statement of qualification - ultramarine.com eld. study of fpso yoke moored to a jacket with an...

62
Ultramarine Offshore Consultants

Upload: phamhanh

Post on 03-Feb-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

UltramarineOffshore Consultants

Statement of Quali�cations

November 25, 2011

3100 South Gessner, Suite 325 - Houston - TX 77063Business 713-975-8146 - Fax 713-975-8179

[email protected] - http://www.ultramarine.com

Page 2: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Contents

Introduction 1

Representative Projects 2

Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2O�shore Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Bridge Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6FPSOs, Spars and TLPs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Mooring and Mating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Ship Launch and O�oading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10General Engineering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Software Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

MOSES Installations 14

Engineers and Analysts 15

Marcelo E. Canga . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16David Kummer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24Yvan Leipold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28Ray Nachlinger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30Allan R. Schultz . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36John Windus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

Associate Consultants 48

Claudia Claro . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49Nelson S. Galgoul . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52Huang H. Tao . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

ii

Page 3: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Introduction

Ultramarine O�shore Consultants is a privately owned professional organization which o�ers engineering ser-vices to the technical community. It specializes in engineering design and analysis as well as the developmentof special purpose computer programs to assist in such analyses.

The closely controlled structure of Ultramarine ensures the superior quality of its products and services,each of which is tailored to meet the individual client's speci�c requirements. This corporate framework alsoguarantees prompt, continuing maintenance and support services of each product to ensure the repeatedsatisfaction of its clients.

1

Page 4: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Representative Projects

Transportation

� Motions connection load for tanker moored to the side of an export FPSO. Sofec 1998.

� Za�ro mooring repair work. Mooring analysis for worker FPSO. Mobil 199-2000.

� Corocoro �eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and intandem. Conoco Phillips 2003.

� Belanack, side by side tanker mooring studies. Conoco Phillips 2001.

� Sable, Exxon Mobil. Fatigue analysis.

� Lowering of PLEMS for Sofec. Floatover recovery.

� Transportation analysis for Chevron's Banzala project o� West Africa.

� Transportation fatigue analysis of Chevron's Lomba and Nemba jackets, decks, and are jacket.

� Transportation analysis of a 5500 ton deck for a trans-Atlantic tow, including API code checks.

2

Page 5: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Transportation and transportation fatigue analysis for the Zafco jacket and deck.

� Evaluation of static stresses and fatigue ratios for tiedowns and jacket members for the Harvest tow.

� Nemba jacket, topsides and Lamba are. Chevron 1997

� KWIP water ood injection platform. ChevronTexaco

� North Nemba topsides, Chevron 2001

� Sanha jacket and topsides. Chevron 2002

3

Page 6: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

O�shore Installation

� Installation analyses for various PEMEX projects installed in the Bay of Campeche.

� Installation analysis of Mobil's Flare Buoy in Equatorial Guinea.

� Installation engineering on Shell O�shore's Spirit jacket in a water depth of 722 feet. Installed inViosca Knoll 780 during July, 1998, this 9700 short ton structure was analyzed for structural loadout,transportation and launch (simulation and structural), and upend. Also performed was a launchanalysis in an environment, including wind, wave and current.

� Installation engineering of Shell O�shore's Salsa jacket in a water depth of 693 feet. This 10,200 shortton structure was installed in Garden Banks 171 during December 1997. Analyses included loadout,transportation, launch and upend, complete with structural analysis and associated API code checksfor everything except upend. Also included was an onsite forensic study to determine which oodvalves failed during launch.

4

Page 7: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Installation engineering for Shell O�shore's Enchilada Platform. This involved a transportation analysisand several unusual considerations. In particular, the docking of the base section over predrilled wells,and the top section with the base section were analyzed. Also, a two crane uprighting procedure wasdesigned.

� Transportation, transportation fatigue, and upending analysis for the British Gas Tunisia project.

� Installation engineering of two jackets, a are tripod and several deck sections for Chevron's KokongoDevelopment project located o�shore Cabinda, Africa in water depths ranging from 343 to 387 feet.With fabrication in Brazil, the transportation analyses for the jackets included structural code checksand spectral fatigue. These structures were successfully installed by Saipem.

� Performed inplace, inplace fatigue, loadout, launch, and transportation of a 496 ft. water depth jacketfor the South China Sea, Lufeng 13-1.

