos 47.500,00Rp
69 Keramik putih 30x30 cm m2 42.500,00Rp
70 Keramik Roman Plint Lantai 10 x 40 cm m2 149.000,00Rp
71 Keramik Roman Plint Lantai 10 x 40 cm bh 5.960,00Rp
72 paving block model bata 6 cm m2 65.000,00Rp
73 paving block model bata 8 cm m2 75.000,00Rp
74 paving block model cacing 6 cm m2 65.000,00Rp
75 paving block model cacing 6 cm bh 1.300,00Rp
76 paving block model cacing 8 cm m2 75.000,00Rp
77 paving block model hexagon 6 cm m2 65.000,00Rp
78 paving block model hexagon 8cm m2 75.000,00Rp
79 paving block model trihexagonal 6 cm m2 65.000,00Rp
80 paving block model trihexagonal 8 cm m2 75.000,00Rp
81 paving block model ubin set 6 cm m2 80.000,00Rp
82 paving block model ubin set 8 cm m2 90.000,00Rp
83 paving block model ubin kecil 6 cm m2 80.000,00Rp
84 paving block model ubin kecil 8 cm m2 90.000,00Rp
85 paving block model ubin full 6 cm m2 80.000,00Rp
86 paving block model ubin full 8 cm m2 90.000,00Rp
D JENIS KAYU
1 kayu jati klas 1 balok m3 23.925.000,00Rp
2 kayu jati klas 1 papan m3 24.104.440,00Rp
3 kayu bengkirai balok m3 10.000.000,00Rp
4 kayu bengkirai papan m3 11.000.000,00Rp
5 kayu meranti balok m3 9.075.000,00Rp
6 kayu meranti papan m3 9.375.000,00Rp
7 Formica 120x240 cm lbr 74.250,00Rp
8 Kayu Balok 5/7 m2 2.500.000,00Rp
9 Kayu papan bekisting m2 12.000,00Rp
10 Kayu Papan Bouplank 3/20 m3 3.107.500,00Rp
11 Plywood 120x240 cm tebal 4 mm lbr 145.000,00Rp
12 Plywood 90 x 210 cm tebal 4 mm lbr 77.000,00Rp
E JENIS BESI ATAU LOGAM DAN KACA
1 besi cor kg 7.500,00Rp
2 besi beton bulat kg 13.000,00Rp
3 Besi Strip kg 11.880,00Rp
4 Kawat Beton kg 13.000,00Rp
5 Kawat beton rol 65.000,00Rp
6 Kawat duri rol 65.000,00Rp
7 Kawat las kg 22.000,00Rp
8 Besi Beton Polos kg 11.000,00Rp
9 Besi Hollow 2/4 btg 22.600,00Rp
10 Besi Hollow 4/4 btg 29.200,00Rp
11 kaca bening 3mm m2 87.600,00Rp
12 Kaca Bening 5mm m2 145.200,00Rp
13 Paku Biasa 1/2" - 1" kg 15.000,00Rp
14 Paku Biasa 2" - 5" kg 16.950,00Rp
15 Pipa besi D 2" ljr 40.000,00Rp
16 Profil alumunium m' 150.000,00Rp
17 sealant tube 35.000,00Rp
18 skrup fixer bh 250,00Rp
F CAT
1 amplas lbr 3.500,00Rp
2 Cat Besi Emco biasa kg 45.000,00Rp
3 Cat Besi Emco bintang kg 58.000,00Rp
4 Cat Besi Emco segitiga kg 50.000,00Rp
5 Cat besi ex Emco Bintang kg 58.000,00Rp
6 Cat kayu avian kg 46.500,00Rp
7Cat kayu emco kg 36.500,00Rp
8 Cat tembok catylac biasa Kg 92.500,00Rp
9 Cat tembok Decholit Kg 80.000,00Rp
10 Cat tembok decolite 5kg Galon 60.000,00Rp
11 Cat tembok Maxilite Galon 55.000,00Rp
12 Cat Dasar kg 16.000,00Rp dulux
13 Cat Dinding Eksterior / Weathershield kg 86.000,00Rp Dulux
14 Cat Dinding Interior kg 53.000,00Rp Dulux
15 Cat Genteng kg 60.000,00Rp Desnilux
16 Cat menie kayu kg 20.570,00Rp Emco
17 Cat minyak kg 35.700,00Rp
18 Plamur Dinding kg 15.730,00Rp
19 Plamur Kayu kg 22.500,00Rp
G JENIS PIPA PVC
1 Pipa PVC Tipe AW Ø 1/2" ljr 25.300,00Rp
2 Pipa PVC Tipe AW Ø 3/4" ljr 7.440,00Rp
3 Pipa PVC Tipe AW Ø 1" ljr 13.620,00Rp
4 Pipa PVC Tipe AW Ø 1 1/2" ljr 19.670,00Rp
5 Pipa PVC Tipe AW Ø 2" ljr 23.190,00Rp
6 Pipa PVC Tipe AW Ø 2 1/2" ljr 26.620,00Rp
7 Pipa PVC Tipe AW Ø 3" ljr 29.840,00Rp
8 Pipa PVC Tipe AW Ø 4" ljr 49.920,00Rp
9 Knie bh 6.000,00Rp
10 Terstek T bh 8.000,00Rp
H PERALATAN SANITASI
1 kloset duduk lengkap INA bj 1.050.000,00Rp
2 kloset duduk putih dengan tangki TOTO bj 1.550.000,00Rp
3 kloset duduk porselin lux dengan tangki bj 1.350.000,00Rp
4 kloset duduk standar dengan tangki bj 850.000,00Rp
5 kloset duduk dengan warna dengan tangki TOTO bj 1.950.000,00Rp
6 kloset duduk keramik INA pcs 845.000,00Rp
7 kloset duduk keramik LOLO pcs 265.000,00Rp
8 Bak Cuci Stainless Steel unit 466.700,00Rp
9 water drain + accecories set 9.000,00Rp
10 Floor Drain bh 16.000,00Rp
11 Kran Air bh 28.000,00Rp
12 pompa bh 500.000,00Rp
13 Shower bh 1.230.000,00Rp
14 Tandon Air unit 3.000.000,00Rp 2000L
15 Water Drain bh 15.000,00Rp
I LISTRIK
1 kabel m 35.000,00Rp
2 fitting bh 20.000,00Rp
3 Lampu 5 watt bh 21.250,00Rp
4 Lampu 8 watt bh 24.200,00Rp
5 Lampu 14 watt bh 28.500,00Rp
6 Lampu18 watt bh 31.500,00Rp
7 Lampu 23 watt bh 31.800,00Rp
8 Stopkontak bh 19.500,00Rp
9 Saklar tunggal bh 13.500,00Rp
10 Saklar Double Bh 15.000,00Rp
J ATAP DAN PLAFON
1 Gypsum Jayaboard lb 58.450,00Rp 6.5x1200x2400
2 Gypsum Jayaboard lb 35.300,00Rp 8x1200x1800
3 Gypsum Jayaboard lb 62.980,00Rp 9x1200x2400
4 Gypsum Jayaboard lb 76.032,00Rp 12x1200x2400
5 Gypsum Jayaboard lb 85.536,00Rp 12x1200x2700
6 Gypsum Jayaboard lb 275.300,00Rp 12x1200x2400
7 Kalsi rata 3 lb 13.850,00Rp 3x1000x1000
8 Kalsi rata 3 lb 7.020,00Rp 3x500x1000
9 Kalsi board Ling 3.5 lb 50.350,00Rp 3.5x1200x2400
10 Kalsi board Ling 4.5 lb 70.160,00Rp 4.5x1200x2400
11 Kalsi board Ling 6 lb 100.120,00Rp 6x1200x2400
12 Kalsi board Ling 6 R-2 lb 102.740,00Rp 6x1200x2400
13 Kalsi board Ling 6 R-4 lb 103.770,00Rp 6x1200x2400
14 Compound zak 75.000,00Rp 3000/kg
15 Cotton Plaster bh 15.000,00Rp
16 genteng beton besar bh 3.750,00Rp
17 Bubung geneteng palentong bh 9.350,00Rp
18 Paku Gypsum kg 17.500,00Rp
K ALAT GANTUNG
1 engsel patrom H 80 x 50 psg 5.000,00Rp
2 engsel patrom H 110 x 55 psg 8.000,00Rp
3 engsel nilon RCH 3" pcs 6.000,00Rp
4 engsel nilon RCH 4" pcs 9.000,00Rp
5 engsel pintu tipis 3" pcs 9.000,00Rp
6 engsel pintu tipis 4" pcs 15.000,00Rp
7 engsel panel putih 3" pcs 20.000,00Rp
8 engsel panel putih 4" pcs 25.000,00Rp
9 engsel panel putih 5" pcs 30.000,00Rp
10 engsel panel kuning 3" pcs 20.000,00Rp
11 engsel panel kuning 4" pcs 25.000,00Rp
12 engsel panel kuning 5" pcs 30.000,00Rp
13 engsel ram jendela kuningan 2" pcs 7.000,00Rp
14 engsel ram jendela kuningan 2.5" pcs 9.000,00Rp
15 engsel ram jendela kuningan 3" pcs 11.000,00Rp
16 engsel kupu-kupu tipis 1.5 pcs 2.000,00Rp
17 engsel kupu-kupu tipis 2 pcs 3.000,00Rp
18 engsel kupu-kupu tipis 2.5 pcs 3.500,00Rp
19 engsel kupu-kupu tipis 3 pcs 4.000,00Rp
20 engsel kupu-kupu tipis 4 pcs 4.500,00Rp
21 engsel sendok bengkok pcs 8.500,00Rp
22 engsel sendok lurus pcs 8.500,00Rp
23 Kunci tanam bh 90.020,00Rp
24 pull handle dahlia natural 25 bh 35.000,00Rp
25 handle k-014 bh 30.000,00Rp
26 handle ars 12" bh 38.000,00Rp
27 pull handle stainless amani TS286 ukir bh 45.000,00Rp
28 pull handle stainless bossini bulat 881 UK bh 81.000,00Rp
29 handle kotak minimalis 1 bh 100.000,00Rp
30 handle mahkota vas SN/CP bh 100.000,00Rp
31 handle minimalis 3 bh 100.000,00Rp
32 handle gradino p.99.30 bh 149.000,00Rp
33 handle gradino p.99.31 bh 149.000,00Rp
34 handle pintu hampton ph003 bh 156.500,00Rp
35 hak jendela jepit bh 30.000,00Rp
36 hak jendela lubang bh 25.000,00Rp
37 hak jendela cantol psg 25.000,00Rp
38 slot besi bh 25.000,00Rp
39 slot plastik bh 10.000,00Rp
sumber: www.pip2bdiy.go.id diakses 27 April 2014
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
NO. URAIAN BAHAN SATUAN HARGA (Rp) KETERANGAN
A TIMBUNAN DAN GALIAN
1 pasir pasang m3 110.000,00Rp progo
2 pasir urug m3 70.000,00Rp
3 tanah urug m3 53.000,00Rp
B BAHAN PEREKAT
1 kapur padam kg 6.500,00Rp
2 kapur pasang m3 85.000,00Rp
3 lem kayu lt 37.400,00Rp
4 PC zak 41.500,00Rp holcim
5 PC kg 1.037,50Rp holcim
6 Seal tape bh 92.570,00Rp
7 semen warna kg 2.500,00Rp
C BATU / BATU CETAKAN
1 bata merah bh 720,00Rp 5 x 10 x 22
2 batu belah 15/20 cm m3 128.000,00Rp
3 batu andesit susun sirih m2 110.000,00Rp 3 x 30 x 1,5
4 keramik 10x40 cm bh 5.690,00Rp
5 keramik 20x20 cm bh 2.490,00Rp
6 keramik 20x25 cm bh 3.150,00Rp
7 keramik 40x40 cm bh 9.680,00Rp
8 kerikil beton m3 140.000,00Rp
9 paving block bh 2.300,00Rp
D JENIS KAYU
1 Kayu Bangkirai balok m3 10.000.000,00Rp
2 Formica 4'x3' lbr 74.250,00Rp
3 Kayu Balok 5/7 m2 2.500.000,00Rp
4 Kayu Bengkirai Papan (Kls. 1) m3 11.000.000,00Rp
5 Kayu jati papan m3 16.900.000,00Rp
6 Kayu papan bekisting m2 12.000,00Rp
7 Kayu Papan Bouplank 3/20 m3 3.107.500,00Rp
8 Plywood 4'x3'x4 mm lbr 51.920,00Rp
E JENIS BESI ATAU LOGAM DAN KACA
1 Besi Strip kg 11.880,00Rp
2 Kawat Beton kg 16.000,00Rp
3 Besi Beton Polos kg 11.000,00Rp
4 Besi Hollow 2/4 btg 22.600,00Rp
5 Besi Hollow 4/4 btg 29.200,00Rp
6 Kaca Bening 5mm m2 145.200,00Rp
7 Paku Biasa 1/2" - 1" kg 15.000,00Rp
8 Paku Biasa 2" - 5" kg 16.950,00Rp
9 Pipa besi D 2" ljr 40.000,00Rp
10 Profil alumunium m' 150.000,00Rp
11 sealant tube 35.000,00Rp
12 skrup fixer bh 250,00Rp
DAFTAR HARGA BAHAN
F CAT
