40
S/. Cambio de dólar: 2.79 Nº de Hectareas PAGO (US$/HECT.) 40.55 0.50 CANTIDAD DESCRIPCION 1.00 Juego de barrenos 10.00 Sacos de ANFO 24.00 Cartuchos de Dinamita 24.00 Fulminantes 192.00 TOTAL CANTIDAD DESCRIPCION 1.00 Supervisor 2.00 Ayudantes TOTAL A DATOS Metros de cordón detonante COSTOS 1.- PAGO POR DENUNCIO MINERO 2.- COSTOS DE INSUMOS DE VOL 3.- COSTOS DE SERVICIOS DE PE 4.- COSTOS DE EQUIPO DE PER

Upload: eder-soncco-bravo

Post on 01-Jan-2016

47 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Excel Final

S/. US$Cambio de dólar: 2.79 1.00

Nº de Hectareas PAGO (US$/HECT.) PAGO TOTAL (US$)

40.55 0.50 20.28

CANTIDAD DESCRIPCION

1.00 Juego de barrenos 190.0010.00 Sacos de ANFO 21.0024.00 Cartuchos de Dinamita 0.0824.00 Fulminantes 0.10

192.00 0.32

TOTAL

CANTIDAD DESCRIPCION costo S/. /mes1.00 Supervisor 2500.002.00 Ayudantes 1200.00

TOTAL 3700.00

PERFORADORAA DATOS

COSTO UNITARIO(US$)

Metros de cordón detonante

COSTOS

1.- PAGO POR DENUNCIO MINERO

2.- COSTOS DE INSUMOS DE VOLADURA

3.- COSTOS DE SERVICIOS DE PERFORACIÓN Y VOLADURA

4.- COSTOS DE EQUIPO DE PERFORACIÓN

Page 2: Excel Final

A

tasa interes efectiva anual(TEA)Condiciones de operaciónMaquinapotencia del motorVALOR DE LA MAQUINA(V)valor residual -termino de la vida util(10%)Precio Base de Depreciacion

TIEMPO BASE DE DEPRECIACION

Horas de operación por año

INVERSION ANUAL PROMEDIO =

B COSTO DE POSECION

C Costo de Posecion por Hora

D 2. COSTO DE OPERACIÓN Consumo Diesel 8.50Consumo de Aceites, Grasas, Filtros, Etc.(% consumo según tabla)Mantenimiento y Reparacion MR=%MR*(V/ve)Costo de Operación por Hora

E Mano de Obra Directa (Salario + Beneficios Sociales)F

Accesorios

BarraBroca Costo Accesorio

G COSTO TOTAL HORARIO

5.- COSTOS DE HERRAMIENTAS MANUALES

Depreciacion por hora = Precio base depreciacion Tiempo depreciacion (hora)

Costo Financiero = (N + 1/2N)*V*i*N) Vida Util H.S.

𝐼𝑛𝑣𝑒𝑟𝑠𝑖𝑜𝑛 𝐴𝑛𝑢𝑎𝑙 𝑃𝑟𝑜𝑚𝑒𝑑𝑖𝑜 = ( +1 𝑁 𝑥 𝑉)/2𝑁

Page 3: Excel Final

Maquina perforadora.

º DESCRIPCION

8.00 Picos 25.008.00 Barretas 100.006.00 Combos 150.00

24.00 Cinceles 8.00

8.00 Palas 25.00

TOTAL

CANTIDAD ANUAL DESCRIPCION

6.00 Cascos 18.0072.00 Pares de guantes 6.0012.00 Lentes de seguridad 4.506.00 Zapatos punta de acero 80.00

TOTAL

Costos de Mano de Obra

CANTIDAD DESCRIPCION SUELDO BRUTO (S/.)

2.00 Jefes de Obra 1700.00

4.00 Ayudantes de obra 1200.00

TOTAL

COSTO UNITARIO (S/.)

PRECIO UNITARIO (S/.)

