gateway providers data dictionary - oracle cloud · wish to use this object to integrate data with...
TRANSCRIPT
GGaatteewwaayy PPrroovviiddeerrss DDaattaa DDiiccttiioonnaarryyVVeerrssiioonn 1177
JJuullyy 22001177
3
Contents
Overview ................................................................................................ 9
Supported Integrations ................................................................................ 11
Flow Types Supported by Primavera Providers .................................................... 11
EnterpriseTrack Business Objects ................................................................. 13
Project .................................................................................................. 14
ProjectFinance ......................................................................................... 16
ProjectFinanceElement ............................................................................... 19
ProjectFinanceSnapshot .............................................................................. 20
Gateway and File Provider Business Objects .................................................... 23
Activity .................................................................................................. 32
ActivityCode ............................................................................................ 39
ActivityCodeType ...................................................................................... 39
ActivityExpense ........................................................................................ 40
ActivityRisk ............................................................................................. 41
BaselineType ........................................................................................... 41
BlanketPurchaseOrder ................................................................................ 42
BlanketPurchaseOrderDetail ......................................................................... 42
BudgetApproval ........................................................................................ 43
BudgetApprovalDetail ................................................................................. 43
BudgetChange .......................................................................................... 44
BudgetChangeDetail ................................................................................... 44
BudgetChangeOrder ................................................................................... 45
BudgetChangeOrderDetail ............................................................................ 46
BudgetItem ............................................................................................. 47
BudgetItemDetail ...................................................................................... 47
BudgetTransfer ......................................................................................... 48
BudgetTransferDetail ................................................................................. 49
Calendar ................................................................................................ 49
CBS ....................................................................................................... 51
CBSDurationSummary ................................................................................. 51
CBSExpenseSpread ..................................................................................... 52
CBSResourceSpread .................................................................................... 53
ChangeOrder ........................................................................................... 55
ChangeOrderDetail .................................................................................... 55
Contract ................................................................................................. 56
ContractDetail ......................................................................................... 57
CostAccount ............................................................................................ 58
Gateway Providers Data Dictionary
4
CostColumn ............................................................................................. 58
Currency ................................................................................................ 59
EPS ....................................................................................................... 59
Estimate ................................................................................................. 67
EstimateDetail ......................................................................................... 67
ExchangeRate .......................................................................................... 68
ExpenseCategory ....................................................................................... 68
FinancialPeriod ......................................................................................... 69
FundAppropriation ..................................................................................... 69
FundAppropriationDetail.............................................................................. 69
Invoice ................................................................................................... 70
InvoiceDetail ........................................................................................... 71
JournalEntry ............................................................................................ 71
JournalEntryDetail ..................................................................................... 72
Location ................................................................................................. 72
NotebookTopic ......................................................................................... 73
Payment ................................................................................................. 74
PaymentApplication ................................................................................... 74
PaymentApplicationDetail ............................................................................ 75
PaymentApplicationtoOwner ......................................................................... 75
PaymentApplicationtoOwnerDetail ................................................................. 76
PaymentDetail ......................................................................................... 77
PaymentFromOwner ................................................................................... 78
PaymentFromOwnerDetail ........................................................................... 78
POAmendment ......................................................................................... 79
POAmendmentDetail .................................................................................. 80
PotentialChangeOrder ................................................................................ 80
PotentialChangeOrderDetail ......................................................................... 81
Project .................................................................................................. 81
ProjectCode ............................................................................................ 90
ProjectCodeType ...................................................................................... 90
ProjectFinance ......................................................................................... 90
ProjectFinanceElement ............................................................................... 92
ProjectFinanceSnapshot .............................................................................. 93
ProjectInformation .................................................................................... 94
ProjectResource ....................................................................................... 94
PurchaseOrder ......................................................................................... 95
PurchaseOrderDetail .................................................................................. 95
Relationship ............................................................................................ 96
RequestForSubstitution ............................................................................... 97
RequestForSubstitutionDetail ........................................................................ 97
Resource ................................................................................................ 98
Contents
5
ResourceAssignment ................................................................................... 99
ResourceCode ......................................................................................... 104
ResourceCodeType ................................................................................... 104
ResourceCurve ........................................................................................ 104
ResourceRate .......................................................................................... 105
ResourceRole .......................................................................................... 105
Risk ..................................................................................................... 106
RiskAndIssue ........................................................................................... 107
RiskAndIssueDetail .................................................................................... 107
RiskImpact ............................................................................................. 108
RiskMatrix .............................................................................................. 108
RiskMatrixScore ....................................................................................... 109
RiskMatrixThreshold .................................................................................. 110
RiskResponseAction ................................................................................... 111
RiskResponseActionImpact .......................................................................... 112
RiskResponsePlan ..................................................................................... 113
RiskThreshold ......................................................................................... 114
RiskThresholdLevel ................................................................................... 114
Role ..................................................................................................... 115
RoleLimit ............................................................................................... 115
RoleRate ............................................................................................... 116
ShellList ................................................................................................ 116
Timesheet.............................................................................................. 117
TimesheetDetail ...................................................................................... 117
UDFType ............................................................................................... 118
UnitOfMeasure ........................................................................................ 118
Vendor .................................................................................................. 118
VendorDetail .......................................................................................... 119
VendorEvaluation ..................................................................................... 119
WBS ..................................................................................................... 120
WBSCategory .......................................................................................... 121
WBSExpenseSpread ................................................................................... 121
WBSResourceSpread .................................................................................. 122
WBSSpread ............................................................................................. 124
WorkRelease ........................................................................................... 127
WorkReleaseDetail.................................................................................... 128
P6 Business Objects List ........................................................................... 129
Activity ................................................................................................. 134
ActivityCode ........................................................................................... 153
ActivityCodeType ..................................................................................... 154
ActivityExpense ....................................................................................... 154
Gateway Providers Data Dictionary
6
ActivityRisk ............................................................................................ 157
BaselineType .......................................................................................... 157
Calendar ............................................................................................... 158
Example of Importing a Global Calendar ................................................... 161
CBS ...................................................................................................... 161
CBSDurationSummary ................................................................................ 162
CBSExpenseSpread .................................................................................... 163
CBSResourceSpread ................................................................................... 164
CostAccount ........................................................................................... 166
Currency ............................................................................................... 167
EPS ...................................................................................................... 168
ExpenseCategory ...................................................................................... 181
FinancialPeriod ........................................................................................ 181
Location ................................................................................................ 182
NotebookTopic ........................................................................................ 183
Project ................................................................................................. 183
ProjectCode ........................................................................................... 199
ProjectCodeType ..................................................................................... 200
ProjectResource ...................................................................................... 201
Relationship ........................................................................................... 202
Resource ............................................................................................... 204
ResourceAssignment .................................................................................. 207
ResourceCode ......................................................................................... 215
ResourceCodeType ................................................................................... 216
ResourceRate .......................................................................................... 217
ResourceCurve ........................................................................................ 218
ResourceRole .......................................................................................... 218
Risk ..................................................................................................... 219
RiskImpact ............................................................................................. 219
RiskMatrix .............................................................................................. 220
RiskMatrixScore ....................................................................................... 221
RiskMatrixThreshold .................................................................................. 222
RiskResponseAction ................................................................................... 222
RiskResponseActionImpact .......................................................................... 224
RiskResponsePlan ..................................................................................... 224
RiskThreshold ......................................................................................... 225
RiskThresholdLevel ................................................................................... 225
Role ..................................................................................................... 226
RoleLimit ............................................................................................... 227
RoleRate ............................................................................................... 227
UDFType ............................................................................................... 228
UnitOfMeasure ........................................................................................ 229
Contents
7
WBS ..................................................................................................... 229
WBSCategory .......................................................................................... 239
WBSExpenseSpread ................................................................................... 240
WBSResourceSpread .................................................................................. 240
WBSSpread ............................................................................................. 243
Prime Business Objects List....................................................................... 249
Activity ................................................................................................. 254
ActivityRisk ............................................................................................ 261
Calendar ............................................................................................... 261
CBSSegment ........................................................................................... 262
CBSTemplate .......................................................................................... 262
CBSTemplateCode .................................................................................... 263
CostCategory .......................................................................................... 264
CostSheetWorkspaceTotalCostRow ................................................................. 264
CostSheetWorkspaceTotalItem ..................................................................... 266
Currency ............................................................................................... 267
EPS ...................................................................................................... 268
ExchangeRate ......................................................................................... 268
Holiday ................................................................................................. 269
HolidayGroup .......................................................................................... 269
Location ................................................................................................ 270
Project ................................................................................................. 270
ProjectBudget ......................................................................................... 278
ProjectBudgetChange ................................................................................ 279
ProjectBudgetTransfer ............................................................................... 280
ProjectCode ........................................................................................... 281
ProjectCodeType ..................................................................................... 281
Relationship ........................................................................................... 281
Resource ............................................................................................... 282
ResourceAssignment .................................................................................. 284
ResourceCode ......................................................................................... 287
ResourceCodeType ................................................................................... 288
ResourceRate .......................................................................................... 288
ResourceRoleAssignment ............................................................................ 288
Risk ..................................................................................................... 289
RiskImpact ............................................................................................. 290
RiskMatrix .............................................................................................. 290
RiskMatrixScore ....................................................................................... 291
RiskMatrixThreshold .................................................................................. 292
RiskResponseAction ................................................................................... 293
RiskResponseActionImpact .......................................................................... 294
Gateway Providers Data Dictionary
8
RiskResponsePlan ..................................................................................... 295
RiskThreshold ......................................................................................... 296
RiskThresholdLevel ................................................................................... 296
Role ..................................................................................................... 297
UDFType ............................................................................................... 297
UnitOfMeasure ........................................................................................ 298
WBS ..................................................................................................... 298
WBSSpread ............................................................................................. 299
Unifier Business Objects ........................................................................... 301
CBS ...................................................................................................... 302
CBSDurationSummary ................................................................................ 303
CBSExpenseSpread .................................................................................... 303
CBSResourceSpread ................................................................................... 305
CompanyCosts ......................................................................................... 307
Column ................................................................................................. 307
CompanyCostsDetail .................................................................................. 308
CompanyLineItem..................................................................................... 308
CompanyLineItemDetail ............................................................................. 309
CompanySimple ....................................................................................... 309
ExchangeRate ......................................................................................... 310
OtherProjectCosts .................................................................................... 310
OtherProjectCostsDetail ............................................................................. 310
P6ActivitySheet ....................................................................................... 311
Project ................................................................................................. 312
ProjectCommits ....................................................................................... 313
ProjectCommitsDetail ................................................................................ 314
ProjectDocument ..................................................................................... 314
ProjectDocumentDetail .............................................................................. 315
ProjectInvoices ........................................................................................ 315
ProjectInvoicesDetail ................................................................................ 316
ProjectSimple ......................................................................................... 317
Resource ............................................................................................... 317
Role ..................................................................................................... 317
ShellList ................................................................................................ 318
WBS ..................................................................................................... 318
Legal Notices ........................................................................................ 320
9
Overview
The Primavera Gateway Providers Data Dictionary provides a comprehensive listing of all business objects and all associated fields available with each Primavera provider delivered with Primavera Gateway. Review the list of supported business objects in each application to determine the data that needs to be supported for integration in Primavera Gateway.
To view these business objects in the Primavera Gateway user interface log in to Gateway and select the Data Dictionary menu.
Within our documentation, some content might be specific for cloud deployments while other content is relevant for on-premises deployments. Any content that applies to only one of these deployments is labeled accordingly.
In This Section
Supported Integrations ............................................................................................ 11 Flow Types Supported by Primavera Providers ....................................................... 11
11
Supported Integrations
Integrations between the following Primavera applications are supported and delivered in Primavera Gateway:
Integrations With P6 EPPM Sample File
Oracle Prime x x x
Oracle Instantis EnterpriseTrack
x x
P6 EPPM x x x
Primavera Unifier x x x
Flow Types Supported by Primavera Providers
Primavera Gateway supports the following flow types:
Master Data
Use this flow type to export or import master data between two applications or between distinct P6 deployments. For example, export master data from P6 to Prime.
Project Data
Use this flow type to export or import project data between two applications or between distinct P6 deployments. For example, export transfer project data from P6 to Prime.
The following table identifies the default flow types supported for each Primavera provider:
Flows EnterpriseTrack P6 Prime Sample Unifier File
Master Data x x x x x
Project Data x x x x x x
13
EnterpriseTrack Business Objects
For the EnterpriseTrack provider, the Project business object is available in the Data Dictionarymenu in the Gateway user interface. Select this business object to review a detailed list of fields supported for an EnterpriseTrack project.
Business Object Description
Project
A project is a temporary endeavor undertaken to create a unique product, service, or result. Project fields will depend on an initiative. Project attributes for different initiatives will be different, as some of the settings are initiative specific.The following fields are available for an EnterpriseTrack project.
ProjectFinance
The EnterpriseTrack Project Finance object contains actual values associated with a project finance structure. To import or export a ProjectFinance object, you will need to select the following objects in the field mapping template:
Project
ProjectFinance
ProjectFinanceElement
Note: By default, all ProjectFinance related business objects are commented in the metadata XML file. You will need to remove the comment tags if you wish to use this object to integrate data with your ERP application.
ProjectFinanceElement
The EnterpriseTrack ProjectFinanceSnapshot object is a representation of the project finance values at a specific point in time. To import or export a ProjectFinanceSnapshot object, you will need to select the following objects in the field mapping template:
Project
ProjectFinance
ProjectFinanceSnapshot
ProjectFinanceElement
Note: By default, all ProjectFinance related business objects are commented out in the metadata XML file. You will need to remove the comment tags if you wish to use this object to integrate data with your ERP application.
Gateway Providers Data Dictionary
14
Business Object Description
Project
A project is a temporary endeavor undertaken to create a unique product, service, or result. Project fields will depend on an initiative. Project attributes for different initiatives will be different, as some of the settings are initiative specific.The following fields are available for an EnterpriseTrack project.
ProjectFinanceSnapshot
The EnterpriseTrack ProjectFinanceElement is the most granular unit of the project finance structure. To import or export a ProjectFinanceElement object, you will need to select the following objects in the field mapping template:
ProjectFinance
ProjectFinanceSnapshot
ProjectFinanceElement
Note: By default, all ProjectFinance related business objects are commented out in the metadata XML file. You will need to remove the comment tags if you wish to use this object to integrate data with your ERP application.
In This Section
Project ..................................................................................................................... 14 ProjectFinance ........................................................................................................ 16 ProjectFinanceElement ........................................................................................... 19 ProjectFinanceSnapshot ......................................................................................... 20
Project
Description: A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities. The following fields are available for an EnterpriseTrack project:
Field Description Read-Only
project_number The unique ID generated by the system. No
project_name The name of the project. No
project_status
The status of the project. Valid values are:
Active
On-Hold
No
EnterpriseTrack Business Objects
15
Field Description Read-Only
Canceled
Completed-Post Realization
Closed-In Realization
percent_completion_type Indicates the activity default percent complete type of the activity.
No
planned_realization_date Planned realization date. No
The following fields can be modified in the metadata file
business_unit Organization hierarchy - Business Unit. No
calendar_id Project calendar name. No
consider_for_finances Consider for Finances flag. No
currency_code Project currency. No
default_laborexpensetype Default expense type. No
division Organization hierarchy - Division No
emailnotification_flag Email notification flag No
externalmode_datesduration External mode - Dates Duration No
externalmode_durationeffort External mode - Duration Effort No
externalmode_effortcost External mode - Effort Cost No
fin_approval_template_id Finance approval template. No
fin_edit_mode Finance edit mode. No
fin_track_start_date Finance tracking start month. No
fintemplateid Finance template. No
functional_area Functional area. No
grace_period_for_completed_activities_in_ts
Grace period for completed activities in timesheet.
No
grace_period_for_future_activities_in_ts
Grace period for future activities in timesheet.
No
initial_forecast_cost Initial Forecast - Cost No
initial_forecast_savings Initial Forecast - Savings No
initial_forecast_total Initial Forecast - Total No
is_capitalization_enabled Is Capitalization enabled flag No
Is_capitalized Is capitalized flag. No
is_etc_enabled_for_timesheet
ETC Enabled for timesheets flag. No
Gateway Providers Data Dictionary
16
Field Description Read-Only
is_etc_required_for_timesheet
ETC Required for timesheet flag. No
is_fin_lock_global Global finance lock flag. No
is_laborexpensetype_mandatory
Labor expense mandatory flag. No
keywords Project keywords. No
object_id The unique ID generated by the system. No
pcs Project initiative No
percent_completion_type Project percent completion type. No
planned_realization_date Planned realization date of the project. No
planned_start_date Planned start date of the project. No
priority Priority. No
project_fin_lock_date Project finance lock date No
project_name Project name No
project_number Project number No
project_status Project status
project_type Project type No
resource_computation_enabled
Resource computation enabled flag. No
roadmap Project roadmap No
start_date Project start date No
ProjectFinance
Description: The EnterpriseTrack Project Finance object contains actual values associated with a project finance structure. To import or export a ProjectFinance object, you will need to select the following objects in the field mapping template:
Project
ProjectFinance
ProjectFinanceElement
EnterpriseTrack Business Objects
17
Note: Project finance data (and finance-related business objects) transfer is supported only between two distinct instances of EnterpriseTrack applications.
Field Description Read-Only
fin_data_type The finance data type ( current / snapshot / structure ).
No
fin_edit_mode
The finance edit mode used only when editing. Valid options include:
" " If set to a blank value, then finances will be retrieved in the finance edit mode. For example, if the finance edit mode is monthly and the fin_search_mode is set to "", then finances will be retrieved in monthly mode.
M Indicates monthly finance edit mode
Y Indicates yearly finance edit mode
A Indicates aggregate finance edit mode
No
fin_search_mode
The finance Search Mode ( M / Y / A ); used only when searching. Valid options include:
" " If set to a blank value, then finances will be retrieved in the finance edit mode. For example, if the finance edit mode is monthly and the fin_search_mode is set to "", then finances will be retrieved in monthly mode.
M Indicates monthly finance search mode
Y Indicates yearly finance search mode
A Indicates aggregate finance search mode
No
fintemplate_id The name of the project's finance template. No
fintemplate_version_id The version of the project's finance template.
No
Gateway Providers Data Dictionary
18
Field Description Read-Only
from_month
The from (start) month when searching or updating; applicable only if fin_search_mode or fin_edit_mode = M. (YYYY/MM Format)
If from_month and to_month have non empty values, then finance data will be retrieved for the specific month range.
If from_month is not specified and to_month is valued, then finances will be retrieved for all months till the to_month value.
If from_month is valued and to_month is not specified, then finances will be retrieved for all months starting from the from_month value.
No
from_year
The from (start) year is used to define month range when searching or updating finance information. This is applicable only if fin_search_mode or fin_edit_mode = Y. (YYYY Format).
No
object_id The unique ID generated by the system. No
operation_type The operation type; specifies the operation being performed.
No
project_object_id The unique ID of the Project. No
to_month
The to (end) month when searching or updating; applicable only if fin_search_mode or fin_edit_mode = M. (YYYY/MM Format)
If from_month and to_month have non empty values, then finance data will be retrieved for the specific month range.
If from_month is not specified and to_month is valued, then finances will be retrieved for all months till the to_month value.
If from_month is valued and to_month is not specified, then finances will be retrieved for all months starting from the from_month value.
No
EnterpriseTrack Business Objects
19
Field Description Read-Only
to_year
The to (end) year is used to define month range when searching or updating finance information. This is applicable only if fin_search_mode or fin_edit_mode = Y. (YYYY Format).
No
ProjectFinanceElement
Description: The EnterpriseTrack ProjectFinanceElement is the most granular unit of the project finance structure. To import or export a ProjectFinanceElement object, you will need to select the following objects in the field mapping template:
ProjectFinance
ProjectFinanceSnapshot
ProjectFinanceElement
Note: Project finance data (and finance-related business objects) transfer is supported only between two distinct instances of EnterpriseTrack applications.
Field Description Read-Only
display_name The display name of the element. No
element_class The element classification; indicates the element's class within the project finance structure.
No
element_type
The element type; indicates whether the element is currency or some user-specified, non-currency type (such as kilowatts, hours, etc.).
No
id The finance element ID. No
mf_type The element multiplication factor type. No
mf_value
The multiplication factor value of the element; specifies its impact (contribution) toward computation of parent element values.
No
Gateway Providers Data Dictionary
20
Field Description Read-Only
number_of_units
Contains raw data; used if the element_type is not currency.
During finance import, only specify the value element (listed below) if the element_type is not currency.
During finance export, specify the number_of_units element which contains the raw data and the value element (listed below) which contains the currency amount.
No
object_id The unique ID generated by the system. No
parent_id The ID of the parent element; this will be empty if element_id is 'Total'.
No
project_object_id The unique ID of the associated project. No
projectfinance_object_id
The unique ID of the associated project finance.
No
sequence_number The sequence of this element within parent; 10, 20, 30, etc.
No
value
Contains the actual value of element; editable only when element_type is currency. If element_type is not currency, value is not editable, and is instead computed internally from number_of_units.
No
ProjectFinanceSnapshot
Description: The EnterpriseTrack ProjectFinanceSnapshot object is a representation of the project finance values at a specific point in time. To import or export a ProjectFinanceSnapshot object, you will need to select the following objects in the field mapping template:
Project
ProjectFinance
ProjectFinanceSnapshot
ProjectFinanceElement
Note: Project finance data (and finance-related business objects) transfer is supported only between two distinct instances of EnterpriseTrack applications.
EnterpriseTrack Business Objects
21
Field Description Read-Only
is_default_snapshot The is default snapshot flag; indicates whether or not this is the default snapshot.
No
is_editable_snapshot
The is editable snapshot flag; indicates whether or not snapshot can be edited. Used only during export, as this is a read-only attribute.
No
object_id The unique ID generated by the system. No
project_object_id The unique ID of the associated project. No
projectfinance_object_id
The unique ID of the associated project finance.
No
snapshot_created_by The login ID of the user who created the snapshot.
No
snapshot_created_date The date on which the snapshot was created. No
snapshot_desc The snapshot description. No
snapshot_name The snapshot name. No
snapshot_updated_by The login ID of the user who last updated the snapshot.
No
snapshot_updated_date
The date on which the snapshot was last updated.
No
23
Gateway and File Provider Business Objects
The following business objects are supported in Gateway as well as the File providers:
Note: If you want to change the read-only status for a specific field in a business object, you will need to modify the Read-Only value for that field in the metadata file of the provider. Gateway developers and administrators can change the read-only status of field.
Business Object Description
Activity An activity is a unit of work performed during the course of a project.
ActivityCode Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
ActivityCodeType
Activity code types provide a way of classifying activity codes. Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
ActivityExpense Activity expenses are non-resource costs associated with a project and assigned to a project's activities. They are typically one-time expenditures for non-reusable items.
ActivityRisk The activity risk object stores the relationship between a single activity and a single Risk.
BaselineType BaselineType fields
BlanketPurchaseOrders
A company level purchase order, which enables agreements with vendors to provide services across multiple projects, released on a per-project/per-period basis with work authorizations against a previously determined maximum.
BlanketPurchaseOrdersDetail
Line Items for Blanket Purchase Order
BudgetApproval used to approve project budget
BudgetApprovalDetail Line Items for Budget Approval
BudgetChange For requesting additional (or reduced) budget beyond the existing budget
BudgetChangeDetail Line Items for Budget Change
BudgetChangeOrder A change to a budget that is typically created for a contractor that is based on changes to a contract between the
Gateway Providers Data Dictionary
24
Business Object Description
contractor and owner.
Note: This object is not available in the File provider data dictionary.
BudgetChangeOrderDetail
Line Items for Budget Change Orders
Note: This object is not available in the File provider data dictionary.
BudgetItem
A budget that is typically created for a contractor that is based on a contract they have with an owner for a project.
Note: This object is not available in the File provider data dictionary.
BudgetItemDetail
Line Items for Budget Items
Note: This object is not available in the File provider data dictionary.
BudgetTransfer For transferring budget from one WBS code to another. Most typically used to release budget contingency to other cost items.
BudgetTransferDetail Line Items for Budget Transfer
Calendar The P6 Calendar Object definition
CBS CBS business object
CBSDurationSummary CBSDurationSummary business object
CBSExpenseSpread Summarized spread data per CBS per expense category
CBSResourceSpread Summarized spread data per CBS per resource assignment
ChangeOrder
A formal commit change to the contract
Note: This object is not available in the File provider data dictionary.
ChangeOrderDetail
Line Items for Change Order
Note: This object is not available in the File provider data dictionary.
Contract Base Commit for EPC Activities (SOV = Payment Application)
ContractDetail Line Items for Contract
CostAccount
Cost accounts contain the organization's cost account IDs. Available across all projects, they support tracking of costs and earned value based on the organization's cost account IDs. Cost accounts are hierarchical objects.
CostColumn CostColumn is used to exchange the cost sheet data. Cost Sheet is a sheet which will have all the Costs related to
Gateway and File Provider Business Objects
25
Business Object Description
different WBS codes for a particular project listed in it.
Note: This object is not available in the File provider data dictionary.
Currency Currency fields
EPS EPS
Estimate Used to create multiple project estimates and identify the preferred scenario
EstimateDetail Line Items for Estimate
ExchangeRate
ExchangeRate allows the use of multiple currencies within a project for Cost purposes and are defined at the Company level. ExchangeRate would be used to define the current exchange rate for a currency as compared to the base currency of the Company.
Note: This object is not available in the File provider data dictionary.
ExpenseCategory Expense categories are used to categorize project expenses. They are used for standardizing expenses and for rolling up expenses across projects.
FinancialPeriod Financial periods are used to provide accurate display and reporting of actual units and costs. Financial periods may not overlap each other and do not have to be contiguous.
FundAppropriation Fund accounts as assigned to projects
FundAppropriationDetail Line Items for Fund Appropriation
Invoice A general process for requesting and approving payments against commitments (invoice at the WBS or breakdown level do not calculate retainage or stored materials)
InvoiceDetail Line items for invoice
JournalEntry A process for adjusting spends line items. Most commonly used to reassign costs to alienate cost centers or GL code. Generic spend to transfer across cost codes.
JournalEntryDetail Line items for Journal Entry
Location The location is used to store address information including latitude and longitude. Locations can be assigned to resources, projects and/or activities.
NotebookTopic Notebook topics are used to categorize notes on EPS, project, WBS,and activity objects.
Payment BP to hold Checks Processed Information from Financial System.
Gateway Providers Data Dictionary
26
Business Object Description
PaymentApplication A process to track your payment information using a standard payment application method (for example, tracking retainage, stored materials, past payments, etc.)
PaymentApplicationDetail
Line Items for Payment Application
PaymentApplicationtoOwner
A payment application that is raised by a contractor to the owner in order for the contractor to receive payment.
Note: This object is not available in the File provider data dictionary.
PaymentApplicationOwnerDetail
Line Items for Payment Applications to Owner
Note: This object is not available in the File provider data dictionary.
PaymentDetail Line Items for Payment
PaymentFromOwner
A record of the actual payments a contractor will have received from the owner based on the payment application they presented to the owner.
Note: This object is not available in the File provider data dictionary.
PaymentFromOwnerDetail
Line Items for Payments From Owner
Note: This object is not available in the File provider data dictionary.
POAmendment Approval process for purchase order changes
POAmendmentDetail Line items for PO Amendment
PotentialChangeOrder Contractor initiated potential change order.
PotentialChangeOrderDetail
Line items for Potential Change Order.
Project A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities.
ProjectCode Project codes are user-defined codes to classify and categorize projects across the enterprise.
ProjectCodeType Project code types provide a way of classifying project codes. Project codes are user-defined codes to classify and categorize projects across the enterprise.
ProjectFinance EnterpriseTrack Project Finance.
ProjectFinanceElement EnterpriseTrack Project Finance Element.
ProjectFinanceSnapshot EnterpriseTrack Project Finance Snapshot.
Gateway and File Provider Business Objects
27
Business Object Description
ProjectInformation Project attribute information
ProjectResource Primavera's resource planning feature allows you to do high-level project planning for future project or project that does not require resource assignments at the activity level.
PurchaseOrder To track money committed to be spent (General Spends type Base Commit)
PurchaseOrderDetail Line items for Purchase Order
Relationship
A relationship defines how an activity relates to the start or finish of another activity or assignment. These relationships, which form the logic of the project network, are used together with activity durations to determine schedule dates.
RequestforSubstitution A change of identical material or equipment
RequestforSubstitutionDetail
Line items for Request For Substitution
Resource Resources include labor, nonlabor, and materials that are used for activities across all projects.
ResourceAssignment Resource assignments track the work of resources or roles that are performing various activities.
ResourceCode Resource codes are user-defined codes to classify and categorize resources across all projects.
ResourceCodeType Resource Code Types provide a way of classifying resource codes. Resource codes areuser-defined codes to classify and categorize resources across all projects.
ResourceCurve Resource curves enable you to specify how you want resource units or costs spread over the duration of an activity.
ResourceRate Resource rates provide a way of specifying multiple resource prices and maximum units per time values that vary over time.
ResourceRole A resource role object represents an association between a resource object and a role object.
Risk The risk object represents a probabilistic event or condition which if it occurs has an impact on the project.
RiskAndIssue A log for documenting, tracking, and estimating impacts of open issues and risks; Log of items that may impact schedule/scope/cost.
RiskAndIssueDetail Line items for Risk and Issue.
Gateway Providers Data Dictionary
28
Business Object Description
RiskImpact The risk impact object stores the pre-response qualitative value assigned to a risk for each of the risk thresholds.
RiskMatrix
The risk matrix object contains the name and description of each probability and impact diagram (PID). The Risk Matrix is then used to qualitatively assess each risk and assign a score.
RiskMatrixScore The risk matrix score object stores the score values from the probability and impact diagram (PID) of the risk score matrix.
RiskMatrixThreshold
The risk matrix threshold object creates a relationship between a RiskThreshold object and a RiskMatrix object. This allows a single RiskThreshold object to be associated with multiple RiskMatrix objects.
RiskResponseAction
The risk response action object contains the detailed steps that need to occur to complete the risk response plan. Multiple actions can be associated with one response plan and each action can be linked to an activity in the project.
RiskResponseActionImpact
The risk response action impact object is a post-risk response action qualitative value that is assigned to a risk for each of the risk thresholds.
RiskResponsePlan The risk response plan object communicates how the project team plans to address the identified risk.
RiskThreshold
The risk threshold object contains the name, description, and type of each risk threshold. Risk thresholds provide a mechanism for setting up the criteria that is used to assess the risk.
RiskThresholdLevel The risk threshold level object stores the level information (e.g. Low, Medium, High) for each risk threshold.
Role
Roles are project personnel job titles or skills, such as mechanical engineer, inspector, or carpenter. They represent a type of resource with a certain level of proficiency rather than a specific individual.
RoleLimit Role limits define the limits of the maximum work units per time for a Role in a time period.
RoleRate Role rates enable you to select a predefined price per unit for cost calculating when assigning the role to an activity.
ShellList Shell List
Timesheet Used to capture Employee Timesheets (project / non-project hrs)
TimesheetDetail Line Items for Timesheet
Gateway and File Provider Business Objects
29
Business Object Description
UDFType User-defined fields (UDFs) enable users to add custom fields and values to the project database.
UnitOfMeasure The unit of measure provides definitions of units of measure for material resources.
Vendor Company Vendor directory
VendorDetail Line items for Vendor
VendorEvaluation Document vendor performance for consideration for future work (simple)
WBS
The project work breakdown structure (WBS) is a hierarchical arrangement of the products and services produced during and by a project. Each element of a WBS may contain more-detailed WBS elements, activities, or both. WBS are hierarchical objects.
WBSCategory As their name implies, WBS categories are used to categorize WBS elements. They are defined globally.
WBSExpenseSpread Expense spread data per WBS per ExpenseCategory
WBSResourceSpread Spread data per WBS per Resource
WBSSpread Summarized spread data per WBS
WorkRelease
Process that is connected to Blanket Purchase Order Business Process that is deployed at company level. This process can be used to write against the Market purchase order.
WorkReleaseDetail Line items for Work Release
Gateway Providers Data Dictionary
30
In This Section
Activity ..................................................................................................................... 32 ActivityCode ............................................................................................................ 39 ActivityCodeType .................................................................................................... 39 ActivityExpense ....................................................................................................... 40 ActivityRisk .............................................................................................................. 41 BaselineType .......................................................................................................... 41 BlanketPurchaseOrder ............................................................................................ 42 BlanketPurchaseOrderDetail ................................................................................... 42 BudgetApproval ....................................................................................................... 43 BudgetApprovalDetail .............................................................................................. 43 BudgetChange ........................................................................................................ 44 BudgetChangeDetail ............................................................................................... 44 BudgetChangeOrder ............................................................................................... 45 BudgetChangeOrderDetail ...................................................................................... 46 BudgetItem .............................................................................................................. 47 BudgetItemDetail ..................................................................................................... 47 BudgetTransfer ....................................................................................................... 48 BudgetTransferDetail .............................................................................................. 49 Calendar ................................................................................................................. 49 CBS ......................................................................................................................... 51 CBSDurationSummary ............................................................................................ 51 CBSExpenseSpread ............................................................................................... 52 CBSResourceSpread .............................................................................................. 53 ChangeOrder .......................................................................................................... 55 ChangeOrderDetail ................................................................................................. 55 Contract .................................................................................................................. 56 ContractDetail ......................................................................................................... 57 CostAccount ............................................................................................................ 58 CostColumn ............................................................................................................ 58 Currency ................................................................................................................. 59 EPS ......................................................................................................................... 59 Estimate .................................................................................................................. 67 EstimateDetail ......................................................................................................... 67 ExchangeRate ......................................................................................................... 68 ExpenseCategory .................................................................................................... 68 FinancialPeriod ....................................................................................................... 69 FundAppropriation ................................................................................................... 69 FundAppropriationDetail .......................................................................................... 69 Invoice ..................................................................................................................... 70 InvoiceDetail ............................................................................................................ 71 JournalEntry ............................................................................................................ 71 JournalEntryDetail ................................................................................................... 72 Location .................................................................................................................. 72 NotebookTopic ........................................................................................................ 73 Payment .................................................................................................................. 74 PaymentApplication ................................................................................................. 74
Gateway and File Provider Business Objects
31
PaymentApplicationDetail ........................................................................................ 75 PaymentApplicationtoOwner ................................................................................... 75 PaymentApplicationtoOwnerDetail .......................................................................... 76 PaymentDetail ......................................................................................................... 77 PaymentFromOwner ............................................................................................... 78 PaymentFromOwnerDetail ...................................................................................... 78 POAmendment ........................................................................................................ 79 POAmendmentDetail ............................................................................................... 80 PotentialChangeOrder ............................................................................................. 80 PotentialChangeOrderDetail .................................................................................... 81 Project ..................................................................................................................... 81 ProjectCode ............................................................................................................ 90 ProjectCodeType ..................................................................................................... 90 ProjectFinance ........................................................................................................ 90 ProjectFinanceElement ........................................................................................... 92 ProjectFinanceSnapshot ......................................................................................... 93 ProjectInformation ................................................................................................... 94 ProjectResource ...................................................................................................... 94 PurchaseOrder ........................................................................................................ 95 PurchaseOrderDetail ............................................................................................... 95 Relationship ............................................................................................................ 96 RequestForSubstitution ........................................................................................... 97 RequestForSubstitutionDetail .................................................................................. 97 Resource ................................................................................................................. 98 ResourceAssignment .............................................................................................. 99 ResourceCode ...................................................................................................... 104 ResourceCodeType .............................................................................................. 104 ResourceCurve ..................................................................................................... 104 ResourceRate ....................................................................................................... 105 ResourceRole ....................................................................................................... 105 Risk ....................................................................................................................... 106 RiskAndIssue ........................................................................................................ 107 RiskAndIssueDetail ............................................................................................... 107 RiskImpact ............................................................................................................ 108 RiskMatrix ............................................................................................................. 108 RiskMatrixScore .................................................................................................... 109 RiskMatrixThreshold .............................................................................................. 110 RiskResponseAction ............................................................................................. 111 RiskResponseActionImpact ................................................................................... 112 RiskResponsePlan ................................................................................................ 113 RiskThreshold ....................................................................................................... 114 RiskThresholdLevel ............................................................................................... 114 Role....................................................................................................................... 115 RoleLimit ............................................................................................................... 115 RoleRate ............................................................................................................... 116 ShellList ................................................................................................................ 116 Timesheet ............................................................................................................. 117 TimesheetDetail .................................................................................................... 117 UDFType ............................................................................................................... 118
Gateway Providers Data Dictionary
32
UnitOfMeasure ...................................................................................................... 118 Vendor .................................................................................................................. 118 VendorDetail ......................................................................................................... 119 VendorEvaluation .................................................................................................. 119 WBS ...................................................................................................................... 120 WBSCategory ....................................................................................................... 121 WBSExpenseSpread ............................................................................................. 121 WBSResourceSpread ........................................................................................... 122 WBSSpread .......................................................................................................... 124 WorkRelease ......................................................................................................... 127 WorkReleaseDetail ................................................................................................ 128
Activity
Description: An activity is a unit of work performed during the course of a project.
Field Description Read-Only
ActualDuration
The activity actual duration percent of planned. Computed as actual duration / BL duration * 100. The value can exceed 100. The BL duration is the activity's at completion duration from the project baseline.
No
ActualFinishDate The actual finish date of the activity.
No
ActualStartDate The actual start date of the activity.
No
ActualTotalCost
The actual total cost for the activity, including labor resources, nonlabor resources, and project expenses. Actual total cost = actual labor costs + actual nonlabor costs + actual expense costs.
No
AtCompletionDuration The total working time from the activity's current start date to the current finish date.
No
AtCompletionTotalCost
The total cost at completion for the activity, including labor resources, nonlabor resources, and project expenses. At completion total cost = at completion labor cost + at
No
Gateway and File Provider Business Objects
33
Field Description Read-Only
completion nonlabor cost + at completion expense cost.
BaselineDuration The duration for the activity in the project baseline.
No
BaselineFinishDate The current finish date of the activity in the project baseline.
No
BaselinePlannedLaborUnits The planned units for all labor resources assigned to the activity.
No
BaselinePlannedNonLaborUnits The planned units for all nonlabor resources assigned to the activity.
No
BaselineStartDate The current start date of the activity in the project baseline.
No
CalendarCode The unique code of the calendar. No
CalendarName The name of the calendar. No
CalendarObjectId The unique ID of the calendar. No
DataDate An Activity field to define Data Date.
No
DurationType
The duration type of the activity. One of 'Fixed Units/Time', 'Fixed Duration and Units/Time', 'Fixed Units', or 'Fixed Duration and Units'.
No
EarlyFinishDate The early finish date of the activity.
No
EarlyStartDate The early start date of the activity. No
EBSBdugetCurrentCost Current Budget Activity Level No
EBSBdugetCurrentQuantity A project UDF to define BudgetCurrentQuantity.
No
EBSBdugetOriginalCost Current Budget Original Level No
EBSBdugetOriginalQuantity A project UDF to define BudgetOriginalQuantity.
No
EBSBdugetProposedCost Proposed Budget Activity Level No
Gateway Providers Data Dictionary
34
Field Description Read-Only
EBSBdugetProposedQuantity A project UDF to define BudgetProposedQuantity.
No
EBSBdugetStatusCode A project UDF to define BudgetStatusCode.
No
EBSVersionName A project UDF to define BudgetVersionName.
No
EBSVersionNumber A project UDF to define BudgetVersionNumber.
No
ExpectedFinishDate
The date the activity is expected to be finished according to the progress made on the activity's work products. The expected finish date is entered manually by people familiar with progress of the activity's work products.
No
FinishDate The early finish date of the activity.
No
Id The unique identifier of the activity.
No
IsStarred The flag that indicates whether this activity is marked as starred activity.
No
IsWorkPackage The flag that indicates whether this activity is the child of a work package WBS.
No
LateFinishDate The late finish date of the activity. No
LateStartDate The late start date of the activity. No
LessonsLearned An activity note field to store notes.
No
LocationCode The code of the location assigned to the Activity.
No
LocationName The name of the location assigned to the activity.
No
LocationObjectId The unique ID of the location assigned to the activity.
No
LongText The long text value. No
MaximumDuration The maximum duration of the No
Gateway and File Provider Business Objects
35
Field Description Read-Only
activity
MinimumDuration The minimum duration of the activity
No
MostLikelyDuration The most likely duration of the activity
No
Name The name of the activity. The activity name does not have to be unique.
No
ObjectId The unique ID generated by the system.
No
PercentComplete
The activity percent complete. This value is tied to the activity duration % complete, units % complete, or physical % complete, depending on the setting for the activity's percent complete type.
No
Phase An activity code to track the phase of the activity.
No
PhysicalPercentComplete
The physical percent complete which can either be user entered or calculated from the activity's weighted steps.
No
PlannedDuration The activity planned duration. No
PlannedFinishDate
The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.
No
PlannedStartDate
The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.
No
Gateway Providers Data Dictionary
36
Field Description Read-Only
PlannedTotalCost
The planned total cost for the activity, including labor resources, nonlabor resources, and project expenses. Planned total cost = planned labor cost + planned nonlabor cost + planned expense cost.
No
PostResponsePessimisticFinish The post-response pessimistic finish date for the activity.
No
PostResponsePessimisticStart The post-response pessimistic start date for the activity.
No
PreResponsePessimisticFinish The pre-response pessimistic finish date for the activity.
No
PreResponsePessimisticStart The pre-response pessimistic start date for the activity.
No
PrimaryConstraintDate The primary constraint date of the activity.
No
PrimaryConstraintType The primary constraint type of the activity.
No
ProjectId The short code of the associated project.
No
ProjectObjectId The unique ID of the associated project.
No
RemainingDuration No
RemainingEarlyFinishDate The remaining late end date, which is calculated by the scheduler.
No
RemainingEarlyStartDate
The date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager.
No
RemainingLateFinishDate The remaining late finish date of the project.
No
RemainingLateStartDate The remaining late start date of the project.
No
Gateway and File Provider Business Objects
37
Field Description Read-Only
RemainingTotalCost
The remaining total cost for the activity, including labor resources, nonlabor resources, and project expenses. Remaining total cost = remaining labor costs + remaining nonlabor costs + remaining expense costs.
No
ResourceType The resource type: "Labor", "Nonlabor", or "Material".
No
ResumeDate The resume of the project. No
RolledupWBSObjectId Rolled up WBS Object Ids after filtering either by levels or tagging
No
SecondaryConstraintDate
The date to be used for the cstr_type2 assignment, if the activity has a cstr_type2 value. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.
No
SecondaryConstraintType The additional constraint to be used by the scheduler.
No
StartDate The early start date of the activity. No
Status The current status of the activity, either 'Not Started', 'In Progress', or 'Completed'.
No
SuspendDate The suspend of the project. No
TotalActualCost An Activity UDF to store Total Actual Cost for the Activity.
No
TotalCommitmentCost An Activity UDF to store Total Commitment Cost for the Activity.
No
TotalPlannedCost An Activity UDF to store Total Planned Cost for the Activity.
No
Type
The type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone', 'Finish Milestone', or 'WBS Summary'.
No
Gateway Providers Data Dictionary
38
Field Description Read-Only
VCPActDemandPeggedAvlDate No
VCPActDemandPeggedOrderNumber
No
VCPActDemandPeggedOrderType
No
VCPActItemSelection No
VCPActItemSelectionCode No
VCPActivityObjectId VCP Activity Object Id No
VCPActSupplyActualStartDate No
VCPActSupplyDockDate No
VCPActSupplyDueDate No
VCPActSupplyItemId No
VCPActSupplyItemName No
VCPActSupplyOrderDate No
VCPActSupplyOrderNumber No
VCPActSupplyOrderType No
VCPActSupplyOrganization No
VCPActSupplyPeggedActivityId No
VCPActSupplyPeggedOrderNumber
No
VCPActSupplyQuantity No
VCPActSupplyShipDate No
VCPActSupplyStartDate No
VCPActSupplyUpdatedArrivalDate No
WBSCode WBSCode No
WBSName The name of the WBS element. No
WBSObjectId The unique ID of the WBS for the activity.
No
WBSPath The WBS path of the Activity. No
Gateway and File Provider Business Objects
39
ActivityCode
Description: Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
Field Description Read-Only
CodeTypeName The name of the activity code type. No
CodeTypeObjectId The unique ID of the activity code type. No
CodeValue The value of the activity code. No
Color The Hex representation for the color. No
Description The description of the activity code. No
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent activity code. No
SequenceNumber The sequence number for sorting. No
ActivityCodeType
Description: Activity code types provide a way of classifying activity codes. Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
Field Description Read-Only
EPSObjectId The unique ID of the EPS. No
Length The maximum number of characters allowed for values of this activity code.
No
Gateway Providers Data Dictionary
40
Field Description Read-Only
Name The name of the activity code type. No
ObjectId The unique ID generated by the system. No
ProjectObjectId The unique ID of the project. No
Scope The scope of activity code type. No
ActivityExpense
Description: Activity expenses are non-resource costs associated with a project and assigned to a project's activities. They are typically one-time expenditures for non-reusable items.
Field Description Read-Only
ActivityObjectId
The unique ID of the activity to which the project expense is linked. Every project expense is associated with one activity in the project.
No
ActualCost The actual cost for the project expense. No
ActualUnits The actual units for the project expense. No
AtCompletionCost The sum of the actual plus remaining costs for the project expense. Computed as actual cost + remaining cost.
No
AtCompletionUnits The at completion units for the project expense.