� Performed launch and transportation analysis of a compliant tower.

� Analysis of the static and dynamic stability of the Texaco Harvest jacket on KSC-700.

� Analysis of the jacket and barge hydrodynamics and structural stresses during the salvage tow of theEugene Island 361 platform.

� The development of jacket upending, ooding, and lifting sequences for several jackets.

� The planning and evaluation of the loadout, tow, and launch sequences of the Shell Eureka jacket.

� Analysis to identify and suppress vortex shedding sensitive elements in the Texaco Harvest jacket fora trans-Paci�c tow.

5

Page 8: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Bridge Installation

� Performed loadout, transport, mooring and mating studies for mating 5000 metric ton bridge sectionsof the Kwang Ahn Bridge in Pusan, South Korea.

� Performed side launch, towing, upending and setdown studies for 7 separate bridge support structuresin 12 to 90 meters of water in Chiapas, Mexico.

� Mooring and Hydrodynamic Motions Analysis for multiple pontoon sections of the Hood Canal FloatingBridge for the State of Washington, including structural dynamic e�ects.

� ICA. Chiapas bridge project in Chiapas, Mexico. Innovative installation design of 8 jackets usingo�shore technology. Launch, transportation, upending and positioning. Execution of installationoperations

6

Page 9: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

FPSOs, Spars and TLPs

� Motions analysis for TotalFinaElf , Girasol FPSO, global stress analysis (1998, 2000) including moduleinstallation and stability Fatigue

� Transportation and dynamic upending analysis of a truss spar.

� Tow motion study of Chevron's Genesis spar.

� Stability analysis of MARS and Ram-Powell tension leg platforms.

� Assess the structural integrity and fatigue life for the ares on three FPSO's.

� BP Holstein. Wet transportation, truss loadout and oato� operations, truss and hard tank mating.Spar upending and mooring. Fatigue analysis during wet tow. Modeling and fatigue analysis of hullstrakes during wet tow

� Saipem SA. Erha FPSO. Hull Hydro-Structural model prepared with Builder3D, an Ultramarine soft-ware product

7

Page 10: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Mooring and Mating

� Tanker berthing studies for the Cabo Negro tanker terminal in the Straits of Magellan, Chile, forProceanic Ingenieria Ltd.

� Analysis of lowering a oat-over deck using water jacks.

� Performed an analysis of mating the jacket to a template for Chevron's Lomba and Nemba jackets.

� Study the relative motion of two tankers moored side by side with a turret moor.

� Two body tanker motions analysis involving sizing the hawser between a production tanker and ashuttle tanker for a oating production and o�-loading system.

� Analysis of motions at an o�shore terminal to facilitate the design of the mooring equipment.

� Analysis to determine the dynamic impact loads when positioning a platform onto template stabbingguides.

� Screening and down time analyses for several deep and shallow water mooring systems.

� Analysis of the motions of a D.P. drillship during thruster failure.

� Analysis of the dynamic responses of a jacket and a derrick barge during upending.

8

Page 11: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Analysis of the dynamic response of a moored, continuous span oating bridge excited by a randomsea.

� Analysis of the applicability of synthetic �ber ropes for mooring systems.

� Bohai Bay 2000, Worley.

� Benguela Belice, Piece mating for compliant tower. ChevronTexaco 2004

� Sakhalin, deck mating. Shell.

9

Page 12: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Ship Launch and O�oading

� Float-o� analysis of a oating casino vessel from a launch barge for Service Marine Industries.

� Analyze the oat-o� of a 39 meter average diameter by 15 meter long caisson from a submersible barge,for China O�shore Oil Marine Engineering Co. This analysis used gap elements to connect the twobodies, and included a complete ballasting procedure and stability check for each stage of the oat-o�.

� Analysis of launching a jackup drill rig from a set of ways at the shipyard.

� Analysis of o�oading a truss spar structure from a barge.

� Analysis of launching a 600 ft. spar structure from a fabrication bulkhead.

� Dynamic Launch analysis of a Roll-on/Roll-o� passenger vessel launched from a shipyard for HalterMarine.

10

Page 13: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

General Engineering

� Study the feasibility of the Versatruss concept for lifting.

� Engineering consulting services performed in DORIS Development Canada Engineering's o�ce for theloadout, tow and mating analysis of the topsides for the gravity based HIBERNIA structure.

