TESTING AND MAINTENANCE OF POWER TRANSFORMER Presented by Othman Al Darraji Department of Electrical Engineering TAA. University Ankara , Turkey [email protected] TESTING AND MAINTENANCE OF POWER TRANSFORMER Supervision Prof. Dr. Ibrahim Mahariq Department of Electrical Engineering TAA. University Ankara , Turkey [email protected] om Turkey – Ankara 10 - 5 - 2016 University of Turkish Aeronautical Association Faculty of engineering EEE department 1 Presented by Omar Saadi Alshear Department of Electrical Engineering TAA. University Ankara , Turkey omarsaad529@gmail. com

Upload: omar-alshaar

Post on 14-Feb-2017

109 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: Omar saady

1

T E S T I N G A N D M A I N T E N A N C E O F P O W E R

T R A N S F O R M E RPresented by

Othman Al DarrajiDepartment of Electrical

EngineeringTAA. UniversityAnkara , Turkey

[email protected]

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

SupervisionProf. Dr. Ibrahim

MahariqDepartment of Electrical

EngineeringTAA. UniversityAnkara , Turkey

[email protected]

Turkey – Ankara 10 - 5 - 2016

University of Turkish Aeronautical Association Faculty of engineering EEE department

Presented byOmar Saadi Alshear

Department of Electrical Engineering

TAA. UniversityAnkara , Turkey

[email protected]

Page 2: Omar saady

2T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

Page 3: Omar saady

3

Transformer is a static device which transforms A.C electrical power from one voltage to anotherVoltage keeping The frequency same by Electromagnetic induction.

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

WHAT IS TRANSFORMER?

Page 4: Omar saady

4T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

IRON CORE

WHAT IS TRANSFORMER?

Page 5: Omar saady

5T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

Page 6: Omar saady

6

1- NAME PLATE FOR TRANSFORMER

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

S.N: 925 554

1 = 5 0 K V A2 = 1 0 0 K V A3 = 2 0 0 K V A4 = 3 0 0 K V A5 = 5 0 0 K V A6 = 8 0 0 K V A7 = 1 0 0 0 K V A8 = 1 5 0 0 K V A

TEST REQUIREMENTS

Page 7: Omar saady

7T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

2-TESTING DEVICES

TEST REQUIREMENTS

Page 8: Omar saady

8

3- SAFETY EQUIPMENT

4 - MECHANICAL EQUIPMENT

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

TEST REQUIREMENTS

Page 9: Omar saady

9T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

Page 10: Omar saady

10T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

TESTING OF TRANSFORMER

Types of testing

1- Routine tests

2- Type tests

3- Special tests

Page 11: Omar saady

11

1-ROUTINE TESTS

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1.1- Measurement of voltage ratio

1.2-Vector group verification

1.3-Measurement of winding resistance

1.4-Impedance voltage test(z)

1.5-Dielectrics TestA-Measurement of insulation resistance.

B- Dissipation power factor / insulation power factor (tan∂)

C- OIL TEST

TESTING OF TRANSFORMER

Page 12: Omar saady

12

THESE TESTS ARE CARRIED OUT ON ONE TRANSFORMER OF THE LOT.

2.1- All routine tests.

2.2- Additionally following tests are included in type tests.

A- Lightening impulse test.

B- Temperature rise test.

2- TYPE TESTS

TESTING OF TRANSFORMER

Page 13: Omar saady

13

3.1- Measurement of zero Phase sequence. 3.2- Measurement of acoustic noise level.3.3- Measurement of harmonics of the no load current.3.4- Magnetic balance test.

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

3-SPECIAL TESTS

TESTING OF TRANSFORMER

Page 14: Omar saady

14T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

Page 15: Omar saady

15T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Transformer Breakdowns

Page 16: Omar saady

16T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Sources of faults in transformer

Page 17: Omar saady

17T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Page 18: Omar saady

18T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Apply Tests Routine on Power Transformer

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYnd11

1-ROUTINE TESTS

Page 19: Omar saady

19

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

6- Equipment used : Transformer Turns Ratiometer ( T T R)

1- This test measures the voltage ratio as per the customer’s requirement.

2- V1/V2 = N1/N2

3-The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct.

4- apply the rated ratio for all tab (1-17).