No
CostAccountId The ID of the cost account. No
CostAccountName The name of the cost account. No
CostAccountObjectId The unique ID of the cost account. No
ExpenseCategoryName The name of the expense category. No
ExpenseCategoryObjectId
The unique ID of the expense category. No
ExpenseItem The name of the project expense. No
ObjectId The unique ID generated by the system. No
PlannedCost
The planned cost for the project expense. This field is named BudgetedCost in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
No
Gateway and File Provider Business Objects
41
Field Description Read-Only
PlannedUnits The planned number of units for the project expense. This number is multiplied by the price per unit to compute the planned cost.
No
RemainingCost
The remaining cost for the project expense. Before actual expenses are made, remaining cost should be the same as planned cost.
No
RemainingUnits The remaining units for the project expense.
No
ActivityRisk
Description: The activity risk object stores the relationship between a single Activity and a single Risk.
Field Description Read-Only
ActivityId The short name of the associated activity. No
ActivityName The name of the associated activity. No
ActivityObjectId The unique ID of the associated activity. No
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. No
ProjectObjectId The unique ID of the associated project. No
RiskId The short name of the associated risk. No
RiskName The name of the associated risk. No
RiskObjectId The unique ID of the associated risk. No
BaselineType
Description: BaselineType Fields
Field Description Read-Only
CreateDate The create Date for currency No
CreateUser The name of the user that created this user-defined field.
No
Gateway Providers Data Dictionary
42
Field Description Read-Only
LastUpdateDate The Last Update Date for currency No
LastUpdateUserThe name of the user that last updated this user-defined field.
No
Name The name for BaselineType No
ObjectId The unique ID generated by the system. No
SequenceNumber
Sequence Number for BaselineType No
BlanketPurchaseOrder
Description: A company level purchase order, which enables agreements with vendors to provide services across multiple projects, released on a per-project/per-period basis with work authorizations against a previously determined maximum.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
ObjectId The unique ID generated by the system No
RecordNo Record Number No
Status Status No
Title Title No
BlanketPurchaseOrderDetail
Description: Line Items for Blanket Purchase Order
Field Description Read-Only
Amount Amount No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Gateway and File Provider Business Objects
43
Field Description Read-Only
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
BudgetApproval
Description: Used to approve project budget
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
BudgetApprovalDetail
Description: Line items for Budget Approval
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Descriptions Description No
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
Gateway Providers Data Dictionary
44
Field Description Read-Only
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
BudgetChange
Description: For requesting additional (or reduced) budget beyond the existing budget.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
BudgetChangeDetail
Description: Line items for Budget Change
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate Effective Date No
Gateway and File Provider Business Objects
45
Field Description Read-Only
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
BudgetChangeOrder
Description: A change to a budget that is typically created for a contractor that is based on changes to a contract between the contractor and owner.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
CurrencyRate Rate in Project Currency No
Description Description No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
Gateway Providers Data Dictionary
46
Field Description Read-Only
RefBPO Reference BPO No
RefId Contract/PO No
Status Status No
Title Title No
BudgetChangeOrderDetail
Description: Line Items for Budget Change Orders
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefBPOLineItem
Reference BPO Lineitem No
ShortDesc Short Description No
SOVLineNo Reference No
TabId Tab Name No
WPId Work Package No
Gateway and File Provider Business Objects
47
BudgetItem
Description: A budget that is typically created for a contractor that is based on a contract they have with an owner for a project.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
CurrencyRate Rate in Project Currency No
Description Description No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefBPO Reference BPO No
RefId Contract/PO No
Status Status No
Title Title No
BudgetItemDetail
Description: Line Items for Budget Items
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
Gateway Providers Data Dictionary
48
Field Description Read-Only
BitemId Cost Code No
Description Description No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefBPOLineItem
Reference BPO Lineitem No
ShortDesc Short Description No
SOVLineNo Reference No
TabId Tab Name No
WPId Work Package No
BudgetTransfer
Description: For transferring budget from one WBS code to another. Most typically used to release budget contingency to other cost items.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
Gateway and File Provider Business Objects
49
BudgetTransferDetail
Description: Line items for Budget Transfer
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate
Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system
No
ParentObjectId
The unique ID of the blanket purchase order
No
PricePerUnit
Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
Calendar
Description: Calendars defined the available work hours in each calendar day, and includes global and resource types.
Field Description Read-Only
BaseCalendarObjectId
The unique ID of the global calendar to which this calendar is linked. Any changes to the global calendar are automatically propagated to this calendar.
No
Code The Code of the calendar. No
CreateDate The date this calendar was created. No
Gateway Providers Data Dictionary
50
Field Description Read-Only
CreateUser The name of the user that created this calendar.
No
HolidayOrExceptionsAll dates with holidays or exceptions in this calendar.
No
HoursPerDay The max hours per day value for a calendar No
HoursPerMonth The max hours per month value for a calendar
No
HoursPerWeek The max hours per week value for a calendar
No
HoursPerYear The max hours per year value for a calendar
No
IsBaseline The boolean value indicating if this business object is related to a Project or Baseline.
No
IsDefault The flag that identifies the default global calendar (applies to global calendars only)
No
IsPersonal The flag indicating if this calendar is a personal calendar (applies to resource calendars only).
No
IsTemplate The flag that identifies if the calendar is a template.
No
LastUpdateDate The date this resource code was last updated.
No
LastUpdateUser The name of the user that last updated this resource code.
No
Name The name of the calendar. No
ObjectId The unique ID generated by the system. No
ProjectId The short name of the project. No
ProjectObjectId The unique ID of the project. No
StandardWorkWeek Standard detailed work hours for each day of week
No
Type The calendar type - either 'Global' or 'Resource'.
No
Gateway and File Provider Business Objects
51
CBS
Description: CBS business object
Field Description Read-Only
CBSCode CBS Code associated with the Project No
CBSDescription CBS Code Description No
CBSStatus CBS Code Status. Valid values are "Active" and "InActive".
No
ObjectId The unique ID generated by the system No
ProjectObjectId The unique ID of the associated Project No
ParentObjectId The unique ID of the parent CBS No
CBSDurationSummary
Description: CBSDurationSummary business object
Field Description Read-Only
BaselineType Baseline type of the associated baseline
No
CBSObjectId The unique ID of the associated CBS.
No
DataDate Data date of the associated project No
ObjectId The unique ID generated by the system
No
OriginalProjectObjectId The original object ID of the associated Project
No
ProjectId The short name of the associated Project
No
ProjectName The name of the associated Project No
ProjectObjectId The unique ID of the associated Project
No
SummaryActualDuration Summarized Actual Duration the project
No
SummaryActualFinishDate
Summarized Actual Finish Date of the project
No
SummaryActualStartDate Summarized Actual Start Date of the No
Gateway Providers Data Dictionary
52
Field Description Read-Only
project
SummaryPercentComplete
Summarized Percent Complete the project
No
SummaryPlannedDurationSummarized Planned Duration the project
No
SummaryPlannedFinishDate
Summarized Planned Finish Date of the project
No
SummaryPlannedStartDate
Summarized Planned Start Date of the project
No
SummaryRemainingDuration
Summarized Remaining Duration the project
No
SummaryRemainingFinishDate
Summarized Remaining Finish Date of the project
No
SummaryRemainingStartDate
Summarized Remaining Start Date of the project
No
CBSExpenseSpread
Description: Summarized spread data per CBS per expense category
Field Description Read-Only
ActualCost Actual Cost No
ActualUnits Actual Units No
AtCompletionCost At Completion Cost No
AtCompletionUnits At Completion Units No
BaselineType Baseline Type No
CBSObjectId The unique ID of CBS. No
DataDate Date date No
EndDate End date No
ExpenseCategoryName Expense Category No
ObjectId The unique ID generated by the system.
No
PlannedCost Planned Cost No
PlannedUnits Planned Units No
Gateway and File Provider Business Objects
53
Field Description Read-Only
ProjectId Project short name No
ProjectName Project name No
ProjectObjectId The unique ID of Project. No
ProjectOrigObjectId The original object id of the associated Project
No
RemainingCost Remaining Cost No
RemainingUnits Remaining Units No
StartDate Start date No
SummaryActualCost Summarized Actual cost No
SummaryActualUnits Summarized Actual Units No
SummaryAtCompletionCost Summarized At completion cost No
SummaryAtCompletionUnits Summarized At Completion Units No
SummaryPlannedCost Summarized Planned cost No
SummaryPlannedUnits Summarized Planned Units No
SummaryRemainingCost Summarized Remaining cost No
SummaryRemainingUnits Summarized Remaining Units No
CBSResourceSpread
Description: Summarized spread data per CBS per resource assignment
Field Description Read-Only
ActualCost Actual Cost No
ActualUnits Actual Units No
AtCompletionCost At Completion Cost No
AtCompletionUnits At Completion Units No
BaselineType Baseline Type No
CBSObjectId The unique ID of CBS. No
CurrencyId Currency Id No
CurrencyName Currency Name No
DataDate Date date No
Gateway Providers Data Dictionary
54
Field Description Read-Only
EndDate End date No
ObjectId The unique ID generated by the system.
No
OriginalProjectObjectId The original object id of the associated Project
No
PlannedCost Planned Cost No
PlannedUnits Planned Units No
ProjectId Project short name No
ProjectName Project name No
ProjectObjectId The unique ID of Project. No
RemainingCost Remaining Cost No
RemainingUnits Remaining Units No
ResourceId Resource short name No
ResourceName Resource Name No
ResourceType Resource Type No
StartDate Start date No
SummaryActualCost Summarized Actual cost No
SummaryActualFinish Summarized Actual finish date No
SummaryActualStart Summarized Actual Start date No
SummaryActualUnits Summarized Actual Units No
SummaryAtCompletionCost Summarized At completion cost No
SummaryAtCompletionUnits Summarized At Completion Units No
SummaryPlannedCost Summarized Planned cost No
SummaryPlannedFinish Summarized Planned finish date No
SummaryPlannedStart Summarized Planned Start date No
SummaryPlannedUnits Summarized Planned Units No
SummaryRemainingCost Summarized Remaining cost No
SummaryRemainingFinish Summarized Remaining finish date No
SummaryRemainingStart Summarized Remaining Start date No
SummaryRemainingUnits Summarized Remaining Units No
UnitAbbreviation Unit Abbreviation No
Gateway and File Provider Business Objects
55
Field Description Read-Only
UnitName Unit Name No
ChangeOrder
Description: A formal commit change to the contract.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
CurrencyRate Rate in Project Currency No
Description Description No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefBPO Reference BPO No
RefId Contract/PO No
Status Status No
Title Title No
ChangeOrderDetail
Description: Line Items for Change Order
Gateway Providers Data Dictionary
56
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefBPOLineItem Reference BPO Lineitem No
ShortDesc Short Description No
SOVLineNo Reference No
TabId Tab Name No
WPId Work Package No
Contract
Description: Base commit for EPC Activities (SOV = Payment Application)
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
CurrencyRate Rate in Project Currency No
Description Description No
DMPublishPath Publish Path No
DueDate Due Date No
Gateway and File Provider Business Objects
57
Field Description Read-Only
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefBPO Reference BPO No
RefId Contract/PO No
Status Status No
Title Title No
ContractDetail
Description: Line Items for Contract
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefBPOLineItem Reference BPO Lineitem No
ShortDesc Short Description No
SOVLineNo Reference No
TabId Tab Name No
WPId Work Package No
Gateway Providers Data Dictionary
58
CostAccount
Description: Cost accounts contain the organization's cost account IDs. Available across all projects, they support tracking of costs and earned value based on the organization's cost account IDs. Cost accounts are hierarchical objects.
Field Description Read-Only
Description The description of the cost account. No
Id The short code that uniquely identifies this cost account.
No
Name The name of the cost account. No
ObjectId The unique ID of the cost account. No
ParentObjectId The unique ID of the parent cost account of this cost account in the hierarchy.
No
SequenceNumber The sequence number for sorting. No
CostColumn
Description: CostColum is used to exchange the cost sheet data. Cost Sheet is a sheet which will have all the Costs related to different WBS codes for a particular project listed in it.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
LongDesc Long Description No
ObjectId The unique ID generated by the system No
Quantity Quantity No
ShortDesc Short Description No
SpendCategory Spends Category No
UnitCost Unit Cost No
UnitOfMeasure Unit of Measure No
WBSCode Cost Code No
Gateway and File Provider Business Objects
59
Currency
Description: Currency fields
Field Description Read-Only
CreateDate The create Date for currency. No
CreateUser The name of the user that created this user-defined field.
No
DecimalSymbol The symbol for decimal. No
DigitGroupingSymbol The symbol for Digit Groups. No
ExchangeRate The exchange rate for currency. No
Id The ID for currency. No
LastUpdateDate The Last Update Date for currency No
LastUpdateUser The name of the user that last updated this user-defined field.
No
Name The Name of currency. No
NegativeSymbol The symbol for negative currency. No
ObjectId The unique ID generated by the system. No
PositiveSymbol The symbol for positive currency. No
Symbol The symbol for decimal. No
EPS
Description: EPS
Field Description Read-Only
AnticipatedFinishDate Anticipated Finish Date. No
AnticipatedStartDate Anticipated Start Date. No
CreateDate The date this EPS was created.
No
CreateUser The name of the user that created this EPS.
No
CurrentBudget Current Budget. No
CurrentVariance Current Variance. No
DistributedCurrentBudget DistributedCurrentBudget. No
Gateway Providers Data Dictionary
60
Field Description Read-Only
FinishDate Finish Date. No
GUID GUID. No
Id The short name of the EPS. No
IndependentETCLaborUnits Independent ETC Labor Units. No
IndependentETCTotalCost Independent ETC Total Cost. No
LastSummarizedDate Last Summarized Date. No
LastUpdateDate Last Update Date. No
LastUpdateUser Last Update User. No
Name The name of the EPS. No
ObjectId The unique id that uniquely identifies this EPS.
No
OBSName OBS Name. No
OBSObjectId OBS Object ID. No
OriginalBudget Original Budget. No
ParentObjectId Parent EPS Object ID. No
PlannedStartDate Planned Start Date. No
ProjectObjectId Project Object ID. No
ProposedBudget Proposed Budget. No
SequenceNumber Sequence Number. No
StartDate StartDate. No
SummaryAccountingVarianceByCost Summary Accounting Variance By Cost.
No
SummaryAccountingVarianceByLaborUnits
Summary Accounting Variance By Labor Units.
No
SummaryActivityCount Summary Activity Count. No
SummaryActualDuration Summary Actual Finish Date. No
SummaryActualExpenseCost Summary Actual Expense Cost.
No
SummaryActualFinishDate Summary Actual Finish Date. No
SummaryActualLaborCost Summary Actual Labor Cost. No
SummaryActualLaborUnits Summary Actual Labor Units. No
SummaryActualMaterialCost Summary Actual Material Cost. No
Gateway and File Provider Business Objects
61
Field Description Read-Only
SummaryActualNonLaborCost Summary Actual Non Labor Cost.
No
SummaryActualNonLaborUnits Summary Actual Non Labor Units.
No
SummaryActualStartDate Summary Actual Start Date. No
SummaryActualThisPeriodCost Summary Actual This Period Cost.
No
SummaryActualThisPeriodLaborCost Summary Actual This Period Labor Cost.
No
SummaryActualThisPeriodLaborUnits Summary Actual This Period Labor Units.
No
SummaryActualThisPeriodMaterialCostSummary Actual This Period Material Cost.
No
SummaryActualThisPeriodNonLaborCost
Summary Actual This Period Non Labor Cost.
No
SummaryActualThisPeriodNonLaborUnits
Summary Actual This Period Non Labor Units.
No
SummaryActualTotalCost Summary Actual Total Cost. No
SummaryActualValueByCost Summary Actual Value By Cost.
No
SummaryActualValueByLaborUnits Summary Actual Value By Labor Units.
No
SummaryAtCompletionDuration Summary At Completion Duration.
No
SummaryAtCompletionExpenseCost Summary At Completion Expense Cost.
No
SummaryAtCompletionLaborCost Summary At Completion Labor Cost.
No
SummaryAtCompletionLaborUnits Summary At Completion Labor Units.
No
SummaryAtCompletionMaterialCost Summary At Completion Material Cost.
No
SummaryAtCompletionNonLaborCost Summary At Completion Non Labor Cost.
No
SummaryAtCompletionNonLaborUnits Summary At Completion Non Labor Units.
No
Gateway Providers Data Dictionary
62
Field Description Read-Only
SummaryAtCompletionTotalCost Summary At Completion Total Cost.
No
SummaryAtCompletionTotalCostVariance
Summary At Completion Total Cost Variance.
No
SummaryBaselineCompletedActivityCount
Summary Baseline Completed Activity Count.
No
SummaryBaselineDuration Summary Baseline Duration. No
SummaryBaselineExpenseCost Summary Baseline Expense Cost.
No
SummaryBaselineFinishDate Summary Baseline Finish Date.
No
SummaryBaselineInProgressActivityCount
Summary Baseline In Progress Activity Count.
No
SummaryBaselineLaborCost Summary Baseline Labor Cost. No
SummaryBaselineLaborUnits Summary Baseline Labor Units.
No
SummaryBaselineMaterialCost Summary Baseline Material Cost.
No
SummaryBaselineNonLaborCost Summary Baseline Non Labor Cost.
No
SummaryBaselineNonLaborUnits Summary Baseline Non Labor Units.
No
SummaryBaselineNotStartedActivityCount
Summary Baseline Not Started Activity Count.
No
SummaryBaselineStartDate Summary Baseline Start Date. No
SummaryBaselineTotalCost Summary Baseline Total Cost. No
SummaryBudgetAtCompletionByCost Summary Budget At Completion By Cost.
No
SummaryBudgetAtCompletionByLaborUnits
Summary Budget At Completion By Labor Units.
No
SummaryCompletedActivityCount Summary Completed Activity Count.
No
SummaryCostPercentComplete Summary Cost Percent Complete.
No
SummaryCostPercentOfPlanned Summary Cost Percent Of Planned.
No
Gateway and File Provider Business Objects
63
Field Description Read-Only
SummaryCostPerformanceIndexByCost
Summary Cost Performance Index By Cost.
No
SummaryCostPerformanceIndexByLaborUnits
Summary Cost Performance Index By Labor Units.
No
SummaryCostVarianceByCost Summary Cost Variance By Cost.
No
SummaryCostVarianceByLaborUnits Summary Cost Variance By Labor Units.
No
SummaryCostVarianceIndex Summary Cost Variance Index. No
SummaryCostVarianceIndexByCost Summary Cost Variance Index By Cost.
No
SummaryCostVarianceIndexByLaborUnits
Summary Cost Variance Index By Labor Units.
No
SummaryDurationPercentComplete Summary Duration Percent Complete.
No
SummaryDurationPercentOfPlanned Summary Duration Percent Of Planned.
No
SummaryDurationVariance Summary Duration Variance. No
SummaryEarnedValueByCost Summary Earned Value By Cost.
No
SummaryEarnedValueByLaborUnits Summary Earned Value By Labor Units.
No
SummaryEstimateAtCompletionByCostSummary Estimate At Completion By Cost.
No
SummaryEstimateAtCompletionByLaborUnits
Summary Estimate At Completion By Labor Units.
No
SummaryEstimateAtCompletionHighPercentByLaborUnits
Summary Estimate At Completion High Percent By Labor Units.
No
SummaryEstimateAtCompletionLowPercentByLaborUnits
Summary Estimate At Completion Low Percent By Labor Units.
No
SummaryEstimateToCompleteByCost Summary Estimate To Complete By Cost.
No
SummaryEstimateToCompleteByLaborUnits
Summary Estimate To Complete By Labor Units.
No
SummaryExpenseCostPercentComplet Summary Expense Cost No
Gateway Providers Data Dictionary
64
Field Description Read-Only
e Percent Complete.
SummaryExpenseCostVariance Summary Expense Cost Variance.
No
SummaryFinishDateVariance Summary Finish Date Variance.
No
SummaryInProgressActivityCount Summary In Progress Activity Count.
No
SummaryLaborCostPercentComplete Summary Labor Cost Percent Complete.
No
SummaryLaborCostVariance Summary Labor Cost Variance.
No
SummaryLaborUnitsPercentComplete Summary Labor Units Percent Complete.
No
SummaryLaborUnitsVariance Summary Labor Units Variance.
No
SummaryMaterialCostPercentCompleteSummary Material Cost Percent Complete.
No
SummaryMaterialCostVariance Summary Material Cost Variance.
No
SummaryNonLaborCostPercentComplete
Summary Non Labor Cost Percent Complete.
No
SummaryNonLaborCostVariance Summary Non Labor Cost Variance.
No
SummaryNonLaborUnitsPercentComplete
Summary Non Labor Units Percent Complete.
No
SummaryNonLaborUnitsVariance Summary Non Labor Units Variance.
No
SummaryNotStartedActivityCount Summary Not Started Activity Count.
No
SummaryPerformancePercentCompleteByCost
Summary Performance Percent Complete By Cost.
No
SummaryPerformancePercentCompleteByLaborUnits
Summary Performance Percent Complete By Labor Units.
No
SummaryPlannedCost Summary Planned Cost. No
SummaryPlannedDuration Summary Planned Duration. No
SummaryPlannedExpenseCost Summary Planned Expense No
Gateway and File Provider Business Objects
65
Field Description Read-Only
Cost.
SummaryPlannedFinishDate Summary Planned Finish Date. No
SummaryPlannedLaborCost Summary Planned Labor Cost. No
SummaryPlannedLaborUnits Summary Planned Labor Units.
No
SummaryPlannedMaterialCost Summary Planned Material Cost.
No
SummaryPlannedNonLaborCost Summary Planned Non Labor Cost.
No
SummaryPlannedNonLaborUnits Summary Planned Non Labor Units.
No
SummaryPlannedStartDate Summary Planned Start Date. No
SummaryPlannedValueByCost Summary Planned Value By Cost.
No
SummaryPlannedValueByLaborUnits Summary Planned Value By Labor Units.
No
SummaryProgressFinishDate Summary Progress Finish Date.
No
SummaryRemainingDuration Summary Remaining Duration. No
SummaryRemainingExpenseCost Summary Remaining Expense Cost.
No
SummaryRemainingFinishDate Summary Remaining Finish Date.
No
SummaryRemainingLaborCost Summary Remaining Labor Cost.
No
SummaryRemainingLaborUnits Summary Remaining Labor Units.
No
SummaryRemainingMaterialCost Summary Remaining Material Cost.
No
SummaryRemainingNonLaborCost Summary Remaining Non Labor Cost.
No
SummaryRemainingNonLaborUnits Summary Remaining Non Labor Units.
No
SummaryRemainingStartDate Summary Remaining Start Date.
No
SummaryRemainingTotalCost Summary Remaining Total No
Gateway Providers Data Dictionary
66
Field Description Read-Only
Cost.
SummarySchedulePercentComplete Summary Schedule Percent Complete.
No
SummarySchedulePercentCompleteByLaborUnits
Summary Schedule Percent Complete By Labor Units.
No
SummarySchedulePerformanceIndexByCost
Summary Schedule Performance Index By Cost.
No
SummarySchedulePerformanceIndexByLaborUnits
Summary Schedule Performance Index By Labor Units.
No
SummaryScheduleVarianceByCost Summary Schedule Variance By Cost.
No
SummaryScheduleVarianceByLaborUnits
Summary Schedule Variance By Labor Units.
No
SummaryScheduleVarianceIndex Summary Schedule Variance Index.
No
SummaryScheduleVarianceIndexByCost
Summary Schedule Variance Index By Cost.
No
SummaryScheduleVarianceIndexByLaborUnits
Summary Schedule Variance Index By Labor Units.
No
SummaryStartDateVariance Summary Start Date Variance. No
SummaryToCompletePerformanceIndexByCost
Summary To Complete Performance Index By Cost.
No
SummaryTotalCostVariance Summary Total Cost Variance. No
SummaryTotalFloat Summary Total Float. No
SummaryUnitsPercentComplete Summary Units Percent Complete.
No
SummaryVarianceAtCompletionByLaborUnits
Summary Variance At Completion By Labor Units.
No
TotalBenefitPlan Total Benefit Plan. No
TotalBenefitPlanTally Total Benefit Plan Tally. No
TotalFunding Total Funding. No
TotalSpendingPlan Total Spending Plan. No
TotalSpendingPlanTally Total Spending Plan Tally. No
UnallocatedBudget Unallocated Budget. No
Gateway and File Provider Business Objects
67
Field Description Read-Only
UndistributedCurrentVariance Undistributed Current Variance.
No
Estimate
Description: Used to create multiple project estimates and identify the preferred scenario.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
EstimateDetail
Description: Line items for Estimate
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Gateway Providers Data Dictionary
68
Field Description Read-Only
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
ExchangeRate
Description: Exchange Rate allows the use of multiple currencies within a project for cost purposes and are defined at the Company level. ExchangeRate would be used to define the current exchange rate for a currency as compared to the base currency of the Company.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
CurrencyCode Currency Code No
CurrencyName Currency Name No
ObjectId The unique ID generated by the system No
Rate Currency Exchange Rate No
ExpenseCategory
Description: Expense categories are used to categorize project expenses. They are used for standardizing expenses and for rolling up expenses across projects.
Field Description Read-Only
ExpenseCategory The Expense Category Name. No
ObjectId The unique ID generated by the system. No
Gateway and File Provider Business Objects
69
FinancialPeriod
Description: Financial periods are used to provide accurate display and reporting of actual units and costs. Financial periods may not overlap each other and do not have to be contiguous.
Field Description Read-Only
EndDate The end date of the financial period. No
Name The name of the financial period. No
ObjectId The unique ID of the financial period. No
StartDate The start date of the financial period. No
FundAppropriation
Description: Fund accounts as assigned to projects.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
FundAppropriationDetail
Description: Line Items for Fund Appropriation
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
Gateway Providers Data Dictionary
70
Field Description Read-Only
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
Invoice
Description: A general process for requesting and approving payments against commitments (invoice at the WBS or breakdown level do not calculate retainage or stored materials)
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefId Contract/PO No
Status Status No
Title Title No
Gateway and File Provider Business Objects
71
InvoiceDetail
Description: Line items for invoice
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
BreakDown Break Down No
Description Description No
EffectiveDate Effective Date No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefNum Reference Number No
ScheduledValue Scheduled Value No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
JournalEntry
Description: A process for adjusting spends line items. Most commonly used to reassign costs to alienate cost centers or GL code. Generic spend to transfer across cost codes.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
Gateway Providers Data Dictionary
72
Field Description Read-Only
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
JournalEntryDetail
Description: Line items for Journal Entry
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
Location
Description: The location is used to store address information including latitude and longitude. Locations can be assigned to resources, projects and/or activities.
Field Description Read-Only
AddressLine1 The first line of the address with street number and street name.
No
Gateway and File Provider Business Objects
73
Field Description Read-Only
AddressLine2 The second line of the address with street number and street name.
No
City The city name of the address. No
Country The country of the address. No
CountryCode The country code of the address. No
Latitude The latitude of the location. No
LocationCode The code that identifies this location. No
Longitude The longitude of the location. No
Municipality The municipality name of the address. No
Name The name of the location. No
ObjectId The unique ID generated by the system. No
PostalCode The postal code of the address. No
State The state name of the address. No
StateCode The state abbreviation of the address. No
NotebookTopic
Description: The NotebookTopic Object
Field Description Read-Only
AvailableForActivity The flag indicating that the topic will be available to assign to activities.
No
AvailableForEPS The flag indicating that the topic will be available to assign to EPS.
No
AvailableForProject The flag indicating that the topic will be available to assign to projects.
No
AvailableForWBS The flag indicating that the topic will be available to assign to WBS.
No
Name The name of the NotebookTopic. No
ObjectId The unique ID of the NotebookTopic. No
Gateway Providers Data Dictionary
74
Payment
Description: BP to hold Checks Processed Information from Financial System.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
PaymentApplication
Description: A process to track your payment information using a standard payment application method (for example, tracking retainage, stored materials, past payments, etc.)
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefId Contract/PO No
Status Status No
Title Title No
Gateway and File Provider Business Objects
75
PaymentApplicationDetail
Description: Line items for Payment Application
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
BreakDown Break Down No
Description Description No
EffectiveDate Effective Date No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefNum Reference Number No
ScheduledValue Scheduled Value No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
PaymentApplicationtoOwner
Description: A payment application that is raised by a contractor to the owner in order for the contractor to receive payment.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Gateway Providers Data Dictionary
76
Field Description Read-Only
BreakDown Break Down No
Description Description No
EffectiveDate Effective Date No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefNum Reference Number No
ScheduledValue Scheduled Value No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
PaymentApplicationtoOwnerDetail
Description: Line Items for Payment Applications to Owner.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
BreakDown Break Down No
Description Description No
EffectiveDate Effective Date No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
Gateway and File Provider Business Objects
77
Field Description Read-Only
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefNum Reference Number No
ScheduledValue Scheduled Value No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
PaymentDetail
Description: Line Items for Payment
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
Gateway Providers Data Dictionary
78
PaymentFromOwner
Description: A record of the actual payments a contractor will have received from the owner based on the payment application they presented to the owner.
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
PaymentFromOwnerDetail
Description: Line Items for Payments From Owner
Note: This object is not available in the File provider data dictionary.
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
Gateway and File Provider Business Objects
79
Field Description Read-Only
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
POAmendment
Description: Approval process for purchase order changes
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
CurrencyRate Rate in Project Currency No
Description Description No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefBPO Reference BPO No
RefId Contract/PO No
Status Status No
Title Title No
Gateway Providers Data Dictionary
80
POAmendmentDetail
Description: Line items for PO Amendment
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefBPOLineItem Reference BPO Lineitem No
ShortDesc Short Description No
SOVLineNo Reference No
TabId Tab Name No
WPId Work Package No
PotentialChangeOrder
Description: Contractor initiated potential change order.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Gateway and File Provider Business Objects
81
Field Description Read-Only
Title Title No
PotentialChangeOrderDetail
Description: Line items for Potential Change Order
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WPId Work Package No
Project
Description: A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities.
Field Description Read-Only
ActivityDefaultCalendarCode The default activity calendar code
No
ActivityDefaultCalendarName The name of the Activity Default Calendar of this project.
No
Gateway Providers Data Dictionary
82
Field Description Read-Only
ActivityDefaultCalendarObjectId The unique id of the Activity Default Calendar of this project.
No
ActivityDefaultDurationType Indicates the activity default duration type of the activity..
No
ActualCost The actual cost of the project No
ActualDuration The actual duration of the project.
No
AcutalFinishDate The date on which the project is actually finished.
No
ActualStartDate The date on which the project is actually started.
No
AnnualDiscountRate The annual discount rate value of the project.
No
AnticipatedFinishDate The anticipated finish date of the project.
No
AnticipatedStartDate The anticipated start date of the project.
No
AtCompletionCost The at completion cost of the project.
No
BusinessSegment A Project Code field to define the Business Segment of the project.
No
BusinessUnit Organization Hierarchy-Business Unit
No
CalculateFloatBasedOnFinishDate
The flag that indicates how each activity's float will be calculated with respect to other projects in the scheduling batch. This setting only has an effect when scheduling multiple projects at the same time
No
Comments A Project UDF to define additional comments for the project.
No
ComputeTotalFloatType The method for calculating total float for all activities.
No
ConsiderForFinances Consider for Finances flag. No
Gateway and File Provider Business Objects
83
Field Description Read-Only
CostPerformanceIndex The cost performance index of the project.
No
CostVariance The cost variance of the project. No
CriticalActivityFloatThreshold The maximum float time for activities before they are marked critical.
No
CriticalActivityPathType Indicates Activity critical path type.
No
CriticalFloatThreshold The option used for setting the critical float threshold value when scheduling projects.
No
CurrencyCode Project currency. No
CurrentBaselineProjectObjectId The current baseline project objectId of the project.
No
CurrentBudget The current budget of the project.
No
DataDate Data date of the project. No
DatesDuration External mode- Dates Duration. No
DefaultLaborExpenseType Default expense type. No
Description The description of the project. No
Division Organization Hierarchy - Division.
No
DurationEffort External mode- Duration Effort No
EarnedValueCost The earned value cost of the project.
No
EBSBudgetCurrentCost Current Budget Project Level No
EBSBudgetCurrentQuantity A project UDF to define BudgetCurrentQuantity.
No
EBSBudgetOriginalCost Original Budget Project Level No
Gateway Providers Data Dictionary
84
Field Description Read-Only
EBSBudgetOriginalQuantity A project UDF to define BudgetCurrentQuantity.
No
EBSBudgetProposedCost Proposed Budget Project Level No
EBSBudgetProposedQuantity A project UDF to define BudgetProposedQuantity.
No
EBSBudgetStatusCode A project UDF to define BudgetStatusCode.
No
EBSBudgetVersionName A project UDF to define BudgetVersionName.
No
EBSBudgetVersionNumber A project UDF to define BudgetVersionNumber.
No
EBSCalendarWorkingHours
Calendar mulitiplier for days to hours conversion days as defined in P6. Contains the numeric value representing the working hours in a day.
No
EBSETCurrencyCode EBS currency code for ET. No
EBSEFTinTemplateId EBS financial template ID for ET.
No
EBSPlannedCost A project UDF to define EBSPlannedCost.
No
EBSProjectOrgName A project UDF to define EBSProjectOrgName.
No
EBSProjectStatus A project UDF to define EBSProjectStatus
No
EBSProjectType A project UDF to define EBSProjectType.
No
EffortCost External mode- Effort Cost No
EMailNotificationFlag Email notification flag No
EstimateAtCompletionCost The estimate at completion cost of the project.
No
EstimateToCompletionCost The estimate to completion cost of the project.
No
Gateway and File Provider Business Objects
85
Field Description Read-Only
FinanceApprvoalTemplate Finance approval template No
FinanceEditMode Finance edit mode No
FinanceLockDate Project finance lock date No
FinanceTemplateid Finance template No
FinanceTrackStartDate Finance tracking start month No
FinishDate The finish date of the project. No
ForecastCost Initial Forecast - Cost No
ForecaseGroup4 Initial forecast - Group 4 No
ForecastGroup5 Initial forecast - Group 5 No
ForecastNonRollup Initial forecast - Nonrollup No
ForecastTotal Initial forecast - Total No
FunctionalArea Functional area No
GracePeriodForCompletedActiitiesGrace period for completed activities in timesheet
No
GracePeriodForFutureActiities Grace period for future activities in timesheet
No
Id The short code of the Project No
IgnoreOtherProjectRelationships
The option used by the scheduler for treating activity relationships between projects when scheduling.
No
InitialForecast Initial forecast - Savings No
IntegratedType
The indicator that determines whether the resource is integrated with an Enterprise Resource Planning (ERP) system. 'Fusion' indicates the resource is integrated with Oracle Fusion. 'ERP' indicates the resource is integrated with another ERP system.
No
Gateway Providers Data Dictionary
86
Field Description Read-Only
IsCapitalizationEnabled Is capitalization enabled flag No
IsCapitalized Is capitalized flag No
IsETCEnabledForTS ETC enabled for timesheets flag
No
IsETCRequiredForTS ETC required for timesheets flag
No
IsFinanceLockGlobal Global finance lock flag No
IsLaborExpenseMandatory Labor Expense mandatory flag No
Keywords Project Keywords No
LimitMultipleFloatPaths The number of critical float paths to calculate.
No
Location Organization hierarchy - Location
No
LocationCode The code of the location assigned to the project.
No
LocationId Location ID No
LocationName The name of the location assigned to the project.
No
LocationObjectId The unique ID of the location assigned to the project.
No
MakeOpenEndedActivitiesCritical
The option used by the scheduler for automatically leveling resources when scheduling projects.
No
MaximumMultipleFloatPaths The number of critical float paths to calculate
No
MultipleFloatPathsEnabled
The Boolean value that indicates whether multiple critical float paths (sequences of activities) should be calculated in the project schedule.
No
MultipleFloatPathsEndingActivityObjectId
The activity in the WBS that you want to represent the end of the float paths.
No
MultipleFloatPathsUseTotalFloat The Boolean value that decides whether or not to use total float in multiple float path
No
Gateway and File Provider Business Objects
87
Field Description Read-Only
calculations.
MustFinishByDate The expected completion date of the project.
No
Name The name of the Project No
NetPresentValue The net present value of the project.
No
ObjectId The unique ID generated by the system.
No
OriginalBudget The original budget of the project.
No
OriginalProjectObjectId The unique ID of the original project. It is a baseline project if this field is not null.
No
OutOfSequenceScheduleType
The type of logic used to schedule the progressed activities: 'Retained Logic', 'Progress Override', or 'Actual Dates'.
No
Owner Owner of the project No
ParentEPSId The parent eps id of the project. No
ParentEPSObjectId The unique ID of the parent EPS of this project.
No
PaybackPeriod The payback period of the project.
No
PCS Project initiative No
PercentComplete Project percent completion value
No
PercentCompleteType Project percent completion type No
PlannedBudget The planned budget of the project.
No
PlannedDuration The planned duration of the project.
No
PlannedStartDate The expected start date of the project.
No
PlannedValueCost The summary planned value by cost of the project.
No
Gateway Providers Data Dictionary
88
Field Description Read-Only
PrimeWorkspace A Project Code fied to define the Prime Workspace of the Project.
No
Priority Priority No
Process Process No
Product Product No
ProjectScheduleType Schedule type of the project - Valid values are 'Duration' or 'Resource' or 'Cost'.
No
ProjectSource Project source No
ProjectType Project type No
PropertyType The project property name associated with the scheduling of projects.
No
ProposedBudget The proposed budget of the property.
No
Region Organization hierarchy- Region No
RelationshipLagCalendar The calendar used to calculate the lag between predecessors and successors for all activities.
No
RemainingDuration The remaining duration of the project.
No
RemainingTotalCost The remaining total cost of the project.
No
ResourceComputationEnable Resource computation enabled flag
No
ReturnInvestment The return on investment of the project.
No
RiskMatrixCode The code of the risk matrix. No
RiskMatrixName The name of the associated risk matrix.
No
RiskScore The risk score of the project. No
Gateway and File Provider Business Objects
89
Field Description Read-Only
Roadmap Project roadmap No
SchedulePerformanceIndex The schedule performance index of the project.
No
ScheduleVariance The schedule variance of the project.
No
StartDate The start date of the project. No
StartToStartLagCalculationType
The method used to calculate lag when a start-to-start relationship exists and the predecessor starts out of sequence.
No
Status
The status of the project. valid values are PLANNED, ACTIVE, INACTIVE, WHAT-IF, REQUESTED.
No
StrategicPriority The strategic priority of the project.
No
SubUnit Organization hierarchy - Sub Unit
No
SummaryRemainingTotalCost The summary remaining total cost of the project.
No
URL The string web site URL of the project.
No
UseExpectedFinishDates
The option used for setting activity finish dates as the expected finish dates when scheduling projects.
No
VarianceFinishDate The variance finish date of the project.
No
VarianceStartDate The variance start date of the project.
No
VCPProjectObjectId VCP Project Object ID No
Gateway Providers Data Dictionary
90
ProjectCode
Description: Project codes are user-defined codes to classify and categorize projects across the enterprise.
Field Description Read-Only
CodeTypeName The name of the project code type. No
CodeTypeObjectId
The unique ID of the project code type. No
CodeValue The value of the project code. No
Description The description of the project code. No
ObjectId The unique ID generated by the system. No
ParentId The short code that uniquely identifies the parent Project code.
No
ParentObjectId The unique ID of the parent project code. No
SequenceNumber
The sequence number for sorting. No
Weight The weight for this project code. No
ProjectCodeType
Description: Project code types provide a way of classifying project codes. Project codes are user-defined codes to classify and categorize projects across the enterprise.
Field Description Read-Only
Length The maximum number of characters allowed for values of this project code.
No
MaxCodeValueWeight The maximum weight of the code values for this project code type.
No
Name The name of the project code type. No
ObjectId The unique ID generated by the system. No
Weight The weight for this project code type. No
ProjectFinance
Description: EnterpriseTrack Project Finance.
Gateway and File Provider Business Objects
91
Field Description Read-Only
FinanceDataType
Finance Data Type ( current / snapshot / structure )
Current - Indicates data from the current project finance table.
Snapshot - This indicates data from a snapshot of the project finance table.
Structure - Indicates metadata that describes the project finance table and its structure.
No
FinanceEditMode
Finance Edit Mode ( M / Y / A ) This is to be used only when editing.
M Finance Mode: Monthly
Y Finance Mode: Yearly
A Finance Mode: Aggregate
No
FinanceSearchMode
Finance Search Mode ( M / Y / A ). This is to be used only when searching.
M Finance Mode: Monthly
Y Finance Mode: Yearly
A Finance Mode: Aggregate
No
FinanceTemplateId The name of the project's finance template. No
FinanceTemplateVersionId
The version of the project's finance template. No
FromMonth
From (Start) Month when Searching or Updating. Applicable only if fin_search_mode or fin_edit_mode = M. (YYYY/MM Format) The element level period must be within range of from_month and to_month
No
FromYear
From (Start) Year when Searching or Updating. Applicable only if fin_search_mode or fin_edit_mode = Y. (YYYY Format) The element level period must be within range of from_year and to_year.
No
ObjectId The unique ID generated by the system. No
OperationType Operation Type. Specifies the operation being performed.
No
ProjectObjectId The unique ID of the associated project. No
Gateway Providers Data Dictionary
92
Field Description Read-Only
ToMonth
To (End) Month when Searching or Updating. Applicable only if fin_search_mode or fin_edit_mode = M. (YYYY/MM Format) The element level period must be within range of from_month and to_month
No
ToYear
To (End) Year when Searching or Updating. Applicable only if fin_search_mode or fin_edit_mode = Y. (YYYY Format) The element level period must be within range of from_year and to_year.
No
ProjectFinanceElement
Description: EnterpriseTrack Project Finance Element
Field Description Read-Only
DisplayName Display Name of the element. No
ElementClass
Classification of element. This indicates the element's class within the project finance structure.
Total Type: Total (There can be only one instance of this type. This is the root for all groups.
Group Element type : Group
Category Element type : Category
Element Element type : Element
No
ElementType Indicates whether the element is currency or some user-specified, non-currency type (such as kilowatts, hours, etc.)
No
Id Element ID No
MultiplicationFactorType
Multiplication Factor Type of the element.
Static Use 'Static' if the value of mf_tag is used to multiply element value to compute parent element value.
Expr Use 'Expr' if the value of mf_tag is evaluated at runtime and its value is used to mulitply element value to compute parent element value.
No
Gateway and File Provider Business Objects
93
Field Description Read-Only
MultiplicationFactorValue
Multiplication factor of the element. This indicates its impact (contribution) toward computation of parent element values.
No
NumberOfUnits This represents raw data, if element_type is non currency.
No
ObjectId The unique ID generated by the system. No
ParentId ID of the parent element. This will be empty if element_id is 'Total'.
No
ProjectFinanceObjectId
The unique ID of the associated project finance.
No
ProjectObjectId The unique ID of the associated project. No
SequenceNumber Sequence of this element within parent. 10, 20, 30, etc.
No
Value
This tag represents actual value of element. If element_type is not currency, it is not editable. It is computed internally from number_of_units.
No
ProjectFinanceSnapshot
Description: EnterpriseTrack Project Finance Snapshot
Field Description Read-Only
IsDefaultSnapshot Indicates whether or not this is the default snapshot.
No
IsEditableSnapshot Indicates whether or not snapshot can be edited. Used only during export, as this is a read-only attribute.
No
ObjectId The unique ID generated by the system. No
ProjectFinanceObjectId
The unique ID of the associated project finance.
No
ProjectObjectId The unique ID of the associated project. No
SnapshotCreatedBy Login ID of user who created snapshot. No
SnapshotCreatedDate
Date on which snapshot was created. No
SnapshotDescription Snapshot Description No
Gateway Providers Data Dictionary
94
Field Description Read-Only
SnapshotName Snapshot Name No
SnapshotUpdatedBy Login ID of user who last updated snapshot. No
SnapshotUpdatedDate
Date on which snapshot was last updated. No
ProjectInformation
Description: Project attribute information
Field Description Read-Only
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
Status Status No
Title Title No
ProjectResource
Description: Primavera's resource planning feature allows you to do high-level project planning for future project or project that does not require resource assignments at the activity level.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ProjectObjectId The unique ID of the associated project. No
ResourceName The name of the associated resource. No
ResourceObjectId The unique ID of the associated resource. No
WBSObjectId The unique ID of the associated WBS. No
Gateway and File Provider Business Objects
95
PurchaseOrder
Description: To track money committed to spend (General Spends type Base Commit)
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
CurrencyRate Rate in Project Currency No
Description Description No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefId Contract/PO No
Status Status No
Title Title No
PurchaseOrderDetail
Description: Line items for Purchase Order
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Gateway Providers Data Dictionary
96
Field Description Read-Only
Quantity Item Quantity No
RecordNo Parent Record Number No
RefBPOLineItem Reference BPO Lineitem No
ShortDesc Short Description No
SOVLineNo Reference No
TabId Tab Name No
WPId Work Package No
Relationship
Description: A relationship defines how an activity relates to the start or finish of another activity or assignment. These relationships, which form the logic of the project network, are used together with activity durations to determine schedule dates.
Field Description Read-Only
Lag
The time lag of the relationship. This is the time lag between the predecessor activity's start or finish date and the successor activity's start or finish date, depending on the relationship type.
No
ObjectId The unique ID generated by the system.
No
PredecessorActivityId The unique ID of the predecessor activity.
No
PredecessorActivityObjectIdThe unique ID of the predecessor activity.
