1 KB001 Kanban A New Approach Kanban A New Approach (Tool for Information Flow)

Upload: sahana-grewal

Post on 20-Oct-2015

12 views

Category:

Documents


0 download

DESCRIPTION

engineering

TRANSCRIPT

Page 1: Kanban things

1

KB001

Kanban A New Approach

Kanban A New Approach(Tool for Information Flow)Kanban A New Approach

(Tool for Information Flow)

Page 2: Kanban things

2

KB001

Kanban A New Approach

AgendaAgenda

Time Topic/Activity

8:00 AM 8:05 AM 8:20 AM 9:05 AM 9:20 AM10:05 AM10:20 AM11:15 AM12:15 PM 1:00 PM 2:00 PM 2:45 PM 3:00 PM 4:00 PM 4:45 PM 5:00 PM 5:30 PM 5:45 PM

OpeningIntroductionInformation FlowBreakKanban Simulation1BreakThe CustomerLeveling ExerciseLunchKanban Simulation 2Internal Pull SystemBreakLot Box ProductionLot Size CalculationBreakMaterial MovementSupplier Card CalculationClosing

Page 3: Kanban things

3

KB001

Kanban A New Approach

NameYears of ServiceCurrent Position

IntroductionsIntroductions

Page 4: Kanban things

4

KB001

Kanban A New Approach

Kanban SystemKanban System

• Based on Toyota Production System

• Driven by External Customers

• Addresses Constraints & Bottlenecks

1. Understanding our Capabilities

2. Lot Size Production

Page 5: Kanban things

5

KB001

Kanban A New Approach

OverviewOverview• Supporting Company Strategy

• Understanding Customer Needs

• Internal Kanban System

• Signaling the Supplier

Page 6: Kanban things

6

KB001

Kanban A New Approach

The ObjectiveThe Objective

Create Information System that Supports Lean Principles

Pull of Product Based on Usage

Lower Inventory / Reduced Lead-Time

Page 7: Kanban things

7

KB001

Kanban A New Approach

Company StrategyCompany Strategy• Grow our Business

– Internal and external

– Strengthen our resources

• Improve our Competitive Position– Continually strive for perfection

– Reduce cost

– Eliminate waste in operations

Page 8: Kanban things

8

KB001

Kanban A New Approach

Supporting Company StrategySupporting Company Strategy

• Elimination of Waste• Overproduction

• Material movement

• Inventory

• Transition to Just-in-Time• Kanban system

• Kanban signals

Page 9: Kanban things

9

KB001

Kanban A New Approach

• Production schedules will always change

• Production will never go according to schedule

• It is human nature to overproduce

Key AssumptionsKey Assumptions

Page 10: Kanban things

10

KB001

Kanban A New Approach

Offsetting the AssumptionsOffsetting the Assumptions• Kanban System

• Withdraw only what you need

• Replenish what is taken

• Overall Benefits• Flexibility in production

• Prevents overproduction

• Reduces inventory

Page 11: Kanban things

11

KB001

Kanban A New Approach

Information FlowInformation Flow

Page 12: Kanban things

12

KB001

Kanban A New Approach

The Kanban SignalThe Kanban Signal

The Kanban signal tells us:

When to make it! When to move it!

Page 13: Kanban things

13

KB001

Kanban A New Approach

Kanban SystemKanban System

Supplying Process

Customer Process

product

“Production” Card

Finished Goods Store

“Withdrawal” Card

product

Page 14: Kanban things

14

KB001

Kanban A New Approach

Withdrawal Kanban SignalWithdrawal Kanban Signal

• Tells us:• When to move

• What to move

• Where to move

• How much to move

When to moveWhat to move

Where to move

How much

Page 15: Kanban things

15

KB001

Kanban A New Approach

Three Types of Withdrawal Kanban Signals

Three Types of Withdrawal Kanban Signals

• Customer Kanban Signal• Transfers material from plant to customer

• Move Kanban Signal• Transfers material between work units

• Supplier Kanban Signal• Pulls material from supplier to plant

Page 16: Kanban things

16

KB001

Kanban A New Approach

Customer Kanban Signal InformationCustomer Kanban Signal Information

• Supplier

• Quantity

• Supplier Number

• Card Number

• Kanban Signal Number

• Container Type

• Part Number

• Description

• Storage Location

• Storage Address

Page 17: Kanban things

17

KB001

Kanban A New Approach

Customer Kanban SignalCustomer Kanban Signal

Supplier

Kanban Signal No.

Part No.

Storage Location

Quantity Supplier No.

Card No.

ContainerType

Description

Storage Address

Page 18: Kanban things

18

KB001

Kanban A New Approach

Flow of Customer Kanban SignalFlow of Customer Kanban Signal

Plant

FinishedGoodsStore

ExternalCustomer

needed product

Customer Kanban Signal

Page 19: Kanban things

19

KB001

Kanban A New Approach

Move Kanban Signal InformationMove Kanban Signal Information

• Part Number

• Supplier Name

• Storage Address (Point of Storage)

• Card Number

• Kanban Signal Number

• Work Unit Name (Customer)

• Quantity per Container

• Line Address (Point of Use)

Page 20: Kanban things

20

KB001

Kanban A New Approach

Move Kanban SignalMove Kanban Signal

WORK UNIT ADDRESSSTORE ADDRESS

SUPPLIER NAME Kanban Signal No. WORK UNIT NAME

PART No. QUANTITY CARD #

Page 21: Kanban things

21

KB001

Kanban A New Approach

Flow of Move Kanban SignalFlow of Move Kanban Signal

Internal

RawMaterial

Store

ProductionWork Unit

needed product

Move Kanban Signal

Page 22: Kanban things

22

KB001

Kanban A New Approach

Supplier Kanban Signal InformationSupplier Kanban Signal Information• Supplier Name

• Part Number

• Part Name

• Customer

• Storage Address

• Work Unit Address

• Quantity per Container

• Card Number

• Kanban Signal Number

Page 23: Kanban things

23

KB001

Kanban A New Approach

Supplier Kanban SignalSupplier Kanban Signal

Kanban Signal NumberSupplier Name

Part Number Quantity Card No.

Customer

Store Address Work Unit Address

Part Name

Page 24: Kanban things

24

KB001

Kanban A New Approach

Flow of Supplier Kanban SignalFlow of Supplier Kanban Signal

ExternalSupplier

FinishedGoodsStore

needed product

Supplier Kanban Signal

Internal

RawMaterial

Store

Page 25: Kanban things

25

KB001

Kanban A New Approach

ExternalSupplier

Internal

Raw Materials

Storeneeded product

Flow of Withdrawal Kanban SignalsFlow of Withdrawal Kanban Signals

Internal

ProductionWork Unitneeded

product

Plant

FinishedGoodsStoreneeded

product

ExternalCustomer

needed product

Supplier Signal Move Signal Customer Signal

Page 26: Kanban things

26

KB001

Kanban A New Approach

Production Kanban Signal Production Kanban Signal

• Tells Us:

• When to make

• What to make

• How much to make

Page 27: Kanban things

27

KB001

Kanban A New Approach

Two Types of Production Kanban SignalsTwo Types of Production Kanban Signals

• Production Kanban Signal• Instructs us to make One Container

• Signal (Triangle) • Instructs us to produce One Lot

• Used when a work unit does not have the changeover capability to produce one container for one production card

Page 28: Kanban things

28

KB001

Kanban A New Approach

Production Card InformationProduction Card Information

• Store Address

• Kanban Signal Number

• Work Unit Name

• Part Number

• Quantity

• Card Number

Page 29: Kanban things

29

KB001

Kanban A New Approach

Production CardProduction Card

STORE ADDRESS

Kanban Signal No.

WORK UNIT NAME

PART No. QUANTITY CARD #

Page 30: Kanban things

30

KB001

Kanban A New Approach

Signal (Triangle) InformationSignal (Triangle) Information

• Work Unit Name

• Part Number

• Container Type

• Quantity

• Process Time

• Lot Size

• Order Point

• Kanban Signal Number

Page 31: Kanban things

31

KB001

Kanban A New Approach

Signal (Triangle) Signal (Triangle)

WORK UNIT NAME

PART No.

CONTAINERTYPE

QUANTITY PROCESSINGTIME FOR 1 LOT

LOT SIZE ORDER POINT

Kanban Signal #

# of containers to produce

Where the signal

is placed in inventory

Page 32: Kanban things

32

KB001

Kanban A New Approach

Flow of Production Kanban SignalsFlow of Production Kanban Signals

InternalSub

AssemblyWorkUnitStore

InternalFinal

AssemblyWorkUnitneeded

product

FinishedGoodsStore

needed product

Internal

SubAssembly

WorkUnit

needed product

Triangle SignalProduction Signal Move Signal

Page 33: Kanban things

33

KB001

Kanban A New Approach

Kanban Signal FlowKanban Signal Flow

Sub

Assembly

Work Unit

Finished

Assembly

Work Unit

Production Kanban Signal

Triangle

Kanban Signal

Move

Sub Stores

Finished GoodsStore

A CB D

Page 34: Kanban things

34

KB001

Kanban A New Approach

How Do You Handle Non-Standard Situations

How Do You Handle Non-Standard Situations

Temporary Kanban Signals

• Need scheduled down time to PM equipment

• Sample parts

• Service parts

Page 35: Kanban things

35

KB001

Kanban A New Approach

Temporary Kanban Signal CardTemporary Kanban Signal Card

STORE ADDRESS

WORK UNIT NAME

PART No. QUANTITY CARD #

Kanban Signal No.

