    By: Wadea Ameen 431106471 1

    King Saud University

    College of Engineering

    Industrial Engineering Department

  • 8/7/2019 Controll Presentation

    2/32

    What is DMAIC ?

    A structured approach to problem solving and process improvement

  • 8/7/2019 Controll Presentation

    3/32

    DMAIC ProcessDMAIC Process

    y PHASE 0: Definition.

    These processes consist of identification of product orprocess that need improvement and also benchmarkingproduct characteristic from other company.

    y PHASE 1: Measurement.

    This phase consist of selecting characteristic (dependentvariable, independent variable, process mapping). The majortool is Quality Functional Deployment (QFD).

    y PHASE 2: Analysis.y This process analyze and benchmark the key product or

    performance metrics. This phase determine which factor thatinfluence more and which level of factor is the best for theprocess. Common tool is using Design of Experiment (DOE).

  • 8/7/2019 Controll Presentation

    4/32

    DMAIC Process cont.DMAIC Process cont.

    y PHASE 3: Improvement.

    After knowing which characteristic level is thebest, we must improve that process factor andcharacteristic. DOE and Taguchi Method arecommon tools used to make improvement.

    y PHASE 4: Control.

    This process need to monitor new processconditions via Statistical Process Control (SPC).After steady period, the process capability isassessed.

    y control: process performance and ensure thatdefects do not recur.

  • 8/7/2019 Controll Presentation

    5/32

    Flow chart (DMAIC):Flow chart (DMAIC):

  • 8/7/2019 Controll Presentation

    6/32

    ControlActivities& ToolsControlActivities& Tools

    y Control Activities- Determine Needed Controls(measurement, design, etc.)- Implement and Validate Controls- Develop Transfer Plan- Realize Benefits of Implementing Solution- Close Project and Communicate Results

    y Control Quality Tools- Statistical Process Control

    - Out of ControlAction Plan (OCAP)- Design Changes to eliminate

  • 8/7/2019 Controll Presentation

    7/32

    Objective ControlObjective Control

    y Prevent the problem and its root cause

    from recurring.

    y Document project

    y Implement results

    y Implement controls

  • 8/7/2019 Controll Presentation

    8/32

    ControlControl PhasePhase ActivasteisActivasteis

    y Confirmation you solved the practical problem

    y Benefit validation

    y Buy into the Control plan

    y Quality plan implementation

    y Confirmation of Improvementy Procedural changes

    y System changes

    y Statistical process control implementation

    y

    Mistake-proofing the processy Close documentation

    y Audit process

    y Coping(creat) next project

  • 8/7/2019 Controll Presentation

    9/32

  • 8/7/2019 Controll Presentation

    10/32

    All new tooling, processes, clarifications, andvisual aids documented in PIs.Creation of MOPXXX with all the quality criteriafor Variable Lasso Deflection and Contraction

    performance.MOP003 updated with reference to new createdMOPXXX.PU quality criteria documented in WSS001 andavailable in QA workbenches.

    Standardize

  • 8/7/2019 Controll Presentation

    11/32

    MONITORINGMONITORING

  • 8/7/2019 Controll Presentation

    12/32

  • 8/7/2019 Controll Presentation

    13/32

    Project ClosureProject Closurey

    Improvement must be continuous, but individualy initiatives and project teams come to an end.

    y Learn when its time to say goodbye.

    y Effective project closure weaves together the themes

    y of:

    y

    Project purpose.y Improvement methods.

    y Team skills and structures.

    y Develop managerial systems to capture learnings and

    y enable the organization to address system issues.

    y Documentation and recognition are two critical aspectsy of project team closure.

    y Celebrate

  • 8/7/2019 Controll Presentation

    14/32

    Elements of a Control SystemSensor(measurement technology & control chart)

    Allows the system to monitor the

    current process performance

    Alarm(control limits and trend rules)

    Establish limit(s) and run ruleswhich require attention

    Control Logic(OCAP)

    A predefined set of actions to

    follow that are alarm specific

    Validate(next sample)

    Assure the action was effective

    Add alarms where needed and assure we do not ignore validalarms. SPC methods should be used to establish alarms.

  • 8/7/2019 Controll Presentation

    15/32

    Control Plan Tools:

    1. B Six Sigma con ro method .

    - 7M Tools: Affinity diagram, tree diagram, process

    decision program charts, matrix diagrams,

    interrelationship diagrams, prioritization matrices,activity network diagram.

