expansion of sugar plant from 5000 to 7500tcd · 2020. 12. 23. · lincon / cenlub . tender...
TRANSCRIPT
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 1 of 24
EXPANSION OF SUGAR PLANT FROM
5000 TO 7500TCD SHRI SOMESHWAR SAHAKARI SAKHAR KARKHANA LTD.,
SOMESHWARNAGAR, TAL; BARAMATI,
DIST: PUNE-412306
MAHARASHTRA, INDIA
NOTICE INVITING TENDER
FOR
DESIGN, SUPPLY, ERECTION AND COMMISSIONING
OF CENTRILIZED LUBRICATION SYSTEM Tender No 3. SSSKL/CENTRILIZED LUBRICATION SYSTEM/2020
DECEMBER 2020
TENDER NOTICE
CONSULTANT
VASANTDADA SUGAR INSTITUTE
MANJARI (BK), PUNE, MAHARASHTRA
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 2 of 24
TENDER PACKAGE NO.1
TECHNICAL SPECIFICATIONS AND SCOPE OF SUPPLY
Design, Manufacture, Supply, Erection and Commissioning of Centralized Lubrication
System suitable for 30 “ x 60” with TRPF milling tandem for five mill and master gear &
pinion gearing arrangement.
Technical Specifications
A common centralized dual line grease lubrication system complete with 2 positive
displacement pumping unit (one working + one standby) with two lubricating points
for each bearing, alongwith seamless SS 304 steel piping, 2 mm thk, 16mm dia shall
be provided for mill roller and TRF roller bearing, Master gear and pinion drive
gearing arrangement lubrication / Grease lubrication. The changeover valve, relief
valve, distributors, feed lines of 8 mm dia x 2mm thk, control panel, audio/video
alarm with timer to control pump operation shall be provided.
SCOPE OF WORK / SUPPLY (BIDDER)
1. To design, Manufacture, Procure, Supply, Erection & Commissioning of
Centralized lubrication system
2. All the drawings shall be get approved from the sugar mill / inspecting agency
before start to manufacturing process.
3. To offer the equipment for inspection to sugar mill / inspecting agency during
and after the fabrication testing and get it approve. The inspection will be for the
material, dimensional, approval etc. access to contractors manufacturing shop
will be provided to sugar mill /inspecting agency.
4. Supplier shall procure all brought out components equipments such as Roller,
chains, planetary gearbox, motor consumables etc. as per specification given.
5. To transport and supply all the equipment and brought out components at the
sugar mill site.
6. Bidder has to check the existing structure for installation of rotary juice screen or
necessary structure and staging for the equipment is in scope of supply.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 3 of 24
7. To commission the unit, this will also include tuning and calibration of
instrument to hand over the unit after satisfactory commissioning.
8. The necessary working platforms shall be provided with staircases. The chequard
plate or grate shall be used for platforms. The railing shall also be provided
where necessary.
9. To provide necessary structure stability certificate from structural designer for
supporting structure.
10. To give satisfactory performance of unit and provide performance guarantee.
11. One Qualified Engineer shall be deputed for to Supervise for erection and
commissioning.
SCOPE OF WORK OF PURCHASERS
1. To provide space for unloading the equipment, structure etc.
2. To provide personnel for the operation of unit during and after commissioning of
the plant.
3. To provide electrical power, as utility at the time of commissioning.
To provide Civil Work and foundations for equipment as per drawing provided if
required.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 4 of 24
A) GENERAL SPECIFICATIONS
CLARIFICATIONS AND ELUCIDATIONS
1.0 PIPE LINES AND FITTINGS
All hot and cold water, live steam, low pressure steam and lines shall
designed as per velocities given tender document.
1.1 VALVES
i) Safety valves to be provided in the steam pipe lines wherever necessary.
Blow off pipes shall extend beyond the roof/factory building.
ii) Safety valves in the exhaust and reduced pressure lines shall be lever
operated.
iii) Suitable drains, valves, steam traps etc. shall be provided in all steam
lines, where necessary.
iv) All vapour and exhaust valves shall be of right angle type.