Page 36: Kanban things

36

KB001

Kanban A New Approach

Summary of Kanban TypesSummary of Kanban Types

• Withdrawal

- Customer Kanban Signal

- Move Kanban Signal

- Supplier Kanban Signal

• Production

- Production Kanban Signal

- Signal (Triangle)

- Temporary Kanban Signal

Page 37: Kanban things

37

KB001

Kanban A New Approach

Additional Benefits of KanbanAdditional Benefits of Kanban

• Support Visual Control• Are we behind?

• What do I produce first?

• What is my inventory situation?

• Continuous Improvement• Large inventories hide problems

• Facilitate continuous improvement by removing Kanban Signals

Page 38: Kanban things

38

KB001

Kanban A New Approach

Kanban System SimulationKanban System Simulation

Exercise 1

(Without Leveling)

Page 39: Kanban things

39

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 1

• Objective• To gain an understanding of Kanban System card transfer,

exchange, and loop location

Page 40: Kanban things

40

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 1

• Details• Activity will be run in time segments

• Each time segment consists of one day

• One truck from customer per day

• Simulation will run for “5” days

Page 41: Kanban things

41

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 1 Activity Pieces

• 35 Plastic bowls

• 73 White Lego Blocks

• 35 Yellow Lego Blocks

• 5 Customer Cards

• 18 Place Mats

• 13 Production Cards

• 8 Move Cards

• 4 Supplier Cards

• 5 Signal Posts

• 5 Order Cards

Page 42: Kanban things

42

KB001

Kanban A New Approach

Activity Layout - Exercise 1

W

YCustomer

EmptyContainers

SignalPost

4

FinalAssembly

3

3

3

EmptyContainers

SignalPost

1@15

3

3

3

SubAssembly

1

1

1

EmptyContainers

SignalPost

2@15

1Raw

MaterialProcessing

EmptyContainers

SignalPost

1

Supplier

EmptyContainers

SignalPost

A B C

D

E F G H I

J

A - CustomerB - Truck Driver-1 (Customer to Plant)C - Final Assembly OperatorD - Material Handler-1 (Final Assembly to Sub-Assembly)E - Sub-Assembly OperatorF - Material Handler-2 (Sub-Assembly to Raw Material Storage)G - Raw Material Processing (Parts Ordering / Parts Receiving)H - Truck Driver-2 (Plant to Supplier)I - SupplierJ - Manager

W W

Y4 =

WY3 =

Y2 =

W1 =

1@15

4

44

44 4

44

4

11

1

11

1

3 3 1

Page 43: Kanban things

43

KB001

Kanban A New Approach

Activity Layout - Exercise 1Card Types

W

Y

EmptyContainers

Customer

4

4

4

4

4

SignalPost

4

4

4

4

4

FinalAssembly

3

3

3

EmptyContainers

SignalPost

3

3

3

SubAssembly

1

1

1

EmptyContainers

SignalPost

1

1

1Raw

MaterialStorage

EmptyContainers

SignalPost

1

1

1

Supplier

EmptyContainers

SignalPost

Customer Card

Production Card

Move Card

Production Card

Move Card

Supplier Card Production Card

1 1

3 3 1

Page 44: Kanban things

44

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 1 Roles

• Customer• Receive order from facilitator

• Move raw materials to customer processing area

• Remove Customer Cards from container

• Place Customer Cards in Signal post

• Disassemble lego blocks and place in designated containers

• Move empty containers to customer empty container storage

• Repeat above steps for each order

Page 45: Kanban things

45

KB001

Kanban A New Approach

• Truck Driver 1• Pick up Cards from Signal post

• Pick up empty containers from customer empty container storage

• Move empty containers to finished goods empty container storage

• Remove Production Cards from finished goods container and replace with Customer Cards

• Place Production Cards in final assembly Signal post

• Move finished goods to customer raw material storage

• Repeat above steps for each daily order

Kanban System Simulation - Exercise 1 Roles

Page 46: Kanban things

46

KB001

Kanban A New Approach

• Final Assembly Operator• Check final assembly Signal post for production requirements

• Move raw material container to final assembly processing area

• Remove sub-assembly and place on final assembly processing area

• Remove Move Card and place in empty container

• Move empty container back to final assembly raw materials storage

• Pick up empty container from finished goods empty container storage and move to final assembly processing area

• Pick up white processing lego and assemble to sub-assembly and place in finished goods container

• Pick up Production Card from Signal post and place on finished goods container

• Move finished goods container to final assembly finished goods storage

• Repeat above steps for each Kanban Signal

Kanban System Simulation - Exercise 1 Roles

Page 47: Kanban things

47

KB001

Kanban A New Approach

• Material Handler 1

• Pick up Move Cards and empty containers from final assembly raw material storage

• Place empty containers in sub-assembly empty container storage

• Remove Production Cards from sub-assembly finished goods and replace with Move Cards

• Place Production Cards in the sub-assembly Signal post

• Move finished goods containers to final assembly raw material storage

• Repeat above steps for each Kanban Signal

Kanban System Simulation - Exercise 1 Roles

Page 48: Kanban things

48

KB001

Kanban A New Approach

• Sub-Assembly Operator• Check sub-assembly Signal post for production requirements

• Move raw material container to sub-assembly processing area

• Remove raw material and place on sub-assembly processing area

• Remove Move Card and place in empty container

• Move empty container back to sub-assembly raw material storage

• Pick up empty container from sub-assembly empty container storage and move to sub-assembly processing area

• Pick up yellow processing lego and assemble to raw material and place in finished goods container

• Pick up Production Card from Signal post and place on finished goods container

• Move finished goods container to sub-assembly finished goods storage

• Repeat above steps for each Kanban Signal

Kanban System Simulation - Exercise 1 Roles

Page 49: Kanban things

49

KB001

Kanban A New Approach

• Material Handler 2

• Pick up Move Cards and empty containers from sub-assembly raw material storage

• Place empty containers in raw material empty container storage

• Remove Supplier Cards from raw material storage and replace with Move Cards

• Place Supplier Cards in the raw material Signal post

• Move raw material containers to sub-assembly raw material storage

• Repeat above steps for each Kanban Signal

Kanban System Simulation - Exercise 1 Roles

Page 50: Kanban things

50

KB001

Kanban A New Approach

• Raw Material Store (Parts Ordering)• Move empty container from raw material empty container storage

to raw material processing

• Remove Supplier Card from supplier Signal post

• Place Supplier Card on empty container

• Repeat above steps for each Kanban Signal

• Prepare order for shipment

• Raw Material Store (Parts Receiving)• Move raw material container from raw material receiving to raw

material storage area

Kanban System Simulation - Exercise 1 Roles

Page 51: Kanban things

51

KB001

Kanban A New Approach

• Truck Driver 2• Pick up empty containers with Supplier Cards from raw material

processing area

• Place empty containers in Suppliers empty container storage

• Remove Supplier Production Cards from suppliers raw material container and replace with Supplier Cards

• Place Supplier Production Cards in supplier Signal post

• Move raw materials from supplier to raw material receiving

• Repeat above steps for each daily order

Kanban System Simulation - Exercise 1 Roles

Page 52: Kanban things

52

KB001

Kanban A New Approach

• Supplier• Check Supplier Signal post for production requirements

• Move empty container from supplier empty container storage to supplier processing area

• Pick up white processing lego and place in raw material container

• Pick up Production Card from supplier Signal post and place on raw material container

• Move raw material container to supplier finished goods storage

• Repeat above steps for each Kanban Signal

Kanban System Simulation - Exercise 1 Roles

Page 53: Kanban things

53

KB001

Kanban A New Approach

• Manager• Review the daily production requirements

• Instruct cells to produce to customer demand or capacity

• Monitor the production of parts in the value stream

• Evaluate daily production results

Kanban System Simulation - Exercise 1 Roles

Page 54: Kanban things

54

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 1Customer Orders vs Capacity

3 units = 8hrs 00min

4 units = 10hrs 40min

Capacity

1 unit = 2hrs 40min

2 units = 5hrs 20min

Day Customer Capacity Actual ProductionOrder Production Hours

12345

Page 55: Kanban things

55

KB001

Kanban A New Approach

The CustomerThe Customer

(Starting Point for a Kanban System)

Page 56: Kanban things

56

KB001

Kanban A New Approach

Understanding Customer NeedsUnderstanding Customer Needs

• Customer Demand

• Anticipated Requirements (Forecast)• Takt Time (time required to produce a single part based upon

customer usage)

• Actual Requirements (Daily Pull)• Leveling

Page 57: Kanban things

57

KB001

Kanban A New Approach

Anticipated RequirementsAnticipated Requirements

• What information do we need?• Customer demand for the month

• Number of days in demand period

Part Monthly Demand No. of Working Days Daily DemandA 18,000 20 900

Note: 900 units / 2 shifts = 450 units per shift

Page 58: Kanban things

58

KB001

Kanban A New Approach

Takt TimeTakt Time

Available Operating TimePieces

Takt Time =

57,600” - 2,400”900 pcs

=

61.33” per piece =

Sets pace of production to match customer demand

Page 59: Kanban things

59

KB001

Kanban A New Approach

ProductionWork Unit

Customer

Producing to Customer DemandProducing to Customer Demand

Customer CardProduction Card

Page 60: Kanban things

60

KB001

Kanban A New Approach

Customer Ordering History

0

200

400

600

800

1000

1200

1400

1600

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Day

Un

its

0

200

400

600

800

1000

1200

1400

1600

Forecast

Actual

Page 61: Kanban things

61

KB001

Kanban A New Approach

Analyze Actual RequirementsAnalyze Actual Requirements

Anticipated Demand vs. Actual Demand

Part Anticipated Demand Actual Demand DifferenceA 18,000 19,000 1000

Page 62: Kanban things

62

KB001

Kanban A New Approach

Opportunities in Customer FluctuationOpportunities in Customer Fluctuation

• Buffer Stock• Used when demand is in excess of customer forecast

• Replenished when demand is less than customer forecast

• Note: Buffers are an indicator of waste in the system!