1 amplas lbr 3.500,00Rp
2 Cat Dasar kg 16.000,00Rp
3 Cat Dinding Eksterior / Weathershield kg 86.000,00Rp Dulux
4 Cat Dinding Interior kg 53.000,00Rp Dulux
5 Cat Genteng kg 60.000,00Rp Desnilux
6 Cat menie kayu kg 20.570,00Rp Emco
7 Cat minyak kg 35.700,00Rp
8 Plamur Dinding kg 15.730,00Rp
9 Plamur Kayu kg 22.500,00Rp
G JENIS PIPA PVC
1 AW Pipa PVC Ø 3" m' 29.840,00Rp Rucika
2 AW Pipa PVC Ø 3/4" m' 7.440,00Rp Rucika
3 AW Pipa PVC Ø 4" m' 49.920,00Rp
4 Pipa Besi d 2" ljr 40.000,00Rp
5 Knie bh 6.000,00Rp
6 Terstek T bh 8.000,00Rp
H PERALATAN SANITASI
1 Kloset duduk lengkap bj 1.550.000,00Rp TOTO
2 Bak Cuci Stainless Steel unit 466.700,00Rp
3 Floor Drain bh 16.000,00Rp
4 Kran Air bh 28.000,00Rp
5 pompa bh 500.000,00Rp
6 Shower bh 1.230.000,00Rp
7 Tandon Air unit 3.000.000,00Rp 2000L
8 Water Drain bh 15.000,00Rp
I LISTRIK
1 kabel m 35.000,00Rp
2 fitting bh 20.000,00Rp
3 Lampu philips 18 watt bh 30.600,00Rp
4 Stopkontak bh 19.500,00Rp
5 Saklar tunggal bh 13.500,00Rp
6 Saklar Double Bh 15.000,00Rp
J ATAP DAN PLAFON
2 Gypsum Board 9mm m2 79.800,00Rp
4 Ramset/Dinabolt bh 7.200,00Rp
5 Compound zak 75.000,00Rp 3000/kg
6 Cotton Plaster bh 15.000,00Rp
8 genteng beton besar bh 3.750,00Rp
9 Bubung geneteng palentong bh 9.350,00Rp
10 Paku Gypsum kg 17.500,00Rp
K ALAT GANTUNG
1 Engsel pintu bh 15.130,00Rp
2 Kunci tanam bh 90.020,00Rp
3 Handle pintu bh 120.000,00Rp
4 Hak angin bh 25.050,00Rp
5 Engsel jendela bh 15.730,00Rp
6 Kunci selot bh 27.230,00Rp
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
NO. JENIS UPAH SATUAN HARGA
1 pekerja hari 45.000,00Rp
2 tukang batu hari 60.000,00Rp
3 tukang keramik hari 70.000,00Rp
tukang kayu hari 60.000,00Rp
4 tukang kayu ahli hari 70.000,00Rp
5 tukang cat hari 60.000,00Rp
6 tukang gali hari 50.000,00Rp
7 tukang besi hari 60.000,00Rp
8 tukang listrik hari 60.000,00Rp
9 kepala tukang batu hari 75.000,00Rp
10 kepala tukang kayu hari 80.000,00Rp
11 kepala tukang cat hari 75.000,00Rp
12 kepala tukang gali hari 60.000,00Rp
13 kepala tukang besi hari 75.000,00Rp
14 mandor hari 85.000,00Rp
sumber: www.pip2bdiy.go.id diakses 27 April 2014
DAFTAR UPAH PEKERJA
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
1. Pekerjaan Persiapan
1 m² Membersihkan lapangan dan perataan
Tenaga
Pekerja 0,100 Oh x 45.000,00Rp = 4.500,00Rp
Mandor 0,050 Oh x 85.000,00Rp = 4.250,00Rp
Jumlah = 8.750,00Rp
2. Pekerjaan Bouwplank
Bahan
Kayu 5/7 0,012 M3 x 2.500.000,00Rp = 30.000,00Rp
Paku biasa 2" - 5" 0,020 Kg x 16.950,00Rp = 339,00Rp
Kayu papan 3/20 0,007 M3 x 3.107.500,00Rp = 21.752,50Rp
jumlah 1 = 52.091,50Rp
Tenaga
Tukang kayu 0,100 Oh x 60.000,00Rp = 6.000,00Rp
Pekerja 0,100 Oh x 45.000,00Rp = 4.500,00Rp
Kepala tukang 0,010 Oh x 80.000,00Rp = 800,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
jumlah 2 = 11.725,00Rp
jumlah 1 + 2 = 63.816,50Rp
B. PEKERJAAN GALIAN DAN TANAH
1. Pekerjaan Galian Tanah Pondasi
1 m³ Galian tanah biasa sedalam 1 meter
Tenaga
Pekerja 0,400 Oh x 45.000,00Rp = 18.000,00Rp
Mandor 0,040 Oh x 85.000,00Rp = 3.400,00Rp
jumlah = 21.400,00Rp
2. Pekerjaan Urugan Pasir Bawah Pondasi
1 m³ Urugan pasir
Bahan
Pasir urug 1,200 M³ x 70.000,00Rp = 84.000,00Rp
Jumlah (1) 84.000,00Rp
Tenaga
Pekerja 0,300 Oh x 45.000,00Rp = 13.500,00Rp
Mandor 0,015 Oh x 85.000,00Rp = 1.275,00Rp
Jumlah (2) = 14.775,00Rp
Jumlah (1) + (2) = 98.775,00Rp
3. Pekerjaan Urugan Tanah Kembali
1 m³ Urugan kembali
Tenaga
Pekerja 0,192 Oh x 45.000,00Rp = 8.640,00Rp
Mandor 0,019 Oh x 85.000,00Rp = 1.615,00Rp
jumlah = 10.255,00Rp
4. Pekerjaan Pemadatan Tanah
1 m³ Pemadatan tanah
Tenaga
Pekerja 0,500 Oh x 45.000,00Rp = 22.500,00Rp
Mandor 0,050 Oh x 85.000,00Rp = 4.250,00Rp
jumlah = 26.750,00Rp
5. Pekerjaan Peninggian Tanah
1 m³ Peninggian Tanah
Bahan
Tanah urug 1,200 m3 x 53.000,00Rp = 63.600,00Rp
Tenaga
Pekerja 0,300 Oh x 45.000,00Rp = 13.500,00Rp
Mandor 0,010 Oh x 85.000,00Rp = 850,00Rp
jumlah = 77.950,00Rp
ANALISIS HARGA SATUAN
6. Pekerjaan Pasir Pasang Bawah Lantai
1 m³ Pasir Pasang Bawah Lantai
Bahan
Pasir pasang 1,200 m3 x 100.000,00Rp = 120.000,00Rp
Tenaga
Pekerja 0,300 Oh x 45.000,00Rp = 13.500,00Rp
Mandor 0,010 Oh x 85.000,00Rp = 850,00Rp
jumlah = 134.350,00Rp
C. PEKERJAAN PONDASI
1. Pekerjaan Anstamping / Batu Kosong
1 M³ Pasang pondasi batu kosong
Bahan
Batu belah 10/15 cm 1,200 M³ x 128.000,00Rp = 153.600,00Rp
Pasir pasang 0,300 M³ x 100.000,00Rp = 30.000,00Rp
= 183.600,00Rp
Tenaga
Pekerja 0,780 Oh x 45.000,00Rp = 35.100,00Rp
Tukang batu 0,390 Oh x 60.000,00Rp = 23.400,00Rp
Kepala tukang 0,039 Oh x 75.000,00Rp = 2.925,00Rp
Mandor 0,039 Oh x 85.000,00Rp = 3.315,00Rp
Jumlah (2) = 64.740,00Rp
Jumlah (1) +(2) = 248.340,00Rp
2. Pekerjaan Pondasi Batu Kali
1 M³ Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps
Bahan
Batu belah 15/20 cm 1,100 M³ x 128.000,00Rp = 140.800,00Rp
semen 61,000 Kg x 1.350,00Rp = 82.350,00Rp
Kapur pasang 0,147 M³ x 85.000,00Rp = 12.495,00Rp
Pasir Pasang 0,492 M³ x 100.000,00Rp = 49.200,00Rp
1,739 Jumlah (1) = 284.845,00Rp
Tenaga
Pekerja 1,500 Oh x 45.000,00Rp = 67.500,00Rp
Tukang batu 0,600 Oh x 60.000,00Rp = 36.000,00Rp
Kepala tukang 0,060 Oh x 75.000,00Rp = 4.500,00Rp
Mandor 0,075 Oh x 85.000,00Rp = 6.375,00Rp
Jumlah (2) = 114.375,00Rp
Jumlah (1) +(2) = 399.220,00Rp
3. Pekerjaan Pondasi Rolag
1 M' Pasang pondasi rolag, 1 Pc : 5 Ps
Bahan
Batu Bata Merah 20,000 Bh x 720,00Rp = 14.400,00Rp
Semen 0,790 zak x 54.000,00Rp = 42.660,00Rp
Pasir Pasang 0,125 m3 x 100.000,00Rp = 12.500,00Rp
jumlah (1) 69.560,00Rp
Tenaga
Pekerja 0,800 Oh x 45.000,00Rp = 36.000,00Rp
Tukang Batu 0,270 Oh x 60.000,00Rp = 16.200,00Rp
Kepala Tukang Batu 0,027 Oh x 75.000,00Rp = 2.025,00Rp
Mandor 0,040 Oh x 85.000,00Rp = 3.400,00Rp
jumlah (2) = 57.625,00Rp
jumlah (1) + (2) = 127.185,00Rp
D. PEKERJAAN BETON
Beton
1 M³ Pekerjaan Beton 1PC : 3 PS : 4 KR
Bahan
Semen 6,380 zak x 54.000,00Rp = 344.520,00Rp
Pasir 0,520 m3 x 100.000,00Rp = 52.000,00Rp
Kerikil 0,840 m3 x 140.000,00Rp = 117.600,00Rp
jumlah (1) = 514.120,00Rp
Tenaga
Pekerja 0,410 Oh x 45.000,00Rp = 18.450,00Rp
Tukang Batu 0,700 Oh x 60.000,00Rp = 42.000,00Rp
Kepala Tukang Batu 0,070 Oh x 75.000,00Rp = 5.250,00Rp
Mandor 0,021 Oh x 85.000,00Rp = 1.785,00Rp
jumlah (2) = 67.485,00Rp
jumlah (1) + (2) = 581.605,00Rp
Pembesian
1 Kg Pekerjaan Pembesian 100 kg
Bahan
Besi Beton 1,100 Kg x 11.000,00Rp = 12.100,00Rp
Kawat 0,010 Kg x 16.000,00Rp = 160,00Rp
jumlah (1) = 12.260,00Rp
Tenaga
Pekerja 0,030 Oh x 45.000,00Rp = 1.350,00Rp
Tukang Besi 0,030 Oh x 60.000,00Rp = 1.800,00Rp
Kepala Tukang Besi 0,015 Oh x 75.000,00Rp = 1.125,00Rp
jumlah (2) = 4.275,00Rp
jumlah (1) + (2) = 16.535,00Rp
Bekisting
1M² Pekerjaan Bekisting
Bahan
Kayu papan bekisting 0,350 m2 x 12.000,00Rp = 4.200,00Rp
Paku 0,250 Kg x 15.000,00Rp = 3.750,00Rp
Kawat 0,025 Kg x 16.000,00Rp = 400,00Rp
jumlah (1) = 8.350,00Rp
Tenaga
Pekerja 0,540 Oh x 45.000,00Rp = 24.300,00Rp
Tukang Kayu 0,360 Oh x 60.000,00Rp = 21.600,00Rp
Kepala Tukang Kayu 0,036 Oh x 80.000,00Rp = 2.880,00Rp
Mandor 0,027 Oh x 85.000,00Rp = 2.295,00Rp
jumlah (2) = 51.075,00Rp
jumlah (1) + (2) = 59.425,00Rp
1. Pekerjaan Pembuatan Sloof 15/20
1 M³ Sloof 15/20
Beton 0,170 m3 x 581.605,00Rp = 98.872,85Rp
Besi 149,570 Kg x 16.535,00Rp = 2.473.139,95Rp
Bekisting 10,272 m2 x 59.425,00Rp = 610.413,60Rp
jumlah = 3.182.426,40Rp
2. Pekerjaan Pembuatan Kolom 15/15
1 M³ Kolom 15/15
Beton 0,240 m3 x 581.605,00Rp = 139.585,20Rp
Besi 144,300 Kg x 16.535,00Rp = 2.386.000,50Rp
Bekisting 13,330 m2 x 59.425,00Rp = 792.135,25Rp
jumlah = 3.317.720,95Rp
3. Pekerjaan Pembuatan Kolom 15/20
1 M³ Kolom 15/20
Beton 0,240 m3 x 581.605,00Rp = 139.585,20Rp
Besi 154,430 Kg x 16.535,00Rp = 2.553.500,05Rp
Bekisting 13,330 m2 x 59.425,00Rp = 792.135,25Rp
jumlah = 3.485.220,50Rp
4. Pekerjaan Pembuatan Ring Balk 15/15
1 M³ Ring Balk 15/15
Beton 0,240 m3 x 581.605,00Rp = 139.585,20Rp
Besi 144,300 Kg x 16.535,00Rp = 2.386.000,50Rp
Bekisting 13,330 m2 x 59.425,00Rp = 792.135,25Rp
jumlah = 3.317.720,95Rp
5. Pekerjaan Pembuatan Ring Balk 1520
1 M³ Ring Balk 15/20
Beton 0,240 m3 x 581.605,00Rp = 139.585,20Rp
Besi 154,430 Kg x 16.535,00Rp = 2.553.500,05Rp
Bekisting 13,330 m2 x 59.425,00Rp = 792.135,25Rp
jumlah = 3.485.220,50Rp
6. Pekerjaan Pembuatan Dak Beton
1 M³ Dak Beton
Beton 0,140 m3 x 581.605,00Rp = 81.424,70Rp
Besi 152,830 Kg x 16.535,00Rp = 2.527.044,05Rp