No
PredecessorActivityType
The type of the predecessor activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'.
No
PredecessorProjectId The unique ID of the project that owns the predecessor activity.
No
PredecessorProjectObjectIdThe unique ID of the project that owns the predecessor activity.
No
SuccessorActivityId The unique ID of the successor activity. No
SuccessorActivityObjectId The unique ID of the successor activity. No
Gateway and File Provider Business Objects
97
Field Description Read-Only
SuccessorActivityType
The type of the successor activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'.
No
SuccessorProjectId The unique ID of the project that owns the successor activity.
No
SuccessorProjectObjectId The unique ID of the project that owns the successor activity.
No
Type The type of relationship: 'Finish to Start', 'Finish to Finish', 'Start to Start', or 'Start to Finish'.
No
RequestForSubstitution
Description: A change of identical material or equipment.
Field Description Read-Only
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
ShortDesc Short Description No
Status Status No
Title Title No
RequestForSubstitutionDetail
Description: Line items for Request For Substitution
Field Description Read-Only
IssueDate Issue Date No
LineItemStatus Line Item Status No
Gateway Providers Data Dictionary
98
Field Description Read-Only
LineNo Line No. No
Name Name No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
ShortDesc Short Description No
Status Status No
Title Title No
Resource
Description: Resources include labor, nonlabor, and materials that are used for activities across all projects.
Field Description Read-Only
BusinessUnit A Resource Code field to define the Business Unit of the Resource.
No
CalculateCostFromUnits
The option that determines whether any new assignments for this resource will have its costs recalculated whenever any quantity changes occur.
No
CalendarCode The unique code of the calendar. No
CalendarName The name of the calendar that is assigned to the resource.
No
CalendarObjectId The unique ID of the calendar that is assigned to the resource.
No
DefaultUnitsPerTime The Default units/time setting for resource.
No
DepartmentId A Resource UDF to define the Department Id of the Resource.
No
EmailAddress The resource's email address. No
EmployeeId The resource identifier within the organization, typically the employee number or social security number.
No
Id The unique identifier of the Resource No
Gateway and File Provider Business Objects
99
Field Description Read-Only
IsActive The option that determines whether the resource is active. A value of true indicates the resource is active.
No
IsOverTimeAllowed The option that determines whether overtime is allowed to be entered into a timesheet for the resource.
No
LocationCode The code of the location assigned to the resource.
No
LocationName The name of the location assigned to the resource.
No
LocationObjectId The unique ID of the location assigned to the resource.
No
Name The name of the resource. No
ObjectId The unique ID for the Resource which is generated by the Primavera Data Integration application.
No
OfficePhone The resource's work phone number. No
OtherPhone Other phone for the resource. No
OvertimeFactor The overtime factor used to compute the overtime price for the resource.
No
ParentObjectId The unique ID of the parent resource of this resource in the hierarchy.
No
PrimaryRoleId The short code that uniquely identifies the primary role for this resource.
No
ResourceType The indicator that determines the resource type. Valid values are LABOR, NON_LABOR, MATERIAL.
No
Title The title of the resource. No
UnitOfMeasureAbbreviation
The unit of measure for a resource. No
ResourceAssignment
Description: Resource assignments track the work of resources or roles that are performing various activities.
Gateway Providers Data Dictionary
100
Field Description Read-Only
ActivityId The short ID that uniquely identifies the activity within the project.
No
ActivityObjectId The unique ID of the activity to which the resource is assigned.
No
ActivityType The type of the activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'.
No
ActualCost A Resource Assignment field to define Actual Cost.
No
ActualRegularUnits
The actual non-overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager.
No
ActualUnits The actual non-overtime plus overtime units worked by the resource on this activity.
No
AssignmentCode The code that identifies this assignment
No
AtCompletionUnits The sum of the actual plus remaining units for the resource assignment on the activity.
No
EBS_TA_DISPLAY_FLAG EBS_TA_DISPLAY_FLAG No
EBSBudgetCurrentCost A Resource Assignment UDF to define BudgetCurrentCost.
No
EBSBudgetCurrentQuantity A Resource Assignment UDF to define BudgetCurrentQuanttity.
No
EBSBudgetOriginalCost A Resource Assignment UDF to define BudgetOriginalCost.
No
EBSBudgetOriginalQuantity A Resource Assignment UDF to define BudgetOriginalQuantity.
No
EBSBudgetProposedCost A Resource Assignment UDF to define BudgetProposedCost.
No
EBSBudgetProposedQuantity A Resource Assignment UDF to define BudgetProposedQuantity.
No
EBSBudgetStatusCode A Resource Assignment UDF to define BudgetStatusCode.
No
Gateway and File Provider Business Objects
101
Field Description Read-Only
EBSBudgetVersionName A Resource Assignment UDF to define BudgetVersionName.
No
EBSBudgetVersionNumber A Resource Assignment UDF to define BudgetVersionNumber.
No
EBSPlannedCost A Resource Assignment UDF to define EBSPlannedCost.
No
IsActivityFlagged
The flag that indicates whether the resource who is assigned to the activity assignment has flagged the activity as important to the resource.
No
IsPrimaryResource The flag that indicates whether this resource is the activity's primary resource.
No
ObjectId The unique ID generated by the system.
No
PlannedCost Planned Cost No
PlannedDuration
The planned working time for the resource assignment on the activity, from the resource's planned start date to the planned finish date.
No
PlannedFinishDate
The date the resource is scheduled to finish working on the activity. This date is computed by the project scheduler but can be updated manually by the project manager.
No
PlannedLag
The planned time lag between the activity's planned start date and the resource's planned start date on the activity.
No
PlannedStartDate
The date the resource is scheduled to begin working on the activity. This date is computed by the project scheduler but can be updated manually by the project manager.
No
PlannedUnits The planned units of work for the resource assignment on the activity.
No
PlannedUnitsPerTime The planned units per time at which the resource is to perform work on this activity.
No
Gateway Providers Data Dictionary
102
Field Description Read-Only
ProjectId The short code that uniquely identifies the project.
No
ProjectObjectId The unique ID of the project. No
RateSource
The value that indicates which price/unit will be used to calculate costs for the assignment, such as 'Resource', 'Role', and 'Override'.
No
RemainingUnits The remaining units of work to be performed by this resource on this activity.
No
ResourceId The name that uniquely identifies the resource.
No
ResourceName The name of the associated resource. No
ResourceObjectId The unique ID of the associated resource.
No
ResourceType The resource type: 'Labor', 'Nonlabor', or 'Material'.
No
RoleId The short code that uniquely identifies the role.
No
RoleObjectId The unique ID of the associated role. No
RolledupWBSObjectId Rolled up WBS key after filtering either by levels or tagging
No
TotalActualCost A Resource Assignment UDF to store Total Actual Cost for the Resource Assignment.
No
TotalCommitmentCost A Resource Assignment UDF to store Total Commitment Cost for the Resource Assignment.
No
TotalPlannedCost A Resource Assignment UDF to store Total Planned Cost for the Resource Assignment.
No
VCPPlannedStartDate A field to check if Resource Assignment VCP Planned StartDate
No
VCPRasDemandPeggedAvldate
No
VCPRasDemandPeggedOrderN No
Gateway and File Provider Business Objects
103
Field Description Read-Only
umber
VCPRasDemandPeggedOrderType
No
VCPRasDemandSupplyFlag No
VCPRasInventoryOrgCode VCP Resource Assignment Inventory Organization Code (UDF)
No
VCPRasSelection A field to check if Resource Assignment is to be selected in VCP demand (YES/NO)
No
VCPRasSelectionCode A field to check if Resource Assignment is to be selected in VCP demand (YES/NO)
No
VCPRasSupplyActualStartDate No
VCPRasSupplylDockDate No
VCPRasSupplyDueDate No
VCPRasSupplyItemId No
VCPRasSupplyItemName No
VCPRasSupplyOrderDate No
VCPRasSupplyOrderNumber No
VCPRasSupplyOrderType No
VCPRasSupplyOrganization No
VCPRasSupplyPeggedOrderNumber
No
VCPRasSupplyProjectId No
VCPRasSupplyQuantity No
VCPRasSupplyShipDate No
VCPRasSupplyStartDate No
VCPRasSupplyTaskId No
VCPRasSupplyStartDate No
VCPRasSupplyUpdatedArrivalDate
No
Gateway Providers Data Dictionary
104
Field Description Read-Only
VCPResourceAssignmentObjectId
VCP Resource Assignment Object Id No
WBSObjectId WBS key No
ResourceCode
Description: Resource codes are user-defined codes to classify and categorize resources across the enterprise.
Field Description Read-Only
CodeTypeName The name of the resource code type. No
CodeTypeObjectId The unique ID of the resource code type. No
CodeValue The value of the resource code. No
Description The description of the resource code. No
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent resource code. No
ResourceCodeType
Description: Resource code types provide a way of classifying resource codes. Resource codes are user-defined codes to classify and categorize resources across the enterprise.
Field Description Read-Only
Length The maximum number of characters allowed for values of this resource code.
No
Name The name of the resource code type. No
ObjectId The unique ID generated by the system. No
ResourceCurve
Description: Resource curves enable you to specify how you want resource units or costs spread over the duration of an activity.
Gateway and File Provider Business Objects
105
Field Description Read-Only
CurveData The 21 point curve data. No
IsDefault The flag that indicates the default curve. No
Name The name of the resource curve. No
ObjectId The unique ID generated by the system. No
ResourceRate
Description: Resource rates provide a way of specifying multiple resource prices and maximum units per time values that vary over time.
Field Description Read-Only
EffectiveDate The effective time period of Resource Rate. No
MaxUnitsPerTime The maximum work units per time this resource can perform on all their assigned activities.
No
ObjectId The unique ID generated by the system. No
PricePerUnit The non-overtime price per time for the resource.
No
PricePerUnit2 The non-overtime price per time for the resource.
No
PricePerUnit3 The non-overtime price per time for the resource.
No
PricePerUnit4 The non-overtime price per time for the resource.
No
PricePerUnit5 The non-overtime price per time for the resource.
No
ResourceObjectId The unique ID of the associated resource. No
ResourceRole
Description: A resource role object represents an association between a resource object and a role object.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
Gateway Providers Data Dictionary
106
Field Description Read-Only
Proficiency The resource's profiiciency at performing this role.
No
ResourceId The short code that uniquely identifies the resource.
No
ResourceName The name of the resource. No
ResourceObjectId The unique ID of the resource. No
RoleId The short code that uniquely identifies the role. No
RoleName The name of the role. No
RoleObjectId The unique ID of the role. No
Risk
Description: The risk object represents a probabilistic event or condition which if it occurs has an impact on the project.
Field Description Read-Only
Cause The description of the cause of the risk. No
Description The description of the risk. No
Effect The description of the risk's effect on the project.
No
Id The ID of the risk. Must be unique within a project.
No
IdentifiedDate The date this risk was identified. No
Name The name of the risk. Does not need to be unique.
No
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. No
ProjectObjectId The unique ID of the associated project. No
ResponseTotalCost The total estimated cost for the risk. No
Status The current status of the risk. Valid values are 'Proposed', 'Open', 'Rejected', 'Managed', and 'Impacted'.
No
Type The type of the risk. Valid values are 'Threat' and 'Opportunity'.
No
Gateway and File Provider Business Objects
107
RiskAndIssue
Description: A log for documenting, tracking, and estimating impacts of open issues and risks; Log of items that may impact schedule/scope/cost.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
RiskAndIssueDetail
Description: Line items for Risk and Issue.
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
EffectiveDate Effective Date No
FundCode Fund Code No
LineNo Line No. No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the blanket purchase order No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
ShortDesc Short Description No
Gateway Providers Data Dictionary
108
Field Description Read-Only
TabId Tab Name No
WPId Work Package No
RiskImpact
Description: The risk impact object stores the pre-response qualitative value assigned to a risk for each of the risk thresholds.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. No
ProjectObjectId The unique ID of the associated project. No
RiskId The short name of the associated risk. No
RiskName The name of the associated risk. No
RiskObjectId The unique ID of the associated risk. No
RiskThresholdCode The code of the risk threshold. No
RiskThresholdLevelCode The short name of the associated risk threshold level.
No
RiskThresholdLevelName The name of the associated risk threshold level.
No
RiskThresholdLevelObjectId
The unique ID of the associated risk threshold level.
No
RiskThresholdName The name of the associated risk threshold.
No
RiskThresholdObjectId The unique ID of the associated risk threshold.
No
RiskMatrix
Description: The risk matrix object contains the name and description of each probability and impact diagram (PID). The Risk Matrix is then used to qualitatively assess each risk and assign a score.
Gateway and File Provider Business Objects
109
Field Description Read-Only
Code The code of the risk matrix. No
Description The description of the risk matrix. No
ImpactThresholdLevel
The number of levels for the impact thresholds assigned to the risk scoring matrix. This impact level with the probability level determines the size of the matrix.
No
IsActive
The indication of whether the response plan is currently active for the associated risk. Only one response plan can be active at a given time for a risk.
No
Name The name of the risk matrix. No
ObjectId The unique ID generated by the system. No
ProbabilityThresholdLevel
The number of levels for the probability threshold assigned to the risk matrix. This probability level with the impact level determines the size of the matrix.
No
RiskScoringMethod
The calculation method used to determine the risk score. Valid values are 'Highest', 'Average of Impacts', 'Average of Individual Scores'.
No
RiskMatrixScore
Description: The risk matrix score object stores the score values from the probability and impact diagram (PID) of the risk score matrix.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ProbabilityThresholdLevel
The level number of the probability threshold. Valid numbers are 1-9.
No
RiskMatrixCode The code of the risk matrix. No
RiskMatrixName The name of the associated risk matrix. No
RiskMatrixObjectId The unique ID of the associated risk matrix.
No
Severity1 The first severity level of the Risk Matrix Score.
No
Gateway Providers Data Dictionary
110
Field Description Read-Only
Severity1Label The label for the first severity level. No
Severity2 The second severity level of the Risk Matrix Score.
No
Severity2Label The label for the second severity level. No
Severity3 The third severity level of the Risk Matrix Score.
No
Severity3Label The label for the third severity level. No
Severity4 The fourth severity level of the Risk Matrix Score.
No
Severity4Label The label for the fourth severity level. No
Severity5 The fifth severity level of the Risk Matrix Score.
No
Severity5Label The label for the fifth severity level. No
Severity6 The sixth severity level of the Risk Matrix Score.
No
Severity6Label The label for the sixth severity level. No
Severity7 The seventh severity level of the Risk Matrix Score.
No
Severity7Label The label for the seventh severity level. No
Severity8 The eighth severity level of the Risk Matrix Score.
No
Severity8Label The label for the eighth severity level. No
Severity9 The ninth severity level of the Risk Matrix Score.
No
Severity9Label The label for the ninth severity level. No
RiskMatrixThreshold
Description: The risk matrix threshold object creates a relationship between a RiskThreshold object and a RiskMatrix object. This allows a single RiskThreshold object to be associated with multiple RiskMatrix objects.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
Gateway and File Provider Business Objects
111
Field Description Read-Only
RiskMatrixCode The code of the risk matrix. No
RiskMatrixName The name of the associated risk matrix. No
RiskMatrixObjectId The unique ID of the associated risk matrix.
No
RiskThresholdCode The name of the associated risk threshold. No
RiskThresholdName The name of the associated risk threshold. No
RiskThresholdObjectId The unique ID of the associated risk threshold.
No
RiskResponseAction
Description: The risk response action object contains the detailed steps that need to occur to complete the risk response plan. Multiple actions can be associated with one response plan and each action can be linked to an activity in the project.
Field Description Read-Only
ActivityId The short name of the associated activity. No
ActivityName The name of the associated activity. No
ActivityObjectId The unique ID of the associated activity. No
ActualCost The actual cost. No
FinishDate The finish date of the risk response action. If an activity is assigned, the risk response action uses the activity finish date.
No
Id The short name of the risk response plan. No
Name The name of the risk response plan. No
ObjectId The unique ID generated by the system. No
PlannedCost The planned cost. No
PlannedFinishDate The planned finish date. No
PlannedStartDate The planned start date. No
ProjectId The short name of the associated project. No
ProjectObjectId The unique ID of the associated project. No
RemainingCost The remaining cost associated with the risk response action.
No
Gateway Providers Data Dictionary
112
Field Description Read-Only
ResourceId The short name of the associated resource.
No
ResourceName The name of the associated resource. No
ResourceObjectId The unique ID of the associated resource. No
RiskId The short name of the associated risk. No
RiskResponsePlanId The short name of the associated risk response plan.
No
RiskResponsePlanName
The name of the associated risk response plan.
No
RiskResponsePlanObjectId
The unique ID of the associated risk response plan.
No
StartDate The start date of the risk response action. If an activity is assigned, the risk response action uses the activity start date.
No
Status The status of the risk response action. Valid values are 'Proposed', 'Sanctioned', 'Rejected', 'InProgress', and 'Complete'.
No
RiskResponseActionImpact
Description: The risk response action impact object is a post-risk response action qualitative value that is assigned to a risk for each of the risk thresholds.
Field Description Read-Only
ObjectId The unique ID generated by the system.
No
ProjectId The short name of the associated project.
No
ProjectObjectId The unique ID of the associated project.
No
RiskId The short name of the associated risk.
No
RiskResponseActionId The short name of the associated risk response action.
No
RiskResponseActionName The name of the associated risk response action.
No
Gateway and File Provider Business Objects
113
Field Description Read-Only
RiskResponseActionObjectId The unique ID of the associated risk response action.
No
RiskThresholdCode The code of the risk threshold. No
RiskThresholdLevelCode The short name of the associated risk threshold level.
No
RiskThresholdLevelName The name of the associated risk threshold level.
No
RiskThresholdLevelObjectId The unique ID of the associated risk threshold level.
No
RiskThresholdName The name of the associated risk threshold.
No
RiskThresholdObjectId The unique ID of the associated risk threshold.
No
RiskResponsePlan
Description: The risk response plan object communicates how the project team plans to address the identified risk.
Field Description Read-Only
Id The short name of the risk response plan. No
IsActive
The indication of whether the response plan is currently active for the associated risk. Only one response plan can be active at a given time for a risk.
No
Name The name of the risk response plan. No
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. No
ProjectObjectId The unique ID of the associated project. No
ResponseType
The risk response plan type. If the risk is a threat, the valid types are 'Avoid', 'Transfer', 'Reduce', and 'Accept'. If the risk is a opportunity, the valid types are 'Exploit', 'Facilitate', 'Enhance', and 'Reject'.
No
RiskId The short name of the associated risk. No
RiskName The name of the associated risk. No
Gateway Providers Data Dictionary
114
RiskObjectId The unique ID of the associated risk. No
RiskThreshold
Description: The risk threshold object contains the name, description, and type of each risk threshold. Risk thresholds provide a mechanism for setting up the criteria that is used to assess the risk.
Field Description Read-Only
Code The code of the risk matrix. No
Name The name of the risk threshold. No
ObjectId The unique ID generated by the system. No
ThresholdType
The type of Risk Threshold. Valid types are 'Probability', 'Tolerance', 'Schedule', 'Cost', 'Relative Schedule', 'Relative Cost' and 'User Defined'.
No
RiskThresholdLevel
Description: The risk threshold level object stores the level information (e.g. Low, Medium, High) for each risk threshold.
Field Description Read-Only
Code The 10 character code for the threshold level.
No
Color The Hex representation for the color e.g. 0xFFFFFF.
No
CostRange The cost range of the threshold level. No
Level The valid values are between 0 and 9. Defines a level for the Risk Threshold.
No
Name The 40 character name for the threshold level.
No
ObjectId The unique ID generated by the system. No
ProbabilityRange The probability range of the threshold level. No
Range The user defined range. No
RiskThresholdCode The code of the risk threshold. No
Gateway and File Provider Business Objects
115
Field Description Read-Only
RiskThresholdName The name of the associated risk threshold. No
RiskThresholdObjectId The unique ID of the associated risk threshold.
No
ScheduleRange The schedule range of the threshold level. No
ThresholdType
The type of risk threshold. Valid types are, 'Probability', 'Tolerance', 'Schedule', 'Cost', 'Relative Schedule', 'Relative Cost' and 'User Defined'.
No
ToleranceRange The tolerance range of the threshold level. No
Role
Description: Roles are project personnel job titles or skills, such as mechanical engineer, inspector, or carpenter. They represent a type of resource with a certain level of proficiency rather than a specific individual.
Field Description Read-Only
CalculateCostFromUnits
The option that indicates whether costs and quantities are linked, and whether quantities should be updated when costs are updated.
No
Description The responsibilities for the role. No
Id The unique identifier of the Role No
Name The name of the resource or role. No
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent role of this role in the hierarchy.
No
RoleLimit
Description: Role limits define the limits of the maximum work units per time for a Role in a time period.
Field Description Read-Only
EffectiveDate The effective date for the role maximum units No
Gateway Providers Data Dictionary
116
Field Description Read-Only
per time.
MaxUnitsPerTime the maximum work units per time this role can perform on all their assigned activities.
No
ObjectId The unique ID generated by the system. No
RoleObjectId The unique ID of the role. No
RoleRate
Description: Role rates enable you to select a predefined price per unit for cost calculating when assigning the role to an activity.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
PricePerUnit The non-overtime price per time for the resource. No
PricePerUnit2 The non-overtime price per time for the resource. No
PricePerUnit3 The non-overtime price per time for the resource. No
PricePerUnit4 The non-overtime price per time for the resource. No
PricePerUnit5 The non-overtime price per time for the resource. No
RoleObjectId The unique ID of the associated role. No
ShellList
Description: Shell List
Field Description Read-Only
Description The description of the project No
Id The short code of the Project. No
Name The name of the project. No
ObjectId The unique identifier of the project No
PlannedStartDate The expected start date of the Project. No
ProjectScheduleType Schedule type of the project. Valid values are "Duration" or "Resource" or "Cost"
No
Gateway and File Provider Business Objects
117
Field Description Read-Only
Status The status of the project No
Timesheet
Description: Used to capture Employee Timesheets (project / non-project hrs)
Field Description Read-Only
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
DueDate Due Date No
Objectid The unique ID generated by the system No
RecordNo Parent Record Number No
Status Status No
Title Title No
WeekPicker Week Of No
TimesheetDetail
Description: Line items for Timesheet
Field Description Read-Only
LineNo Line No No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the timesheet. No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WeekPicker Week Of No
Gateway Providers Data Dictionary
118
UDFType
Description: User-defined fields (UDFs) enable users to add custom fields and values to the project database.
Field Description Read-Only
DataType The data type of the user-defined field: 'Text', 'Start Date', 'Finish Date', 'Cost', 'Double', 'Integer', 'Indicator', or 'Code'.
No
ObjectId The unique ID generated by the system. No
SubjectArea The subject area of the user-defined field. No
Title The name/title of the user-defined field. v
UnitOfMeasure
Description: The unit of measure provides definitions of units of measure for material resources.
Field Description Read-Only
Abbreviation the abbreviation of the unit of measure No
Name The name of the unit of measure. No
ObjectId The unique ID generated by the system. No
SequenceNumber The sequence number for sorting. v
Vendor
Description: Company vendor directory
Field Description Read-Only
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
DueDate Due Date No
Objectid The unique ID generated by the system No
RecordNo Parent Record Number No
Status Status No
Gateway and File Provider Business Objects
119
Field Description Read-Only
Title Title No
WeekPicker Week Of No
VendorDetail
Description: Line Items for Vendor.
Field Description Read-Only
LineNo Line No No
Objectid The unique ID generated by the system No
ParentObjectId The unique ID of the timesheet. No
RecordNo Parent Record Number No
ShortDesc Short Description No
TabId Tab Name No
WeekPicker Week Of No
VendorEvaluation
Description: Document vendor performance for consideration for future work (Simple)
Field Description Read-Only
CreateDate Creation Date No
CreateUserId Creator No
DMPublishPath Publish Path No
DueDate Due Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Parent Record Number No
Status Status No
Title Title No
Gateway Providers Data Dictionary
120
WBS
Description: The project work breakdown structure (WBS) is a hierarchical arrangement of the products and services produced during and by a project. Each element of a WBS may contain more-detailed WBS elements, activities, or both. WBS are hierarchical objects.
Field Description Read-Only
AnticipatedStartDate The anticipated start date of WBS, project and EPS elements.
No
AnticipatedFinishDate The anticipated finish date of WBS, project and EPS elements.
No
Code The short name of the WBS. No
CurrentBudget The current budget of the WBS. No
EBSBudgetCurrentCost Current Budget WBS Level No
EBSBudgetCurrentQuantity A WBS UDF to define BudgetCurrentQuantity
No
EBSBudgetOriginalCost Original Budget WBS level No
EBSBudgetOriginalQuantityA WBS UDF to define BudgetOriginalQuantity
No
EBSBudgetProposedCost Proposed Budget WBS level No
EBSBudgetProposedQuantity
A WBS UDF to define BudgetProposedQuantity
No
EBSBudgetStatusCode A WBS UDF to define BudgetStatusCode
No
EBSBudgetVersionName A WBS UDF to define BudgetVersionName
No
EBSBudgetVersionNumber A WBS UDF to define BudgetVersionNumber
No
EBSPlannedCost A WBS UDF to define EBSPlannedCost No
FinishDate The date finish date of the WBS. No
IsWorkPackage Whether this WBS is a work package. No
Name The name of the WBS. No
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent WBS of this WBS in the hierarchy.
No
ProjectId The project Id of the WBS. No
ProjectObjectId The unique ID of the associated project. No
Gateway and File Provider Business Objects
121
Field Description Read-Only
SequenceNumber The sequence number of the WBS. No
StartDate The start date of the WBS. No
SummaryActualFinishDate Actual Finish Date No
SummaryActualStartDate Actual Start Date No
SummaryPlannedFinishDate
Planned Finish Date No
SummaryPlannedStartDate Planned Start Date No
TotalActualCost A WBS UDF to store Total Actual Cost for the WBS
No
TotalCommitmentCost A WBS UDF to store Total Commitment Cost for the WBS
No
TotalPlannedCost A WBS UDF to store Total Planned Cost for the WBS
No
VCPWBSObjectId VCP WBS Object ID No
WBSCategoryObjectId The unique wbs category objectIdof the WBS.
No
WBSCategory
Description: As their name implies, WBS categories are used to categorize WBS elements. They are defined globally.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
Name The name of the WBS category. No
WBSExpenseSpread
Description: Expense spread data per WBS per expense category.
Field Description Read-Only
ActualCost Actual cost. No
AtCompletionCost At completion cost. No
Gateway Providers Data Dictionary
122
Field Description Read-Only
EndDate Spread end date. No
ExpenseCategoryObjectId
The unique ID of ExpenseCategory. No
ExpenseCategoryName ExpenseCategory name. No
ObjectId The unique ID generated by the system. No
PeriodType The type of period for summarized spread data.
No
PlannedCost Planned cost. No
RemainingCost Remaining cost. No
StartDate Spread start date. No
WBSCode WBS Code. No
WBSObjectId The unique ID of WBS. No
WBSResourceSpread
Description: Spread data per WBS per Resource
Field Description Read-Only
ActualCost Actual Cost. No
ActualOvertimeCost Actual Overtime Cost. No
ActualOvertimeUnits Actual Overtime Units. No
ActualRegularCost Actual Regular Cost. No
ActualRegularUnits Actual Regular Units. No
ActualUnits Actual Units. No
AtCompletionCost At Completion Cost. No
AtCompletionUnits At Completion Units. No
EndDate Spread end date. No
Limit Limit. No
ObjectId The unique ID generated by the system.
No
PeriodActualCost Period Actual Cost. No
PeriodActualUnits Period Actual Units. No
Gateway and File Provider Business Objects
123
Field Description Read-Only
PeriodAtCompletionCost Period At Completion Cost. No
PeriodAtCompletionUnits Period At Completion Units. No
PeriodType The type of period for summarized spread data.
No
PlannedCost Planned Cost. No
PlannedUnits Planned Units. No
ProjectId Project short name. No
ProjectObjectId The unique ID of Project. No
RemainingCost Remaining Cost. No
RemainingLateCost Remaining Late Cost. No
RemainingLateUnits Remaining Late Units. No
RemainingUnits Remaining Units. No
ResourceId Resource short name. No
ResourceObjectId The unique ID of Resource. No
RoleId Role short name. No
RoleObjectId The unique ID of Role. No
StaffedActualCost Staffed Actual Cost. No
StaffedActualOvertimeCost Staffed Actual Overtime Cost. No
StaffedActualOvertimeUnits Staffed Actual Overtime Units. No
StaffedActualRegularCost Staffed Actual Regular Cost. No
StaffedActualRegularUnits Staffed Actual Regular Units. No
StaffedActualUnits Staffed Actual Units. No
StaffedAtCompletionCost Staffed At Completion Cost. No
StaffedAtCompletionUnits Staffed At Completion Units. No
StaffedPlannedCost Staffed Planned Cost. No
StaffedPlannedUnits Staffed Planned Units. No
StaffedRemainingCost Staffed Remaining Cost. No
StaffedRemainingLateCost Staffed Remaining Late Cost. No
StaffedRemainingLateUnits Staffed Remaining Late Units. No
StaffedRemainingUnits Staffed Remaining Units. No
StartDate Spread start date. No
Gateway Providers Data Dictionary
124
Field Description Read-Only
WBSCode WBS short name. No
WBSObjectId The unique ID of WBS. No
WBSSpread
Description: Summarized spread data per WBS
Field Description Read-Only
ActualCost Actual Cost. No
ActualExpenseCost Actual Expense Cost. No
ActualLaborCost Actual Labor Cost. No
ActualLaborUnits Actual Labor Units. No
ActualMaterialCost Actual Material Cost. No
ActualNonlaborCost Actual Nonlabor Cost. No
ActualNonlaborUnits Actual Nonlabor Units. No
ActualTotalCost Actual Total Cost. No
AtCompletionExpenseCost At Completion Expense Cost. No
AtCompletionLaborCost At Completion Labor Cost. No
AtCompletionLaborUnits At Completion Labor Units. No
AtCompletionMaterialCost At Completion Material Cost. No
AtCompletionNonlaborCost At Completion Nonlabor Cost. No
AtCompletionNonlaborUnits At Completion Nonlabor Units. No
AtCompletionTotalCost At Completion Total Cost. No
BaselinePlannedExpenseCost Baseline Planned Expense Cost.
No
BaselinePlannedLaborCost Baseline Planned Labor Cost. No
BaselinePlannedLaborUnits Baseline Planned Labor Units. No
BaselinePlannedMaterialCost Baseline Planned Material Cost. No
BaselinePlannedNonlaborCost Baseline Planned Nonlabor Cost.
No
BaselinePlannedNonlaborUnits Baseline Planned Nonlabor Units.
No
Gateway and File Provider Business Objects
125
Field Description Read-Only
BaselinePlannedTotalCost Baseline Planned Total Cost. No
EarnedValueCost Earned Value Cost. No
EarnedValueLaborUnits Earned Value Labor Units. No
EndDate Spread end date. No
EstimateAtCompletionCost Estimate At Completion Cost. No
EstimateAtCompletionLaborUnits Estimate At Completion Labor Units.
No
EstimateToCompleteCost Estimate To Complete Cost. No
EstimateToCompleteLaborUnits Estimate To Complete Labor Units.
No
ObjectId The unique ID generated by the system.
No
PeriodActualCost Period Actual Cost. No
PeriodActualExpenseCost Period Actual Expense Cost. No
PeriodActualLaborCost Period Actual Labor Cost. No
PeriodActualLaborUnits Period Actual Labor Units. No
PeriodActualMaterialCost Period Actual Material Cost. No
PeriodActualNonLaborCost Period Actual NonLabor Cost. No
PeriodActualNonLaborUnits Period Actual NonLabor Units. No
PeriodAtCompletionExpenseCost Period At Completion Expense Cost.
No
PeriodAtCompletionLaborCost Period At Completion Labor Cost.
No
PeriodAtCompletionLaborUnits Period At Completion Labor Units.
No
PeriodAtCompletionMaterialCost Period At Completion Material Cost.
No
PeriodAtCompletionNonLaborCost Period At Completion NonLabor Cost.
No
PeriodAtCompletionNonLaborUnits Period At Completion NonLabor Units.
No
PeriodAtCompletionTotalCost Period At Completion Total Cost.
No
PeriodEarnedValueCost Period Earned Value Cost. No
Gateway Providers Data Dictionary
126
Field Description Read-Only
PeriodEarnedValueLaborUnits Period Earned Value Labor Units.
No
PeriodEstimateAtCompletionCost Period Estimate At Completion Cost.
No
PeriodEstimateAtCompletionLaborUnits
Period Estimate At Completion Labor Units.
No
PeriodPlannedValueCost Period Planned Value Cost. No
PeriodPlannedValueLaborUnits Period Planned Value Labor Units.
No
PeriodType The type of period for summarized spread data.
No
PlannedExpenseCost Planned Expense Cost. No
PlannedLaborCost Planned Labor Cost. No
PlannedLaborUnits Planned Labor Units. No
PlannedMaterialCost Planned Material Cost. No
PlannedNonlaborCost Planned Nonlabor Cost. No
PlannedNonlaborUnits Planned Nonlabor Units. No
PlannedTotalCost Planned Total Cost. No
PlannedValueCost Planned Value Cost. No
PlannedValueLaborUnits Planned Value Labor Units. No
ProjectId Project short name. No
ProjectObjectId The unique ID of Project. No
RemainingExpenseCost Remaining Expense Cost. No
RemainingLaborCost Remaining Labor Cost. No
RemainingLaborUnits Remaining Labor Units. No
RemainingLateExpenseCost Remaining Late Expense Cost. No
RemainingLateLaborCost Remaining Late Labor Cost. No
RemainingLateLaborUnits Remaining Late Labor Units. No
RemainingLateMaterialCost Remaining Late Material Cost. No
RemainingLateNonlaborCost Remaining Late Nonlabor Cost. No
RemainingLateNonlaborUnits Remaining Late Nonlabor Units. No
RemainingLateTotalCost Remaining Late Total Cost. No
Gateway and File Provider Business Objects
127
Field Description Read-Only
RemainingMaterialCost Remaining Material Cost. No
RemainingNonlaborCost Remaining Nonlabor Cost. No
RemainingNonlaborUnits Remaining Nonlabor Units. No
RemainingTotalCost Remaining Total Cost. No
StartDate Spread start date. No
WBSCode WBS Code. No
WBSObjectId The unique ID of WBS. No
WorkRelease
Description: Process that is connected to Blanket Purchase Order Business Process that is deployed at company level. This process can be used to write against the Market purchase order.
Field Description Read-Only
Amount Amount No
CreateDate Creation Date No
CreateUserId Creator No
CurrencyId Transaction Currency No
CurrencyRate Rate in Project Currency No
Description Description No
DMPublishPath Publish Path No
DueDate Due Date No
EffectiveDate Effective Date No
Objectid The unique ID generated by the system No
ProjectObjectId The unique ID of the project No
RecordNo Record Number No
RefBPO Reference BPO No
RefId Contract/PO No
Status Status No
Title Title No
Gateway Providers Data Dictionary
128
WorkReleaseDetail
Description: Line Items for Work Release
Field Description Read-Only
Amount Amount No
BitemId Cost Code No
Description Description No
LineNo Line No No
Objectid The unique ID generated by the system No
ParentDetailId The unique ID of the parent contract detail No
ParentObjectId The unique ID of the parent contract No
PricePerUnit Item Unit Cost No
Quantity Item Quantity No
RecordNo Parent Record Number No
RefBPOLineItem
Reference BPO Lineitem No
ShortDesc Short Description No
SOVLineNo Reference No
TabId Tab Name No
WPId Work Package No
129
P6 Business Objects List
For the P6 provider, the following business objects are available in the data dictionary. Select a specific business object to review a detailed list of fields supported for that business object.
Business Object Description
Activity An activity is a unit of work performed during the course of a project.
ActivityCode Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
ActivityCodeType
Activity codes types provide a way of classifying activity codes. Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
ActivityExpense Activity expenses are non-resource costs associated with a project and assigned to a project's activities. They are typically one-time expenditures for non-reusable items.
ActivityRisk The activity risk object stores the relationship between a single Activity and a single Risk.
BaselineType BaselineType fields.
Calendar Calendars define the available work hours in each calendar day, and include global, resource, and project types.
CBS CBS business object.
CBSDurationSummary CBSDurationSummary business object.
CBSExpenseSpread Summarized spread data per CBS per expense category
CBSResourceSpread Summarized spread data per CBS per resource assignment
CostAccount
Cost accounts contain the organization's cost account IDs. Available across all projects, they support tracking of costs and earned value based on the organization's cost account IDs. Cost accounts are hierarchical objects.
Currency Currencies are the monetary units used to store costs for all projects in the database. Monetary units are stored in the database with a base currency but can be viewed in other
Gateway Providers Data Dictionary
130
Business Object Description
currencies using the exchange for each currency.
EPS Enterprise Project Structure.
ExpenseCategory Expense categories are used to categorize project expenses. They are used for standardizing expenses and for rolling up expenses across projects.
FinancialPeriod Financial periods are used to provide accurate display and reporting of actual units and costs. Financial periods may not overlap each other and do not have to be contiguous.
Location The location is used to store address information including latitude and longitude. Locations can be assigned to resources, projects and/or activities.
NotebookTopic Notebook topics are used to categorize notes on EPS, project, WBS,and activity objects.
Project A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities.
ProjectCode Project codes are user-defined codes to classify and categorize projects across the enterprise.
ProjectCodeType Project code types provide a way of classifying project codes. Project codes are user-defined codes to classify and categorize projects across the enterprise.
ProjectResource Primavera's resource planning feature allows you to do high-level project planning for future project or project that does not require resource assignments at the activity level.
Relationship
A relationship defines how an activity relates to the start or finish of another activity or assignment. These relationships, which form the logic of the project network, are used together with activity durations to determine schedule dates.
Resource Resources include labor, nonlabor, and materials that are used for activities across all projects.
ResourceAssignment Resource assignments track the work of resources or roles that are performing various activities.
ResourceCode Resources codes are user-defined codes to classify and categorize resources across the enterprise.
P6 Business Objects List
131
Business Object Description
ResourceCodeType Resource code types provide a way of classifying resource codes. Resources codes are user-defined codes to classify and categorize resources across the enterprise.
ResourceRate Resource rates specify multiple resource prices and maximum units per time values that vary over time.
Risk The risk object represents a probabilistic event or condition which if it occurs has an impact on the project.
RiskImpact The risk impact object stores the pre-response qualitative value assigned to a risk for each of the risk thresholds.
RiskMatrix
The risk matrix object contains the name and description of each probability and impact diagram (PID). The Risk Matrix is then used to qualitatively assess each risk and assign a score.
RiskMatrixScore The risk matrix score object stores the score values from the probability and impact diagram (PID) of the risk score matrix.
RiskMatrixThreshold
The risk matrix threshold object creates a relationship between a RiskThreshold object and a RiskMatrix object. This allows a single RiskThreshold object to be associated with multiple RiskMatrix objects.
RiskResponseAction
The risk response action object contains the detailed steps that need to occur to complete the risk response plan. Multiple actions can be associated with one response plan and each action can be linked to an activity in the project.
RiskResponseActionImpact
The risk response action impact object is a post-risk response action qualitative value that is assigned to a risk for each of the risk thresholds.
RiskResponsePlan The risk response plan object communicates how the project team plans to address the identified risk.
RiskThreshold
The risk threshold object contains the name, description, and type of each risk threshold. Risk thresholds provide a mechanism for setting up the criteria that is used to assess the risk.
RiskThresholdLevel The risk threshold level object stores the level information (e.g. Low, Medium, High) for each risk threshold.
Role
Roles are project personnel job titles or skills, such as mechanical engineer, inspector, or carpenter. They represent a type of resource with a certain level of proficiency rather than a specific individual.
Gateway Providers Data Dictionary
132
Business Object Description
RoleRate Role rates enable you to select a predefined price per unit for cost calculating when assigning the role to an activity.
UDFType User-defined fields (UDFs) enable users to add custom fields and values to the project database.
WBS
The project work breakdown structure (WBS) is a hierarchical arrangement of the products and services produced during and by a project. Each element of a WBS may contain more-detailed WBS elements, activities, or both. WBS are hierarchical objects.
WBSCategory WBS categories group WBS elements based on a shared attribute. They are defined globally.
WBSExpenseSpread Expense spread data per WBS per ExpenseCategory.
WBSResourceSpread Spread data per WBS per Resource
WBSSpread Summarized spread data per WBS.
P6 Business Objects List
133
In This Section
Activity ................................................................................................................... 134 ActivityCode .......................................................................................................... 153 ActivityCodeType .................................................................................................. 154 ActivityExpense ..................................................................................................... 154 ActivityRisk ............................................................................................................ 157 BaselineType ........................................................................................................ 157 Calendar ............................................................................................................... 158 CBS ....................................................................................................................... 161 CBSDurationSummary .......................................................................................... 162 CBSExpenseSpread ............................................................................................. 163 CBSResourceSpread ............................................................................................ 164 CostAccount .......................................................................................................... 166 Currency ............................................................................................................... 167 EPS ....................................................................................................................... 168 ExpenseCategory .................................................................................................. 181 FinancialPeriod ..................................................................................................... 181 Location ................................................................................................................ 182 NotebookTopic ...................................................................................................... 183 Project ................................................................................................................... 183 ProjectCode .......................................................................................................... 199 ProjectCodeType ................................................................................................... 200 ProjectResource .................................................................................................... 201 Relationship .......................................................................................................... 202 Resource ............................................................................................................... 204 ResourceAssignment ............................................................................................ 207 ResourceCode ...................................................................................................... 215 ResourceCodeType .............................................................................................. 216 ResourceRate ....................................................................................................... 217 ResourceCurve ..................................................................................................... 218 ResourceRole ....................................................................................................... 218 Risk ....................................................................................................................... 219 RiskImpact ............................................................................................................ 219 RiskMatrix ............................................................................................................. 220 RiskMatrixScore .................................................................................................... 221 RiskMatrixThreshold .............................................................................................. 222 RiskResponseAction ............................................................................................. 222 RiskResponseActionImpact ................................................................................... 224 RiskResponsePlan ................................................................................................ 224 RiskThreshold ....................................................................................................... 225 RiskThresholdLevel ............................................................................................... 225 Role....................................................................................................................... 226 RoleLimit ............................................................................................................... 227 RoleRate ............................................................................................................... 227 UDFType ............................................................................................................... 228 UnitOfMeasure ...................................................................................................... 229 WBS ...................................................................................................................... 229
Gateway Providers Data Dictionary
134
WBSCategory ....................................................................................................... 239 WBSExpenseSpread ............................................................................................. 240 WBSResourceSpread ........................................................................................... 240 WBSSpread .......................................................................................................... 243
Activity
Description: An activity in P6 EPPM is a unit of work performed during the course of a project.
Field Description Read-Only
AccountingVariance
The difference between the planned value of work scheduled and the actual cost of work performed. Computed as accounting variance = planned value - actual cost . A negative value indicates that actual costs have exceeded the scheduled costs.
Yes
AccountingVarianceLaborUnits
The difference between the planned value of work scheduled and the actual work performed. Computed as accounting variance labor units = planned value labor units - actual units.
Yes
ActualDuration
The activity actual duration percent of planned. Computed as actual duration / BL duration * 100. The value can exceed 100. The BL duration is the activity's at completion duration from the project baseline.
No
ActualExpenseCost The actual costs for all project expenses associated with the activity.
Yes
ActualFinishDate The date on which the activity is actually finished.
No
ActualLaborCost
The actual costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity actual labor units * project default price / time.
No
ActualLaborUnits The actual units for all labor resources assigned to the activity.
No
ActualMaterialCost The sum of all regular and overtime costs for material resources.
Yes
ActualNonLaborCost The actual costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity actual
No
P6 Business Objects List
135
Field Description Read-Only
nonlabor units * project default price / time.
ActualNonLaborUnits The actual units for all nonlabor resources assigned to the activity.
No
ActualStartDate The date on which the activity is actually started.
No
ActualThisPeriodLaborCostThe actual this period labor cost for all labor resources assigned to the activity.
No
ActualThisPeriodLaborUnits
The actual this period labor units (hours) for all labor resources assigned to the activity.
No
ActualThisPeriodMaterialCost
The sum of all material resource costs for the current period.
No
ActualThisPeriodNonLaborCost
The actual this period nonlabor cost for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity actual nonlabor units * project default price / time.
No
ActualThisPeriodNonLaborUnits
The actual this period nonlabor units (hours) for all nonlabor resources assigned to the activity.
No
ActualTotalCost
The actual total cost for the activity, including labor resources, nonlabor resources, and project expenses. Actual total cost = actual labor costs + actual nonlabor costs + actual expense costs.
Yes
ActualTotalUnits The sum of Actual Labor Units and Actual Nonlabor Units.
Yes
AtCompletionDuration The total working time from the activity's current start date to the current finish date.
No
AtCompletionExpenseCost
The sum of the actual plus remaining costs for all expenses associated with the activity. Computed as actual expense cost + remaining expense cost.
Yes
AtCompletionLaborCost
The sum of the actual plus remaining costs for all labor resources assigned to the activity. Computed as actual labor cost + remaining labor cost.
No
AtCompletionLaborUnits
The sum of the actual plus remaining units for all labor resources assigned to the activity. Computed as actual labor units + remaining labor units.
No
Gateway Providers Data Dictionary
136
Field Description Read-Only
AtCompletionLaborUnitsVariance
The project baseline planned total labor units minus the estimate at completion labor units.