    2. Statistical Process Control (SPC)

    - Control Charts

    Attribute based (np, p, c, u). Variable based (X-R, X)

    -PRE-Control

    -Common Cause Chart (Exponentially Balanced

    Moving Average (EWMA))

  • 8/7/2019 Controll Presentation

    16/32

    The affinity diagram is a business tool used to organizeideas and data. It is one of the Seven Management and PlanningTools.The tool is commonly used within project management andallows large numbers of ideas stemming from

    brainstorming to be sorted into groups for review andanalysis

    The affinity diagram was devised byJiro Kawakita in the1960s and is sometimes referred to as the KJ Method.

    Record each idea on cards or notes

    Look for ideas that seem to be related

    Sort cards into groups until all cards have been used.Once the cards have been sorted into groups the team may sort large

    clusters into subgroups for easier management and analysis.[4] Oncecompleted, the affinity diagram may be used to create acause and

    effect diagram

  • 8/7/2019 Controll Presentation

    17/32

    Tree Diagram

    Tree diagrams can be a helpful way of organizingoutcomes in order to identify probabilities. For

    example, if we have a box with two red,two green and two white balls in it, and we

    choose two balls without looking, what is the

    probability of getting two balls of the samecolor?

    P(same color) = P(RR or GG or WW)

    We use the tree diagram to the left to help us

    identify the possible combinations of outcomes.Here we see that there are nine possibleoutcomes, listed to the right of the tree diagram.

    This number is the size of the sample space for

    this two state experiment, and will be in the

    denominator of each of our probabilities.

    Each of these possible nine outcomes has a

    probability of 1/9, which we can find using themultiplication rule P(RR or GG or WW) = 3/9.

  • 8/7/2019 Controll Presentation

    18/32

    The process decision program chart systematically identifies what might go

    wrong in a plan under development. Countermeasures( ) aredeveloped to prevent or offset those problems. By using PDPC, you caneither revise the plan to avoid the problems or be ready with the best

    response when a problem occurs.

    The process decision program chart

    How do we develop a Process Decision Program Chart?

    Break down the task into a tree diagram. The bottom 'leaves' on the tree will now indicate the actual tasks

    to be carried out.

    For each bottom-level task 'leaf', brainstorm or otherwise identify a list of possible problems that could

    occur.

    Select one or a few of the risks identified in step 2 to put on the diagram, based on a combination of

    probability of the risk occurring and the potential impact, should the risk materialize.

    For each risk selected in step 2, brainstorm or otherwise identify possible countermeasures(prevent ) thatyou could take to minimize the effect of the risk.

    Select a practical subset of countermeasures identified in step 4 to put in the chart.

    Continue building the chart as above finding risks and countermeasures for each task. If there are a large

    number of tasks, you can simplify the task by only doing this for tasks that are considered to be at risk orwhere the impact of their failure would be large.

  • 8/7/2019 Controll Presentation

    19/32

    Purpose:Compare two or more groups of ideas, determinerelationships among the elements, and make decisions.

    Matrix Diagram

    Process

    Generate two or more sets of characteristics to

    be compared. Use tree diagrams orbrainstorming.Choose the proper matrix to represent theinteractions (L, T, X, Y).

    Put the characteristics on the axes of thematrix.Rank the interactions from 1 (low) to 5 (high)

