The Design, Construction, Testing & Commissioning of Strategic Reservoirs

(Phase III) Faisaliah - Jeddah

Page 3: Faisalaiah project (english) 3 REV.03

Letter of Award: 8/1/2014Site Hand Over Date : 22/06/2014Completion Date: 23/04/2016Contract Period: 18 monthTime Extension : 9 monthsContract Value: 451,800,000 SR

Project location: Jeddah City - Reservoirs area of FAISALAH

Page 4: Faisalaiah project (english) 3 REV.03

Project location:

Site

Page 5: Faisalaiah project (english) 3 REV.03

PROJECT SITUATION

Page 6: Faisalaiah project (english) 3 REV.03

• Finish the soil improvement work for both tanks 1&3• Finish of installation and commissioning for the batch plant by the

attendance of the Consultant and receive approval for the submitted calibration report.

• Finish the design for the tower crane location, casting 1 crane foundation and finish reinforcement for 3 other cranes foundation and ready to cast , finish assembly for 2 tower crane and ready for installation.

• Delivery for 4 tower cranes to the site.• Excavation is running in area of tank #1 and finish about

50%.• Submit the recovery time schedule by the new dates after notice of

proceeding the work of the project.• Delivery for the formwork for the wall, Post tensioning material, pipes

material.• Finish 95 % of site mobilization.• Finish the first path of rerouting the fiber optic and delivered the Lab to

NWC, Working is running to finish the second path to delivered the training center.

Work Situation:

Page 7: Faisalaiah project (english) 3 REV.03

Construction ..1:

Excavation is running in area of tank #1

Page 8: Faisalaiah project (english) 3 REV.03

Complete removal for the existing pipe in

area of tank #4

Construction ..2:

Page 9: Faisalaiah project (english) 3 REV.03

Start assembly

for the wall

formwork

Internal

External

Construction ..3:

Page 10: Faisalaiah project (english) 3 REV.03

Finish assembly for 2 tower

cranes

Tower crane #1

Tower crane #2

Construction ..4:

Page 11: Faisalaiah project (english) 3 REV.03

Start dewatering activity

Construction ..5:

Page 12: Faisalaiah project (english) 3 REV.03

Finish the soil improvement work for tank #3

Construction ..6:

Page 13: Faisalaiah project (english) 3 REV.03

After approval for the soil improvement for tanks 2 & 4 to be

“Stone Column” technique – as shown in the photos below

(1)(2)(3)

Construction ..7:

Page 14: Faisalaiah project (english) 3 REV.03

Finish of installation and

commissioning for the batch plant by the attendance of

the Consultant

Construction ..8:

Page 15: Faisalaiah project (english) 3 REV.03

Implementation for protection trench

Construction ..9:

Page 16: Faisalaiah project (english) 3 REV.03

Start rebar & formwork forming

Construction ..10:

Page 17: Faisalaiah project (english) 3 REV.03

Finish new offices for DNGO

site engineers and main

subcontractors

Construction ..11:

Page 18: Faisalaiah project (english) 3 REV.03

Material delivery

Page 19: Faisalaiah project (english) 3 REV.03

Material delivery

for formwork and post tension material

Material Delivery ..1:

Page 20: Faisalaiah project (english) 3 REV.03

Delivery for pipes 8”

Material Delivery ..2:

Page 21: Faisalaiah project (english) 3 REV.03

Design

Page 22: Faisalaiah project (english) 3 REV.03

Soil improvement work:• Receive approval for the design report for tank #1.• Pressure meter test is running to submit the final report for tank #3.• Receive APPROVAL FOR THE NEW SOIL IMPROVEMENT TECHNIQUE

“Stone Column” for tanks 2 & 4.Foundation design:• Submit the foundation design (under revision)Wall design:• Receive approval for the wall design.Piping design:• Receive approval for the “GRP PIPING SPECIFICATIONS UNDER TANK”• Receive approval for the submitted method statement for pipe

installation and hydro test.• Receive approval for the method statement for the dewatering system.• Received some information for the hydraulic and electrical

design, still some minor information is missing to complete the required design.

التصميم أع�مال :موقف

Page 23: Faisalaiah project (english) 3 REV.03

Project Resources

Page 24: Faisalaiah project (english) 3 REV.03

• In hand 394 manpower, 76 equipment.

• Manpower are available under the sponsorship of the company to complete the work on the project.