1.3 PIPELINES & FITTINGS
i) Mild Steel Pipes
All mild steel pipes and pipe fittings to be used for carrying out the
necessary modifications & expansion; like the one to be used for
conveying of air, cold water and hot water (except feed water piping)
shall confirm to IS: 1239 (part-I)-1976 and IS:1239 (part-II)-1982
specifications.
In case of all piping above 25 mm NB, only flanged joints shall be used.
All flanges to be as per IS:6392-1971.
ii) Integral piping, Feed Water Piping and Live steam piping.
a) These shall conform to I.B.R. wherever applicable.
b) Drains with valves and with steam trap shall be provided at
suitable location in the above piping.
2.0 MATERIAL SPECIFICATIONS
i) Compressed asbestos fibre shall conform to IS:2712-1971.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 5 of 24
ii) Plummer blocks use for roller bearings shall conform to IS:4773-1968.
iii) The slide rails for electric motors, if of grey cast iron conform to grade 15
of IS:210-1962. The slide rails shall be as IS:2968-1964
iv) Structural steel and mild steel plates conforming to IS:2062 or equivalent
shall be used for the fabrication of rest of the machinery and equipment.
v) All power cables shall be of P.V.C. insulated XLPE aluminium conductor
armored type as per IS 1554 specifications and shall be laid overhead on
proper racks and supports suitably spaced and clamped to the racks. All
cable terminations shall be through crimping type cable lugs. Cable
glands shall be provided at panels.
vi) Specification of rotating electric machines IS: 4722
3.0 GENERAL
i) The deliveries of materials for the plant and machinery for modernization
cum expansion shall be accompanied with clear detailed packing lists in
triplicate noting therein gross weight of the packages as well as the net
weight, wherever possible.
ii) All pipelines excepting steam and water up to 250 mm dia should be
provided with flanges at lengths not exceeding 6 meters to facilitate easy
dismantling whenever cleaning is necessitated. The fabrication of steam
lines is to be as per IBR.
iii) Good quality jointing shall be used at all flanges points commensurate
with the pressure as well as the materials to be handled. For high-
pressure pipeline, only S.S. spiral bound jointing shall be used.
iv) In all cases tensile strength or solidity has been mentioned, the supplier
will provide a suitable certificate for the guarantee of the same from the
original manufacturers or from government approved testing
laboratories.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 6 of 24
v) All material used in manufacture, fabrication and erection of machinery
shall conform to the specifications laid down in material specifications
given earlier. Where specifications are not given, standard-engineering
practices shall be followed.
vi) All instruments must have dust, moisture proof casing to avoid failure of
these during operation even in unsatisfactory working conditions. The
supplier of instruments has to provide trouble shooting and inspection
manual and training to the technical staff of the sugar mill.
4.0 Miscellaneous
1) The O & M manuals, drawings, specifications etc should be supplied by
the seller to the purchaser 1 months before the schedule of the
commissioning of the rotary juice screen.
2) Material to be used for lagging:
For lagging, Factory made mattresses of bonded glass wool / rock wool
/Mineral wool as per IS : 8183 specifications .
The thickness of lagging should be such that the difference between
Temperature measured at any point on the outer surface of the lagging
and ambient temperature should not be more than 100C.
i) For protective finish:
Aluminum cladding shall be provided over the lagging of all piping.
ii) The valves & flanges to be lagged shall be provided with the open
able lagging boxes for valves & fittings of the HP steam lines ,
openable boxes shall be out of 18 SWG thick aluminum sheets as
per IS : 737 designation condition H3 .
3) All the maintenance tools, tube expanders etc . to be supplied by the seller
to the purchaser as per scope of supply stipulated under this agreement
should be brand new and should not be those used by the seller for
erection & commissioning.
4) All nuts & bolts and non-return valves should be as per ISI specifications.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 7 of 24
5) In case, tensile strength or solidity has been mentioned, the supplier shall
submit a suitable certificate of the same from original manufacturer /
Govt. approved testing laboratories /Govt. engineering colleges.