� Analysis of a submersible superstructure during a three point lift.

� Analysis of the vibrations induced in a platform piping sub-assembly with recommendations to minimizethese vibrations.

� Pemex. Paragon Engineering Services. Installation engineering for 12 jackets and topsides for MANIK-A, MALOOB-A, MALOOB-B, HAZAAPC, HAKUH. Loadout, transportation, otation and jacketupending. The scope includes ballasting plans, mooring design, motion analysis, stability analysis andstructural analysis of cargo and barges. Loadout operation execution.

� Pemex. Swecomex. Installation engineering for 16 structures including jackets, topsides, bridges forHAZAAPC and HAKUH. Loadout, transportation, otation, jacket upending and on-bottom stability.The scope includes ballasting plans, mooring design, motion analysis, stability analysis and structuralanalysis of cargo and barges. Seafastening design and padeye design.

11

Page 14: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Software Development

� Modify MOSES to allow for dynamic ooding of compartments so that dynamic upending could beanalyzed.

� Modify MOSES to include the inertia and deformation during static, time domain, and frequencydomain analyses for the Mobil O�shore Base assembling 6 semisubmersibles with a combined lengthof 4000 feet.

� The development of a computer program which computes inertial, hydrostatic and hydrodynamic loadson a vessel and its cargo, and then performs stress and fatigue structural analysis on the compositestructure (OTTO).

� The development of a computer program to simulate the jacket launching procedure from an articulatedbarge.

� The development of a computer program to plan and evaluate the hydrostatics and loadout sequenceof a large structure onto a oating vessel (ISAAC).

� The development of a computer program to simulate the dynamics of launching a jacket from a barge,and the statics of upending the jacket (OSCAR Launch and Upend).

12

Page 15: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� The development of an onboard computer program to control the positioning of a subsea payload beinglowered by moored barges.

� The development of a �nite element computer program to analyze piping systems.

13

Page 16: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

MOSES Installations

ABB Offshore Systems A.S Aker Offshore Partner A.SAmec Offshore Limited Amec Process & Energy Ltd.Aquarius Internatl Consultants Pty Ltd. Argonautics Marine EngineeringAsian Lift Pte Ltd Atlas Engineering, Inc.Berger/Abam Engineers Inc. BT Offshore Pte LtdBurness Corlett - Three Quays Casbarian Engineering AssociatesChevronTexaco Clough OffshoreCNOOC Research Center COOECDaewoo Shipbuilding & Marine Engr Diamond Offshore Drilling, Inc.Doris Engineering Eagle Maritime Consultants, Inc.Econofreight Heavy Transport Ltd. ExxonMobil Development Co.Falconer, Bryan & Associates Friede & Goldman Ltd.Global Industries Ltd. Global Maritime A.S.Global Maritime Ltd. Global Maritime U.S.A.GustoMSC-Ocean Design Inc. Heerema Marine Contractors NederlandHogskolen I Bergen Hyundai Construction Co. Ltd.Hyundai Engineering Co. Ltd. Hyundai Heavy Industries Co. Ltd.Inha University Inocean A/SJ. Ray Mcdermott Kellogg Brown & Root, Inc.Korea Maritime University LeTourneau, Inc.Marine Projects International Maritime Sector SpecialistsM&H Energy Services Mustang Engineering, L.P.National University Of Singapore Navalprogetti srlNgee Ann Polytechnic Ocean Dynamics, LLCOpticonsult A.S. Overdick GmBH & Co.Petrobras, Cenpes Petro-Marine Engineering, Inc.Proeight Offshore Engineering Pt KomaritimRanhill Worley Sdn Bhd Saipem Energy InternationalSaipem Mediterranean Services Saipem S.A.Saipem UK Limited Samsung Heavy Ind. Co. Ltd.Sargent & Herkes, Inc. Scivita, Inc.Sea Quest Technology Pte Ltd Semco Salvage & Marine Pte LtdShell International E & P Inc. Six Tee Marine & Offshore Engr.Henry Sliwinski, P.E. Smit Engineering B.V.Stolt Offshore M.S. Ltd. Stress Engineering ServicesA.K. Suda, Inc. Technip GeoproductionTechnip Offshore, Inc. Tecon SrlTempleton & Associates Tero Marine (S) Pte Ltd.Texas A&M University T.L. Offshore Sdn BhdUltratec University of NewcastleU.S. Coast Guard Academy U.S. Coast Guard R&D CenterVietsovPetro Joint Venture Waller MarineWorleyParsons Services Pty Ltd

14

Page 17: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Engineers and Analysts

� Marcelo E. Canga

� David Kummer

� Yvan Leipold

� R. Ray Nachlinger

� Allan R. Schultz

� John Windus

15

Page 18: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Marcelo E. Canga, Ph.D.