Page 63: Kanban things

63

KB001

Kanban A New Approach

Leveled Production(Based On 500 Units Of Buffer Stock)

0

200

400

600

800

1000

1200

1400

1600

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Day

Un

its

0

200

400

600

800

1000

1200

1400

1600

Forecast

Actual

Production

Page 64: Kanban things

64

KB001

Kanban A New Approach

Opportunities in Truck PitchOpportunities in Truck Pitch

• Even Truck Pitch• Drives constant Takt Time

• Reduces fluctuation

• Overall Benefit• Reduction in inventory

Page 65: Kanban things

65

KB001

Kanban A New Approach

Truck PitchTruck Pitch

Truck 2 Truck 3 Truck 4 Truck 1

6:00 10:00 14:30 16:00 21:00 24:30

= Break

= Lunch= Between

Shifts

Truck Times1 - 6:00 3 – 16:00 2 - 10:00 4 – 21:00

Page 66: Kanban things

66

KB001

Kanban A New Approach

Replenishment CapabilityReplenishment Capability• Truck Pick-up Times

1. 6:00 2. 10:00 3. 16:00 4. 21:00

• Replenishment Capability Based on Takt Time

• 21:00 - 24:30 = 3.5 hours = 12,600 seconds

• 12,600 seconds - 600 seconds (break) = 12,000 seconds

• 12,000 seconds / 61.33 seconds (takt time) = 195.66 pcs

• 195.66 pcs / 50 pcs in container = 3.91 containers

• Truck 1 = 3 containers (45.66 remaining for Truck 2)

Page 67: Kanban things

67

KB001

Kanban A New Approach

Leveling PostLeveling Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

500 pcs. used to buffer Customer Orders

• 50 pcs. per container

• 10 slots required in Leveling Post for Buffer

Page 68: Kanban things

68

KB001

Kanban A New Approach

ProductionWork Unit

Customer

Leveling Post

B

P

Leveling Customer DemandLeveling Customer Demand

Forecast

Page 69: Kanban things

69

KB001

Kanban A New Approach

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

Takt Time PostTakt Time Post

Page 70: Kanban things

70

KB001

Kanban A New Approach

Information Required for Takt Time Post

Information Required for Takt Time Post

• Takt Time = 61.33 seconds

• Number of pieces per container = 50

Time per container = (Takt Time * Container Quantity) / 60

= (61.33 * 50) / 60 = 51 minutes(Must deliver a Kanban from the Takt Time Post

to the Production Work Unit every 51 minutes)

Page 71: Kanban things

71

KB001

Kanban A New Approach

Takt Time PostTakt Time Post

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

Page 72: Kanban things

72

KB001

Kanban A New Approach

ProductionWork Unit

Customer

Leveling Post

B

P

Leveling Customer DemandLeveling Customer DemandForecast

Takt Time Post

Page 73: Kanban things

73

KB001

Kanban A New Approach

Separating Safety StockSeparating Safety Stock

• Distinguish between customer fluctuation and internal problems

• Safety Stock inventory amount is based on downtime history

Page 74: Kanban things

74

KB001

Kanban A New Approach

ProductionWork Unit

Customer

Leveling Post

B

P

Utilizing Safety StockUtilizing Safety Stock

Forecast

Takt Time Post

S

Page 75: Kanban things

75

KB001

Kanban A New Approach

Leveling Leveling

• Benefits:

• Neutralizes fluctuation from:• Customer’s orders

• Truck pitch

• Pulls product based on: • Customer usage

• Takt Time

Page 76: Kanban things

76

KB001

Kanban A New Approach

Leveling SystemLeveling System

Visual Aid 1

(Neutralizing Customer Fluctuation)

Page 77: Kanban things

77

KB001

Kanban A New Approach

ObjectiveObjective

• To establish a pull system of production that levels the demand of the customer to meet production capabilities

Page 78: Kanban things

78

KB001

Kanban A New Approach

Visual Aid RequirementsVisual Aid Requirements

• Leveling Post

• Takt Time Post

• Signal Post

• (20) Customer Cards

• (7) Production Cards

• (10) Buffer Stock Cards

• (5) Safety Stock Cards

Page 79: Kanban things

79

KB001

Kanban A New Approach

Card NumberCard Number

• To determine the number of Production Cards in the system, take the highest available Cards to be shipped on one truck and add one Card.

• EXAMPLE:

• Truck 4 = 6 Cards

• 6 Cards + 1 Card = 7 Cards

• (7) Production Cards Required

• Note: Additional Cards may be required for longer lead-times

Page 80: Kanban things

80

KB001

Kanban A New Approach

Card PlacementCard Placement

• To determine the location of the Production Card on the takt time post, take the available Cards for the last truck and subtract the quantity for the first truck and count backwards from the last truck

• EXAMPLE:

• Truck 4 - Truck 1 = Cards Generated for 1st

• (6) - (3) = 3 Cards for 1st Shift

• Note: If the number is zero or a negative number, only the last Card of the last truck is generated for 1st shift

Page 81: Kanban things

81

KB001

Kanban A New Approach

Visual Aid Layout - Day 1 (End of 2nd Shift)

Leveling Post

Takt Time Post600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 82: Kanban things

82

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (6:00 am)

Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

Page 83: Kanban things

83

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (6:00 am - continued)

Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

930

2

936

942

948

954

1000

1006

1012

1018

1024

3

1030

1036

1042

1048

1054

1100

1106

1112

1118

1124

1130

1136

1142

L/T

4

1148

1154

1200

1206

1212

1218

1224

1230

1236

5

1242

1248

1254

L/T

L/T

L/T

L/T

Page 84: Kanban things

84

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (10:00 am)Leveling Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Takt Time Post930

2

936

942

948

954

1000

1006

1012

1018

1024

3

1030

1036

1042

1048

1054

1100

1106

1112

1118

1124

1130

1136

1142

L/T

4

1148

1154

1200

1206

1212

1218

1224

1230

1236

5

1242

1248

1254

L/T

L/T

L/T

L/T

B/T

B/T

Page 85: Kanban things

85

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (10:00 am - continued)

Leveling Post1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Takt Time Post100

106

112

118

124

130

136

6

142

148

154

200

206

212

218

224

230

236

242

248

254

300

306

312

318

324

330

336

342

348

354

400

406

412

418

424

B/T

B/T

Page 86: Kanban things

86

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (10:00 am - continued)

Leveling Post1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Takt Time Post430

7

436

442

448

454

500

506

512

518

8

524

530

536

542

548

554

600

606

612

9

618

624

630

636

642

648

654

700

706

712

10

718

724

730

736

742

748

754

B/T

B/T

Page 87: Kanban things

87

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (4:00 pm)

Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

430

7

436

442

448

454

500

506

512

518

8

524

530

536

542

548

554

600

606

612

9

618

624

630

636

642

648

654

700

706

712

10

718

724

730

736

742

748

754

B/T

B/T

Page 88: Kanban things

88

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (4:00 pm - continued)Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

800

11

806

812

818

824

830

836

842

848

854

12

900

906

912

918

924

930

936

942

948

954

1000

1006

1012

13

1018

1024

1030

1036

1042

1048

1054

1100

1106

14

1112

1118

1124

L/T

L/T

L/T

L/T

L/T

B/T

B/T

Page 89: Kanban things

89

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (9:00 pm)Leveling Post

Takt Time Post800

11

806

812

818

824

830

836

842

848

854

12

900

906

912

918

924

930

936

942

948

954

1000

1006

1012

13

1018

1024

1030

1036

1042

1048

1054

1100

1106

14

1112

1118

1124

L/T

L/T

L/T

L/T

L/T

B/T

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 90: Kanban things

90

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (9:00 pm - continued)

Leveling Post

Takt Time Post1130

1136

1142

1148

1154

1200

1206

15

1212

1218

1224

1230

1236

1242

1248

1254

100

106

112

118

124

130

136

142

148

154

200

206

212

218

224

230

236

242

248

254

B/T

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 91: Kanban things

91

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (9:00 pm - continued)Leveling Post

Takt Time Post600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 92: Kanban things

92

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (End of 2nd Shift)Leveling Post

Takt Time Post600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 93: Kanban things

93

KB001

Kanban A New Approach

Visual Aid Layout - Day 2 (End of 2nd Shift - cont.d)

Leveling Post

Takt Time Post600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 94: Kanban things

94

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (6:00 am)

Leveling Post

Takt Time Post600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 95: Kanban things

95

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (6:00 am - continued)Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

930

2

936

942

948

954

1000

1006

1012

1018

1024

3

1030

1036

1042

1048

1054

1100

1106

1112

1118

1124

1130

1136

1142

L/T

4

1148

1154

1200

1206

1212

1218

1224

1230

1236

5

1242

1248

1254

L/T

L/T

L/T

L/T

Page 96: Kanban things

96

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (10:00 am)Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

