Executive Summary-[System Connectivity-
Owners Study]
Cluster XIV & XV
-
7/29/2019 Mega Lift Presentation
2/26
Design of Main Step-Down Distribution Sub-Station(MSDSS)[33/6.6 kV in relation to the projected load & voltageregulation]
Design & Lay-out of above switch yard and inter linkingsystem networking. Design of Sub-Transmission Lines (33 kV), HT Lines (6.6 kV)and LT (0.415kV) lines including conductor/cable/ supportingstructures. Design of protection & control for 33 kV, 6.6 kV & 415 Voltsystems.
-
7/29/2019 Mega Lift Presentation
3/26
Physical Scope under SystemConnectivity.docx
http://localhost/var/www/apps/conversion/tmp/scratch_8/Physical%20Scope%20under%20System%20Connectivity.docxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Physical%20Scope%20under%20System%20Connectivity.docxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Physical%20Scope%20under%20System%20Connectivity.docxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Physical%20Scope%20under%20System%20Connectivity.docx -
7/29/2019 Mega Lift Presentation
4/26
System connectivity should be sustainable, reliable and
affordable.
Development of Sub Transmission-system (33 kV) is toensure quality of supply, along with bringing down thetechnical losses to an optimal minimum value .
By quality power supply mean voltage regulation with in alimit laid by Grid code.
Optimal use of existing network infrastructures ofTransmission Utility (OPTCL) and/ or concerned Distributionlicensee.
Direct connectivity from Grid S/S interface for Concentratedload (Cluster points) & minimum linkage with DISCOMsnetwork except for those isolated schemes.
-
7/29/2019 Mega Lift Presentation
5/26
Create common asset with reduced financialliability and would take care technical needs ofcluster points.
Network development should be in integrated
manner, so as to, conserve ROW & would meet thefuture loads of the MLIP- Concept of IntegratedOptimal Strategy & Optimal location of MSDSS/DSS.
Phasing of works can be done depending upon the
materialization of Projects.
Compliances with OGC (Odisha Grid Code) &Distribution (Supply) Code & other relevantregulations in force.
-
7/29/2019 Mega Lift Presentation
6/26
Cluster-XIV
Schemes: 13 Nos
[ ID (120,122,124),123, (255),(257,119),16,(127,121,258),(259,14)]
CCA: 14,300 Ha
Cluster-XV
Schemes: 15Nos
Phase I- 11 Nos[ID(15,260,13),(11),(12,262),(261,10),(33,34,263)]
Phase II -4 Nos *[(31),264,(32,265)]
CCA: Phase I :15,250Phase II : 5,900
Total: 21,150 Ha*[Phase-II ( shall be linked to DISCOM Network as interim measure
& shall be diverted to new 132/33 KV Grid near to Project site at TUSHURA ]
-
7/29/2019 Mega Lift Presentation
7/26
TOTAL : 12,034
Load in KVAMain Drives
:10,934Auxiliary : 1100
Cluster XIVNo OF Schemes 14 [HV-9 & LV-5]
TOTAL : 15,345
Load in KVAMain Drives :
13947 Auxiliary : 1398
Cluster XVNo OF Schemes 15[HV-12 & LV-3]
-
7/29/2019 Mega Lift Presentation
8/26
SonepurGrid
Inter Cluster 33 kV Link
[ New Grid Sub-Station (2x12.5 MVA, 132/33 KV) at Tushura ]
shall ultimately feed entire load of Cluster XV & part load of Cl XIV
-
7/29/2019 Mega Lift Presentation
9/26
220/132/33 Kv,
2x40 MVA Grid
Bolangir
132/33 Kv, (1x10+1x12.5)MVA Grid- Saintala
132/33 Kv,3x12.5 MVA,
Grid- Sonepur
[ At radial distance of 24.4 km fromnearest Scheme ID 261 , near Tuhsura]
Grid needs system augmentation.
[At a distance of 7.5 Km from nearest
scheme ID 14.]
A dedicated S/S for Ordinance Factory
and have no system connectivity with
local DISCOM (i.e. WESCO) network for
Area supply.
Grid needs system up-gradation
[ At radial distance of 28 km from
nearest scheme ID265]
Grid needs system augmentation
Project Site: Cluster XV
(15 schemes)
-
7/29/2019 Mega Lift Presentation
10/26
Project site : Cluster XIV
(13 schemes)
132/33 KV,(1x40+1x20) MVA Grid Kesinga.
(1) [Located in side the Project area ( at a distance of 5 km from the
nearest Scheme ID 124 & shall exclusively feed entire projected
demand of Cluster XIV]
(2) System augmentation proposed : 3rd 20 MVA TRF & two nos of new
33 KV Bays.
(3) Cost of augmentation paid to OPTCL.