5-apply the rated ratio for (132 kv,33kv 11kv)

1-1-Measurement of voltage ratio

Page 20: Omar saady

20T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11Rated ratio (Ynd11)H.V-L.V=( 132 / √3 ) / 11.5=6.6227 FOR TAP (9)

Tap pos. TAP Voltage(kv)

(A-N) / (a-c)(Measured

value)

(B-N) / (b-a)(Measured

value)

(C-N) / (c-b)(Measured

value)

Rated Ratio(Rated value )

1 145.2 / 11.5

91011

132.0 (132 ⁄ √3) ⁄ 11.5 = 6.627

17 118.8

1-1-Measurement of voltage ratio

Page 21: Omar saady

21T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

TEST:

TR.

1-1-Measurement of voltage ratio

a

N

VECT. GROUP: Ynd11 FOR H.V – L.V

b

c CBA

L.V

H.V

M.V

Ratio meter

ac

b

n

a

TR.

N

Page 22: Omar saady

22

The no-load deviation of the turn ratios should be ≤ % 0,5

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

APPLLY THIS LAW

1-1-Measurement of voltage ratio

Page 23: Omar saady

23

.

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

The use of modern equipment

1-1-Measurement of voltage ratio

TTR (Transformer Turns Ratio)

Page 24: Omar saady

24

This test is very important for an engineer to figure out directional connectivity for transformers.

(( Dy11 ,Yd11, Dy1,Yd1))

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1-2-Vector Group Verification

Page 25: Omar saady

25T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Dy11

Yd11

Page 26: Omar saady

26T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Yd1

Dy1

Page 27: Omar saady

27T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Steps to implement the test

1-2-Vector Group Verification

STEP 2S.C

STEP 3Take V

B-b , B-c ,C-b , C-c

STEP 1Connect H.V

Page 28: Omar saady

28T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Dy11

Yd11

Dy1

Yd1

Dd0

1-2-Vector Group Verification

C-b > C-c ≈ B-b ≈ B-c B-c > B-b ≈ C-c ≈ C-b B-c ≈ C-b>B-b ≈ C-c

Yy0

Page 29: Omar saady

29T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

This test measures the resistance of the H.V , M.V& L.V winding. The values of resistance should be balance for all three phases and should match the designed values.

Equipment used : Digital resistance meter.

1-3-Measurement of winding resistance

D.C RESISTANCE

Page 30: Omar saady

30T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Tap pos. A-Nohm

B-Nohm

C-Nohm

Resistance 3-ph

Oil Temp Rest. At 75C˚

1

9 0.4108 0.4104 0.4192 1.2305 19C˚ 1.5023

17

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11 FOR H.V, USES TAP POS. 1-9-17FOR M.V , USES TAP POS. 1 - 3 - 5FOR L.V , USES TAP POS. 1

1-3-Measurement of winding resistance

Page 31: Omar saady

31T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11WHEATSTON BRIDGE

a

N

WIND. REST. FOR H.V

b

c CBA

L.V

H.V

M.V

WHEATSTON BRIDGE

a

cb

na

TR.

N

1-3-Measurement of winding resistance

Page 32: Omar saady

32T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Where :T: CONSTANT ==234.5. for copperT1: 75C˚T2: The temperature at which the measurement (19C ˚).Rt1: Resistance value at the temperature (75C ˚).Rt2: Resistance value at measured temperature

Rt1=1.502326 ohm

RESISTANCE WINDINGS AT 75 C˚

Page 33: Omar saady

33T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11VOLTMETER – AMMETERApply ohm law D.C

12V

A

A

A

C

B

C

B

BC

N

N

AH.V

M.V

L.V

1-3-Measurement of winding resistance

V

V

V

Page 34: Omar saady

34T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11WINDING REST. H.V

The use of modern equipment

a

N

bc CBA

L.V

H.V

M.Va

cb

na

TR.

N

2

1

1-3-Measurement of winding resistance

The use of modern equipment

Page 35: Omar saady

35T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

What is the benefit of?

1- It is to compare the design calculations in terms of volumes conductors used

2- Resistance winding test used in calculating copper losses

1-3-Measurement of winding resistance

Page 36: Omar saady

36T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

S.C ON

L.VA A

A

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11VOLTMETER - AMMETER

1-4-IMPEDANCE VOLTAGE TEST(Z)

Page 37: Omar saady

37T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Tap pos. A-B B-C C-A A B C

1 420V 422V 429V 3.5AMP 3.3AMP 3.4AMP

9

17

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11IMPEDANCE VOLTAGE (Z) :( H.V—L.V) (1,9,17) TAP POS.IMPEDANCE VOLTAGE (Z) :( H.V—M.V) (1,9,17) TAP POS.

IMPEDANCE VOLTAGE TEST(Z)

Page 38: Omar saady

38T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Why do we apply the equation below?