5.0 Terminal Points:
1) Civil foundation work is excluded from the scope of supplier. However
civil foundation drawings shall be provided by the supplier if required.
2) Bidder shall visit to factory site to see the existing structure layout and
proposed installation of centralized lubrication system.
3) The necessary structure, platform with railing and staircase is included in
scope of supply.
4) The necessary drawing shall be get approved from sugar mill / V.S.I.
Pune, before manufacturing the unit.
5) Work completion period for within 6 month from agreement.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 8 of 24
B) LIST OF APPROVED MAKE
1. AC /DC MOTORS SIEMENS/CROMPTON /KIRLOSKAR /ABB /
KEC/ IEC
2
PLANETARY GEAR BOX ELICON /Premium
3 Centrifugal Lubrication
System
LINCON / CENLUB
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 9 of 24
C) SCHEDULE OF SUBMISSION OF DRAWINGS, MANUALS & OTHER DOCUMENTS
SUBMISSION OF DRAWINGS
1.1
a) Within 20 days from the date of signing of the agreement, 2 copies of
the general layout of feeder table in the existing factory layout showing
the positions of the new equipments for the approval of the Purchaser/
or its authorized agency. The Purchaser or its authorized agency shall
unless they have any objection approve the same in writing or indicate
the corrections (required to be incorporated by sellers) subject to which
the drawings can be deemed as approved so that the purchaser can go
ahead further to save time. The sellers shall however incorporate the
required correction and submit 6 copies of general layout for final
approval and records.
b) Seller shall submit all major foundation drawings of the machinery to the
architect of the owner purchaser within 10 days to max 15 days of
acceptance of the LOI so that the civil contractor is able to procure the
materials required in time.
1.2 Within 15 days from the date of receipt of approval of layout of the position of
new plant & equipments as in 1.1 above, 2 copies of the engineering layout of
the plant and machinery for the approval of the Purchaser/its authorized
agency. The Purchaser shall unless they have any objection, approve this layout
in writing and dispatch it with their approval/comments (by which the drawings
can be deemed as approved – for saving time for execution) to the sellers within
10 days of its receipt. Sellers shall incorporate the required correction (if any)
and submit 6 copies of engineering layout for final approval and records.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 10 of 24
1.3 Within one week of finalization of engineering layout the Sellers shall, in
consultation with Purchaser, Vasantdada Sugar Institute, Architect and Civil
Contractor of Purchaser, indicate the dates in the Performa given below so as to
commission the plant and machinery by the stipulated date i.e.
1 2 3 4 5 6
S.No. Description Drawing & details to
be received from the
Sellers
Completion of
designing of
foundations by the
Architect &
submission to
Sellers for
comments and
approval
Completion
date of
foundation by
civil contractor
for starting the
erection work
Date of start and
completion of
supervision of
erection by the
Sellers
1.5 Progressively and in proper sequence, within 2 months of the date of signing this
Agreement, 2 copies of the following shall be submitted to the purchaser for
their approval. Vasantdada Sugar Institute shall return the drawings within 2
weeks with due comments/approval. Sellers shall incorporate the correction, if
suggested by Vasantdada Sugar Institute, and submit 6 sets of drawings for final
approval and implementation
a) Layout of the Centralized lubrication system
b) Drawings of the staging for the plant and machinery along with a
stability certificate from a Chartered Structural Engineer.
c) Drawings showing all details of Centralized lubrication system is to be
provided.
d) The Purchasers shall furnish to the Sellers within 1 month of the signing
of this Agreement, 2 copies of plan showing the locations of Centralized
lubrication system in layout of existing milling tandem.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 11 of 24
1.6 Progressively within 2 months from the date of signing of the Agreement, 6
copies of all general arrangement drawings and instruction manuals as may be
required for running and maintenance of the plant and machinery, pipelines,
electrical installation etc. except that in case of imported machines all drawings
and instruction manuals in respect thereof, shall wherever necessary for running
and maintenance of the plant and machinery be submitted at the time of
delivery.