  • 8/7/2019 Controll Presentation

    20/32

    MATRIX DIAGRAM

    Patientsch

    eduled

    Attendanta

    ssigned

    Attendanta

    rrives

    Obtainsequipment

    Transports

    patient

    ProvideTherapy

    Notifiesofreturn

    Attendanta

    ssigned

    Attendanta

    rrives

    Patientretu

    rned

    Arrive at scheduled time 5 5 5 5 1 5 0 0 0 0 0

    Arrive with proper equipment 4 2 0 0 5 0 0 0 0 0 0

    Dressed properly 4 0 0 0 0 0 0 0 0 0 0

    Delivered via correct mode 2 3 0 0 1 0 0 0 0 0 0

    Take back to room promptly 4 0 0 0 0 0 0 5 5 5 5

    IMPORTANCE SCORE 39 25 25 27 25 0 20 20 20 20

    RANK 1 3 3 2 3 7 6 6 6 6

    5 = high importance, 3 = average importance, 1 = low importance

    HOWS

    WHATS

    RELATIONSHIP

    MATRIX

    CUSTOMERIMPORTANCE

    MATRIX

  • 8/7/2019 Controll Presentation

    21/32

    Ad

    dfea

    tures

    Ma

    keex

    istingpro

    duc

    tfas

    ter

    Ma

    keex

    istingpro

    duc

    teas

    iertouse

    Leaveas-isan

    dlowerprice

    De

    vo

    teresources

    tonew

    pro

    du

    cts

    Inc

    rease

    tec

    hn

    ica

    lsupport

    bud

    ge

    t

    Ou

    tarrows

    In

    arrows

    To

    talarrows

    Streng

    th

    Add features 5 0 5 45

    Make existing product faster 2 1 3 27

    Make existing product easier to use 1 2 3 21

    Leave as-is and lower price 0 3 3 21

    Devote resources to new products 1 1 2 18

    Increase technical support budget 0 2 2 18

    (9) = Strong Influence

    (3) = Some Influence

    (1) = Weak/possible influence

    Means row leads to column item

    Means column leads to row item

    COMBINATION ID/MATRIX DIAGRAM

    CHARACTERISTICS:

    Uncover patterns in

    cause and effectrelationships.

    Most detailed level in

    tree diagram. Impact

    on one another

    evaluated.

  • 8/7/2019 Controll Presentation

    22/32

    Control:Control:y 12. Implement process control system and bring the project to a close

    y

    y Three primary approaches may be used at this stage:

    y Risk Management:

    y This is similar to FMEA but now focus is trained on x, rather than y.

    y Risk Management Score = RMS = (Impact)*(Probability)y RM identifies and quantifies risks, establishes a risk abatement plan,

    y and monitors the progress of the plan.

    y Mistake Proofing:

    y This is a technique for eliminating errors by making it impossible to make them in

    y the process. To quote:It is good to do it right the first time. It is even better

    y to make it impossible to do it wrong.

    y Statistical Process Control (Charts):

    y This is a feedback system with sequential data and ongoing process data collection.

  • 8/7/2019 Controll Presentation

    23/32

    StatisticalStatistical ProcessProcess ControlControl

    y Statistical process control (SPC) is the applicationof statistical methods to the monitoring and control ofa process to ensure that it operates at its full potentialto produce conforming product

    y Statistical Process Control may be broadly broken downinto three sets of activities:

    y understanding the process,

    y understanding the causes of variation,

    y and elimination of the sources of special cause variation

  • 8/7/2019 Controll Presentation

    24/32

    CControlontrolCCharthart

    Why Use a Control Chart? To monitor, control, and improve process performance

    over time by studying variation and its source.

    How Do I Use Control Charts? There are many types of control charts. The control

    charts that you or your team decides to use shouldbe determined by the type of data that you have.

    Use the following tree diagram to determine whichchart will best fit your situation. Only the mostcommon types of charts are addressed.

  • 8/7/2019 Controll Presentation

    25/32

    n is large

    n > 10n = 1

    2 < n < 9

    median

    n is small

    3 < n < 5

    X & Rm X & R X & R X & S

    ControlChartSelection:VariableData

  • 8/7/2019 Controll Presentation

    26/32

    CControlontrolCCharthartSSelection:election:AAttributettributeDDataata

    c chart u chart p or np chart p chart

    Defect orNonconformity Data

    Defective Data

    Constant Variable ConstantVariable

    sample size sample size n > 50 n >50

  • 8/7/2019 Controll Presentation

    27/32

    How do we selec the correct Control Chart:

    Typ

    nd. M s. o

    subg oups

    No y d s .

    d

    n s in

    sudd n mean

    changes

    G aph defectsofdefectives

    Opo t. Area

    constant fromsamp e to

    samp e

    X, Rm

    p, np

    X - RMA, EWMA or

    CUSUM andRm

    u

    C, u

    Size of the

    subgroup

    constant

    p

    If mean isbig, X and

    R are effective too

    Irneithernnorp are

    small: X - R, X - Rm

    are effective

    More efective to

    detect gradual

    changes in long term

    Use X - R chart with

    modified rules

    VariablesAttributes

    Measurement

    ofsubgroupsIndividuals

    Yes

    No No

    Yes

    Yes

    No

    Yes

    No

    efects efectives

  • 8/7/2019 Controll Presentation

    28/32

  • 8/7/2019 Controll Presentation

    29/32

    PREPRE--ControlControl

    y PRE-Control technique helps shop operators to controlthe process so that defective parts are not

    produced.Although simple to understand for even the

    shop operators, PRE-Control is statistically

    robust In PRE-Control, the drawing tolerance is divided inthree zones as shown in the figure. These three zonesare Green,Yellow, and Red.

  • 8/7/2019 Controll Presentation

    30/32

  • 8/7/2019 Controll Presentation

    31/32

    PREPRE--Control Rules:Control Rules: If five consecutive pieces are in Greenzone, set-up is ok to run If one yellow, restart counting If two consecutive yellows, adjust theprocess If one reading is red, adjust the process