Referencia: pag 36, cap 5. calcular primero malla de perforacion , aprox 30 tal para haltura de banco de 8 m, tiempo que tomara la operacion de perforacion y vo ladira para calcular sueldos de trabajadores y con esto calcualr costo de perforadora, que se denbe sumar a cosyos totales.

5.- COSTOS DE HERRAMIENTAS MANUALES

6.- COSTOS DE EQUIPO DE SEGURIDAD

7.- COSTOS DE MANO DE OBRA

Page 4: Excel Final

COSTO US$

190.00210.00

1.922.40

61.44

465.76

COSTO S/./año costo UU$/año costo UU$/hora costo total30000.00 10771.99 4.49 439.8614400.00 5170.56 2.15 211.1344400.00 15942.55 6.64 650.99

PERFORADORADATOS

2.- COSTOS DE INSUMOS DE VOLADURA

3.- COSTOS DE SERVICIOS DE PERFORACIÓN Y VOLADURA

4.- COSTOS DE EQUIPO DE PERFORACIÓN

Page 5: Excel Final

tasa interes efectiva anual(TEA) 0.16promedio

Maquina perforadora martillo en cabeza(trackdrill)potencia del motor

7800.00 US$780.00 US$

Precio Base de Depreciacion 7020.00 US$

TIEMPO BASE DE DEPRECIACION

1000.00 Vida util(hrs)1.00 años(N)1.00 Guardias /dia8.00 Hrs efectivas/Gdia

Horas de operación por año 2400.00 Horas

INVERSION ANUAL PROMEDIO = 7800.00 US$

COSTO DE POSECION

=

=

Costo de Posecion por Hora

Gln/Hr = 3.10 $/GalonConsumo de Aceites, Grasas, Filtros, Etc.(% consumo según tabla)

Costo de Operación por Hora

Mano de Obra Directa (Salario + Beneficios Sociales)

AccesoriosVida util Hrs Efect.

Precio $

1000.00 190.00200.00 30.00

Costo Accesorio

COSTO TOTAL HORARIO

COSTO HORARIO TOTALCOSTO DE ALQUILER

TOTAL

5.- COSTOS DE HERRAMIENTAS MANUALES

Depreciacion por hora = Precio base depreciacion Tiempo depreciacion (hora)

Costo Financiero = (N + 1/2N)*V*i*N) Vida Util H.S.

𝐼𝑛𝑣𝑒𝑟𝑠𝑖𝑜𝑛 𝐴𝑛𝑢𝑎𝑙 𝑃𝑟𝑜𝑚𝑒𝑑𝑖𝑜 = ( +1 𝑁 𝑥 𝑉)/2𝑁

Page 6: Excel Final

VIDA UTIL (hr) COSTO (US$/hr)

300.00 0.03 71.81300.00 0.12 287.25400.00 0.13 323.16100.00 0.03 68.94300.00 0.03 71.81

TOTAL 822.98

COSTO ANUAL US$

108.00 38.78432.00 155.12

54.00 19.39480.00 172.35

TOTAL 385.64

COSTO MENSUAL (US$)

3400.00 1220.83 14649.914800.00 1723.52 20682.23

TOTAL 35332.14

COSTO ANUAL (US$)

COSTO ANUAL (S/.)

COSTO TOTAL MENSUALlDAD (S/.)

COSTO TOTAL ANUAL (US$)

Referencia: pag 36, cap 5. calcular primero malla de perforacion , aprox 30 tal para haltura de banco de 8 m, tiempo que tomara la operacion de perforacion y vo ladira para calcular sueldos de trabajadores y con esto calcualr costo de perforadora, que se denbe sumar a cosyos totales.

5.- COSTOS DE HERRAMIENTAS MANUALES

6.- COSTOS DE EQUIPO DE SEGURIDAD

Page 7: Excel Final
Page 8: Excel Final

Horas al año 2400.00

Page 9: Excel Final

Horas

COSTO DE POSECION$ /Hr.