1.7 In all cases where provision exists for approval by Purchasers of the drawings,
diagrams of layouts, one copy of the said drawings, diagrams or layout shall be
returned to the Sellers with the comments/approval in writing thereon by the
Purchasers within the time provided therefore. While drawings are required to
be resubmitted for approval, 6 copies of the revised drawings shall be submitted
to the purchaser/Consultant by the sellers within 3 weeks of the receipt of the
latter's' comments.
1.8 Purchaser shall have the right to suggest minor modifications to be made in the
drawings, diagrams or layout as in their opinion may appear necessary for more
efficient functioning of the plant and machinery and as may be mutually agreed
upon by the Sellers and Purchasers.
2. MISTAKES IN DRAWINGS
The Sellers shall be responsible for and shall pay for any alternations of the plant
and machinery due to any discrepancies of errors or omissions in the drawings or
other particulars supplied by them whether such drawings or particulars have
been approved by the Purchasers or not.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 12 of 24
3. MANUALS AND OTHER DOCUMENTS
The sellers shall submit the following information, progressively within 1months
of signing the agreement. (This information shall also be filled in the Performa
mentioned under 1.5 above)
i) 6 (six) sets of civil scope design data and necessary information in respect
of all civil and structural engineering work including cable trenches,
drains etc., to be carried out by the Purchaser. Design data should
contain enough information on static load and other design data required
for detailed calculations and designs for all plant buildings, structures,
misc. works etc.
ii) 6 (six) sets of plans for equipment layout drawings showing all the details
of the relevant location and space requirement of each item of plant and
equipment.
iii) 6 (six) copies of flow sheets, showing the details of the flows pertaining
to raw-materials, utilities and other inputs, items of machinery and
equipments etc.
iv) 6 (six) copies of the plant operation and maintenance manuals containing
specifications and detailed working guidance for each item of equipment,
maintenance procedures, specifications of lubricants (of at least 4
prominent National lubricant oil manufacturers) recommended for all
machinery and equipment to enable the Purchaser to arrange for the
procurement of the same.
v) 6 (six) copies of the manuals of instructions for care and safe custody of
plant and equipment at site and for their erection prior to the dispatch of
the plant and equipment.
vi) Such other information, explanation and advises as may be requested
from time to time by the Purchasers with regard to the installation,
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 13 of 24
erection start-up and operation of the plant for and upto a period of 2
(two) years after commissioning.
vii) one months before commissioning of the plant & machinery the seller
shall furnish the list of spares and accessories to the Purchasers.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 14 of 24
D) PERFORMANCE CERTIFICATE
(TO BE ISSUED BY AUTHORISED AGENCIES)
This is to certify that M/s………………………………….. have supplied, supervised the
erection and commissioning of following Plant and Machinery for modernization cum
Expansion form 5000 TCD to 7500 TCD for equipments, commissioned on date ……………
and following performance has been achieved during performance trials.
Name of equipment supplied:
Sr. No. Performance Parameter Remark
1
2
3
4
Seal & Signature of
AUTHORISED AGENCIES
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 15 of 24
E) BANK GUARANTEE FORMAT
This Guarantee made on the day of by the having its Branch at-------------------------
(hereinafter called “The Guarantor” which expression shall unless repugnant to
the context or contrary to the meaning thereof, include its successors and
assigns) of the one part.
IN FAVOUR OF M/s Shri Someshwar sahakari sakhar karkhana Ltd.,. a society,
registered under the Maharashtra STATE CO.OP SOCIETIES ACT, having its
registered office (hereinafter called “The Purchaser” which expression shall
unless repugnant to the subject or context, include their successors and assigns)
of the other part. WHEREAS M/s.--------------------------------------------------
(hereinafter called “The Seller” which expression shall unless repugnant to the
subject or context include their legal representatives, administrators, successors
or permitted assigns) had entered into an agreement vide letter of Intent dt.------
------ (hereinafter called “The said Agreement”) with the purchaser to design,
prepare and the plant and supply Machinery for purchasers existing sugar plant
at Shri Someshwar sahakari sakhar karkhana Ltd., (hereinafter called the Site) in
accordance with the terms and conditions therein contained (hereinafter
referred to as “The Said Plant”).