Bekisting 20,110 m2 x 59.425,00Rp = 1.195.036,75Rp
jumlah = 3.803.505,50Rp
7. Pekerjaan Pembuatan Kanopi
1 M³ Kanopi
Bahan
Semen 8,500 zak x 41.500,00Rp = 352.750,00Rp
Pasir 0,540 m3 x 110.000,00Rp = 59.400,00Rp
Kerikil 0,820 m3 x 140.000,00Rp = 114.800,00Rp
jumlah (1) = 526.950,00Rp
Tenaga
Pekerja 3,000 Oh x 45.000,00Rp = 135.000,00Rp
Tukang Batu 1,000 Oh x 60.000,00Rp = 60.000,00Rp
Mandor 0,100 Oh x 85.000,00Rp = 8.500,00Rp
jumlah (2) 203.500,00Rp
jumlah (1) + (2) 730.450,00Rp
E. PEKERJAAN DINDING
1. Pekerjaan Dinding Bata Merah 1Pc : 3 Ps
1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps
Bahan
Bata merah 5 x 10 x 20 cm 70,000 Bh x 720,00Rp = 50.400,00Rp
Semen portland 14,370 Kg x 1.350,00Rp = 19.399,50Rp
Pasir pasang 0,040 M³ x 100.000,00Rp = 4.000,00Rp
jumlah (1) 73.799,50Rp
Tenaga
Pekerja 0,320 Oh x 45.000,00Rp = 14.400,00Rp
Tukang batu 0,100 Oh x 60.000,00Rp = 6.000,00Rp
Kepala tukang 0,010 Oh x 75.000,00Rp = 750,00Rp
Mandor 0,015 Oh x 85.000,00Rp = 1.275,00Rp
jumlah (2) Rp 22.425,00Rp
jumlah (1) + (2) Rp 96.224,50Rp
2. Pekerjaan Dinding Bata Merah 1Pc : 3 Kp : 10 Ps
1 m² Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Kp : 10 Ps
Bahan
Bata merah 5 x 11 x 22 cm 70,000 Bh x 720,00Rp = 50.400,00Rp
Semen portland 4,500 Kg x 1.350,00Rp = 6.075,00Rp
Pasir pasang 0,050 M³ x 100.000,00Rp = 5.000,00Rp
Kapur pasang 0,015 M³ x 85.000,00Rp = 1.275,00Rp
jumlah (1) = 62.750,00Rp
Tenaga
Pekerja 0,320 Oh x 45.000,00Rp = 14.400,00Rp
Tukang batu 0,100 Oh x 60.000,00Rp = 6.000,00Rp
Kepala tukang 0,010 Oh x 75.000,00Rp = 750,00Rp
Mandor 0,015 Oh x 85.000,00Rp = 1.275,00Rp
jumlah (2) = 22.425,00Rp
jumlah (1) + (2) = 85.175,00Rp
3. Pekerjaan Plesteran Dinding
1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm
Bahan
Semen portland 6,480 Kg x 1.350,00Rp = 8.748,00Rp
Pasir pasang 0,019 M³ x 100.000,00Rp = 1.900,00Rp
jumlah (1) = 10.648,00Rp
Tenaga
Pekerja 0,200 Oh x 45.000,00Rp = 9.000,00Rp
Tukang batu 0,150 Oh x 60.000,00Rp = 9.000,00Rp
Kepala tukang 0,015 Oh x 75.000,00Rp = 1.125,00Rp
Mandor 0,010 Oh x 85.000,00Rp = 850,00Rp
jumlah (2) = 19.975,00Rp
jumlah (1) + (2) = 30.623,00Rp
4. Pekerjaan Plesteran Dinding
1 M² Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm
Bahan
Semen portland 1,840 Kg x 1.350,00Rp = 2.484,00Rp
Kapur padam 0,006 M³ x 85.000,00Rp = 510,00Rp
Pasir pasang 0,014 M³ x 100.000,00Rp = 1.400,00Rp
jumlah (1) = 4.394,00Rp
Tenaga
Pekerja 0,200 Oh x 45.000,00Rp = 9.000,00Rp
Tukang batu 0,150 Oh x 60.000,00Rp = 9.000,00Rp
Kepala tukang 0,015 Oh x 75.000,00Rp = 1.125,00Rp
Mandor 0,010 Oh x 85.000,00Rp = 850,00Rp
jumlah (2) = 19.975,00Rp
jumlah (1) + (2) = 24.369,00Rp
5. Pekerjaan Lis/Sponing
1M' Lis/Sponing
Bahan
Semen 0,500 Kg x 1.350,00Rp = 675,00Rp
Pasir 0,002 m3 x 100.000,00Rp = 200,00Rp
jumlah (1) = 875,00Rp
Tenaga
Pekerja 0,057 Oh x 45.000,00Rp = 2.565,00Rp
Tukang Batu 0,038 Oh x 60.000,00Rp = 2.280,00Rp
Kepala Tukang Batu 0,004 Oh x 75.000,00Rp = 285,00Rp
Mandor 0,002 Oh x 85.000,00Rp = 170,00Rp
jumlah (2) = 5.300,00Rp
jumlah (1) + (2) = 6.175,00Rp
6. Pasang Dinding Batu Andesit
1 m² Pasang Dinding Batu Tempel Hitam
Bahan
Batu Tempel Hitam 1,050 m2 x 95.000,00Rp = 99.750,00Rp
Semen Abu -abu 11,750 Kg x 2.500,00Rp = 29.375,00Rp
Pasir Pasang 0,035 m3 x 110.000,00Rp = 3.850,00Rp
jumlah (1) = 132.975,00Rp
Tenaga
Perkerja 0,620 Oh x 45.000,00Rp = 27.900,00Rp
Tukang Batu 0,350 Oh x 60.000,00Rp = 21.000,00Rp
Kepala Tukang 0,035 Oh x 75.000,00Rp = 2.625,00Rp
Mandor 0,030 Oh x 85.000,00Rp = 2.550,00Rp
jumlah (2) = 54.075,00Rp
jumlah (1) + (2) = 187.050,00Rp
F. PEKERJAAN KAYU
1. Pekerjaan Kusen Pintu dan Jendela Kayu
1 M³ Pasang kusen pintu dan jendela kayu bengkirai
Bahan
Kayu bengkirai 1,200 M³ x 10.000.000,00Rp = 12.000.000,00Rp
jumlah (1) = 12.000.000,00Rp
Tenaga
Pekerja 6,000 Oh x 45.000,00Rp = 270.000,00Rp
Tukang kayu 18,000 Oh x 70.000,00Rp = 1.260.000,00Rp
Kepala tukang 2,000 Oh x 80.000,00Rp = 160.000,00Rp
Mandor 0,300 Oh x 85.000,00Rp = 25.500,00Rp
jumlah (2) = 1.715.500,00Rp
jumlah (1) + (2) = 13.715.500,00Rp
2. Pekerjaan Kusen Pintu dan Jendela Alumunium
Bahan
Profil Alumunium 1,100 M' x 150.000,00Rp = 165.000,00Rp
Skrup Fixer 2,000 Bh x 250,00Rp = 500,00Rp
Sealant 0,060 Tube x 35.000,00Rp = 2.100,00Rp
jumlah (1) = 167.600,00Rp
Tenaga
Pekerja 0,043 Oh x 45.000,00Rp = 1.935,00Rp
tukang 0,043 Oh x 60.000,00Rp = 2.580,00Rp
Kepala tukang 0,004 Oh x 75.000,00Rp = 322,50Rp
Mandor 0,002 Oh x 85.000,00Rp = 178,50Rp
jumlah (2) = 5.016,00Rp
jumlah (1) + (2) = 172.616,00Rp
3. Pekerjaan Pintu Panel Kayu Jati
1 M² Pasang pintu panel kayu jati :
Bahan
Kayu jati, papan 0,036 M³ x 24.104.440,00Rp = 867.759,84Rp
jumlah (1) = 867.759,84Rp
Tenaga
Pekerja 1,000 Oh x 45.000,00Rp = 45.000,00Rp
Tukang kayu 2,500 Oh x 70.000,00Rp = 175.000,00Rp
Kepala tukang 0,250 Oh x 80.000,00Rp = 20.000,00Rp
Mandor 0,050 Oh x 85.000,00Rp = 4.250,00Rp
jumlah (2) = 244.250,00Rp
jumlah (1) + (2) = 1.112.009,84Rp
4. Pekerjaan Pintu Plywood Rangka Kayu Bengkirai
1 M² Pasang pintu plywood rangka, rangka kayu bengkirai :
Bahan
Kayu bengkirai, papan 0,020 M³ x 10.000.000,00Rp = 196.000,00Rp
Paku biasa ½" - 1" 0,030 Kg x 15.000,00Rp = 450,00Rp
Lem kayu 0,300 Lt x 37.400,00Rp = 11.220,00Rp
Playwood 4' x 3' x 4 mm 1,000 Lbr x 145.000,00Rp = 145.000,00Rp
Jumlah (1) = 352.670,00Rp
Tenaga
Pekerja 0,600 Oh x 45.000,00Rp = 27.000,00Rp
Tukang kayu 2,000 Oh x 70.000,00Rp = 140.000,00Rp
Kepala tukang 0,200 Oh x 80.000,00Rp = 16.000,00Rp
Mandor 0,030 Oh x 85.000,00Rp = 2.550,00Rp
Jumlah (2) = 185.550,00Rp
Jumlah (1) +(2) = 538.220,00Rp
5. Pekerjaan Pintu Plywood & Formika Rangka Kayu Bengkirai
1 M² Pasang pintu plywood & formika, rangka kayu meranti batu :
Bahan
Kayu bengkirai papan 0,020 M³ x 11.000.000,00Rp = 215.600,00Rp
Paku biasa ½" - 1" 0,300 Kg x 15.000,00Rp = 4.500,00Rp
Lem kayu 0,800 Lt x 37.400,00Rp = 29.920,00Rp
Plywood 4' x 3' x 4 mm 1,000 Lbr x 145.000,00Rp = 145.000,00Rp
Formica 4' x 3' 1,000 Lbr x 74.250,00Rp = 74.250,00Rp
Jumlah (1) = 469.270,00Rp
Tenaga
Pekerja 0,800 Oh x 45.000,00Rp = 36.000,00Rp
Tukang kayu 2,500 Oh x 70.000,00Rp = 175.000,00Rp
Kepala tukang 0,250 Oh x 80.000,00Rp = 20.000,00Rp
Mandor 0,040 Oh x 85.000,00Rp = 3.400,00Rp
Jumlah (2) = 234.400,00Rp
Jumlah (1) +(2) = 703.670,00Rp
6. Pekerjaan Pintu & Jendela Kaca Panel Kayu Jati
1 M² Pasang pintu dan jendela kaca panel kayu jati :
Bahan
Kayu jati, papan 0,035 M³ x 24.104.440,00Rp = 843.655,40Rp
Kaca polos 5 mm 0,800 M³ x 145.200,00Rp = 116.160,00Rp
Jumlah (1) = 959.815,40Rp
Tenaga
Pekerja 0,800 Oh x 45.000,00Rp = 36.000,00Rp
Tukang kayu 2,000 Oh x 70.000,00Rp = 140.000,00Rp
Kepala tukang 0,200 Oh x 80.000,00Rp = 16.000,00Rp
Mandor 0,040 Oh x 85.000,00Rp = 3.400,00Rp
Jumlah (2) = 195.400,00Rp
Jumlah (1) +(2) = 1.155.215,40Rp
G. PEKERJAAN ATAP
1. Pekerjaan Rangka Atap
1 M³ Pasang Rangka Atap Kayu Bengkirai
Bahan
Kayu bengkirai, balok 1,100 M³ x 10.000.000,00Rp = 11.000.000,00Rp
Besi strip 15,000 Kg x 11.880,00Rp = 178.200,00Rp
Paku biasa 2" - 5" 0,800 Kg x 40.000,00Rp = 32.000,00Rp
Jumlah (1) = 11.210.200,00Rp
Tenaga
Pekerja 4,000 Oh x 45.000,00Rp = 180.000,00Rp
Tukang kayu 12,000 Oh x 70.000,00Rp = 840.000,00Rp
Kepala tukang 1,200 Oh x 80.000,00Rp = 96.000,00Rp
Mandor 0,200 Oh x 85.000,00Rp = 17.000,00Rp
Jumlah (2) = 1.133.000,00Rp
Jumlah (1) +(2) = 12.343.200,00Rp
2. Pekerjaan Kaso + Reng
1 M² Pasang kaso + reng genteng beton kayu bengkirai :
Bahan
Kayu 5/7 0,014 M³ x 2.500.000,00Rp = 35.000,00Rp
Paku biasa 2" - 5" 0,150 Kg x 16.950,00Rp = 2.542,50Rp
Jumlah (1) = 37.542,50Rp
Tenaga
Pekerja 0,100 Oh x 45.000,00Rp = 4.500,00Rp
Tukang kayu 0,100 Oh x 70.000,00Rp = 7.000,00Rp
Kepala tukang 0,010 Oh x 80.000,00Rp = 800,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
Jumlah (2) = 12.725,00Rp
Jumlah (1) +(2) = 50.267,50Rp
3. Pekerjaan Lisplang 3 x 20 cm Kayu Bengkirai
1 M´ Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai :
Bahan
Kayu Bengkirai, papan 0,007 M³ x 10.000.000,00Rp = 72.000,00Rp
Paku biasa 2" - 5" 0,050 Kg x 16.950,00Rp = 847,50Rp
Jumlah (1) = 72.847,50Rp
Tenaga
Pekerja 0,100 Oh x 45.000,00Rp = 4.500,00Rp
Tukang kayu 0,200 Oh x 70.000,00Rp = 14.000,00Rp
Kepala tukang 0,020 Oh x 80.000,00Rp = 1.600,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
