Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar Vasantdada Sugar Institute, Pune Page 1 of 24 EXPANSION OF SUGAR PLANT FROM 5000 TO 7500TCD SHRI SOMESHWAR SAHAKARI SAKHAR KARKHANA LTD., SOMESHWARNAGAR, TAL; BARAMATI, DIST: PUNE-412306 MAHARASHTRA, INDIA NOTICE INVITING TENDER FOR DESIGN, SUPPLY, ERECTION AND COMMISSIONING OF CENTRILIZED LUBRICATION SYSTEM Tender No 3. SSSKL/CENTRILIZED LUBRICATION SYSTEM/2020 DECEMBER 2020 TENDER NOTICE CONSULTANT VASANTDADA SUGAR INSTITUTE MANJARI (BK), PUNE, MAHARASHTRA

Upload: others

Post on 07-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 1 of 24

    EXPANSION OF SUGAR PLANT FROM

    5000 TO 7500TCD SHRI SOMESHWAR SAHAKARI SAKHAR KARKHANA LTD.,

    SOMESHWARNAGAR, TAL; BARAMATI,

    DIST: PUNE-412306

    MAHARASHTRA, INDIA

    NOTICE INVITING TENDER

    FOR

    DESIGN, SUPPLY, ERECTION AND COMMISSIONING

    OF CENTRILIZED LUBRICATION SYSTEM Tender No 3. SSSKL/CENTRILIZED LUBRICATION SYSTEM/2020

    DECEMBER 2020

    TENDER NOTICE

    CONSULTANT

    VASANTDADA SUGAR INSTITUTE

    MANJARI (BK), PUNE, MAHARASHTRA

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 2 of 24

    TENDER PACKAGE NO.1

    TECHNICAL SPECIFICATIONS AND SCOPE OF SUPPLY

    Design, Manufacture, Supply, Erection and Commissioning of Centralized Lubrication

    System suitable for 30 “ x 60” with TRPF milling tandem for five mill and master gear &

    pinion gearing arrangement.

    Technical Specifications

    A common centralized dual line grease lubrication system complete with 2 positive

    displacement pumping unit (one working + one standby) with two lubricating points

    for each bearing, alongwith seamless SS 304 steel piping, 2 mm thk, 16mm dia shall

    be provided for mill roller and TRF roller bearing, Master gear and pinion drive

    gearing arrangement lubrication / Grease lubrication. The changeover valve, relief

    valve, distributors, feed lines of 8 mm dia x 2mm thk, control panel, audio/video

    alarm with timer to control pump operation shall be provided.

    SCOPE OF WORK / SUPPLY (BIDDER)

    1. To design, Manufacture, Procure, Supply, Erection & Commissioning of

    Centralized lubrication system

    2. All the drawings shall be get approved from the sugar mill / inspecting agency

    before start to manufacturing process.

    3. To offer the equipment for inspection to sugar mill / inspecting agency during

    and after the fabrication testing and get it approve. The inspection will be for the

    material, dimensional, approval etc. access to contractors manufacturing shop

    will be provided to sugar mill /inspecting agency.

    4. Supplier shall procure all brought out components equipments such as Roller,

    chains, planetary gearbox, motor consumables etc. as per specification given.

    5. To transport and supply all the equipment and brought out components at the

    sugar mill site.

    6. Bidder has to check the existing structure for installation of rotary juice screen or

    necessary structure and staging for the equipment is in scope of supply.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 3 of 24

    7. To commission the unit, this will also include tuning and calibration of

    instrument to hand over the unit after satisfactory commissioning.

    8. The necessary working platforms shall be provided with staircases. The chequard

    plate or grate shall be used for platforms. The railing shall also be provided

    where necessary.

    9. To provide necessary structure stability certificate from structural designer for

    supporting structure.

    10. To give satisfactory performance of unit and provide performance guarantee.

    11. One Qualified Engineer shall be deputed for to Supervise for erection and

    commissioning.

    SCOPE OF WORK OF PURCHASERS

    1. To provide space for unloading the equipment, structure etc.

    2. To provide personnel for the operation of unit during and after commissioning of

    the plant.

    3. To provide electrical power, as utility at the time of commissioning.

    To provide Civil Work and foundations for equipment as per drawing provided if

    required.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 4 of 24

    A) GENERAL SPECIFICATIONS

    CLARIFICATIONS AND ELUCIDATIONS

    1.0 PIPE LINES AND FITTINGS

    All hot and cold water, live steam, low pressure steam and lines shall

    designed as per velocities given tender document.