AND WHEREAS under the said agreement, the Purchaser required to pay to the
sellers
against security of a Bank Guarantee an advance payment of Rs.----------------------
---- (Rupees--------------------------------------------------------------------------------------------
----) representing of the contract price for the purpose of procurement of
materials / equipments for the said plant. Such guarantee to be valid till the full
advance amount is adjusted against the base price of the actual deliveries of
machinery and equipment received at site.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 16 of 24
AND WHEREAS before advance payment as aforesaid is made the Guarantor has,
at the request of the Sellers, agreed to give the Guarantee as hereinafter
contained..
NOW THIS DEED WITNESSES AS FOLLOWS
1). In consideration of the premises the Guarantor, hereby undertake to pay to the
Purchaser within 30 days of demand and without demur such a sum not
exceeding Rs.------------------------- The Purchaser may demand representing of the
contract price, and if the Guarantor shall fall to pay the same within the said
period, the Guarantor, shall also pay on the sum demanded interest at the Bank
lending rate then prevailing reckoned from the date of demand till the date of
payment. Provided that the liability of the Guarantor hereunder shall reduce to
the extent of the advance adjusted according to of the said agreement.
2). The Guarantor shall pay to the Purchaser on demand the sum under Clause 1
above without demur and without requiring the Purchaser to invoke any legal
remedy that may be available to them. it being understood and agreed FIRSTLY
that the Purchaser shall be the sole judge of and as to whether the Sellers have
committed any breach(es) of any of the terms and conditions of the said
agreement and SECONDLY that the right of the Purchaser to recover from the
Guarantor any amount due to the Purchaser shall not be effected or suspended
by reasons of the fact that any dispute or disputes have been raised by the
Sellers with regards to their liability or that proceedings are pending before any
Tribunal, Arbitrator(s) or Court with regards thereto or in connection therewith,
and THIRDLY that the Guarantor shall immediately pay the aforesaid guaranteed
amount to the Purchaser on demand, it shall not be open to the Guarantor to
know the reasons of or to investigate or to go into the merits of the demand or
to question or to challenge the demand or to know any facts affecting the
deemed, and LASTLY, that it shall not be open to the Guarantor to require proof
of the liability of the Sellers to pay the amount, before paying the aforesaid
guaranteed amount to the Purchaser.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 17 of 24
3). This Guarantee shall come into force from the date release of payment hereof
and shall remain valid till the full advance amount is adjusted under the said
Agreement, which according to the terms and conditions of the said Agreement
is stipulated to be adjusted against actual deliveries of the machinery and
equipment at site, but if the actual deliveries as aforesaid have not been
completed by the seller within the said period for any reasons whatsoever the
Guarantor, hereby undertakes that the Sellers shall furnish a fresh or renewed
guarantees on the Purchaser’s Proforma for such further period as the Purchaser
may intimate failing which the Guarantor shall pay to the Purchasers a sum not
exceeding Rs. -------------------------- /- (Rupees:-----------------------------------------------
-----------------------------------------------------------------------------------) or the residual
amount of balance advance left after proportion to adjustment in accordance
with Clause 1 above as the Purchaser may demand..
4) This Guarantee is in addition to and not in substitution for any other guarantee
executed by the Guarantor in favor of the Purchaser on behalf of the Sellers.
5) The Sellers and Purchaser will be at liberty to vary and moodily the terms and
conditions of the said agreement without effecting this guarantor is, hereby
waived and the same shall be deemed to have been done with the assent of the
Guarantor.
6) This Guarantee shall not be effected by any change in the constitution of the
Guarantor or of the Seller nor shall the guarantee be effected by any change in
the constitution of the Purchaser or any amalgamation or absorption with any
other body corporated and this guarantee will be available to or enforceable by
such body corporate.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 18 of 24
7) This Guarantee is irrevocable except with the written consent of the Purchaser.
8) The neglect or forbearance of the Purchaser in enforcing any payment of
moneys, the payment whereof is intended to be hereby secured or the giving of
time by the Purchaser for the payment thereof, shall, in no way, release the
Guarantor from its liability under this Deed.