930

2

936

942

948

954

1000

1006

1012

1018

1024

3

1030

1036

1042

1048

1054

1100

1106

1112

1118

1124

1130

1136

1142

L/T

4

1148

1154

1200

1206

1212

1218

1224

1230

1236

5

1242

1248

1254

L/T

L/T

L/T

L/T

B/T

B/T

Page 97: Kanban things

97

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (10:00 am - continued)

Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

100

106

112

118

124

130

136

6

142

148

154

200

206

212

218

224

230

236

242

248

254

300

306

312

318

324

330

336

342

348

354

400

406

412

418

424

B/T

B/T

Page 98: Kanban things

98

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (10:00 am - continued)Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

430

7

436

442

448

454

500

506

512

518

8

524

530

536

542

548

554

600

606

612

9

618

624

630

636

642

648

654

700

706

712

10

718

724

730

736

742

748

754

B/T

B/T

Page 99: Kanban things

99

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (4:00 pm)

Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

430

7

436

442

448

454

500

506

512

518

8

524

530

536

542

548

554

600

606

612

9

618

624

630

636

642

648

654

700

706

712

10

718

724

730

736

742

748

754

B/T

B/T

Page 100: Kanban things

100

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (4:00 pm - continued)Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

800

11

806

812

818

824

830

836

842

848

854

12

900

906

912

918

924

930

936

942

948

954

1000

1006

1012

13

1018

1024

1030

1036

1042

1048

1054

1100

1106

14

1112

1118

1124

L/T

L/T

L/T

L/T

L/T

B/T

B/T

Page 101: Kanban things

101

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (9:00 pm)Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

800

11

806

812

818

824

830

836

842

848

854

12

900

906

912

918

924

930

936

942

948

954

1000

1006

1012

13

1018

1024

1030

1036

1042

1048

1054

1100

1106

14

1112

1118

1124

L/T

L/T

L/T

L/T

L/T

B/T

B/T

Page 102: Kanban things

102

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (9:00 pm - continued)

Leveling Post

Takt Time Post

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

1130

1136

1142

1148

1154

1200

1206

15

1212

1218

1224

1230

1236

1242

1248

1254

100

106

112

118

124

130

136

142

148

154

200

206

212

218

224

230

236

242

248

254

B/T

B/T

Page 103: Kanban things

103

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (9:00 pm - continued)

Leveling Post

Takt Time Post600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 104: Kanban things

104

KB001

Kanban A New Approach

Visual Aid Layout - Day 3 (End of 2nd Shift)

Leveling Post

Takt Time Post600

16

606

612

618

624

630

636

642

648

17

654

700

706

712

718

724

730

736

742

18

748

754

800

806

812

B/T

818

824

830

836

842

1

848

854

900

906

912

918

924

B/T

1 2 3 4 Buffer Stock

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

Page 105: Kanban things

105

KB001

Kanban A New Approach

Kanban System SimulationKanban System Simulation

Exercise 2

(With Leveling)

Page 106: Kanban things

106

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 2

• Objective• To gain an understanding of the method and benefits of leveling

Page 107: Kanban things

107

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 2

• Details• Activity will be run in time segments

• Each time segment consists of one day

• One truck from customer per day

• Simulation will run for “5” days

• Leveling of production occurs at the Point of Pull

Page 108: Kanban things

108

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 2

Activity Pieces

• 36 Plastic bowls

• 75 White Lego Blocks

• 36 Yellow Lego Blocks

• 5 Customer Cards

• 11 Production Cards

• 18 Place Mats

• 3 Buffer Stock Cards

• 8 Move Cards

• 4 Supplier Cards

• 5 Signal Posts

• 1 Leveling Post

• 5 Order Cards

Page 109: Kanban things

109

KB001

Kanban A New Approach

Activity Layout - Exercise 2

W

YCustomer

4

4

4

4

4

EmptyContainers

SignalPost

4

4

4 4

4

4

FinalAssembly

3

3

3

EmptyContainers

SignalPost

1@15

3

3

3

SubAssembly

1

1

1

EmptyContainers

SignalPost

2@15

1

11Raw

MaterialStorage

EmptyContainers

SignalPost

1

11 Supplier

EmptyContainers

SignalPost

A B C

D

E F G H I

J

A - CustomerB - Truck Driver-1 (Customer to Plant)C - Final Assembly OperatorD - Material Handler-1 (Final Assembly to Sub-Assembly)E - Sub-Assembly OperatorF - Material Handler-2 (Sub-Assembly to Raw Material Storage)G - Raw Material Processing (Parts Ordering / Parts Receiving)H - Truck Driver-2 (Plant to Supplier)I - SupplierJ - Manager

W W

Y4 =

WY3 =

Y2 =

W1 =

1@15Leveling

Post

1 1

3 13

Page 110: Kanban things

110

KB001

Kanban A New Approach

Activity Layout - Exercise 2

Card Types

Customer Cards

(3) Production Cards(3) Buffer Stock Cards

Move Cards

Production Cards

Move Cards

Supplier Cards Production Cards

W

Y

EmptyContainers

Customer

4

4

4

4

4

SignalPost

4

4

4 4

4

4

FinalAssembly

3

3

3

EmptyContainers

SignalPost

3

3

3

SubAssembly

1

1

1

EmptyContainers

SignalPost

1

1

1Raw

MaterialStorage

EmptyContainers

SignalPost

1

1

1

Supplier

EmptyContainers

SignalPost

LevelingPost

1 1

3 3 1

Page 111: Kanban things

111

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 2Roles

• Following Roles Same As Exercise 1• Customer

• Final Assembly Operator

• Material Handler 1

• Sub-Assembly Operator

• Material Handler 2

• Raw Material Store

• Truck Driver 2

• Supplier

Page 112: Kanban things

112

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 2Roles

• Truck Driver 1• Pick up Customer Cards from Customer Signal post

• Pick up empty containers from customer empty container storage

• Move empty containers to finished goods empty container storage

• Place Customer Cards in leveling post

• Remove Cards from leveling post after leveling

• Remove Production Cards from finished goods container and replace with Customer Cards

• Place Production Cards, and/or Buffer Stock Cards if required, in final assembly Signal post

• Move finished goods to customer raw material storage

• Repeat above steps for each daily order

Page 113: Kanban things

113

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 2Roles

• Manager• Focus on improving operations

Page 114: Kanban things

114

KB001

Kanban A New Approach

Kanban System Simulation - Exercise 2Customer Orders vs Capacity

Day Customer Capacity Actual ProductionOrder Production Hours

12345

3 units = 8hrs 00min

4 units = 10hrs 40min

Capacity

1 unit = 2hrs 40min

2 units = 5hrs 20min

Page 115: Kanban things

115

KB001

Kanban A New Approach

Internal Kanban SystemInternal Kanban System

(Operating The Internal System)

Page 116: Kanban things

116

KB001

Kanban A New Approach

Internal Kanban SystemInternal Kanban System

• Production Instruction• Production Card

• Signal (Triangle)

• Material Movement• Move Card

• Delivery system

Page 117: Kanban things

117

KB001

Kanban A New Approach

Kanban Signal“Tool To Trigger Production”

Kanban Signal“Tool To Trigger Production”

• Production Card

• High level of capability in the work unit

• Production of parts in any order

Page 118: Kanban things

118

KB001

Kanban A New Approach

• If a work unit can produce parts in the same order that they are pulled from stores, then they produce Card for Card

• The Production Card (typically a white card) is attached to the container after production

• When a container is pulled from the work unit store, the card is removed and sent back to the work unit to trigger production

ProducingCard for Card

ProducingCard for Card

Page 119: Kanban things

119

KB001

Kanban A New Approach

• The Production Card is the signal to produce a container of a particular part number

• The work unit produces in the order that the Production Cards are received

• Changeover time must be equal to or less than the consumers changeover time

Points to RememberPoints to Remember

Page 120: Kanban things

120

KB001

Kanban A New Approach

Flow of the Production CardFlow of the Production Card

Supplying Process

product

“Production” Card

Page 121: Kanban things

121

KB001

Kanban A New Approach

Kanban Signal“Tool to Trigger Production”

Kanban Signal“Tool to Trigger Production”

• Signal (Triangle)

• Long changeover times

• Production in lot size

Page 122: Kanban things

122

KB001

Kanban A New Approach

Production by Lot SizeProduction by Lot Size

A B CC CA A B

1st 2nd

CB

3rd 4th

Withdrawal Period

A B

Direct Relationship between Changeover times and Inventory Levels

Page 123: Kanban things

123

KB001

Kanban A New Approach

Signal (Triangle) Signal (Triangle)

WORKUNIT

NAME

PART No.

