non-government organisation information development update on information development activities...

11
Non-Government Organisation Information Development Update on Information Development Activities Trevor Dare Manager, Information Development Performance and Reporting Directorate 30 th October 2013

Upload: arnold-fowler

Post on 16-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Non-Government Organisation Information Development

Update on Information Development Activities

Trevor DareManager, Information Development

Performance and Reporting Directorate

30th October 2013

• Background

• MH NGOE SDC

• Process

• Next Steps

• Key Dates

• Introduction to the Web-based Instrument

• Questions

Overview

Background• Dec’11-Mar’12 – National working group• July 2012 – Sector forum• July 2012 – Information package distributed• October 2012 – WA NGO Technical Working Group

(TWG) formed– Five meetings to date– Information development MHC webpage

• Jan-Jun’13 – contract renewal

Background (cont.)• Why?

• Collect nationally consistent information to better inform policy, practice and planning of NGO activities

• Recognised burden in regard to what when how and to whom• TWG preferred solution (web-based) agreed to by the Commissions

Corporate Executive• Purpose is for one collection to meet requirements for

• Contract acquittal• State KPI • State Annual reporting• Meet future National Minimum Data Set requirements

NG

OA

IHW

MH

C

Reporting–the big picture

NGO Systems

WA MH NGOE SDC

MH NGOE NMDS

Feedback / Reports

ContractAcquittal

ST

AT

E

Annual ReportKPI

CommonwealthNational Mental Health Report

Mental Health Services in Australia

MH NGOE SDC• Data alignment with national definitions• MHC contracts have changed to meet with this

requirement.• Reporting burden

– Compared with previous years there are some small changes to what is being reported

– Any additional burden offset by having a collection based on the principle of collect once use many times.

Process• Consulted with NGO members of the TWG • Consulted with MHC CX• Researched potential providers based on specifications

(TWG members provided with specification details) • Government procurement process• WebSurvey deemed most suitable and services procured• Initial development and testing (MHC)• User acceptance testing (MHC contract managers and

TWG NGO members)• Information sheet distributed to all MHC funded NGOs

Process (yet to complete)• Changes to system based on UAT feedback• Documentation (available within system)

• User guide• Data guides• Full specifications

• Training

Next Steps• This is stage one of the development and has focused on

data collection only• Future phases

• Improve functionality (feedback from users)• Add modules associated with 25 July 2014 reporting

requirements• Include more real time validation• Incorporate historical data • System generated reports/feedback

Key Dates• Go Live date planned for Monday 2 December 2013

• 2013 standards and outcome monitoring• 2014 service improvement plan

• 6 month activity reporting for period 1 Jul-31 Dec• Due Date: 25 January 2014

Questions?

Trevor Dare

[email protected]