Transcript
Page 1: Yanbo Zhao Petros Ioannou

Dynamic Train Headway Selection

and Its Effect on Capacity Yanbo Zhao Petros Ioannou

Email: [email protected], [email protected].

Evaluation & Results

Motivation & Introduction

Proposed Method

Headway Policy Switch

Location

Velocity

Brake Characteristics

Driver Response

Track

Track Grade

Track Curvature

Track Occupy

Status

Comm

Obtain Inputs

Define and

Start

( )fa t( )la t

Set Time Step Interval T

(0) (0) 0l fS S

min lH L

0k

Add safe margin and

output ( ) 0fV kT

minH

( 1)

(( 1) ) ( ) ( ) ( )k T

l l lkT

V k T V kT a d

( 1)

(( 1) ) ( ) ( ) ( )k T

f f fkT

V k T V kT a d

( 1)

(( 1) ) ( ) ( ) ( )k T

l l lkT

S k T S kT V d

( 1)

(( 1) ) ( ) ( ) ( )k T

f f fkT

S k T S kT V d

max (( 1) ) (( 1) ), 0f lS S k T S k T

minlS L H

min lH S L

1k k

No

No

Yes

Yes

0 10 20 30 40 50 60 70 80 900

2000

4000

6000

8000

10000

12000

Time (second)

Positio

n (

feet)

Following Train

Leading Train

0 10 20 30 40 50 60 70 80 900

2000

4000

6000

8000

10000

12000

Time (second)

Positio

n (

feet)

Following Train

Leading Train

0 2 4 6 8 10 12 14 16 18 20 226400

6420

6440

6460

6480

6500

6520

Inner

Dis

tance (

feet)

Time (second)

Input Factors

Signal Signal Signal

Fixed Block System

Moving Block System

Brick-wall Headway PolicyBrick-wall Headway Policy

Communication

Network

Train Dispatch

Center

Communication Based Train

Control System

Leading

Train

Following

Train

Braking distance

Dynamic Headway Policy

•Communication Based

•Continuous Updating

•Reducing Headway

•Improving Capacity

Train

Communication

Interval Time

Communication

Delay

H = max {Hmin, Following Train Emergency Stopping Distance + Leading Train Length}

Numeric Headway Calculation Algorithm

Failure Tolerance Headway Selection

•Decelerate Trains to New

Operation Velocity

•Check The Received Signal

If Green, Switch Successfully

If Not, Continue Deceleration

Dynamic Headway Policy to Brick-wall Policy when Communication Network Fails

Brick-wall Policy to Dynamic Headway Policy when Communication Network Recovers

Passenger Train Freight Train

Length, feet 250 3000

Maximum Service

Brake Rate

(feet/min2)

5280 1950

Maximum

Emergency Brake

Rate (feet/min2)

10560 3900

Brake System

Response Time (sec)0.5 0.5

Brake System

Build-up

Time (sec)

2.0 2.0

Velocity (mph) 60 40

Driver Reaction

Time

(sec)

0.5 0.5

Communication

Delay

(sec)

1

Track Grade 0

Track Curvature

Radius (feet)0

Safe Margin

Distance (feet)200

Time Interval in

Timetable Headway

Policy (min)

5

Timetable

Policy (5 min)

Brick-wall

Policy

Dynamic

Policy

Case 1 P-P 26550 ft 3286 ft 1858 ft

Case 2 P-F 20600 ft 3758 ft 3410 ft

Case 3 F-P 29300 ft 6036 ft 4376 ft

Case 4 F-F 23600 ft 6508 ft 4847 ft

Factor ValueHeadway

(ft)

Line

Capacity

(trains/hour)

Initial

Velocity

(mph)

20 3627 29.1

30 4138 38.3

40 4847 43.6

50 5755 45.0

60 6862 46.2

Service/Eme

rgency

Brake

Capability

(feet/min2)

975/1950 6436 32.8

1560/3120 5244 40.2

1950/3900 4847 43.6

2340/4680 4583 46.1

2925/5850 4318 48.9

Driver

Reaction

Time

Difference

(sec)

-2 4730 44.7

-1 4788 44.1

0 4847 43.6

1 4906 43.1

2 4965 42.5

Track

Grade

-3‰ 5403 39.1

-2‰ 5189 40.7

-1‰ 5005 42.1

0 4847 43.6

+1‰ 4710 44.8

+2‰ 4589 46.0

+3‰ 4482 47.1

Communica

tion Delay

(sec)

0 4789 44.1

0.4 4800 43.9

0.8 4824 43.7

1.0 4847 43.6

1.2 4859 43.4

1.6 4870 43.2

2.0 4905 43.0

Input Parameters Sensitivity Analysis (Case F-F)

Headways of Different Policies

Signal Signal Signal

vf

vf’

vl

vl’P.

Case 1

Signal Signal Signal

vf vl

vl’P.

Case 2

•Accelerate Trains to Reduce Inner Distance

until Reaching Minimum Secure Dynamic Headway

Examples

Switch to Brick-wall Policy Switch to Dynamic Policy

•Find the Minimum Headway

between two trains such that the

Following Train front should not

run across the Leading Train rear

until the Following Train comes to

a fully stop

•Two trains in a straight track line

•If an emergency occurs, the

Leading Train starts to decelerate

and send event report to the

Following Train

•The Following Train will start to

brake when receiving event report

from the Leading Train

Top Related