Yes
AtCompletionMaterialCost The sum of all actual and remaining costs for material resources.
Yes
AtCompletionNonLaborCost
The sum of the actual plus remaining costs for all nonlabor resources assigned to the activity. Computed as actual nonlabor cost + remaining nonlabor cost.
No
AtCompletionNonLaborUnits
The sum of the actual plus remaining units for all nonlabor resources assigned to the activity. Computed as actual nonlabor units + remaining nonlabor units.
No
AtCompletionTotalCost
The total cost at completion for the activity, including labor resources, nonlabor resources, and project expenses. At completion total cost = at completion labor cost + at completion nonlabor cost + at completion expense cost.
Yes
AtCompletionTotalUnits The sum of the actual plus remaining units for the resource assignment on the activity.
Yes
AtCompletionVariance
The difference between the project baseline total cost and the current estimate of total cost. Computed as VAC = BAC - EAC. A negative value indicates an estimated cost overrun. BAC is computed from the current project baseline.
Yes
AutoComputeActuals
The option that determines whether the activity's actual and remaining units, start date, finish date, and percent complete are computed automatically using the planned dates, planned units and the schedule percent complete.
No
Baseline1Duration The duration for the activity in the primary baseline.
Yes
Baseline1FinishDate The current finish date of the activity in the primary baseline.
Yes
Baseline1PlannedDuration
The planned duration for the activity in the primary baseline. Planned duration is the total working time from the activity current start date to the current finish date.
Yes
P6 Business Objects List
137
Field Description Read-Only
Baseline1PlannedExpenseCost
The planned costs for all project expenses associated with the activity. This field is named Baseline 1 Budgeted Expense Cost in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
Yes
Baseline1PlannedLaborCost
The cost at completion for all labor resources assigned to the activity in the primary baseline. Computed from the primary baseline at completion labor units.
Yes
Baseline1PlannedLaborUnits
The planned units for all labor resources assigned to the activity. This field is named Baseline 1 Budgeted Labor Units in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
Yes
Baseline1PlannedMaterialCost
The Planned Material Cost for a primary baseline activity.
Yes
Baseline1PlannedNonLaborCost
The planned costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity planned nonlabor units * project default price / time.
Yes
Baseline1PlannedNonLaborUnits
The planned units for all nonlabor resources assigned to the activity. This field is named Baseline 1 Budgeted Non Labor Units in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
Yes
Baseline1PlannedTotalCost
The planned total cost for the activity, including labor resources, nonlabor resources, and project expenses. Planned total cost = planned labor cost + planned nonlabor cost + planned expense cost.
Yes
Baseline1StartDate
The current start date of the activity in the primary baseline. Set to the planned start date until the activity is started, then set to the actual start date.
Yes
BaselineDuration The duration for the activity in the project baseline.
Yes
BaselineFinishDate The current finish date of the activity in the project baseline.
Yes
BaselinePlannedDuration The planned duration for the activity in the Yes
Gateway Providers Data Dictionary
138
Field Description Read-Only
project baseline.
BaselinePlannedExpenseCost
The planned costs for all project expenses associated with the activity.
Yes
BaselinePlannedLaborCostThe cost at completion for all labor resources assigned to the activity in the project baseline.
Yes
BaselinePlannedLaborUnits
The planned units for all labor resources assigned to the activity.
Yes
BaselinePlannedMaterialCost
The Planned Material Cost for a project baseline activity.
Yes
BaselinePlannedNonLaborCost
The planned costs for all nonlabor resources assigned to the activity.
Yes
BaselinePlannedNonLaborUnits
The planned units for all nonlabor resources assigned to the activity.
Yes
BaselinePlannedTotalCost The planned total cost for the activity, including labor resources, nonlabor resources, and project expenses.
Yes
BaselineStartDate The current start date of the activity in the project baseline.
Yes
BudgetAtCompletion The planned total cost through activity completion.
Yes
CalendarName The name of the calendar. Yes
CalendarObjectId
The unique ID of the calendar assigned to the activity. Activity calendars can be assigned from the global calendar pool or the project calendar pool.
No
CostPercentComplete The percent complete of costs for all labor resources, nonlabor resources, and expenses for the activity.
Yes
CostPercentOfPlanned The percent complete of planned costs for all labor resources, nonlabor resources, and expenses for the activity.
Yes
CostPerformanceIndex The earned value divided by the actual cost. A value less than 1 indicates that actual cost have exceeded the planned value.
Yes
CostPerformanceIndexLaborUnits
The ratio of the earned value labor units and the actual work performed. Computed as CPI labor units = earned value labor units / actual labor units.
Yes
P6 Business Objects List
139
Field Description Read-Only
CostVariance
The difference between the earned value and the actual cost of work performed. Computed as CV = earned value - actual costs.
Yes
CostVarianceIndex The ratio of the cost variance and the earned value of work performed. Computed as CVI = cost variance / earned value.
Yes
CostVarianceIndexLaborUnits
The ratio of the cost variance labor units and the earned value of work performed. Computed as CVI labor units = CV labor units / earned value labor units.
Yes
CostVarianceLaborUnits
The difference between the earned value of labor units and the actual cost of labor units. Calculated as CV labor units = earned value planned units - actual units.
Yes
CreateDate The date this activity was created. Yes
CreateUser The name of the user that created this activity.
Yes
DataDate
The current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied.
Yes
Duration1Variance
The duration between the activity's primary baseline duration and the at complete duration. Computed as primary baseline duration - at completion duration.
Yes
DurationPercentComplete
The percent complete of the activity duration. Computed as (planned duration - remaining duration) / planned duration * 100. Always in the range 0 to 100.
No
DurationPercentOfPlanned
The activity actual duration percent of planned. Computed as actual duration / BL duration * 100. The value can exceed 100. The BL duration is the activity's at completion duration from the project baseline.
Yes
DurationType
The duration type of the activity. One of 'Fixed Units/Time', 'Fixed Duration and Units/Time', 'Fixed Units', or 'Fixed Duration and Units'.
No
Gateway Providers Data Dictionary
140
Field Description Read-Only
DurationVariance
The duration between the activity's project baseline duration and the at complete duration. Computed as project baseline duration - at completion duration.
Yes
EarlyFinishDate
The earliest possible date the activity can finish. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
Yes
EarlyStartDate
The earliest possible date the remaining work for the activity can begin. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
Yes
EarnedValueCost
The portion of the project baseline total cost of the activity that is actually completed as of the project data date. Computed as earned value = BAC * performance % complete.
Yes
EarnedValueLaborUnits
The portion of the project baseline labor units that is actually completed as of the project data date. Computed as labor units earned value = project baseline labor units * performance % complete.
Yes
EBSBudgetCurrentCost EBS_ACT_Budget_Current_Cost No
EBSBudgetCurrentQuantity EBS_ACT_Budget_Current_Qty No
EBSBudgetOriginalCost EBS_ACT_Budget_Original_Cost No
EBSBudgetOriginalQuantity
EBS_ACT_Budget_Original_Qty No
EBSBudgetProposedCost EBS_ACT_Budget_Proposed_Cost No
EBSBudgetProposedQuantity
EBS_ACT_Budget_Proposed_Qty No
EBSBudgetStatusCode EBS_ACT_Budget_Status_Code No
EBSBudgetVersionName EBS_ACT_Budget_Version_Name No
EBSBudgetVersionNumber EBS_ACT_Budget_Version_Number No
EstimateAtCompletionCost
The estimated cost at completion for the activity. Computed as the actual total cost plus the estimate-to-complete cost; EAC = ACWP + ETC.
Yes
P6 Business Objects List
141
Field Description Read-Only
EstimateAtCompletionLaborUnits
The estimated labor units at completion of the activity. Calculated as actual labor units + estimate to complete labor units.
Yes
EstimateToComplete
The estimated cost to complete the activity. Computed as either the remaining total cost for the activity (remaining total cost), or as PF * (BAC - earned value), depending on the earned-value technique selected for the activity's WBS..
Yes
EstimateToCompleteLaborUnits
The estimated quantity to complete the activity. Computed as either the remaining total units for the activity (remaining total units), or as PF * (BL labor units - earned value), depending on the earned-value technique selected for the activity's WBS.
Yes
ExpectedFinishDate
The date the activity is expected to be finished according to the progress made on the activity's work products. The expected finish date is entered manually by people familiar with progress of the activity's work products.
No
ExpenseCost1Variance The difference between primary baseline expense cost and at completion expense cost.
Yes
ExpenseCostPercentComplete
The percent complete of costs for all expenses associated with the activity. Computed as actual expense cost / at completion expense cost * 100. Always in the range 0 to 100.
Yes
ExpenseCostVariance
The difference between project baseline expense cost and at completion expense cost. Calculated as project baseline expense cost - at completion expense cost (at completion expense cost = actual expense cost + remaining expense cost).
Yes
ExternalEarlyStartDate
The date value that determines the early start date for imported activities with external constraints lost (relations from/to external projects that do not exist in the database).
No
ExternalLateFinishDate The date value that determines the Late Finish Date for imported activities with
No
Gateway Providers Data Dictionary
142
Field Description Read-Only
external constraints lost (from/to external projects that do not exist in the database).
Feedback The feedback from the resource. No
FinishDate
The current finish date of the activity. Set to the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed.
No
FinishDate1Variance
The duration between the finish date in the current project and the primary baseline finish date. Calculated as finish date - primary baseline finish date.
Yes
FloatPath
The integer representing the critical path this activity is on. The value 1 is the most critical path, value 2 is the second most critical path, etc.
Yes
FreeFloat The amount of time the activity can be delayed before delaying the start date of any successor activity.
Yes
GUID The globally unique ID generated by the system.
No
HasFutureBucketData The flag that indicates whether a resource assignment on the activity has future bucket data.
Yes
Id The short ID that uniquely identifies the activity within the project.
No
IsBaseline The Boolean value indicating if this business object is related to a Project or Baseline
Yes
IsCritical
The flag that indicates whether the activity is critical. An activity is critical when its total Float is below the critical duration specified for the project. Delaying critical activities will delay the finish date of the project.
Yes
IsLongestPath The flag that indicates whether an activity is on the longest path.
Yes
IsNewFeedback The flag that indicates that a resource has sent feedback notes about this activity which have not been reviewed yet.
No
P6 Business Objects List
143
Field Description Read-Only
IsStarred The flag that indicates whether this activity is marked as starred activity.
No
IsTemplate The Boolean value indicating if this business object is related to a template Project.
Yes
IsWorkPackage The flag that indicates whether this activity is the child of a work package WBS.
Yes
LaborCost1Variance
The difference between primary baseline labor cost and at completion labor cost. Calculated as BL labor cost - at completion labor cost.
Yes
LaborCostPercentComplete
The percent complete of costs for all labor resources assigned to the activity. Computed as actual labor cost / at completion labor cost * 100. Always in the range 0 to 100.
Yes
LaborCostVariance
The difference between project baseline labor cost and at completion labor cost. Calculated as BL labor cost - at completion labor cost.
Yes
LaborUnits1Variance
The difference between primary baseline labor units and at completion labor units. Calculated as BL labor units - at completion labor units.
Yes
LaborUnitsPercentComplete
The percent complete of units for all labor resources for the activity. Computed as actual labor units / at completion labor units * 100. Always in the range 0 to 100.
Yes
LaborUnitsVariance
The difference between project baseline labor units and at completion labor units. Calculated as BL labor units - at completion labor units.
Yes
LastUpdateDate The date this activity was last updated. Yes
LastUpdateUser The name of the user that last updated this activity.
Yes
LateFinishDate
The latest possible date the activity must finish without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
Yes
Gateway Providers Data Dictionary
144
Field Description Read-Only
LateStartDate
The latest possible date the remaining work for the activity must begin without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
Yes
LessonsLearned An activity note field to store notes. No
LevelingPriority
The activity priority used to prioritize activities in a project when performing resource leveling. Valid values are 'Top', 'High', 'Normal', 'Low', and 'Lowest'.
No
LocationName The name of the location assigned to the activity.
Yes
LocationObjectId The unique ID of the location assigned to the activity.
No
MaterialCost1Variance The primary Baseline Planned Material Cost minus the At Completion Material Cost.
Yes
MaterialCostPercentComplete
The percent complete of costs for all material resources assigned to the activity. Computed as actual nonlabor cost / at completion nonlabor cost * 100. Always in the range 0 to 100.
Yes
MaterialCostVariance The project BaselinePlannedMaterialCost minus the AtCompletionMaterialCost.
Yes
MaximumDuration The maximum duration of the activity. No
MinimumDuration The minimum duration of the activity. No
MostLikelyDuration The most likely duration of the activity. No
Name The name of the activity. The activity name does not have to be unique.
No
NonLaborCost1Variance
The difference between the primary baseline nonlaborcost and at completion nonlabor cost. Calculated as BL nonlabor cost - at completion nonlabor cost.
Yes
NonLaborCostPercentComplete
The percent complete of costs for all nonlabor resources assigned to the activity. Computed as actual nonlabor cost / at completion nonlabor cost * 100. Always in
Yes
P6 Business Objects List
145
Field Description Read-Only
the range 0 to 100.
NonLaborCostVariance
The difference between the project baseline labor cost and at completion labor cost. Calculated as BL nonlabor cost - at completion nonlabor cost.
Yes
NonLaborUnits1Variance
The difference between the primary baseline nonlabor units and at completion nonlabor units. Calculated as BL nonlabor units - at completion nonlabor units.
Yes
NonLaborUnitsPercentComplete
The percent complete of units for all nonlabor resources for the activity. Computed as actual nonlabor units / at completion nonlabor units * 100. Always in the range 0 to 100.
No
NonLaborUnitsVariance
The difference between the project baseline labor units and at completion labor units. Calculated as BL nonlabor units - at completion nonlabor units.
Yes
NotesToResources The notes from the project manager to the timesheet resources.
No
ObjectId The unique ID generated by the system. No
PercentComplete
The activity percent complete. This value is tied to the activity duration % complete, units % complete, or physical % complete, depending on the setting for the activity's percent complete type.
No
PercentCompleteType The activity percent complete type: 'Physical', 'Duration', or 'Units'.
No
PerformancePercentComplete
The activity performance percent complete. The performance percent complete is used to compute earned value.
Yes
Phase An activity code filed to track the phase of the Activity.
No
PhysicalPercentComplete The physical percent complete, which can either be user entered or calculated from the activity's weighted steps.
No
PlannedDuration The total working time from the activity planned start date to the planned finish date. The planned working time is computed
No
Gateway Providers Data Dictionary
146
Field Description Read-Only
using the activity's calendar.
PlannedExpenseCost
The planned costs for all project expenses associated with the activity. This field is named BudgetedExpenseCost in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
Yes
PlannedFinishDate
The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.
No
PlannedLaborCost
The planned costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity planned labor units * project default price / time.
No
PlannedLaborUnits
The planned units for all labor resources assigned to the activity. This field is named BudgetedLaborUnits in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
No
PlannedMaterialCost The sum of all material resource costs. Yes
PlannedNonLaborCost
The planned costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity planned nonlabor units * project default price / time.
No
PlannedNonLaborUnits
The planned units for all nonlabor resources assigned to the activity. This field is named BudgetedNonLaborUnits in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
No
PlannedStartDate
The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.
No
PlannedTotalCost The planned total cost for the activity, including labor resources, nonlabor
Yes
P6 Business Objects List
147
Field Description Read-Only
resources, and project expenses. Planned total cost = planned labor cost + planned nonlabor cost + planned expense cost.
PlannedTotalUnits
The sum of Planned Labor Units and Planned Nonlabor Units. This field is named BudgetedTotalUnits in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
Yes
PlannedValueCost
The portion of the project baseline total cost of the activity that is scheduled to be completed as of the project data date. Computed as BAC * schedule % complete. Also known as the work scheduled to be performed for the activity.
Yes
PlannedValueLaborUnits
The portion of the project baseline labor units that is scheduled to be completed as of the project data date. Computed as BL labor units * schedule % complete.
Yes
PostResponsePessimisticFinish
The post-response pessimistic finish date for the activity.
No
PostResponsePessimisticStart
The post-response pessimistic start date for the activity.
No
PreResponsePessimisticFinish
The pre-response pessimistic finish date for the activity.
No
PreResponsePessimisticStart
The pre-response pessimistic start date for the activity.
No
PrimaryConstraintDate
The constraint date for the activity, if the activity has a constraint. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.
No
PrimaryConstraintType The type of constraint applied to the activity start or finish date. Activity constraints are used by the project scheduler.
No
PrimaryResourceId The name of the resource. Yes
PrimaryResourceName The name of the resource. Yes
PrimaryResourceObjectId
The unique ID of the primary resource for the activity. The primary resource is responsible for the overall work on the activity and updates the activity status using
No
Gateway Providers Data Dictionary
148
Field Description Read-Only
Timesheets.
ProjectId The short code of the associated project. Yes
ProjectName The name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. No
RemainingDuration
The remaining duration of the activity. The remaining duration is the remaining working time for the activity on the project, from the activity's remaining start date to the remaining finish date.
No
RemainingEarlyFinishDate The remaining late end date, which is calculated by the scheduler.
No
RemainingEarlyStartDate
The date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager.
No
RemainingExpenseCost The remaining costs for all project expenses associated with the activity.
Yes
RemainingFloat
The amount of time remaining by which the activity can be delayed before delaying the project finish date. Computed as late finish - remaining finish.
Yes
RemainingLaborCost
The remaining costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity remaining labor units * project default price / time.
No
RemainingLaborUnits
The remaining units for all labor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity.
No
RemainingLateFinishDate The remaining late finish date calculated by the scheduler.
No
RemainingLateStartDate The remaining late start date calculated by the scheduler.
No
RemainingMaterialCost The sum of all material resource remaining costs.
Yes
P6 Business Objects List
149
Field Description Read-Only
RemainingNonLaborCost
The remaining costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity remaining nonlabor units * project default price / time.
No
RemainingNonLaborUnits
The remaining units for all nonlabor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity.
No
RemainingTotalCost
The remaining total cost for the activity, including labor resources, nonlabor resources, and project expenses. Remaining total cost = remaining labor costs + remaining nonlabor costs + remaining expense costs.
Yes
RemainingTotalUnits The sum of Remaining Labor Units and Remaining Nonlabor Units.
Yes
ResumeDate
The date when a suspended task or resource dependent activity should be resumed. The resume date must be later than the suspend date and earlier than the actual finish date.
No
ReviewFinishDate
The finish date of the activity as proposed by the primary resource using Timesheets, while the activity is in "For Review" state. If the project manager approves the activity completion, the review finish is copied to the actual finish.
Yes
ReviewStatus
The activity review status. Valid values are 'OK', 'For Review', and 'Rejected'. Primary resources set the status to 'For Review' when they believe the activity is completed but are not allowed to mark activities as completed.
No
RolledupWBSObjectId Rolled up WBS Object IDs after filtering either by levels or tagging.
No
SchedulePercentComplete
The activity schedule percent complete, which specifies how much of the activity's project baseline duration has been completed so far.
Yes
Gateway Providers Data Dictionary
150
Field Description Read-Only
SchedulePerformanceIndex
The ratio of the earned value of work performed and the work scheduled to be performed. Computed as SPI = earned value/ planned value. A value less than 1 indicates that less work was actually performed than was scheduled.
Yes
SchedulePerformanceIndexLaborUnits
The ratio of the earned value of labor units and the planned value of labor units. Computed as SPI labor units = earned value labor units / planned value labor units.
Yes
ScheduleVariance
The difference between the earned value of work performed and the work scheduled to be performed. Computed as SV = earned value - planned value. A negative value indicates that less work was actually performed than was scheduled.
Yes
ScheduleVarianceIndex The ratio of the schedule variance and the work scheduled to be performed. Computed as SVI = SV / planned value.
Yes
ScheduleVarianceIndexLaborUnits
The ratio of the schedule variance and the work scheduled to be performed. Computed as SVI labor units = SV labor units / planned value labor units.
Yes
ScheduleVarianceLaborUnits
The difference between the earned value of work performed and the work scheduled to be performed. Computed as SV labor units = earned value labor units - planned value labor units.
Yes
SecondaryConstraintDate
The date to be used for the cstr_type2 assignment, if the activity has a cstr_type2 value. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.
No
SecondaryConstraintType The additional constraint to be used by the scheduler.
No
StartDate The start date of the activity. Set to the remaining start date until the activity is started, then set to the actual start date.
No
P6 Business Objects List
151
Field Description Read-Only
StartDate1Variance
The duration between the start date in the current project and the primary baseline start date. Calculated as start date - primary baseline start date.
Yes
StartDateVariance
The duration between the start date in the current project and the project baseline start date. Calculated as start date - project baseline start date.
Yes
Status The current status of the activity, either 'Not Started', 'In Progress', or 'Completed'.
No
SuspendDate
The start date when the progress of a task or resource dependent activity is delayed from. The suspend date must be later than the actual start date, which the activity must have.
No
ToCompletePerformanceIndex
The TCPI, which is calculated as (budget at completion - earned value) / (estimate at completion - ACWP).
Yes
TotalActualCost An Activity UDF to store Total Actual Cost for the Activity.
No
TotalCommitmentCost An Activity UDF to store Total Commitment Cost for the Activity.
No
TotalCost1Variance
The difference between the primary baseline total cost and the at completion total cost. Calculated as BL total cost - at completion total cost.
No
TotalCostVariance
The difference between the project baseline total cost and the at completion total cost. Calculated as BL total cost - at completion total cost.
Yes
TotalFloat
The amount of time the activity can be delayed before delaying the project finish date. Total float can be computed as late start - early start or as late finish - early finish; this option can be set when running the project scheduler.
Yes
TotalPlannedCost An Activity UDF to store Total Planned Cost for the activity.
No
Gateway Providers Data Dictionary
152
Field Description Read-Only
Type
The type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone', 'Finish Milestone', or 'WBS Summary'.
No
UnitsPercentComplete
The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as actual units / at completion units * 100. Always in the range 0 to 100.
No
VCPActDemandPeggedAvlDate
VCP Activity Demand Pegged Avl Date (UDF)
No
VCPActDemandPeggedOrderNumber
VCP Activity Demand Pegged Order Number (UDF)
No
VCPActDemandPeggedOrderType
VCP Activity Demand Pegged Order Type (UDF)
No
VCPActItemSelection VCP Activity Item Selection (UDF) No
VCPActItemSelectionCode VCP Activity Item Selection Code (UDF) No
VCPActSupplyActualStartDate
VCP Activity Supply Actual Start Date (UDF)
No
VCPActSupplyDockDate VCP Activity Supply Dock Date (UDF) No
VCPActSupplyDueDate VCP Activity Supply Due Date (UDF) No
VCPActSupplyItemId VCP Activity Supply Item Id (UDF) No
VCPActSupplyItemName VCP Activity Supply Item Name (UDF) No
VCPActSupplyOrderDate VCP Activity Supply Order Date (UDF) No
VCPActSupplyOrderNumber
VCP Activity Supply Order Number (UDF) No
VCPActSupplyOrderType VCP Activity Supply Order Type (UDF) No
VCPActSupplyOrganization VCP Activity Supply Organization (UDF) No
VCPActSupplyPeggedActivityId
VCP Activity Supply Pegged Activity Id (UDF)
No
VCPActSupplyPeggedOrderNumber
VCP Activity Supply Pegged Order Number (UDF)
No
VCPActSupplyQuantity VCP Activity Supply Quantity (UDF) No
VCPActSupplyShipDate VCP Activity Supply Ship Date (UDF) No
VCPActSupplyStartDate VCP Activity Supply Start Date (UDF) No
P6 Business Objects List
153
Field Description Read-Only
VCPActSupplyUpdatedArrivalDate
VCP Activity Supply Updated Arrival Date (UDF)
No
WBSCode
The short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
Yes
WBSName The name of the WBS element. Yes
WBSObjectId The unique ID of the WBS for the activity. No
WBSPath The unique ID of the WBS for the activity. Yes
ActivityCode
Description: Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
Field Description Read-Only
CodeTypeName The name of the activity code type. Yes
CodeTypeObjectId The unique ID of the activity code type. No
CodeTypeScope The scope of the parent activity code type. Yes
CodeValue The value of the activity code. No
Color The Hex representation for the color No
CreateDate The date this activity code was created. Yes
Description The description of the activity code. No
LastUpdateDate The date this activity code was last updated. Yes
LastUpdateUser The name of the user that last updated this activity code.
Yes
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent activity code. No
ProjectObjectId The unique project ID of the parent code type for this code if code type scope is 'Project' or 'EPS', null for code types with scope 'Global'.
Yes
SequenceNumber The sequence number for sorting. No
Gateway Providers Data Dictionary
154
ActivityCodeType
Description: Activity code types provide a way of classifying activity codes. Activity codes are user-defined codes to classify and categorize activities according to the organization's and project's needs.
Field Description Read-Only
CreateDate The date this activity code type was created. Yes
CreateUser The name of the user that created this activity code type.
Yes
EPSObjectId The unique ID of the EPS. No
IsBaseline The Boolean value indicating if this business object is related to a project or baseline.
Yes
IsSecureCode The flag indicating whether this is a secure activity code type.
No
IsTemplate The Boolean value indicating if this business object is related to a template project.
Yes
LastUpdateDate The date this activity code type was last updated. Yes
LastUpdateUser The name of the user that last updated this activity code type.
Yes
Length The maximum number of characters allowed for values of this activity code type.
No
Name The name of the activity code type. No
ObjectId The unique ID generated by the system. No
ProjectObjectId The unique ID of the project. No
Scope The scope of the activity code type. No
SequenceNumber The sequence number for sorting. No
ActivityExpense
Description: Activity expenses in P6 EPPM are non-resource costs associated with a project and assigned to a project's activities. They are typically one-time expenditures for non-reusable items. When importing expenses into P6, you can add a cost account dynamically for the expense as long as the cost account fields are included in the Expense field mapping template.
Field Description Read-Only
AccrualType The accrual type for the project expense. If the accrual type is 'Start of Activity', the entire expense costs are accrued at the start date of
No
P6 Business Objects List
155
Field Description Read-Only
the activity.
ActivityId The short ID that uniquely identifies the activity within the project.
Yes
ActivityName The name of the activity. The activity name does not have to be unique.
Yes
ActivityObjectId
The unique ID of the activity to which the project expense is linked. Every project expense is associated with one activity in the project.
No
ActualCost The actual cost for the project expense. No
ActualUnits The actual units for the project expense. No
AtCompletionCost The sum of the actual plus remaining costs for the project expense. Computed as actual cost + remaining cost.
Yes
AtCompletionUnits The at completion units for the project expense.
Yes
AutoComputeActuals
The flag that identifies whether the actual and remaining costs for the expense are computed automatically using the planned cost and the activity's schedule percent complete.
No
CostAccountId The ID of associated cost account. Yes
CostAccountName The name of the associated cost account. Yes
CostAccountObjectId The unique ID of the cost account associated with the project expense.
No
CreateDate The date this expense was created. Yes
CreateUser The name of the user that created this expense.
Yes
DocumentNumber
The document number for the expense. Use this for the purchase order number, invoice number, requisition number, or similar, as needed.
No
ExpenseCategoryName The name of the expense category. Yes
ExpenseCategoryObjectId
The unique ID of the expense category for the project expense.
No
ExpenseDescription The description of the expense. No
ExpenseItem The name of the project expense. No
Gateway Providers Data Dictionary
156
Field Description Read-Only
ExpensePercentComplete
The percent complete of the project expense. No
IsBaseline The Boolean value indicating if this business object is related to a Project or Baseline.
Yes
IsTemplate The Boolean value indicating if this business object is related to a template Project.
Yes
LastUpdateDate The date this expense was last updated. Yes
LastUpdateUser The name of the user that last updated this expense.
Yes
ObjectId The unique ID generated by the system. No
OverBudget
The indicator that reflects whether the project expense is over budget. An expense is over budget when the actual cost + remaining cost exceeds the planned cost.
Yes
PlannedCost
The planned cost for the project expense. This field is named BudgetedCost in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
No
PlannedUnits The planned number of units for the project expense. This number is multiplied by the price per unit to compute the planned cost.
No
PricePerUnit
The planned price per unit for the project expense. This number is multiplied by the planned number of units to compute the planned cost.
No
ProjectId The short code that uniquely identifies the project.
Yes
ProjectObjectId The unique ID of the associated project. Yes
RemainingCost The remaining cost for the project expense. Before actual expenses are made, remaining cost should be the same as planned cost.
No
RemainingUnits The remaining units for the project expense. No
UnitOfMeasure The unit of measure for the project expense. No
Vendor The name of the vendor providing the product or service associated with the expense.
No
WBSObjectId The unique ID of the WBS for the activity. Yes
P6 Business Objects List
157
ActivityRisk
Description: The activity risk object stores the relationship between a single activity and a single risk.
Field Description Read-Only
ActivityId The short name of the associated activity. Yes
ActivityName The name of the associated activity. Yes
ActivityObjectId The unique ID of the associated activity. No
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. Yes
RiskId The short name of the associated risk. Yes
RiskName The name of the associated risk. Yes
RiskObjectId The unique ID of the associated risk. Yes
BaselineType
Description: Baseline Type fields
Field Description Read-Only
CreateDate The create Date for currency. Yes
CreateUser The name of the user that created this user-defined field.
Yes
LastUpdateDate The Last Update Date for currency. Yes
LastUpdateUser The name of the user that last updated this user-defined field.
Yes
Name The name for BaselineType. No
ObjectId The unique ID generated by the system. No
SequenceNumber Sequence Number for BaselineType. No
Gateway Providers Data Dictionary
158
Calendar
Description: The Calendar business object is used to import calendars into P6 EPPM. Calendars define the available work hours in each calendar day, and include global, resource, and project types. Global and resource calendars are supported during import. Existing resource calendars can be promoted to global or shared resource calendars.The following flows support calendar import into P6 EPPM:
Master Data
Note: No mapping template is available for the Calendar object. However, to ensure it will be imported when selected in the Master Data flow, add an option for the Calendar object in the field mapping selection template.
Project Data, only if the Calendar object exists in the project xml file
Support for Global Calendars
Providers must send the start time and end time for each day of the standard work week. All exception time must also be sent.
Support for Resource Calendars
During import, resource calendars are processed as follows:
All resource calendars are created using the default calendar's settings, including the standard work week. values. If the workweek values are not available, the default calendar workweek is used. If a default calendar workweek is not set, then the default global calendar will be used as the default calendar.
The incoming resource calendar must be assigned to a resource or as a shared calendar. By default, all resource calendars are created as Shared, unless the isPersonal flag is set to True.
If a resource has been assigned to a resource calendar, then the existing resource calendar will be updated by the incoming resource calendar using a cross-reference mapping.
If a resource calendar does not have a resource assignment, then it must be created as a shared calendar. This enables you to convert the resource calendar in P6 to Personal without having to re-import.
See the following example of a resource calendar imported into P6.
Field Description Read-Only
BaseCalendarObjectId
The unique ID of the global calendar to which this calendar is linked. Any changes to the global calendar are automatically propagated to this calendar.
No
CreateDate The date this calendar was created. Yes
CreateUser The name of the user that created this calendar. Yes
P6 Business Objects List
159
Field Description Read-Only
BaseCalendarObjectId
The unique ID of the global calendar to which this calendar is linked. Any changes to the global calendar are automatically propagated to this calendar.
No
HolidayOrExceptions
All dates with holidays or exceptions in this calendar. A child object that describes all the dates that the working hours are different from those in the standard work week.
No
IsPersonal The flag indicating if this calendar is a personal calendar (applies to resource calendars only).
No
IsDefault The flag that identifies the default global calendar (applies to global calendars only).
No
LastUpdateDate The date this calendar was last updated. Yes
LastUpdateUser The name of the user that last updated this calendar.
Yes
Name The name of the calendar. No
ObjectId The unique ID generated by the system. No
ProjectObjectId The unique ID of the project. Yes
ProjectId The short name of the project. No
StandardWorkWeek
Standard detailed work hours for each day of week.
No
Type The calendar type - either 'Global', 'Resource', or 'Project'.
No
161
Example of Importing a Global Calendar
The following is an example of modifying a global calendar imported into P6:
The existing imported workweek is:
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Start and Stop Time
8 to 5 8 to 5 8 to 5 8 to 5 8 to 5
The subsequent import is:
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Start and Stop Time
9 to 3 9 to 3 9 to 3
After import, the workweek is:
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Start and Stop Time
9 to 3 9 to 3 9 to 3
The following changes have been made:
The existing work time for Monday and Friday have been removed.
In the source calendar, Exception time (Holiday) is April 24, 2013 and workday exception is April 27, 2013 (Saturday).
The incoming updates made to the calendar are: Holiday is April 26, 2013 and Workday exception is April 28, 2013 (Sunday).
Note: April 24, 2013 and April 26, 2013 are still exceptions as the exception list has been merged in the existing calendar.
CBS
Description: CBS business object.
Field Description Read-Only
CBSCode CBS Code associated with the Project No
Gateway Providers Data Dictionary
162
Field Description Read-Only
CBSDescription CBS Code Description No
CBSStatus CBS Code Status. Valid values are "Active" and "InActive"
No
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent CBS. No
ProjectObjectId The unique ID of the associated Project No
CBSDurationSummary
Description: CBSDurationSummary business object.
Field Description Read-Only
BaselineType Baseline type of the associated baseline.
No
CBSObjectId The unique ID of the associated CBS. Yes
DataDate Data date of the associated project. No
ObjectId The unique ID generated by the system.
No
OriginalProjectObjectId The original object ID of the associated project.
Yes
ProjectId The short name of the associated project.
Yes
ProjectName The name of the associated project. Yes
ProjectObjectId The unique ID of the associated project.
Yes
SummaryActualDuration Summarized Actual Duration the project.
Yes
SummaryActualFinishDate Summarized Actual Finish Date of the project.
Yes
SummaryActualStartDate Summarized Actual Start Date of the project.
Yes
SummaryPercentComplete Summarized Percent Complete the project
Yes
SummaryPlannedDuration Summarized Planned Duration the project.
Yes
P6 Business Objects List
163
Field Description Read-Only
SummaryPlannedFinishDate
Summarized Planned Finish Date of the project.
Yes
SummaryPlannedStartDate Summarized Planned Start Date of the project.
Yes
SummaryRemainingDuration
Summarized Remaining Duration the project.
Yes
SummaryRemainingFinishDate
Summarized Remaining Finish Date of the project.
Yes
SummaryRemainingStartDate
Summarized Remaining Start Date of the project.
Yes
CBSExpenseSpread
Description: Summarized spread data per CBS per expense category
Field Description Read-Only
ActualCost Actual Cost No
Actual Units Actual Units No
AtCompletionCost At Completion Cost No
AtCompletionUnits At Completion Units No
BaselineType Baseline Type No
CBSObjectId The unique ID of CBS. No
DateDate Date date No
EndDate End date. No
ExpenseCategoryName Expense Category No
ObjectId The unique ID generated by the system.
No
OriginalProjectObjectId The original object id of the associated Project.
No
PlannedCost Planned Cost No
PlannedUnits Planned Units No
ProjectId Project short name No
ProjectName Project name. No
Gateway Providers Data Dictionary
164
Field Description Read-Only
ProjectObjectId The unique ID of Project. No
RemainingCost Remaining Cost No
RemainingUnits Remaining Units No
StartDate Start date. No
SummaryActualCost Summarized Actual cost No
SummaryActualUnits Summarized Actual Units No
SummaryAtCompletionCost Summarized At completion cost No
SummaryAtCompletionUnits
Summarized At Completion Units No
SummaryPlannedCost Summarized Planned Cost. No
SummaryPlannedUnits Summarized Planned Units. No
SummaryRemainingCost Summarized Remaining cost No
SummaryRemainingUnits Summarized Remaining Units No
CBSResourceSpread
Description: Summarized spread data per CBS per resource assignment
Field Description Read-Only
ActualCost Actual Cost of the resource assignments when summarized by CBS
No
Actual Units The actual units of the resource assignments when summarized by CBS.
No
AtCompletionCost At completion cost of the resource assignments when summarized by CBS.
No
AtCompletionUnits At completion units of the resource assignments when summarized by CBS.
No
BaselineType The name of the baseline type for this project baseline. Baseline types are used to categorize project baselines.
No
CBSObjectId The unique ID of CBS. Yes
CurrencyId Currency ID No
CurrencyName Currency Name No
P6 Business Objects List
165
Field Description Read-Only
DataDate The data date of the project when it was last summarized by CBS.
No
EndDate End date of the resource assignments when summarized by CBS.
No
ObjectId The unique ID generated by the system. No
OriginalProjectObjectId
The original object id of the associated project. Yes
PlannedCost Planned cost of the resource assignments when summarized by CBS
No
PlannedUnits The planned units of the resource assignments when summarized by CBS.
No
ProjectId The short code that uniquely identifies the project. Yes
ProjectName The name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. Yes
RemainingCost Remaining cost of the resource assignments when summarized by CBS.
No
RemainingUnits The remaining cost of the resource assignments when summarized by CBS.
No
ResourceId The short code that uniquely identifies the resource. Yes
ResourceName The name of the resource. Yes
ResourceType The resource type: "Labor", "Nonlabor", or "Material". No
StartDate Start date of the resource assignments when summarized by CBS.
No
SummaryActualCost
Actual cost of the resource assignments when summarized by CBS.
Yes
SummaryActualFinish
Actual finish date of the resource assignments when summarized by CBS.
Yes
SummaryActualStart
Actual Start date of the resource assignments when summarized by CBS.
Yes
SummaryActualUnits
Actual Units of the resource assignments when summarized by CBS.
Yes
SummaryAtCompletionCost
At completion cost of the resource assignments when summarized by CBS.
Yes
SummaryAtCompletionUnits
At Completion Units of the resource assignments when summarized by CBS.
Yes
Gateway Providers Data Dictionary
166
Field Description Read-Only
SummaryPlannedCost
Planned cost of the resource assignments when summarized by CBS.
Yes
SummaryPlannedFinish
Finish date of the resource assignments when summarized by CBS.
Yes
SummaryPlannedStart
Planned start of the resource assignments when summarized by CBS.
Yes
SummaryPlannedUnits
Planned Units of the resource assignments when summarized by CBS.
Yes
SummaryRemainingCost
Remaining cost of the resource assignments when summarized by CBS.
Yes
SummaryRemainingFinish
Remaining finish date of the resource assignments when summarized by CBS.
Yes
SummaryRemainingStart
Remaining Start date of the resource assignments when summarized by CBS.
Yes
SummaryRemainingUnits
Remaining Units of the resource assignments when summarized by CBS.
Yes
UnitAbbreviation Unit Abbreviation No
UnitName Unit Name No
CostAccount
Description: Cost accounts contain the organization's cost account IDs. Available across all projects, they support tracking of costs and earned value based on the organization's cost account IDs. Cost accounts are hierarchical objects.
Field Description Read-Only
CreateDate The date this cost account was created. Yes
CreateUser The name of the user that created this cost account. Yes
Description The description of the cost account. No
Id The short code that uniquely identifies this cost account. No
LastUpdateDate
The date this cost account was last updated. Yes
LastUpdateUser
The name of the user that last updated this cost account. Yes
Name The name of the cost account. No
P6 Business Objects List
167
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ParentObjectIdThe unique ID of the parent cost account of this cost account in the hierarchy.
No
SequenceNumber
The sequence number for sorting. No
Currency
Description: Currencies are the monetary units used to store costs for all projects in the database. Monetary units are stored in the database with a base currency but can be viewed in other currencies using the exchange for each currency.
Field Description Read-Only
CreateDate The create date for the currency. Yes
CreateUser The name of the user that created this user-defined field.
Yes
DecimalSymbol The symbol for decimal. No
DigitGroupingSymbol
The symbol for Digit Groups. No
ExchangeRate The exchange rate for the currency. No
Id The ID for currency. No
LastUpdateDate The Last Update Date for currency Yes
LastUpdateUser The name of the user that last updated this user-defined field.
Yes
Name The Name of currency No
NegativeSymbol The symbol for negative currency. No
ObjectId The unique ID generated by the system. No
PositiveSymbol The symbol for positive currency. No
Symbol The symbol for decimal. No
Gateway Providers Data Dictionary
168
EPS
Description: EPS (Enterprise Project Structure). To export an EPS hierarchy from P6, the EPS ID and EPS Name fields are required and must be included in the default EPS field mapping template.
Field Description Read-Only
AnticipatedFinishDate The anticipated finish date of the EPS. No
AnticipatedStartDate The anticipated start date of the EPS. No
CreateDate The date this EPS was created. Yes
CreateUser The name of the user that created this EPS.
Yes
CurrentBudget The sum of the original budget plus the approved and pending budgets from the budget change log.
Yes
CurrentVariance The difference between the current budget and the total spending plan.
Yes
DistributedCurrentBudget The current budget values from one level lower.
Yes
FinishDate The finish date of the EPS. Yes
GUID The globally unique ID generated by the system.
No
Id The short name of the EPS. No
IndependentETCLaborUnits The user-entered ETC total labor. Yes
IndependentETCTotalCost The user-entered ETC total cost. Yes
LastSummarizedDate The date the project was last summarized.
Yes
LastUpdateDate The date this EPS was last updated. Yes
LastUpdateUser The name of the user that last updated this EPS.
Yes
Name The name of the EPS. No
ObjectId The unique ID generated by the system. No
OBSName The name of the person/role in the organization, sometimes referred to as the "responsible manager".
Yes
OBSObjectId The unique ID of the project manager from the project's OBS tree who is responsible for the EPS.
No
P6 Business Objects List
169
Field Description Read-Only
OriginalBudget The original budget for the project. No
ParentObjectId The unique ID of the associated project. No
PlannedStartDate The planned start date of the project. Used by the project scheduler.
Yes
ProjectObjectId The internal Project ID of the EPS. This ID cannot be used to load a Project object directly.
Yes
ProposedBudget
The Proposed Budget, which is the sum of the original budget plus the approved and pending budgets from the budget change log.
Yes
SequenceNumber The sequence number for sorting. No
StartDate The start date of the EPS. Yes
SummaryAccountingVarianceByCost
The Planned Value minus the Actual Cost.
Yes
SummaryAccountingVarianceByLaborUnits
The Planned Value Labor Units minus the Actual Units.
Yes
SummaryActivityCount The number of activities that are currently in progress.
Yes
SummaryActualDuration The actual duration. Yes
SummaryActualExpenseCost The actual costs for all project expenses associated with the EPS.
Yes
SummaryActualFinishDate The latest actual finish date of all activities in the EPS.
Yes
SummaryActualLaborCost The actual cost for all labor resources assigned to the activity.
Yes
SummaryActualLaborUnits The actual labor units. Yes
SummaryActualMaterialCost The actual units for all material resources assigned to the activity.
Yes
SummaryActualNonLaborCost The actual cost for all nonlabor resources assigned to the activity.
Yes
SummaryActualNonLaborUnits The actual nonlabor units. Yes
SummaryActualStartDate The earliest actual start date of all activities in the EPS.
Yes
Gateway Providers Data Dictionary
170
Field Description Read-Only
SummaryActualThisPeriodCostThe actual this period cost (will be labor or nonlabor).
Yes
SummaryActualThisPeriodLaborCost
The actual this period labor cost. Yes
SummaryActualThisPeriodLaborUnits
The actual this period labor units. Yes
SummaryActualThisPeriodMaterialCost
The actual this period material cost. Yes
SummaryActualThisPeriodNonLaborCost
The actual this period nonlabor cost. Yes
SummaryActualThisPeriodNonLaborUnits
The actual this period nonlabor units. Yes
SummaryActualTotalCost The actual labor cost + actual nonlabor cost + actual expense cost as of the project data date.
Yes
SummaryActualValueByCost
The actual total cost incurred on the activity as of the project data date, computed as Actual Labor Cost + Actual Nonlabor Cost + Actual Material Cost + Actual Expense Cost.
Yes
SummaryActualValueByLaborUnits
The actual total labor units for the activity as of the project data date (i.e., actual total cost by labor units).
Yes
SummaryAtCompletionDuration
The duration at completion. Yes
SummaryAtCompletionExpenseCost
The sum of the actual plus remaining cost for all project expenses associated with the cost account. Computed as Actual Expense Cost + Remaining Expense Cost.
Yes
SummaryAtCompletionLaborCost
The sum of the actual plus remaining costs for all labor resources assigned to the activity. Computed as actual labor cost + remaining labor cost. Same as the planned labor costs if the activity is not started and the actual labor costs once the activity is completed.
Yes
SummaryAtCompletionLaborUnits
The sum of the actual plus remaining units for all labor resources assigned to the activity. Computed as actual labor
Yes
P6 Business Objects List
171
Field Description Read-Only
units + remaining labor units. Same as the planned labor units if the activity is not started and the actual labor units once the activity is completed.
SummaryAtCompletionMaterialCost
The material cost at completion. It is the sum of the actual plus remaining costs for all material resources assigned to the activity. Computed as actual material cost + remaining material cost. Same as the planned material costs if the activity is not started and the actual material costs once the activity is completed.
Yes
SummaryAtCompletionNonLaborCost
The nonlabor cost at completion. It is the sum of the actual plus remaining costs for all nonlabor resources assigned to the activity. Computed as actual nonlabor cost + remaining nonlabor cost. Same as the planned nonlabor costs if the activity is not started and the actual nonlabor costs once the activity is completed.
Yes
SummaryAtCompletionNonLaborUnits
The nonlabor units at completion. It is the sum of the actual plus remaining units for all nonlabor resources assigned to the activity. Computed as actual nonlabor units + remaining nonlabor units. Same as the planned nonlabor units if the activity is not started and the actual nonlabor units once the activity is completed.