President

Summary of Qualifications

Experience in design of o�shore installation operations including Loadout, O�oad, Transportation, Upend-ing, Mating, Lowering, Launching and Mooring. Stinger and pipelay analysis. Advanced analytical skillswith emphasis on Dynamics, Hydrostatics, Hydrodynamics and Structural analysis. Nonlinear Finite El-ement analysis. Proven ability to lead a team, to organize, to negotiate and to communicate with peers,committees and governing bodies.

Education

Dec. 2004 Licensed Professional EngineerPE License Number 94515, Texas, USA.

June 93 - Dec. 97 Ph.D. in Engineering Mechanics. GPA 4.0/4.0.University of Texas at Austin, USA.Dissertation topic: \An iterative algorithm for the �nite element analysis ofnear-incompressible materials."

Sept. 90 - May 92 ME in Mechanical Engineering. GPA 4.0/4.0.Carnegie Mellon University, Pittsburgh, Pa, USA.Major in Solid Mechanics and Vibrations.Dissertation topic: \Mechanical interactions between continuum bodies in met-al forming processes. Constitutive friction laws."

Mar. 82 - Oct. 88 MS in Civil Engineering. GPA top 10%.Universidad de Buenos Aires, Buenos Aires, Argentina.Major in Structural Mechanics and Structural Design.Project topics: \Structural design of a concrete pre-stressed highway bridge,"\Dynamic response of slender structures."

16

Page 19: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Work Experience

October 2005 - present PresidentUltramarine O�shore Consultants, Houston, TX, USA

� PetrobrasPapaterra ProjectTension Leg Platform (TLP) and topsides installation engineeringProject in progress

� WoodsideMcDermottBrowse ProjectP1 oatover 30,000-t deckQU oatover 22,000-t deck

� Noble energy.Tamar project.10,000-t deck. Loadout and transportation screening

� Noble energy.Tamar project20,000-t jacket. Launch and upend. Marine and structural veri�cation.

� TPAO. Turkish Oil Company.Akcakoca project.Consulting marine services for their �rst o�shore jacket/topside installationproject.

� Global IndustriesG1200 deepwater pipelay vesselStinger structural design veri�cation. A-Frame and strong back structuralstrength. Pipe tensioner upgrade veri�cation. Hull redesign for new pipe ten-sioner. ABS rules.

� Woodside.FloatoverNorth Rankin B.

� Versabar Inc.Custom Salvage System (bottom feeder)Performance and strength evaluation of the lifting system for transportation,stand-by and lifting. Mooring analysis. Model basin supervision in Escondido,CA. Redesign of barge-gantry connector con�guration. Coast Guard approvalprocess.

� Total.Paz or FPSO.Fatigue and strength analysis of several structures.

� ChevronTexaco.Index Frame, a pipe handling system.Deployment strength evaluation in deep water.

17

Page 20: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Globalmaritime, NorwayGMlift, Semisubmersible lift vessel.Performance and strength evaluation of mating system. Hydraulic lift systemstudy. Model test.

� The Expro GroupTwo MOPU (jackup) vesselsPerformance and structural strength evaluation. Redesign and reconstruction.

� Bay engineering.Great Lakes Single Point Mooring Buoy Mooring coupled to a hooper dredge.Connection design forces. Motions.

� Momentum Engineering.Mooring analysis for the Crane Barge Titan III

� Chet Morrison Contractors.Quay side launch of a dry dock.

� Foxtrot International.Compressor Module Transportation. Seafastening design.

� Project Costa Afuera Pemex. Paragon, Bay-Inelectra.Installation engineering for 2 Living Quarter Decks (4000 ton each), HA-KU-Hand HA-ZAAP-C. Loadout and transportation. The scope includes ballastingplans, mooring design, motion analysis, stability analysis and structural analysisof cargo and barges. Lead for the execution of the loadout operations

� Project Costa Afuera Pemex. Swecomex.Installation engineering of 16 structures, including jackets, decks and bridges.HA-KU-H and HA-ZAAP-C. Loadout, transportation and lifting. The scopeincludes ballasting plans, mooring design, motion analysis, stability analysisand structural analysis of cargo and barges. Design of seafastenings, padeyes,rings, etc.

