Download - VWP Presentation
-
8/2/2019 VWP Presentation
1/15
Vantage WasteProcessor
-
8/2/2019 VWP Presentation
2/15
About usWe have developed a technology,
patent applied for worldwide, whichprovides a solution to recycling
municipal domestic waste in a process
that exceeds government targets and
directives. The system also removes
any unpleasant odours generated.
Ability to produce ethanol or clean plastic in commercial quantities.
The modular design treats unsorted waste with injected steam.
Unique continuous feed facility provides speedier processing.
This is the most efficient and the most environmentally friendly system
on the market today.It reduces capital outlay by up to 10th of the cost of a comparable
incinerator plant.
-
8/2/2019 VWP Presentation
3/15
What is the solution?Thermal hydration steam treatment
By treating the municipal householdwaste with high temperature andmoisture, the waste can be renderedinto usable, high-value product whichcan be sold back to raw material
processors, or used to generatehighly valuable electrical power orbio-ethanol.
Reduced planning issuesSignificantly reduced energy requirementEnd product a sanitised, non-toxic, saleablebiomass fuelNo sulphur emissionsNo fumes
-
8/2/2019 VWP Presentation
4/15
Treatment of household wasteThe options at present
Landfill Incineration waste is buried without sorting combustible waste is burnt
takes up valuable space non-combustible waste sent to
landfill
renders land unusable for many years creates harmful sulphur emissions
toxic effluent can leach into land requires high unsightly chimneys
requires high energy input
-
8/2/2019 VWP Presentation
5/15
What are the benefits?No pre-separation required
each waste treatment unit can handle
multiples of up to 95,000 tonnes ofhousehold waste per annum (2 units
handle 190,000 tonnes per annum etc)
waste is sanitized and reduced, resulting
in up to 60% reduction in volume
the residue biomass can be sold or convertedto energy
all metals and plastics can be sold forrecycling as they arecleaned and de-labeled
CALCULATIONS ARE BASED ON A PLANT RUNNING 86% Of THE YEAR. THE ABOVE EXCEEDS GOVERNMENT ENERGY POLICY
-
8/2/2019 VWP Presentation
6/15
The Vantage Waste Processor By treating municipal household
waste with high temperature steam
on a continuous feed basis,sanitised biomass is produced
The waste is reduced in volume by
over 60%
A patented odour removal system
ensures no toxins or odours are
emitted to atmosphere during
treatment Each unit processes 10 tonnes per hour (typically95,000tonnes per year)Each plant can expand to include additional processors
Very low energy requirementWorldwide patented process
-
8/2/2019 VWP Presentation
7/15
Odour removalWhen operating the waste processor there is
the risk of odour emissions the risk is eliminated by the installation of an odour removal
system incorporated in the extract ducting
this unique, patented system, will eliminate unpleasant odours
leaving the air safe to breathe and free from unpleasant smell
By the installation of advanced ultra violet technology,
offensive odours will be eliminated and airborne
compounds will be greatly reduced.
-
8/2/2019 VWP Presentation
8/15
Processing Plant layout
Processing 190,000 tonnes of waste per year converting biomass to bio-ethanol
-
8/2/2019 VWP Presentation
9/15
Land requirementFOR PROCESSING 190,000 TONNES OF MUNICIPAL WASTE (2 x VWPS)
TO INCLUDE THE PRODUCTION OF APPROXIMATELY 45 MILLION LITRES OF BIO-ETHANOL
(PLANT OUTLINED IN GREEN SUPPLIED BY RECLAIM RESOURCES Offices,SHREDDERS, SORTER ETC, BY OTHERS)
-
8/2/2019 VWP Presentation
10/15
In summary a fraction of the cost of a comparable incinerator no toxins or odours to atmosphere
plant much lower running costs patented odour control system
a continuous non stop process that ensures can be moved to different locationproduction is infinitely faster and easily expandable allowing flexibility when working
existing landfill
overall volume ofwaste substantially returns valuable prime land back forreduced following processing development
resultant product and residue of biomass is eligible forcarbon credits bysanitized ready for re-processing achieving EU and national targets
separate processor/s available to generate underwritten by a first classbio-fuel in commercial quantities insurance policy
patented worldwide
-
8/2/2019 VWP Presentation
11/15
Capital/OperationalExpense and NetProceeds in theOperations of 190,000tons VWP
-
8/2/2019 VWP Presentation
12/15
Capex/Opex 190,000 tonne plant
Capex Building 2,400,000
Weigh bridge area 50,000
Shredder x 2 (150 mm) or finer 330,000
VWP x 2 1,750,000Odour control unit 30,000
Sorter 900,000
Ethanol Converter x 2 500,000
TOTAL 5,960,000
-
8/2/2019 VWP Presentation
13/15
OPEX Staff x 30 (over shifts) Avg 30k 900,000
Maintenance 500,000Ins/rates/utilities/etc 1,000,000
OPEX VWP x 2 Electricity per year 22,500
Water per year 11,250
Gas/oil per year 631,800
OPEX Ethanol Chamber
Yeast annual 332,000Cellulase annual 264,393
Water per year (22,207,500 liters) 33,311
-
8/2/2019 VWP Presentation
14/15
OPEX Bio-diesel Chamber Solvents 500,000
Water per year (6,345,000 liters) 9,517
Electricity per year 11,250
TOTAL 4,227,497
-
8/2/2019 VWP Presentation
15/15
Income:
Gate fee $60 per ton x 190,000 ton 9,000,000Ethanol $0.50 liter (295 liters per tonne) 22,090,000
Bio-diesel $0.50 liter (76 liters per tonne) 5,670,000
Ferrous Metals 4% (6,000 tonne) x $65 390,000
None ferrous Metals 1% (1,500 tonne) x $750 P/T 1,125,000
Income 38,275,000
Profit less OPEX
29,820,406