Yes
SummaryAtCompletionTotalCost
The estimated cost at completion for the activity. Computed as the actual total cost plus the estimate-to-complete cost; EAC = ACWP + ETC. Note that the method for computing ETC depends on the earned-value technique selected for the activity's WBS.
Yes
SummaryAtCompletionTotalCostVariance
The Baseline Planned Total Cost - At Completion Total Cost.
Yes
SummaryBaselineCompletedActivityCount
The number of completed activities in the baseline.
Yes
SummaryBaselineDuration The planned duration for the activity in the primary baseline. Planned duration is
Yes
Gateway Providers Data Dictionary
172
Field Description Read-Only
the total working time from the activity current start date to the current finish date. Same as the actual duration plus the remaining duration. The total working time is computed using the activity's calendar.
SummaryBaselineExpenseCost
The planned cost for all project expenses associated with the activity in the primary baseline. Computed as the baseline actual expense cost plus the baseline remaining expense cost.
Yes
SummaryBaselineFinishDate The current latest finish date of all activities in the EPS for the current baseline.
Yes
SummaryBaselineInProgressActivityCount
The number of activities that should be currently in progress, according to the primary baseline. Computed using the baseline start and finish dates and the current data date.
Yes
SummaryBaselineLaborCost
The planned cost for all labor resources assigned to the activity in the primary baseline. Computed from the baseline At Completion labor units. If no resources are assigned, computed as the activity Baseline Planned Labor Units * Project Default Price / Time.
Yes
SummaryBaselineLaborUnits
The planned units for all labor resources assigned to the activity in the primary baseline. Computed as the baseline actual labor units plus the baseline remaining labor units.
Yes
SummaryBaselineMaterialCost
The planned cost for all material resources assigned to the activity in the primary baseline. Computed from the baseline At Completion nonlabor units. If no resources are assigned.
Yes
SummaryBaselineNonLaborCost
The planned cost for all nonlabor resources assigned to the activity in the primary baseline. Computed from the baseline At Completion nonlabor units. If no resources are assigned, computed as the activity Baseline Planned Nonlabor Units * Project Default Price / Time.
Yes
P6 Business Objects List
173
Field Description Read-Only
SummaryBaselineNonLaborUnits
The planned units for all nonlabor resources assigned to the activity in the primary baseline. Computed as the baseline actual nonlabor units plus the baseline remaining nonlabor units.
Yes
SummaryBaselineNotStartedActivityCount
The number of activities not started in the baseline.
Yes
SummaryBaselineStartDate The current earliest start date of all activities in the EPS for the current baseline.
Yes
SummaryBaselineTotalCost
The Planned Total Cost for the activity in the primary baseline, including labor resources, nonlabor resources, and project expenses. Baseline Planned Total Cost = Baseline Planned Labor Cost + Baseline Planned Nonlabor Cost + Baseline Planned Expense Cost.
Yes
SummaryBudgetAtCompletionByCost
The Planned Total Cost through activity completion. Computed as Planned Labor Cost + Planned Nonlabor Cost + Planned Expense Cost, same as the Planned Total Cost.
Yes
SummaryBudgetAtCompletionByLaborUnits
The Baseline Labor Units. Yes
SummaryCompletedActivityCount
The number of activities that have an Actual Finish in the EPS.
Yes
SummaryCostPercentComplete
The percent complete of costs for the resource assignments in the EPS. Computed as Actual Units / At Complete Units * 100. Always in the range 0 to 100.
Yes
SummaryCostPercentOfPlanned
The activity actual cost percent of planned. Computed as actual total cost / baseline total cost * 100, or equivalently as ACWP / BAC * 100. The value can exceed 100. The baseline total cost is the activity's at completion cost from the current baseline. This field is named SummaryCostPercentOfBudget in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
Yes
Gateway Providers Data Dictionary
174
Field Description Read-Only
SummaryCostPerformanceIndexByCost
The Earned Value divided by the Actual Cost. A value less than 1 indicates that the Actual Cost has exceeded the Planned Value.
Yes
SummaryCostPerformanceIndexByLaborUnits
The Earned Value Labor Units / Actual Labor Units.
Yes
SummaryCostVarianceByCost
The Earned Value minus the Actual Cost. A negative value indicates that the Actual Cost has exceeded the Planned Value.
Yes
SummaryCostVarianceByLaborUnits
The Earned Value Labor Cost minus Actual Value Labor Cost.
Yes
SummaryCostVarianceIndex The value that is calculated as the Cost Variance divided by Earned Value.
Yes
SummaryCostVarianceIndexByCost
The Cost Variance divided by Earned Value.
Yes
SummaryCostVarianceIndexByLaborUnits
The Cost Variance Labor Units divided by Earned Value Labor Units.
Yes
SummaryDurationPercentComplete
The activity actual duration percent of planned. Computed as (baseline planned duration - remaining duration) / baseline planned duration * 100.
Yes
SummaryDurationPercentOfPlanned
The summary actual duration percent of planned of all activities under this EPS. Computed as actual duration / baseline duration * 100. The value can exceed 100. The Baseline duration is the activity's at complete duration from the current baseline.
Yes
SummaryDurationVariance
The duration between the activity's baseline duration and the at complete duration. Computed as baseline duration - at completion duration.
Yes
SummaryEarnedValueByCost
The Budget at Completion * Performance % Complete. The method for computing the Performance Percent Complete depends on the Earned Value technique selected for the activity's WBS. Budget at Completion is computed from the primary baseline.
Yes
P6 Business Objects List
175
Field Description Read-Only
SummaryEarnedValueByLaborUnits
The Schedule Variance Labor Units divided by the Planned Value Labor Units.
Yes
SummaryEstimateAtCompletionByCost
The Actual Cost plus the Estimate to Complete Cost. The method for computing Estimate to Complete depends on the Earned Value technique selected for the activity's WBS.
Yes
SummaryEstimateAtCompletionByLaborUnits
The Actual Labor Units + Estimate To Complete Labor Units. (Estimate To Complete Labor Units is calculated based off of the Earned Value setting on the EPS.)
Yes
SummaryEstimateAtCompletionHighPercentByLaborUnits
The high forecast of Estimate At Completion (EAC) by labor units.
Yes
SummaryEstimateAtCompletionLowPercentByLaborUnits
The low forecast of Estimate At Completion (EAC) by labor units.
Yes
SummaryEstimateToCompleteByCost
The Remaining Total Cost for the activity or the Performance Factor * (Budget at Completion - Earned Value), depending on the Earned Value technique selected for the activity's WBS (calculated from the primary baseline).
Yes
SummaryEstimateToCompleteByLaborUnits
The estimated quantity to complete the activity. Computed as either the remaining total units for the activity, or as Performance Factor * (Baseline Planned Labor Units - Planned Quantity of Work Performed), depending on the Earned Value Technique selected for the activity's WBS.
Yes
SummaryExpenseCostPercentComplete
The percent complete of cost for all expenses associated with the EPS. It is computed as Actual Expense Cost / At Complete Expense Cost * 100, and it is always in the range of 0 to 100.
Yes
SummaryExpenseCostVariance
The Baseline Planned Expense Cost - At Completion Expense Cost (At Completion Expense Cost = Actual Expense Cost + Remaining Expense Cost).
Yes
Gateway Providers Data Dictionary
176
Field Description Read-Only
SummaryFinishDateVariance
The duration between the finish date in the current project and the baseline finish date. Calculated as finish date - baseline finish date.
Yes
SummaryInProgressActivityCount
The number of activities that are currently in progress.
Yes
SummaryLaborCostPercentComplete
The percent complete of cost for all labor resources assigned to the EPS. It is computed as Actual Labor Cost / At Complete Labor Cost * 100, and it is always in the range of 0 to 100.
Yes
SummaryLaborCostVariance The Baseline Planned Labor Cost - At Completion Labor Cost.
Yes
SummaryLaborUnitsPercentComplete
The percent complete of units for all labor resources for the EPS. Computed as actual labor units / at complete labor units * 100. Always in the range 0 to 100.
Yes
SummaryLaborUnitsVariance
The difference between baseline labor units and at completion labor units. Calculated as Baseline labor units - at completion labor units.
Yes
SummaryMaterialCostPercentComplete
The percent complete of cost for all material resources assigned to the EPS. It is computed as Actual Material Cost / At Complete Material Cost * 100, and it is always in the range of 0 to 100.
Yes
SummaryMaterialCostVarianceThe variance that is calculated as Baseline Material Cost - At Completion Material Cost.
Yes
SummaryNonLaborCostPercentComplete
The percent complete of cost for all non-labor resources assigned to the EPS. It is computed as Actual Nonlabor Cost / At Complete Nonlabor Cost * 100, and it is always in the range of 0 to 100.
Yes
SummaryNonLaborCostVariance
The Baseline Planned Nonlabor Cost - At Completion Nonlabor Cost.
Yes
SummaryNonLaborUnitsPercentComplete
The percent complete of units for all nonlabor resources for the EPS. Computed as Actual Nonlabor Cost / At Completion Nonlabor Cost * 100. Always in the range 0 to 100.
Yes
P6 Business Objects List
177
Field Description Read-Only
SummaryNonLaborUnitsVariance
The difference between baseline nonlabor units and at completion non labor units. Calculated as Baseline nonlabor units - at completion nonlabor units.
Yes
SummaryNotStartedActivityCount
The number of activities that are currently not started.
Yes
SummaryPerformancePercentCompleteByCost
The percent complete of performance for all labor resources, nonlabor resources, and expenses. Computed as Earned Value / Budget At Completion * 100. Always in the range 0 to 100.
Yes
SummaryPerformancePercentCompleteByLaborUnits
The percent complete of performance for all labor resources. Computed as earned value labor units / baseline labor units * 100. Always in the range 0 to 100.
Yes
SummaryPlannedCost The sum of all planned expense, non labor, labor, and material costs in the EPS.
Yes
SummaryPlannedDuration The total working days between planned start and finish dates in the EPS.
Yes
SummaryPlannedExpenseCostThe sum of all planned expense costs in the EPS.
Yes
SummaryPlannedFinishDate The latest planned finish date of all activities in the EPS.
Yes
SummaryPlannedLaborCost The sum of all planned labor costs in the EPS.
Yes
SummaryPlannedLaborUnits The sum of all planned labor units in the EPS.
Yes
SummaryPlannedMaterialCost The sum of all planned material costs in the EPS.
Yes
SummaryPlannedNonLaborCost
The sum of all planned non labor costs in the EPS.
Yes
SummaryPlannedNonLaborUnits
The sum of all planned non labor units in the EPS.
Yes
SummaryPlannedStartDate The earliest planned start date of all activities in the EPS.
Yes
Gateway Providers Data Dictionary
178
Field Description Read-Only
SummaryPlannedValueByCost
The Budget at Completion * Schedule % Complete. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. Budget at Completion is computed from the primary baseline
Yes
SummaryPlannedValueByLaborUnits
The portion of the baseline labor units that is scheduled to be completed as of the project data date. Computed as Baseline Labor Units * Schedule % Complete. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. The Baseline Labor Units is taken from the current baseline.
Yes
SummaryProgressFinishDate
The date the activity is expected to be finished according to the progress made on the activity's work products. The expected finish date is entered manually by people familiar with progress of the activity's work products.
Yes
SummaryRemainingDuration The total working time from the EPS remaining start date to the remaining finish date.
Yes
SummaryRemainingExpenseCost
The remaining costs for all project expenses associated with the activities in the EPS.
Yes
SummaryRemainingFinishDate
The date the resource is scheduled to finish the remaining work for the activity. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining finish date is the same as the planned finish date.
Yes
SummaryRemainingLaborCost
The remaining costs for all labor resources assigned to the activities. The remaining cost reflects the cost remaining for the EPS.
Yes
SummaryRemainingLaborUnitsThe remaining units for all labor resources assigned to the activities. The remaining units reflects the work
Yes
P6 Business Objects List
179
Field Description Read-Only
remaining to be done for the EPS.
SummaryRemainingMaterialCost
The remaining material costs for all project expenses associated with the activities in the EPS.
Yes
SummaryRemainingNonLaborCost
The remaining nonlabor costs for all project expenses associated with the activities in the EPS.
Yes
SummaryRemainingNonLaborUnits
The remaining units for all nonlabor resources assigned to the activities. The remaining units reflects the work remaining to be done for the EPS.
Yes
SummaryRemainingStartDate The earliest remaining start of all activities assigned to the EPS.
Yes
SummaryRemainingTotalCost The sum of all remaining total costs in the EPS.
Yes
SummarySchedulePercentComplete
The measure that indicates how much of the EPS baseline duration has been completed so far. Computed based on where the current data date falls between the activity's baseline start and finish dates. If the data date is earlier than the Baseline start, the schedule % complete is 0. If the data date is later than the Baseline finish, the schedule % complete is 100. The schedule % complete indicates how much of the EPS duration should be currently completed, relative to the selected baseline.
Yes
SummarySchedulePercentCompleteByLaborUnits
The percent complete of units for all labor resources. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100.
Yes
SummarySchedulePerformanceIndexByCost
The Earned Value divided by the Planned Value. A value less than 1 indicates that less work was actually performed than was scheduled.
Yes
SummarySchedulePerformanceIndexByLaborUnits
The Earned Value Labor Units divided by Planned Value Labor Units.
Yes
Gateway Providers Data Dictionary
180
Field Description Read-Only
SummaryScheduleVarianceByCost
The Earned Value divided by the Planned Value. A negative value indicates that less work was actually performed than was scheduled.
Yes
SummaryScheduleVarianceByLaborUnits
The Earned Value Labor Units minus the Planned Value Labor Units.
Yes
SummaryScheduleVarianceIndex
The value that is calculated as the Schedule Variance Labor Units divided by Planned Value Labor Units.
Yes
SummaryScheduleVarianceIndexByCost
The value that is calculated as the Schedule Variance Labor Units divided by Planned Value Labor Units.
Yes
SummaryScheduleVarianceIndexByLaborUnits
The Schedule Variance Labor Units divided by the Planned Value Labor Units.
Yes
SummaryStartDateVariance The (Budget at Completion - Earned Value) divided by (Estimate at Completion - Actual Cost).
Yes
SummaryToCompletePerformanceIndexByCost
The (Budget at Completion - Earned Value) divided by (Estimate at Completion - Actual Cost).
Yes
SummaryTotalCostVariance The value that is calculated as baseline total cost - total cost.
Yes
SummaryTotalFloat
The amount of time the EPS can be delayed before delaying the project finish date. Total float can be computed as late start - early start or as late finish - early finish; this option can be set when running the project scheduler.
Yes
SummaryUnitsPercentComplete
The percent complete of units for the resource assignments in the EPS. Computed as Actual Units / At Complete Units * 100. Always in the range 0 to 100.
Yes
SummaryVarianceAtCompletionByLaborUnits
The Baseline Planned Total Labor Units minus Estimate at Completion Labor Units.
Yes
TotalBenefitPlan The sum of the monthly benefit plan. Yes
TotalBenefitPlanTally The sum of the monthly benefit plan tally. Yes
P6 Business Objects List
181
Field Description Read-Only
TotalFunding The total amount of funding contributed to the project by your funding sources.
Yes
TotalSpendingPlan The sum of the monthly spending plan. Yes
TotalSpendingPlanTally The sum of the monthly spending plan tally.
Yes
UnallocatedBudget The total current budget minus the distributed current budget.
Yes
UndistributedCurrentVariance The total spending plan minus the total spending plan tally.
Yes
ExpenseCategory
Description: Expense categories are used to categorize project expenses. They are used for standardizing expenses and for rolling up expenses across projects.
Field Description Read-Only
CreateDate The date this expense category was created. Yes
CreateUser The name of the user that created this expense category.
Yes
LastUpdateDate The date this expense category was last updated. Yes
LastUpdateUser The name of the user that last updated this expense category.
Yes
ObjectId The unique ID generated by the system. No
Name The name of the expense category. No
SequenceNumber The sequence number for sorting. No
FinancialPeriod
Description: Financial periods are used to provide accurate display and reporting of actual units and costs. When importing financial periods to P6 ensure that the periods do not overlap or contain gaps. Otherwise errors display during import. Financial periods must be sequential, but do not have to be contiguous. To import a financial period to P6, the StartDate, EndDate, and the Name must be specified.
Gateway Providers Data Dictionary
182
Note: Partial success is not supported for importing a financial period.
Field Description Read-Only
CreateDate The date this financial period was created. Yes
CreateUser The name of the user that created this financial period.
Yes
EndDate The end date of the financial period. No
LastUpdateDate
The date this financial period was last updated. Yes
LastUpdateUser
The name of the user that last updated this financial period.
Yes
Name The name of the financial period. No
ObjectId The unique ID generated by the system. No
StartDate The start date of the financial period. No
Location
Description: The location is used to store address information including latitude and longitude. Locations can be assigned to resources, projects and/or activities.
Location codes from P6 can be exported to Prime or Sample providers using the Master Global Data flow. To export location codes, all fields must be included in the field mapping template.
Field Description Read-Only
AddressLine1 The first line of the address with street number and street name.
No
AddressLine2 The second line of the address with street number and street name.
No
City The city name of the address. No
Country The country of the address. No
CountryCode The country code of the address. No
CreateDate The date this location was created. Yes
CreateUser The name of the user that created this location. Yes
LastUpdateDate The date this location was last updated. Yes
LastUpdateUser The name of the user that last updated this location.
Yes
P6 Business Objects List
183
Field Description Read-Only
Latitude The latitude of the location. No
Longitude The longitude of the location. No
Municipality The municipality name of the address. No
Name The name of the location. No
ObjectId The unique ID generated by the system. No
PostalCode The postal code of the address. No
State The state name of the address. No
StateCode The state abbreviation of the address. No
NotebookTopic
Description: Notebook topics are used to categorize notes on EPS, project, WBS,and activity objects.
Field Description Read-Only
AvailableForActivity
The flag indicating that the topic will be available to assign to activities.
No
AvailableForEPS The flag indicating that the topic will be available to assign to EPS.
No
AvailableForProject
The flag indicating that the topic will be available to assign to projects.
No
AvailableForWBSThe flag indicating that the topic will be available to assign to WBS.
No
ObjectId The unique ID of the NotebookTopic. No
Name The name of the NotebookTopic. No
Project
Description: A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities.
Field Description Read-Only
ActivityDefaultActivityType Indicates the activityType of the No
Gateway Providers Data Dictionary
184
Field Description Read-Only
activity.
ActivityDefaultCalendarName The name of the Activity Default Calendar of this project.
Yes
ActivityDefaultCalendarObjectId The unique ID of the Activity Default Calendar of this project.
No
ActivityDefaultCostAccountObjectId The unique ID of the Activity Default Cost Account of this project.
No
ActivityDefaultDurationType Indicates the activity default duration type of the activity.
No
ActivityDefaultPercentCompleteType Indicates the activity default percent complete type of the activity.
No
ActivityDefaultPricePerUnit The activity default price per unit for an activity.
No
ActivityIdBasedOnSelectedActivity The Boolean activity ID based on selected activity indicator of the activity.
No
ActivityIdIncrement The increment value of the activity ID.
No
ActivityIdPrefix The prefix value of the activity ID. No
ActivityIdSuffix The suffix value of the activity ID. No
ActivityPercentCompleteBasedOnActivitySteps
The Boolean activity percent complete based on activity steps value of the project.
No
AddActualToRemaining The Boolean add actual to remaining value of the activity.
No
AddedBy The addedBy value of the project. No
AllowNegativeActualUnitsFlag The Boolean allow negative actual units flag value of the activity.
No
AnnualDiscountRate The annual discount rate value of the project.
No
AnticipatedFinishDate The anticipated finish date of the project.
No
AnticipatedStartDate The anticipated start date of the project.
No
P6 Business Objects List
185
Field Description Read-Only
AssignmentDefaultDrivingFlag The Boolean assignment default driving flag value of the assignment.
No
AssignmentDefaultRateType Indicates the default rate type of the assignment.
No
BusinessSegment A Project Code field to define th Business Segment of the Project.
No
Calculate FloatBasedOnFinishDate
The flag that indicates how each activity's float will be calculated with respect to other projects in the scheduling batch. This setting only has an effect when scheduling multiple projects at the same time.
Yes
CheckOutDate The check out date of the project. Yes
CheckOutStatus The Boolean check out status flag value of the project.
No
CheckOutUserObjectId The check out user objectId value.
Yes
Comments A Project UDF to define additional comments for the Project.
No
ComputeTotalFloatType The method for calculating total float for all activities.
Yes
ContainsSummaryData The Boolean contains summary data flag of the project.
Yes
ContractManagementGroupName The contract management group name value of the project.
No
ContractManagementProjectName The contract management project name value of the project.
No
CostQuantityRecalculateFlag The Boolean cost quantity recalculate flag of the project.
No
CreateDate The created date of the project. Yes
CreateUser The user who created the project. Yes
CriticalActivityFloatLimit The critical activity float limit. No
CriticalActivityPathType Indicates Activity critical path type.
Yes
CurrentBaselineProjectObjectId The current baseline project No
Gateway Providers Data Dictionary
186
Field Description Read-Only
objectId of the project.
CurrentBudget The current budget of the project. Yes
CurrentVariance The current variance of the project.
Yes
DataDate The data date of the project. No
DateAdded The date added of the project. No
DefaultPriceTimeUnits Indicates default price time units of the activity.
No
Description The description of the project. No
DiscountApplicationPeriod Indicates discount application period of the project.
No
DistributedCurrentBudget The distributed current budget of the project.
Yes
EarnedValueComputeType Indicates earned value compute type of the project.
No
EarnedValueETCComputeType Indicates earned value ETC compute type of the project.
No
EarnedValueETCUserValue The earned value ETC user value for project computing earned value.
No
EarnedValueUserPercent The earned value user percent for project to compute earned value.
No
EBSBudgetCurrentCost EBS_PRU_Budget_Current_Cost No
EBSBudgetCurrentQuantity EBS_PRU_Budget_Current_Qty No
EBSBudgetOriginalCost EBS_PRU_Budget_Original_Cost No
EBSBudgetOriginalQuantity EBS_PRU_Budget_Original_Qty No
EBSBudgetProposedCost EBS_PRU_Budget_Proposed_Cost
No
EBSBudgetProposedQuantity EBS_PRU_Budget_Proposed_Qty
No
EBSBudgetStatusCode EBS_PRU_Budget_Status_Code No
EBSBudgetVersionName EBS_PRU_Budget_Version_Name
No
EBSBudgetVersionNumber EBS_PRU_Budget_Version_Number
No
P6 Business Objects List
187
Field Description Read-Only
EBSCalendarWorkingHours
Calendar mulitiplier for days to hours conversion days as defined in P6. Contains the numeric value representing the working hours in a day.
No
EBSPlannedCost EBS_PRU_Planned_Cost No
EBSProjectOrgName EBS_PROJECT_ORGANIZATION
No
EBSProjectStatus EBS_PROJECT_STATUS No
EBSProjectType EBS_PROJECT_TYPE No
EnablePublication The Boolean enable publication flag of the project.
No
EnableSummarization The Boolean enable summarization flag of the project.
No
FinishDate The date finish date of the project. Yes
FiscalYearStartMonth The fiscal year start month of the project.
No
ForecastFinishDate The date forecast finish date of the project.
Yes
ForecastStartDate The date forecast start date of the project.
Yes
GUID The GUID of the project. No
HasFutureBucketData The Boolean has future bucket data flag of the project.
Yes
Id The short ID assigned to each project for identification.
No
IgnoreOtherProjectRelationships
The option used by the scheduler for treating activity relationships between projects when scheduling.
Yes
IndependentETCLaborUnits The independent ETC labor units of the project.
No
IndependentETCTotalCost The independent ETC total cost of the project.
No
IntegratedType The type of system integration, if any, in place at the organization.
No
IsTemplate The Boolean is template flag of Yes
Gateway Providers Data Dictionary
188
Field Description Read-Only
the project.
LastApplyActualsDate The last apply actuals date of the project.
Yes
LastFinancialPeriodObjectId The last financial period objectId of the project.
No
LastLevelDate The last leveling date of the project.
Yes
LastPublishedOn The date last published on of the project.
Yes
LastScheduleDate The last schedule date of the project.
Yes
LastSummarizedDate The last summarized date of the project.
Yes
LastUpdateDate The last update date of the project.
Yes
LastUpdateUser The last update user of the project.
Yes
LevelingPriority The leveling priority of the project. No
LimitMutualFloatPaths The number of critical float paths to calculate.
Yes
LinkActualToActualThisPeriod The Boolean link actual to actual this period of the project.
No
LinkPercentCompleteWithActual The Boolean link percent complete with actual of the project.
No
LinkPlannedAndAtCompletionFlag The Boolean link planned and atCompletion flag of the project.
No
LocationName The name of the location assigned to the project.
Yes
LocationObjectId The unique ID of the location assigned to the project.
No
MakeOpenEndedActivitiesCritical
The option used by the scheduler for automatically leveling resources when scheduling projects.
Yes
MaximumMultipleFloatPaths The number of critical float paths to calculate.
Yes
P6 Business Objects List
189
Field Description Read-Only
MultipleFloatPathsEnabled
The Boolean value that indicates whether multiple critical float paths (sequences of activities) should be calculated in the project schedule.
Yes
MultipleFloatPathsEndingActivityObjectId
The activity in the WBS that you want to represent the end of the float paths.
Yes
MultipleFloatPathsUseTotalFloat The Boolean value that decides whether or not to use total float in multiple float path calculations.
Yes
MustFinishByDate The date by which all project activities must finish.
No
Name The name of the project. No
NetPresentValue The net present value of the project.
Yes
ObjectId The unique ID generated by the system.
No
OBSName The obs name of the project. Yes
OBSObjectId The obs object ID of the project. No
OriginalBudget The original budget of the project. No
OriginalProjectObjectId The unique ID of the original project. It is a baseline project if this field is not null.
Yes
OutOfSequenceScheduleType
The type of logic used to schedule the progressed activities: 'Retained Logic, 'Progress Override', or 'Actual Dates'.
Yes
OverallProjectScore The overall project score of the project.
Yes
OwnerResourceId The short code that uniquely identifies the owner resource.
No
OwnerResourceObjectId The owner resource objectID of the project.
No
ParentEPSId The parent eps ID of the project. No
ParentEPSObjectId The unique ID of the parent EPS of this project.
No
Gateway Providers Data Dictionary
190
Field Description Read-Only
PaybackPeriod The pay back period of the project.
Yes
PlannedBudget A Project UDF to define planned budget for the project.
No
PlannedStartDate The planned start date of the project.
No
PrimaryResourcesCanMarkActivitiesAsCompleted
The Boolean primary resources can mark activities as completed flag of the project.
No
PrimeWorkspace A Project Code field to define the Prime Workspace of the Project.
No
ProjectForecastStartDate The forecast start date of the project.
No
ProjectScheduleType Schedule type of the project. Valid values are 'Duration', or 'Resource', or 'Cost'.
No
PropertyType The project property name associated with the scheduling of projects.
Yes
ProposedBudget The proposed budget of the project.
Yes
PublicationPriority The publication priority of the project.
No
RelationshipLagCalendar The calendar used to calculate the lag between predecessors and successors for all activities.
Yes
ResetPlannedToRemainingFlag The Boolean reset planned to remaining flag of the project.
No
ResourceCanBeAssignedToSameActivityMoreThanOnce
The Boolean resource can be assigned to same activity more than once flag of the project.
No
ResourcesCanAssignThemselvesToActivities
The Boolean resource can assign themselves to activities of the project.
No
ResourcesCanEditAssignmentPercentComplete
The Boolean resource can edit assignment percent complete of the project.
No
ResourcesCanMarkAssignmentAsCoThe Boolean resource can mark assignment as completed of the
No
P6 Business Objects List
191
Field Description Read-Only
mpleted project.
ResourcesCanViewInactiveActivities The Boolean resource can view inactive activities of the project.
No
ReturnOnInvestment The return on investment of the project.
Yes
RiskExposure The proposed budget of the project.
Yes
RiskLevel Indicates risk level of the project No
RiskMatrixName The name of the associated risk matrix.
Yes
RiskMatrixObjectId The risk matrix objectId of the project.
No
RiskScore The risk score of the project. Yes
ScheduledFinishDate The scheduled finish date of the project.
No
SourceProjectObjectId The source project objectId of the project.
Yes
StartDate The start date of the project. Yes
StartToStartLagCalculationType
The method used to calculate lag when a start-to-start relationship exists and the predecessor starts out of sequence.
Yes
Status The status of the project. No
StrategicPriority The strategic priority of the project.
N
SummarizedDataDate The summarized data date of the project.
No
SummarizeToWBSLevel The summarize to wbs level of the project.
No
SummaryAccountingVarianceByCost The summary accounting variance by cost of the project.
Yes
SummaryAccountingVarianceByLaborUnits
The summary accounting variance by labor units of the project.
Yes
SummaryActivityCount The summary activity count of the project.
Yes
Gateway Providers Data Dictionary
192
Field Description Read-Only
SummaryActualDuration The summary actual duration of the project.
Yes
SummaryActualExpenseCost The summary actual expense cost of the project.
Yes
SummaryActualFinishDate The summary actual finish date of the project.
Yes
SummaryActualLaborCost The summary actual labor cost of the project.
Yes
SummaryActualLaborUnits The summary actual labor units of the project.
Yes
SummaryActualMaterialCost The summary actual material cost of the project.
Yes
SummaryActualNonLaborCost The summary actual nonlabor cost of the project.
Yes
SummaryActualNonLaborUnits The summary actual nonlabor units of the project.
Yes
SummaryActualStartDate The summary actual start date of the project.
Yes
SummaryActualThisPeriodCost The summary actual this period cost of the project.
Yes
SummaryActualThisPeriodLaborCost The summary actual this period labor cost of the project.
Yes
SummaryActualThisPeriodLaborUnitsThe summary actual this period labor unit of the project.
Yes
SummaryActualThisPeriodMaterialCost
The summary actual this period material cost of the project.
Yes
SummaryActualThisPeriodNonLaborCost
The summary actual this period nonlabor cost of the project.
Yes
SummaryActualThisPeriodNonLaborUnits
The summary actual this period nonlabor unit of the project.
Yes
SummaryActualTotalCost The summary actual total cost of the project.
Yes
SummaryActualValueByCost The summary actual value by cost of the project.
Yes
SummaryActualValueByLaborUnits The summary actual value by labor units of the project.
Yes
SummaryAtCompletionDuration The summary at completion Yes
P6 Business Objects List
193
Field Description Read-Only
duration of the project.
SummaryAtCompletionExpenseCost The summary at completion expense cost of the project.
Yes
SummaryAtCompletionLaborCost The summary at completion labor cost of the project.
Yes
SummaryAtCompletionLaborUnits The summary at completion labor units of the project.
Yes
SummaryAtCompletionMaterialCost The summary at completion material cost of the project.
Yes
SummaryAtCompletionNonLaborCostThe summary at completion nonlabor cost of the project.
Yes
SummaryAtCompletionNonLaborUnitsThe summary at completion nonlabor units of the project.
Yes
SummaryAtCompletionTotalCost The summary at completion total cost of the project.
Yes
SummaryAtCompletionTotalCostVariance
The summary at completion total cost variance of the project.
Yes
SummaryBaselineCompletedActivityCount
The summary baseline completed activity count of the project.
Yes
SummaryBaselineDuration The summary baseline duration of the project.
Yes
SummaryBaselineExpenseCost The summary baseline expense cost of the project.
Yes
SummaryBaselineFinishDate The summary baseline finish date of the project.
Yes
SummaryBaselineInProgressActivityCount
The summary baseline in progress activity count of the project.
Yes
SummaryBaselineLaborCost The summary baseline labor cost of the project.
Yes
SummaryBaselineLaborUnits The summary baseline labor units of the project.
Yes
SummaryBaselineMaterialCost The summary baseline material cost of the project.
Yes
SummaryBaselineNonLaborCost The summary baseline nonlabor cost of the project.
Yes
SummaryBaselineNonLaborUnits The summary baseline nonlabor Yes
Gateway Providers Data Dictionary
194
Field Description Read-Only
Units of the project.
SummaryBaselineNotStartedActivityCount
The summary baseline not start activity count of the project.
Yes
SummaryBaselineStartDate The summary baseline start date of the project.
Yes
SummaryBaselineTotalCost The summary baseline total cost of the project.
Yes
SummaryBudgetAtCompletionByCostThe summary budget at completion by cost of the project.
Yes
SummaryBudgetAtCompletionByLaborUnits
The summary budget at completion by labor units of the project.
Yes
SummaryCompletedActivityCount The summary completed activity count of the project.
Yes
SummaryCostPercentComplete The summary cost percent complete of the project.
Yes
SummaryCostPercentOfPlanned The summary cost percent of planned of the project.
Yes
SummaryCostPerformanceIndexByCost
The summary cost performance index by cost of the project.
Yes
SummaryCostPerformanceIndexByLaborUnits
The summary cost performance index by labor units of the project.
Yes
SummaryCostVarianceByCost The summary cost variance by cost of the project.
Yes
SummaryCostVarianceByLaborUnits The summary cost variance by labor units of the project.
Yes
SummaryCostVarianceIndex The summary cost variance index of the project.
Yes
SummaryCostVarianceIndexByCost The summary cost variance index by cost of the project.
Yes
SummaryCostVarianceIndexByLaborUnits
The summary cost variance index by labor unit of the project.
Yes
SummaryDurationPercentComplete The summary duration percent complete of the project.
Yes
SummaryDurationPercentOfPlanned The summary duration percent of planned of the project.
Yes
SummaryDurationVariance The summary duration variance Yes
P6 Business Objects List
195
Field Description Read-Only
of the project.
SummaryEarnedValueByCost The summary earned value by cost of the project.
Yes
SummaryEarnedValueByLaborUnits The summary earned value by labor units of the project.
Yes
SummaryEstimateAtCompletionByCost
The summary estimate at completion by cost of the project.
Yes
SummaryEstimateAtCompletionByLaborUnits
The summary estimate at completion by labor units of the project.
Yes
SummaryEstimateAtCompletionHighPercentByLaborUnits
The summary estimate at completion high percent by labor units of the project.
Yes
SummaryEstimateAtCompletionLowPercentByLaborUnits
The summary estimate at completion low percent by labor units of the project.
Yes
SummaryEstimateToCompleteByCostThe summary estimate to completion by cost of the project.
Yes
SummaryEstimateToCompleteByLaborUnits
The summary estimate to completion by labor units of the project.
Yes
SummaryExpenseCostPercentComplete
The summary expense cost percent complete of the project.
Yes
SummaryExpenseCostVariance The summary expense cost variance of the project.
Yes
SummaryFinishDateVariance The summary finish date variance of the project.
Yes
SummaryInProgressActivityCount The summary in progress activity count of the project.
Yes
SummaryLaborCostPercentComplete The summary labor cost percent complete of the project.
Yes
SummaryLaborCostVariance The summary labor cost variance of the project.
Yes
SummaryLaborUnitsPercentCompleteThe summary labor units percent complete of the project.
Yes
SummaryLaborUnitsVariance The summary labor units variance of the project.
Yes
Gateway Providers Data Dictionary
196
Field Description Read-Only
SummaryLevel Indicates summary level of the project
No
SummaryMaterialCostPercentComplete
The summary material cost percent complete of the project.
Yes
SummaryMaterialCostVariance The summary material cost variance of the project.
Yes
SummaryNonLaborCostPercentComplete
The summary nonlabor cost percent complete of the project.
Yes
SummaryNonLaborCostVariance The summary nonlabor cost variance of the project.
Yes
SummaryNonLaborUnitsPercentComplete
The summary nonlabor units percent complete of the project.
Yes
SummaryNonLaborUnitsVariance The summary nonlabor units variance of the project.
Yes
SummaryNotStartedActivityCount The summary non started activity count of the project.
Yes
SummaryPerformancePercentCompleteByCost
The summary performance percent complete by cost of the project.
Yes
SummaryPerformancePercentCompleteByLaborUnits
The summary performance percent complete by labor units of the project.
Yes
SummaryPlannedCost The summary planned cost of the project.
Yes
SummaryPlannedDuration The summary planned duration of the project.
Yes
SummaryPlannedExpenseCost The summary planned expense cost of the project.
Yes
SummaryPlannedFinishDate The summary planned finish date of the project.
Yes
SummaryPlannedLaborCost The summary planned labor cost of the project.
Yes
SummaryPlannedLaborUnits The summary planned labor units of the project.
Yes
SummaryPlannedMaterialCost The summary planned material cost of the project.
Yes
SummaryPlannedNonLaborCost The summary planned non labor Yes
P6 Business Objects List
197
Field Description Read-Only
cost of the project.
SummaryPlannedNonLaborUnits The summary planned non labor units of the project.
Yes
SummaryPlannedStartDate The summary planned start date of the project.
Yes
SummaryPlannedValueByCost The summary planned value by cost of the project.
Yes
SummaryPlannedValueByLaborUnits The summary planned value by labor units of the project.
Yes
SummaryProgressFinishDate The summary progress finish date of the project.
Yes
SummaryRemainingDuration The summary remaining duration of the project.
Yes
SummaryRemainingExpenseCost The summary remaining expense cost of the project.
Yes
SummaryRemainingFinishDate The summary remaining finish date of the project.
Yes
SummaryRemainingLaborCost The summary remaining labor cost of the project.
Yes
SummaryRemainingLaborUnits The summary remaining labor units of the project.
Yes
SummaryRemainingMaterialCost The summary remaining material cost of the project.
Yes
SummaryRemainingNonLaborCost The summary remaining non labor cost of the project.
Yes
SummaryRemainingNonLaborUnits The summary remaining non labor units of the project.
Yes
SummaryRemainingStartDate The summary remaining start date of the project.
Yes
SummaryRemainingTotalCost The summary remaining total cost of the project.
Yes
SummarySchedulePercentComplete The summary schedule percent complete of the project.
Yes
SummarySchedulePercentCompleteByLaborUnits
The summary schedule percent complete by labor units of the project.
Yes
SummarySchedulePerformanceIndex The summary schedule Yes
Gateway Providers Data Dictionary
198
Field Description Read-Only
ByCost performance index by cost of the project.
SummarySchedulePerformanceIndexByLaborUnits
The summary schedule performance index by labor units of the project.
Yes
SummaryScheduleVarianceByCost The summary schedule variance by cost of the project.
Yes
SummaryScheduleVarianceByLaborUnits
The summary schedule variance by labor units of the project.
Yes
SummaryScheduleVarianceIndex The summary schedule variance index of the project.
Yes
SummaryScheduleVarianceIndexByCost
The summary schedule variance index by cost of the project.
Yes
SummaryScheduleVarianceIndexByLaborUnits
The summary schedule variance index by labor units of the project.
Yes
SummaryStartDateVariance The summary start date variance of the project.
Yes
SummaryToCompletePerformanceIndexByCost
The summary to complete performance index by cost of the project.
Yes
SummaryTotalCostVariance The summary total cost variance of the project.
Yes
SummaryTotalFloat The summary total float of the project.
Yes
SummaryUnitsPercentComplete The summary units percent complete of the project.
Yes
SummaryVarianceAtCompletionByLaborUnits
The summary variance at completion by labor units of the project.
Yes
TotalBenefitPlan The total benefit plan of the project.
Yes
TotalBenefitPlanTally The total benefit plan tally of the project.
Yes
TotalFunding The total funding of the project. Yes
TotalSpendingPlan The total spending plan of the project.
Yes
TotalSpendingPlanTally The total spending plan tally of the project.
Yes
P6 Business Objects List
199
Field Description Read-Only
UnallocatedBudget The unallocated budget of the project.
Yes
UndistributedCurrentVariance The undistributed current variance of the project.
Yes
UseExpectedFinishDates The option used for setting activity finish dates as the expected finish dates when scheduling projects.
Yes
UseProjectBaselineForEarnedValue The Boolean use project baseline for earned value of the project.
No
WBSCodeSeparator The string wbs code separator of the project.
No
WBSMilestonePercentComplete The wbs milestone percent complete of the project.
Yes
WBSObjectId The unique ID of the associated WBS.
Yes
WebSiteURL The string web site URL of the project.
No
ProjectCode
Description: Project codes are user-defined codes to classify and categorize projects across the enterprise.
Project codes from P6 can be exported to Prime or Sample providers using the Master Global Data flow. To export project codes, the following fields are required and must be specified: ID, Name, Code Length, Sequence, Secure Code Indicator, Code values and hierarchy of those values.
Field Description Read-Only
CodeTypeName The name of the project code type. Yes
CodeTypeObjectId The unique ID of the project code type. No
CodeValue The value of the project code. No
CreateDate The date this project code was created. Yes
CreateUser The name of the user that created this project code.
Yes
Description The description of the project code. No
LastUpdateDate The date this project code was last updated. Yes
Gateway Providers Data Dictionary
200
Field Description Read-Only
LastUpdateUser The name of the user that last updated this project code.
Yes
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent project code. No
SequenceNumber The sequence number for sorting. No
Weight The weight for this project code. No
ProjectCodeType
Description: Project code types provide a way of classifying project codes. Project codes are user-defined codes to classify and categorize projects across the enterprise.
Field Description Read-Only
CreateDate The date this project code type was created. Yes
CreateUser The name of the user that created this project code type.
Yes
IsSecureCode The flag indicating whether this is a secure project code type.
No
LastUpdateDate The date this project code type was last updated.
Yes
LastUpdateUser The name of the user that last updated this project code type.
Yes
Length The maximum number of characters allowed for values of this project code.
No
MaxCodeValueWeight The maximum weight of the code values for this project code type.
No
Name The name of the project code type. No
ObjectId The unique ID generated by the system. No
SequenceNumber The sequence number for sorting. No
Weight The weight for this project code type. No
P6 Business Objects List
201
ProjectResource
Description: Primavera's resource planning feature allows you to do high-level project planning for future project or project that does not require resource assignments at the activity level.
Field Description Read-Only
CommittedFlag
The Boolean value that determines whether a resource is committed, and so, the resource assignment is stable and unlikely to change. When calculating availability, Primavera considers only assignments that are marked as committed.
No
CreateDate The date this project resource was created.
Yes
CreateUser The name of the user that created this project resource.
Yes
FinishDate
The finish date of the assignment. By default, it is set to the Planned Start date of the project + 1 day, finishing at 5:00pm.
No
IsBaseline The Boolean value indicating if this business object is related to a Project or Baseline.
Yes
IsTemplate The Boolean value indicating if this business object is related to a template Project.
Yes
LastUpdateDate The date this project resource was last updated.
Yes
LastUpdateUser The name of the user that last updated this project resource.
Yes
LifeOfProjectFlag
The Boolean value that determines whether a resource that is assigned to a project at Project or WBS level, has that assignment for the duration of the project.
No
ObjectId The unique ID generated by the system.
No
ProjectId The short code that uniquely identifies the associated project.
Yes
ProjectObjectId The unique ID of the associated project.
No
Gateway Providers Data Dictionary
202
Field Description Read-Only
ProjectResourceCategoryName
The name of the associated project resource category.
No
ProjectResourceCategoryObjectId
The unique ID of the associated project resource category.
No
ResourceName The name of the associated resource. Yes
ResourceObjectId The unique ID of the associated resource.
No
RoleName The name of the associated role. Yes
RoleObjectId The unique ID of the associated role. No
StartDate
The start date of the assignment. By default, it is set to the Planned Start date of the project. If LifeOfProjectFlag is set to true, this date is set to the Project Planned Start date.
No
Status The project or WBS status: 'Planned', 'Active', 'Inactive', 'What-If', or 'Requested'.
No
WBSCode The short code assigned to the associated WBS element for identification.
Yes
WBSObjectId The unique ID of the associated WBS. Yes
Relationship
Description: A relationship defines how an activity relates to the start or finish of another activity or assignment. These relationships, which form the logic of the project network, are used together with activity durations to determine schedule dates.
Field Description Read-Only
CreateDate The date this relationship was created. Yes
CreateUser The name of the user that created this relationship.
Yes
IsPredecessorBaseline The Boolean value indicating if the predecessor activity is related to a Project or Baseline.
Yes
P6 Business Objects List
203
Field Description Read-Only
IsPredecessorTemplate The Boolean value indicating if this business object is related to a template project.
Yes
IsSuccessorBaseline The Boolean value indicating if the successor activity is related to a Project or Baseline.
Yes
IsSuccessorTemplate The Boolean value indicating if this business object is related to a template project.
Yes
Lag
The time lag of the relationship. This is the time lag between the predecessor activity's start or finish date and the successor activity's start or finish date, depending on the relationship type.
Yes
LastUpdateDate The date this resource code was last updated.
Yes
LastUpdateUser The name of the user that last updated this resource code.
Yes
ObjectId The unique ID generated by the system. No
PredecessorActivityId The unique ID of the predecessor activity. Yes
PredecessorActivityName The name of the predecessor activity. Yes
PredecessorActivityObjectId
The unique ID of the predecessor activity. No
PredecessorActivityType The type of the predecessor activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'.
Yes
PredecessorProjectId The unique ID of the project that owns the predecessor activity.
No
PredecessorProjectObjectId
The unique ID of the project that owns the predecessor activity.
No
SuccessorActivityId The unique ID of the successor activity. Yes
SuccessorActivityName The name of the successor activity. Yes
SuccessorActivityObjectId The unique ID of the successor activity. No
SuccessorActivityType
The type of the successor activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone', 'Finish Milestone', or 'WBS Summary'.