Jumlah (2) = 20.525,00Rp
Jumlah (1) +(2) = 93.372,50Rp
4. Pekerjaan Penutup Atap Genteng Beton
1 M² Pasang atap genteng beton
Bahan
Atap genteng beton 11,000 Bh x 3.750,00Rp = 41.250,00Rp
Paku biasa 2" - 5" 0,030 Kg x 16.950,00Rp = 508,50Rp
Jumlah (1) = 41.758,50Rp
Tenaga 0,200 Oh x 45.000,00Rp = 9.000,00Rp
Pekerja 0,100 Oh x 70.000,00Rp = 7.000,00Rp
Tukang Kayu 0,010 Oh x 80.000,00Rp = 800,00Rp
Kepala Tukang 0,010 Oh x 85.000,00Rp = 850,00Rp
Mandor Jumlah (2) = 17.650,00Rp
Jumlah (1) + (2) = 59.408,50Rp
5. Pekerjaan Pasang Genteng Bubungan
1 M² Pasang genteng bubung
Bahan
Bubung genteng 5,000 bh x 9.350,00Rp = 46.750,00Rp
Semen portland 8,000 Kg x 1.037,50Rp = 8.300,00Rp
Pasir Pasang 0,032 M³ x 100.000,00Rp = 3.200,00Rp
Jumlah (1) = 58.250,00Rp
Tenaga
Pekerja 0,400 Oh x 45.000,00Rp = 18.000,00Rp
Tukang Kayu 0,200 Oh x 70.000,00Rp = 14.000,00Rp
Kepala Tukang 0,020 Oh x 80.000,00Rp = 1.600,00Rp
Mandor 0,002 Oh x 85.000,00Rp = 170,00Rp
Jumlah (2) = 33.770,00Rp
Jumlah (1) + (2) = 92.020,00Rp
H. PEKERJAAN PLAFON
1. Pekerjaan Rangka Plafond
1 M² Pasang Rangka Plafond Hollow 4 x 4 Cm
Bahan
Hollow 4x4 cm 0,415 Btg x 29.200,00Rp = 12.118,00Rp
Hollow 2x4 cm 0,150 Btg x 22.600,00Rp = 3.390,00Rp
Ramset 4,000 Bh x 7.200,00Rp = 28.800,00Rp
jumlah (1) = 44.308,00Rp
Tenaga
Pekerja 0,100 Oh x 45.000,00Rp = 4.500,00Rp
Tukang kayu 0,050 Oh x 70.000,00Rp = 3.500,00Rp
Kepala tukang 0,005 Oh x 80.000,00Rp = 400,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
jumlah (2) = 8.825,00Rp
jumlah (1) + (2) = 53.133,00Rp
2. Pekerjaan Plafond Gypsum
1 M² Pasang Palfon Gypsum
Bahan
Gypsumboard 240x120x9 mm 0,364 Lbr x 62.980,00Rp = 22.924,72Rp
Paku Gypsum 0,110 Kg x 17.500,00Rp = 1.925,00Rp
Cotton Plaster 0,072 Bh x 15.000,00Rp = 1.080,00Rp
Compoun 0,125 Zak x 75.000,00Rp = 9.375,00Rp
jumlah (1) = 35.304,72Rp
Tenaga
Pekerja 0,100 Oh x 45.000,00Rp = 4.500,00Rp
Tukang kayu 0,050 Oh x 70.000,00Rp = 3.500,00Rp
Kepala tukang 0,005 Oh x 80.000,00Rp = 400,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
jumlah (2) = 8.825,00Rp
jumlah (1) + (2) = 44.129,72Rp
I. PEKERJAAN LANTAI
1. Pekerjaan Pemasangan Keramik 40x40
1 M² Pasang lantai keramik 40 x 40 cm
Bahan
Ubin keramik 40 x 40 cm 6,250 Bh x 17.333,33Rp = 108.333,33Rp
Semen portland 11,380 Kg x 1.350,00Rp = 15.363,00Rp
Pasir pasang 0,042 M³ x 100.000,00Rp = 4.200,00Rp
Semen warna 1,500 Kg x 2.500,00Rp = 3.750,00Rp
Jumlah (1) = 131.646,33Rp
Tenaga
Pekerja 0,620 Oh x 45.000,00Rp = 27.900,00Rp
Tukang batu 0,350 Oh x 60.000,00Rp = 21.000,00Rp
Kepala tukang 0,035 Oh x 75.000,00Rp = 2.625,00Rp
Mandor 0,030 Oh x 85.000,00Rp = 2.550,00Rp
Jumlah (2) = 54.075,00Rp
Jumlah (1) + (2) = 185.721,33Rp
2. Pekerjaan Pemasangan Keramik 20x20
1 M² Pasang lantai keramik 20 x 20 cm
Bahan
Ubin keramik 20 x 20 cm 25,000 Bh x 3.480,00Rp = 87.000,00Rp
Semen portland 11,380 Kg x 1.350,00Rp = 15.363,00Rp
Pasir pasang 0,042 M³ x 100.000,00Rp = 4.200,00Rp
Semen warna 1,500 Kg x 2.500,00Rp = 3.750,00Rp
Jumlah (1) = 110.313,00Rp
Tenaga
Pekerja 0,620 Oh x 45.000,00Rp = 27.900,00Rp
Tukang batu 0,350 Oh x 60.000,00Rp = 21.000,00Rp
Kepala tukang 0,035 Oh x 75.000,00Rp = 2.625,00Rp
Mandor 0,030 Oh x 85.000,00Rp = 2.550,00Rp
Jumlah (2) = 54.075,00Rp
Jumlah (1) + (2) = 164.388,00Rp
3. Pekerjaan Pemasangan Keramik Dinding 20x25
1 M² Pasang dinding keramik 20 x 25 cm
Bahan
Keramik 20 x 25 cm 20,000 Bh x 4.200,00Rp = 84.000,00Rp
Semen portland 9,300 Kg x 1.350,00Rp = 12.555,00Rp
Pasir pasang 0,018 M³ x 100.000,00Rp = 1.800,00Rp
Semen warna 1,500 Kg x 2.500,00Rp = 3.750,00Rp
Jumlah (1) = 102.105,00Rp
Tenaga
Pekerja 0,600 Oh x 45.000,00Rp = 27.000,00Rp
Tukang batu 0,450 Oh x 60.000,00Rp = 27.000,00Rp
Kepala tukang 0,045 Oh x 75.000,00Rp = 3.375,00Rp
Mandor 0,030 Oh x 85.000,00Rp = 2.550,00Rp
Jumlah (2) = 59.925,00Rp
Jumlah (1) + (2) = 162.030,00Rp
4. Pekerjaan Pemasangan Plint Keramik Lantai
1 M' Pasang plint keramik ukuran 10 x 40 cm
Bahan
Keramik 10 x 40 cm 2,5 Bh x 5.960,00Rp = 14.900,00Rp
Semen portland 0,85 Kg x 1.350,00Rp = 1.147,50Rp
Pasir pasang 0,0032 M³ x 100.000,00Rp = 320,00Rp
Semen warna 0,08 Kg x 2.500,00Rp = 200,00Rp
Jumlah (1) = 16.567,50Rp
Tenaga
Pekerja 0,09 Oh x 45.000,00Rp = 4.050,00Rp
Tukang batu 0,09 Oh x 60.000,00Rp = 5.400,00Rp
Kepala tukang 0,009 Oh x 75.000,00Rp = 675,00Rp
Mandor 0,0045 Oh x 85.000,00Rp = 382,50Rp
Jumlah (2) = 10.507,50Rp
Jumlah (1) + (2) = 27.075,00Rp
J. PEKERJAAN LISTRIK
1. Pekerjaan Pemasangan 1 Stop Kontak
bahan
stop kontak 1,000 bh x 19.500,00Rp = 19.500,00Rp
kabel 0,250 m x 35.000,00Rp = 8.750,00Rp
jumlah (1) = 28.250,00Rp
tenaga
Tukang Listrik 0,600 org 60.000,00Rp = 36.000,00Rp
jumlah (2) = 36.000,00Rp
jumlah (1) + (2) = 64.250,00Rp
2. Pekerjaan Pemasangan 1 Titik Lampu
bahan
fitting 1,000 bh x 20.000,00Rp = 20.000,00Rp
kabel 0,250 m x 35.000,00Rp = 8.750,00Rp
Lampu philips 18 watt 1,000 bh x 31.500,00Rp = 31.500,00Rp
jumlah (1) = 60.250,00Rp
tenaga
Tukang Listrik 0,600 org x 60.000,00Rp = 36.000,00Rp
jumlah (2) = 36.000,00Rp
jumlah (1) + (2) = 96.250,00Rp
3. Pekerja Pemasangan 1 Saklar Tunggal
bahan
Saklar Tunggal 1,000 bh x 13.500,00Rp = 13.500,00Rp
kabel 0,250 m x 35.000,00Rp = 8.750,00Rp
jumlah (1) = 22.250,00Rp
tenaga
Tukang Listrik 0,600 org x 60.000,00Rp = 36.000,00Rp
jumlah (2) = 36.000,00Rp
jumlah (1) + (2) = 58.250,00Rp
4. Pekerja Pemasangan 1 Saklar Double
bahan
Saklar Double 1,000 bh x 15.000,00Rp = 15.000,00Rp
kabel 0,250 m x 35.000,00Rp = 8.750,00Rp
jumlah (1) = 23.750,00Rp
tenaga
Tukang Listrik 0,600 org x 60.000,00Rp = 36.000,00Rp
jumlah (2) = 36.000,00Rp
jumlah (1) + (2) = 59.750,00Rp
K. PEKERJAAN PENGECATAN
1. Pengecatan Tembok Baru Dalam
1M² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
Plamir 0,120 Kg x 15.730,00Rp = 1.887,60Rp
Cat dasar 0,120 Kg x 16.000,00Rp = 1.920,00Rp
Cat tembok dalam 2 x 0,260 Kg x 53.000,00Rp = 13.780,00Rp
Jumlah (1) = 17.587,60Rp
Tenaga
Pekerja 0,040 Oh x 45.000,00Rp = 1.800,00Rp
Tukang cat 0,120 Oh x 60.000,00Rp = 7.200,00Rp
Kepala tukang 0,012 Oh x 75.000,00Rp = 900,00Rp
Mandor 0,002 Oh x 85.000,00Rp = 170,00Rp
Jumlah (2) = 10.070,00Rp
Jumlah (1) + (2) = 27.657,60Rp
2. Pengecatan Tembok Baru Luar
1M² Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
Plamir 0,120 Kg x 15.730,00Rp = 1.887,60Rp
Cat dasar 0,120 Kg x 16.000,00Rp = 1.920,00Rp
Cat tembok luar 2 x 0,260 Kg x 86.000,00Rp = 22.360,00Rp
Jumlah (1) = 26.167,60Rp
Tenaga
Pekerja 0,040 Oh x 45.000,00Rp = 1.800,00Rp
Tukang cat 0,120 Oh x 60.000,00Rp = 7.200,00Rp
Kepala tukang 0,012 Oh x 75.000,00Rp = 900,00Rp
Mandor 0,002 Oh x 85.000,00Rp = 170,00Rp
Jumlah (2) = 10.070,00Rp
Jumlah (1) + (2) = 36.237,60Rp
3. Pengecatan Genteng
1M² Pengecatan Genteng
bahan
amplas 1,000 Lbr x 3.500,00Rp = 3.500,00Rp
cat finishing desnilux 0,290 Kg x 60.000,00Rp = 17.400,00Rp
jumlah (1) = 20.900,00Rp
tenaga
tukang cat 0,063 Oh x 60.000,00Rp = 3.780,00Rp
kepala tukang 0,006 Oh x 75.000,00Rp = 472,50Rp
pekerja 0,020 Oh x 45.000,00Rp = 900,00Rp
mandor 0,003 Oh x 85.000,00Rp = 212,50Rp
jumlah (2) = 5.365,00Rp
jumlah (1) + (2) = 26.265,00Rp
4. Pengecatan Bidang Kayu
1M² Pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar, 2 lps cat minyak
Bahan
Cat menie kayu 0,2 Kg x 20.570,00Rp = 4.114,00Rp
Plamir 0,15 Kg x 22.500,00Rp = 3.375,00Rp
Cat dasar 0,17 Kg x 16.000,00Rp = 2.720,00Rp
Cat Minyak 0,26 Kg x 35.700,00Rp = 9.282,00Rp
Jumlah (1) = 19.491,00Rp
Tenaga
Pekerja 0,07 Oh x 45.000,00Rp = 3.150,00Rp
Tukang cat 0,09 Oh x 60.000,00Rp = 5.400,00Rp
Kepala tukang 0,009 Oh x 75.000,00Rp = 675,00Rp
Mandor 0,0025 Oh x 85.000,00Rp = 212,50Rp
Jumlah (2) = 9.437,50Rp
Jumlah (1) + (2) = 28.928,50Rp
L. PEKERJAAN SANITASI
1. Pembuatan Sumur Air Bersih
pompa 1 unt x 500.000,00Rp = 500.000,00Rp
sumur 1 unt x 1.720.000,00Rp = 1.720.000,00Rp
jumlah = 2.220.000,00Rp
2. Pekerjaan Pemasangan Kloset Duduk
Memasang 1 buah kloset duduk/monoblok
Bahan
Klosed duduk/monoblok 1,000 Bh x 1.550.000,00Rp = 1.550.000,00Rp
Perlengkapan 6% x 1.550.000,00Rp = 93.000,00Rp
Jumlah (1) = 1.643.000,00Rp
Tenaga
Pekerja 3,300 Oh x 45.000,00Rp = 148.500,00Rp
Tukang batu 1,500 Oh x 60.000,00Rp = 90.000,00Rp
Kepala tukang 0,150 Oh x 75.000,00Rp = 11.250,00Rp
Mandor 0,160 Oh x 85.000,00Rp = 13.600,00Rp
Jumlah (2) = 263.350,00Rp
Jumlah (1) +(2) = 1.906.350,00Rp
3. Pekerjaan Bak Kontrol
Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm
tinggi 50 cm
Bahan
Batu bata 250,000 Bh x 720,00Rp = 180.000,00Rp
Semen portland 77,000 Kg x 1.350,00Rp = 103.950,00Rp
Pasir pasang 0,130 M³ x 100.000,00Rp = 13.000,00Rp
Batu kerikil 0,020 M³ x 140.000,00Rp = 2.800,00Rp
Besi beton 2,600 Kg x 11.000,00Rp = 28.600,00Rp
Pasir beton 0,090 M³ x 110.000,00Rp = 9.900,00Rp
Jumlah (1) = 338.250,00Rp
Tenaga
Pekerja 1,420 Oh x 45.000,00Rp = 63.900,00Rp
Tukang batu 0,473 Oh x 60.000,00Rp = 28.380,00Rp
Kepala tukang 0,047 Oh x 75.000,00Rp = 3.525,00Rp
Mandor 0,071 Oh x 85.000,00Rp = 6.035,00Rp
Jumlah (2) = 101.840,00Rp
Jumlah (1) +(2) = 440.090,00Rp
4. Pekerjaan Pemasangan Pipa PVC 3/4'
Memasang 1 m' pipa PVC tipe AW diameter ¾"
Bahan
Pipa PVC 1,200 M´ x 7.440,00Rp = 8.928,00Rp
Perlengkapan 0,35 harga pipa x 7.440,00Rp = 2.604,00Rp
Jumlah (1) = 11.532,00Rp
Tenaga
Pekerja 0,036 Oh x 45.000,00Rp = 1.620,00Rp
Tukang batu 0,060 Oh x 60.000,00Rp = 3.600,00Rp
Kepala tukang 0,006 Oh x 75.000,00Rp = 450,00Rp
Mandor 0,002 Oh x 85.000,00Rp = 153,00Rp
Jumlah (2) = 5.823,00Rp
Jumlah (1) +(2) = 17.355,00Rp
5. Pekerjaan Pemasangan Pipa PVC 3'
Memasang 1 m' pipa PVC tipe AW diameter 3"
Bahan
Pipa PVC 1,200 M´ x 29.840,00Rp = 35.808,00Rp
Perlengkapan 0,35 harga pipa x 29.840,00Rp = 10.444,00Rp
Jumlah (1) = 46.252,00Rp
Tenaga
Pekerja 0,081 Oh x 45.000,00Rp = 3.645,00Rp
Tukang batu 0,135 Oh x 60.000,00Rp = 8.100,00Rp
Kepala tukang 0,014 Oh x 75.000,00Rp = 1.012,50Rp
Mandor 0,004 Oh x 85.000,00Rp = 348,50Rp
Jumlah (2) = 13.106,00Rp
Jumlah (1) +(2) = 59.358,00Rp
harga klosed
6. Pekerjaan Pemasangan Pipa PVC 4'
Memasang 1 m' pipa PVC tipe AW diameter 4"
Bahan
Pipa PVC 1,200 M´ x 49.920,00Rp = 59.904,00Rp
Perlengkapan 0,35 harga pipa x 49.920,00Rp = 17.472,00Rp
Jumlah (1) = 77.376,00Rp
Tenaga
Pekerja 0,081 Oh x 45.000,00Rp = 3.645,00Rp
Tukang batu 0,135 Oh x 60.000,00Rp = 8.100,00Rp
Kepala tukang 0,014 Oh x 75.000,00Rp = 1.012,50Rp
Mandor 0,004 Oh x 85.000,00Rp = 348,50Rp
Jumlah (2) = 13.106,00Rp
Jumlah (1) +(2) = 90.482,00Rp
7. Pekerjaan Bak Cuci Piring
Memasang 1 bh bak cuci piring stainles steel
Bahan
Bak cuci stainless steel 1,000 Bh x 466.700,00Rp = 466.700,00Rp
Water drain asesories 1,000 Set x 15.000,00Rp = 15.000,00Rp
Jumlah (1) = 481.700,00Rp
Tenaga
Pekerja 0,030 Oh x 45.000,00Rp = 1.350,00Rp
Tukang batu 0,300 Oh x 60.000,00Rp = 18.000,00Rp
Kepala tukang 0,030 Oh x 75.000,00Rp = 2.250,00Rp
Mandor 0,002 Oh x 85.000,00Rp = 127,50Rp
Jumlah (2) = 21.727,50Rp
Jumlah (1) +(2) = 503.427,50Rp
8. Pekerjaan Pasang Kran
Memasang 1 bh kran diameter ¾" atau ½"
Bahan
Kran air 1,000 Bh x 28.000,00Rp = 28.000,00Rp
Seal tape 0,025 Bh x 92.570,00Rp = 2.314,25Rp
Jumlah (1) = 30.314,25Rp
Tenaga
Pekerja 0,010 Oh x 45.000,00Rp = 450,00Rp
Tukang batu 0,100 Oh x 60.000,00Rp = 6.000,00Rp
Kepala tukang 0,010 Oh x 75.000,00Rp = 750,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
Jumlah (2) = 7.625,00Rp
Jumlah (1) +(2) = 37.939,25Rp
9. Pekerjaan Pasang Floor Drain
Memasang 1 bh Floor drain
Bahan
Floor drain 1,000 Bh x 16.000,00Rp = 16.000,00Rp
Jumlah (1) = 16.000,00Rp
Tenaga
Pekerja 0,010 Oh x 45.000,00Rp = 450,00Rp
Tukang batu 0,100 Oh x 60.000,00Rp = 6.000,00Rp
Kepala tukang 0,010 Oh x 75.000,00Rp = 750,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
Jumlah (2) = 7.625,00Rp
Jumlah (1) +(2) = 23.625,00Rp
10. Pekerjaan Septictank
1 Bak Septictank Standart 1 KK NKKBS
Bahan
Bata Merah 2100,000 biji x 720,00Rp = 1.512.000,00Rp
PC 771,000 kg x 1.350,00Rp = 1.040.850,00Rp
PS 1,215 m3 x 100.000,00Rp = 121.500,00Rp
Pasir Urug 0,300 m3 x 70.000,00Rp = 21.000,00Rp
Pasir Beton 0,070 m3 x 110.000,00Rp = 7.700,00Rp
Krikil Beton 0,166 m3 x 140.000,00Rp = 23.240,00Rp
Besi Tulangan 26,000 kg x 11.000,00Rp = 286.000,00Rp
Kawat Bendrat 0,260 kg x 16.000,00Rp = 4.160,00Rp
Paku 0,400 kg x 15.000,00Rp = 6.000,00Rp
Papan Kayu Bekisting 0,031 m3 x 800.000,00Rp = 24.800,00Rp
Pipa Besi D 2" 1,000 lonjor x 40.000,00Rp = 40.000,00Rp
Knie 1,000 biji x 6.000,00Rp = 6.000,00Rp
Terstek T 1,000 biji x 8.000,00Rp = 8.000,00Rp
Pipa PVC D 4" 1,000 lonjor x 49.920,00Rp = 49.920,00Rp
jumlah (1) = 3.151.170,00Rp
Tenaga
Tukang Batu 7,600 Oh x 60.000,00Rp = 456.000,00Rp
Tukang Besi 0,500 Oh x 60.000,00Rp = 30.000,00Rp
Tukang Kayu 0,400 Oh x 70.000,00Rp = 28.000,00Rp
Kepala Tukang 0,760 Oh x 75.000,00Rp = 57.000,00Rp
Pekerja 28,000 Oh x 45.000,00Rp = 1.260.000,00Rp
jumlah (2) = 1.831.000,00Rp
jumlah (1) + (2) = 4.982.170,00Rp
11. Pekerjaan Pemasangan Shower
bahan
shower 1,000 Bh x 1.230.000,00Rp = 1.230.000,00Rp
seal tape 0,025 Bh x 92.570,00Rp = 2.314,25Rp
jumlah (1) = 1.232.314,25Rp
tenaga
tukang 1,500 Oh x 60.000,00Rp = 90.000,00Rp
kepala tukang 1,500 Oh x 75.000,00Rp = 112.500,00Rp
pekerja 1,000 Oh x 45.000,00Rp = 45.000,00Rp
mandor 0,160 Oh x 85.000,00Rp = 13.600,00Rp
jumlah (2) = 261.100,00Rp
jumlah (1) + (2) = 1.493.414,25Rp
M. PEKERJAAN ALAT GANTUNG DAN KACA
1. Pekerjaan Pasang Kaca Tebal 5 mm
1 M² pasang kaca, tebal 5 mm
Bahan
Kaca 1,1 M² x 145.200,00Rp = 159.720,00Rp
Jumlah (1) = 159.720,00Rp
Tenaga
Pekerja 0,0155 Oh x 45.000,00Rp = 697,50Rp
Tukang Kayu 0,155 Oh x 70.000,00Rp = 10.850,00Rp
Kepala Tukang 0,0155 Oh x 80.000,00Rp = 1.240,00Rp
Mandor 0,00075 Oh x 85.000,00Rp = 63,75Rp
Jumlah (2) = 12.851,25Rp
Jumlah (1) + (2) = 172.571,25Rp
2. Pekerjaan Pasang 1 Engsel Pintu
1 buah pasang engsel pintu
Bahan
engsel pintu 1 Bh x 9.000,00Rp = 9.000,00Rp
Jumlah (1) = 9.000,00Rp
Tenaga
Pekerja 0,015 Oh x 45.000,00Rp = 675,00Rp
Tukang Kayu 0,15 Oh x 70.000,00Rp = 10.500,00Rp
Kepala Tukang 0,015 Oh x 80.000,00Rp = 1.200,00Rp
Mandor 0,00075 Oh x 85.000,00Rp = 63,75Rp
Jumlah (2) = 12.438,75Rp
Jumlah (1) + (2) = 21.438,75Rp
3. Pekerjaan Pasang Kunci Tanam dan Handle Pintu
1 buah pasang kunci tanam dan handle
Bahan
Kunci tanam 1,000 Bh x 100.000,00Rp = 100.000,00Rp
Handle pintu 1,000 Bh 120.000,00Rp = 120.000,00Rp
Jumlah (1) = 220.000,00Rp
Tenaga
Pekerja 0,010 Oh x 45.000,00Rp = 450,00Rp
Tukang Kayu 0,500 Oh x 70.000,00Rp = 35.000,00Rp
Kepala Tukang 0,010 Oh x 80.000,00Rp = 800,00Rp
Mandor 0,005 Oh x 85.000,00Rp = 425,00Rp
Jumlah (2) = 36.675,00
Jumlah (1) + (2) = 256.675
4. Pekerjaan Pasang Engsel Jendela
1 buah pasang engsel jendela
Bahan
Engsel jendela 1 Bh x 20.000,00Rp = 20.000,00Rp
Jumlah (1) = 20.000,00Rp
Tenaga
Pekerja 0,01 Oh x 45.000,00Rp = 450,00Rp
Tukang Kayu 0,1 Oh x 70.000,00Rp = 7.000,00Rp
Kepala Tukang 0,01 Oh x 80.000,00Rp = 800,00Rp
Mandor 0,0005 Oh x 85.000,00Rp = 42,50Rp
Jumlah (2) = 8.292,50Rp
Jumlah (1) + (2) = 28.292,50Rp
5. Pekerjaan Pasang 1 Hak Angin
1 buah pasang hak angin
Bahan
Hak angin 1 Bh x 30.000,00Rp = 30.000,00Rp
Jumlah (1) = 30.000,00Rp
Tenaga
Pekerja 0,02 Oh x 45.000,00Rp = 900,00Rp
Tukang Kayu 0,2 Oh x 70.000,00Rp = 14.000,00Rp
Kepala Tukang 0,02 Oh x 80.000,00Rp = 1.600,00Rp
Mandor 0,01 Oh x 85.000,00Rp = 850,00Rp
Jumlah (2) = 17.350,00Rp
Jumlah (1) + (2) = 47.350,00Rp
6. Pekerjaan Pasang Kunci Selot
1 buah pasang kunci selot
Bahan
Kunci selot 1 Bh x 25.000,00Rp = 25.000,00Rp
Jumlah (1) = 25.000,00Rp
Tenaga
Pekerja 0,02 Oh x 52.500,00Rp = 1.050,00Rp
Tukang Kayu 0,2 Oh x 78.800,00Rp = 15.760,00Rp
Kepala Tukang 0,02 Oh x 91.900,00Rp = 1.838,00Rp
Mandor 0,001 Oh x 65.600,00Rp = 65,60Rp
Jumlah (2) = 18.713,60Rp
Jumlah (1) + (2) = 43.713,60Rp
N. PEKERJAAN TAMAN
1. Pekerjaan Taman
1M2 Taman Datar
Lungsum = 75.000,00Rp
2. Pekerjaan Paving Block
1M2 Paving Block
Bahan
Paving Block 27,000 Bh x 1.300,00Rp = 35.100,00Rp
Pasir Urug 0,003 m3 x 70.000,00Rp = 210,00Rp
jumlah (1) = 35.310,00Rp
Tenaga
Pekerja 0,090 Oh x 45.000,00Rp = 4.050,00Rp
Tukang Batu 0,270 Oh x 60.000,00Rp = 16.200,00Rp
Kepala Tukang Batu 0,015 Oh x 75.000,00Rp = 1.125,00Rp
Mandor 0,014 Oh x 85.000,00Rp = 1.190,00Rp
jumlah (2) = 22.565,00Rp
jumlah (1) + (2) = 57.875,00Rp
ANALISA VOLUME Pekerjaan FORM :
Proyek : No. Lbr :
Lokasi :
Bagian : Jml.Lbr :
Variabel
No Uraian Pekerjaan (sketsa) Variable Dim. Sat P L T Un/L Volume Sat Keterangan
A. PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LOKASI
panjang 17,00 m 17,00 8,00 0,10 13,60 m2
lebar 8,00 m
2 PEKERJAAN BOUWPLANK
panjang 17,00 m 1,00 16,00 1,00 18,00 9,00 54,00 m'
lebar 8,00 m 1,00 7,00 1,00
B. PEKERJAAN GALIAN DAN TANAH
1 GALIAN TANAH PONDASI
Terhitung
Uraian Dim.