CONTAINERTYPE

QUANTITY PROCESSINGTIME FOR 1 LOT

LOT SIZE ORDER POINT

Signal #

# of containers to produce

Where the signal

is placed in inventory

Page 124: Kanban things

124

KB001

Kanban A New Approach

Signal TriangleSignal Triangle

• When using the Signal Triangle, every part number on the work unit has it’s own signal

• The signal instructs the work unit to produce and is dependent on how inventory is pulled from the work unit

• If parts are not withdrawn from the work unit, the work unit will not receive a signal to produce

Page 125: Kanban things

125

KB001

Kanban A New Approach

Lot Size ProductionLot Size Production

• Signal Instructs the Work Unit:

• When to produce the part

• How many to produce at one time

Page 126: Kanban things

126

KB001

Kanban A New Approach

Elements Required to Determine the Lot SizeElements Required to Determine the Lot Size

• Available Time

• Monthly Demand for Each Part Number

• Production Time for Each Part Number

• Average Changeover Time

Page 127: Kanban things

127

KB001

Kanban A New Approach

Available TimeAvailable Time

Available Time =

(Number of Hours per Shift) – (Break Time)

57,600 seconds - 2,400 seconds = 55,200 seconds

Number of Shifts: 2 Hours per Shift: 8Number of Breaks per Shift: 2 Minutes per Break: 10

Page 128: Kanban things

128

KB001

Kanban A New Approach

Demand CalculationDemand Calculation

Daily Demand = Monthly Demand # of Days in Demand Period

Part Monthly Demand Daily Demand A 4000 pcs 200 pcs B 6000 pcs 300 pcs C 8000 pcs 400 pcs D 12000 pcs 600 pcsTotal 30000 pcs ???? pcs

Days in Month = 20

Page 129: Kanban things

129

KB001

Kanban A New Approach

Demand CalculationDemand Calculation

Daily Demand = Monthly Demand # of Days in Demand Period

Part Monthly Demand Daily Demand A 4000 pcs 200 pcs B 6000 pcs 300 pcs C 8000 pcs 400 pcs D 12000 pcs 600 pcsTotal 30000 pcs 1500 pcs

Days in Month = 20

Page 130: Kanban things

130

KB001

Kanban A New Approach

Calculating Production TimeCalculating Production Time

Production Time = Cycle Time x Daily Demand

Part Daily Demand Cycle Time Production Time A 200 28.5” 5700” B 300 28.0” 8400” C 400 30.5” 12200” D 600 32.0” 19200”Total 1500 30.3” ??????”

Page 131: Kanban things

131

KB001

Kanban A New Approach

Calculating Production TimeCalculating Production Time

Production Time = Cycle Time x Daily Demand

Part Daily Demand Cycle Time Production Time A 200 28.5” 5700” B 300 28.0” 8400” C 400 30.5” 12200” D 600 32.0” 19200”Total 1500 30.3” 45500”

Page 132: Kanban things

132

KB001

Kanban A New Approach

Calculating Average Changeover TimeCalculating Average Changeover Time

Part Daily Demand Changeover Time A 200 900 seconds B 300 600 seconds C 400 720 seconds D 600 600 secondsTotal ???? ???? seconds

Average C/O Time = Changeover Time = ???? = ??? # of Parts Numbers ?

Total

Page 133: Kanban things

133

KB001

Kanban A New Approach

Calculating Average Changeover TimeCalculating Average Changeover Time

Part Daily Demand Changeover Time A 200 900 seconds B 300 600 seconds C 400 720 seconds D 600 600 secondsTotal 1500 2820 seconds

Average C/O Time = Changeover Time = 2820 = 705 # of Parts Numbers 4

Total

Page 134: Kanban things

134

KB001

Kanban A New Approach

Lot Size CalculationLot Size Calculation

Step 1: Determine the Number of Changeovers per Day

# of C/O per Day = Available Time - Production Time Average Changeover Time

# of C/O per Day = ????? - ????? = ??? C/O’s ???

(# of Parts) (# of Available C/O’s)

(?)

/

/ (???)

= (LOT SIZE)

= ??? Days

Page 135: Kanban things

135

KB001

Kanban A New Approach

Lot Size CalculationLot Size Calculation

Step 1: Determine the Number of Changeovers per Day

# of C/O per Day = Available Time - Production Time Average Changeover Time

# of C/O per Day = 55,200 - 45,500 = 13.7 C/O’s 705

(# of Parts) (# of Available C/O’s)

(4)

/

/ (13.7)

= (LOT SIZE)

= .29 Days

Page 136: Kanban things

136

KB001

Kanban A New Approach

Lot Size per Part NumberLot Size per Part Number

Part Daily Demand Lot Size # in Lot A 200 0.29 days 58 pcs B 300 0.29 days 87 pcs C 400 0.29 days 116 pcs D 600 0.29 days 174 pcs

Page 137: Kanban things

137

KB001

Kanban A New Approach

# of Containers in a Lot = Lot Size

Qty per Cont.

Example:

Lot Size for Part A = 58 pcs

Container Size = 30 pcs

Part A = 58 pcs per lot size = 1.9 containers

30 pcs per container

Part A Lot Size = 2 Containers

Round Up to Next Full Container

Container Lot SizeContainer Lot Size

Page 138: Kanban things

138

KB001

Kanban A New Approach

Order PointOrder Point

• The order point determines how much inventory is needed in the stores to cover customer requirements during the work unit’s peak period of downtime

• For instance, the order point = 2 • The signal is placed on the 2nd to the last container. When

the container above the signal on is pulled, exposing the Signal Triangle, the signal goes back to the line to trigger production with the corresponding amount of Production Cards

Page 139: Kanban things

139

KB001

Kanban A New Approach

Signal (Triangle) Signal (Triangle)

Pull from Top

Remove Signal Triangle when this container is pulled!!

Page 140: Kanban things

140

KB001

Kanban A New Approach

Order Point CalculationOrder Point Calculation(Daily Demand x Downtime Percentage) = Order Point

Quantity per Container

Daily Demand: 200pcs (200 x .20) = 1.33

Peak Downtime Percentage: 20% 30

Quantity per Container: 30pcs

Order Point: 2 Round Up to Next Full Container

Page 141: Kanban things

141

KB001

Kanban A New Approach

Order PointsOrder Points

Part Daily Demand D/T #PCS Pcs/Cont O.P. A 200 .20 40 30 ? B 300 .20 60 30 ?

C 400 .20 80 30 ?

D 600 .20 120 30 ?

Page 142: Kanban things

142

KB001

Kanban A New Approach

Order PointsOrder Points

Part Daily Demand D/T #PCS Pcs/Cont O.P. A 200 .20 40 30 2 B 300 .20 60 30 2

C 400 .20 80 30 3

D 600 .20 120 30 4

Page 143: Kanban things

143

KB001

Kanban A New Approach

How are the Containers Identified?How are the Containers Identified?

• A Production Card is placed on a container after it is produced

• When the container is pulled from the store the Production Card is removed and is put into a collection box, while a Move Card is put on the container in it’s place

• When the signal is sent to the work unit for production, the number of Production Cards that are needed to I.D. the containers are also taken

Page 144: Kanban things

144

KB001

Kanban A New Approach

1.

Inventory Stores

3.

2.

Inventory Stores

Inventory Stores

The Production Card is putinto a collection box to besent back to the work unit.

Move Card signals thatthe Customer Work Unit needs parts.

The container is pickedand the Kanban Card isreplaced with the MoveCard.

Parts are taken to the Customer Work Unit.

Page 145: Kanban things

145

KB001

Kanban A New Approach

# of Production Cards in the System

# of Production Cards = Lot Size + Order Point

= 2 + 2

= 4 Tags

The number of cards is the maximum amount of material that will be in the stores

Page 146: Kanban things

146

KB001

Kanban A New Approach

Flow Of The Signal ( Triangle)

Order

Point

Customer

Pulling

Now Next

Roll Cut Work Unit

Signal Board

A B C D

Roll Cut Stores

A

B

C

D

A B DC

CollectionBox

Page 147: Kanban things

147

KB001

Kanban A New Approach

Lot Box ProductionLot Box Production

An Alternative Approach for Increased Visual Management

Page 148: Kanban things

148

KB001

Kanban A New Approach

Supplying Process

product

“Production” Card

Lot Box Production FlowLot Box Production Flow

LotBox

Page 149: Kanban things

149

KB001

Kanban A New Approach

The Lot BoxThe Lot Box

Order PointProduction Cards

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Zero Inventory

Page 150: Kanban things

150

KB001

Kanban A New Approach

Work Unit Kanban PostWork Unit Kanban Post

Part D C/O Card Part A C/O Card

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

Page 151: Kanban things

A B C D E F G H IDaily Demand Lot Size Cycle Time C/O Lot Time Total Run Container SizeMin. / Container C.O. Time (min.) Calculations

E=(BXC)F=(D+E)

H=(GXC)/60I=D/60

Part #1 2 3 4 5 6 C/O Total

ABCD

Container No.

Page 152: Kanban things

152

KB001

Kanban A New Approach

Example for Part # C

A: I - I - -

B: I - I - - I - -

C: I - I - - I - I - -

D: I - - I - - I - I - - I - I - -

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

1 2 3 4 5 6 C/O TOTAL15.25 30.5 45.75 61 X X 12 73

Page 153: Kanban things

153

KB001

Kanban A New Approach

Lot Box ProductionLot Box Production

Visual Aid 2

(An Alternative Approach)

Page 154: Kanban things

154

KB001

Kanban A New Approach

ObjectiveObjective

• To visually demonstrate the flow of Cards based on lot size production using the Lot Box as a tool for instruction to produce.