    1.1 VALVES

    i) Safety valves to be provided in the steam pipe lines wherever necessary.

    Blow off pipes shall extend beyond the roof/factory building.

    ii) Safety valves in the exhaust and reduced pressure lines shall be lever

    operated.

    iii) Suitable drains, valves, steam traps etc. shall be provided in all steam

    lines, where necessary.

    iv) All vapour and exhaust valves shall be of right angle type.

    1.3 PIPELINES & FITTINGS

    i) Mild Steel Pipes

    All mild steel pipes and pipe fittings to be used for carrying out the

    necessary modifications & expansion; like the one to be used for

    conveying of air, cold water and hot water (except feed water piping)

    shall confirm to IS: 1239 (part-I)-1976 and IS:1239 (part-II)-1982

    specifications.

    In case of all piping above 25 mm NB, only flanged joints shall be used.

    All flanges to be as per IS:6392-1971.

    ii) Integral piping, Feed Water Piping and Live steam piping.

    a) These shall conform to I.B.R. wherever applicable.

    b) Drains with valves and with steam trap shall be provided at

    suitable location in the above piping.

    2.0 MATERIAL SPECIFICATIONS

    i) Compressed asbestos fibre shall conform to IS:2712-1971.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 5 of 24

    ii) Plummer blocks use for roller bearings shall conform to IS:4773-1968.

    iii) The slide rails for electric motors, if of grey cast iron conform to grade 15

    of IS:210-1962. The slide rails shall be as IS:2968-1964

    iv) Structural steel and mild steel plates conforming to IS:2062 or equivalent

    shall be used for the fabrication of rest of the machinery and equipment.

    v) All power cables shall be of P.V.C. insulated XLPE aluminium conductor

    armored type as per IS 1554 specifications and shall be laid overhead on

    proper racks and supports suitably spaced and clamped to the racks. All

    cable terminations shall be through crimping type cable lugs. Cable

    glands shall be provided at panels.

    vi) Specification of rotating electric machines IS: 4722

    3.0 GENERAL

    i) The deliveries of materials for the plant and machinery for modernization

    cum expansion shall be accompanied with clear detailed packing lists in

    triplicate noting therein gross weight of the packages as well as the net

    weight, wherever possible.

    ii) All pipelines excepting steam and water up to 250 mm dia should be

    provided with flanges at lengths not exceeding 6 meters to facilitate easy

    dismantling whenever cleaning is necessitated. The fabrication of steam

    lines is to be as per IBR.

    iii) Good quality jointing shall be used at all flanges points commensurate

    with the pressure as well as the materials to be handled. For high-

    pressure pipeline, only S.S. spiral bound jointing shall be used.

    iv) In all cases tensile strength or solidity has been mentioned, the supplier

    will provide a suitable certificate for the guarantee of the same from the

    original manufacturers or from government approved testing

    laboratories.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 6 of 24

    v) All material used in manufacture, fabrication and erection of machinery

    shall conform to the specifications laid down in material specifications

    given earlier. Where specifications are not given, standard-engineering

    practices shall be followed.

    vi) All instruments must have dust, moisture proof casing to avoid failure of

    these during operation even in unsatisfactory working conditions. The

    supplier of instruments has to provide trouble shooting and inspection

    manual and training to the technical staff of the sugar mill.

    4.0 Miscellaneous

    1) The O & M manuals, drawings, specifications etc should be supplied by

    the seller to the purchaser 1 months before the schedule of the

    commissioning of the rotary juice screen.

    2) Material to be used for lagging:

    For lagging, Factory made mattresses of bonded glass wool / rock wool

    /Mineral wool as per IS : 8183 specifications .

    The thickness of lagging should be such that the difference between

    Temperature measured at any point on the outer surface of the lagging

    and ambient temperature should not be more than 100C.

    i) For protective finish:

    Aluminum cladding shall be provided over the lagging of all piping.

    ii) The valves & flanges to be lagged shall be provided with the open

    able lagging boxes for valves & fittings of the HP steam lines ,

    openable boxes shall be out of 18 SWG thick aluminum sheets as

    per IS : 737 designation condition H3 .