7.02

1.25

8.27

26.351.020.70

28.07

3.33

US$/hora

0.190.150.34

40.01

3600.721080.224680.94

Page 10: Excel Final

Referencia: pag 36, cap 5. calcular primero malla de perforacion , aprox 30 tal para haltura de banco de 8 m, tiempo que tomara la operacion de perforacion y vo ladira para calcular sueldos de trabajadores y con esto calcualr costo de perforadora, que se denbe sumar a cosyos totales.

Page 11: Excel Final

ITEM US$/AÑO

Derecho de vigencia 20.28 0.05Insumo para voladura 465.76 1.24Servicios de P & V 650.99 1.74Maquina Perforadora 4680.94 12.48Herramientas manuales 822.98 2.19Equipo de seguridad 385.64 1.03Mano de obra 35332.14 94.22Costos 42358.71 112.96Imprevistos (10 %) 4235.87 11.30COSTOS TOTALES 46594.58 124.25

COSTOS UNITARIOS

(US$/TM)

CUADRO RESUMEN

Page 12: Excel Final

Flujo de Fondos Económico y Análisis por Indicadores Economcos :VAN, TIR , B/C & PAY BACK

Precio de Laja en el mercado S/. /m235.00

$/m211.18

Metros cuadrados al año(m2) 6750.00Ingreso Anual ($) 75498.20

FLUJO DE FONDOS ECONÓMICO

Concepto/año 0.00 1.00INVERSIÓN 46594.58

Ingreso por ventas 75498.20Totales de Ingresos 75498.20

CostoDerecho de vigencia 20.28Insumo para voladura 465.76

Servicios de P & V 650.99Maquina Perforadora 4680.94

Herramientas manuales 822.98Equipo de seguridad 385.64

Mano de obra 35332.14Imprevistos(10%) 4235.87

Costos de operación 46594.58

Amortización de prestamos 9379.62

Costos totales 55974.21

Renta neta 19524.00

Utilidad NetaRenta neta 19524.00

Par. Accionistas 9% 1757.16Par. Trabajadores 8% 1561.92

Regalias 7% 1366.68Subtotal 4685.76

Utilidad imponible 14838.24

Precio de venta del titular (89% del precio en el mercado)

Page 13: Excel Final

Impuesto 30% 4451.47Ingemet 1.5% 222.57

Total de impuesto 4674.05Utilidad Neta -46594.58 10164.19

Utilidad Neta Acumulada 10164.199075.17

Indicadores Económicos

VAN 49854.20TIR 23.66%B/C 2.07

PEDIODO DE RECUPERACIÓN 7.05 años

Amortización de la Deuda 9379.62

Page 14: Excel Final

Flujo de Fondos Económico y Análisis por Indicadores Economcos :VAN, TIR , B/C & PAY BACK

$/m212.57 Tonelaje (TM) 375.00

Metros cúbicos al año 150.00Metros cuadrados al año 7500.00

Recuperación 90.00%Metros cuadrados Totales 6750.00

2.00 3.00 4.00 5.00 6.00 7.00 8.00

75498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.2075498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.20

20.28 20.28 20.28 20.28 20.28 20.28 20.28465.76 465.76 465.76 465.76 465.76 465.76 465.76650.99 650.99 650.99 650.99 650.99 650.99 650.99

4680.94 4680.94 4680.94 4680.94 4680.94 4680.94 4680.94822.98 822.98 822.98 822.98 822.98 822.98 822.98385.64 385.64 385.64 385.64 385.64 385.64 385.64

35332.14 35332.14 35332.14 35332.14 35332.14 35332.14 35332.144235.87 4235.87 4235.87 4235.87 4235.87 4235.87 4235.87