Page 155: Kanban things

155

KB001

Kanban A New Approach

Visual Aid RequirementsVisual Aid Requirements

• 1 Lot Box

• 1 Kanban Post

• 1 Parts Withdrawal Timing Sheet

• 4 (Part A) Production Cards

• 5 (Part B) Production Cards

• 7 (Part C) Production Cards

• 10 (Part D) Production Cards

• 17 Changeover Cards

Page 156: Kanban things

156

KB001

Kanban A New Approach

Visual Aid LayoutVisual Aid Layout

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

Kanban Post

Page 157: Kanban things

157

KB001

Kanban A New Approach

Visual Aid Layout Inventory StatusVisual Aid Layout Inventory Status

Part A Part B Part C Part D

1 Container 1 Container 1 Container 1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 158: Kanban things

158

KB001

Kanban A New Approach

Part Withdrawal Timing

Part A8:10 am

10:38 am 1:36 pm5:54 pm8:22 pm

11:10 pm

Part B7:32 am9:14 am

10:46 am 12:48 pm

2:30 pm6:02 pm7:44 pm9:16 pm

11:18 pm 1:00 am

Part C7:09 am8:18 am9:37 am

10:46 am 12:25 pm 1:44 pm4:53 pm6:02 pm7:21 pm8:30 pm

10:09 pm 11:18 pm 12:37 am

Part D6:28 am7:14 am8:00 am8:56 am

9:42 am 10:28 am 11:44 am 12:30 pm

1:26 pm2:12 pm4:58 pm5:44 pm6:30 pm7:26 pm8:12 pm8:58 pm

10:14 pm 11:00 pm 11:56 am 12:42 am

Page 159: Kanban things

159

KB001

Kanban A New Approach

Board Status - 6:00 amBoard Status - 6:00 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

Kanban Post

Page 160: Kanban things

160

KB001

Kanban A New Approach

Board Status – 6:00 amBoard Status – 6:00 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

Kanban Post

Page 161: Kanban things

161

KB001

Kanban A New Approach

Inventory Status - 6:00 amInventory Status - 6:00 am

Part A Part B Part C Part D

1 Container

1 Container

1 Container 1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 162: Kanban things

162

KB001

Kanban A New Approach

Board Status - 6:42 amBoard Status - 6:42 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

Kanban Post

Line 100

B/T

B/T

1st Shift 754

736

730

748

742

812

824

642

654

700

706

712

718

724

806

800

818

830

836

842

648

Page 163: Kanban things

163

KB001

Kanban A New Approach

Board Status - 6:42 amBoard Status - 6:42 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

Kanban Post

Line 100

B/T

B/T

1st Shift 754

736

730

748

742

812

824

642

654

700

706

712

718

724

806

800

818

830

836

842

648

Page 164: Kanban things

164

KB001

Kanban A New Approach

Inventory Status - 6:42 amInventory Status - 6:42 am

Part A Part B Part C Part D

1 Container 1 Container 1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 165: Kanban things

165

KB001

Kanban A New Approach

Board Status - 8:42 amBoard Status - 8:42 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

Line 100

Kanban Post

1st Shift 954

936

930

948

942

842

854

900

906

912

918

924

1000

1006

1012

1024

1030

1036

1042

1018

848

Page 166: Kanban things

166

KB001

Kanban A New Approach

Board Status - 8:42 amBoard Status - 8:42 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

Line 100

Kanban Post

1st Shift 954

936

930

948

942

842

854

900

906

912

918

924

1000

1006

1012

1024

1030

1036

1042

1018

848

Page 167: Kanban things

167

KB001

Kanban A New Approach

Inventory Status - 8:42 amInventory Status - 8:42 am

Part B

1 Container

Part C

1 Container 1 Container

Part A

1 Container

Part D

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 168: Kanban things

168

KB001

Kanban A New Approach

Board Status – 9:54 amBoard Status – 9:54 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

Line 100

Kanban Post

L/T

L/T

L/T

L/T

L/T

1st Shift

1000

1006

1012

1024

1030

1036

1042

1048

1018

1054

1100

1106

1112

1118

1124

1100

1106

1112

1118

1124

954

Page 169: Kanban things

169

KB001

Kanban A New Approach

Board Status – 9:54 amBoard Status – 9:54 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

Line 100

Kanban Post

L/T

L/T

L/T

1st Shift

1000

1006

1012

1024

1030

1036

1042

1048

1018

1054

1100

1106

1112

1118

1124

1100

1106

1112

1118

1124

954

L/T

L/T

Page 170: Kanban things

170

KB001

Kanban A New Approach

Inventory Status – 9:54 amInventory Status – 9:54 am

Part B

1 Container

Part C

1 Container 1 Container

Part A

1 Container

Part D

1 Container

1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 171: Kanban things

171

KB001

Kanban A New Approach

Board Status – 10:48 amBoard Status – 10:48 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

Kanban Post1124

1136

1218

1224

1230

1236

1242

1212

1248

1118

1048

1054

1100

1106

1112

1130

1142

1148

1154

1200

1206

L/T

L/T

L/T

L/T

L/T

Page 172: Kanban things

172

KB001

Kanban A New Approach

Board Status – 10:48 amBoard Status – 10:48 am

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

Kanban Post1124

1136

1218

1224

1230

1236

1242

1212

1248

1118

1048

1054

1100

1106

1112

1130

1142

1148

1154

1200

1206

L/T

L/T

L/T

L/T

L/T

Page 173: Kanban things

173

KB001

Kanban A New Approach

Inventory Status – 10:48 amInventory Status – 10:48 am

Part B

1 Container

Part C

1 Container 1 Container

Part A

1 Container

Part D

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 174: Kanban things

174

KB001

Kanban A New Approach

Board Status - 12:02 pmBoard Status - 12:02 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

Kanban Post

B/T

B/T

1200

1206

1212

1218

1224

1230

1236

1242

1248

1254

100

106

112

118

124

130

136

142

154

200

206

Page 175: Kanban things

175

KB001

Kanban A New Approach

Board Status - 12:02 pmBoard Status - 12:02 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

Kanban Post

B/T

B/T

1200

1206

1212

1218

1224

1230

1236

1242

1248

1254

100

106

112

118

124

130

136

142

154

200

206

Page 176: Kanban things

176

KB001

Kanban A New Approach

Inventory Status - 12:02 pmInventory Status - 12:02 pm

Part B

1 Container

Part C

1 Container 1 Container

Part A

1 Container

Part D

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 177: Kanban things

177

KB001

Kanban A New Approach

Board Status – 1:58 pmBoard Status – 1:58 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

1st Shift

Line 100

Lot Box

Kanban Post

154

200

354

348

342

330

312

324

318

336

230

212

218

224

236

242

248

254

300

306

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

EOS

B/S

206

Page 178: Kanban things

178

KB001

Kanban A New Approach

Board Status – 1:58 pmBoard Status – 1:58 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

Kanban Post

154

200

354

348

342

330

312

324

318

336

230

212

218

224

236

242

248

254

300

306

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

EOS

B/S

206

Page 179: Kanban things

179

KB001

Kanban A New Approach

Inventory Status – 1:58 pmInventory Status – 1:58 pm

Part B

1 Container

Part C

1 Container 1 Container

Part A

1 Container

Part D

1 Container

1 Container 1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 180: Kanban things

180

KB001

Kanban A New Approach

Board Status - 4:30 pmBoard Status - 4:30 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

2nd Shift

Line 100

Kanban Post

624

630

618

612

606

554

536

548

542

600

454

436

442

448

430

500

506

512

518

524

530

Page 181: Kanban things

181

KB001

Kanban A New Approach

Inventory Status - 4:30 pmInventory Status - 4:30 pm

Part B

1 Container

Part C

1 Container 1 Container

Part A

1 Container

Part D

1 Container

1 Container

1 Container 1 Container 1 Container

1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 182: Kanban things

182

KB001

Kanban A New Approach

Board Status - 5:06 pmBoard Status - 5:06 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

2nd Shift

Line 100

Kanban Post

700

706

654

648

642

630

612

624

618

636

530

512

518

524

506

536

542

548

554

600

606

B/T

B/T

Page 183: Kanban things

183

KB001

Kanban A New Approach

Inventory Status - 5:06 pmInventory Status - 5:06 pm

Part B

1 Container

Part DPart A

1 Container

Part C

1 Container 1 Container

1 Container

1 Container 1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 184: Kanban things

184

KB001

Kanban A New Approach

Board Status - 6:06 pmBoard Status - 6:06 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

2nd Shift

Line 100

Kanban Post

754

800

748

742

736

724

706

718

712

730

624

606

612

618

600

630

636

642

648

654

700

B/T

B/T

Page 185: Kanban things

185

KB001

Kanban A New Approach

Board Status - 6:06 pmBoard Status - 6:06 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

2nd Shift

Line 100

Kanban Post

754

800

748

742

736

724

706

718

712

730

624

606

612

618

600

630

636

642

648

654

700

B/T

B/T

Page 186: Kanban things

186

KB001

Kanban A New Approach

Inventory Status - 6:06 pmInventory Status - 6:06 pm

Part B

1 Container

Part DPart A

1 Container

Part C

1 Container 1 Container

1 Container

1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 187: Kanban things

187

KB001

Kanban A New Approach

Board Status – 6:42 pmBoard Status – 6:42 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

2nd Shift

Line 100

Kanban Post

836

842

830

824

818

806

748

800

754

812

706

648

654

700

642

712

718

724

730

736

742

B/T

B/T

Page 188: Kanban things

188

KB001

Kanban A New Approach

Board Status – 6:42 pmBoard Status – 6:42 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

2nd Shift

Line 100

Kanban Post

836

842

830

824

818

806

748

800

754

812

706

648

654

700

642

712

718

724

730

736

742

B/T

B/T

Page 189: Kanban things

189

KB001

Kanban A New Approach

Inventory Status - 6:42 pmInventory Status - 6:42 pm

Part B

1 Container

Part DPart A

1 Container

Part C

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 190: Kanban things

190

KB001

Kanban A New Approach

Board Status – 8:30 pmBoard Status – 8:30 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post1024