    3) All the maintenance tools, tube expanders etc . to be supplied by the seller

    to the purchaser as per scope of supply stipulated under this agreement

    should be brand new and should not be those used by the seller for

    erection & commissioning.

    4) All nuts & bolts and non-return valves should be as per ISI specifications.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 7 of 24

    5) In case, tensile strength or solidity has been mentioned, the supplier shall

    submit a suitable certificate of the same from original manufacturer /

    Govt. approved testing laboratories /Govt. engineering colleges.

    5.0 Terminal Points:

    1) Civil foundation work is excluded from the scope of supplier. However

    civil foundation drawings shall be provided by the supplier if required.

    2) Bidder shall visit to factory site to see the existing structure layout and

    proposed installation of centralized lubrication system.

    3) The necessary structure, platform with railing and staircase is included in

    scope of supply.

    4) The necessary drawing shall be get approved from sugar mill / V.S.I.

    Pune, before manufacturing the unit.

    5) Work completion period for within 6 month from agreement.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 8 of 24

    B) LIST OF APPROVED MAKE

    1. AC /DC MOTORS SIEMENS/CROMPTON /KIRLOSKAR /ABB /

    KEC/ IEC

    2

    PLANETARY GEAR BOX ELICON /Premium

    3 Centrifugal Lubrication

    System

    LINCON / CENLUB

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 9 of 24

    C) SCHEDULE OF SUBMISSION OF DRAWINGS, MANUALS & OTHER DOCUMENTS

    SUBMISSION OF DRAWINGS

    1.1

    a) Within 20 days from the date of signing of the agreement, 2 copies of

    the general layout of feeder table in the existing factory layout showing

    the positions of the new equipments for the approval of the Purchaser/

    or its authorized agency. The Purchaser or its authorized agency shall

    unless they have any objection approve the same in writing or indicate

    the corrections (required to be incorporated by sellers) subject to which

    the drawings can be deemed as approved so that the purchaser can go

    ahead further to save time. The sellers shall however incorporate the

    required correction and submit 6 copies of general layout for final

    approval and records.

    b) Seller shall submit all major foundation drawings of the machinery to the

    architect of the owner purchaser within 10 days to max 15 days of

    acceptance of the LOI so that the civil contractor is able to procure the

    materials required in time.

    1.2 Within 15 days from the date of receipt of approval of layout of the position of

    new plant & equipments as in 1.1 above, 2 copies of the engineering layout of

    the plant and machinery for the approval of the Purchaser/its authorized

    agency. The Purchaser shall unless they have any objection, approve this layout

    in writing and dispatch it with their approval/comments (by which the drawings

    can be deemed as approved – for saving time for execution) to the sellers within

    10 days of its receipt. Sellers shall incorporate the required correction (if any)

    and submit 6 copies of engineering layout for final approval and records.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 10 of 24

    1.3 Within one week of finalization of engineering layout the Sellers shall, in

    consultation with Purchaser, Vasantdada Sugar Institute, Architect and Civil

    Contractor of Purchaser, indicate the dates in the Performa given below so as to

    commission the plant and machinery by the stipulated date i.e.

    1 2 3 4 5 6

    S.No. Description Drawing & details to

    be received from the

    Sellers

    Completion of

    designing of

    foundations by the

    Architect &

    submission to

    Sellers for

    comments and

    approval

    Completion

    date of

    foundation by

    civil contractor

    for starting the

    erection work

    Date of start and

    completion of

    supervision of

    erection by the

    Sellers

    1.5 Progressively and in proper sequence, within 2 months of the date of signing this

    Agreement, 2 copies of the following shall be submitted to the purchaser for

    their approval. Vasantdada Sugar Institute shall return the drawings within 2

    weeks with due comments/approval. Sellers shall incorporate the correction, if

    suggested by Vasantdada Sugar Institute, and submit 6 sets of drawings for final

    approval and implementation

    a) Layout of the Centralized lubrication system

    b) Drawings of the staging for the plant and machinery along with a

    stability certificate from a Chartered Structural Engineer.

    c) Drawings showing all details of Centralized lubrication system is to be

    provided.

    d) The Purchasers shall furnish to the Sellers within 1 month of the signing

    of this Agreement, 2 copies of plan showing the locations of Centralized

    lubrication system in layout of existing milling tandem.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 11 of 24

    1.6 Progressively within 2 months from the date of signing of the Agreement, 6

    copies of all general arrangement drawings and instruction manuals as may be

    required for running and maintenance of the plant and machinery, pipelines,

    electrical installation etc. except that in case of imported machines all drawings

    and instruction manuals in respect thereof, shall wherever necessary for running

    and maintenance of the plant and machinery be submitted at the time of

    delivery.