-
7/29/2019 Mega Lift Presentation
11/26
SLD for CLUSTER - XIV - Final -(20.11.2012).pdf
http://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20CLUSTER%20-%20XIV%20-%20Final%20-%20(20.11.2012).pdf -
7/29/2019 Mega Lift Presentation
12/26
SLD for Cluster - XV - Final - (20.11.2012).pdf
http://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SLD%20for%20Cluster%20-%20XV%20-%20Final%20-%20(20.11.2012).pdf -
7/29/2019 Mega Lift Presentation
13/26
Composite SLD for CLUSTER - XIV & XV -Final - (20.11.2012).pdf
http://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Composite%20SLD%20for%20CLUSTER%20-%20XIV%20&%20XV%20-%20Final%20-%20(20.11.2012).pdf -
7/29/2019 Mega Lift Presentation
14/26
Tail-end voltage regulation of all 33 KV feederscatering to the scheme area.
Tail-end voltage regulation of all 6.6 KV feedersfrom 33/6.6 KV Substations catering to the scheme
area. Maximum demands on all 33/6.6 KV and/or
33/0.415 KV Substations and associated 6.6 KV, LTfeeders.
Annual energy losses in the system with theProject.
-
7/29/2019 Mega Lift Presentation
15/26
The Technical specifications of REC for procurement of equipment &materials and the construction standards of REC forerection/construction/installation shall be adopted for implementation of theProject.
The implementing agency shall adhere to the conditions stipulated inrelevant sections of Indian Electricity Rules under Electricity Act 2003 in
regard to construction, erection and commissioning of electric supply lines(overhead and underground), systems and apparatus for low, high voltagesystems and for power supply.
As per REC norms, for HT over head lines, the permissible voltageregulation shall not be more than (-) 8% on the lower side. However, weprefer to adopt more conservative norms of (-) 7%, keeping into therequirement of Project.
For LT lines, the permissible voltage regulation shall not be more than (-)5%.
-
7/29/2019 Mega Lift Presentation
16/26
Feeding EHTS/S Nos ofScheme Projectedload (KVA) 33 kV, Voltage Regulation (in%) RemarkACSR (100 mm2 ) AAAC (232
sq mm)
Bolangir 15 15,345 24.4 17.92 Trunk link (33kV)-24.4 km
8 7,960 8.96 6.6
Sonepur 7 7,385 12.4 9.12 Trunk link (33kV) -28km
Saintala 15 15,345 15.23 11.9 Trunk link (33kV) -13.5 km
11 12,142 8.5 6.25
Sonepur 4 3,203 4.1
With NewGrid
15 15,345 9.49 6.97 Trunk Line- Nil
Comfort (Voltage Regulation ) zone: (- 7%)
Schemes that attributes to poor VR, may be phased in Phase-II
& shall be executed in tandem with development of new Grid,or may be linked to DISCOM network subject to permissible KVA-Km criteria.
-
7/29/2019 Mega Lift Presentation
17/26
Annexture-1.xlsx
http://localhost/var/www/apps/conversion/tmp/scratch_8/Annexture-1.xlsxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Annexture-1.xlsxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Annexture-1.xlsxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Annexture-1.xlsx -
7/29/2019 Mega Lift Presentation
18/26
132/33KV,[1x10+1x12.5)MVA,SaitalaGrid
S/S
Feeder-2, 13.5 km/232 mm2 AAAC
Feeder-1, 15.7km/232 mm2AAAC
Tushar
MSDSS-9
(2 Schemes/3660VA) MSDSS-10(3 Schemes/37530KVA)
MSDSS-8
(2schemes/13510KVA)
MSDSS-7(3 Schemes/2410KVA)
MSDSS-6
(560 KVA)
A
C
B
10 km/232 mm2 AAAC 9 km/232 mm2 AAAC
7.3km/100mm2AAAC
7 km/ 100 mm2 AAAC VR B: (-) 5.9%
VR A: (-) 2.05%
-
7/29/2019 Mega Lift Presentation
19/26
213K24MVBanrGdS
Beherapali
(3.15+1.6) MVA
1 km
5km
Pvt (2x250+150+100) KVA
15 km
ACSR 50,80 mm 2
9.7km
7km
ID265, ID32
(1729 KVA)
Dumerbahal 33 KV Feeder
ID 264
(412 KVA)
Dumerbahal
Sonepur Grid
VR: (-) 1.5%
[ with up rating of Condr. by 100mm2 ]
VR:(-) 2.7%
Note: Scope of work of up rating of conductor
to AAAC100 mm2 from Bolangir Grid to Dumerbahal: 18 Km
-
7/29/2019 Mega Lift Presentation
20/26
33 kV Line fromSonepur Grid
Manmunda
(2x1.6)MVA
Kantamal
(1x1.6) MVA
Bousuni
(1x1.6) MVA
Janapanka
(1x0.630)
Boud(2x3.15)
MVA
Charichaka
(1x1.6) MVA
Chataranga
(1x0.63) MVA
33KV Line From 132/33KV Phulbani Grid
132/33 KV Boud Grid
(UC)
17km
VR:(-)3.3%
ID31
-
7/29/2019 Mega Lift Presentation
21/26
33 KV System
Constraints
Long 33Kv Line & exceeds permitted KVA-KM Loading.