Yes
Gateway Providers Data Dictionary
204
Field Description Read-Only
SuccessorProjectId The unique ID of the project that owns the successor activity.
Yes
SuccessorProjectObjectId The unique ID of the project that owns the successor activity.
No
Type The type of relationship: 'Finish to Start', 'Finish to Finish', 'Start to Start', or 'Start to Finish'.
No
Resource
Description: Resources include labor, nonlabor, and materials that are used for activities across all projects.
Field Description Read-Only
AutoComputeActuals
The option that determines whether the activity actual and remaining units, and start and finish dates for the resource are calculated automatically using the planned dates, planned units, and the activity's schedule percent complete.
No
BusinessUnit A Resource Code field to define the Business Unit of the Resource.
No
CalculateCostFromUnits
The option that determines whether any new assignments for this resource will have its costs recalculated whenever any quantity changes occur.
No
CalendarName The name of the calendar that is assigned to the resource.
Yes
CalendarObjectId The unique ID of the calendar assigned to the resource.
No
CreateDate The date this resource was created. Yes
CreateUser The name of the user that created this resource.
Yes
CurrencyId The unique currency abbreviation for the currency associated with this resource.
Yes
CurrencyName The name of the currency associated with this resource.
Yes
P6 Business Objects List
205
Field Description Read-Only
CurrencyObjectId The unique ID of the currency associated with this resource.
No
DefaultUnitsPerTime
The default units/time setting, which determines the value of the remaining units/time and planned units/time when a resource assignment is added.
No
DepartmentId A Resource Code field to define the Department ID of the Resource.
No
EffectiveDate The earliest day when the resource becomes over allocated. This date is calculated during the summarization.
Yes
EmailAddress The e-mail address for the resource. No
EmployeeId The resource identifier within the organization, typically the employee number or social security number.
No
GUID The globally unique ID generated by the system.
No
Id The short code that uniquely identifies the resource.
No
IntegratedType
The indicator that determines whether the resource is integrated with an Enterprise Resource Planning (ERP) system. 'Fusion' indicates the resource is integrated with Oracle Fusion. 'ERP' indicates the resource is integrated with another ERP system.
No
IsActive
The option that determines whether the resource is currently active. Non-active resources may be resources that have left the organization but not deleted from the system since they may have actual hours.
No
IsOverTimeAllowed The option that determines whether the resource is allowed to log overtime hours.
No
LastUpdateDate The date this resource was last updated.
Yes
LastUpdateUser The name of the user that last updated this resource.
Yes
Gateway Providers Data Dictionary
206
Field Description Read-Only
LocationName The name of the location assigned to the resource.
Yes
LocationObjectId The unique ID of the location assigned to the resource.
No
MaxUnitsPerTime The maximum work units per time this resource can perform on all their assigned activities.
Yes
Name The name of the resource. No
ObjectId The unique ID generated by the system.
No
OfficePhone The office phone number for the resource.
No
OtherPhone The other phone numbers for the resource - pager, home phone, cell phone, etc.
No
OvertimeFactor The overtime factor used to compute the overtime price for the resource.
No
ParentObjectId The unique ID of the parent resource of this resource in the hierarchy.
No
PricePerUnit
The planned price per unit for the project expense. This number is multiplied by the planned number of units to compute the planned cost.
Yes
PrimaryRoleId The short code that uniquely identifies the primary role for this resource.
Yes
PrimaryRoleName The name of the primary role for this resource.
Yes
PrimaryRoleObjectId The unique ID of the role that is assigned as the resource's primary role.
No
ResourceNotes The notes about the resource. No
ResourceType
The resource type: Labor resource performs labor and is measured in units of time, Nonlabor resource does not perform labor and is measured in units of time, Material resource has a unit of measure other than time.
No
SequenceNumber The sequence number for sorting. No
P6 Business Objects List
207
Field Description Read-Only
ShiftObjectId The unique ID of the shift associated with the resource.
No
TimesheetApprovalManager
The resource manager assigned to approve timesheets for the resource.
Yes
TimesheetApprovalManagerObjectId
The unique ID of the resource manager assigned to approve timesheets for the resource.
Yes
Title The title of the resource. Yes
UnitOfMeasureAbbreviation
The unique ID of the unit of measure this material resource uses.
Yes
UserName The user's login name. Yes
UserObjectId The unique ID of the associated user. No
UseTimesheets The option that determines whether the resource uses timesheets.
Yes
ResourceAssignment
Description: Resource assignments track the work of resources or roles that are performing various activities.
Field Description Read-Only
ActivityId The short ID that uniquely identifies the activity within the project.
Yes
ActivityName The name of the activity. The activity name does not have to be unique.
Yes
ActivityObjectId The unique ID of the activity to which the resource is assigned.
No
ActivityType Yes
ActualCost
The actual non-overtime plus overtime cost for the resource assignment on the activity. Computed as actual cost = actual regular cost + actual overtime cost.
No
ActualDuration The actual duration for the resource assignment on the activity.
Yes
ActualFinishDate The date the resource actually finished working on the activity.
No
Gateway Providers Data Dictionary
208
Field Description Read-Only
ActualOvertimeCost
The actual overtime cost for the resource assignment on the activity. Computed as actual overtime cost = actual overtime units * cost per time * overtime factor.
No
ActualOvertimeUnits
The actual overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager.
No
ActualRegularCost
The actual non-overtime cost for the resource assignment on the activity. Computed as actual regular cost = actual regular units * cost per time.
No
ActualRegularUnits
The actual non-overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager.
No
ActualStartDate The date the resource actually started working on the activity.
No
ActualThisPeriodCost The actual this period cost (will be labor or nonlabor).
No
ActualThisPeriodUnits The actual this period units (hours) (will be labor or nonlabor).
No
ActualUnits
The actual non-overtime plus overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager.
No
AtCompletionCost The sum of the actual plus remaining costs for the resource assignment on the activity.
No
AtCompletionDuration The total working time from the activity's current start date to the current finish date.
Yes
AtCompletionUnits The sum of the actual plus remaining units for the resource assignment on the activity.
No
AutoComputeActuals The option that determines whether the activity's actual and remaining units, start date, finish date, and percent complete are
Yes
P6 Business Objects List
209
Field Description Read-Only
computed automatically using the planned dates, planned units and the schedule percent complete.
CalendarName The name of the calendar. Yes
CalendarObjectId The unique ID generated by the system for the calendar associated with the resource assignment.
Yes
CostAccountId The ID of associated cost account. Yes
CostAccountName The name of the associated cost account. Yes
CostAccountObjectId The unique ID of the cost account associated with this resource assignment.
No
CreateDate The date this assignment was created. Yes
CreateUser The name of the user that created this assignment.
Yes
Designator A Resource Assignment UDF. No
DrivingActivityDatesFlag The flag indicating whether new resource/role assignments drive activity dates, by default.
No
EBSBudgetCurrentCost EBS_RAS_Budget_Current_Cost No
EBSBudgetCurrentQuantity EBS_RAS_Budget_Current_Qty No
EBSBudgetOriginalCost EBS_RAS_Budget_Original_Cost No
EBSBudgetOriginalQuantity
EBS_RAS_Budget_Original_Qty No
EBSBudgetProposedCost EBS_RAS_Budget_Proposed_Cost No
EBSBudgetProposedQuantity
EBS_RAS_Budget_Proposed_Qty No
EBSBudgetStatusCode EBS_RAS_Budget_Status_Code No
EBSBudgetVersionName EBS_RAS_Budget_Version_Name No
EBSBudgetVersionNumber EBS_RAS_Budget_Version_Number No
EBSPlannedCost EBS_RAS_Planned_Cost No
FinishDate
The finish date of the resource assignment on the activity. Set to the remaining finish date until the activity is completed, then set to the actual finish date.
No
GUID The globally unique ID generated by the system.
No
Gateway Providers Data Dictionary
210
Field Description Read-Only
HasFutureBucketData The flag that indicates whether the assignment has future bucket data.
Yes
IsActive
The option that determines whether the resource is currently active. Non-active resources may be resources that have left the organization but not deleted from the system since they may have actual hours.
Yes
IsActivityFlagged No
IsBaseline The flag that indicates whether this resource assignment is active.
Yes
IsCostUnitsLinked The flag that determines whether or not cost should be calculated based on units.
No
IsOvertimeAllowed The flag that indicates whether the resource is allowed to log overtime hours.
Yes
IsPrimaryResource The flag that indicates whether this resource is the activity's primary resource.
No
IsTemplate The boolean value indicating if this business object is related to a template Project.
Yes
LastUpdateDate The date this assignment was last updated.
Yes
LastUpdateUser The name of the user that last updated this assignment.
Yes
ObjectId The unique ID generated by the system. No
OvertimeFactor
The overtime factor used to compute the overtime price for the resource assignment on this activity. Overtime price = standard price * overtime factor.
No
PendingActualOvertimeUnits
The actual overtime units worked by the resource on this activity.
Yes
PendingActualRegularUnitsThe actual nonovertime units worked by the resource on this activity.
Yes
PendingPercentComplete
The estimate of the percentage of the resource's units of work completed on this activity. The pending percent complete is entered by each resource using Timesheets.
No
PendingRemainingUnits The estimate of the resource's remaining units on this activity. The pending
No
P6 Business Objects List
211
Field Description Read-Only
remaining units is entered by each resource using Timesheets.
PlannedCost
The planned cost for the resource assignment on the activity. Computed as planned cost = planned units * price per time.
No
PlannedDuration
The planned working time for the resource assignment on the activity, from the resource's planned start date to the planned finish date.
No
PlannedFinishDate
The date the resource is scheduled to finish working on the activity. This date is computed by the project scheduler but can be updated manually by the project manager.
No
PlannedLag
The planned time lag between the activity's planned start date and the resource's planned start date on the activity. If the resource is planned to start work when the activity is planned to start, the planned lag is zero.
No
PlannedStartDate
The date the resource is scheduled to begin working on the activity. This date is computed by the project scheduler but can be updated manually by the project manager.
No
PlannedUnits
The planned units of work for the resource assignment on the activity. This field is named BudgetedUnits in Primavera's Engineering and Construction and Maintenance and Turnaround solutions.
No
PlannedUnitsPerTime The planned units per time at which the resource is to perform work on this activity.
No
PricePerUnit The price per time for the resource on this activity. This price is used to compute the resource's cost for the activity.
No
PriorActualOvertimeUnits
The difference between the pending quantity value and the actual quantity value for overtime before applying the new actual value.
Yes
PriorActualRegularUnits The difference between the pending Yes
Gateway Providers Data Dictionary
212
Field Description Read-Only
quantity value and the actual quantity value before applying the new actual value.
Proficiency The skill level that is associated with the role. The values are 'Master', 'Expert', 'Skilled', 'Proficient', and 'Inexperienced'.
No
ProjectId The short code that uniquely identifies the project.
Yes
ProjectObjectId The unique ID of the associated project. Yes
RateSource
The value that indicates which price/unit will be used to calculate costs for the assignment, such as 'Resource', 'Role', and 'Override'.
No
RateType
The rate type that determines which of the five prices specified for the resource will be used to calculate the cost for the resource assignment.
No
RemainingCost
The remaining cost for the resource assignment on the activity. Computed as remaining cost = remaining units * cost per time.
No
RemainingDuration
The remaining duration of the resource assignment. The remaining duration is the remaining working time for the resource assignment on the activity, from the resource's remaining start date to the remaining finish date.
No
RemainingFinishDate
The date the resource is scheduled to finish the remaining work for the activity. This date is computed by the project scheduler but can be updated manually by the project manager.
No
RemainingLag The time lag between the activity's remaining start date and the resource's remaining start date on the activity.
No
RemainingLateFinishDate The remaining late finish date calculated by the scheduler.
Yes
RemainingLateStartDate The remaining late start date calculated by the scheduler.
Yes
RemainingStartDate The date the resource is scheduled to No
P6 Business Objects List
213
Field Description Read-Only
begin the remaining work for the activity. This date is computed by the project scheduler but can be updated manually by the project manager.
RemainingUnits
The remaining units of work to be performed by this resource on this activity. Before the activity is started, the remaining units are the same as the planned units. After the activity is completed, the remaining units are zero.
No
RemainingUnitsPerTime The units per time at which the resource will be performing work on the remaining portion of this activity.
No
ResourceCalendarName The name of the calendar for the resource. Yes
ResourceCurveName The name of the resource curve that determines how resources and costs are distributed over time for this activity.
Yes
ResourceCurveObjectId The unique ID of the resource curve. No
ResourceId The short code that uniquely identifies the resource.
Yes
ResourceName The name of the resource. Yes
ResourceObjectId The unique ID of the associated resource. No
ResourceType The resource type: "Labor", "Nonlabor", or "Material".
No
RoleId The short code that uniquely identifies the role.
Yes
RoleName The name of the role. The role name uniquely identifies the role.
Yes
RoleObjectId
The unique ID of the role the resource is performing on this activity. A resource may be assigned to the same activity more than once, performing different roles.
No
RolledUpWBSObjectId Rolled up WBS Object Ids after filtering either by levels or tagging.
No
StaffedRemainingCost The time distribution of the resource's remaining cost for resource assignments that have filled a role.
Yes
StaffedRemainingUnits The time distribution of the resource's remaining units for resource assignments
Yes
Gateway Providers Data Dictionary
214
Field Description Read-Only
that have filled a role.
StartDate
The start date of the resource assignment on the activity. Set to the remaining start date until the activity is started, then set to the actual start date.
No
TotalActualCost A Resource Assignment UDF to store Total Actual Cost for the Resource Assignment.
No
TotalCommitmentCost A Resource Assignment UDF to store Total Commitment Cost for the Resource Assignment.
No
TotalPlannedCost A Resource Assignment UDF to store Total Planned Cost for the Resource Assignment.
No
UnitsPercentComplete
The percent complete of units for the resource assignment on the activity. Computed as actual units / at completion units * 100. Always in the range 0 to 100.
No
UnstaffedRemainingCost The time distribution of the resource's remaining cost for resource assignments that have not filled a role.
Yes
UnstaffedRemainingUnits The time distribution of the resource's remaining units for resource assignments that have not filled a role.
Yes
VCPRasDemandPeggedAvlDate
VCP Resource Assignment Demand Pegged Avl Date (UDF)
No
VCPRasDemandPeggedAvlOrderNumber
VCP Resource Assignment Demand Pegged Order Number (UDF)
No
VCPRasDemandPeggedAvlOrderType
VCP Resource Assignment Demand Pegged Order Type (UDF)
No
VCPRasInventoryOrgCode VCP Resource Assignment Inventory Organization Code (UDF)
No
VCPRasSelection VCP Resource Assignment code for filtering (UDF)
No
VCPRasSelectionCode VCP Resource Assignment code for filtering (UDF)
No
VCPRasSupplyActualStartDate
VCP Resource Assignment Supply Actual Start Date (UDF)
No
P6 Business Objects List
215
Field Description Read-Only
VCPRasSupplyDockDate VCP Resource Assignment Supply Dock Date (UDF)
No
VCPRasSupplyDueDate VCP Resource Assignment Supply Due Date (UDF)
No
VCPRasSupplyItemId VCP Resource Assignment Supply Item Id (UDF)
No
VCPRasSupplyItemName VCP Resource Assignment Supply Item Name (UDF)
No
VCPRasSupplyOrderDate VCP Resource Assignment Supply Order Date (UDF)
No
VCPRasSupplyOrderNumber
VCP Resource Assignment Supply Order Number (UDF)
No
VCPRasSupplyOrderType VCP Resource Assignment Supply Order Type (UDF)
No
VCPRasSupplyOrganization
VCP Resource Assignment Supply Organization (UDF)
No
VCPRasSupplyPeggedOrderNumber
VCP Resource Assignment Supply Pegged Order Number (UDF)
No
VCPRasSupplyQuantity VCP Resource Assignment Supply Quantity (UDF)
No
VCPRasSupplyShipDate VCP Resource Assignment Supply Ship Date (UDF)
No
VCPRasSupplyStartDte VCPRasSupplyStartDte No
VCPRasSupplyUpdatedArrivalDate
VCP Resource Assignment Supply Updated Arrival Date (UDF)
No
WBSObjectId The unique ID of the WBS for the activity. Yes
ResourceCode
Description: Resource codes are user-defined to classify and categorize resources across the enterprise.
Field Description Read-Only
CodeTypeName The name of the resource code type. Yes
CodeTypeObjectId The unique ID of the resource code type. No
Gateway Providers Data Dictionary
216
Field Description Read-Only
CodeValue The value of the resource code. No
CreateDate The date this resource code was created. Yes
CreateUser The name of the user that created this resource code.
Yes
Description The description of the resource code. No
LastUpdateDate The date this resource code was last updated.
Yes
LastUpdateUser The name of the user that last updated this resource code.
Yes
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent resource code. No
SequenceNumber The sequence number for sorting. No
ResourceCodeType
Description: Resource code types provide a way of classifying resource codes. Resource codes are user-defined codes to calssify and categorize resources across the enterprise.
Field Description Read-Only
CreateDate The date this resource code type was created. Yes
CreateUser The name of the user that created this resource code type.
Yes
IsSecureCode The flag indicating whether this is a secure resource code type.
No
LastUpdateDate The date this resource code was last updated. Yes
LastUpdateUser The name of the user that last updated this resource code.
Yes
Length The maximum number of characters allowed for values of this resource code.
No
Name The name of the resource code type. No
ObjectId The unique ID generated by the system. No
SequenceNumber The sequence number for sorting. No
P6 Business Objects List
217
ResourceRate
Description: Resource rates provide a way of specifying multiple resource prices and maximum units per time values that vary over time.
Field Description Read-Only
CreateDate The date this resource rate was created. Yes
CreateUser The name of the user that created this resource rate.
Yes
EffectiveDate The effective date for the resource price and maximum units per time.
No
LastUpdateDate The date this resource rate was last updated. Yes
LastUpdateUser The name of the user that last updated this resource rate.
Yes
MaxUnitsPerTime The maximum work units per time this resource can perform on all their assigned activities.
No
ObjectId The unique ID generated by the system. No
PricePerUnit The non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to.
No
PricePerUnit2 The non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to.
No
PricePerUnit3 The non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to.
No
PricePerUnit4 The non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to.
No
PricePerUnit5 The non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to.
No
ResourceId The short code that uniquely identifies the resource.
Yes
ResourceName The name of the resource. Yes
ResourceObjectId The unique ID of the associated resource. No
ShiftPeriodObjectId The unique ID of the associated shift. No
Gateway Providers Data Dictionary
218
ResourceCurve
Description: Resource curves enable you to specify how you want resource units or costs spread over the duration of an activity.
Field Description Read-Only
CreateDate The date this resource code was created. Yes
CreateUser The name of the user that created this resource code.
Yes
CurveData The 21-point curve data. No
IsDefault The flag that identifies the default curve. Yes
LastUpdateDate The date this resource code was last updated..
Yes
LastUpdateUser The name of the user that last updated this resource code.
Yes
Name The name of the resource curve No
ObjectId The unique ID generated by the system No
ResourceRole
Description: A resource role object represents an association between a resource object and a role object.
Field Description Read-Only
CreateDate The date this resource code was created. Yes
CreateUser The name of the user that created this resource code.
Yes
LastUpdateDate The date this resource code was last updated..
Yes
LastUpdateUser The name of the user that last updated this resource code.
Yes
ObjectId The unique ID generated by the system. No
Proficiency The resource's proficiency at performing this role.
No
ResourceId The short code that uniquely identifies the resource.
Yes
ResourceName The name of the resource. Yes
P6 Business Objects List
219
Field Description Read-Only
ResourceObjectId The unique ID of the resource. No
RoleId The short code that uniquely identifies the role.
Yes
RoleName The name of the role. Yes
RoleObjectId The unique ID of the role. No
Risk
Description: The risk object represents a probabilistic event or condition which if it occurs has an impact on the project.
Field Description Read-Only
Cause The description of the cause of the Risk. No
Description The description of the Risk. No
Effect The description of the risks effect on the project. No
Id The ID of the Risk. Must be unique within a project. No
IdentifiedDate The date this risk was identified. No
Name The name of the Risk. Does not need to be unique. No
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. No
ResponseTotalCost
The total estimated cost for the risk. No
Status The current status of the Risk. Valid values are 'Proposed', 'Open', 'Rejected', 'Managed', and 'Impacted'.
No
Type The type of the risk. Valid values are 'Threat' and 'Opportunity'.
No
RiskImpact
Description: The risk impact object stores the pre-response qualitative value assigned to a risk for each of the risk thresholds.
Gateway Providers Data Dictionary
220
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ProjectObjectId The unique ID of the associated project. Yes
ProjectId The short name of the associated project. Yes
RiskId The short name of the associated risk. Yes
RiskName The name of the associated risk. Yes
RiskObjectId The unique ID of the associated risk. No
RiskThresholdLevelCode
The short name of the associated risk threshold level.
Yes
RiskThresholdLevelName
The name of the associated risk threshold level.
Yes
RiskThresholdLevelObjectId
The unique ID of the associated risk threshold level.
No
RiskThresholdName The name of the associated risk threshold. Yes
RiskThresholdObjectId The unique ID of the associated risk threshold. Yes
RiskMatrix
Description: The risk matrix object contains the name and description of each probability and impact diagram (PID). The Risk Matrix is then used to qualitatively assess each risk and assign a score.
Field Description Read-Only
Description The description of the risk matrix. No
ImpactThresholdLevel
The number of levels for the impact thresholds assigned to the risk scoring matrix. This impact level with the probability level determines the size of the matrix.
Yes
IsActive
The indication of whether the response plan is currently active for the associated risk. Only one response plan can be active at a given time for a risk.
No
Name The name of the risk matrix. No
ObjectId The unique ID generated by the system. No
P6 Business Objects List
221
Field Description Read-Only
ProbabilityThresholdLevel
The number of levels for the probability threshold assigned to the risk matrix. This probability level with the impact level determines the size of the matrix.
Yes
RiskScoringMethod The calculation method used to determine the risk score. Valid values are 'Highest', 'Average of Impacts', 'Average of Individual Scores'.
No
RiskMatrixScore
Description: The risk matrix score object stores the score values from the probability and impact diagram (PID) of the risk score matrix.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ProbabilityThresholdLevel
The level number of the probability threshold. Valid numbers are 1-9.
No
RiskMatrixName The name of the associated risk matrix. Yes
RiskMatrixObjectId The unique ID of the associated risk matrix. No
Severity1 The first severity level of the Risk Matrix Score.
No
Severity1Label The label for the first severity level. No
Severity2 The second severity level of the Risk Matrix Score.
No
Severity2Label The label for the second severity level. No
Severity3 The third severity level of the Risk Matrix Score.
No
Severity3Label The label for the third severity level. No
Severity4 The fourth severity level of the Risk Matrix Score.
No
Severity4Label The label for the fourth severity level. No
Severity5 The fifth severity level of the Risk Matrix Score.
No
Severity5Label The label for the fifth severity level. No
Gateway Providers Data Dictionary
222
Field Description Read-Only
Severity6 The sixth severity level of the Risk Matrix Score.
No
Severity6Label The label for the sixth severity level. No
Severity7 The seventh severity level of the Risk Matrix Score.
No
Severity7Label The label for the seventh severity level. No
Severity8 The eighth severity level of the Risk Matrix Score.
No
Severity8Label The label for the eighth severity level. No
Severity9 The ninth severity level of the Risk Matrix Score.
No
Severity9Label The label for the ninth severity level. No
RiskMatrixThreshold
Description: The risk matrix threshold object creates a relationship between a RiskThreshold object and a RiskMatrix object. This allows a single RiskThreshold object to be associated with multiple RiskMatrix objects.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
RiskMatrixName The name of the associated risk matrix. Yes
RiskMatrixObjectId The unique ID of the associated risk matrix. No
RiskThresholdName The name of the associated risk threshold. Yes
RiskThresholdObjectId The unique ID of the associated risk threshold.
No
RiskResponseAction
Description: The risk response action object contains the detailed steps that need to occur to complete the risk response plan. Multiple actions can be associated with one response plan and each action can be linked to an activity in the project.
P6 Business Objects List
223
Field Description Read-Only
ActivityId The short name of the associated activity. Yes
ActivityName The name of the associated activity. Yes
ActivityObjectId The unique ID of the associated activity. No
ActualCost The actual cost. No
FinishDate The finish date of the risk response action. If an activity is assigned, the risk response action uses the activity finish date.
No
Id The short name of the risk response plan. No
Name The name of the risk response plan. No
ObjectId The unique ID generated by the system. No
PlannedCost The planned cost. No
PlannedFinishDate The planned finish date. No
PlannedStartDate The planned start date. No
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. Yes
RemainingCost The remaining cost associated with the risk response action.
No
ResourceId The short name of the associated resource. Yes
ResourceName The name of the associated resource. Yes
ResourceObjectId The unique ID of the associated resource. No
RiskId The short name of the associated risk. Yes
RiskResponsePlanIdThe short name of the associated risk response plan.
Yes
RiskResponsePlanName
The name of the associated risk response plan. Yes
RiskResponsePlanObjectId
The unique ID of the associated risk response plan.
No
StartDate The start date of the risk response action. If an activity is assigned, the risk response action uses the activity start date.
No
Status The status of the risk response action. Valid values are 'Proposed', 'Sanctioned', 'Rejected', 'InProgress', and 'Complete'.
No
Gateway Providers Data Dictionary
224
RiskResponseActionImpact
Description: The risk response action impact object is a post-risk response action qualitative value that is assigned to a risk for each of the risk thresholds.
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. Yes
RiskId The short name of the associated risk. Yes
RiskResponseActionId
The short name of the associated risk response action.
Yes
RiskResponseActionName
The name of the associated risk response action.
Yes
RiskResponseActionObjectId
The unique ID of the associated risk response action.
No
RiskThresholdLevelCode
The short name of the associated risk threshold level.
Yes
RiskThresholdLevelName
The name of the associated risk threshold level. Yes
RiskThresholdLevelObjectId
The unique ID of the associated risk threshold level.
No
RiskThresholdName The name of the associated risk threshold. Yes
RiskThresholdObjectId
The unique ID of the associated risk threshold. Yes
RiskResponsePlan
Description: The risk response plan object communicates how the project team plans to address the identified risk.
Field Description Read-Only
Id The short name of the risk response plan. No
IsActive The indication of whether the response plan is currently active for the associated risk. Only one response plan can be active at a given time for a risk.
No
Name The name of the risk response plan. No
P6 Business Objects List
225
Field Description Read-Only
ObjectId The unique ID generated by the system. No
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. Yes
ResponseType
The risk response plan type. If the risk is a threat, the valid types are 'Avoid', 'Transfer', 'Reduce', and 'Accept'. If the risk is a opportunity, the valid types are 'Exploit', 'Facilitate', 'Enhance', and 'Reject'.
No
RiskId The short name of the associated risk. Yes
RiskName The name of the associated risk. Yes
RiskObjectId The unique ID of the associated risk. No
RiskThreshold
Description: The risk threshold object contains the name, description, and type of each risk threshold. Risk thresholds provide a mechanism for setting up the criteria that is used to assess the risk.
Field Description Read-Only
Name The name of the risk threshold. No
ObjectId The unique ID generated by the system. No
ThresholdType The type of Risk Threshold. Valid types are 'Probability', 'Tolerance', 'Schedule', 'Cost', 'Relative Schedule', 'Relative Cost' and 'User Defined'.
Yes
RiskThresholdLevel
Description: The risk threshold level object stores the level information (e.g. Low, Medium, High) for each risk threshold.
Field Description Read-Only
Code The 10 character code for the threshold level. No
Color The Hex representation for the color e.g. 0xFFFFFF.
No
CostRange The cost range of the threshold level. No
Gateway Providers Data Dictionary
226
Field Description Read-Only
Level The valid values are between 0 and 9. Defines a level for the Risk Threshold.
No
Name The 40 character name for the threshold level. No
ObjectId The unique ID generated by the system. No
ProbabilityRange The probability range of the threshold level. No
Range The user defined range. No
RiskThresholdName
The name of the associated risk threshold. Yes
RiskThresholdObjectId
The unique ID of the associated risk threshold. No
ScheduleRange The schedule range of the threshold level. No
ThresholdType The type of Risk Threshold. Valid types are 'Probability', 'Tolerance', 'Schedule', 'Cost', 'Relative Schedule', 'Relative Cost' and 'User Defined'.
Yes
ToleranceRange The tolerance range of the threshold level. No
Role
Description: Roles are project personnel job titles or skills, such as mechanical engineer, inspector, or carpenter. They represent a type of resource with a certain level of proficiency rather than a specific individual.
Field Description Read-Only
CalculateCostFromUnits
The option that indicates whether costs and quantities are linked, and whether quantities should be updated when costs are updated.
No
CreateDate The date this role was created. Yes
CreateUser The name of the user that created this role. Yes
Id The short code that uniquely identifies the role. No
LastUpdateDate The date this role was last updated. Yes
LastUpdateUser The name of the user that last updated this role. Yes
Name The name of the role. No
ObjectId The unique ID generated by the system. No
ParentObjectId The unique ID of the parent role of this role in the No
P6 Business Objects List
227
Field Description Read-Only
hierarchy.
Responsibilities The responsibilities for the role. No
SequenceNumber
The sequence number for sorting. No
RoleLimit
Description: Role limits define the limits of the maximum work units per time for a Role in a time period.
Field Description Read-Only
CreateDate The date this resource code was created. Yes
CreateUser The name of the user that created this resource code.
Yes
EffectiveDate The effective date for the role maximum units per time.
No
LastUpdateDate The date this resource code was last updated..
Yes
LastUpdateUser The name of the user that last updated this resource code.
Yes
MaxUnitsPerTime the maximum work units per time this role can perform on all their assigned activities.
No
Role ObjectId The unique ID generated by the system. No
SequenceNumber The sequence number for sorting No
RoleRate
Description: Role rates enable you to select a predefined price per unit for cost calculating when assigning the role to an activity.
Field Description Read-Only
CreateDate The date this role rate was created. Yes
CreateUser The name of the user that created this role rate. Yes
LastUpdateD The date this role rate was last updated. Yes
Gateway Providers Data Dictionary
228
Field Description Read-Only
ate
LastUpdateUser
The name of the user that last updated this role rate. Yes
ObjectId The unique ID generated by the system. No
PricePerUnit The non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to.
No
PricePerUnit2The non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to.
No
PricePerUnit3The non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to.
No
PricePerUnit4The non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to.
No
PricePerUnit5The non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to.
No
RoleId The short code that uniquely identifies the role. Yes
RoleName The name of the role. Yes
RoleObjectId The unique ID of the associated role. No
UDFType
Description: User-defined fields (UDFs) enable users to add custom fields and values to the project database.
UDF codes from P6 can be exported to Prime or Sample providers using the Export Global Data flow. However, first export the project UDFs, and then export all other UDF dictionaries. The default field mapping template must included all fields listed below.
Field Description Read-Only
CreateDate The date this user-defined field was created. Yes
CreateUser The name of the user that created this user-defined field.
Yes
DataType The data type of the user-defined field: "Text", "Start Date", "Finish Date", "Cost", "Double",
No
P6 Business Objects List
229
Field Description Read-Only
"Integer", "Indicator", or "Code".
IsCalculated The flag indicating whether this is a calculated user defined field type.
Yes
IsConditional The flag indicating whether this is a indicator user defined field type.
Yes
IsSecureCode The flag indicating whether this is a secure code type.
No
LastUpdateDate The date this user-defined field was last updated. Yes
LastUpdateUser The name of the user that last updated this user-defined field.
Yes
ObjectId The unique ID generated by the system. No
SubjectArea The subject area of the user-defined field. No
Title The name/title of the user-defined field. No
UnitOfMeasure
Description: The unit of measure provides definition of units of measure for material resources.
Field Description Read-Only
CreateDate The date this resource code was created. Yes
CreateUser The name of the user that created this resource code.
Yes
LastUpdateDate The date this resource code was last updated. Yes
LastUpdateUser The name of the user that last updated this resource code.
Yes
Name The name of the unit of measure. No
ObjectId The unique ID generated by the system. No
SequenceNumber The sequence number for sorting No
WBS
Description: The project work breakdown structure (WBS) is a hierarchical arrangement of the products and services produced during and by a project. Each element of a WBS may contain more-detailed WBS elements, activities, or both. WBS are hierarchical objects.
Gateway Providers Data Dictionary
230
Field Description Read-Only
AnticipatedFinishDate The anticipated finish date of WBS, project and EPS elements.
No
AnticipatedStartDate The anticipated start date of WBS, project and EPS elements.
No
Code The short code assigned to each WBS element for identification.
Ni
ContainsSummaryData The Boolean contains summary data flag of the WBS.
Yes
CreateDate The created date of the WBS. Yes
CreateUser The user who created the WBS. Yes
CurrentBudget The current budget of the WBS. Yes
CurrentVariance The current variance of the WBS. Yes
DistributedCurrentBudget The distributed current budget of the WBS.
Yes
EarnedValueComputeType Indicates earned value compute type of the WBS
No
EarnedValueETCComputeType Indicates earned value ETC compute type of the WBS
No
EarnedValueETCUserValue The earned value ETC user value for WBS computing earned value.
No
EarnedValueUserPercent The earned value user percent for WBS to compute earned value.
No
EBSBudgetCurrentCost EBS_WBS_Budget_Current_Cost No
EBSBudgetCurrentQuantity EBS_WBS_Budget_Current_Qty No
EBSBudgetOriginalCost EBS_WBS_Budget_Original_Cost No
EBSBudgetOriginalQuantity EBS_WBS_Budget_Original_Qty No
EBSBudgetProposedCost EBS_WBS_Budget_Proposed_Cost
No
EBSBudgetProposedQuantity EBS_WBS_Budget_Proposed_Qty
No
EBSBudgetStatusCode EBS_WBS_Budget_Status_Code No
EBSBudgetVersionName EBS_WBS_Budget_Version_Name
No
EBSBudgetVersionNumber EBS_WBS_Budget_Version_Num No
P6 Business Objects List
231
Field Description Read-Only
ber
EBSPlannedCost EBS_WBS_Planned_Cost No
FinishDate The date finish date of the WBS. Yes
ForecastFinishDate The date forecast finish date of the WBS.
Yes
ForecastStartDate The date forecast start date of the WBS.
Yes
GUID The GUID of the WBS. No
IndependentETCLaborUnits The independent ETC labor units of the WBS.
No
IndependentETCTotalCost The independent ETC total cost of the WBS.
No
IntegratedType Indicates integrated type of the WBS
No
IsBaseline The Boolean is baseline flag of the WBS.
Yes
IsTemplate The Boolean is template flag of the WBS.
Yes
IsWorkPackage Whether this WBS is a work package.
No
LastUpdateDate The last update date of the WBS. Yes
LastUpdateUser The last update user of the WBS. Yes
Name The name of the WBS. No
ObjectId The unique ID generated by the system.
No
OBSName The obs name of the WBS. Yes
OBSObjectId The obs object id of the WBS. No
OriginalBudget The original budget of the project. No
ParentObjectId The unique ID of the parent WBS of this WBS in the hierarchy.
No
ProjectId The project Id of the WBS. Yes
ProjectObjectId The unique ID of the associated project.
No
ProposedBudget The proposed budget of the WBS. Yes
Gateway Providers Data Dictionary
232
Field Description Read-Only
SequenceNumber The sequence number of the WBS.
No
StartDate The start date of the WBS. Yes
Status The status of the WBS. No
SummaryAccountingVarianceByCost
The summary accounting variance by cost of the WBS.
Yes
SummaryAccountingVarianceByLaborUnits
The summary accounting variance by labor units of the WBS.
Yes
SummaryActivityCount The summary activity count of the WBS.
Yes
SummaryActualDuration The summary actual duration of the WBS.
Yes
SummaryActualExpenseCost The summary actual expense costof the WBS.
Yes
SummaryActualFinishDate The summary actual finish date of the WBS.
Yes
SummaryActualLaborCost The summary actual labor cost of the WBS.
Yes
SummaryActualLaborUnits The summary actual labor units of the WBS.
Yes
SummaryActualMaterialCost The summary actual material cost of the WBS.
Yes
SummaryActualNonLaborCost The summary actual nonlabor cost of the WBS.
Yes
SummaryActualNonLaborUnits The summary actual nonlabor units of the WBS.
Yes
SummaryActualStartDate The summary actual start date of the WBS.
Yes
SummaryActualThisPeriodCost The summary actual this period cost of the WBS.
Yes
SummaryActualThisPeriodLaborCost
The summary actual this period labor cost of the WBS.
Yes
SummaryActualThisPeriodLaborUnits
The summary actual this period labor unit of the WBS.
Yes
SummaryActualThisPeriodMaterialCost
The summary actual this period material cost of the WBS.
Yes
P6 Business Objects List
233
Field Description Read-Only
SummaryActualThisPeriodNonLaborCost
The summary actual this period nonlabor cost of the WBS.
Yes
SummaryActualThisPeriodNonLaborUnits
The summary actual this period nonlabor unit of the WBS.
Yes
SummaryActualTotalCost The summary actual total cost of the WBS.
Yes
SummaryActualValueByCost The summary actual value by cost of the WBS.
Yes
SummaryActualValueByLaborUnits
The summary actual value by labor units of the WBS.
Yes
SummaryAtCompletionDuration The summary at completion duration of the WBS.
Yes
SummaryAtCompletionExpenseCost
The summary at completion expense cost of the WBS.
Yes
SummaryAtCompletionLaborCost
The summary at completion labor cost of the WBS.
Yes
SummaryAtCompletionLaborUnits
The summary at completion labor units of the WBS.
Yes
SummaryAtCompletionMaterialCost
The summary at completion material cost of the WBS.
Yes
SummaryAtCompletionNonLaborCost
The summary at completion nonlabor cost of the WBS.
Yes
SummaryAtCompletionNonLaborUnits
The summary at completion nonlabor units of the WBS.
Yes
SummaryAtCompletionTotalCostThe summary at completion total cost of the WBS.
Yes
SummaryAtCompletionTotalCostVariance
The summary at completion total cost variance of the WBS.
Yes
SummaryBaselineCompletedActivityCount
The summary baseline completed activity count of the WBS.
Yes
SummaryBaselineDuration The summary baseline duration of the WBS.
Yes
SummaryBaselineExpenseCost The summary baseline expense cost of the WBS.
Yes
SummaryBaselineFinishDate The summary baseline finish date of the WBS.
Yes
SummaryBaselineInProgressActi The summary baseline in progress Yes
Gateway Providers Data Dictionary
234
Field Description Read-Only
vityCount activity count of the WBS.
SummaryBaselineLaborCost The summary baseline labor cost of the WBS.
Yes
SummaryBaselineLaborUnits The summary baseline labor units of the WBS.
Yes
SummaryBaselineMaterialCost The summary baseline material cost of the WBS.
Yes
SummaryBaselineNonLaborCostThe summary baseline nonlabor cost of the WBS.
Yes
SummaryBaselineNonLaborUnitsThe summary baseline nonlabor Units of the WBS.
Yes
SummaryBaselineNotStartedActivityCount
The summary baseline not start activity count of the WBS.
Yes
SummaryBaselineStartDate The summary baseline start date of the WBS.
Yes
SummaryBaselineTotalCost The summary baseline total cost of the WBS.
Yes
SummaryBudgetAtCompletionByCost
The summary budget at completion by cost of the WBS.
Yes
SummaryBudgetAtCompletionByLaborUnits
The summary budget at completion by labor units of the WBS.
Yes
SummaryCompletedActivityCount
The summary completed activity count of the WBS.
Yes
SummaryCostPercentComplete The summary cost percent complete of the WBS.
Yes
SummaryCostPercentOfPlanned The summary cost percent of planned of the WBS.
Yes
SummaryCostPerformanceIndexByCost
The summary cost performance index by cost of the WBS.
Yes
SummaryCostPerformanceIndexByLaborUnits
The summary cost performance index by labor units of the WBS.
Yes
SummaryCostVarianceByCost The summary cost variance by cost of the WBS.
Yes
SummaryCostVarianceByLaborUnits
The summary cost variance by labor units of the WBS.
Yes
SummaryCostVarianceIndex The summary cost variance index Yes
P6 Business Objects List
235
Field Description Read-Only
of the WBS.
SummaryCostVarianceIndexByCost
The summary cost variance index by cost of the WBS.
Yes
SummaryCostVarianceIndexByLaborUnits
The summary cost variance index by labor unit of the WBS.
Yes
SummaryDurationPercentComplete
The summary duration percent complete of the WBS.
Yes
SummaryDurationPercentOfPlanned
The summary duration percent of planned of the WBS.
Yes
SummaryDurationVariance The summary duration variance of the WBS.
Yes
SummaryEarnedValueByCost The summary earned value by cost of the WBS.
Yes
SummaryEarnedValueByLaborUnits
The summary earned value by labor units of the WBS.
Yes
SummaryEstimateAtCompletionByCost
The summary estimate at completion by cost of the WBS.
Yes
SummaryEstimateAtCompletionByLaborUnits
The summary estimate at completion by labor units of the WBS.
Yes
SummaryEstimateAtCompletionHighPercentByLaborUnits
The summary estimate at completion high percent by labor units of the WBS.
Yes
SummaryEstimateAtCompletionLowPercentByLaborUnits
The summary estimate at completion low percent by labor units of the WBS.
Yes
SummaryEstimateToCompleteByCost
The summary estimate to completion by cost of the WBS.
Yes
SummaryEstimateToCompleteByLaborUnits
The summary estimate to completion by labor units of the WBS.
Yes
SummaryExpenseCostPercentComplete
The summary expense cost percent complete of the WBS.
Yes
SummaryExpenseCostVariance The summary expense cost variance of the WBS.
Yes
SummaryFinishDateVariance The summary finish date variance of the WBS.
Yes
Gateway Providers Data Dictionary
236
Field Description Read-Only
SummaryInProgressActivityCount
The summary in progress activity count of the WBS.
Yes
SummaryLaborCostPercentComplete
The summary labor cost percent complete of the WBS.
Yes
SummaryLaborCostVariance The summary labor cost variance of the WBS.
Yes
SummaryLaborUnitsPercentComplete
The summary labor units percent complete of the WBS.
Yes
SummaryLaborUnitsVariance The summary labor units variance of the WBS.
Yes
SummaryMaterialCostPercentComplete
The summary material cost percent complete of the WBS.
Yes
SummaryMaterialCostVariance The summary material cost variance of the WBS.
Yes
SummaryNonLaborCostPercentComplete
The summary nonlabor cost percent complete of the WBS.
Yes
SummaryNonLaborCostVarianceThe summary nonlabor cost variance of the WBS.
Yes
SummaryNonLaborUnitsPercentComplete
The summary nonlabor units percent complete of the WBS.
Yes
SummaryNonLaborUnitsVariance
The summary nonlabor units variance of the WBS.
Yes
SummaryNotStartedActivityCount
The summary non started activity count of the WBS.
Yes
SummaryPerformancePercentCompleteByCost
The summary performance percent complete by cost of the WBS.
Yes
SummaryPerformancePercentCompleteByLaborUnits
The summary performance percent complete by labor units of the WBS.
Yes
SummaryPlannedCost The summary planned cost of the WBS.
Yes
SummaryPlannedDuration The summary planned duration of the WBS.
Yes
SummaryPlannedExpenseCost The summary planned expense cost of the WBS.
Yes
SummaryPlannedFinishDate The summary planned finish date Yes
P6 Business Objects List
237
Field Description Read-Only
of the WBS.
SummaryPlannedLaborCost The summary planned labor cost of the WBS.
Yes
SummaryPlannedLaborUnits The summary planned labor units of the WBS.
Yes
SummaryPlannedMaterialCost The summary planned material cost of the WBS.
Yes
SummaryPlannedNonLaborCost The summary planned non labor cost of the WBS.
Yes
SummaryPlannedNonLaborUnitsThe summary planned non labor units of the WBS.
Yes
SummaryPlannedStartDate The summary planned start date of the WBS.
Yes
SummaryPlannedValueByCost The summary planned value by cost of the WBS.
Yes
SummaryPlannedValueByLaborUnits
The summary planned value by labor units of the WBS.
Yes
SummaryProgressFinishDate The summary progress finish date of the WBS.
Yes
SummaryRemainingDuration The summary remaining duration of the WBS.
Yes
SummaryRemainingExpenseCost
The summary remaining expense cost of the WBS.
Yes
SummaryRemainingFinishDate The summary remaining finish date of the WBS.
Yes
SummaryRemainingLaborCost The summary remaining labor cost of the WBS.
Yes
SummaryRemainingLaborUnits The summary remaining labor units of the WBS.
Yes
SummaryRemainingMaterialCostThe summary remaining material cost of the WBS.
Yes
SummaryRemainingNonLaborCost
The summary remaining non labor cost of the WBS.
Yes
SummaryRemainingNonLaborUnits
The summary remaining non labor units of the WBS.
Yes
SummaryRemainingStartDate The summary remaining start date of the WBS.
Yes
Gateway Providers Data Dictionary
238
Field Description Read-Only
SummaryRemainingTotalCost The summary remaining total cost of the WBS.
Yes
SummarySchedulePercentComplete
The summary schedule percent complete of the WBS.
Yes
SummarySchedulePercentCompleteByLaborUnits
The summary schedule percent complete by labor units of the WBS.
Yes
SummarySchedulePerformanceIndexByCost
The summary schedule performance index by cost of the WBS.
Yes
SummarySchedulePerformanceIndexByLaborUnits
The summary schedule performance index by labor units of the WBS.
Yes
SummaryScheduleVarianceByCost
The summary schedule variance by cost of the WBS.