46594.58 46594.58 46594.58 46594.58 46594.58 46594.58 46594.58

9379.62 9379.62 9379.62 9379.62 9379.62 9379.62 9379.62

55974.21 55974.21 55974.21 55974.21 55974.21 55974.21 55974.21

19524.00 19524.00 19524.00 19524.00 19524.00 19524.00 19524.00

Utilidad Neta19524.00 19524.00 19524.00 19524.00 19524.00 19524.00 19524.001757.16 1757.16 1757.16 1757.16 1757.16 1757.16 1757.161561.92 1561.92 1561.92 1561.92 1561.92 1561.92 1561.921366.68 1366.68 1366.68 1366.68 1366.68 1366.68 1366.684685.76 4685.76 4685.76 4685.76 4685.76 4685.76 4685.76

14838.24 14838.24 14838.24 14838.24 14838.24 14838.24 14838.24

Page 15: Excel Final

4451.47 4451.47 4451.47 4451.47 4451.47 4451.47 4451.47222.57 222.57 222.57 222.57 222.57 222.57 222.57

4674.05 4674.05 4674.05 4674.05 4674.05 4674.05 4674.0510164.19 10164.19 10164.19 10164.19 10164.19 10164.19 10164.1920328.39 30492.58 40656.78 50820.97 60985.16 71149.36 81313.5517178.01 24412.68 30872.21 36639.64 41789.14 46386.91 50492.05

Interpolación para Periodo de Recuperación

46386.91 7.0046594.58 X50492.05 8.00

Page 16: Excel Final

Cambio del Dólar (S/.): 2.79

Ingresos del Comprador ($/ año) 160751.80

9.00 10.00 11.00 12.00 13.00 14.00 15.00

75498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.2075498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.20

20.28 20.28 20.28 20.28 20.28 20.28 20.28465.76 465.76 465.76 465.76 465.76 465.76 465.76650.99 650.99 650.99 650.99 650.99 650.99 650.99

4680.94 4680.94 4680.94 4680.94 4680.94 4680.94 4680.94822.98 822.98 822.98 822.98 822.98 822.98 822.98385.64 385.64 385.64 385.64 385.64 385.64 385.64

35332.14 35332.14 35332.14 35332.14 35332.14 35332.14 35332.144235.87 4235.87 4235.87 4235.87 4235.87 4235.87 4235.87

46594.58 46594.58 46594.58 46594.58 46594.58 46594.58 46594.58

46594.58 46594.58 46594.58 46594.58 46594.58 46594.58 46594.58

28903.62 28903.62 28903.62 28903.62 28903.62 28903.62 28903.62

28903.62 28903.62 28903.62 28903.62 28903.62 28903.62 28903.622601.33 2601.33 2601.33 2601.33 2601.33 2601.33 2601.332312.29 2312.29 2312.29 2312.29 2312.29 2312.29 2312.292023.25 2023.25 2023.25 2023.25 2023.25 2023.25 2023.256936.87 6936.87 6936.87 6936.87 6936.87 6936.87 6936.87

21966.75 21966.75 21966.75 21966.75 21966.75 21966.75 21966.75

Page 17: Excel Final

6590.03 6590.03 6590.03 6590.03 6590.03 6590.03 6590.03329.50 329.50 329.50 329.50 329.50 329.50 329.50

6919.53 6919.53 6919.53 6919.53 6919.53 6919.53 6919.5315047.23 15047.23 15047.23 15047.23 15047.23 15047.23 15047.2396360.78 111408.00 126455.23 141502.45 156549.68 171596.90 186644.1355918.23 60763.04 65088.75 68951.00 72399.44 75478.40 78227.47

Page 18: Excel Final

16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00

75498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.2075498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.20 75498.20

20.28 20.28 20.28 20.28 20.28 20.28 20.28 20.28465.76 465.76 465.76 465.76 465.76 465.76 465.76 465.76650.99 650.99 650.99 650.99 650.99 650.99 650.99 650.99

4680.94 4680.94 4680.94 4680.94 4680.94 4680.94 4680.94 4680.94822.98 822.98 822.98 822.98 822.98 822.98 822.98 822.98385.64 385.64 385.64 385.64 385.64 385.64 385.64 385.64