� ConocoPhillips. SPS.Performance and strength analysis of a spud barge for oil production in Mara-caibo, Venezuela. Motion and mooring analysis. Strength and fatigue analysisof the spuds. Shallow water.

� Versabar Inc. ChevronTexacoWest Africa Module InstallationInstallation of a 2,500 Ton module onto South Nemba �xed platform. Moduleand Barge dynamic interaction analysis. Tip-hook dynamic force ampli�cationfactor. Mooring lines, hawsers, barge supports and rigging design forces.

June 2004 - present Engineering ConsultantCanga & Associates, Houston, TX, USA

� Project Costa Afuera Pemex. Installation engineering for 3 jackets and deck-s, Manik-A, Maloob-A and Maloob-B. Loadout, transportation, otation andjacket upending. The scope includes ballasting plans, mooring design, motionanalysis, stability analysis and structural analysis of cargo and barges. Leadfor the execution of the loadout operations

18

Page 21: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Torch O�shore. Alba Field Development. Stationkeeping analysis on the Mid-night Brave. Damage and Intact cases.

� Stolt O�shore. Pipelay Angostura Project. Two body structural analysis of the46m stinger. Pipelay analysis for 18 in and 30 in pipe.

Feb. 98 - May 2004 Engineering ConsultantUltramarine Engineers and Analysts, Houston, TX, USA

� Technip. Holstein Truss-Spar. Loadout and Floato� operations. Truss - Hardtank mating operations. Mating tank removal operation.

� Saipem SA. Erha FPSO. Hull Hydro-Structural model prepared with Builder3D,a model generator software developed by Marcelo Canga.

� Technip-Co exip. Holstein Truss-Spar. Structural analysis of transportationand upending operations. Fatigue analysis during wet tow. Modeling andfatigue analysis of hull strakes during wet tow.

� Shell. Bonga FPSO. Suction Pile Mooring installation analysis.

� ICA. Chiapas bridge project in Chiapas, Mexico. Project manager and ChiefEngineer. Innovative installation design of 8 jackets using o�shore technology.Launch, transportation, upending and positioning. Responsible for all commu-nications with Mexican Construction Contractor, Mexican Design Engineersand the Department of Transportation, Mexico. In addition, Technical Leadfor all installation engineering for the project

� Responsible for successful bid for the Chiapas bridge project in Chiapas, Mexico

� Shell. Marine Advisory System documentation project.

� OPE. Stability and bollard pull analysis for AMT carrier barge.

� CSO-Aker. Mountain Horn. Quality assurance consultant for the Truss-Sparupending operation

� Ultramarine. Responsible for software development for the analysis and designof oating marine structures

� Ultramarine. Developed a three and four node shell element for incorporationin the MOSES analysis software

� Paragon Engineering Services. Flotation and upend analyses of a three legjacket for Benchamas BWD project.

� Paragon Engineering Services. Flotation and upend analysis of a four leg jacketfor the High Island Block A368 project.

� Alliance Engineering. Transportation analyses of the Dong-Fang project jacketsand decks; otation and upend analyses of two jackets; launch analysis of a fourleg jacket. Work included stress and fatigue analysis.

� Lowe O�shore. Flotation and upend analysis of a three leg jacket for the SouthMarsh Island project.

Dec. 97 - Feb. 98 Post-Doc Research Associate

19

Page 22: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

TICAM, University of Texas at Austin, USA.

� Large scale computations of composite material models.

June 93 - Dec. 97 Research Assistant.University of Texas at Austin, Austin, TX, USA.

� Developed a 3D object oriented Finite Element Code (C++). The code supportshyperelastic and viscoelastic material models; direct and iterative solvers

� Studied friction laws for deformable-deformable 3D contact algorithms

� Developed numerical techniques for the solution of viscoelastic materials sub-jected to large deformations and damage

� Developed iterative techniques for nearly incompressible materials such as rub-ber

Research supported by the National Science Foundation.

June 95 - Feb. 98 Engineering ConsultantMSI, Austin, TX, USA.

