    Maintenance Management

    Group - 4

  • 8/8/2019 MM Presentation- Balaji

    2/39

    Contents

    1. Policy Statement2. Maintenance Chart3. Co-ordinateProduction4. To Do PreventiveMaintenance5. Calibration of Instruments6. Condition Of Assets

    7. R

    epair of all assets8. Recording ofMaintenance activities9. Review and Actions10. Standardizing of equipments11. Inventory levels12. SafetyRules13. Fire fighting Equipment

    14. Energy saving15. Recruitment16. Maintenance Budget17. Maintenance Cost Control18. Maintenance Information System19. Skill Development20. Allotment of work

  • 8/8/2019 MM Presentation- Balaji

    3/39

    Policy Statements Vision is to be the most respected and successful enterprise, delighting

    customers with a wide range of products and solutions in the automobileindustry with the best people and the best technology".

    Mission of Toyota is to provide safe & sound journey. Toyota is developingvarious new technologies from the perspective of energy saving and diversifyingenergy sources. Environment has been first and most important issue inpriorities of Toyota and working toward creating a prosperous society and cleanworld.

    To achieve our Vision we abide by our Core values. World class product quality. Achieving the ultimate goal of complete customer satisfaction. Fostering the spirit of Teamwork Inculcating ethical and honest practices

    QualityPolicyToyota will strive to meet customer's expectations by providing world-class products and services through total employee commitment andcontinuous improvement

  • 8/8/2019 MM Presentation- Balaji

    4/39

    Maintenance Policy

    A company-wide team-based effort to build quality intoequipment and to improve overall equipment

    effectiveness

    Totalall employees are involved

    it aims to eliminate all accidents, defects andbreakdownsProductive

    actions are performed while production goes ontroubles for production are minimized

    Maintenancekeep in good condition

    repair, clean, lubricate

  • 8/8/2019 MM Presentation- Balaji

    5/39

  • 8/8/2019 MM Presentation- Balaji

    6/39

    Maintenance ChartPlannedMaintenancePreventive maintenance

    BreakdownMaintenance

    Maintenance Prevention

    PeriodicMaintenance

    Predictive maintenance

    Revision

    CorrectiveMaintenance

  • 8/8/2019 MM Presentation- Balaji

    7/39

    Maintenance Philosophy

  • 8/8/2019 MM Presentation- Balaji

    8/39

  • 8/8/2019 MM Presentation- Balaji

    9/39

    PREVENTIVEMAINTENANCE

    There are Seven elements of Preventive Maintenance: Inspection Servicing

    Calibration Testing

    Alignment

    Adjustment Installation

    The traditional approach to preventive maintenance is a clear-cutdivision of labor.

    Machine operators perform routine maintenance functions. Maintenance technicians are responsible for specialized maintenance and for

    improving maintainability.

    Engineering is responsible for improving the process.

    This practice is not capable of achieving the TPM targets, as there is a

    lack of communication between operating and maintenance teams.

  • 8/8/2019 MM Presentation- Balaji

    10/39

    MODERN TECHNIQUE

    An alternative approach of appointing a machinetechnician (MT) that supports communication betweenoperators and maintenance.

    The responsibilities of the MT were to perform minormaintenance and repair tasks.

    These MTs underwent classroom training on tool finishingand fitting as well as on-the-job training. On-the-jobtraining gave them exposure to machines and helped themgain expertise in their area.

  • 8/8/2019 MM Presentation- Balaji

    11/39

    Firstly, there is the centralized maintenance approach.This requires maintenance personnel to be cross-trained, thusproviding flexibility of using a number of workers forscheduling maintenance tasks. This flexibility is essential

    because as workers move up in seniority level, there is atendency to opt for convenient shifts instead of third shift.

    Second approach is decentralization. As personnel becomemore experienced in one functional area, they gain more

    expertise. Sometimes it requires six months of training before aperson becomes proficient in a new area. Thus, frequent jobrotations may result in under-utilization of skills gainedthrough training.

  • 8/8/2019 MM Presentation- Balaji

    12/39

    AT TOYOTA

    Toyota has a centralized maintenance function with cross-trained employees. The benefits of decentralized maintenanceare derived from the use of MTs. These MTs are experts intheir areas. However, availability of limited maintenance

    personnel necessitates cross-trained employees.

    Toyota also collects data for analysis and trend establishment.Sufficient data on the trend and pattern of equipmentsperformance should be available for identifying and setting up

    standards and procedures for preventive maintenance. Thisdata would also be useful in determining costs of preventivemaintenance and repairs, run-to-failure vs. preventivemaintenance, and failure history.

  • 8/8/2019 MM Presentation- Balaji

    13/39

    MAINTENANCE

    Outside Vehicle:

    General Maintenance

    x Tires

    x Wheel Nuts

    x Windshield Wiper Blades

    x Fluid Leaks

    x Doors and Engine Hood

    Inside Vehicle:

    Lights

    Windshield Defroster

    Windshield Wipers andWashers

    Seats

    Steering Wheel

    Seat Belts

    Accelerator Pedal

    Parking Brake

    Under Hood Engine Brake Chassis Body

  • 8/8/2019 MM Presentation- Balaji

    14/39

    Assets Maintenance - Autonomous

    maintenanceAutonomous maintenance is the collection of activities in whichoperators make an important portion of the maintenance of theirmachines independently from the maintenance department.