    1.7 In all cases where provision exists for approval by Purchasers of the drawings,

    diagrams of layouts, one copy of the said drawings, diagrams or layout shall be

    returned to the Sellers with the comments/approval in writing thereon by the

    Purchasers within the time provided therefore. While drawings are required to

    be resubmitted for approval, 6 copies of the revised drawings shall be submitted

    to the purchaser/Consultant by the sellers within 3 weeks of the receipt of the

    latter's' comments.

    1.8 Purchaser shall have the right to suggest minor modifications to be made in the

    drawings, diagrams or layout as in their opinion may appear necessary for more

    efficient functioning of the plant and machinery and as may be mutually agreed

    upon by the Sellers and Purchasers.

    2. MISTAKES IN DRAWINGS

    The Sellers shall be responsible for and shall pay for any alternations of the plant

    and machinery due to any discrepancies of errors or omissions in the drawings or

    other particulars supplied by them whether such drawings or particulars have

    been approved by the Purchasers or not.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 12 of 24

    3. MANUALS AND OTHER DOCUMENTS

    The sellers shall submit the following information, progressively within 1months

    of signing the agreement. (This information shall also be filled in the Performa

    mentioned under 1.5 above)

    i) 6 (six) sets of civil scope design data and necessary information in respect

    of all civil and structural engineering work including cable trenches,

    drains etc., to be carried out by the Purchaser. Design data should

    contain enough information on static load and other design data required

    for detailed calculations and designs for all plant buildings, structures,

    misc. works etc.

    ii) 6 (six) sets of plans for equipment layout drawings showing all the details

    of the relevant location and space requirement of each item of plant and

    equipment.

    iii) 6 (six) copies of flow sheets, showing the details of the flows pertaining

    to raw-materials, utilities and other inputs, items of machinery and

    equipments etc.

    iv) 6 (six) copies of the plant operation and maintenance manuals containing

    specifications and detailed working guidance for each item of equipment,

    maintenance procedures, specifications of lubricants (of at least 4

    prominent National lubricant oil manufacturers) recommended for all

    machinery and equipment to enable the Purchaser to arrange for the

    procurement of the same.

    v) 6 (six) copies of the manuals of instructions for care and safe custody of

    plant and equipment at site and for their erection prior to the dispatch of

    the plant and equipment.

    vi) Such other information, explanation and advises as may be requested

    from time to time by the Purchasers with regard to the installation,

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 13 of 24

    erection start-up and operation of the plant for and upto a period of 2

    (two) years after commissioning.

    vii) one months before commissioning of the plant & machinery the seller

    shall furnish the list of spares and accessories to the Purchasers.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 14 of 24

    D) PERFORMANCE CERTIFICATE

    (TO BE ISSUED BY AUTHORISED AGENCIES)

    This is to certify that M/s………………………………….. have supplied, supervised the

    erection and commissioning of following Plant and Machinery for modernization cum

    Expansion form 5000 TCD to 7500 TCD for equipments, commissioned on date ……………

    and following performance has been achieved during performance trials.

    Name of equipment supplied:

    Sr. No. Performance Parameter Remark

    1

    2

    3

    4

    Seal & Signature of

    AUTHORISED AGENCIES

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 15 of 24

    E) BANK GUARANTEE FORMAT

    This Guarantee made on the day of by the having its Branch at-------------------------

    (hereinafter called “The Guarantor” which expression shall unless repugnant to

    the context or contrary to the meaning thereof, include its successors and

    assigns) of the one part.

    IN FAVOUR OF M/s Shri Someshwar sahakari sakhar karkhana Ltd.,. a society,

    registered under the Maharashtra STATE CO.OP SOCIETIES ACT, having its

    registered office (hereinafter called “The Purchaser” which expression shall

    unless repugnant to the subject or context, include their successors and assigns)

    of the other part. WHEREAS M/s.--------------------------------------------------

    (hereinafter called “The Seller” which expression shall unless repugnant to the

    subject or context include their legal representatives, administrators, successors

    or permitted assigns) had entered into an agreement vide letter of Intent dt.------

    ------ (hereinafter called “The said Agreement”) with the purchaser to design,

    prepare and the plant and supply Machinery for purchasers existing sugar plant

    at Shri Someshwar sahakari sakhar karkhana Ltd., (hereinafter called the Site) in

    accordance with the terms and conditions therein contained (hereinafter

    referred to as “The Said Plant”).