High sub-transmission losses.
Redundancy (N-0)
EHT Back-upAll three Grid S/S need system augmentation including capacity addition.
Compliance with
OERC (Condition
of Supply)
Code,2004
Cluster being considered an Unit, Power supply shall be at 3 , EHT (System Load exceeds 15 MVA)
New Grid
Facilitate to comply with the Planning criteria ( Voltage regulation & system loss)Facilitate Reduction in System Loss & thereby reduce anticipated Energy charges payable by the Beneficiaries.
Benefit of additional power availability in the command area & enhance power reliability , quality of power
supply.
-
7/29/2019 Mega Lift Presentation
22/26
Following phasing proposed: Phase-I ( schemes with out system constraints)
Group-I (11 schemes), that shall initially fed from nearbySaintala Grid. [ ID (15,260,13), 11, (12,262), (261,10),(33,263,34)].
Subsequently these schemes shall be pooled into new dedicatedGrid to form a single source of supply for entire Cluster, for bothoperation & billing.
Phase II ( schemes that attribute to poor VR)
Group-II (4 schemes), that shall be developed in tandem withdevelopment of new 132/33 KV, (2x12.5) MVA Grid S/S in theproject area. [ ID31,264, (32,265)] or linked to local DISCOMnetwork.
Note: All schemes are under the jurisdiction of WESCO
except (ID 31 & 32) that fall under SOUTHCO
-
7/29/2019 Mega Lift Presentation
23/26
Description Cluster XIV Cluster XVEHT Back-UP:
Existing Kesinga : 132/33 kV,
(1x40+1x20) MVA Saintala : 132/33 kV, (1x10+1x12.5) MVA
Capacity augmentation : 3rd 20
MVA TRF Capacity augmentation : 3rd 20 MVA TRF
New 33 KV Bays : 2 New 33 KV Bays : 2
New Sub-Station -PHASE-II
Grid S/S at TUSHURA
Sub- Transmission
Line
(33 kV):
Intra Networking: 47. 7 km
Inter-Cluster link: 8.7 km
Link with DISCOM: 1.4 km
Total : 57.8 km
PHASE-I
Intra Networking: 66.2km
Link with DISCOM:12.0 km
Total : 78.2km
PHASE-II
Intra Networking:17 KmGrand Total: 95.2 Km
Up-rating of conductor
( to 100 mm2 AAAC)
Nil 18 km ( To be executed by concerned
DISCOM)
HT Line( 6.6 KV) : 17.5 km 13.5 km
Total Overhead Line: 75.3 Km 108.7Km
-
7/29/2019 Mega Lift Presentation
24/26
Description Cluster XIV Cluster XVMain Step-down Sub-Station (MSDSS)
5 nos 7 nos
Distribution Sub-station(33/0.4kV) 2 nos 1 no
TRFs:33/6.6 KV 8x1.6 MVA3x630 KVA 9x1.6 MVA7x630 KVA
33/0.415 KV 2x630 KVA 1x630 KVA6.6/0.415 KV 3x630 KVA
12x100 KVA2x630 KVA6x100 KVA4X200 KVA
River Crossings 4 nos 5 nos
Figures are tentative, subject to deviation after detailed field survey
-
7/29/2019 Mega Lift Presentation
25/26
1. Single line diagrams for system connectivity (SLD): 33 KV Integrated SLD (Grid S/S - 33 KV sub-transmission MSDSS).
SLD for each MSDSS [Covering HT (6.6 KV & LT)].
2. System networking for the Cluster as a whole on SoI sheet (Scale 1:100,000):Integrated map showing feeding Grid S/S (New and/or existing), 33 KV (existing andnew proposed under the scheme or any other schemes), MSDSSs, HT (6.6 KV) lines.
3. Details of existing EHV sub-Station feeding the Project area:Power Transformer capacity and existing/ anticipated demand at existing 220 and 132KV sub-stations to ensure backup capacity. (Format ESC-1)
4. Details of 33 KV feeders emanating from EHV sub-station: Section wise details of 33KV feeders with calculation of voltage regulation and energy
loss. (Format ESC-2)
System study Report (Load flow).
5. Details of Primary sub-stations (33/6.6 KV MSDSS) and (33/0.415 DSS) and 6.6 KVfeeders:Details of MSDSS and DSS and concerned 6.6 KV feeders proposed to be fed from
MSDSS along with voltage regulation and system loss. (Format ESC-3)6. Details of augmentation of conductor size of existing 33 KV lines proposed under theProject. ( Format ESC-4).7, Pert Chart for execution of system connectivity.8. Technical & Guarantee Particulars (GTPs) of equipments/system elements.
-