Yes
SummaryScheduleVarianceByLaborUnits
The summary schedule variance by labor units of the WBS.
Yes
SummaryScheduleVarianceIndex
The summary schedule variance index of the WBS.
Yes
SummaryScheduleVarianceIndexByCost
The summary schedule variance index by cost of the WBS.
Yes
SummaryScheduleVarianceIndexByLaborUnits
The summary schedule variance index by labor units of the WBS.
Yes
SummaryStartDateVariance The summary start date variance of the WBS.
Yes
SummaryToCompletePerformanceIndexByCost
The summary to complete performance index by cost of the WBS.
Yes
SummaryTotalCostVariance The summary total cost variance of the WBS.
Yes
SummaryTotalFloat The summary total float of the WBS.
Yes
SummaryUnitsPercentComplete The summary units percent complete of the WBS.
Yes
SummaryVarianceAtCompletionByLaborUnits
The summary variance at completion by labor units of the WBS.
Yes
TotalActualCost A WBS UDF to store Total Actual No
P6 Business Objects List
239
Field Description Read-Only
Cost for the WBS.
TotalBenefitPlan The total benefit plan of the WBS. Yes
TotalBenefitPlanTally The total benefit plan tally of the WBS.
Yes
TotalCommitmentCost A WBS UDF to store Total Commitment Cost for the WBS.
No
TotalPlannedCost A WBS UDF to store Total Planned Cost for the WBS.
No
TotalSpendingPlan The total spending plan of the WBS.
Yes
TotalSpendingPlanTally The total spending plan tally of the WBS.
Yes
UnallocatedBudget The unallocated budget of the WBS.
Yes
UndistributedCurrentVariance The undistributed current variance of the WBS.
Yes
WBSCategoryObjectId The unique WBS category objectId of the WBS.
No
WBSMilestonePercentComplete The wbs milestone percent complete of the WBS.
Yes
WBSCategory
Description: As their name implies, WBS categories are used to categorize WBS elements. They are defined globally.
Field Description Read-Only
CreateDate The date this WBS category was created. Yes
CreateUser The name of the user that created this WBS category.
Yes
LastUpdateDate The date this WBS category was last updated. Yes
LastUpdateUser The name of the user that last updated this WBS category.
Yes
Name The name of the WBS category. No
ObjectId The unique ID generated by the system. No
Gateway Providers Data Dictionary
240
Field Description Read-Only
SequenceNumber
The sequence number of the WBS category. No
WBSExpenseSpread
Description: Expense spread data per WBS per ExpenseCategory.
Note: Expense category summaries are only supported by financial period.
Field Description Read-Only
ActualCost Actual Cost. No
AtCompletionCost At completion cost. No
EndDate Spread end date. No
ExpenseCategoryName
Expense Category name. No
ExpenseCategoryObjectId
The unique ID of expense category. No
ObjectId The unique ID generated by the system. No
PeriodType The type of period for summarized spread data.
No
PlannedCost Planned cost. No
RemainingCost Remaining cost. No
StartDate Spread start date. No
WBSCode WBS Code. No
WBSObjectId The unique ID of the WBS. No
WBSResourceSpread
Description: Spread data per WBS per Resource
P6 Business Objects List
241
Field Description Read-Only
ActualCost
Actual cost.
The actual non-overtime plus overtime cost for the resource for the wbs or project. Computed as actual cost = actual regular cost + actual overtime cost.
No
ActualOvertimeCost
Actual Overtime Cost. No
ActualOvertimeUnits
Actual Overtime Units. No
ActualRegularCost Actual Regular Cost. No
ActualRegularUnits Actual Regular Units. No
ActualUnits Actual Units. No
AtCompletionCost At Completion Cost. No
AtCompletionUnits At Completion Units No
EndDate Spread end date. No
Limit Limit. No
ObjectId The unique ID generated by the system. No
PeriodActualCost Period Actual Cost. No
PeriodActualUnits Period Actual Units. No
PeriodAtCompletionCost
Period At Completion Cost. No
PeriodAtCompletionUnits
Period At Completion Units. No
PeriodType The type of period for summarized spread data. No
Gateway Providers Data Dictionary
242
Field Description Read-Only
PlannedCost Planned Cost. No
PlannedUnits Planned Units. No
ProjectId Project short name. No
ProjectObjectId The unique ID of the project. No
RemainingCost Remaining Cost. No
RemainingLateCost
Remaining Late Cost. No
RemainingLateUnits
Remaining Late Units. No
RemainingUnits Remaining Units No
ResourceId Resource short name. No
ResourceObjectId The unique ID of the resource. No
RoleId Role short name. No
RoleObjectId The unique ID of the role. No
StaffedActualCost Staffed Actual Cost. No
StaffedActualOvertimeCost
Staffed Actual Overtime Cost. No
StaffedActualOvertimeUnits
Staffed Actual Overtime Units. No
StaffedActualRegularCost
Staffed Actual Regular Cost. No
StaffedActualRegularUnits
Staffed Actual Regular Units. No
StaffedActualUnits Staffed Actual Units. No
StaffedAtCompletionCost
Staffed At Completion Cost. No
StaffedAtCompletionUnits
Staffed At Completion Units. No
StaffedPlannedCost
Staffed Planned Cost. No
StaffedPlannedUnits
Staffed Planned Units. No
StaffedRemainingCost
Staffed Remaining Cost. No
P6 Business Objects List
243
Field Description Read-Only
StaffedRemainingLateCost
StaffedRemainingLateCost. No
StaffedRemainingLateUnits
Staffed Remaining Late Units. No
StaffedRemainingUnits
Staffed Remaining Units. No
StartDate Spread start date. No
WBSCode WBS code. No
WBSObjectId The unique ID of the WBS. No
WBSSpread
Description: Summarized spread data in each WBS
Field Description Read-Only
ActualCost Actual Cost. No
ActualExpenseCost Actual Expense Cost. No
ActualLaborCost Actual Labor Cost. No
ActualLaborUnits Actual Labor Units.
No
ActualMaterialCost Actual Material Cost.
No
ActualNonlaborCost Actual Nonlabor Cost.
No
ActualNonlaborUnits Actual Nonlabor Units.
No
ActualTotalCost
Actual Total Cost.
No
AtCompletionExpenseCost
At Completion Expense Cost.
No
AtCompletionLaborCost At Completion Labor Cost.
No
Gateway Providers Data Dictionary
244
Field Description Read-Only
AtCompletionLaborUnits At Completion Labor Units.
No
AtCompletionMaterialCost
At Completion Material Cost. No
AtCompletionNonlaborCost
At Completion Nonlabor Cost. No
AtCompletionNonlaborUnits
At Completion Nonlabor Units. No
AtCompletionTotalCost At Completion Total Cost.
No
BaselinePlannedExpenseCost
Baseline Planned Expense Cost. No
BaselinePlannedLaborCost
Baseline Planned Labor Cost. No
BaselinePlannedLaborUnits
Baseline Planned Labor Units. No
BaselinePlannedMaterialCost
Baseline Planned Material Cost. No
BaselinePlannedNonlaborCost
Baseline Planned Nonlabor Cost. No
BaselinePlannedNonlaborUnits
Baseline Planned Nonlabor Units. No
BaselinePlannedTotalCost
Baseline Planned Total Cost. No
EarnedValueCost Earned Value Cost. No
P6 Business Objects List
245
Field Description Read-Only
EarnedValueLaborUnits Earned Value Labor Units. No
EndDate Spread end date. No
EstimateAtCompletionCost
Estimate At Completion Cost. No
EstimateAtCompletionLaborUnits
Estimate At Completion Labor Units. No
EstimateToCompleteCost
Estimate To Complete Cost. No
EstimateToCompleteLaborUnits
Estimate To Complete Labor Units. No
ObjectId The unique ID generated by the system. No
PeriodActualCost Period Actual Cost. No
PeriodActualExpenseCost
Period Actual Expense Cost. No
PeriodActualLaborCost Period Actual Labor Cost. No
PeriodActualLaborUnits Period Actual Labor Units. No
PeriodActualMaterialCost
Period Actual Material Cost. No
PeriodActualNonLaborCost
Period Actual NonLabor Cost. No
PeriodActualNonLaborUnits
Period Actual NonLabor Units. No
PeriodAtCompletionExpenseCost
Period At Completion Expense Cost. No
PeriodAtCompletionLaborCost
Period At Completion Labor Cost. No
Gateway Providers Data Dictionary
246
Field Description Read-Only
PeriodAtCompletionLaborUnits
Period At Completion Labor Units. No
PeriodAtCompletionMaterialCost
Period At Completion Material Cost. No
PeriodAtCompletionNonLaborCost
Period At Completion NonLabor Cost. No
PeriodAtCompletionNonLaborUnits
Period At Completion NonLabor Units. No
PeriodAtCompletionTotalCost
Period At Completion Total Cost. No
PeriodEarnedValueCost Period Earned Value Cost. No
PeriodEarnedValueLaborUnits
Period Earned Value Labor Units. No
PeriodEstimateAtCompletionCost
Period Estimate At Completion Cost. No
PeriodEstimateAtCompletionLaborUnits
Period Estimate At Completion Labor Units. No
PeriodPlannedValueCost Period Planned Value Cost. No
PeriodPlannedValueLaborUnits
Period Planned Value Labor Units. No
PeriodType The type of period for summarized spread data.
No
PlannedExpenseCost Planned Expense Cost. No
PlannedLaborCost Planned Labor Cost. No
PlannedLaborUnits Planned Labor Units. No
PlannedMaterialCost Planned Material Cost. No
PlannedNonlaborCost Planned Nonlabor Cost. No
PlannedNonlaborUnits Planned Nonlabor Units. No
PlannedTotalCost Planned Total Cost. No
PlannedValueCost Planned Value Cost. No
PlannedValueLaborUnits Planned Value Labor Units. No
ProjectId Project short name. No
ProjectObjectId The unique ID of the project. No
RemainingExpenseCost Remaining Expense Cost. No
P6 Business Objects List
247
Field Description Read-Only
RemainingLaborCost Remaining Labor Cost. No
RemainingLaborUnits Remaining Labor Units. No
RemainingLateExpenseCost
Remaining Late Expense Cost. No
RemainingLateLaborCost
Remaining Late Labor Cost. No
RemainingLateLaborUnits
Remaining Late Labor Units. No
RemainingLateMaterialCost
Remaining Late Material Cost. No
RemainingLateNonlaborCost
Remaining Late Nonlabor Cost. No
RemainingLateNonlaborUnits
Remaining Late Nonlabor Units. No
RemainingLateTotalCost Remaining Late Total Cost. No
RemainingMaterialCost Remaining Material Cost. No
RemainingNonlaborCost Remaining Nonlabor Cost. No
RemainingNonlaborUnits Remaining Nonlabor Units. No
RemainingTotalCost Remaining Total Cost. No
StartDate Spread start date. No
WBSCode WBS Code. No
WBSObjectId The unique ID of WBS. No
249
Prime Business Objects List
The following Prime business objects are available in the Data Dictionary menu of the Gateway user interface. Select a specific business object to review a detailed list of fields supported for that business object.
Business Object Description
Activity An activity is a unit of work performed during the course of a project.
ActivityRisk The activity risk object stores the relationship between a single Activity and a single Risk.
Calendar Calendars defined the available work hours in each calendar day, and includes global and resource types.
CBSSegment CBS Segment Fields
CBSTemplate CBS Template Fields
CBSTemplateCode CBS TemplateCode Fields
CostCategory CostCategory Fields
CostSheetWorkspaceTotalCostRow CostSheetWorkspaceTotalCostRow
CostSheetWorkspaceTotalItem CostSheetWorkspaceTotalItem
Currency Currencies are the monetary units used to store costs for all projects in the database.
EPS EPS
ExchangeRate ExchangeRate Fields
Holiday Calendar Holiday
HolidayGroup Calendar Holiday group
Location
The location is used to store address information including latitude and longitude. Locations can be assigned to resources, projects and/or activities.
Project
A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities.
Gateway Providers Data Dictionary
250
Business Object Description
ProjectBudget ProjectBudget Fields
ProjectBudgetChange ProjectBudgetChange Fields
ProjectBudgetTransfer ProjectBudgetTransfer Fields
ProjectCode Project codes are user-defined codes to classify and categorize projects across the enterprise.
ProjectCodeType
Project code types provide a way of classifying project codes. Project codes are user-defined codes to classify and categorize projects across the enterprise.
Relationship
A relationship defines how an activity relates to the start or finish of another activity or assignment. These relationships, which form the logic of the project network, are used together with activity durations to determine schedule dates.
Resource Resources include labor, nonlabor, and materials that are used for activities across all projects.
ResourceAssignment Resource assignments track the work of resources or roles that are performing various activities.
ResourceCode Resource codes are user-defined codes to classify and categorize resources across the enterprise.
ResourceCodeType
Resource code types provide a way of classifying Resource codes. Resource codes are user defined codes to classify and categorize resources across the enterprise
ResourceRate Resource rates provide a way of specifying multiple resource prices and maximum units per time values that vary over time.
ResourceRoleAssignment ResourceRoleAssignment Fields
Risk The risk object represents a probabilistic event or condition which if it occurs has an impact on the project.
Prime Business Objects List
251
Business Object Description
RiskImpact The risk impact object stores the pre-response qualitative value assigned to a risk for each of the risk thresholds.
RiskMatrix
The risk matrix object contains the name and description of each probability and impact diagram (PID). The Risk Matrix is then used to qualitatively assess each risk and assign a score.
RiskMatrixScore The risk matrix score object stores the score values from the probability and impact diagram (PID) of the risk score matrix.
RiskMatrixThreshold
The risk matrix threshold object creates a relationship between a RiskThreshold object and a RiskMatrix object. This allows a single RiskThreshold object to be associated with multiple RiskMatrix objects.
RiskResponseAction
The risk response action object contains the detailed steps that need to occur to complete the risk response plan. Multiple actions can be associated with one response plan and each action can be linked to an activity in the project.
RiskResponseActionImpact
The risk response action impact object is a post-risk response action qualitative value that is assigned to a risk for each of the risk thresholds.
RiskResponsePlan The risk response plan object communicates how the project team plans to address the identified risk.
RiskThreshold
The risk threshold object contains the name, description, and type of each risk threshold. Risk thresholds provide a mechanism for setting up the criteria that is used to assess the risk.
RiskThresholdLevel The risk threshold level object stores the level information (e.g. Low, Medium, High) for each risk threshold.
Gateway Providers Data Dictionary
252
Business Object Description
Role
Roles are project personnel job titles or skills, such as mechanical engineer, inspector, or carpenter. They represent a type of resource with a certain level of proficiency rather than a specific individual
UDFType User-defined fields (UDFs) enable users to add custom fields and values to the project database.
UnitOfMeasure UnitOfMeasure Fields
WBS
The project work breakdown structure (WBS) is a hierarchical arrangement of the products and services produced during and by a project. Each element of a WBS may contain more-detailed WBS elements, activities, or both. WBS are hierarchical objects.
WBSSpread Project phase/curve/spread data for the project cash flow.
Prime Business Objects List
253
In This Section
Activity ................................................................................................................... 254 ActivityRisk ............................................................................................................ 261 Calendar ............................................................................................................... 261 CBSSegment ........................................................................................................ 262 CBSTemplate ........................................................................................................ 262 CBSTemplateCode ............................................................................................... 263 CostCategory ........................................................................................................ 264 CostSheetWorkspaceTotalCostRow ...................................................................... 264 CostSheetWorkspaceTotalItem ............................................................................. 266 Currency ............................................................................................................... 267 EPS ....................................................................................................................... 268 ExchangeRate ....................................................................................................... 268 Holiday .................................................................................................................. 269 HolidayGroup ........................................................................................................ 269 Location ................................................................................................................ 270 Project ................................................................................................................... 270 ProjectBudget ........................................................................................................ 278 ProjectBudgetChange ........................................................................................... 279 ProjectBudgetTransfer........................................................................................... 280 ProjectCode .......................................................................................................... 281 ProjectCodeType ................................................................................................... 281 Relationship .......................................................................................................... 281 Resource ............................................................................................................... 282 ResourceAssignment ............................................................................................ 284 ResourceCode ...................................................................................................... 287 ResourceCodeType .............................................................................................. 288 ResourceRate ....................................................................................................... 288 ResourceRoleAssignment ..................................................................................... 288 Risk ....................................................................................................................... 289 RiskImpact ............................................................................................................ 290 RiskMatrix ............................................................................................................. 290 RiskMatrixScore .................................................................................................... 291 RiskMatrixThreshold .............................................................................................. 292 RiskResponseAction ............................................................................................. 293 RiskResponseActionImpact ................................................................................... 294 RiskResponsePlan ................................................................................................ 295 RiskThreshold ....................................................................................................... 296 RiskThresholdLevel ............................................................................................... 296 Role....................................................................................................................... 297 UDFType ............................................................................................................... 297 UnitOfMeasure ...................................................................................................... 298 WBS ...................................................................................................................... 298 WBSSpread .......................................................................................................... 299
Gateway Providers Data Dictionary
254
Activity
Description: An activity is a unit of work performed during the course of a project.
Field Description Read-Only
ActivityPercentComplete
The percent of the activity that has been completed. The value is based on the formula for the selected Percent Complete Type. The Percent Complete Type can be Physical, Duration, or Units.
No
ActivityPriority Determines the priority of the activity when performing role leveling.
No
ActualDuration
The activity actual duration percent of planned. Computed as actual duration / BL duration * 100. The value can exceed 100. The BL duration is the activity's at completion duration from the project baseline.
Yes
ActualFinishDate The date when the activity was completed.
Yes
ActualLaborUnits The number of units expended for all labor resources assigned to the activity.
No
ActualNonLaborUnits The number of nonlabor units that have been expended on the activity.
No
ActualStartDate The date work on the activity began. No
ActualThisPeriodLaborCost ActualThisPeriodLaborCost No
AtCompletionBudgetLaborUnits
AtCompletionBudgetLaborUnits Yes
AtCompletionDuration The total working time from the activity's current start date to the current finish date.
Yes
AtCompletionLaborUnits
The sum of the actual plus remaining units for all nonlabor resources assigned to the activity. It is the same as the planned nonlabor units if the activity is not started, and the actual nonlabor units once the activity is completed.
No
CalendarCode The unique code of the calendar. Yes
Prime Business Objects List
255
CalendarName The name of the calendar. Yes
CalendarObjectId The calendar assigned to the activity. No
CompletedWeight CompletedWeight Yes
CostVarianceLaborUnits CostVarianceLaborUnits Yes
DistributionShape DistributionShape of the activity. No
DrivingPath
The sequence of project activities from start to finish where the Total Duration is no longer than any other path.
Yes
DurationPercentComplete
The duration percent complete for the activity. Calculated as Planned Duration minus Remaining Duration divided by Planned Duration multiplied by 100.
No
DurationPercentOfPlanned
The actual duration percent of planned duration for the activity. Calculated as Actual Duration divided by BL Duration multiplied by 100.
Yes
DurationType
Determines how remaining duration, units, and units/time are calculated when you update an activity that has resources assigned. The valid values are Fixed Units/time, Fixed Units, Fixed Duration & Units, and Fixed Duration & Units/Time.
No
EarlyFinishDate
The earliest possible date the activity can finish. This date is calculated based on network logic, schedule constraints, and resource availability.
No
EarlyStartDate
The earliest possible date the remaining work for the activity can begin. This date is calculated based on network logic, schedule constraints, and resource availability.
No
ExistenceProbability
Signifies the probability that a particular activity occurs (exists) in a given project. For example, an activity that may or may not have to be done depending on circumstances.
No
Gateway Providers Data Dictionary
256
ExpectedFinishDate The expected finish date of the activity in the project baseline.
No
FinishDate The current finish date of the activity. Yes
FreeFloat The amount of time the activity can be delayed before delaying the start date of any successor activity.
Yes
Id The unique identifier of the activity. Yes
IsCritical
Designates an activity as critical. An activity is defined as critical based upon the project settings configured for the project.
Yes
IsWorkPackage Whether this WBS is a work package.
No
LaborUnitsCompletePercent
The percent complete of units for all labor resources for the activity. Calculated as Actual Labor Units divided by At Completion Labor Units multiplied by 100.
Yes
LateFinishDate
The latest possible date the activity can finish without delaying the project finish date. This date is calculated based on activity relationships, schedule constraints, and resource availability.
No
LateStartDate
The latest possible date the remaining work for the activity can begin without delaying the project finish date. This date is calculated based on activity relationships, schedule constraints, and resource availability.
No
LocationObjectId The physical location associated with the activity.
No
MaterialCostPercentComplete
MaterialCostPercentComplete No
MaximumDuration The maximum duration of the activity No
MinimumDuration The minimum duration of the activity No
MonteCarloScenario The Risk Analysis scenario Yes
MostLikelyDuration The most likely duration of the activity
No
Prime Business Objects List
257
Name The name of the activity. No
NonLaborUnitsCompletePercent
The percent complete of units for all nonlabor resources for the activity. Calculated as Actual Nonlabor Units divided by At Completion Nonlabor Units multiplied by 100.
Yes
ObjectId The unique ID generated by the system.
Yes
OwnerId The user responsible for the activity. No
ParentActivity The ID of the summary activity to which the activity belongs, if summary activities are used.
No
PercentCompleteType PercentCompleteType of the activity No
PercentCompleteWeightedBy
PercentCompleteWeightedBy of the activity
No
PhysicalPercentComplete The activity percent complete, manually entered by the user.
Yes
PlannedDuration
The expected amount of time required to complete an activity. The planned working time is calculated using the activity's calendar. The duration is measured from the activity's planned start date to its planned finish date.
No
PlannedFinishDate
The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.
Yes
PlannedLaborUnits The planned number of units for all labor resources assigned to the activity.
Yes
PlannedNonLaborCost PlannedNonLaborCost No
PlannedNonLaborUnits The planned units for all non labor resources assigned to the activities in the project.
Yes
PlannedStartDate
The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager.
Yes
Gateway Providers Data Dictionary
258
This date is not changed by the project scheduler after the activity has been started.
PlannedValueCost PlannedValueCost No
PostResponsePessimisticFinish
The post-response pessimistic finish date for the activity.
Yes
PostResponsePessimisticStart
The post-response pessimistic start date for the activity.
Yes
PreResponsePessimisticFinish
The pre-response pessimistic finish date for the activity.
Yes
PreResponsePessimisticStart
The pre-response pessimistic start date for the activity.
Yes
PrimaryConstraintDate The constraint date for the activity, if the activity has a constraint.
No
PrimaryConstraintType The main restriction impacting the activity start or finish date
No
PrimaryResource The user designated as the primary resource for the activity.
No
ProjectId The unique identifier of the project to which the activity was added.
Yes
ProjectObjectId The unique identifier of the project to which the activity was added.
Yes
RecordCount The number of activities added to the project.
Yes
RemainingDuration The total working time from the activity remaining start date to the remaining finish date.
Yes
RemainingFinish
The date the remaining work for the activity is scheduled to finish. If this activity is not started, this date is the planned finish. This date can be updated manually by the user, but it is overwritten when you schedule the project.
Yes
RemainingFloat
The amount of time remaining in which the activity can be delayed before delaying the project finish date. Calculated as Late Finish minus Remaining Finish.
Yes
RemainingLaborUnits The remaining units for all labor resources assigned to the activity.
No
Prime Business Objects List
259
The Remaining Labor Units reflect the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the planned units.
RemainingLateFinish The remaining late finish date of the project.
Yes
RemainingLateStart The remaining late start date of the project.
Yes
RemainingNonLaborCost RemainingNonLaborCost No
RemainingNonLaborUnits
The remaining units for all nonlabor resources assigned to the activity. The remaining units reflect the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the planned units
No
RemainingStart
The date the remaining work for the activity is scheduled to begin. This date can be updated manually by the user. Before the activity is started, this date is the same as the planned start.
No
ResumeDate The date when a suspended task or activity is resumed.
No
RolledupWBSObjectId Rolled up WBS Object Ids after filtering either by levels or tagging
Yes
SchedulePercentComplete
The activity schedule percent complete, which specifies how much of the activity's project baseline duration is complete so far. Calculated based on where the current data date falls relative to the activity's project baseline start and finish dates.
Yes
SchedulePerfIndexLaborUnits
The ratio of the earned value of labor units to the planned value of labor units. Calculated as Earned Value Labor Units divided by Planned Value Labor Units.
Yes
ScheduleVarIndexLaborUnits
The ratio of schedule variance labor units and the planned value labor units. Calculated as Schedule
Yes
Gateway Providers Data Dictionary
260
Variance Labor Units divided by Planned Value Labor Units.
ScopePercentComplete
The percentage completion of the scope items linked to the activity. It is calculated as the sum of the Quantity Completed Weight for the scope items assigned to the activity divided by the total Revised Quantity for the scope items.
Yes
SecondaryConstraintDate The date for the activity's secondary constraint, if the activity has a secondary constraint.
No
SecondaryConstraintType The secondary restriction impacting the activity start or finish date.
No
SequenceNumber The number that specifies the position of the activity relative to others within the view.
No
StartDate The early start date of the activity. No
Status The current status of the activity, either "Not started", "In Progress", or "Completed".
No
SuspendDate The date work was temporarily stopped on a given activity.
No
TotalFloat
The amount of time the activity can be delayed before delaying the project finish date. Calculated as Late Start minus Early Start or as Late Finish minus Early Finish.
Yes
Type
The type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone', 'Finish Milestone', or 'WBS Summary'.
No
UnitsPercentComplete
The percent complete of units for all labor and nonlabor resources assigned to the activity.Calculated as Actual Units divided by At Completion Units multiplied by 100.
Yes
VarCost VarCost Yes
WBSCode The short code assigned to each WBS element for identification. Each WBS element is uniquely identified
Yes
Prime Business Objects List
261
by concatenating its own code together with its parents' codes.
WBSObjectId The unique ID of the WBS for the activity.
No
Weight The importance of the activity in relation to other activities.
No
WorkPackageId The unique identifier for the work package that the activity is associated with.
No
ActivityRisk
Description: The activity risk object stores the relationship between a single Activity and a single Risk.
Field Description Read-Only
ActivityId The short name of the associated activity. No
ActivityName The name of the associated activity. Yes
ActivityObjectId The unique ID of the associated activity. No
ObjectId The unique ID generated by the system. Yes
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. No
RiskId The short name of the associated risk. Yes
RiskName The name of the associated risk. Yes
RiskObjectId The unique ID of the associated risk. No
Calendar
Description: Calendars defined the available work hours in each calendar day, and includes global and resource types.
Field Description Read-Only
Code The unique code for the calendar. No
HolidayOrExceptions All dates with holidays or exceptions in this calendar.
No
IsPersonal The flag indicating if this calendar is a No
Gateway Providers Data Dictionary
262
Field Description Read-Only
personal calendar (applies to resource calendars only).
Name The name of the calendar. No
ObjectId The unique ID generated by the system. Yes
StandardWorkWeek Standard detailed work hours for each day of week
No
Type The calendar type - either 'Global' or 'Resource'.
No
CBSSegment
Description: CBS Segment Fields
Field Description Read-Only
CopiedFrom CopiedFrom No
Extensible Extensible No
ObjectId The unique ID generated by the system Yes
SegmentDefaultValue A value that is added to the concatenated code by default. This is not a required field.
No
SegmentDefinitionName
The name of the CBS segment. No
SegmentId The unique identifier of the segmentId. No
SegmentSeparator
The separator determines how the concatenated code is separated. The separator can be a period, space, or hyphen.
No
CBSTemplate
Description: CBS Template Fields
Field Description Read-Only
CBSTemplateId The unique identifier of the CBSTemplateId. No
Description The description of the CBS template. No
Prime Business Objects List
263
Field Description Read-Only
Name The name of the CBS template. No
ObjectId The unique identifier of the segmentId. Yes
WorkspaceId The unique identifier of the segmentId. No
CBSTemplateCode
Description: CBS TemplateCode Fields
Field Description Read-Only
CBSItemId The unique identifier of the CBSTemplateCodeId.
No
CBSTemplateObjectId The unique identifier of the CBS template. No
Code
The cost breakdown structure code is a code that is concatenated with its parent and child according to the segment definition.
No
CopiedFromItem The unique identifier of the CBSTemplateCode.
No
CostType
The category of the cost breakdown structure code. Expense: Represents an expense. Capital: Represents capital. None: Type is not divided into expense or capital. None is selected by default if no other choice is made.
No
IsCodeCopied The flag represents is templateCode copied or not
No
Name The name of the CBS template. No
ObjectId The unique ID generated by the system. Yes
ParentObjectId The unique ID of the parent of CBS templateCode.
No
PushDownStatus The active field indicates the CBS code is active for use.
No
SequenceNumber CBS template item sequence Nmber. No
Gateway Providers Data Dictionary
264
CostCategory
Description: CostCategory Fields
Field Description Read-Only
Abbreviation The abbreviation for the cost category name.
No
CostCategoryName The name of the cost category. No
CostcategoryType The classification of the cost category. Valid values are 'Labor', 'Equipment', 'Materials, and 'Other'.
No
CostCategoryId The unique identifier of the CostCategory. No
ObjectId The unique ID generated by the system. Yes
WorkspaceId The unique identifier of the workspace. No
CostSheetWorkspaceTotalCostRow
Description: CostSheetWorkspaceTotalCostRow
Field Description Read-Only
ActualCostToDate actualCostToDate No
ActualHoursToDate actualHoursToDate No
AdjustedCost adjustedCost No
ApprovedChangedCost approvedChangedCost No
ApprovedChangedHours approvedChangedHours No
ApprovedManualBudget approvedManualBudget No
ApprovedManualBudgetChanges
approvedManualBudgetChanges No
ApprovedManualBudgetTransfers
approvedManualBudgetTransfers No
ApprovedManualCurrentBudget
approvedManualCurrentBudget No
AtCompletionCost atCompletionCost No
AtCompletionHours atCompletionHours No
BacCost bacCost No
BacHours bacHours No
Prime Business Objects List
265
Field Description Read-Only
BaselineCost baselineCost No
CostSheetWorksspaceTotalCostRowId
The unique identifier for the CostSheetWorksspaceTotalCostRowId.
No
CostSheetWorksspaceTotalItemObjectId
The unique identifier for the CostSheetWorksspaceTotalItemObjectId
Yes
EacCost eacCost No
EacHours eacHours No
EarnedCost earnedCost No
EarnedHours earnedHours No
EtcAdjustedHours etcAdjustedHours No
EtcCost etcCost No
EtcHours etcHours No
InstalledCost installedCost No
InstalledHours installedHours No
ObjectId The unique ID generated by the system.
Yes
PendingChangedCost pendingChangedCost No
PendingChangedHours pendingChangedHours No
PendingManualBudget pendingManualBudget No
PendingManualBudgetChanges
pendingManualBudgetChanges No
PendingManualBudgetTransfers
pendingManualBudgetTransfers No
PlannedCost plannedCost No
PlannedHours plannedHours No
RemainingCost remainingCost No
RemainingHours remainingHours No
RevisedCost revisedCost No
RevisedHours revisedHours No
Gateway Providers Data Dictionary
266
CostSheetWorkspaceTotalItem
Description: CostSheetWorkspaceTotalItem
Field Description Read-Only
ActualCostToDate actualCostToDate
ActualHoursToDate actualHoursToDate
AdjustedCost adjustedCost
ApprovedChangedCost approvedChangedCost
ApprovedChangedHours
approvedChangedHours
ApprovedManualBudget approvedManualBudget
ApprovedManualBudgetChanges
approvedManualBudgetChanges
ApprovedManualBudgetTransfers
approvedManualBudgetTransfers
ApprovedManualCurrentBudget
approvedManualCurrentBudget
AtCompletionCost atCompletionCost
AtCompletionHours atCompletionHours
BacCost bacCost
BacHours bacHours
BaselineCost baselineCost
CostSheetWorkspaceTotalItemId
The unique identifier for the CostSheetWorkspaceTotalItem.
No
CostSheetWorkspaceTotalItemObjectId
The unique identifier for the CostSheetWorkspaceTotalItemId.
EacCost eacCost
EacHours eacHours
EtcAdjustedHours etcAdjustedHours
EtcCost etcCost
EtcHours etcHours
EarnedCost earnedCost
EarnedHours earnedHours
InstalledCost installedCost
Prime Business Objects List
267
Field Description Read-Only
InstalledHours installedHours
ObjectId The unique ID generated by the system. No
ParentWorkspaceId The unique identifier of the parent workspace.
No
PlannedCost plannedCost
PlannedHours plannedHours
PendingChangedCost pendingChangedCost
PendingChangedHours pendingChangedHours
PendingManualBudget pendingManualBudget
PendingManualBudgetChanges
pendingManualBudgetChanges
PendingManualBudgetTransfers
pendingManualBudgetTransfers
ReferenceObjectId ReferenceObjectId No
ReferenceTemplateType
ReferenceTemplateType No
RemainingCost remainingCost
RemainingHours remainingHours
RevisedCost revisedCost
RevisedHours revisedHours
Currency
Description: Currencies are the monetary units used to store costs for all projects in the database.
Field Description Read-Only
ConfiguredByUser The currency can be configured by the user. Yes
CurrencyCode The unique identifier for the currency. The currency code is 3 characters.
No
CurrencyId The ID for currency. No
CurrencyName The Name of currency. No
CurrencySymbol The symbol for the currency. No
Gateway Providers Data Dictionary
268
Field Description Read-Only
DecimalsToDisplay The number of decimals to display. No
ObjectId The unique ID generated by the system. Yes
SystemCurrencyFlag The default currency. Any currency conversions will be measured against this form of currency.
No
WorkspaceId The ID for Workspace. No
EPS
Description: EPS
Field Description Read-Only
Id The short name of the EPS. No
Name The name of the EPS. No
ObjectId The unique ID that uniquely identifies this EPS.
Yes
SequenceNumber Sequence Number. No
ExchangeRate
Description: ExchangeRate Fields.
Field Description Read-Only
BaseExchangeRate The exchange rate for a currency. No
CurrencyObjectId The unique ID of the currency. No
EffectiveEndDate The date the exchange rate ends effect.
No
EffectiveStartDate The date the exchange rate goes into effect.
No
ExchangeRateId The unique identifier of the ExchangeRate.
No
ObjectId The unique ID generated by the system.
Yes
Prime Business Objects List
269
Holiday
Description: Calendar Holiday.
Field Description Read-Only
DayOfMonth The day of the month the holiday is in.
No
DayOfWeek The day of the week the holiday is in.
No
HolidayDate The date of the holiday. No
HolidayGroupObjectId The unique identifier for the holiday list.
No
HolidayId The unique identifier for the holiday.
Yes
HolidayName The name of the holiday. No
Month The month the holiday is in. No
ObjectId The unique ID generated by the system.
Yes
Week The week of the month the holiday is in.
No
WorkTime This fields is always NULL. No
HolidayGroup
Description: Calendar Holiday group.
Field Description Read-Only
HolidayGroupid The unique identifier for the holiday list.
No
HolidayGroupName The name of the holiday list. No
ObjectId The unique ID generated by the system.
Yes
WorkspaceId The unique identifier of the workspace.
No
Gateway Providers Data Dictionary
270
Location
Description: The location is used to store address information including latitude and longitude. Locations can be assigned to resources, projects and/or activities.
Field Description Read-Only
AddressLine1 The first line of the address with street number and street name.
No
AddressLine2 The second line of the address with street number and street name.
No
CityName The city name of the address. No
CountryCode The country code of the address. No
Latitude The latitude of the location. No
LocationCode LocationCode No
LocationName The name of the location. No
Longitude The longitude of the location. No
MunicipalityName
The municipality name of the address. No
ObjectId The unique ID generated by the system. Yes
PostalCode The postal code of the address. No
StateCode The state abbreviation of the address. No
StateName The state name of the address. No
Project
Description: A project is a temporary endeavor undertaken to create a unique product, service, or result. Projects usually contain a work breakdown structure (WBS) and activities.
Field Description Read-Only
ActivityDefaultCalendarCode The default activity calendar object ID.
No
ActivityDefaultCalendarName The name of the Activity Default No
Prime Business Objects List
271
Field Description Read-Only
Calendar of this project.
ActivityDefaultCalendarObjectId
The unique ID of the Activity Default Calendar of this project.
No
ActualCost The actual cost of the project. No
ActualDuration The actual duration of the project. Yes
ActualFinishDate The date on which the project is actually finished.
No
ActualStartDate The date on which the project is actually started.
No
AddressLine1 The first line of the address of a location. This might be the building number and the street address.
No
AddressLine2 The second line of the address of a location. This might be a neighborhood or town.
No
AnnualDiscountRate The annual discount rate value of the project.
No
AtCompletionCost The at completion cost of the project.
No
BusinessSegment A Project Code field to define the Business Segment of the Project.
No
CalculateFloatBasedOnFinishDate
The flag that indicates how each activity's float will be calculated with respect to other projects in the scheduling batch. This setting only has an effect when scheduling multiple projects at the same time
No
CalendarId The calendar associated with the project.
Yes
CalendarObjectId The unique identifier of the calendar associated with the project.
No
CityName The city name for a location. No
ComputeTotalFloatType The method for calculating total float for all activities.
No
CostPerformanceIndex The cost performance index of the project.
No
CostVariance The cost variance of the project. No
Gateway Providers Data Dictionary
272
Field Description Read-Only
CountryCode The Country for a location. No
CriticalActivityFloatThresholdThe maximum float time for activities before they are marked critical.
No
CriticalActivityPathType Indicates Activity critical path type. No
CurrencyId The currency used by the project. The project currency can differ from the base currency.
Yes
CurrencyObjectId The unique identifier of the currency used by the project.
No
CurrentApprovedBudget The current approved budget of the project.
Yes
CurrentApprovedBudgetBaseDistributed
The amount of approved budget currently allocated across the project timescale.
Yes
CurrentApprovedBudgetBaseUndistributed
The amount of approved budget unallocated across the project timescale.
Yes
CurrentApprovedFinishDate The finish date for the Current Approved Budget set by the capital planner.
Yes
CurrentApprovedSpendVariance
The total and time phased variance between the project's Current Approved Budget and Spends.
Yes
CurrentApprovedStartDate The start date for the Current Approved Budget set by the capital planner.
Yes
DataDate The data date of the project. No
Description Description of the project No
EarnedValueCost The earned value cost of the project. No
EstimateAtCompletionCost The estimate at completion cost of the project.
No
EstimateToCompletionCost The estimate to completion cost of the project.
No
ExchangeRateType
The type of exchange rate. Floating: A fixed, user-defined exchange rate. Pegged: Follows the exchange rates defined at the workspace.
No
Prime Business Objects List
273
Field Description Read-Only
ExchangeRate The custom exchange rate for a pegged exchange rate.
No
FinishDate Project finish date No
ForecastCost
The total estimation of a project's remaining costs. Once projects have begun, project managers update the project forecast to represent remaining cost estimates for the duration of the project's life cycle.
No
ForecastCostDistributed The amount of forecast cost currently allocated across the project timescale.
Yes
ForecastCostUnDistributed The amount of forecast cost unallocated across the project timescale.
Yes
ForecastCurrApprVar The total and time phased variance between the project's Forecast and Current Approved Budget.
Yes
ForecastFinishDate The planned finish date of a project's remaining Forecast cost.
No
ForecastStartDate The planned start date of a project's remaining Forecast cost.
No
IgnoreOtherProjectRelationships
The option used by the scheduler for treating activity relationships between projects when scheduling.
No
IntegratedType
The indicator that determines whether the resource is integrated with an Enterprise Resource Planning (ERP) system. 'Fusion' indicates the resource is integrated with Oracle Fusion. 'ERP' indicates the resource is integrated with another ERP system.
Yes
IntRateReturn
The quantitative measurement used to compare the profitability of project investments. The rate at which investors will receive returns on their investments in a project.
No
Latitude The geographical coordinate for the latitude of the location. The default format for latitude is decimal
No
Gateway Providers Data Dictionary
274
Field Description Read-Only
degrees format, but the format you need to use will depend on your geolocation service.
LinkForecastToSpend
Enables you to link Forecast data to project Spends data. When linked any updates to the project's Spends values will automatically be applied to the project's Forecast values.
No
LocationCode The code of the location assigned to the project.
Yes
LocationId Location Id Yes
LocationName A name for the location that your users will understand and recognize.
No
LocationObjectId The unique ID of the location assigned to the project.
No
Longitude
The geographical coordinate for the longitude of the location. The default format for longitude is decimal degrees format, but the format you need to use will depend on your geolocation service.
No
MakeOpenEndedActivitiesCritical
The option used by the scheduler for automatically leveling resources when scheduling projects.
No
MaximumMultipleFloatPaths The number of critical float paths to calculate
No
MultipleFloatPathsEnabled
The Boolean value that indicates whether multiple critical float paths (sequences of activities) should be calculated in the project schedule.
No
MultipleFloatPathsEndingActivityObjectId
The activity in the WBS that you want to represent the end of the float paths.
No
MultipleFloatPathsUseTotalFloat
The Boolean value that decides whether or not to use total float in multiple float path calculations.
No
MustFinishByDate The planned finish date of the project.
No
NetPresentValue The net present value of the project. No
Prime Business Objects List
275
Field Description Read-Only
OutOfSequenceScheduleType
The type of logic used to schedule the progressed activities: 'Retained Logic', 'Progress Override', or 'Actual Dates'.
No
Owner Owner of the project No
ParentEPSId The parent eps ID of the project. No
PaybackPeriod The pay back period of the project. No
PercentComplete Percent complete of the project. No
PercentCompleteWeightedBy
The weight for scope items is calculated using quantity.
No
PlannedBudget The planned budget of the project. No
PlannedBudgetDistributed The amount of planned budget allocated across the project timescale.
Yes
PlannedBudgetUnDistributedThe amount of planned budget unallocated across the project timescale.
No
PlannedDuration The planned duration of the project. Yes
PlannedFinishDate The planned finish date of the project.
No
PlannedStartDate The planned start date of the project. No
PlannedValueCost The planned value cost of the project.
No
PostalCode The postal code, post code, or zip code of a location.
No
PrimeWorkspace A Project Code field to define the Prime Workspace of the Project.
No
ProjectCode Project short name. No
ProjectId The unique ID generated by the system.
No
ProjectName The name of the project. No
ProposedBudget The proposed budget of the project. No
ProposedBudgetBaseDistributed
The amount of proposed budget unallocated across the project timescale.
Yes
ProposedBudgetBaseUnDistr The amount of proposed budget Yes
Gateway Providers Data Dictionary
276
Field Description Read-Only
ibuted unallocated across the project timescale.
ProposedFinishDate The finish date for the Proposed Budget of the project.
Yes
ProposedForecastVariance The total and time phased variance between the project's Proposed Budget and Forecast.
Yes
ProposedPlannedVar The total and time phased variance between the project's Proposed Budget and Planned Budget.
Yes
ProposedStartDate The start date for the Proposed Budget of the project.
Yes
RelationshipLagCalendar The calendar used to calculate the lag between predecessors and successors for all activities.
No
RemainingCost
The remaining total cost for the project, including labor resources, nonlabor resources, and project expenses.
No
RemainingDuration The duration between the Project Start and Project Finish.
No
ReportCycleId ReportCycle of the project. No
ReportCycleNamingBoundary
Determines when period names will be reset. The options available are based on the selection for Reporting Cycle. The standard calendar start and end dates are used as boundaries for resetting periods.
No
ReturnInvestment The return on investment of the project.
No
RiskLevel
The risk level assigned to the project. You can use risk level to determine what projects should be included in your plans as well as which projects should be of priority.
No
RiskMatrixCode The code of the risk matrix. Yes
RiskMatrixId The risk matrix assigned to the project for calculating project risk scores.
Yes
Prime Business Objects List
277
Field Description Read-Only
RiskMatrixName The name of the associated risk matrix.
Yes
RiskMatrixObjectId The unique identifier of the risk matrix assigned to the project for calculating project risk scores.
No
RiskScore
The risk score is based on the probability and impacts of a risk. It is derived from the probability impact matrix and any associated rules.
Yes
ScheduledFinishDate
The calculated latest early finish date, which is based on the schedule most recently generated for the project.
Yes
SchedulePerformanceIndex The schedule performance index of the project.
No
ScheduleVariance The schedule variance of the project.
No
SecurityGrid SecurityGrid of the project. Yes
SequenceNumber SequenceNumber of the project. No
SpendCost
Linking Spends and Forecast enables you to combine costs already incurred on a project with the project's predicted future costs effectively creating an at completion curve. Spends cannot be edited if a project has a status of Proposal.
No
SpendEffectiveDate The month in which a spend value was last added to the project.
Yes
SpendFinishDate The finish date for the project spends.
No
SpendForecastVar The total and time phased variance between the project's Spends and Forecast.
Yes
SpendPlannedVariance The total and time phased variance between the project's Spends and Planned Budget.
Yes
SpendStartDate The start date for the project spends. No
StartDate The date on which work on the project starts.
No
Gateway Providers Data Dictionary
278
Field Description Read-Only
StartToStartLagCalculationType
The method used to calculate lag when a start-to-start relationship exists and the predecessor starts out of sequence.
No
StateCode A unique identifier for the state or province.
No
StateName The state, region, or province of a location.
No
Status The status of the project. No
StrategicPriority The strategic priority of the project. No
SummaryRemainingTotalCost
The summary remaining total cost of the project.
No
URL The string web site URL of the project.
No
UseExpectedFinishDates The option used for setting activity finish dates as the expected finish dates when scheduling projects.
No
VarianceFinishDate The variance finish date of the project.
Yes
VarianceStartDate The variance start date of the project.