� Thiokol Corporation. Developed a �nite element numerical algorithm for theconstitutive modeling of solid rocket propellants.

� Medical Carbon Research Institute. Conducted the uid mechanic analysis ofblood ow through a valve heart. Commercial software packages used: FLU-ENT, CFD-ACE, ProEngineer.

� International Fatigue Life Research Project. Analyzed the fatigue life predictionof rubber components.

� MSI. Developed 3D friction models for FLEXPAC, a 3D �nite element program.

March 93 - May 93 Engineering ConsultantHemarsa, civil engineering construction company. Buenos Aires. Argentina.

� Land recovery from the river \Rio de La Plata": designed and analyzed retainingwalls and piles. (Rio de la Plata)

Sept. 90 - Feb 93 Research Assistant.Carnegie Mellon University, Pittsburgh, PA, USA.

� Developed 2D and 3D Finite Elements codes for the modeling of thermo-elastoplastic deformation of materials in industrial metal forming processes

� Developed and implemented models of elastoplastic contact with arbitrary fric-tion laws

� Developed a 2D explicit dynamic code

20

Page 23: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Studied the closure of centerline porosity in at rolling of thick steel plates

� Collaborated in the modeling of the Hot Isostatic Pressing of metallic powders.Research supported by the National Science Foundation.

Oct. 88 - Sept. 90 Engineer.SIDERCA , integrated seamless steel tube manufacturer, Buenos Aires, Ar-gentina.

� Studied the thermo-mechanical behavior of the material during the continuouscasting of steel

� Developed a �nite element ow model for viscoplastic materials (steel at elevatedtemperatures)

� Participated in several engineering projects.

1987 - 1988 Research Assistant.University of Buenos Aires, Buenos Aires, Argentina.

Dissertation topic: \Structural stability of circular arcs subjected to concen-trated loads." Research supported by the University of Buenos Aires.

Teaching Experience

1995 - 1996 \Application of Finite Element Methods," Teaching assistant, ASE/EM, Uni-versity of Texas.

1995 - 1996 \Finite Element Methods," Teaching assistant, ASE/EM, University of Texas.

1989 - 1990 \The Finite Element Method applied to Solid Mechanics," Teaching assistant,Institute of Materials and Structures, University of Buenos Aires.

1985 - 1986 \Analysis III," Teaching assistant, School of Engineering, University of BuenosAires.

Publications

21

Page 24: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

M. Canga, E. Becker, and S�ebnem �Oz�upek. Constitutive modeling of viscoelastic materials with damage -computational aspects. Comput. Meth. Appl. Mech. Engrg., 190(15-17):2207 { 2226, 2001.

M. Canga and E. Becker. An iterative technique for the �nite element analysis of near-incompressiblematerials. Comput. Meth. Appl. Mech. Engrg., 170(1-2):79{101, 1999.

E. Becker, M. Canga, and S�ebnem �Oz�upek. Nonlinear viscoelastic constitutive model with damage forpropellant. In JANNAF Working Group on Mechanical Behavior, Salt Lake City, Utah, March 1998.Defense material, not released.

Marcelo E. Canga. An Iterative Algorithm For The Finite Element Analysis of Near-Incompressible Mate-

rials. PhD thesis, University of Texas, Austin, December 1997.

M. Canga, T. Miller, and E. Becker. A displacement based friction algorithm. In International Fatigue Life

Research Project, number IFL/23, Austin, Texas, April 1994.

M. Canga and E. Becker. An iterative technique for the solution of �nite element analysis applied to near-incompressible materials. NSF #CDR-8721512, University of Texas, O�shore Technology Research Center,Austin, Texas, July 1996.

M. Canga and E. Becker. State of the art in the modeling of cracks in elastomeric bearings. NSF #CDR-8721512, University of Texas, O�shore Technology Research Center, Austin, Texas, September 1994.

J. Trasorras, M. Canga, and W. Eisen. Modeling the hot isostatic pressing of titanium parts to near-netshape. In Advances in Powder Metallurgy and Particulate Materials, volume 7, pages 51{69, Princeton, NewJersey, 1994. American Powder Metallurgy Institute.

E. Dvorkin and M. Canga. Incompressible viscoplastic ow analysis using a quadrilateral 2d element basedon mixed interpolation of tensorial components. Communications in Numerical Methods in Engineering,9(2):157{164, 1993.