    AND WHEREAS under the said agreement, the Purchaser required to pay to the

    sellers

    against security of a Bank Guarantee an advance payment of Rs.----------------------

    ---- (Rupees--------------------------------------------------------------------------------------------

    ----) representing of the contract price for the purpose of procurement of

    materials / equipments for the said plant. Such guarantee to be valid till the full

    advance amount is adjusted against the base price of the actual deliveries of

    machinery and equipment received at site.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 16 of 24

    AND WHEREAS before advance payment as aforesaid is made the Guarantor has,

    at the request of the Sellers, agreed to give the Guarantee as hereinafter

    contained..

    NOW THIS DEED WITNESSES AS FOLLOWS

    1). In consideration of the premises the Guarantor, hereby undertake to pay to the

    Purchaser within 30 days of demand and without demur such a sum not

    exceeding Rs.------------------------- The Purchaser may demand representing of the

    contract price, and if the Guarantor shall fall to pay the same within the said

    period, the Guarantor, shall also pay on the sum demanded interest at the Bank

    lending rate then prevailing reckoned from the date of demand till the date of

    payment. Provided that the liability of the Guarantor hereunder shall reduce to

    the extent of the advance adjusted according to of the said agreement.

    2). The Guarantor shall pay to the Purchaser on demand the sum under Clause 1

    above without demur and without requiring the Purchaser to invoke any legal

    remedy that may be available to them. it being understood and agreed FIRSTLY

    that the Purchaser shall be the sole judge of and as to whether the Sellers have

    committed any breach(es) of any of the terms and conditions of the said

    agreement and SECONDLY that the right of the Purchaser to recover from the

    Guarantor any amount due to the Purchaser shall not be effected or suspended

    by reasons of the fact that any dispute or disputes have been raised by the

    Sellers with regards to their liability or that proceedings are pending before any

    Tribunal, Arbitrator(s) or Court with regards thereto or in connection therewith,

    and THIRDLY that the Guarantor shall immediately pay the aforesaid guaranteed

    amount to the Purchaser on demand, it shall not be open to the Guarantor to

    know the reasons of or to investigate or to go into the merits of the demand or

    to question or to challenge the demand or to know any facts affecting the

    deemed, and LASTLY, that it shall not be open to the Guarantor to require proof

    of the liability of the Sellers to pay the amount, before paying the aforesaid

    guaranteed amount to the Purchaser.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 17 of 24

    3). This Guarantee shall come into force from the date release of payment hereof

    and shall remain valid till the full advance amount is adjusted under the said

    Agreement, which according to the terms and conditions of the said Agreement

    is stipulated to be adjusted against actual deliveries of the machinery and

    equipment at site, but if the actual deliveries as aforesaid have not been

    completed by the seller within the said period for any reasons whatsoever the

    Guarantor, hereby undertakes that the Sellers shall furnish a fresh or renewed

    guarantees on the Purchaser’s Proforma for such further period as the Purchaser

    may intimate failing which the Guarantor shall pay to the Purchasers a sum not

    exceeding Rs. -------------------------- /- (Rupees:-----------------------------------------------

    -----------------------------------------------------------------------------------) or the residual

    amount of balance advance left after proportion to adjustment in accordance

    with Clause 1 above as the Purchaser may demand..

    4) This Guarantee is in addition to and not in substitution for any other guarantee

    executed by the Guarantor in favor of the Purchaser on behalf of the Sellers.

    5) The Sellers and Purchaser will be at liberty to vary and moodily the terms and

    conditions of the said agreement without effecting this guarantor is, hereby

    waived and the same shall be deemed to have been done with the assent of the

    Guarantor.

    6) This Guarantee shall not be effected by any change in the constitution of the

    Guarantor or of the Seller nor shall the guarantee be effected by any change in

    the constitution of the Purchaser or any amalgamation or absorption with any

    other body corporated and this guarantee will be available to or enforceable by

    such body corporate.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 18 of 24

    7) This Guarantee is irrevocable except with the written consent of the Purchaser.