9) The invocation of this guarantee shall be by a letter signed by the Purchaser and
countersigned by Managing Director, Sugar mill
10) Notwithstanding anything stated herein before the liability of the Guarantor
under this guarantee is restricted to Rs.--------------------- /- (Rupees -------------------
------------------------------------------------------------------------:) and interest as provided
in Clause 1. This guarantee shall remain in force up to / / unless a
demand or claim under this guarantee is presented to the Guarantor in writing
within Six Months from the date, all rights of the Purchaser under the guarantee
shall be forfeited and the Guarantor shall be released and discharged from all
liability hereunder.
IN WITNESS WHEREAS
for any on behalf of the Guarantor has signed this Deed on the day and year
above written.
for and on behalf of.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 19 of 24
F) PROFORMA FOR OPENING OF THE LETTER OF CREDIT
No. Date.
To,
Seller
Dear Sirs,
Ref. : - Inland Letter of Credit No.
dt. Confirmed, irrecoverable divisible, assignable,
ordinary / automatic revolving, transferable.
1. We have pleasure in advising you that, we have established in your favour for
account and at their request of a confirmed irrecoverable divisible, assignable,
automatic revolving and transferable without resource, Letter of Credit No.-------
-------------------------------------------------dt.---------------------------- for a sum Rs.---------
-------------------- revolving upto Rs.----------------------- for a sum Rs.----------------------
--------revolving upto Rs.------------------------------ in figures Rs.----------------------------
------------------------------------- in words as per clause of Agreement dated
2. You are, hereby authorized to draw on M/s. Shri Someshwar sahakari sakhar
karkhana Ltd., exceeding Rs.-------------------------------------------- subject to a
maximum drawing of ordinary Letter of Credit Rs.----------------------------- available
by your drafts on them at sight towards 75% (Seventy Five percent) of your price
of ----------------------------- optional and additional items, cost of necessary
facilities, and full price variations plus reimbursement of actual amount of Excise
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 20 of 24
Duty, Central Sales Tax, Octroi, Customs Duties, etc. as per clause----------------- of
the Agreement dated accompanied by the following endorsed in favour of M/s.--
------------------------------------------------------------------
2.1 For Supply of Equipments & Machinery
a) True copy of Inspection Report certified by the Sellers for equipment materials
inspected and accepted by the Inspection Agency before dispatch..
b) Seller Certificate to the effect that in case the Inspection Report, as stated above,
is not attached, the particular consignment are not covered by the mutually
agreed list of equipment’s which are to be inspected at manufacturers works
before dispatch or that the inspection of the same would be carried out at the
Plant Site of M/s.
c) Dispatch List/Bill of material in case of equipment to be fabricated at Site.
d) A Certificate to the effect that the goods are shipped / dispatched as per original
Agreement dt. evidencing transport of machinery of Sugar Plant from any place
in India to Purchaser Plant Site i.e.
e) In case of supply of any imported equipment, machinery, component, spares,
etc. the sellers shall furnish with the memorandum of demand all duly attested
(Attested by the Sellers) copy of document in support of import of the same.
f) While drawing any claim for supply of imported machinery component,
equipment, spares etc., the seller shall furnish a Certificate that the claim has
been calculated as per prevailing foreign exchange rate and provided
documentary proof for the same as per Clause of Agreement dated.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 21 of 24
g) Invoice in triplicate:
i). Every Invoice should contain a reference of item number according to the base
price break-up submitted by the Seller as per Proforma - A of the Agreement dt.-
---------------------- and ---------also----------- the scheduled date of delivery of the
goods as per original delivery schedule adhering to the schedule date of
commissioning and make the plant ready for commercial use of the said plant by
ii). Seller shall deduct from every bill for sugar machinery optioned and additional
items as per Clause--------- (I to III) of the Agreement dated proportionate
amount of advance received from M/s.-------------------------------------------------------
------------------------------------------------------ Invoice shall include Taxes, Duties, and
Levies imposed by law and leviable on 100% of the cost of material as per
Clause--------- of the Agreement dated
h). Packing list of Delivery Note in triplicate
Photostat copy (duly attested by the Seller) of Railway Receipt / Goods Receipt /
Lorry Receipt from any Bank approved transporter evidencing. Despatch of
equipment and machinery for sugar plant from anywhere in India to the Railway
Station or Plant Site of mentioning freight paid/to be paid.
