cv tlazar en web
TRANSCRIPT
7/28/2019 CV TLazar en Web
http://slidepdf.com/reader/full/cv-tlazar-en-web 1/2
CURRICULUM VITAE
Tomas LAZAR Electrical Engineer, Power Engineering
1. NAME Tomas LAZAR 2. EXPERIENCE since 1971,
hydropower engineering, control & protection systems engineering3. QUALIFICATIONS 1970 M.Sc. (El.Eng., Power Engineering)
Institute of Technology, Prague1979 Ph.D. (Power Engineering, Control & Protections)
Power Research Institute, Prague1994 Chartered Engineer - Czech Chamber of Chartered Engineers2000 Chartered Engineer - Slovak Chamber of Chartered Engineers
4. YEAR OF BIRTH 19475. NATIONALITY Czech6. LANGUAGES Czech (mother tongue), English, German, Spanish, Russian7. COUNTRIES OF Austria, Costa Rica, Cuba, Ethiopia, Germany, India, Malaysia,
WORK EXPERIENCE Pakistan, Russia, Spain, Sri Lanka, Taiwan, TurkeyABROAD
8. INTERNATIONAL United Nations, N.Y., USA, Technical Assistance RecruitmentROSTER OF EXPERTS and Administration Service,No. R-24 912
EMPLOYMENT RECORD1971 - 1993 Hydroprojekt Prague, Czechoslovakia
1971 - 1974 Assistant and Senior Designer 1975 - 1993 Chief Designer, Head of Department, Expert
1985 - 1986 Ministry of Basic Industry, La Habana, CubaTechnical Adviser on Hydro Power Plants(temporary leave of absence from Hydroprojekt)
1992 - 1993 Ethiopian Electric Light and Power Authority, Addis Ababa, EthiopiaConsultant on Protection and Control Facilities(temporary leave of absence from Hydroprojekt)
1993 - present INGEA, Pvt. Ltd. Co., Prague, Czech Republic1993 - 1998 Technical Director 1999 - present Director (Consulting Engineers and Contractor Company)
NATURE OF DUTIESElaboration, supervision and management of Feasibility Studies, Technical and Final Projects of
electrical part of Hydro Power Plants (control and protection systems in particular), projectmanagement, designer supervisions of erection and commissioning, consultant in the field of electrical part of Hydro Power Plants (new plants, rehabilitation projects, operation)
EXAMPLES OF SOME MAJOR PROJECTS- Pumped Storage Plant Dalesice, 4x 100 MW, Czechoslovakia (1971-1977)
(control and protection system of the Units)- Hydro Power Plant Malka Wakana, 4x 38 MW, Ethiopia (1982-1990)
(electrical protections of the Units and HV switchyards)- HPP Mangla (Units 9+10), extension project 2x100 MW, Pakistan (1988-1994)
(Chief Designer and Project Manager of the electrical part)
- Pumped Storage Plant Dlouhe Strane, 2x 320 MW, Czech Republic (1990-1996)(Chief Designer and Project Manager on control and protections,incl. supervision during commissioning)
- Hydro Power Plant Liptovska Mara, 4x 50 MW, Slovak Republic (1999 – 2000)
cont. on page 2
7/28/2019 CV TLazar en Web
http://slidepdf.com/reader/full/cv-tlazar-en-web 2/2
CURRICULUM VITAE, Tomas Lazar page 2
(modernisation project – control system, el. protections)- medium and small size hydro power plants - electrical part (continuously)
(design of new plants, design of rehabilitation and modernisation)
PROFESSIONAL EXPERIENCE ABROAD
1975 Austria2 months of training, Tauernkraftwerke AG, Salzburg, computer control systems
1980 - 1995 Costa Rica, Ethiopia, Malaysia, Russia, Spain, Taiwan, Turkeyshort term technical activities related to export of Hydro Power Plant's technological equipment,technical consultant to offers and final projects, designer supervision during erection andcommissioning
1985 - 1986 Cuba14 months Technical Adviser in Ministry of Basic Industry, La Habana, Division of Power PlantsDevelopment, adviser on hydro power plants development, local staff training
1988 - 1994 PakistanChief Designer and Project Manager on electrical part of Hydro Power Plant Mangla ExtensionProject (Units 9+10), Pakistan, incl. co-ordination of suppliers from Czechoslovakia, Germany andPakistan, activity carried out in Czechoslovakia and partially in Pakistan and Germany
1992 - 1993 Ethiopia16 months Consultant (Expert Engineer) on protection and control facilities with Ethiopian ElectricLight and Power Authority, Addis Ababa, Ethiopia, Operation Department. Technical assistance toEthiopia financed in the World Bank / IDA loan. The activity involved training of the local staff on
protection and control facilities (calculations, implementation of a new setting and testing of electrical protections in the whole electrical grid - HV substations, hydro power plants) andadvisory to the management on matters regarding control and protection systems (operation,modernisation)
1998 - 2000 EthiopiaProject Manager of Awash II&III HEPPs rehabilitation project - electrical part (control devices),
project management, design and designer supervision.
2000 - 2003 EthiopiaProject Manager of Tis Abay HEPP excitation system modernization project (external connectionsand control, cabling), project management, design and designer supervision.
2001 - 2002 IndiaProject Manager of Tillari HEPP (1x 68 MW) turbine uprating – electrical part,
project management, design and designer supervision. (under elaboration)
2002 PakistanProject Manager of Mangla HEPP, Units 5 & 6 (2x 125 MVA) turbine governor replacement – electrical part – connection to automatics, project management, design and designer supervision.(under elaboration)