RUMAH TIPE 64/136
GIWANGAN UH VII/105A YOGYAKARTA
8 m
17 m
8 m
17 m
Pondasi A VERTIKAL
panjang 41,50 m' 3,50 3,50 7,50 8,50 5,50
lebar
(1,05+
0,75)/2
=0,9
m' 5,00
tinggi 0,95 m'
8,00 41,50 0,90 0,95 1,00 35,48 m3
Pondasi B VERTIKAL
panjang 36,45 m' 1,00 3,65 0,65 3,50 3,50
lebar
(1,55+
1)/2
=1,275
m' 1,50
tinggi 0,95 m'
3,00 5,00 3,00 3,00 2,00
3,00 3,00 0,65 36,45 1,28 0,95 1,00 44,15 m3
Pondasi Rollag
panjang 11,35 m'
lebar 0,30 m'
tinggi 0,20 m' 11,35 0,30 0,20 1,00 0,68 m3
Total volume galian tanah 80,31 m3
2 PASIR URUG BAWAH PONDASI 10 CM
Pondasi A VERTIKAL
panjang 41,50 m' 3,50 3,50 7,50 8,50 5,50
5,00
lebar 0,75 m'
tebal 0,10 m' 8,00 41,50 0,75 0,10 1,00 3,11 m3
Pondasi B VERTIKAL
panjang 36,45 m' 1,00 3,65 0,65 3,50 3,50
1,50
lebar 1,00 m' 3,00 5,00 3,00 3,00 2,00
tebal 0,10 m' 3,00 3,00 0,65 36,45 1,00 0,10 1,00 3,65 m3
Pondasi Rolag panjang 11,35 m'
lebar 0,30 m'
tebal 0,05 m' 11,35 0,30 0,05 1,00 0,17 m3
Total volume pasir urug bawah pondasi 6,93 m3
HORISONTAL
HORISONTAL
HORISONTAL
HORISONTAL
3 TANAH URUG GALIAN PONDASI volume galian 80,31
volume anstamping 6,71
volume pondasi 21,74
volume rolag 11,35
volume pasir urug 6,93
v galian - v lainnya = 33,59 m3
4 PENINGGIAN TANAH panjang 8,00 m'
lebar 8,00 m'
tinggi 0,10 m' 8,00 8,00 0,10 1,00 6,40 m3
5 PEMADATAN TANAH 33,59 m3
v = 1/3 (tanah urug + peninggian tanah) 6,40 m3 13,33 m3
5 PASIR PASANG BAWAH LANTAI panjang 8,00 m'
lebar 8,00 m'
tinggi 0,10 m' 8,00 8,00 0,10 1,00 6,40 m3
C PEKERJAAN PONDASI
1 ANSTAMPING / BATU KOSONGAN
Pondasi A VERTIKAL
panjang 41,50 m' 3,50 3,50 7,50 8,50 5,50
5,00
lebar 0,60 m'
tinggi 0,15 m' 8,00 41,50 0,38 0,15 1,00 2,33 m3
Pondasi B VERTIKAL
panjang 36,45 m' 1,00 3,65 0,65 3,50 3,50
1,50
lebar 0,80 m' 3,00 5,00 3,00 3,00 2,00
tinggi 0,15 m' 3,00 3,00 0,65 36,45 0,80 0,15 1,00 4,37 m3
Total volume anstamping 6,71 m3
HORISONTAL
HORISONTAL
tanah urug
penggian tanah
2 PONDASI BATU KALI CAMPURAN 1 PC : 3 KP : 10 PS
Pondasi A VERTIKAL
panjang 41,50 m' 3,50 3,50 7,50 8,50 5,50
5,00
lebar
(0,5+0,
25)/2
=0,375
m'
tinggi 0,70 m' 8,00 41,50 0,38 0,70 1,00 10,89 m3
Pondasi B VERTIKAL
panjang 36,45 m' 1,00 3,65 0,65 3,50 3,50
1,50
lebar
(0,6+0,
25)/2
=0,425
m' 3,00 5,00 3,00 3,00 2,00
tinggi 0,70 m' 3,00 3,00 0,65 36,45 0,43 0,70 1,00 10,84 m3
total volume pondasi 21,74 m3
3 PONDASI ROLAG CAMPURAN 1 PC : 5 PS
panjang 11,35 m'
11,35 1,00 11,35 m'
D PEKERJAAN BETON BERTULANG
1 PEKERJAAN SLOOF 15/20 panjang 77,95 m' VERTIKAL
3,50 3,50 7,50 1,00 3,65
0,65 3,50 3,50 1,50 8,50
5,50 5,00
lebar 0,15 m' 8,00 3,00 5,00 3,00 3,00
tinggi 0,20 m' 2,00 3,00 3,00 0,65 77,95 0,15 0,20 1,00 2,34 m3
2 PEKERJAAN KOLOM 15/15
kolom 15/15 pagar panjang 0,15 m'
lebar 0,15 m'
tinggi 2,55 m' 0,15 0,15 2,55 4,00 0,23 m3
kolom 15/15 bangunan panjang 0,15
lebar 0,15
tinggi 3,50 0,15 0,15 3,50 16,00 1,26 m3
HORISONTAL
HORISONTAL
HORISONTAL
kolom gantung 15/15 panjang 0,15 m'
lebar 0,15 m'
tinggi 1,60 m' 0,15 0,15 1,60 1,00 0,04 m3
Total kolom 15/15 1,53 m3
3 PEKERJAAN KOLOM 15/20
panjang 0,20 m'
lebar 0,15 m'
tinggi 3,50 m' 0,20 0,15 3,50 6,00 0,63 m3
4 PEKERJAAN RING BALK 15/15 panjang 21,50 m'
lebar 0,15 m' 3,00 3,50
tinggi 0,15 m'
8,00 1,00 6,00 21,50 0,15 0,15 1,00 0,48 m3
5 PEKERJAAN RING BALK 15/20 panjang 44,50 m'
lebar 0,15 m' 0,50 1,50 4,50 2,50 4,00
tinggi 0,20 m'
1,50 8,00 5,00 2,00 2,00
2,00 4,00 3,00 4,00 44,50 0,15 0,20 1,00 1,34 m3
7 PEKERJAAN DAK BETON 10CM
dak beton ruang cuci panjang 1,50 m'
lebar 1,50 m'
tinggi 0,10 m' 1,50 1,50 0,10 1,00 0,23 m3
HORISONTAL
VERTIKAL
HORISONTAL
VERTIKAL
dak beton teras panjang 1,85 m'
lebar 1,30 m'
tinggi 0,10 m' 1,85 1,30 0,10 1,00 0,24 m3
dak beton kamar panjang 5,00 m'
lebar 2,00 m'
tinggi 0,10 m' 5,00 2,00 0,10 1,00 1,00 m3
total volume dak beton t=10cm 1,47 m3
8 PEKERJAAN KANOPI T=8CM panjang 8,05 m' 1,80 3,25 3,00
lebar 0,50 m'
tinggi 0,08 m' 8,05 0,50 0,08 0,32 m3
9 PEKERJAAN COR MEJA DAPUR T=8CM panjang 4,75 m' 0,75 2,50 0,75 0,75
lebar 0,60 m'
tinggi 0,08 m' 4,75 0,60 0,08 1,00 0,23 m3
E PEKERJAAN DINDING DAN PLESTERAN
1 DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS
trasram dinding panjang 37,20 m'
6,50 3,65 0,65 3,50 3,50
3,50 3,50
3,00 1,00 0,93 1,85 3,00
tinggi 0,35 m' 1,98 0,65 37,20 0,35 13,02 m2
trasram dinding kamar mandi dan ruang cuci panjang 9,65 m' 2,00 1,50 2,00 0,65
1,00 1,50 1,00
tinggi 1,50 m' 9,65 1,50 14,48 m2
total volume dinding trasram 27,50 m2
VERTIKAL
HORISONTAL
2 DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS : 10 KP
dinding pagar belakang panjang 15,00 m'
tinggi 2,55 m' 15,00 2,55 38,25 m2
dinding pagar depan panjang 10,50 m'
tinggi 0,20 m' 10,50 0,20 2,10 m2
dinding bangunan panjang 43,43 m'
6,50 3,65 0,65 3,50 3,50
3,50 3,50
3,00 3,00 1,00 1,00 2,00
tinggi 3,05 m' 3,00 3,00 0,65 1,98
dinding atas kamar mandi dan ruang cuci panjang 9,65
tinggi 1,90
dikurangi lubang pintu dan jendela
PJ 1 3,85 m2 1 m2
PJ 2 4,375 m2 1 m2
PJ 3 2,25 m2 1 m2
P 1 1,575 m2 2
P 2 1,225 m2 1
J 1 2,19 m2 1
J 2 1,88 m2 1 m2
BV 0,9 m2 1 m2
total 18,245 m2 m2 132,54 m2
TOTAL VOLUME DINDING 172,89 m2
3 PEKERJAAN PLESTERAN 1 PC : 3 PS TEBAL 1,5 CM
volume = 2x tembok trasram volume 27,50 2,00 54,99 m2
4 PEKERJAAN PLESTERAN 1 PC : 3 KP : 10 PS TEBAL 1,5 CM
volume = 2x tembok volume 172,89 2,00 345,77 m2
5 PLESTERAN LIS / SPONING 1 PC : 3 PS panjang 3,30 m' 3,30 8,00 26,40 m'
6 PASANG DINDING BATU ANDESIT SUSUN SIRI
UKURAN 3 x 30 x 1,5 panjang 1,95 m' 0,65 0,65 0,65
tinggi 2,50 m' 1,95 2,50 4,88 m2
dinding 1
dinding 2
total 132,54
132,45
18,34
total 150,78
18,25
dikurangi lubang pintu jendela
150,78
VERTIKAL
HORISONTAL
F PEKERJAAN PINTU JENDELA
1 KUSEN PINTU JENDELA KAYU BENGKIRAI
PJ 1 panjang 9,25 m' 1,75 2,20 2,05 0,30 1,20 9,25
1,75 1,75
lebar 0,12 m'
tinggi 0,05 m' 9,25 0,12 0,05 1,00 0,06 m3
PJ 2
panjang 11,35 m' 2,50 1,75 0,63 0,30 1,75 11,35
1,75 0,30 0,63 1,75
lebar 0,12 m'
tinggi 0,05 m' 11,35 0,05 0,05 1,00 0,03 m3
PJ 3 panjang 7,63 m' 1,44 2,05 2,05 0,59 1,50
lebar 0,12 m'
tinggi 0,05 m' 7,63 0,12 0,05 1,00 0,05 m3
P1 panjang 5,00 m' 2,05 0,90 2,05
lebar 0,12 m'
tinggi 0,05 m' 5,00 0,12 0,05 2,00 0,06 m3
P2 panjang 4,80 m' 2,05 0,70 2,05
lebar 0,12 m'
tinggi 0,05 m' 4,80 0,12 0,05 1,00 0,03 m3
W1 panjang 8,75 m' 1,25 1,25 1,75 1,75 2,75
lebar 0,12 m'
tinggi 0,05 m' 8,75 0,12 0,05 1,00 0,05 m3
W2 panjang 7,10 m' 0,80 2,35 0,80 2,35 0,80
lebar 0,12 m'
tinggi 0,05 m' 7,10 0,12 0,05 1,00 0,04 m3
total kusen pintu jendela kayu bengkirai 0,31 m3
2 KUSEN JENDELA ALUMUNIUM
BV panjang 5,30 m' 2,25 0,40 2,25 0,40 5,30 1,00 5,30 m'
3 DAUN PINTU PANEL KAYU JATI
PJ 1 panjang 2,01 m'
lebar 0,92 m' 2,01 0,92 1,00 1,85 m2
PJ 3 panjang 2,01 m'
lebar 0,77 m' 2,01 0,77 1,00 1,55 m2
total volume pintu panel kayu jati 3,40 m2
4 DAUN PINTU PLYWOOD RANGKA KAYU BENGKIRAI
P1 panjang 2,01 m'
lebar 0,82 m' 2,01 0,82 2,00 3,30 m2
5 DAUN PINTU RANGKA KAYU
LAPIS TRIPLEKS 4MM + FORMIKA 1 SISI
P2 panjang 2,06 m'
lebar 0,62 m' 2,06 0,62 1,00 1,28 m2
6 DAUN PINTU KAYU JATI + KACA BENING 5 MM panjang 2,06 m'
lebar 0,59 m' 2,06 0,59 2,00 2,41 m2
7 DAUN JENDELA KAYU JATI + KACA BENING 5 MM
PJ 1 panjang 1,67 m'
lebar 0,57 m' 1,67 0,57 2,00 1,90 m2
PJ 2 panjang 1,67 m'
lebar 0,60 m' 1,67 0,60 2,00 1,99 m2
PJ 3 panjang 1,22 m'
lebar 0,57 m' 1,22 0,57 1,00 0,70 m2
J 1 panjang 1,67 m'
lebar 0,57 m' 1,67 0,57 2,00 1,90 m2
J 2 panjang 1,47 m'
lebar 0,72 m' 1,47 0,72 1,00 1,06 m2
W 1 panjang 1,67 m'
lebar 0,57 m' 1,67 0,57 2,00 1,90 m2
W 2 panjang 1,52 m'
lebar 0,72 m' 1,52 0,72 1,00 1,09 m2
total volume 10,55 m2
G PEKERJAAN ATAP
1 PEKERJAAN BALOK GUNUNG-GUNUNG 15/20
gunung-gunung 1
panjang 19,29 m' 7,50 2,63 4,58 4,58
lebar 0,15 m'
tinggi 0,20 m' 19,29 0,15 0,20 1,00 0,58 m3
gunung-gunung 2
panjang 23,38 m' 8,50 3,50 1,05 6,10 4,23
lebar 0,15 m'
tinggi 0,20 m' 23,38 0,15 0,20 1,00 0,70 m3
gunung-gunung 3
panjang 18,11 m' 5,00 2,45 3,50 1,05 1,83
lebar 0,15 m' 4,28
tinggi 0,20 m' 18,11 0,15 0,20 1,00 0,54 m3
gunung-gunung 4
panjang 17,21 m' 4,25 2,28 6,10 4,58
lebar 0,15 m'
tinggi 0,20 m' 17,21 0,15 0,20 1,00 0,52 m3
total volume balok gunung-gunung 2,34 m3
