I.E 200427140 BJ Song
200527106 EH Kang
200527151 YJ Ann
200527185 HI Choi
Presentation Title
Contents
01 The existing facilities
02
03
Problem and assumption
04
Proposal
05
SLP
Plan
Presentation Title 1
01
원단 부자재창고
storage
cutting
Assistance table lounge
ironhoist
sewing machine obaroque
the existing facilities
Presentation Title 6
01Operation Sequence – open typeOperation Sequence – open type
obarocustorage cutting
Sewing machine (zipper)
Sewing machine (Inter)
Dac-ccu
(rubber-band)
sewing machine (face)
(upper)painting
packing
(laber)Iron
Common process
Upper
pants
the existing facilities
Presentation Title 1
01Operation Sequence – zipper typeOperation Sequence – zipper type
storage cutting
Sewing machine (zipper)
Sewing machine (Inter)
sewing machine (face)
(upper)painting
packing(laber)
Irong
Dacccu(rubber-band)
Common process
Upper
pants
the existing facilities
Presentation Title 6
01Operation Sequence – round typeOperation Sequence – round type
storage cutting
Sewing machine (Inter)
Dac-ccu
(rubber-band)
sewing machine (face)
(upper)painting
packing
(laber)Irong
Common process
Upper
pants
the existing facilities
obarocu
Presentation Title 1
01
storage
cutting
Assistance table
iron
hoist
sewing machine obaroque
lounge
the existing facilities
Presentation Title 1
02
Complicated procedure Simplification of process Mass production – Inappropriateness of process layout
- Movement distance is long Movement distance is straight line and short - Complicated production control Easy to understand the rate of progress - Increment of stock Shortened stock
Problem and assumption
Presentation Title 1
02
Restroom, storage, entrance is fixed
Machine is moved with table
Problem and assumption
Presentation Title 1
03
Q
PProduct layout • Mass production
• Simplification of process
• solution of process layout
problem
Proposal
03
- unused Assistance table.
- Iron, cutting, hoist, packing are fixed.
Presentation Title 1
Sewing machine (face)Dac-cuu (rubber band)
Sewing machine (inter)Sewing machine (zipper)
obaroquestorage
cutting
lounge
iron
hoist
Product layout - straightProduct layout - straight
Proposal
Product layout - groupProduct layout - group
03
- 1 Assistance table.
- Iron, cutting, hoist, packing are fixed.
Presentation Title 1
Sewing machine (face)Dac-cuu (rubber band)
Sewing machine (inter)Sewing machine (zipper)
obaroquestorage
cutting
lounge
iron
hoist
Assistance table
Proposal
StraightStraight
03
- unused Assistance table.
- Iron, cutting, packing are moved.
Presentation Title 1
Sewing machine (face)Dac-cuu (rubber band)
Sewing machine (inter)Sewing machine (zipper)
obaroquestorage
cutting lounge
iron
hoist
Proposal
Presentation Title 1
04
product
set/day
process sequence
1 100
-(storage),cutting,painting(upper),sewing(face),obarocu,sewing(inter),sewing(zipper),iron,packing-(storage),cutting,sewing(face),obarocu,Dac-ccu(rubber band),sewing(inter),iron,packing
2 250-(storage),cutting,painting(upper),sewing(face), sewing(inter),sewing(zipper),iron,packing-(storage),cutting,sewing(face), Dac-ccu(rubber-band),sewing(inter),iron,packing
3 400-(storage),cutting,painting(upper),sewing(face), ,sewing(inter),sewing(zipper),iron,packing-(storage),cutting,sewing(face), Dac-ccu(rubber-band),sewing(inter),iron,packing
Extended part list
SLP
Presentation Title 11
04 SLP
Storage
Cutting
Painting
Sewing (face)
Obaroque
Dac-cuu
Sewing (inter)
Sewing (zipper)
Irong
Packing
AX
UU
EU
UX
X
XA
UU
UU
XX
XX
XX
XX
X
EU
EE
XX
EU
UX
X
EE
XX
EX XEX
E
Activity Relationship Chart
Presentation Title 11
05 plan
New arrangement by using
the SLP method
Cost Analysis