35332.14 35332.14 35332.14 35332.14 35332.14 35332.14 35332.14 35332.144235.87 4235.87 4235.87 4235.87 4235.87 4235.87 4235.87 4235.87

46594.58 46594.58 46594.58 46594.58 46594.58 46594.58 46594.58 46594.58

46594.58 46594.58 46594.58 46594.58 46594.58 46594.58 46594.58 46594.58

28903.62 28903.62 28903.62 28903.62 28903.62 28903.62 28903.62 28903.62

28903.62 28903.62 28903.62 28903.62 28903.62 28903.62 28903.62 28903.622601.33 2601.33 2601.33 2601.33 2601.33 2601.33 2601.33 2601.332312.29 2312.29 2312.29 2312.29 2312.29 2312.29 2312.29 2312.292023.25 2023.25 2023.25 2023.25 2023.25 2023.25 2023.25 2023.256936.87 6936.87 6936.87 6936.87 6936.87 6936.87 6936.87 6936.87

21966.75 21966.75 21966.75 21966.75 21966.75 21966.75 21966.75 21966.75

Page 19: Excel Final

6590.03 6590.03 6590.03 6590.03 6590.03 6590.03 6590.03 6590.03329.50 329.50 329.50 329.50 329.50 329.50 329.50 329.50

6919.53 6919.53 6919.53 6919.53 6919.53 6919.53 6919.53 6919.5315047.23 15047.23 15047.23 15047.23 15047.23 15047.23 15047.23 15047.23

201691.35 216738.58 231785.80 246833.03 261880.25 276927.48 291974.70 307021.9380682.00 82873.54 84830.28 86577.36 88137.26 9075.17 90773.56 91883.87

Page 20: Excel Final

24.00 25.00 26.00 27.00 28.00 29.00

75498.20 75498.20 75498.20 75498.20 75498.20 75498.2075498.20 75498.20 75498.20 75498.20 75498.20 75498.20

20.28 20.28 20.28 20.28 20.28 20.28465.76 465.76 465.76 465.76 465.76 465.76650.99 650.99 650.99 650.99 650.99 650.99

4680.94 4680.94 4680.94 4680.94 4680.94 4680.94822.98 822.98 822.98 822.98 822.98 822.98385.64 385.64 385.64 385.64 385.64 385.64

35332.14 35332.14 35332.14 35332.14 35332.14 35332.144235.87 4235.87 4235.87 4235.87 4235.87 4235.87

46594.58 46594.58 46594.58 46594.58 46594.58 46594.58

46594.58 46594.58 46594.58 46594.58 46594.58 46594.58

28903.62 28903.62 28903.62 28903.62 28903.62 28903.62

28903.62 28903.62 28903.62 28903.62 28903.62 28903.622601.33 2601.33 2601.33 2601.33 2601.33 2601.332312.29 2312.29 2312.29 2312.29 2312.29 2312.292023.25 2023.25 2023.25 2023.25 2023.25 2023.256936.87 6936.87 6936.87 6936.87 6936.87 6936.87

21966.75 21966.75 21966.75 21966.75 21966.75 21966.75

Page 21: Excel Final

6590.03 6590.03 6590.03 6590.03 6590.03 6590.03329.50 329.50 329.50 329.50 329.50 329.50

6919.53 6919.53 6919.53 6919.53 6919.53 6919.5315047.23 15047.23 15047.23 15047.23 15047.23 15047.23

322069.15 337116.38 352163.60 367210.83 382258.05 397305.2892875.21 93760.34 94550.63 95256.25 95886.27 96448.78

Page 22: Excel Final

ESTUDIO DE SESIBILIDAD

Indicadores Económicos Actuales.