2 PEKERJAAN DINDING GUNUNG-GUNUNG
GN 1 panjang 7,50 m'
tinggi 2,63 m' 9,85 m2
GN 2 panjang 8,50 m'
tinggi 3,50 m' 16,70 m2
GN 3 panjang 5,00 m'
tinggi 3,50 m' 12,42 m2
GN 4 panjang 4,25 m'
tinggi 2,28 m' 6,15 m2
total volume dinding GN 45,12 m2
3 PASANG NOK, GORDING DAN MURPLAT 8/12
nok 8/12 panjang 8,90 m'
gording 8/12 panjang 13,00 m'
murplat 8/12 panjang 13,50 m'
lebar 0,08 m'
tinggi 0,12 m' 35,40 0,08 0,12 0,34 m3
4 KASO RENG GENTENG BETON KAYU BENGKIRAI
atap 1 panjang 11,60 m'
lebar 2,00 m' 11,60 2,00 23,20 m2
atap 2 panjang 12,82 m'
lebar 5,50 m' 12,82 5,50 70,51 m2
atap 3 panjang 7,08 m'
lebar 1,08 m' 7,08 1,08 7,64 m2
101,35 m2
5 LISPLANK KAYU UKURAN 3 CM X 20 CM
panjang 27,38 m' 1,18 6,53 1,78 5,45 1,08
1,86 4,87 4,65 27,38 m'
6 PASANG GENTENG BETON
volume = kaso reng 101,35 m2
7 PASANG BUBUNGAN GENTENG BETON panjang 9,48 m' 9,48 m'
H PEKERJAAN PLAFON
1 PLAFON GYPSUM PLASTERBOARD 9MM panjang 8,00 m'
RANGKA HOLLOW 4 CM X 4 CM lebar 8,00 m' 8,00 8,00 64,00 m2
I PEKERJAAN LANTAI
1 LANTAI KERAMIK 40 X 40 CM luas 55,64 m2 55,64 m2
2 LANTAI KERAMIK 40 X 40 CM TEKSTUR P L luas 7,20 m2
teras dapur 1,85 0,50 0,93
teras ruang tamu 1,85 1,50 2,78
teras belakang 3,50 1,00 3,50
3 LANTAI KERAMIK 20 X 20 CM TEKSTUR
kamar mandi panjang 2,00 m' 3,00
lebar 1,50 m'
ruang cuci panjang 1,50 m' 1,50
lebar 1,00 m' 4,50 m2
4 KERAMIK DINDING 20 X 25 CM
kamar mandi dan ruang cuci panjang 9,65 m' 0,65 2,00 1,50 2,00 3,50
tinggi 1,50 m' 9,65 1,50 14,48 m2
dapur panjang 2,50 m'
lebar 1,20 m' 0,60 0,60 2,50 1,20 3,00 m2
total volume keramik dinding 20x25 cm 17,48 m2
5 PLINT KERAMIK LANTAI 10X40 CM
panjang 60,80 m' 60,80 m'
J PEKERJAAN INSTALASI LISTRIK
1 FITTING + LAMPU PIJAR 2,00 ttk 2,00 ttk
2 FITTING + LAMPU LED 8,00 ttk 8,00 ttk
3 LAMPU DINDING 1,00 ttk 1,00 ttk
4 LAMPU TAMAN 1,00 ttk 1,00 ttk
5 SINGLE SAKLAR 5,00 bh 5,00 bh
6 DOUBLE SAKLAR 3,00 bh 3,00 bh
8 STOP KONTAK 11,00 bh 11,00 bh
K PEKERJAAN CAT
1 PENGECATAN TEMBOK DALAM panjang 62,50 m'
tinggi 3,00 m' 62,50 3,00 187,50 m2
2 PENGECATAN TEMBOK LUAR DAN PAGAR
pengecatan tembok luar panjang 28,00 m'
tinggi 3,50 m' 28,00 3,50 98,00 m2
pengecatan tembok pagar panjang 30,00 m'
tinggi 2,55 m' 30,00 2,55 76,50 m2
total 174,50 m2
3 PENGECATAN PLAFON 64,00 m2
4 PENGECATAN GENTENG 101,35 m2
luas = luas plafon
luas = luas genteng
5 PENGECATAN BIDANG KAYU BARU
luas permukaan kusen panjang 53,88 m'
lebar 0,12 m'
tinggi 0,05 m' 53,88 0,12 0,05 18,33 m2
luas permukaan daun pintu dan jendela
PJ 1 4,87 m2
PJ 2 3,08 m2
PJ 3 2,01 m2
P 1 6,59 m2
P 2 1,28 m2
W 1 1,18 m2
W 2 0,59 m2 19,60
total 37,93 m2
6 COATING BATU
L PEKERJAAN SANITASI
1 SUMUR AIR BERSIH D=80 CM 1,00 bh 1,00 bh
2 CLOSET DUDUK 1,00 bh 1,00 bh
3 BAK SEPTICTANK STANDAR 1 KK NKKBS 1,00 bh 1,00 bh
4 RESAPAN AIR KOTOR t=5m D 1m 1,00 bh 1,00 bh
5 RESAPAN AIR HUJAN t=5m D 1m 1,00 bh 1,00 bh
6 PASANG BAK KONTROL 1,00 bh 1,00 bh
7 PASANG ZINK 1,00 bh 1,00 bh
8 PASANG SHOWER 1,00 bh 1,00 bh
9 PASANG WATER HEATER 1,00 bh 1,00 bh
10 PASANG KRAN AIR D 3/4" 4,00 bh 4,00 bh
11 PASANG PIPA PVC D 3/4" 34,13 m' 34,13 m'
12 PASANG PIPA PVC D 3" 29,51 m' 29,51 m'
13 PASANG PIPA PVC D 4" 7,60 m' 7,60 m'
14 PASANG ROOF DRAIN 4,00 bh 4,00 bh
15 PASANG FLOOR DRAIN 2,00 bh 2,00 bh
M PEKERJAAN KACA DAN ALAT GANTUNG
1 PASANG KACA TEBAL 5MM
J 2 panjang 0,75 m'
lebar 0,72 m' 0,75 0,72 1,00 0,54 m2
BV panjang 2,17 m'
lebar 0,32 m' 2,17 0,32 1,00 0,69 m2
total volume 1,23 m2
2 PASANG ENGSEL PINTU 3,00 egsl
7,00 bh 21,00 bh
3 PASANG KUNCI TANAM DAN HANDLE PINTU 1,00 hdl
7,00 bh 7,00 bh
4 ENGSEL JENDELA 2,00 egsl
8,00 bh 16,00 bh
5 PASANG HAK ANGIN JENDELA 2,00 egsl
8,00 bh 16,00 bh
6 PASANG KUNCI SLOT JENDELA 1,00 slot
8,00 bh 8,00 bh
N PEKERJAAN TAMAN DAN HALAMAN
1 TAMAN DATAR
taman depan panjang 5,00
lebar 4,80 5,00 4,80 24,00 m2
taman belakang panjang 8,00
lebar 3,50 8,00 3,50 28,00 m2
total 52,00 m2
2 CARPORT PAVING BLOCK panjang 5,50
lebar 3,08 5,50 3,08 16,91 m2
jumlah pintu =
1 pintu =
1 jendela =
jumlah jendela =
1 jendela =
jumlah jendela =
1 jendela =
jumlah jendela =
1 pintu =
jumlah pintu =
Sat.
Pek.
A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LOKASI 13,60 m2
2 PEKERJAAN BOUWPLANK 54,00 m'
B PEKERJAAN GALIAN DAN TANAH
1 GALIAN TANAH PONDASI 80,31 m3
2 PASIR URUG BAWAH PONDASI 10 CM 6,93 m3
3 TANAH URUG GALIAN PONDASI 33,59 m3
4 PENINGGIAN TANAH 6,40 m3
5 PEMADATAN TANAH 13,33 m3
6 PASIR PASANG BAWAH LANTAI 6,40 m3
C PEKERJAAN PONDASI
1 ANSTAMPING / BATU KOSONGAN 6,71 m3
2 PONDASI BATU KALI CAMPURAN 1 PC : 3 KP : 10 PS 21,74 m3
3 PONDASI ROLAG CAMPURAN 1 PC : 5 PS 11,35 m'
D PEKERJAAN BETON BERTULANG
1 PEKERJAAN SLOOF 15/20 2,34 m3
2 PEKERJAAN KOLOM 15/15 1,53 m3
3 PEKERJAAN KOLOM 15/20 0,63 m3
4 PEKERJAAN RING BALK 15/15 0,48 m3
5 PEKERJAAN RING BALK 15/20 1,34 m3
6 PEKERJAAN DAK BETON 10CM 1,47 m3
7 PEKERJAAN KANOPI T=8CM 0,32 m3
8 PEKERJAAN COR MEJA DAPUR T=8CM 0,23 m3
E PEKERJAAN DINDING DAN PLESTERAN
1 DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS 27,50 m2
2 DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS : 10 KP 172,89 m2
3 PEKERJAAN PLESTERAN 1 PC : 3 PS TEBAL 1,5 CM 54,99 m2
4 PEKERJAAN PLESTERAN 1 PC : 3 KP : 10 PS TEBAL 1,5 CM 345,77 m2
5 PLESTERAN LIS / SPONING 1 PC : 3 PS 26,40 m'
6 PASANG DINDING BATU ANDESIT SUSUN SIRI 4,88 m2
F PEKERJAAN PINTU JENDELA
1 KUSEN PINTU JENDELA KAYU BENGKIRAI 0,31 m3
2 KUSEN JENDELA ALUMUNIUM 5,30 m'
3 DAUN PINTU PANEL KAYU JATI 3,40 m2
4 DAUN PINTU PLYWOOD RANGKA KAYU BENGKIRAI 3,30 m2
5 DAUN PINTU RANGKA KAYU LAPIS TRIPLEKS 4 MM + FORMIKA 1 SISI 1,28 m2
6 DAUN PINTU KAYU JATI + KACA BENING 5 MM 2,41 m2
7 DAUN JENDELA KAYU JATI + KACA BENING 5 MM 10,55 m2
REKAPITULASI VOLUME PEKERJAAN
Volume
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
No. Uraian Pekerjaan
G PEKERJAAN ATAP
1 PEKERJAAN BALOK GUNUNG-GUNUNG 15/20 2,34 m3
2 PEKERJAAN DINDING GUNUNG-GUNUNG 45,12 m2
3 PASANG NOK, GORDING DAN MURPLAT 8/12 0,34 m3
4 KASO RENG GENTENG BETON KAYU BENGKIRAI 101,35 m2
5 LISPLANK KAYU UKURAN 3 CM X 20 CM 27,38 m'
6 PASANG GENTENG BETON 101,35 m2
7 PASANG BUBUNGAN GENTENG BETON 9,48 m'
H PEKERJAAN PLAFON
1 PLAFON GYPSUM PLASTERBOARD 9MM 64,00 m2
I PEKERJAAN LANTAI
1 LANTAI KERAMIK 40 X 40 CM 55,64 m2
2 LANTAI KERAMIK 40 X 40 CM TEKSTUR 7,20 m2
3 LANTAI KERAMIK 20 X 20 CM TEKSTUR 4,50 m2
4 KERAMIK DINDING 20 X 25 CM 17,48 m2
5 PLINT KERAMIK LANTAI 10X40 CM 60,80 m'
J PEKERJAAN INSTALASI LISTRIK
1 FITTING + LAMPU PIJAR 2,00 ttk
2 FITTING + LAMPU LED 8,00 ttk
3 LAMPU DINDING 1,00 ttk
4 LAMPU TAMAN 1,00 ttk
5 SINGLE SAKLAR 5,00 bh
6 DOUBLE SAKLAR 3,00 bh
7 STOP KONTAK 11,00 bh
K PEKERJAAN CAT
1 PENGECATAN TEMBOK DALAM 187,50 m2
2 PENGECATAN TEMBOK LUAR DAN PAGAR 174,50 m2
3 PENGECATAN PLAFON 64,00 m2
4 PENGECATAN GENTENG 101,35 m2
5 PENGECATAN BIDANG KAYU BARU 37,93 m2
6 COATING BATU TEMPEL HITAM 4,88 m2
L PEKERJAAN SANITASI
1 SUMUR AIR BERSIH D=80 CM 1,00 bh
2 TANDON AIR 2000L 1,00 bh
2 CLOSET DUDUK 1,00 bh
3 BAK SEPTICTANK STANDAR 1 KK NKKBS 1,00 bh
4 RESAPAN AIR KOTOR t=5m D 1m 1,00 bh
5 RESAPAN AIR HUJAN t=5m D 1m 1,00 bh
6 PASANG BAK KONTROL 1,00 bh
7 PASANG ZINK 1,00 bh
8 PASANG SHOWER 1,00 bh
9 PASANG WATER HEATER 1,00 bh
10 PASANG KRAN AIR D 3/4" 4,00 bh
11 PASANG PIPA PVC D 3/4" 34,13 m'
12 PASANG PIPA PVC D 3" 29,51 m'
13 PASANG PIPA PVC D 4" 7,60 m'
14 PASANG ROOF DRAIN 4,00 bh
15 PASANG FLOOR DRAIN 2,00 bh
M PEKERJAAN KACA DAN ALAT GANTUNG
1 PASANG KACA TEBAL 5MM 1,23 m2
2 PASANG ENGSEL PINTU 21,00 bh
3 PASANG KUNCI TANAM DAN HANDLE PINTU 7,00 bh
4 ENGSEL JENDELA 16,00 bh
5 PASANG HAK ANGIN JENDELA 16,00 bh
6 PASANG KUNCI SLOT JENDELA 8,00 bh
N PEKERJAAN TAMAN DAN HALAMAN
1 TAMAN DATAR 52,00 m2
2 CARPORT PAVING BLOCK 16,91 m2
NO. JENIS PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA TOTAL HARGA
A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LOKASI m2 13,60 8.750,00Rp 119.000,00Rp
2 PEKERJAAN BOUWPLANK m' 54,00 63.816,50Rp 3.446.091,00Rp
3.565.091,00Rp
B PEKERJAAN GALIAN DAN TANAH
1 GALIAN TANAH PONDASI m3 80,31 21.400,00Rp 1.718.710,24Rp
2 PASIR URUG BAWAH PONDASI 10 CM m3 6,93 98.775,00Rp 684.288,51Rp