E.O~nate, E. Dvorkin, M. Canga, and J. Oliver. On the calculation of the tangent matrix for geometricnonlinear analysis using continuum based beam/shell elements. In W.B. Kratzig and E.O~nate, editors,Computational Mechanics of Nonlinear Response of Shells, 1990.

E. Dvorkin and M. Canga. On the geometric non-linearities of structural elements. InMECOM 88, C�ordoba,Argentina, 1988. XI Latin-American and Iberian Congress on Computational Methods for Engineering.

22

Page 25: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

November 2011

23

Page 26: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

David Kummer

Summary of Qualifications

� Diverse experience in o�shore oil and gas projects

� Design involvement from conceptual design to detail design in numerous types ofo�shore equipment, i.e., jackets, TLP, FPSO, Semi-submersibles, jack-up rigs,crane vessels, tankers, tugboats, and barges.

� Fabrication experience in new construction and modi�cations of existing equip-ment.

� Field involvement in loadout, transportation and installation of platforms.

� Expertise in oat-on deck installations.

� Warranty surveying and vessel inspection/evaluation experience.

� Directed model test programs of jacket transportation and installations.

� Supervision of design departments.

� Good management and communication skills.

� Hands-on experience with most of the structural and marine software designpackages, i.e. SACS, MOSES, AQWA, STRUCAD, ALGOR.

Education

1970 - 1973 University of Michigan, Ann Arbor, MichiganBachelor of Engineering, Naval Architecture and Marine EngineeringGraduated cum laude.

Work Experience

1999 - Present Consultant, Global Ocean Systems, Inc. Houston, Texas

24

Page 27: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Designed structural modi�cations for the Phase II upgrade and life extensionprogram of the FPSO "Zarifo Producer".

1997 - 1998 Senior Naval Architect, Nippon Oil Exploration (M), LTD., Kuala Lumpur,Malaysia

� Member of the engineering and construction project management team, respon-sible for the naval architecture and installation aspects of the detail design ofthe Helang platform. Supervision of subcontractor's engineers. Evaluation offabrication and installations bids.

1997 - 1998 Consultant, TIGA Joint Venture, Melbourne, Australia

� In addition to my dues at Nippon Oil, independently contracted to performthird party design audits of the naval architecture aspects of the preliminarydesign of the Bayu-Udan Upstream Project. Design review included transport,launch and upending of the jackets and transport and oat-over design of two15000 t topsides.

1996 - 1997 Consultant, Global Ocean Systems, Inc., Houston, Texas

� Designed modi�cations including mooring foundations, riser porches, helideckand Loading program for FPSO conversions of the 250,000 DWT tankers,"Za�ro Producer" and "Independence". Float-over deck concept study for Mo-bil's Yoho project. Performed FEA analyzes of the skirt sleeve to leg connectionson Shell's Salsa and Spirit jackets and the lifting trunion on Shell's Enchiladajacket. Intact and damage stability analyzes, and Trim and Stability bookletsfor numerous tank barges, tankers and tugs.

1982 - 1995 Vice President, Manager, Naval Architecture and Marine EngineeringBarnett and Casbarian, Inc., Houston, Texas

� Responsible for technical review of design calculations and installation proce-dures related to the design and installation of o�shore structures as US certi-�ed veri�cationagents and warranty surveyors. Previous project include UnionCerveza Ligera, Exxon Lena Guyed Tower, Esso Iwaki, Shell Eureka, Zapa-ta Tequila, Shell Bullwinkle, Exxon Harmony, Exxon Heritage, Conoco GreenCanyon 52, Mobil Green Canyon 18, Chevron Hermosa, and Exxon East ZeitPlatforms.

� Project Manager for the design of a 700 foot launch barge for Kaiser Steel Corp.which was built in 1984 at Daewoo Shipyard. Developed a conceptual designfor a 1000 foot and 850 foot propulsion assisted launch barge for WalleniusShipping line.

� Designed structural modi�cations to tankers for oating production systems andrapid deployment o�oading terminals utilizing �nite element analysis.

25

Page 28: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Involved with numerous oat-over installation projects including Sarawark ShellM1 and M3 production decks, Exxon Mobile Bay 112, 105, and 62 produc-tion decks, Trinmar compression and water injection decks, Unocal ThailandJakrawan Central processing platform, Pecten Camerons J-deck and MobilNigeria Ekpe production deck. Float-over activities included installation proce-dure development, dynamic mating analysis, mooring and ballast design, tech-nical consultant and on-site advisor during installation.