Z=+ -7.5% FOR TWO WINDINGSZ=+ - 10%FOR THREE WINDINGS

FOR EXAMPLE:Rated voltage =145.2kv , Rated current =250.5Applied voltage Measured current AB=420 A=3.5 BC=422 B=3.3 CA=429 C=3.4 Apply the law :

IMPEDANCE VOLTAGE TEST(Z)

Page 39: Omar saady

39

What is the benefit of?

1- In the case of connecting a power transformer in parallel with the otherTest engineer must calculate the value of impedance. A impedance value should be close.

2- When measuring three windings currents, they are roughly equal. In the case of a damage in one winding .the current size. it will be bigger than two windings remaining. This gives an indication of the presence of a defect in winding.

3- Read the short circuit levelFOR EXAMPLE:Rated voltage =145.2kv , Rated current =250.5

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

IMPEDANCE VOLTAGE TEST(Z)

Page 40: Omar saady

40

The dielectrics are separation between the parts of the electrical system, and it may be solid or gaseous or liquid or free space , and there is no insulating material full electrical insulation , there is a certain electric current passes through it , in spite of the low value of the electric current .You should know the value of this electric current.

The dielectric value less over a period of time. Because of their exposure to different pressures

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1-5-Dielectrics Test

Page 41: Omar saady

41T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Types of dielectric tests

1- Measurement of insulation resistance

2- Dissipation power factor / insulation power factor (tan∂)

3- Test oil

1-5-Dielectrics Test

Page 42: Omar saady

42T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1- Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding.

2- Voltage used: 1000 V to 5000 V

3- Recommended Values are ( M)Ohms for HV & 500 Mohms for LV.

4- Equipment used: MEGGER IS USED.

1-5-1- Measurement of insulation resistance.

Page 43: Omar saady

43T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

Type: 132/33 /11.5KV ,63 MVAVECT. GROUP: YnYn0d11insulation resistance :( H.V—L.V)

a

N

b

c CBAL.V 11.5kv

H.V 132kv

M.V33kv

a

cb

na

TR.

N

1-5-1- Measurement of insulation resistance.

Page 44: Omar saady

44T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1-5-1- Measurement of insulation resistance.

Page 45: Omar saady

45T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

this test done on the electrical transformer to see the quality of isolators used in the TRANSFORMER WINDINGS . and isolators operate among themselves capacitors as in the illustration.

1-5-2-Dissipation power factor

132 kv

33 kv

11.5 kv

Page 46: Omar saady

46T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1- In capacitor ideal has no losses. The electric current precedes voltage an angle of (90˚).

1-5-2-Dissipation power factor

Page 47: Omar saady

47T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

2- In practical, all capacitors find where the loss in insulation

1-5-2-Dissipation power factor

Page 48: Omar saady

48T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1-5-2-Dissipation power factor

Page 49: Omar saady

49T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1-5-2-Dissipation power factor

Page 50: Omar saady

50T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

TESTING

REPEAT THIS TEST: M-HLE: MEDIUM – HIGH , LOW , EARTHL-HME : LOW – HIGH , MEDIUM , EARTHH-M / H-L / M-L /

a

N

b

c CBAL.V 11.5kv

H.V 132kv

M.V33kv

a

cb

na

TR.

N

Tan

1-5-2-Dissipation power factor

e

Page 51: Omar saady

51T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1-5-2-Dissipation power factor

To find good values

Page 52: Omar saady

52T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1- Oil breakdown voltage is checked as per IS-335.100 mm L X 70 mm B X 80 mm Ht. glass pot.500ml Oil sample.

2- Spherical electrodes with gap of 2.5 mm3- Recommended value : 60KV 4- Equipment used : OIL BDV TEST SET.

1-5-3- OIL TEST

Page 53: Omar saady

53T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

Page 54: Omar saady

54T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

1- Periodic checking of any loose connections of the terminations of HV & LV side.

Regular maintenance for power transformers

Page 55: Omar saady

55T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

2-Breather examination. Dehydration of Silica gel if necessary.

3-Explosion vent diaphragm examination.

4-Conservator to be cleaned from inside after every three years.

Regular maintenance for power transformers

Page 56: Omar saady

56T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R

5- Regular inspection of OIL & WINDING TEMPERATURE METER readings.

6- Cleanliness in the Substation yard with all nets, vines, shrubs removed.

Regular maintenance for power transformers

Page 57: Omar saady

57

Thank you for your attention!

Questions?

TESTING AND MAINTENANCE OF POWER TRANSFORMER

University of Turkish Aeronautical Association

Faculty of engineering EEE department

T E S T I N G A N D M A I N T E N A N C E O F P O W E R T R A N S F O R M E R