3 TANAH URUG GALIAN PONDASI m3 33,59 10.255,00Rp 344.463,53Rp
4 PENINGGIAN TANAH m3 6,40 77.950,00Rp 498.880,00Rp
5 PEMADATAN TANAH m3 13,33 26.750,00Rp 356.575,83Rp
6 PASIR PASANG BAWAH LANTAI m3 6,40 134.350,00Rp 859.840,00Rp
4.462.758,10Rp
C PEKERJAAN PONDASI
1 ANSTAMPING / BATU KOSONGAN m3 6,71 248.340,00Rp 1.665.957,85Rp
2 PONDASI BATU KALI CAMPURAN 1 PC : 3 KP : 10 PS m3 21,74 399.220,00Rp 8.678.094,65Rp
3 PONDASI ROLAG CAMPURAN 1 PC : 5 PS m' 11,35 127.185,00Rp 1.443.549,75Rp
11.787.602,25Rp
D PEKERJAAN BETON BERTULANG
1 PEKERJAAN SLOOF 15/20 m3 2,34 3.182.426,40Rp 7.442.104,14Rp
2 PEKERJAAN KOLOM 15/15 m3 1,53 3.317.720,95Rp 5.061.183,31Rp
3 PEKERJAAN KOLOM 15/20 m3 0,63 3.485.220,50Rp 2.195.688,92Rp
4 PEKERJAAN RING BALK 15/15 m3 0,48 3.317.720,95Rp 1.604.947,51Rp
5 PEKERJAAN RING BALK 15/20 m3 1,34 3.485.220,50Rp 4.652.769,37Rp
6 PEKERJAAN DAK BETON 10CM m3 1,47 3.803.505,50Rp 5.574.037,31Rp
7 PEKERJAAN KANOPI T=8CM m3 0,32 730.450,00Rp 235.204,90Rp
8 PEKERJAAN COR MEJA DAPUR T=8CM m3 0,23 3.803.505,50Rp 867.199,25Rp
27.633.134,70Rp
E PEKERJAAN DINDING DAN PLESTERAN
1 DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS m2 27,50 96.224,50Rp 2.645.692,63Rp
2 DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS : 10 KP m2 172,89 85.175,00Rp 14.725.586,34Rp
3 PEKERJAAN PLESTERAN 1 PC : 3 PS TEBAL 1,5 CM m2 54,99 30.623,00Rp 1.683.958,77Rp
4 PEKERJAAN PLESTERAN 1 PC : 3 KP : 10 PS TEBAL 1,5 CM m2 345,77 24.369,00Rp 8.426.130,05Rp
5 PLESTERAN LIS / SPONING 1 PC : 3 PS m' 26,40 6.175,00Rp 163.020,00Rp
6 PASANG DINDING BATU ANDESIT SUSUN SIRI m2 4,88 187.050,00Rp 911.868,75Rp
28.556.256,54Rp
RENCANA ANGGARAN BIAYA
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
F PEKERJAAN PINTU JENDELA
1 KUSEN PINTU JENDELA KAYU BENGKIRAI m3 0,31 13.715.500,00Rp 4.300.563,60Rp
2 KUSEN JENDELA ALUMUNIUM m' 5,30 172.616,00Rp 914.864,80Rp
3 DAUN PINTU PANEL KAYU JATI m2 3,40 1.112.009,84Rp 3.777.386,23Rp
4 DAUN PINTU PLYWOOD RANGKA KAYU BENGKIRAI m2 3,30 538.220,00Rp 1.774.188,41Rp
5 DAUN PINTU RANGKA KAYU LAPIS TRIPLEKS 4 MM + FORMIKA 1 SISI m2 1,28 703.670,00Rp 898.727,32Rp
6 DAUN PINTU KAYU JATI + KACA BENING 5 MM m2 2,41 1.155.215,40Rp 2.784.300,16Rp
7 DAUN JENDELA KAYU JATI + KACA BENING 5 MM m2 10,55 1.155.215,40Rp 12.183.941,30Rp
26.633.971,82Rp
G PEKERJAAN ATAP
1 PEKERJAAN BALOK GUNUNG-GUNUNG 15/20 m3 2,34 3.485.220,50Rp 8.154.370,40Rp
2 PEKERJAAN DINDING GUNUNG-GUNUNG m2 45,12 85.175,00Rp 3.843.096,00Rp
3 PASANG NOK, GORDING DAN MURPLAT 8/12 m3 0,34 12.343.200,00Rp 4.194.713,09Rp
4 KASO RENG GENTENG BETON KAYU BENGKIRAI m2 101,35 50.267,50Rp 5.094.715,68Rp
5 LISPLANK KAYU UKURAN 3 CM X 20 CM m' 27,38 93.372,50Rp 2.556.539,05Rp
6 PASANG GENTENG BETON m2 101,35 59.408,50Rp 6.021.175,04Rp
7 PASANG BUBUNGAN GENTENG BETON m' 9,48 92.020,00Rp 871.889,50Rp
30.736.498,77Rp
H PEKERJAAN PLAFON
1 RANGKA PLAFON HOLLOW 4X4 CM m2 64,00 53.133,00Rp 3.400.512,00Rp
PLAFON GYPSUM PLASTERBOARD 9MM m2 64,00 44.129,72Rp 2.824.302,08Rp
6.224.814,08Rp
I PEKERJAAN LANTAI
1 LANTAI KERAMIK 40 X 40 CM m2 55,64 185.721,33Rp 10.333.534,99Rp
2 LANTAI KERAMIK 40 X 40 CM TEKSTUR m2 7,20 185.721,33Rp 1.337.193,60Rp
3 LANTAI KERAMIK 20 X 20 CM TEKSTUR m2 4,50 164.388,00Rp 739.746,00Rp
4 KERAMIK DINDING 20 X 25 CM m2 17,48 162.030,00Rp 2.831.474,25Rp
5 PLINT KERAMIK LANTAI 10X40 CM m' 60,80 27.075,00Rp 1.646.160,00Rp
16.888.108,84Rp
J PEKERJAAN INSTALASI LISTRIK
1 FITTING + LAMPU PIJAR ttk 2,00 96.250,00Rp 192.500,00Rp
2 FITTING + LAMPU LED ttk 8,00 96.250,00Rp 770.000,00Rp
3 LAMPU DINDING ttk 1,00 96.250,00Rp 96.250,00Rp
4 LAMPU TAMAN ttk 1,00 96.250,00Rp 96.250,00Rp
5 SINGLE SAKLAR bh 5,00 58.250,00Rp 291.250,00Rp
6 DOUBLE SAKLAR bh 3,00 59.750,00Rp 179.250,00Rp
7 STOP KONTAK bh 11,00 64.250,00Rp 706.750,00Rp
2.332.250,00Rp
K PEKERJAAN CAT
1 PENGECATAN TEMBOK DALAM m2 187,50 27.657,60Rp 5.185.800,00Rp
2 PENGECATAN TEMBOK LUAR DAN PAGAR m2 174,50 36.237,60Rp 6.323.461,20Rp
3 PENGECATAN PLAFON m2 64,00 27.657,60Rp 1.770.086,40Rp
4 PENGECATAN GENTENG m2 101,35 26.265,00Rp 2.662.012,38Rp
5 PENGECATAN BIDANG KAYU BARU m2 37,93 28.928,50Rp 1.097.185,68Rp
6 COATING BATU TEMPEL HITAM m2 4,88 27.500,00Rp 134.062,50Rp
17.172.608,16Rp
L PEKERJAAN SANITASI
1 SUMUR AIR BERSIH D=80 CM bh 1,00 2.220.000,00Rp 2.220.000,00Rp
2 TANDON AIR 2000L bh 1,00 3.300.000,00Rp 3.300.000,00Rp
3 CLOSET DUDUK bh 1,00 1.906.350,00Rp 1.906.350,00Rp
4 BAK SEPTICTANK STANDAR 1 KK NKKBS bh 1,00 4.982.170,00Rp 4.982.170,00Rp
5 RESAPAN AIR KOTOR t=5m D 1m bh 1,00 1.720.000,00Rp 1.720.000,00Rp
6 RESAPAN AIR HUJAN t=5m D 1m bh 1,00 1.720.000,00Rp 1.720.000,00Rp
7 PASANG BAK KONTROL bh 1,00 440.090,00Rp 440.090,00Rp
8 PASANG ZINK bh 1,00 503.427,50Rp 503.427,50Rp
9 PASANG SHOWER bh 1,00 1.493.414,25Rp 1.493.414,25Rp
11 PASANG KRAN AIR D 3/4" bh 4,00 37.939,25Rp 151.757,00Rp
12 PASANG PIPA PVC D 3/4" m' 34,13 17.355,00Rp 592.326,15Rp
13 PASANG PIPA PVC D 3" m' 29,51 59.358,00Rp 1.751.654,58Rp
14 PASANG PIPA PVC D 4" m' 7,60 90.482,00Rp 687.663,20Rp
15 PASANG ROOF DRAIN bh 4,00 23.625,00Rp 94.500,00Rp
16 PASANG FLOOR DRAIN bh 2,00 23.625,00Rp 47.250,00Rp
21.610.602,68Rp
M PEKERJAAN ALAT GANTUNG DAN KACA
1 PASANG KACA TEBAL 5MM m2 1,23 172.571,25Rp 213.021,95Rp
2 PASANG ENGSEL PINTU bh 21,00 21.438,75Rp 450.213,75Rp
3 PASANG KUNCI TANAM DAN HANDLE PINTU bh 7,00 256.675,00Rp 1.796.725,00Rp
4 ENGSEL JENDELA bh 16,00 28.292,50Rp 452.680,00Rp
5 PASANG HAK ANGIN JENDELA bh 16,00 47.350,00Rp 757.600,00Rp
6 PASANG KUNCI SLOT JENDELA bh 8,00 43.713,60Rp 349.708,80Rp
4.019.949,50Rp
N PEKERJAAN TAMAN DAN HALAMAN
1 TAMAN DATAR m2 52,00 75.000,00Rp 3.900.000,00Rp
2 CARPORT PAVING BLOCK m2 16,91 57.875,00Rp 978.810,94Rp
4.878.810,94Rp
TOTAL 206.502.457,38Rp
NO. JENIS PEKERJAAN HARGABOBOT
(%)A PEKERJAAN PERSIAPAN 3.565.091,00Rp 1,73
B PEKERJAAN GALIAN DAN TANAH 4.462.758,10Rp 2,16
C PEKERJAAN PONDASI 11.787.602,25Rp 5,71
D PEKERJAAN BETON BERTULANG 27.633.134,70Rp 13,38
E PEKERJAAN DINDING DAN PLESTERAN 28.556.256,54Rp 13,83
F PEKERJAAN PINTU JENDELA 26.633.971,82Rp 12,90
G PEKERJAAN ATAP 30.736.498,77Rp 14,88
H PEKERJAAN PLAFON 6.224.814,08Rp 3,01
I PEKERJAAN LANTAI 16.888.108,84Rp 8,18
J PEKERJAAN INSTALASI LISTRIK 2.332.250,00Rp 1,13
K PEKERJAAN CAT 17.172.608,16Rp 8,32
L PEKERJAAN SANITASI 21.610.602,68Rp 10,47
M PEKERJAAN ALAT GANTUNG DAN KACA 4.019.949,50Rp 1,95
N PEKERJAAN TAMAN DAN HALAMAN 4.878.810,94Rp 2,36
JUMLAH 206.502.457,38Rp 100,00
JASA IMB 1% 2.065.024,57Rp
JASA PERENCANAAN 5% 10.325.122,87Rp
JASA PELAKSANAAN 7% 14.455.172,02Rp
PPN 10% 20.650.245,74Rp
TOTAL JUMLAH 253.998.022,58Rp
harga per m2 = 3.226.600,90Rp
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
REKAPITULASI RENCANA ANGGARAN BIAYA
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14
A PEKERJAAN PERSIAPAN 3.565.091Rp 1,73 1,73
B PEKERJAAN GALIAN DAN TANAH 4.462.758Rp 2,16 0,86 1,30
C PEKERJAAN PONDASI 11.787.602Rp 5,71 1,90 1,90 1,90
D PEKERJAAN BETON BERTULANG 27.633.135Rp 13,38 2,68 2,68 2,68 2,68 2,68
E PEKERJAAN DINDING DAN PLESTERAN 28.556.257Rp 13,83 2,77 2,77 2,77 2,77 2,77
F PEKERJAAN PINTU JENDELA 26.633.972Rp 12,90 2,15 2,15 2,15 2,15 2,15 2,15
G PEKERJAAN ATAP 30.736.499Rp 14,88 2,13 2,13 2,13 2,13 2,13 2,13 2,13
H PEKERJAAN PLAFON 6.224.814Rp 3,01 1,51 1,51
I PEKERJAAN LANTAI 16.888.109Rp 8,18 2,04 2,04 2,04 2,04
J PEKERJAAN INSTALASI LISTRIK 2.332.250Rp 1,13 0,38 0,38 0,38
K PEKERJAAN CAT 17.172.608Rp 8,32 2,08 2,08 2,08 2,08
L PEKERJAAN SANITASI 21.610.603Rp 10,47 1,74 1,74 1,74 1,74 1,74 1,74
M PEKERJAAN ALAT GANTUNG DAN KACA 4.019.950Rp 1,95 0,49 0,49 0,49 0,49
N PEKERJAAN TAMAN DAN HALAMAN 4.878.811Rp 2,36 1,18 1,18
206.502.457Rp 100,00
2,59 3,20 1,90 4,58 6,57 11,46 11,46 11,46 8,79 13,29 8,62 8,62 5,79 1,67
2,59 5,79 7,69 12,27 18,84 30,30 41,77 53,23 62,01 75,30 83,92 92,54 98,33 100,00
RENCANA KERJA DAN KURVA S
No. Jenis Pekerjaan Harga Total (Rp)Bobot
(%)
Juni Juli Agustus September
Nama Proyek : Rumah tipe 64/136
Alamat : Giwangan UH VII / 105a
Kota : Yogyakarta
Keterangan
Jumlah RAB Fisik
Rencana Mingguan
Rencana Komulatif Mingguan