i) Seller Certificate to the effect that the goods are shipped / dispatched as per the
Agreement dated.
j) The Seller shall attach duly attested (attested by Seller) Photostat copies of the
letters sent to the Insurance Company declaring all materials dispatched under
each consignment, with a copy of Purchaser as per Clause of the Agreement
dated.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 22 of 24
For Necessary Facilities:
a) A certificate from the Seller that M/s.------------------------------------------------ ---------
----
have been provided with all details of claims in respect of necessary facilities.
b) A duly attested (Attested by the Seller) Photo copy of the Claims / Bills submitted
to M/s.--------------------------------------------------------------------------------------------------
as per Clause of the Agreement dt.
c) A certificate of Seller certifying that they have not received the payment from
M/s.-------------------------------------------------------------------------- within 30 days
from the date of the bills are received by M/s.----------------------------------------------
---------------------------
3) Special Conditions:
a) The Seller shall furnish photo copy of delivery and commissioning, bank /
insurance guarantee in the form of Purchaser, duly attested by the
representative of Purchaser while drawing the money through for the first
consignment of the material. In the absence of this guarantee, the Seller must
deduct 5% (five percent) from the bills.
b) Partial shipments and transshipments are allowed.
c) The Seller shall furnish the photocopy of performance, bank/insurance
guarantee in the form of Purchaser, duly attested by the representative of M/s.--
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 23 of 24
------------------------------- -------------------------------- on the same becoming due for
submission. In the event of non-submission of the performance bank/insurance
guarantee after the same becoming due for submission, the Seller shall deduct
5% (five percent) from all bills, including bills for escalations..
d) This letter of Credit is automatic revolving (fixed /ordinary / confirmed,
irrevocable, assignable, transferable, divisible for Rs. -------------- lakhs (Rupees: --
-------------------------------------------------------------------------------------------------- )
e) The Credit is irrevocable valid in until 19 .
f) The drawers shall be allowed to draw their claims against necessary facilities
g) Negotiation and bank charge, related to this Letter of Credit, will be borne by
M/s.----------------------------------------------------------------------------------------
h) The total amount of drawing under this automatic/revolving/fixed letter of credit
will be restricted upto Rs. lakhs Rs. Lakhs
(Rupees:---------------------------------------------------- Lakhs)
i) Drafts drawn under this credit are to be negotiated without resources to the
drawers and to bear the following clause “Drawn under (Name of the Opener)”
Credit No. dated.
j) Purchaser are to note amounts of the drafts separately on the Bank hereof.
k) Draft drawn under this credit are negotiable by the (Name of Bank) only.
-
Tender document for Modernization cum Expansion Shri Someshwar SSK, Someshwarnagar
Vasantdada Sugar Institute, Pune Page 24 of 24
l) This credit is subject to uniform, customs and practice for documentary credit
(1974 Revision) international Chambers of Commerce, Brouchur No. 290.
4. We hereby guarantee to protect the drawers, endorsers and bonafide holders
from any consequence which may arise in the event of the non acceptance of
drafts drawing in accordance with the terms of this credit..
G) PROFORMA FOR PERFORMANCE STATEMENT
(For the last Five Years)
Bid No....................................................... date of opening
............................................................. Time ................................ Hours
Name of the bidder
.............………………………………………………………………………………….....
No. of years in service…………………………………**
Order placed by (Full address of purchaser)
Order No. and date
Description* and quantity of ordered equipment
Value of order
Date of completion of delivery
Remarks indicating reasons of late delivery, if any
Has the equipment been satisfactorily functioning? (Attach a cert. From the Engineer incharge)
As per Contract
Actual
1 2 3 4 5 6 7 8
Signature and seal of the bidder ..............................................
Note : *-Indicate the centralized lubrication system
**- Indicate the number of years in the line of business.