VAN 49854.20TIR 23.66%B/C 2.07

PAY BACK 7.05

Sensibilidad de precios

Sensibilidad de precios Precio ($)

12.5710% 13.82-10% 11.3120% 16.59-20% 10.05

Indicadores Económicos para incremento del 10% en el precio.VAN 81383.40TIR 31.41%B/C 2.75

PAY BACK 3.89

Indicadores Económicos para disminución del 10% en el precio.VAN 18325.00TIR 16.22%B/C 1.39

PAY BACK 14.21

Indicadores Económicos para incremento del 20% en el precio.VAN 150747.64TIR 49.23%B/C 4.24

PAY BACK 0.77

Indicadores Económicos para disminución del 20% en el precio.VAN -13204.20

Page 23: Excel Final

TIR 8.94%B/C 0.72

PAY BACK 45.79

Page 24: Excel Final

Indicadores Económicos Actuales.

Sensibilidad de costos de producción

46594.5810% 51254.04-10% 41935.1320% 55913.50-20% 37275.67

Indicadores Económicos para incremento del 10% en el Costo de Producción.VAN 25736.13TIR 17.49%B/C 1.50

PAY BACK 12.10

Indicadores Económicos para disminución del 10% en el Costo de Producción.VAN 73972.26TIR 31.32%B/C 2.76

PAY BACK 3.95

Indicadores Económicos para incremento del 20% en el Costo de Producción.VAN 1618.07TIR 12.32%B/C 1.03

PAY BACK 21.76

Indicadores Económicos para disminución del 20% en el Costo de Producción.VAN 98090.33

Sensibilidad de costos de producción

Costo de producción($)

Page 25: Excel Final

TIR 41.11%B/C 3.63

PAY BACK 1.85

Page 26: Excel Final

DETERMINACIÓN DEL COSTO DE EQUIPO

MÁQUINA CORTADORA – MAR FIL SUPER MARINIEquipo: Máquina Cortadora Valor FOB en el puerto:

Marca: Marini Super Mar Fil Flete marítimo (3 % FOB):

Modelo : Super Mar Fil Seguros (0,50 % FOB):

Peso : 1500 Kg Valor CIF – Callao:

Potencia : 50 HP Inspección (1 % CIF):

Advaloren (12 % CIF):

I: Intereses de equipo Despacho (2 % CIF):

S: Seguro de equipo Costo Almacén – Lima:

Vt: Valor de adquisición Período de pago:

Vt`: Valor sin llantas Horas programadas (mes):

Ve: Vida económica en horas Vida económica:

K: Factor Tasa anual:

n: Vida económica en años: 10 años Tasa mensual:

M: Fondo de reparación

Costo de posesión anual

Costo de posesión mensual

Costo de posesión horario

Fondo de reparación

Lubricantes

Potencia(HP): 50Consumo: ($/HP-hr) 0.004

Mantenimiento

Servicios + Contratista

Page 27: Excel Final

Costo de posesión+Operación

UTILIDAD 10%

COSTO TOTAL

COSTO TOTAL ANUAL (2400 horas)

COSTO ($/m2)

VAN -27460.16TIR 6.82%B/C 0.55

PAY BACK 59.49

Marca: Mitsubishi Costos sin llantas: 24 700,00 US$

Modelo: Hilux 4 x 4 Valor de rescate: 0,00 US$

Capacidad: 1 000 Kg Período de pago: 120 meses

Potencia: 125 HP Horas programadas (mes): 400 hrs

Vida en horas: 9 600,00 hrs

I: Intereses de equipo Tasa anual: 12 %

S: Seguro de equipo Tasa mensual: 1 %

Vt: Valor de adquisición

Vt`: Valor sin llantas

Ve: Vida económica en horas

K: Factor

n: Vida económica en años: 10 años

M: Fondo de reparación

COSTO DE POSESIÓN MENSUAL

Estimación de variación en indicadores económicos al la adquirir maquinaria:

