mat aproval
TRANSCRIPT
-
8/16/2019 Mat Aproval
1/1
: THE ASPEN RESIDENCES@ADMIRALTY
: ......................................................
1 Sub Contractor PT. .................................................................................
2 Submission Date3 Name Of Material Sample
4 Supplier
5 Specification DetailsProduct
Type
Material Code
6 Specification Detail as ContractProduct
Type
7 ReferenceDrawing No.
RKS Page
Others
8 Location Of WoksZone and Axis
Floor and RoomAttachment
Sample of Materials enclosed Not enclosed
Brochure Or Booklet enclosed Not enclosed
Test Result enclosed Not enclosed
10Comply
Not Comply
Comply
Not Comply
11 Good
Fair
Pool
12 Approved
Approved with NoteNot Approved
13 Lab. Test required
Guarantee doc required
Revise & Re - Submit
Mock Up Required
14Approved by Owner Checked by Main - Contractor
Revise & Re - Submit
Mock Up Required
Pool
Approved
Approved with NoteNot Approved
Lab. Test required
Guarantee doc required
Comply
Not Comply
Comply
Not Comply
Good
Fair
Revise & Re - Submit
Mock Up Required
Tower C & D
Pool
Approved
Approved with Note
Not Approved
Lab. Test required
Guarantee doc required
Comply
Not Comply
Comply
Not Comply
Good
Fair
9
: TOWER C-D
MATERIAL APPROVAL
CM OWNER
Notes
MAIN CONTRACTOR
Base of
Evaluation
a. Drawing
b. Technical Specification
Material Quality
Evaluation Result
Follow Up
RESPONSE
MATERIAL DATA
Project
Packages/Works
No.
PT. HARMAS JALESVEVA
(Panhudi Yu wono)Project Manager
PT. PULAU INTAN BPK
(.......................................)Engineer Manager
PT. ENERTEC MITRA SOLUSI
(Sigit Dwi Handoko)Engineer Manager