    7 steps are implemented to progressively increase operatorsknowledge, participation and responsibility for their equipment 1. Perform initial cleaning and inspection 2. Countermeasures for the causes and effects of dirt and dust 3. Establish cleaning and lubrication standards 4. Conduct general inspection training

    5. Carry out equipment inspection checks 6. Workplace management and control 7. Continuous improvement

  • 8/8/2019 MM Presentation- Balaji

    15/39

    Activities Maintenance Staff Operators

    Production *

    Set-up and measurement *

    Cleaning *

    Lubrication *

    Periodic Maintenance *

    Corrective maintenance *

    Predictive maintenance *Breakdown maintenance *

    Maintenance prevention *

    Revision

    *

    Before Autonomous Maintenance

  • 8/8/2019 MM Presentation- Balaji

    16/39

    Activities Maintenance Staff Operators

    Production *

    Set-up and measurement *

    Cleaning *Lubrication *

    Periodic Maintenance * *

    Corrective maintenance *

    Predictive maintenance * *

    Breakdown maintenance * *

    Maintenance prevention *

    Revision * *

    After Autonomous Maintenance

  • 8/8/2019 MM Presentation- Balaji

    17/39

    Equipment management

    program

    The tools of Total Quality Management and Continuous Improvement areapplied to the management and improvement of equipment

    Form project teams and Select model equipment identify equipment problems analyze equipment problems develop solutions and proposals for improvement

    Typical membership of a team five to seven operators a maintenance person a technical expert

    Tools Pareto Cause & effect Root cause Methods Analysis

  • 8/8/2019 MM Presentation- Balaji

    18/39

    Existing machines: Analysis of historical records forx trends of types of failuresx frequency of component failuresx root causes of failures

    Determination on how to eliminate the problemand reduce maintenance through an equipmentdesign change or by changing the process

  • 8/8/2019 MM Presentation- Balaji

    19/39

    Recording Maintenance

    Activities Lean techniques and performance indicators based on: Ease of data retrieval

    Cost of retrieval

    Ease of understanding the results

    The availability and type of data recorded bymaintenance function determine the selection of usableindicators.

  • 8/8/2019 MM Presentation- Balaji

    20/39

    Lean Techniques Used By MaintenanceLean technique used Lean emphasis Perceived benefit

    Standards Improvement Standardised work

    Poka Yoke Prevention Improved throughput

    Root Cause Problemsolving

    Improvement Defect reduction

    Process ActivityMapping

    Time Improved utilisation

    TPM Prevention Asset uptime

    Inventory Management Waste Improved turnover

    Story boarding Visibility Improved access

    Visual Management Task visibility Workforce involvement

    Self audits Visibility Self evaluation

    5S Participation Improved asset mtnce

  • 8/8/2019 MM Presentation- Balaji

    21/39

    Maintenance Performance IndicatorsPerformance

    indicator

    Indicator

    Calculation

    Description Desired outcome

    Utilisation Standard hoursTotal clock time

    Percentage index usedto identify non-productive time

    Trend increase

    Breakdown repair

    hours

    No of hours spent

    on breakdown

    Total direct Mce hours

    Index used to gaugeeffectiveness of Mceprogram

    Trend decrease

    Length of running Total production inunits/hours

    Quantity repairs

    Index used to showwhether added servicein hours, parts or

    frequency would givenoticable results

    Value increase

    Emergency and otherunscheduled tasks

    Man hrs emergencyTotal direct Mce hrs

    Focus on unscheduledtasks

    Trend decrease

  • 8/8/2019 MM Presentation- Balaji

    22/39

    Maintenance Wastes and TacklingProduction wastes Identified maintenance wastes How the maintenance wastes

    are tackled

    Overproduction Excessive PM activities Planned / scheduled PM activities

    Waiting aiting for resources Satellite workshops / stores, lineside

    trays etc.

    Transporting Centralised maintenance Decentralised lineside maintenance

    Processing Excessive TPM activities Escalation capping, (i.e., capability

    guidelines)

    Inventory Excessive stock First in - first out spare parts

    Motions Could not define Could not define

    Defects Poor maintenance Skills matrix, *EEM / **NEPT teams

    Human potential Lack of training Skills matrix, taught courses

    Inappropriate systems Poor information Automated fault systems, training

    Energy and water Energy management ISO 14001

    Materials Poor re-design NEPT / EEM teams

    Customer time Poor procedures Standards / Storyboarding

    Customer defection Poor maintenance Skills matrix, Training

  • 8/8/2019 MM Presentation- Balaji

    23/39

  • 8/8/2019 MM Presentation- Balaji

    24/39

    MR-50

    Maintenance Reduction 50 Percent, or MR-50, is thelatest initiative aimed at eliminating waste andinefficiency in its automobile plants.

