  • 8/2/2019 VWP Presentation

    1/15

    Vantage WasteProcessor

  • 8/2/2019 VWP Presentation

    2/15

    About usWe have developed a technology,

    patent applied for worldwide, whichprovides a solution to recycling

    municipal domestic waste in a process

    that exceeds government targets and

    directives. The system also removes

    any unpleasant odours generated.

    Ability to produce ethanol or clean plastic in commercial quantities.

    The modular design treats unsorted waste with injected steam.

    Unique continuous feed facility provides speedier processing.

    This is the most efficient and the most environmentally friendly system

    on the market today.It reduces capital outlay by up to 10th of the cost of a comparable

    incinerator plant.

  • 8/2/2019 VWP Presentation

    3/15

    What is the solution?Thermal hydration steam treatment

    By treating the municipal householdwaste with high temperature andmoisture, the waste can be renderedinto usable, high-value product whichcan be sold back to raw material

    processors, or used to generatehighly valuable electrical power orbio-ethanol.

    Reduced planning issuesSignificantly reduced energy requirementEnd product a sanitised, non-toxic, saleablebiomass fuelNo sulphur emissionsNo fumes

  • 8/2/2019 VWP Presentation

    4/15

    Treatment of household wasteThe options at present

    Landfill Incineration waste is buried without sorting combustible waste is burnt

    takes up valuable space non-combustible waste sent to

    landfill

    renders land unusable for many years creates harmful sulphur emissions

    toxic effluent can leach into land requires high unsightly chimneys

    requires high energy input

  • 8/2/2019 VWP Presentation

    5/15

    What are the benefits?No pre-separation required

    each waste treatment unit can handle

    multiples of up to 95,000 tonnes ofhousehold waste per annum (2 units

    handle 190,000 tonnes per annum etc)

    waste is sanitized and reduced, resulting

    in up to 60% reduction in volume

    the residue biomass can be sold or convertedto energy

    all metals and plastics can be sold forrecycling as they arecleaned and de-labeled

    CALCULATIONS ARE BASED ON A PLANT RUNNING 86% Of THE YEAR. THE ABOVE EXCEEDS GOVERNMENT ENERGY POLICY

  • 8/2/2019 VWP Presentation

    6/15

    The Vantage Waste Processor By treating municipal household

    waste with high temperature steam

    on a continuous feed basis,sanitised biomass is produced

    The waste is reduced in volume by

    over 60%

    A patented odour removal system

    ensures no toxins or odours are

    emitted to atmosphere during

    treatment Each unit processes 10 tonnes per hour (typically95,000tonnes per year)Each plant can expand to include additional processors

    Very low energy requirementWorldwide patented process

  • 8/2/2019 VWP Presentation

    7/15

    Odour removalWhen operating the waste processor there is

    the risk of odour emissions the risk is eliminated by the installation of an odour removal

    system incorporated in the extract ducting

    this unique, patented system, will eliminate unpleasant odours

    leaving the air safe to breathe and free from unpleasant smell

    By the installation of advanced ultra violet technology,

    offensive odours will be eliminated and airborne

    compounds will be greatly reduced.

  • 8/2/2019 VWP Presentation

    8/15

    Processing Plant layout

    Processing 190,000 tonnes of waste per year converting biomass to bio-ethanol

  • 8/2/2019 VWP Presentation

    9/15

    Land requirementFOR PROCESSING 190,000 TONNES OF MUNICIPAL WASTE (2 x VWPS)

    TO INCLUDE THE PRODUCTION OF APPROXIMATELY 45 MILLION LITRES OF BIO-ETHANOL

    (PLANT OUTLINED IN GREEN SUPPLIED BY RECLAIM RESOURCES Offices,SHREDDERS, SORTER ETC, BY OTHERS)

  • 8/2/2019 VWP Presentation

    10/15

    In summary a fraction of the cost of a comparable incinerator no toxins or odours to atmosphere

    plant much lower running costs patented odour control system

    a continuous non stop process that ensures can be moved to different locationproduction is infinitely faster and easily expandable allowing flexibility when working

    existing landfill

    overall volume ofwaste substantially returns valuable prime land back forreduced following processing development

    resultant product and residue of biomass is eligible forcarbon credits bysanitized ready for re-processing achieving EU and national targets

    separate processor/s available to generate underwritten by a first classbio-fuel in commercial quantities insurance policy

    patented worldwide

  • 8/2/2019 VWP Presentation

    11/15

    Capital/OperationalExpense and NetProceeds in theOperations of 190,000tons VWP

  • 8/2/2019 VWP Presentation

    12/15

    Capex/Opex 190,000 tonne plant

    Capex Building 2,400,000

    Weigh bridge area 50,000

    Shredder x 2 (150 mm) or finer 330,000

    VWP x 2 1,750,000Odour control unit 30,000

    Sorter 900,000

    Ethanol Converter x 2 500,000

    TOTAL 5,960,000

  • 8/2/2019 VWP Presentation

    13/15

    OPEX Staff x 30 (over shifts) Avg 30k 900,000

    Maintenance 500,000Ins/rates/utilities/etc 1,000,000

    OPEX VWP x 2 Electricity per year 22,500

    Water per year 11,250

    Gas/oil per year 631,800

    OPEX Ethanol Chamber

    Yeast annual 332,000Cellulase annual 264,393

    Water per year (22,207,500 liters) 33,311

  • 8/2/2019 VWP Presentation

    14/15

    OPEX Bio-diesel Chamber Solvents 500,000

    Water per year (6,345,000 liters) 9,517

    Electricity per year 11,250

    TOTAL 4,227,497

  • 8/2/2019 VWP Presentation

    15/15

    Income:

    Gate fee $60 per ton x 190,000 ton 9,000,000Ethanol $0.50 liter (295 liters per tonne) 22,090,000

    Bio-diesel $0.50 liter (76 liters per tonne) 5,670,000

    Ferrous Metals 4% (6,000 tonne) x $65 390,000

    None ferrous Metals 1% (1,500 tonne) x $750 P/T 1,125,000

    Income 38,275,000

    Profit less OPEX

    29,820,406