    8) The neglect or forbearance of the Purchaser in enforcing any payment of

    moneys, the payment whereof is intended to be hereby secured or the giving of

    time by the Purchaser for the payment thereof, shall, in no way, release the

    Guarantor from its liability under this Deed.

    9) The invocation of this guarantee shall be by a letter signed by the Purchaser and

    countersigned by Managing Director, Sugar mill

    10) Notwithstanding anything stated herein before the liability of the Guarantor

    under this guarantee is restricted to Rs.--------------------- /- (Rupees -------------------

    ------------------------------------------------------------------------:) and interest as provided

    in Clause 1. This guarantee shall remain in force up to / / unless a

    demand or claim under this guarantee is presented to the Guarantor in writing

    within Six Months from the date, all rights of the Purchaser under the guarantee

    shall be forfeited and the Guarantor shall be released and discharged from all

    liability hereunder.

    IN WITNESS WHEREAS

    for any on behalf of the Guarantor has signed this Deed on the day and year

    above written.

    for and on behalf of.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 19 of 24

    F) PROFORMA FOR OPENING OF THE LETTER OF CREDIT

    No. Date.

    To,

    Seller

    Dear Sirs,

    Ref. : - Inland Letter of Credit No.

    dt. Confirmed, irrecoverable divisible, assignable,

    ordinary / automatic revolving, transferable.

    1. We have pleasure in advising you that, we have established in your favour for

    account and at their request of a confirmed irrecoverable divisible, assignable,

    automatic revolving and transferable without resource, Letter of Credit No.-------

    -------------------------------------------------dt.---------------------------- for a sum Rs.---------

    -------------------- revolving upto Rs.----------------------- for a sum Rs.----------------------

    --------revolving upto Rs.------------------------------ in figures Rs.----------------------------

    ------------------------------------- in words as per clause of Agreement dated

    2. You are, hereby authorized to draw on M/s. Shri Someshwar sahakari sakhar

    karkhana Ltd., exceeding Rs.-------------------------------------------- subject to a

    maximum drawing of ordinary Letter of Credit Rs.----------------------------- available

    by your drafts on them at sight towards 75% (Seventy Five percent) of your price

    of ----------------------------- optional and additional items, cost of necessary

    facilities, and full price variations plus reimbursement of actual amount of Excise

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 20 of 24

    Duty, Central Sales Tax, Octroi, Customs Duties, etc. as per clause----------------- of

    the Agreement dated accompanied by the following endorsed in favour of M/s.--

    ------------------------------------------------------------------

    2.1 For Supply of Equipments & Machinery

    a) True copy of Inspection Report certified by the Sellers for equipment materials

    inspected and accepted by the Inspection Agency before dispatch..

    b) Seller Certificate to the effect that in case the Inspection Report, as stated above,

    is not attached, the particular consignment are not covered by the mutually

    agreed list of equipment’s which are to be inspected at manufacturers works

    before dispatch or that the inspection of the same would be carried out at the

    Plant Site of M/s.

    c) Dispatch List/Bill of material in case of equipment to be fabricated at Site.

    d) A Certificate to the effect that the goods are shipped / dispatched as per original

    Agreement dt. evidencing transport of machinery of Sugar Plant from any place

    in India to Purchaser Plant Site i.e.

    e) In case of supply of any imported equipment, machinery, component, spares,

    etc. the sellers shall furnish with the memorandum of demand all duly attested

    (Attested by the Sellers) copy of document in support of import of the same.

    f) While drawing any claim for supply of imported machinery component,

    equipment, spares etc., the seller shall furnish a Certificate that the claim has

    been calculated as per prevailing foreign exchange rate and provided

    documentary proof for the same as per Clause of Agreement dated.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 21 of 24

    g) Invoice in triplicate:

    i). Every Invoice should contain a reference of item number according to the base

    price break-up submitted by the Seller as per Proforma - A of the Agreement dt.-

    ---------------------- and ---------also----------- the scheduled date of delivery of the

    goods as per original delivery schedule adhering to the schedule date of

    commissioning and make the plant ready for commercial use of the said plant by

    ii). Seller shall deduct from every bill for sugar machinery optioned and additional

    items as per Clause--------- (I to III) of the Agreement dated proportionate

    amount of advance received from M/s.-------------------------------------------------------

    ------------------------------------------------------ Invoice shall include Taxes, Duties, and