    It is Maintenance Reduction 50 Percent, not CostReduction 50 Percent or Employee Reduction 50Percent.

    MR-50 started as a quality circle project

    Based on effective and efficient finding and eliminationof muda

  • 8/8/2019 MM Presentation- Balaji

    25/39

    Inventory Levels

    Toyota Motor Corporation effectively uses just in time. They are known as the "masterand pioneer" of just in time and are currently entering the market to providecustomized vehicles to customers with a minimal wait.

    In order to seek the benefits of providing customized orders and reducing the averagedelivery time, Toyota has developed its own software that connects dealers to factories

    and factories to suppliers.

    The integration of the value chain creates visibility for all members of Toyota's supplychain. When a request from a dealer is received by Toyota their software is able tofigure out the availability of parts nearby, the time to resequence the assembly lineand whether the change would unbalance the line by scheduling.

    Toyota has also adjusted their distribution process to effectively provide customizedvehicles in a just in time process. Toyota now sends finished vehicles to sorting dockswhere they can be grouped by region. This new process cuts delivery by two days. Andin assembling cars, Toyota now considers destination, so that it may, for instance,make vehicles headed to Seattle at the same time. This process adjustment hasprovided Toyota with a cost savings in result.

  • 8/8/2019 MM Presentation- Balaji

    26/39

  • 8/8/2019 MM Presentation- Balaji

    27/39

    Safety Initiatives

    Design for Maintainability (DfMt):

    1. Cleaning

    2. Tightening

    3. Lubricating 4. Replacing

  • 8/8/2019 MM Presentation- Balaji

    28/39

    Fire fighting Equipments

    Fire buckets filled with clean dry sand and ready for Immediate use forextinguishing fires (100).

    First-aid boxes (45) .Trolley mounted and portable CO2 fire extinguishers (50).

    Foam extinguisher Should be used on fires involving Inflammableliquids. e.g. petrol,varnish etc. (65)

    The fire extinguisher should be operated only after the power supply is

    cut off in case of fire from electric equipments.

    Instructions For Restoration and evacution should be clearly displayed

    Fire fighting equipments and protecting dress should be easily ccessibleand at least 4 such fire protecting gears are required

  • 8/8/2019 MM Presentation- Balaji

    29/39

  • 8/8/2019 MM Presentation- Balaji

    30/39

    Energy saving

    In order to reduce electricityconsumption bulbs werereplaced with Leds and CFLbulb.

    Maximized the use of day

    light..by providing glasses onthe roof.Periodic cleaning of electricequipments and ensure that itis in off mode when not in use.

    Always make sure thatequipments purchased ishaving

  • 8/8/2019 MM Presentation- Balaji

    31/39

  • 8/8/2019 MM Presentation- Balaji

    32/39

    Maintenance Budgets

    Budget are the individual objectives of a department.Budgeting is the act of making budgets.

    Budgetary control is the planning of budgets and use of it

    for business planning and control.

    Objectives of Budgetary Control

    Analysis of variations between estimated and actual

    results Allocation of responsibilities

    Planning, coordination and control.

  • 8/8/2019 MM Presentation- Balaji

    33/39

  • 8/8/2019 MM Presentation- Balaji

    34/39

  • 8/8/2019 MM Presentation- Balaji

    35/39

    Maintenance Cost Control

    Cost is divided intoI. Material-Direct and Indirect

    II. Labor-Direct and IndirectIII. Other Expenses-Indirect

    Indirect Cost1. Production Overheads

    2. Administration Overheads

    3. Selling Overheads

    4. Distribution Overheads

    Maintenance costs are all Indirect expenses - Compriseof Wages,Material,Overhead expenses, Transport costsand sundry charges.

  • 8/8/2019 MM Presentation- Balaji

    36/39

    Cost Allocation

    a. Wages and salaries

    b. Material costs

    c. Overhead Costs

  • 8/8/2019 MM Presentation- Balaji

    37/39

    Maintenance Management

    Information System The Maintenance Management Information System is an

    online system that helps gather and analyze data for avariety of purposes.

    MMIS is designed to:

    1)collect data on selected routine maintenance functions,

    which together account for the majority of maintenanceexpenditures

    2) draw data from other computer systems to generatereports relating maintenance costs and

    3)maintain an inventory by country

  • 8/8/2019 MM Presentation- Balaji

    38/39

    Training

    The employees should be trained to achieve the fourphases of skill.

    The goal is to create a factory full of experts. The different phases of skills are:

    Phase 1 : Do not knowPhase 2 : Know the theory but cannot do.Phase 3 : Can do but cannot teachPhase 4 : Can do and also teach.

    Seminars for managers

    Slide presentations for all employees and givingthem TPM handbooks.

  • 8/8/2019 MM Presentation- Balaji

    39/39

    It is aimed

    The maintanence staff to think analitically by increasing theirability levels

    The operators made to clean their machines for all the time

    To have multi-skilled revitalized employees whose morale ishigh and who have eager to come to work and perform allrequired functions effectively and independently.