1030

1018

1012

1006

954

936

948

942

1000

854

836

842

848

830

900

906

912

918

924

930

L/T

L/T

L/T

L/T

L/T

Page 191: Kanban things

191

KB001

Kanban A New Approach

Board Status – 8:30 pmBoard Status – 8:30 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post1024

1030

1018

1012

1006

954

936

948

942

1000

854

836

842

848

830

900

906

912

918

924

930

L/T

L/T

L/T

L/T

L/T

Page 192: Kanban things

192

KB001

Kanban A New Approach

Inventory Status - 8:30 pmInventory Status - 8:30 pm

Part B

1 Container

Part C

1 Container

Part D

1 Container

Part A

1 Container

1 Container

1 Container 1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

To be filledAt 8:32.5

Page 193: Kanban things

193

KB001

Kanban A New Approach

Board Status – 10:12 pmBoard Status – 10:12 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post1206

1212

1200

1154

1148

1136

1118

1130

1124

1142

1036

1018

1024

1030

1012

1042

1048

1100

1106

1054

1112

B/T

B/T

Page 194: Kanban things

194

KB001

Kanban A New Approach

Board Status – 10:12 pmBoard Status – 10:12 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post1206

1212

1200

1154

1148

1136

1118

1130

1124

1142

1036

1018

1024

1030

1012

1042

1048

1100

1106

1054

1112

B/T

B/T

Page 195: Kanban things

195

KB001

Kanban A New Approach

Inventory Status - 10:12 pmInventory Status - 10:12 pm

Part B

1 Container

Part A

1 Container

Part D

1 Container

Part C

1 Container

1 Container

1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 196: Kanban things

196

KB001

Kanban A New Approach

Board Status – 11:06 pmBoard Status – 11:06 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post

100

106

1254

1248

1242

1230

1212

1224

1218

1236

1130

1112

1118

1124

1106

1136

1142

1154

1200

1148

1206

B/T

B/T

EOS

B/S

Page 197: Kanban things

197

KB001

Kanban A New Approach

Board Status – 11:06 pmBoard Status – 11:06 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post

100

106

1254

1248

1242

1230

1212

1224

1218

1236

1130

1112

1118

1124

1106

1136

1142

1154

1200

1148

1206

B/T

B/T

EOS

B/S

Page 198: Kanban things

198

KB001

Kanban A New Approach

Inventory Status - 11:06 pmInventory Status - 11:06 pm

Part B

1 Container

Part A

1 Container

Part D

1 Container

Part C

1 Container

1 Container

1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 199: Kanban things

199

KB001

Kanban A New Approach

Board Status – 11:56 pmBoard Status – 11:56 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post

148

154

142

136

130

118

100

112

106

124

1218

1200

1206

1212

1154

1224

1230

1242

1248

1236

1254

EOS

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

Page 200: Kanban things

200

KB001

Kanban A New Approach

Board Status – 11:56 pmBoard Status – 11:56 pm

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #

Lot Box

2nd Shift

Line 100

Kanban Post

148

154

142

136

130

118

100

112

106

124

1218

1200

1206

1212

1154

1224

1230

1242

1248

1236

1254

EOS

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

B/S

Page 201: Kanban things

201

KB001

Kanban A New Approach

Inventory Status - 11:56 pmInventory Status - 11:56 pm

Part B

1 Container

Part A

1 Container

Part D

1 Container

Part C

1 Container

1 Container

1 Container

1 Container 1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 202: Kanban things

202

KB001

Kanban A New Approach

Board Status - 6:00 am Day 2Board Status - 6:00 am Day 2

Part 1 2 3 4 5 6 7 8 9 10

ABCD

Container #Lot Box

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

Kanban Post

Page 203: Kanban things

203

KB001

Kanban A New Approach

Inventory Status - 6:00 am Day 2Inventory Status - 6:00 am Day 2

Part B

1 Container

Part A

1 Container

Part D

1 Container

Part C

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

1 Container

Page 204: Kanban things

204

KB001

Kanban A New Approach

Lot Size CalculationLot Size Calculation

Exercise 3

(An Alternative Approach)

Page 205: Kanban things

205

KB001

Kanban A New Approach

Calculation Exercise DataCalculation Exercise Data

Part Monthly Demand Changeover Time Cycle Time Container Size

A 10,000 720 22 30B 8,000 600 23 30C 9,000 720 21 30D 11,000 600 22 30

Data

Page 206: Kanban things

206

KB001

Kanban A New Approach

Available TimeAvailable Time

Available Time = Number of hours per Shift - Break Time

Number of Shifts: 2 Hours Per Shift: 8Number of Breaks Per Shift: 2 Minutes Per Break: 10

Available Time=

Page 207: Kanban things

207

KB001

Kanban A New Approach

Available TimeAvailable Time

Available Time = Number of hours per Shift - Break Time

Number of Shifts: 2 Hours Per Shift: 8Number of Breaks Per Shift: 2 Minutes Per Break: 10

Available Time = 55,200 ”

Page 208: Kanban things

208

KB001

Kanban A New Approach

Demand CalculationDemand Calculation

Daily Demand = Monthly Demand # of Days in Demand Period

Days In Month = 20

Part Monthly Demand Daily Demand A 10,000 B 8,000 C 9,000 D 11,000 Total

Page 209: Kanban things

209

KB001

Kanban A New Approach

Demand CalculationDemand Calculation

Daily Demand = Monthly Demand # of Days in Demand Period

Days In Month = 20

Part Monthly Demand Daily Demand A 10,000 500 B 8,000 400 C 9,000 450 D 11,000 550 Total

Page 210: Kanban things

210

KB001

Kanban A New Approach

Calculating Production TimeCalculating Production Time

Production Time = Cycle Time x Daily Demand

Part Daily Demand Cycle Time Production Time A 22” B 23” C 21” D 22”Total

Page 211: Kanban things

211

KB001

Kanban A New Approach

Calculating Production TimeCalculating Production Time

Production Time = Cycle Time x Daily Demand

Part Daily Demand Cycle Time Production Time A 500 22” 11,000” B 400 23” 9,200” C 450 21” 9,450” D 550 22” 12,100”Total 1,900 41,750”

Page 212: Kanban things

212

KB001

Kanban A New Approach

Calculating Average Changeover TimeCalculating Average Changeover Time

Part Daily Demand Changeover Time A 720” B 600” C 720” D 600”Total

Average C/O Time = Total Changeover Time = # of Parts Numbers

Page 213: Kanban things

213

KB001

Kanban A New Approach

Calculating Average Changeover TimeCalculating Average Changeover Time

Part Daily Demand Changeover Time A 500 720” B 400 600” C 450 720” D 550 600”Total 1,900 2,640”

Average C/O Time = Changeover Time = 2,640” = 660” # of Parts Numbers 4

Total

Page 214: Kanban things

214

KB001

Kanban A New Approach

Lot Size CalculationLot Size Calculation

Step 1: Determine The Number of Changeovers per Day

# of C/O per day = Available Time - Production Time Average Changeover Time

# Of C/O Per Day =

(# of Parts) (# of Available C/O’s)/

/

= (LOT SIZE)

=4

Page 215: Kanban things

215

KB001

Kanban A New Approach

Lot Size CalculationLot Size Calculation

Step 1: Determine The Number of Changeovers per Day

# of C/O per day = Available Time - Production Time Average Changeover Time

# Of C/O Per Day = 55,200” – 41,750” = 20.38 660”

(# of Parts) (# of Available C/O’s)/

/

= (LOT SIZE)

=4 20.38 .19

Page 216: Kanban things

216

KB001

Kanban A New Approach

Lot Size Per Part NumberLot Size Per Part Number

Part Daily Demand Lot Size # in Lot A B C D

Page 217: Kanban things

217

KB001

Kanban A New Approach

Lot Size Per Part NumberLot Size Per Part Number

Part Daily Demand Lot Size # in Lot A 500 .19 95 B 400 .19 76 C 450 .19 85.5 D 550 .19 104.5

Page 218: Kanban things

218

KB001

Kanban A New Approach

Container Lot SizeContainer Lot Size

# of Containers in a Lot = Lot size

Qty per Cont.

Example:

Lot Size for Part A =

Container Size = 30

Part A =

Part A Lot Size =

Page 219: Kanban things

219

KB001

Kanban A New Approach

Questions

A B C D E F G H IDaily Demand Lot Size Cycle Time C/O Lot Time Total Run Container SizeMin. / Container C.O. Time (min.) Calculations

E=(BXC)F=(D+E)

H=(GXC)/60I=D/60

Part #1 2 3 4 5 6 C/O Total

ABCD

Container No.

Page 220: Kanban things

220

KB001

Kanban A New Approach

Answers

A B C D E F G H IDaily Demand Lot Size Cycle Time C/O Lot Time Total Run Container SizeMin. / ContainerC.O. Time (min.) Calculations

500 120 22 720 2640 3360 30.0 E=(BXC)400 90 23 600 2070 2670 30.0 F=(D+E)450 90 21 720 1890 2610 30.0 H=(GXC)/60550 120 22 600 2640 3240 30.0 I=D/60

Part #1 2 3 4 5 6 C/O Total

A 11.0 22.0 33.0 44.0 - - 12.0 56.0B 11.5 23.0 34.5 - - - 10.0 44.5C 10.5 21.0 31.5 - - - 12.0 43.5D 11.0 22.0 33.0 44.0 - - 10.0 54.0

Container No.

