Transcript
  • 101413

    *

    *

    2009Green New Deal

    *

    -2008()

    *

    ()

    *

    ()

    *

    ()

    *

    9952100ESCO()

    *

    ()

    *

    ()()()

    -

    *

    4100~1031,287CO2e()

    100~103()2002020200820252000 ()() 428578-81

    *

    ()

    *

    1.2. 3. 4. 5. 1.2.3. 4.5.6. 1. 2.3.4.5. 6. 7.10920202005()8360% 46.7% 100106-10(101-109)()

    *

    ()

    *

    ()

    *

    &&

    *

    ()IEAIPCC30%~50%(GNP 10%)3,0005,000GNP35(1)(2)(3)(4)

    *

    10012

    *

    ()

    *

    ()

    *

    10 ()

    ()()()()()()()()()()

    *

    10 ()

    ()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()()

    *

    ()

    /1/63/13---1/63/13---1/102/82/21--61/52/73/53/27-1/52/32/163/7-1/93/143/28--()

    *

    () ()

    /1/61/182/173/143/22 1/92/203/19--1/52/172/233/19-1/62/14/6--

    *

    *

    ()

    *

    CHP(Combined Heat and Power ) CCHP (Combined Cooling, Heating and Power )DHC(District Heating and Cooling system) UTES(Underground Thermal Energy Storage)(heat pump)

    ()

    *

    ()

    *

    ()

    *

    (ESCO) ESCO>()

    *

    ()

    *

    ()

    *

    ()

    *

    - () http:// lcss.epa.gov.tw()

    *

    ///()

    *

    ()

    *

    *

    ()

    *

    ()

    *

    ()

    *

    ()

    *

    ()

    *

    101313-(1/2)()

    *

    101313-(2/2)()

    *

    1.2.3.

    *

    *


Top Related