    Levies imposed by law and leviable on 100% of the cost of material as per

    Clause--------- of the Agreement dated

    h). Packing list of Delivery Note in triplicate

    Photostat copy (duly attested by the Seller) of Railway Receipt / Goods Receipt /

    Lorry Receipt from any Bank approved transporter evidencing. Despatch of

    equipment and machinery for sugar plant from anywhere in India to the Railway

    Station or Plant Site of mentioning freight paid/to be paid.

    i) Seller Certificate to the effect that the goods are shipped / dispatched as per the

    Agreement dated.

    j) The Seller shall attach duly attested (attested by Seller) Photostat copies of the

    letters sent to the Insurance Company declaring all materials dispatched under

    each consignment, with a copy of Purchaser as per Clause of the Agreement

    dated.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 22 of 24

    For Necessary Facilities:

    a) A certificate from the Seller that M/s.------------------------------------------------ ---------

    ----

    have been provided with all details of claims in respect of necessary facilities.

    b) A duly attested (Attested by the Seller) Photo copy of the Claims / Bills submitted

    to M/s.--------------------------------------------------------------------------------------------------

    as per Clause of the Agreement dt.

    c) A certificate of Seller certifying that they have not received the payment from

    M/s.-------------------------------------------------------------------------- within 30 days

    from the date of the bills are received by M/s.----------------------------------------------

    ---------------------------

    3) Special Conditions:

    a) The Seller shall furnish photo copy of delivery and commissioning, bank /

    insurance guarantee in the form of Purchaser, duly attested by the

    representative of Purchaser while drawing the money through for the first

    consignment of the material. In the absence of this guarantee, the Seller must

    deduct 5% (five percent) from the bills.

    b) Partial shipments and transshipments are allowed.

    c) The Seller shall furnish the photocopy of performance, bank/insurance

    guarantee in the form of Purchaser, duly attested by the representative of M/s.--

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 23 of 24

    ------------------------------- -------------------------------- on the same becoming due for

    submission. In the event of non-submission of the performance bank/insurance

    guarantee after the same becoming due for submission, the Seller shall deduct

    5% (five percent) from all bills, including bills for escalations..

    d) This letter of Credit is automatic revolving (fixed /ordinary / confirmed,

    irrevocable, assignable, transferable, divisible for Rs. -------------- lakhs (Rupees: --

    -------------------------------------------------------------------------------------------------- )

    e) The Credit is irrevocable valid in until 19 .

    f) The drawers shall be allowed to draw their claims against necessary facilities

    g) Negotiation and bank charge, related to this Letter of Credit, will be borne by

    M/s.----------------------------------------------------------------------------------------

    h) The total amount of drawing under this automatic/revolving/fixed letter of credit

    will be restricted upto Rs. lakhs Rs. Lakhs

    (Rupees:---------------------------------------------------- Lakhs)

    i) Drafts drawn under this credit are to be negotiated without resources to the

    drawers and to bear the following clause “Drawn under (Name of the Opener)”

    Credit No. dated.

    j) Purchaser are to note amounts of the drafts separately on the Bank hereof.

    k) Draft drawn under this credit are negotiable by the (Name of Bank) only.

  • Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar

    Vasantdada Sugar Institute, Pune Page 24 of 24

    l) This credit is subject to uniform, customs and practice for documentary credit

    (1974 Revision) international Chambers of Commerce, Brouchur No. 290.

    4. We hereby guarantee to protect the drawers, endorsers and bonafide holders

    from any consequence which may arise in the event of the non acceptance of

    drafts drawing in accordance with the terms of this credit..

    G) PROFORMA FOR PERFORMANCE STATEMENT

    (For the last Five Years)

    Bid No....................................................... date of opening

    ............................................................. Time ................................ Hours

    Name of the bidder

    .............………………………………………………………………………………….....

    No. of years in service…………………………………**

    Order placed by (Full address of purchaser)

    Order No. and date

    Description* and quantity of ordered equipment

    Value of order

    Date of completion of delivery

    Remarks indicating reasons of late delivery, if any

    Has the equipment been satisfactorily functioning? (Attach a cert. From the Engineer incharge)

    As per Contract

    Actual

    1 2 3 4 5 6 7 8

    Signature and seal of the bidder ..............................................

    Note : *-Indicate the centralized lubrication system

    **- Indicate the number of years in the line of business.