Yes
WorkspaceId The unique identifier of the Workspace.
No
YearEndForecastCost Total forecast at the end of year actuals till date, with respect to the current year.
No
YtdSpendCost
A measurement of capital spent on a project starting from the beginning of the year up to the present date. YTD Spends provide an overview of the total amount of spends accrued on a project over the current Period Year.
No
ProjectBudget
Description: ProjectBudget Fields.
Prime Business Objects List
279
Field Description Read-Only
ApprovedDate The date the project budget was approved.
No
BudgetSource BudgetSource of the projectBudget.
No
BudgetStatus
The state of the project budget change request. The change request is awaiting a decision. Approved: The change request was approved. Rejected: The change request was not approved.
No
ManualBudgetEnabled ManualBudgetEnabled flag. No
ObjectId The unique ID generated by the system.
Yes
ProjectBudgetPegRate ProjectBudgetPegRate No
ProjectObjectId The unique identifier of the project. No
WithDrawDate The date the approval of the budget is withdrawn.
No
ProjectBudgetChange
Description: ProjectBudgetChange Fields.
Field Description Read-Only
BudgetStatus
The state of the project budget change request. Pending: the change request is awaiting a decision. Approved: The change request was approved. Rejected: The change request was not approved.
No
ChangeCode The unique identifier of the project budget change request.
No
Description Details supporting the change request. No
FinalizedBy The username of the user who accepted or rejected the transfer request.
No
LastModifiedBy The user name of the user who last made changes to the item.
Yes
ObjectId The unique ID generated by the system. Yes
Gateway Providers Data Dictionary
280
Field Description Read-Only
ProjectBudgetChangeIdThe unique identifier of the ProjectBudgetChangeId.
No
ProjectObjectId The unique identifier of the project. No
SubmittedBy The username of the user that submitted the item.
Yes
TotalCost The cost to be added or subtracted from the project budget.
No
TotalCostProject TotalCostProject No
ProjectBudgetTransfer
Description: ProjectBudgetTransfer Fields.
Field Description Read-Only
Description Details supporting the change request. No
FinalizedBy The username of the user who accepted or rejected the transfer request.
No
LastModifiedBy The username of the user who last made changes to the item.
Yes
ObjectId The unique ID generated by the system. Yes
ProjectBudgetTransferIdThe unique identifier of the ProjectBudgetTransferId.
No
ProjectObjectId The unique identifier of the project. No
Status
The state of the project budget transfer request. Pending: The change request is awaiting a decision. Approved: The change request was approved. Rejected: The change request was not approved.
No
SubmittedBy The username of the user that submitted the item.
Yes
TransferCode The unique identifier of the project budget transfer budget.
No
Prime Business Objects List
281
ProjectCode
Description: Project codes are user-defined codes to classify and categorize projects across the enterprise.
Field Description Read-Only
CodeTypeName The name of the project code type. No
CodeTypeObjectId The unique ID of the project code type. No
CodeValue The value of the project code. No
Description The description of the project code. No
ObjectId The unique ID generated by the system. Yes
ParentId The short code that uniquely identifies the parent Project code.
Yes
ParentObjectId The unique ID of the parent project code. No
SequenceNumber The sequence number for sorting. No
Weight The weight for this project code. No
ProjectCodeType
Description: Project code types provide a way of classifying project codes. Project codes are user-defined codes to classify and categorize projects across the enterprise.
Field Description Read-Only
Length The maximum number of characters allowed for values of this project code.
No
Name The name of the project code type. No
ObjectId The unique ID generated by the system. Yes
Relationship
Description: A relationship defines how an activity relates to the start or finish of another activity or assignment. These relationships, which form the logic of the project network, are used together with activity durations to determine schedule dates.
Field Description Read-Only
Lag The time lag of the relationship. This is the time lag between the predecessor
No
Gateway Providers Data Dictionary
282
Field Description Read-Only
activity's start or finish date and the successor activity's start or finish date, depending on the relationship type.
ObjectId The unique ID generated by the system. Yes
PredecessorActivityId The unique ID of the predecessor activity.
Yes
PredecessorActivityObjectId The unique ID of the predecessor activity.
No
PredecessorActivityType
The type of the predecessor activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'.
No
PredecessorProjectId The unique ID of the project that owns the predecessor activity.
No
SuccessorActivityId The unique ID of the successor activity. Yes
SuccessorActivityObjectId The unique ID of the successor activity. No
SuccessorActivityType
The type of the successor activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'.
No
SuccessorProjectId The unique ID of the project that owns the successor activity.
Yes
Type The type of relationship: 'Finish to Start', 'Finish to Finish', 'Start to Start', or 'Start to Finish'.
No
Resource
Description: Resources include labor, nonlabor, and materials that are used for activities across all projects.
Field Description Read-Only
AddressLine1 The first line of the address of a location. This might be the building number and street address.
No
AddressLine2 The second line of the address of a location. This might be a neighborhood or town.
No
Prime Business Objects List
283
Field Description Read-Only
CalculateCostFromUnits
The option that determines whether any new assignments for this resource will have its costs recalculated whenever any quantity changes occur.
No
CalendarCode The unique code of the calendar. No
CalendarName The name of the calendar that is assigned to the resource.
No
CalendarObjectId The unique ID of the calendar that is assigned to the resource.
No
CityName The city name for a location. No
CountryCode The Country for a location. No
DefaultUnitsPerTime The Default units/time setting for resource.
No
DepartmentId A Resource UDF to define the Department Id of the Resource.
No
EmailAddress The resource's email address. No
EmployeeId The resource identifier within the organization, typically the employee number or social security number.
No
Id The unique identifier of the Resource. No
IsActive The option that determines whether the resource is active. A value of true indicates the resource is active.
No
Latitude
The geographical coordinate for the latitude of the location. The default format for longitude is decimal degrees format, but the format you need to use will depend on your geolocation service.
No
LocationCode The code of the location assigned to the resource.
No
LocationName The name of the location assigned to the resource.
No
LocationObjectId The unique ID of the location assigned to the resource.
No
Longitude
The geographical coordinate for the longitude of the location. The default format for longitude is decimal degrees format, but the format you need to use
No
Gateway Providers Data Dictionary
284
Field Description Read-Only
will depend on your geolocation service.
Name The name of the resource. No
ObjectId The unique Id for the Resource which is generated by the Primavera Data Integration application.
Yes
OfficePhone The resource's work phone number. No
OtherPhone Other phone for the resource. No
ParentObjectId The unique ID of the parent resource of this resource in the hierarchy.
No
PostalCode The postal code, post code, or zip code of a location.
No
PrimaryRoleId The short code that uniquely identifies the primary role for this resource.
No
ResourceType The indicator that determines the resource type. Valid values are LABOR, NON_LABOR, MATERIAL.
No
StateCode A unique identifier for the state or province.
No
StateName The state, region, or province of a location.
No
Title The title of the resource. No
ResourceAssignment
Description: resources or roles that are performing various activities.
Field Description Read-Only
ActivityId The short ID that uniquely identifies the activity within the project.
Yes
ActivityObjectId The unique ID of the activity to which the resource is assigned.
No
ActivityType The type of the activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'.
No
ActualDuration the total working time from the assignment actual start date to the actual finish date for
Yes
Prime Business Objects List
285
Field Description Read-Only
completed assignments, or the total working time from the actual start date to the data date for in-progress assignments.
ActualFinish The date on which the assignment was completed.
No
ActualRegularUnits
The actual non-overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager.
No
ActualStart If the activity has started, the date work began on the activity.
No
ActualUnits The actual non-overtime plus overtime units worked by the resource on this activity.
No
AssignmentCode A unique identifier for the assignment. No
AtCompletionDuration The total working time from the assignment's current start date to the current finish date.
No
AtCompletionUnits The sum of the actual plus remaining units for the resource assignment on the activity.
No
DriveActivityDates Determines whether new resource or role assignments determine activity dates.
No
EstimateToCompletionUnits
The estimated quantity to complete the assignment.
Yes
FinishDate The finish date for the assignment. No
IsActivityFlagged
The flag that indicates whether the resource who is assigned to the activity assignment has flagged the activity as important to the resource.
No
IsPrimaryResource The flag that indicates whether this resource is the activity's primary resource.
No
ObjectId The unique ID generated by the system. Yes
PlannedDuration
The planned working time for the resource assignment on the activity, from the resource's planned start date to the planned finish date.
No
PlannedFinish The date the assignment is scheduled to be finished.
No
Gateway Providers Data Dictionary
286
Field Description Read-Only
PlannedLag The planned time lag between the activity's planned start date and the resource's planned start date on the activity.
No
PlannedStart The planned start date for the assignment on the activity.
No
PlannedUnits The planned units of work for the resource assignment on the activity.
No
PlannedUnitsPerTime The planned units per time at which the resource is to perform work on this activity.
No
PlannedValueUnits PlannedValueUnits No
Proficiency
The skill level of the resource an activity is assigned to. The value values are Master, Expert, Skilled, Proficient, and Inexperienced.
No
ProjectId The short code that uniquely identifies the project.
Yes
RemainingDuration
The remaining working time for the resource assignment on the activity, from the resource's remaining start date to the remaining finish date.
No
RemainingFinish The date the assignment is scheduled to finish.
No
RemainingLag The time lag between the activity's remaining start date and the resource's remaining start date on the activity.
No
RemainingLateFinish The latest possible date the assignment must be finished to not delay the project finish date.
Yes
RemainingLateStart The latest possible date the assignment must begin to not delay the project finish date.
Yes
RemainingStart The date the assignment is scheduled to begin.
No
RemainingUnits The remaining units of work to be performed by this resource on this activity.
No
RemainingUnitsPerHourThe units per time required for the resource assignment to complete the activity.
No
ResourceId The name that uniquely identifies the Yes
Prime Business Objects List
287
Field Description Read-Only
resource.
ResourceObjectId The unique ID of the associated resource. No
ResourceType The resource type: "Labor", "Nonlabor", or "Material".
No
RoleId The short code that uniquely identifies the role.
Yes
RoleObjectId The unique ID of the associated role. No
RolledupWBSObjectId Rolled up WBS key after filtering either by levels or tagging
Yes
StaffedRemainingUnits StaffedRemainingUnits No
StartDate The start date for the activity assignment. No
SyncUnitsFrontCost Determines whether to recalculate actual or actual this period units and costs when one of these values is updated.
No
TotalRemainingLag TotalRemainingLag No
UnitsPercentComplete The percent complete of units for the resource assignment on the activity.
No
UnstaffedRemainingUnits
UnstaffedRemainingUnits No
WBSObjectId WBS key Yes
ResourceCode
Description: Resource codes are user-defined codes to classify and categorize resources across the enterprise.
Field Description Read-Only
CodeTypeName The name of the resource code type. No
CostTypeObjectId The unique ID of the resource code type Yes
CodeValue The value of the resource code. No
Description The description of the resource code No
ObjectId The unique ID generated by the system. Yes
ParentId The short code that uniquely identifies the parent resource code.
No
Gateway Providers Data Dictionary
288
Field Description Read-Only
ParentObjectId The unique ID of the parent resource code No
SequenceNumber The sequence number for sorting. No
ResourceCodeType
Description: Resource code types provide a way of classifying resource codes. Resource codes are user-defined codes to classify and categorize resources across the enterprise.
Field Description Read-Only
Length The maximum number of characters allowed for values of this resource code.
No
Name The name of the resource code type. No
ObjectId The unique ID generated by the system Yes
ResourceRate
Description: resources or roles that are performing various activities.
Field Description Read-Only
EffectiveDate The effective time period of Resource Rate. No
MaxUnitsPerTime The maximum work unites per time this resource can perform all their assigned activities.
No
ObjectId The unique ID generated by the system. Yes
ResourceObjectId The unique ID of the associated resource. No
ResourceRoleAssignment
Description: Resource Role assignment fields
Field Description Read-Only
ObjectId The unique ID generated by the system. Yes
Prime Business Objects List
289
Field Description Read-Only
PrimaryFlag
Determines whether this is the resource's main role. You can only assign one primary role per resource. A resource is not required to have a primary role.
No
Proficiency The skill level of the resource. Skill levels are Master, Expert, Skilled, Proficient, and Inexperienced.
No
ResourceObjectId The identifier for the resource assigned to the role.
No
ResourceRoleAssignmentId
The unique identifier of the ResourceRoleAssignment.
No
RoleObjectId The identifier for the role assigned to the resource.
No
Risk
Description: The risk object represents a probabilistic event or condition which if it occurs has an impact on the project.
Field Description Read-Only
Cause The description of the cause of the Risk. No
Description The description of the Risk. No
Effect The description of the risks effect on the project.
No
Id The ID of the Risk. Must be unique within a project.
No
IdentifiedDate The date this risk was identified. No
Name The name of the Risk. Does not need to be unique.
No
ObjectId The unique ID generated by the system. Yes
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. No
ResponseTotalCost The total estimated cost for the risk. No
Status The current status of the Risk. Valid values are 'Proposed', 'Open', 'Active', 'Rejected', 'Managed', and 'Impacted'.
No
Gateway Providers Data Dictionary
290
Field Description Read-Only
Type The type of the risk. Valid values are 'Threat' and 'Opportunity'.
No
RiskImpact
Description: The risk impact object stores the pre-response qualitative value assigned to a risk for each of the risk thresholds.
Field Description Read-Only
ObjectId The unique ID generated by the system. Yes
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. No
RiskId The short name of the associated risk. Yes
RiskName The name of the associated risk. Yes
RiskObjectId The unique ID of the associated risk. No
RiskThresholdCode The code of the risk threshold. No
RiskThresholdLevelCodeThe short name of the associated risk threshold level.
No
RiskThresholdLevelName
The name of the associated risk threshold level.
Yes
RiskThresholdLevelObjectId
The unique ID of the associated risk threshold level.
No
RiskThresholdName The name of the associated risk threshold. Yes
RiskThresholdObjectId The unique ID of the associated risk threshold. No
RiskMatrix
Description: The risk matrix object contains the name and description of each probability and impact diagram (PID). The Risk Matrix is then used to qualitatively assess each risk and assign a score.
Field Description Read-Only
Code The code of the risk matrix. No
Description The description of the risk matrix. No
Prime Business Objects List
291
Field Description Read-Only
ImpactThresholdLevel
The number of levels for the impact thresholds assigned to the risk scoring matrix. This impact level with the probability level determines the size of the matrix.
No
IsActive
The indication of whether the response plan is currently active for the associated risk. Only one response plan can be active at a given time for a risk.
No
Name The name of the risk matrix. No
ObjectId The unique ID generated by the system. Yes
ProbabilityThresholdLevel
The number of levels for the probability threshold assigned to the risk matrix. This probability level with the impact level determines the size of the matrix.
No
RiskScoringMethod
The calculation method used to determine the risk score. Valid values are 'Highest', 'Average of Impacts', 'Average of Individual Scores'.
No
RiskMatrixScore
Description: The risk matrix score object stores the score values from the probability and impact diagram (PID) of the risk score matrix.
Field Description Read-Only
ObjectId The unique ID generated by the system. Yes
ProbabilityThresholdLevel
The level number of the probability threshold. Valid numbers are 1-9.
No
RiskMatrixCode The code of the risk matrix. No
RiskMatrixName The name of the associated risk matrix. No
RiskMatrixObjectId The unique ID of the associated risk matrix. No
Severity1 The first severity level of the Risk Matrix Score. No
Severity1Label The label for the first severity level. No
Severity2 The second severity level of the Risk Matrix Score. No
Severity2Label The label for the second severity level. No
Gateway Providers Data Dictionary
292
Field Description Read-Only
Severity3 The third severity level of the Risk Matrix Score. No
Severity3Label The label for the third severity level. No
Severity4 The fourth severity level of the Risk Matrix Score. No
Severity4Label The label for the fourth severity level. No
Severity5 The fifth severity level of the Risk Matrix Score. No
Severity5Label The label for the fifth severity level. No
Severity6 The sixth severity level of the Risk Matrix Score. No
Severity6Label The label for the sixth severity level. No
Severity7 The seventh severity level of the Risk Matrix Score. No
Severity7Label The label for the seventh severity level. No
Severity8 The eighth severity level of the Risk Matrix Score. No
Severity8Label The label for the eighth severity level. No
Severity9 The ninth severity level of the Risk Matrix Score. No
Severity9Label The label for the ninth severity level. No
RiskMatrixThreshold
Description: The risk matrix threshold object creates a relationship between a RiskThreshold object and a RiskMatrix object. This allows a single RiskThreshold object to be associated with multiple RiskMatrix objects.
Field Description Read-Only
ObjectId The unique ID generated by the system. Yes
RiskMatrixCode The code of the risk matrix. No
RiskMatrixName The name of the associated risk matrix. No
RiskMatrixObjectId The unique ID of the associated risk matrix. No
RiskThresholdCode The code of the risk threshold. No
RiskThresholdName The name of the associated risk threshold. No
RiskThresholdObjectIdThe unique ID of the associated risk threshold.
No
Prime Business Objects List
293
RiskResponseAction
Description: The risk response action object contains the detailed steps that need to occur to complete the risk response plan. Multiple actions can be associated with one response plan and each action can be linked to an activity in the project.
Field Description Read-Only
ActivityId The short name of the associated activity.
Yes
ActivityName The name of the associated activity. Yes
ActivityObjectId The unique ID of the associated activity.
No
ActualCost The actual cost. No
FinishDate
The finish date of the risk response action. If an activity is assigned, the risk response action uses the activity finish date.
No
Id The short name of the risk response plan.
No
Name The name of the risk response plan. No
ObjectId The unique ID generated by the system.
Yes
PlannedCost The planned cost. No
PlannedFinishDate The planned finish date. No
PlannedStartDate The planned start date. No
ProjectId The short name of the associated project.
Yes
ProjectObjectId The unique ID of the associated project.
No
RemainingCost The remaining cost associated with the risk response action.
No
ResourceId The short name of the associated resource.
Yes
ResourceName The name of the associated resource. Yes
ResourceObjectId The unique ID of the associated resource.
No
RiskId The short name of the associated risk.
Yes
Gateway Providers Data Dictionary
294
Field Description Read-Only
RiskResponsePlanId The short name of the associated risk response plan.
Yes
RiskResponsePlanName The name of the associated risk response plan.
Yes
RiskResponsePlanObjectId The unique ID of the associated risk response plan.
No
Score The risk score from the numeric PID after the response action has been completed.
StartDate
The start date of the risk response action. If an activity is assigned, the risk response action uses the activity start date.
No
Status
The status of the risk response action. Valid values are 'Proposed', 'Sanctioned', 'Rejected', 'In Progress', and 'Complete'.
No
RiskResponseActionImpact
Description: The risk response action impact object is a post-risk response action qualitative value that is assigned to a risk for each of the risk thresholds.
Field Description Read-Only
ObjectId The unique ID generated by the system. Yes
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. No
RiskId The short name of the associated risk. Yes
RiskResponseActionId The short name of the associated risk response action.
Yes
RiskResponseActionName The name of the associated risk response action.
No
RiskResponseActionObjectId
The unique ID of the associated risk response action.
No
RiskThresholdCode The code of the risk threshold. Yes
RiskThresholdLevelCode The short name of the associated risk Yes
Prime Business Objects List
295
Field Description Read-Only
threshold level.
RiskThresholdLevelName The name of the associated risk threshold level.
Yes
RiskThresholdLevelObjectId
The unique ID of the associated risk threshold level.
No
RiskThresholdName The name of the associated risk threshold.
Yes
RiskThresholdObjectId The unique ID of the associated risk threshold.
No
RiskResponsePlan
Description: The risk response plan object communicates how the project team plans to address the identified risk.
Field Description Read-Only
Id The short name of the risk response plan. No
IsActive
The indication of whether the response plan is currently active for the associated risk. Only one response plan can be active at a given time for a risk.
No
Name The name of the risk response plan. No
ObjectId The unique ID generated by the system. Yes
ProjectId The short name of the associated project. Yes
ProjectObjectId The unique ID of the associated project. No
ResponseType
The risk response plan type. If the risk is a threat, the valid types are 'Avoid', 'Transfer', 'Reduce', and 'Accept'. If the risk is a opportunity, the valid types are 'Exploit', 'Facilitate', 'Enhance', and 'Reject'.
No
RiskId The short name of the associated risk. Yes
RiskName The name of the associated risk. Yes
RiskObjectId The unique ID of the associated risk. No
Gateway Providers Data Dictionary
296
RiskThreshold
Description: The risk threshold object contains the name, description, and type of each risk threshold. Risk thresholds provide a mechanism for setting up the criteria that is used to assess the risk.
Field Description Read-Only
Code The code of the risk threshold. No
Name The name of the risk threshold. No
ObjectId The unique ID generated by the system. Yes
ThresholdType
The type of Risk Threshold. Valid types are 'Probability', 'Tolerance', 'Schedule', 'Cost', 'Relative Schedule', 'Relative Cost' and 'User Defined'.
No
RiskThresholdLevel
Description: The risk threshold level object stores the level information (e.g. Low, Medium, High) for each risk threshold.
Field Description Read-Only
Code The 10 character code for the threshold level.
No
Color The Hex representation for the color e.g. 0xFFFFFF.
No
CostRange The cost range of the threshold level. No
Level The valid values are between 0 and 9. Defines a level for the Risk Threshold.
No
Name The 40 character name for the threshold level.
No
ObjectId The unique ID generated by the system. Yes
ProbabilityRange The probability range of the threshold level.
No
Range The user defined range. No
RiskThresholdCode The code of the risk threshold. No
RiskThresholdObjectId The unique ID of the associated risk threshold.
No
RiskThresholdName The name of the associated risk threshold. Yes
Prime Business Objects List
297
Field Description Read-Only
ScheduleRange The schedule range of the threshold level. No
ThresholdType
The type of Risk Threshold. Valid types are 'Probability', 'Tolerance', 'Schedule', 'Cost', 'Relative Schedule', 'Relative Cost' and 'User Defined'.
No
ToleranceRange The tolerance range of the threshold level. No
Role
Description: Roles are project personnel job titles or skills, such as mechanical engineer, inspector, or carpenter. They represent a type of resource with a certain level of proficiency rather than a specific individual.
Field Description Read-Only
CalculateCostFromUnits
The option that indicates whether costs and quantities are linked, and whether quantities should be updated when costs are updated.
No
Description Additional information for the role. No
Id The unique identifier of the Role No
Name The name of the role. No
ObjectId The unique ID generated by the system.
Yes
ParentObjectId The unique ID of the parent role of this role in the hierarchy.
No
UDFType
Description: User-defined fields (UDFs) enable users to add custom fields and values to the project database.
Field Description Read-Only
DataType The data type of the user-defined field: "Text", "Start Date", "Finish Date", "Cost", "Double", "Integer", "Indicator", or "Code".
No
ObjectId The unique ID generated by the system. Yes
Gateway Providers Data Dictionary
298
Field Description Read-Only
SubjectArea The subject area of the user-defined field: "Project", "Activity", "WBS", "Resource Assignment", "Activity Expense".
No
Title The name/title of the user-defined field. No
UnitOfMeasure
Description: Unit of Measure fields.
Field Description Read-Only
DisplayValue The name of the unit of measure No
Key The abbreviation for the unit of measure name. No
ObjectId The unique ID generated by the system Yes
UnitOfMeasureId The unique identifier of the unit of measure No
WorkspaceId The unique ID of the workspace. No
WBS
Description: The project work breakdown structure (WBS) is a hierarchical arrangement of the products and services produced during and by a project. Each element of a WBS may contain more-detailed WBS elements, activities, or both. WBS are hierarchical objects.
Field Description Read-Only
Code The short name of the WBS. No
IsWorkPackage Whether this WBS is a work package.
No
Name The name of the WBS. No
ObjectId The unique ID generated by the system.
Yes
ParentObjectId The unique ID of the parent WBS of this WBS in the hierarchy.
No
ProjectId The project Id of the WBS. Yes
ProjectObjectId The unique ID of the No
Prime Business Objects List
299
Field Description Read-Only
associated project.
SequenceNumber The sequence number of the WBS.
No
WBSSpread
Description: Project phase / curve / spread data for the project cash flow.
Field Description Read-Only
ActualTotalCost Actual Total Cost. No
AtCompletionTotalCost At Completion Total Cost. No
EndDate Spread end date. No
ObjectId The unique ID generated by the system. Yes
PeriodType The type of period for summarized spread data.
No
PlannedTotalCost Planned Total Cost. No
ProjectId Project short name. Yes
ProjectObjectId The unique ID of Project. No
StartDate Spread start date. No
301
Unifier Business Objects
The following Unifier business objects are available in the Data Dictionary menu of the Gateway user interface. Select a specific business object to review a detailed list of fields supported for that business object.
Business Object Description
CBS CBS business object
CBSDurationSummary
Create/Update Duration Based Summary Sheet in Unifier.
CBSExpenseSpread Summarized spread data per CBS per expense category
CBSResourceSpread Summarized spread data per CBS per resource assignment
CompanyCosts Company Costs Business Processes
CompanyCostsDetail Company Costs Detail Business Processes
CompanyLineItem Company LineItem Business Processes
CompanyLineItemDetail
Company LineItem Detail Business Processes
CompanySimple Company Simple Business Processes
OtherProjectCosts Other Project Costs Business Processes
OtherProjectsDetail Other Project Detail Business Processes
P6ActivitySheet P6 Activity Sheet business object.
Project Unifier Project Header
ProjectCommits Project Commits Business Processes
ProjectCommitsDetail Project Commits Detail Business Processes
ProjectDocument Project Document Business Processes
ProjectDocumentDetail
Project Document Detail Business Processes
ProjectInvoices Project Invoices Business Processes
ProjectInvoicesDetail Project Invoices Detail Business Processes
ProjectSimple Project Simple Business Processes
Resource The Unifier Provider Resource Object definition
Role The Sample Provider Role Object definition.
WBS WBS business object
Gateway Providers Data Dictionary
302
In This Section
CBS ....................................................................................................................... 302 CBSDurationSummary .......................................................................................... 303 CBSExpenseSpread ............................................................................................. 303 CBSResourceSpread ............................................................................................ 305 CompanyCosts ...................................................................................................... 307 Column .................................................................................................................. 307 CompanyCostsDetail ............................................................................................. 308 CompanyLineItem ................................................................................................. 308 CompanyLineItemDetail ........................................................................................ 309 CompanySimple .................................................................................................... 309 ExchangeRate ....................................................................................................... 310 OtherProjectCosts ................................................................................................. 310 OtherProjectCostsDetail ........................................................................................ 310 P6ActivitySheet ..................................................................................................... 311 Project ................................................................................................................... 312 ProjectCommits ..................................................................................................... 313 ProjectCommitsDetail ............................................................................................ 314 ProjectDocument ................................................................................................... 314 ProjectDocumentDetail .......................................................................................... 315 ProjectInvoices ...................................................................................................... 315 ProjectInvoicesDetail ............................................................................................. 316 ProjectSimple ........................................................................................................ 317 Resource ............................................................................................................... 317 Role....................................................................................................................... 317 ShellList ................................................................................................................ 318 WBS ...................................................................................................................... 318
CBS
Description: CBS business object
Field Description Read-Only
bitemid The CBS Code id generated by system. No
code CBS code No
item CBS code description No
parentid Parent element ID No
ProjectNumber Project ID No
status CBS status No
Unifier Business Objects
303
CBSDurationSummary
Description: Create/Update Duration Based Summary Sheet in Unifier.
Field Description Read-Only
ActualDuration Actual Duration of work done for a CBS code No
ActualFinish Actual date when work gets finished for a CBS code No
ActualStart Actual date when work gets started for a CBS code No
BaselineType Baseline type of the associated baseline No
bitemid CBS code ID No
DataDate Progress As Of Date v
ElementId The unique identifier of the Duration Summary. No
OriginalProjectId The original Project id for a baseline project No
PercentComplete Percentage of total work completed for a CBS code No
PlannedDuration Planned Duration of work related to a CBS code No
PlannedFinish Planned date for work to get finished for a CBS code No
PlannedStart Planned date for work to get started for a CBS code No
ProjectNumber Project ID No
RemainingDuration
Remaining Duration of work related to a CBS code No
RemainingFinish Date when Remaining work would finish for a CBS code
No
RemainingStart Date when Remaining work would get started for a CBS code
No
Title Project Title No
CBSExpenseSpread
Description: Summarized spread data per CBS per expense category
Field Description Read-Only
ActualCost Actual Cost for a CBS-Expense combination on a date within Actual Duration
No
ActualUnits Actual Units for a CBS-Expense combination on a date within Actual Duration
No
Gateway Providers Data Dictionary
304
Field Description Read-Only
AtCompletionCost At Completion Cost for a CBS-Expense combination on a date within At Completion Duration
No
AtCompletionUnits At Completion Units for a CBS-Expense combination on a date within At Completion Duration
No
BaselineType Baseline type of the associated baseline No
bitemid CBS code ID. No
DataDate Progress As Of date No
ElementId The unique ID generated by the system. No
EndDate At Completion End date No
ExpenseCategory Expense Category viz. Equipment, Travel, Facilities, etc.
No
OriginalProjectId The original Project ID of a baseline Project No
PlannedCost Planned Cost for a CBS-Expense combination on a date within Planned Duration
No
PlannedUnits Planned Units for a CBS-Expense combination on a date within Planned Duration
No
ProjectId Project short name No
ProjectNumber The unique Project Number. No
RemainingCost Remaining Cost for a CBS-Expense combination on a date within Remaining Duration
No
RemainingUnits Remaining Units for a CBS-Expense combination on a date within Remaining Duration
No
StartDate At completion Start date No
SummaryActualCost Actual Cost for a CBS-Expense combination No
SummaryActualUnits Actual Units for a CBS-Expense combination No
SummaryAtCompletionCost
At Completion Cost for a CBS-Expense combination
No
SummaryAtCompletionUnits
At Completion Units for a CBS-Expense combination
No
SummaryPlannedCost Planned Cost for a CBS-Expense No
Unifier Business Objects
305
Field Description Read-Only
combination
SummaryPlannedUnits Planned Units for a CBS-Expense combination
No
SummaryRemainingCost
Remaining cost for a CBS-Expense combination
No
SummaryRemainingUnits
Remaining Units for a CBS-Expense combination
No
Title Project Title No
uuu_object_id The resource Element id of the associated Resource
No
CBSResourceSpread
Description: Summarized spread data per CBS per resource assignment
Field Description Read-Only
ActualCost Actual Cost of work on a date within Actual Duration
No
ActualUnits Actual Units of work on a date within Actual Duration
No
AtCompletionCost At Completion Cost of work on a date within Actual Duration
No
AtCompletionUnits At Completion Units on a date within Actual Duration
No
BaselineType Baseline type of the associated baseline No
bitemid CBS code ID. No
currencyid Currency Code No
DataDate Progress As Of date No
ElementId The unique ID generated by the system. No
EndDate At Completion End date No
OriginalProjectId The Original Project id of a Baseline Project
No
PlannedCost Planned Cost of work on a date within Planned Duration
No
Gateway Providers Data Dictionary
306
Field Description Read-Only
PlannedUnits Planned Units of work on a date within Planned Duration
No
ProjectId Project short name No
ProjectNumber The unique Project Number. No
RemainingCost Remaining Cost of work on a date within Actual Duration
No
RemainingUnits Remaining Units of work on a date within Remaining Duration
No
StartDate At Completion Start date No
SummaryActualCost Actual cost of work for a CBS-Resource combination
No
SummaryActualFinish Actual Finish Date of work for a CBS-Resource combination
No
SummaryActualStart Actual Start Date of work for a CBS-Resource combination
No
SummaryActualUnits Actual Units of work for a CBS-Resource combination
No
SummaryAtCompletionCost
Cost when work for a CBS-Resource combination will be completed
No
SummaryAtCompletionUnits
Units to complete work for a CBS-Resource combination
No
SummaryPlannedCost Planned Cost of work related to a CBS-Resource combination
No
SummaryPlannedUnits Planned Units of work related to a CBS-Resource combination
No
SummaryPlannedStart Planned date for work to get started for a CBS-Resource combination
No
SummaryPlannedFinish Planned date for work to get finished for a CBS-Resource combination
No
SummaryRemainingCost Remaining cost of work for a CBS-Resource combination
No
SummaryRemainingFinishFinish Date of remaining work for a CBS-Resource combination
No
SummaryRemainingStart Start Date of remaining work for a CBS-Resource combination
No
SummaryRemainingUnits Remaining Units of work for a No
Unifier Business Objects
307
Field Description Read-Only
CBS-Resource combination
Title Project Title No
UnitName Role Unit of Measure Name No
uuu_object_id The resource Element id of the associated Resource
No
uuu_role_id Role Id No
uuu_role_name Role Name No
uuu_role_type Role Type No
uuu_role_uom Role Unit of Measure Abbreviation No
CompanyCosts
Description: Company Costs Business Processes
Field Description Read-Only
amount Amount No
creator_id Creator No
Elementid The unique ID generated by the system. No
record_no Record Number No
status Status No
title Title No
uuu_creation_date Creation Date No
Column
Description: Cost Sheet Column Data
Field Description Read-Only
amount Amount No
ElementId The unique ID generated by the system No
long_description Long Description No
quantity Quantity No
Gateway Providers Data Dictionary
308
Field Description Read-Only
short_description Short Description No
spends_category Spends Category No
unit_cost Unit Cost No
unit_of_measure Unit of Measure No
wbs_code Cost Code No
CompanyCostsDetail
Description: Company Costs Detail Business Processes
Field Description Read-Only
amount Amount No
ElementId The unique ID generated by the system. No
li_num Line No. No
ParentElementId Unique ID of the parent company cost No
record_no Parent Record Number No
short_desc Short Description No
uuu_quantity Item Quantity No
uuu_tab_id Tab Name No
uuu_unit_price Item Unit Cost No
CompanyLineItem
Description: Company LineItem Business Processes
Field Description Read-Only
creator_id Creator No
due_date Due Date No
ElementId The unique ID generated by the system. No
record_no Record Number No
status Status No
Unifier Business Objects
309
Field Description Read-Only
title Title No
uuu_creation_date Creation Date No
uuu_dm_publish_path Publish Path No
uuu_week_picker Week Of No
CompanyLineItemDetail
Description: Company LineItem Detail Business Processes
Field Description Read-Only
ElementId The unique ID generated by the system. No
li_num Line No. No
ParentElementId Unique id of the parent company cost No
record_no Parent Record Number No
short_desc Short Description No
uuu_tab_id Tab Name No
uuu_week_picker Week Of
CompanySimple
Description: Company Simple Business Processes
Field Description Read-Only
creator_id Creator No
due_date Due Date
Elementid The unique ID generated by the system. No
record_no Record Number No
status Status No
title Title No
uuu_creation_date Creation Date No
uuu_dm_publish_path Publish Path
Gateway Providers Data Dictionary
310
ExchangeRate
Description: Exchange Rate
Field Description Read-Only
currency_code Currency Code No
currency_name Currency Name No
ElementId The unique ID generated by the system No
rate Currency Rate No
OtherProjectCosts
Description: Other Project Costs Business Processes
Field Description Read-Only
amount Amount No
creator_id Creator No
ElementId The unique ID generated by the system. No
ProjectNumber The unique Project Number. No
record_no Record Number No
status Status No
title Title No
uuu_creation_date Creation Date No
uuu_dm_publish_path Publish Path No
OtherProjectCostsDetail
Description: Other Projects Detail Business Processes
Field Description Read-Only
amount Amount No
bItemId Cost Code No
Unifier Business Objects
311
Field Description Read-Only
description Description No
ElementId The unique ID generated by the system. No
li_num Line No. No
ParentElementId Unique id of the parent company cost No
record_no Parent Record Number No
short_desc Short Description No
uuu_effective_date Effective Date No
uuu_fund_code Fund Code No
uuu_quantity Item Quantity No
uuu_tab_id Tab Name No
uuu_unit_price Item Unit Cost No
wpid Work Package No
P6ActivitySheet
Description: P6 Activity Sheet business object.
Field Description Read-Only
ElementId The unique identifier of the project. No
ProjectNumber Project ID No
uuu_P6ActivityId P6 Activity ID generated by system. No
uuu_P6ActivityName Activity Name No
uuu_P6ActivityStatus uuu_P6ActivityStatus No
uuu_P6ActivityType uuu_P6ActivityType No
uuu_P6ActualDuration uuu_P6ActualDuration No
uuu_P6ActualFinish uuu_P6ActualFinish No
uuu_P6ActualStart uuu_P6ActualStart No
uuu_P6ActualTotalCost uuu_P6ActualTotalCost No
uuu_P6AtCompletionDuration
uuu_P6AtCompletionDuration No
uuu_P6AtCompletionTotalCost
uuu_P6AtCompletionTotalCost No
Gateway Providers Data Dictionary
312
Field Description Read-Only
uuu_P6Finish uuu_P6Finish No
uuu_P6PercentComplete
uuu_P6PercentComplete No
uuu_P6PlannedDuration uuu_P6PlannedDuration No
uuu_P6PlannedFinish uuu_P6PlannedFinish No
uuu_P6PlannedStart uuu_P6PlannedStart No
uuu_P6PlannedTotalCost
uuu_P6PlannedTotalCost No
uuu_P6PrimaryConstraint
Activity Primary Constraint Type No
uuu_P6RemainingDuration
uuu_P6RemainingDuration No
uuu_P6RemainingEarlyFinish
uuu_P6RemainingEarlyFinish No
uuu_P6RemainingEarlyStart
uuu_P6RemainingEarlyStart No
uuu_P6RemainingTotalCost
uuu_P6RemainingTotalCost No
uuu_P6SecondaryConstraint
Activity Secondary Constraint type No
uuu_P6Start uuu_P6Start No
uuu_P6WBSCode uuu_P6WBSCode No
uuu_P6WBSName uuu_P6WBSName No
uuu_P6WBSPath The WBS path of the activity. No
Project
Description: Unifier Project Header.
Field Description Read_Only
description The description of the project. No
ElementId The unique identifier of the project. No
ProjectName The name of the Project. No
ProjectNumber The Unique Project Number. No
Unifier Business Objects
313
Field Description Read_Only
uuu_int_internal_proj_id
P6 internal project ID No
uuu_int_schedule_type
Schedule type of the project - Valid values are "Duration" or "Resource" or "Cost".
No
uuu_location The Location of the project. No
uuu_project_start_date
Project Start Date No
uuu_shell_status The status of the project. No
ProjectCommits
Description: Project Commits Business Processes
Field Description Read-Only
amount Amount No
creator_id Creator No
currencid Transaction Currency No
currencyrate Rate in Project Currency No
description Description No
ElementId The unique ID generated by the system. No
ProjectNumber The unique Project Number. No
record_no Record Number No
ref_bpo Reference BPO No
refid Contract/PO No
status Status No
title Title No
uuu_creation_date Creation Date No
uuu_dm_publish_path Publish Path No
uuu_effective_date Effective Date No
Gateway Providers Data Dictionary
314
ProjectCommitsDetail
Description: Projects Commits Detail Business Processes
Field Description Read-Only
amount Amount No
bItemId Cost Code No
description Description No
ElementId The unique ID generated by the system. No
li_num Line No. No
ParentDetailId Unique ID of the parent project commts detail
No
ParentElementId Unique ID of the parent company cost No
record_no Parent Record Number No
ref_bpo_lineitem Reference BPO LineItem No
short_desc Short Description No
uuu_quantity Item Quantity No
uuu_sovlinum Reference No
uuu_tab_id Tab Name No
uuu_unit_price Item Unit Cost No
wpid Work Package No
ProjectDocument
Description: Project Document Business Processes
Field Description Read-Only
creator_id Creator No
ElementId The unique ID generated by the system. No
ProjectNumber The unique Project Number. No
record_no Record Number No
short_desc Short Description No
status Status No
title Title No
Unifier Business Objects
315
Field Description Read-Only
uuu_creation_date Creation Date No
uuu_dm_publish_path Publish Path No
ProjectDocumentDetail
Description: Projects Document Detail Business Processes
Field Description Read-Only
ElementId The unique ID generated by the system. No
li_num Line No. No
ParentElementId Unique ID of the parent company cost No
record_no Parent Record Number No
short_desc Short Description No
uuu_issue_date Issue Date No
uuu_line_item_status Line Item Status No
uuu_name Name No
uuu_tab_id Tab Name No
ProjectInvoices
Description: Project Invoices Business Processes
Field Description Read-Only
amount Amount No
creator_id Creator No
currencid Transaction Currency No
due_date Due Date No
ElementId The unique ID generated by the system. No
ProjectNumber The unique Project Number. No
record_no Record Number No
refid Contract/PO No
Gateway Providers Data Dictionary
316
Field Description Read-Only
status Status No
title Title No
uuu_creation_date Creation Date No
uuu_dm_publish_path Publish Path No
uuu_effective_date Effective Date No
ProjectInvoicesDetail
Description: Projects Invoices Detail Business Processes
Field Description Read-Only
_breakdown Break Down No
_refnum Reference Number No
amount Amount No
bItemId Cost Code No
description Description No
ElementId The unique ID generated by the system. No
li_num Line No. No
ParentDetailId Unique id of the parent project commts detail
No
ParentElementId Unique id of the parent company cost No
record_no Parent Record Number No
scheduled_value Scheduled Value No
short_desc Short Description No
uuu_effective_date Effective Date No
uuu_quantity Item Quantity No
uuu_tab_id Tab Name No
uuu_unit_price Item Unit Cost No
wpid Work Package No
Unifier Business Objects
317
ProjectSimple
Description: Project Simple Business Processes
Field Description Read-Only
creator_id Creator No
Elementid The unique ID generated by the system. No
record_no Record Number No
status Status No
title Title No
uuu_creation_date Creation Date No
uuu_dm_publish_path Publish Path No
Resource
Description: The Unifier Provider Resource Object definition.
Field Description Read-Only
default_role Resource Default Role Name No
ElementId The unique identifier for the resource No
uuu_resc_capacity Resource Capacity No
uuu_resc_code Resource Code No
uuu_resc_name Resource Name No
uuu_resc_status Resource Status No
uuu_user_email User Email ID No
uuu_user_firstname User First Name No
uuu_user_lastname User Last Name No
Role
Description: The Sample Provider Role Object definition.
Field Description Read-Only
ElementId The unique identifier for the resource No
Gateway Providers Data Dictionary
318
Field Description Read-Only
uuu_role_id The unique identifier of the Role. No
uuu_role_name The name of the resource or role. No
ShellList
Description: Unifier Shell List Header
Field Description Read-Only
description The description of the project No
ElementId The unique identifier of the project No
ProjectName The name of the project. No
ProjectNumber The Unique Project Number No
uuu_int_internal_proj_id P6 Internal Project Id No
uuu_int_schedule_type Schedule type of the project. Valid values are "Duration" or "Resource" or "Cost"
No
uuu_location The Location of the project No
uuu_project_start_date Project Start Date No
uuu_shell_status The status of the project No
WBS
Description: WBS business object
Field Description Read-Only
bitemid The WBS Code id generated by system. No
code WBS code No
item WBS code description No
orderid WBS Order id identifying placement of sibling codes within a hierarchy
No
parentid Parent WBS id for a child WBS No
ProjectNumber Project ID No
status WBS Status No
Unifier Business Objects
319
320
Oracle Primavera Gateway Providers Data Dictionary
Copyright © 2013, 2017, Oracle and/or its affiliates. All rights reserved. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners.
Intel and Intel Xeon are trademarks or registered trademarks of Intel Corporation. All SPARC trademarks are used under license and are trademarks or registered trademarks of SPARC International, Inc. AMD, Opteron, the AMD logo, and the AMD Opteron logo are trademarks or registered trademarks of Advanced Micro Devices. UNIX is a registered trademark of The Open Group.
This software and related documentation are provided under a license agreement containing restrictions on use and disclosure and are protected by intellectual property laws. Except as expressly permitted in your license agreement or allowed by law, you may not use, copy, reproduce, translate, broadcast, modify, license, transmit, distribute, exhibit, perform, publish or display any part, in any form, or by any means. Reverse engineering, disassembly, or decompilation of this software, unless required by law for interoperability, is prohibited.
The information contained herein is subject to change without notice and is not warranted to be error-free. If you find any errors, please report them to us in writing.
If this is software or related documentation that is delivered to the U.S. Government or anyone licensing it on behalf of the U.S. Government, the following notice is applicable:
U.S. GOVERNMENT END USERS: Oracle programs, including any operating system, integrated software, any programs installed on the hardware, and/or documentation, delivered to U.S. Government end users are “commercial computer software" pursuant to the applicable Federal Acquisition Regulation and agency-specific supplemental regulations. As such, use, duplication, disclosure, modification, and adaptation of the programs, including any operating system, integrated software, any programs installed on the hardware, and/or documentation, shall be subject to license terms and license restrictions applicable to the programs. No other rights are granted to the U.S. Government.
This software or hardware is developed for general use in a variety of information management applications. It is not developed or intended for use in any inherently dangerous applications, including applications that may create a risk of personal injury. If you use this software or hardware in dangerous applications, then you shall be responsible to take all appropriate failsafe, backup, redundancy, and other measures to ensure its safe use. Oracle Corporation and its affiliates disclaim any liability for any damages caused by use of this software or hardware in dangerous applications.
This software or hardware and documentation may provide access to or information on content, products and services from third-parties. Oracle Corporation and its affiliates are not responsible for and expressly disclaim all warranties of any kind with respect to third-party content, products, and services. Oracle Corporation and its affiliates will not be responsible for any loss, costs, or damages incurred due to your access to or use of third-party content, products, or services.
Legal Notices