Page 221: Kanban things

221

KB001

Kanban A New Approach

ExampleExample

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

A:

B:

C:

D:

Page 222: Kanban things

222

KB001

Kanban A New Approach

ExampleExample

1st Shift

Line 100

600

724

706

700

718

712

748

800

618

624

630

636

642

648

654

606

612

742

736

730

754

A: I I - I - I -

B: I I - I -

C: I I - I -

D: I I - I - I -

Page 223: Kanban things

223

KB001

Kanban A New Approach

Material MovementMaterial Movement

(Focus of On-Time Delivery)

Page 224: Kanban things

224

KB001

Kanban A New Approach

Internal Material Movement Internal Material Movement

•Move Card

•Standard Delivery Route

Page 225: Kanban things

225

KB001

Kanban A New Approach

Move CardMove Card

• The move card tells us:

• What to move

• Where to find and take material

• Standard material quantity

• When to move

Page 226: Kanban things

226

KB001

Kanban A New Approach

Move CardMove Card

WORK UNIT ADDRESSSTORE ADDRESS

SUPPLIER NAME Kanban Signal No. WORK UNIT NAME

PART No. QUANTITY CARD #

Page 227: Kanban things

227

KB001

Kanban A New Approach

Flow of Move CardFlow of Move Card

Internal

RawMaterial

Store

ProductionWork Unit

Needed product

Move Card

Page 228: Kanban things

When Do I Remove the Move Card?When Do I Remove the Move Card?

Move Card

When the first pieceis taken, the Movecard is removed

Kanban, A new Approach

Page 229: Kanban things

229

KB001

Kanban A New Approach

Partial CardPartial CardA partial card can be any color that attracts attention.

There is only one partial card for each component part on a line.

WORK UNIT ADDRESSSTORE ADDRESS

SUPPLIER NAME

Kanban Signal # WORK UNIT NAME

PART No.Partial

Page 230: Kanban things

230

KB001

Kanban A New Approach

Standard Route of DeliveryStandard Route of Delivery

Why do we need a standard route of delivery?

•To eliminate waste

•To reduce inventory

•To guarantee on time delivery

Page 231: Kanban things

231

KB001

Kanban A New Approach

Standard Route of DeliveryStandard Route of DeliveryPick

Area

Line 1

Line 2

Line 3

Page 232: Kanban things

232

KB001

Kanban A New Approach

Standard Route of DeliveryStandard Route of Delivery

Pick

Area

Line 1

Line 2

Line 3

Page 233: Kanban things

Tig TackTourniquet

Machine Sizer

SecureWrap

RollingMachine

MarkingMachine

Press

ManualWeld

Bracket

Linear Weld Cone Weld

OrbitalWelder

FinishedGoods

STANDARDIZED WORK CHART MATERIAL HANDLER

Part No.

Part Name

Line # of Members Cell Takt Time Delivery Cycle StandardIn-ProcessStock

Date

MemberManualTime

WalkTime

TotalTime

Stops Manual Time

DailyCustomerDemand

60” 15’

Shifts 2

3

1

4440 920

08/30/99CC3330Converter Ass’y

Bottleneck

2”2”

71

2

3

4 5

6

Raw Material Store

30”

30”

240”

30”

30” 30”

30”

90”

90”

20”

15” 25”

90”

90”

30”

30”

420” 480” 900”1

1

Page 234: Kanban things

234

KB001

Kanban A New Approach

How Many Withdrawal Cards Are There?How Many Withdrawal Cards Are There?

•The Number of Withdrawal Cards is Based on:

• Time of the standard route of material deliveries

• Usage rate of material by the work unit

• Quantity per container of material

Page 235: Kanban things

235

KB001

Kanban A New Approach

Calculating Number of Move CardsCalculating Number of Move Cards

• Delivery Cycle = Time to make standard delivery cycle in hours

• Quantity per Hour = # of parts produced by the work unit in 1hour based on target cycle time

• # of Move Cards = Delivery Cycle x Qty per Hr x 2

Quantity per Container

•One set of cards in Process•One set of cards in Que

Page 236: Kanban things

236

KB001

Kanban A New Approach

Number of Move Cards in the SystemNumber of Move Cards in the System

# of Move Cards = Delivery Cycle x Qty per Hr x 2 Qty per Container

# of Move Cards = 0.5 hour x 100 parts/hour x 2

25 Parts per Container

# of Move Cards = 4

Page 237: Kanban things

237

KB001

Kanban A New Approach

How Many Withdrawal Cards are in the System for an Outside Supplier ?

How Many Withdrawal Cards are in the System for an Outside Supplier ?

Need to know :

• Agreed upon delivery cycle

• Daily demand

• Quantity per container

• Safety Stock

Page 238: Kanban things

238

KB001

Kanban A New Approach

Kanban CycleKanban Cycle

Agreed upon delivery cycle

This is usually stated as 3 numbers

A:B:C

In A days

There are B trucks

Parts are returned C shipments after Cards are sent back to the supplier

Page 239: Kanban things

239

KB001

Kanban A New Approach

Delivery CycleDelivery CycleDelivery Cycle 1:2:3

in 1 day : there are 2 deliveries : and parts arrive 3 shipments after cards are sent to supplier

Monday Tuesday Wednesday Thursday Friday

SUPPLIER

Truck 1

Truck 2

1

2

3

Page 240: Kanban things

240

KB001

Kanban A New Approach

# of Supplier = Daily Demand x A x (C+1) + D x Daily Demand

Qty per Cont. B Qty per Cont.

A: # of days

B: # of trucks

C: when the Cards return

D: Safety Stock

Safety Stock covers problems with delivery due to supplier

How Many Withdrawal Cards are in the System for an Outside Supplier?

How Many Withdrawal Cards are in the System for an Outside Supplier?

Page 241: Kanban things

241

KB001

Kanban A New Approach

Daily Demand = 1500pcs A: # of days

Qty/Cont. = 30pcs per container B: # of trucks

Delivery Cycle = 1:2:3 C: when the Cards return

D = .5 Days D: Safety Stock

# of Supplier = Daily Demand x A x (C+1) + D x Daily Demand

Qty per Cont. B Qty per Cont.

= 1500pcs x 1 x (3+1) + .5 x 1500

30pcs per Cont. 2 30

= 50 Containers x 2 + 25

= 125 Cards

How Many Withdrawal Cards are in the System for an Outside Supplier?

How Many Withdrawal Cards are in the System for an Outside Supplier?

Page 242: Kanban things

242

KB001

Kanban A New Approach

Supplier Card FlowSupplier Card Flow

Supplier processing

25 cards

Byusing

25 cards

Safety Stock

25 cardsTruck

25 cards

Truck

25 cards

Page 243: Kanban things

243

KB001

Kanban A New Approach

Supplier Card CalculationSupplier Card Calculation

Exercise 4

(Card Requirements)

Page 244: Kanban things

244

KB001

Kanban A New Approach

Daily Demand = 2000 pieces

Qty/Cont. = 50 pieces / container

Delivery Cycle =A:B:C

1:6:3

D = .25 days

# of Supplier = Daily Demand x A x (C+1) + D x Daily Demand

Qty/Cont. B Qty/Cont

# of Supplier =

How Many Withdrawal Cards are in the System for an Outside Supplier?

How Many Withdrawal Cards are in the System for an Outside Supplier?

Page 245: Kanban things

245

KB001

Kanban A New Approach

Daily Demand = 2000 pieces

Qty/Cont. = 50 pieces / container

Delivery Cycle =A:B:C

1:6:3D = .25 days

# of Supplier = Daily Demand x A x (C+1) + D x Daily Demand

Qty/Cont. B Qty/Cont

# of Supplier = 2000 * 1 * (3+1) + .25 * 2000

50 6 50

# of Supplier = (40 containers * .67) + 10

# of Supplier = 36.8 cards = 37 cards (Round up)

How Many Withdrawal Cards are in the System for an Outside Supplier?

How Many Withdrawal Cards are in the System for an Outside Supplier?

Page 246: Kanban things

246

KB001

Kanban A New Approach

Kanban System Summary Kanban System Summary • Key to Successful Information Flow

• Customer

• Internal

• Supplier

• Opportunities for Improvement• Inventory reduction

• Lead-time reduction

• Greater flexibility

• Better visual management

Page 247: Kanban things

247

KB001

Kanban A New Approach

No Pain, No GainNo Pain, No Gain

• The truth about a Kanban System• Easy to use and follow

• Difficult to implement

• Keys to success in the Kanban System• Training

• Trial and error

• Team problem solving

• Perseverance

Page 248: Kanban things

248

KB001

Kanban A New Approach

Initial Start-UpInitial Start-Up

• Start at the beginning of the chain and work your way downstream• Customer loop

• Internal pull

• Transition to the supplier

• Anticipate problems, they will happen!!!

Page 249: Kanban things

249

KB001

Kanban A New Approach

Think Long-TermThink Long-Term

• Learn the basics first• Understand the root cause of problems

• Take action after the root cause is clear

• Initial inventory goes up• Plan out your strategy

• Communicate your plans to upper management

Page 250: Kanban things

250

KB001

Kanban A New Approach

Be Prepared to DeliverBe Prepared to Deliver

Page 251: Kanban things

251

KB001

Kanban A New Approach

Get Serious !!!Get Serious !!!