Page 28: Excel Final

A = 354,39 US$/mes

SEGUROS DE EQUIPO 0,89 US$/hr

S = K * VT`* s

INTERESES DE EQUIPO 0,10 US$/hr

S = K * VT`* I

FONDO DE REPARACIÓN 0,27 US$/hr

COMBUSTIBLE 0,73 US$/hr

Consumo combustible (gal/hr): 1,0

Costo del combustible (US$/gal): 3,0

LUBRICANTES + FILTROS 3,00 US$/hr

Potencia: 125 HP

Consumo: 0,004 US$/HP

GRASAS

Consumo de grasas (lb/hr): 0,001 0,50 US$/hr

Consumo grasas (US$/lb): 0,102

LLANTAS 0,00 US$/hr

Costo mensual de llantas: 20,43 US$

MANTENIMIENTO

Servicios + Contratista 0,05 US$/hr

COSTO DE POSESIÓN + OPERACIÓN

UTILIDAD (10 %)

1,00 US$/hr

6,54 US$/hr

0,65 US$/hr

COSTO TOTAL

COSTO TOTAL ANUAL (1 980 horas) 28 492,20 US$/año

DETERMINACIÓN DEL COSTO DE EQUIPO

Tiempo de uso por mes (hrs): 400 19 800

14,39 US$/hr

COSTO x m3 (28 492,20 / 6 000m3) 4,75 US$/m3

Page 29: Excel Final

CARGADOR FRONTAL, CATERPILLAR 988B

Equipo: Cargador Frontal Valor FOB en el puerto: 450 000,00 US$

Marca: Caterpillar 988B Flete marítimo (3 % FOB): 13 500,00 US$

Seguros (0,50 % FOB): 2 250,00 US$

I: Intereses de equipo Valor CIF – Callao: 465 750,00 US$

S: Seguro de equipo Inspección (1 % CIF): 4 657,50 US$

Vt: Valor de adquisición Advaloren (12 % CIF): 55 890,00 US$

Vt`: Valor sin llantas Despacho (2 % CIF): 9 315,00 US$

Ve: Vida económica en horas Costo Almacén – Lima: 535 612,50 US$

K: Factor Costos sin llantas: 503 612,50 US$

n: Vida económica en años: 10 años Período de pago: 120 meses

M: Fondo de reparación Horas programadas (mes): 165 hrs

Vida económica: 20 000 hrs

Tasa anual: 12 %

Tasa mensual: 1 %

COSTO DE POSESIÓN MENSUAL

A = 7 225,73 US$/mes =

43,79 US$/hr

FONDO DE REPARACIÓN

COMBUSTIBLE 18,38 US$/hr

Consumo combustible (gal/hr): 8,5

Costo del combustible (US$/gal): 3,0

LUBRICANTES + FILTROS 25,50 US$/hr

Potencia: 300 HP

Consumo: 0,004 US$/HP

LLANTAS 1,20 US$/hr

Costo de juego de llantas: 32 000 US$

Vida útil (hrs): 20 000

Page 30: Excel Final

MANTENIMIENTO 1,60 US$/hr

Servicios + Contratista

4,38 US$/hr

COSTO DE POSESIÓN + OPERACIÓN

UTILIDAD (10 %)

94,85 US$/hr

9,49 US$/hr

COSTO TOTAL

COSTO TOTAL ANUAL (1 980 horas) 206 593,20 US$/año

104,34 US$/hr

34,43 US$/m3COSTO x m3 (206 593,20 / 6 000m3)

Page 31: Excel Final

$40,000.00

$1,200.00$200.00

$41,400.00$414.00

$4,968.00$828.00

$47,610.00120 meses200 horas

19800 horas12.00%1.00%

$7,686.01

640.50053413 $/mes

3.2025026706 $/hr

1.7553181818 $/hr

0.2 $/hr

0.5 US$/hr

Page 32: Excel Final

5.6578208525 US$/hr0.5657820852

6.2236029377 US$/hr

14936.647051 US$/año

2.2128366001 US$/m2