� Performed loadout calculations and �eld supervision of ballast operations onseveral jacket and decks including Mobil Green Canyon 18. Technical advisorto Hyundai for loadout of Exxon Harmony and Heritage jackets.

� Performed numerous motion and stability studies for jacket tows. Designedseafastenings for a variety of cargoes including jackets, decks, modules and pil-ings. Designed the seafastening and performed a jacket transportation analysisof the trans-Paci�c tow of the Texaco Harvest jacket. Performed tow studies ofbarges, TLP's and semisubmersible drilling rigs.

� Performed transportation fatigue analysis for Shell's Auger TLP hull from Italyto US Gulf Coast. Performed preliminary transportation fatigue analysis forShell's Mar's TLP hull.

� Performed on-hire and o�-hire surveys for barges and tugboats. Performed cargostowage inspections. Supervised cargo loadings of ships and barges.

1981 - 1982 Engineering Manager I, Brown and Root, Inc., Houston, Texas

� Consulting Naval Architect for activities related to the installation of the ExxonLena Guyed Tower. Directed all Naval Architects involved in the project.Project included: converting a derrick barge to dynamic positioning, modi�-cation to a launch barge for side launching, launch and upending calculationsfor the tower, and mooring line installation.

1979 - 1982 Sta� Project Engineer, Brown and Root, Inc., Houston, Texas

� Handled all Naval Architecture aspects of the design, loadout and/or installa-tion of several large platforms including Petrobras Namorado IA and Chevronof Spain Casablanca. Project engineer for the design modi�cation of the Wim-brown IV jack-up barge to an accommodation vessel. Was responsible for totalengineering involvement in the job from initial cost estimates to completion ofhull modi�cations in the shipyard.

� From 1979 to February 1981 was supervisor of the hull section of the MarineConstruction Equipment Design Department. Responsible for assignment ofwork and technical quality of all engineering activities performed by this section.Direct supervision of ten Naval Architects and seven draftsmen. Types of workcompleted by the hull section were slotted workover barges, modi�cation of apipelay barge, transportation analysis for o�shore modules, U.S.C.G. StabilityAnalysis for derrick barge and various proposals.

26

Page 29: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

1977 - 1979 Senior Engineer, Brown and Root, Inc., Houston, Texas

� Performed all Naval Architecture calculations related to the design and installa-tion of several o�shore platforms that included Chevron, UK Ninian Northern,Chevron, USA Garden Banks, and Arco Mississippi Canyon. Directed nu-merous model test programs for the transportation and installation of o�shoreplatforms.

1975 - 1977 Design Engineer, Brown and Root, Inc., Houston, Texas

� Assigned to the Naval Architecture Department. Performed numerous engineer-ing calculations for Brown and Root's eet of construction vessels that includeStability, Structural Analysis and Design, Motions and Scantling Design. Waslead Engineer for the design, including calculations, speci�cations, and con-struction support for a 580 x 160 x 36 jacket launch barge.

Professional Memberships

Associate Member of Society of Naval Architects and Marine EngineersRegistered Professional Engineer, Structural - State of Texas

27

Page 30: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Yvan Leipold

Education

MS Degree - Ocean Engineering

University of Miami, Miami, Florida, U.S.A.

Project Expertise

� Design of a tensioned leg platform (TLP) for North Sea installation.

� Hydrodynamic studies of o�shore structures.

� Instruction in the use of the MOSES O�shore Software Package developed byUltramarine, Inc.

Professional Experience

March 1994 - Present Ultramarine Europe, Rambouillet, France

Mr. Leipold joined the Ultramarine sta� in March 1994 to manage UltramarineEurope, a subsidiary of Ultramarine, Inc., to promote sales in Europe andprovide client support of Ultramarine's software products to existing Europeanclients, and provide engineering consulting services to the o�shore industrymarket.

Types of analyses performed: vessel motion, tow, fatigue, oating, mooring,launch, upending, lift, docking, stability, pipelaying, structural.

Projects in which Ultramarine Europe was involved include: BONACCIA,YETAGUN, AL-SHAHEEN, USARI, BEIRUT, GIRASSOL, N'KOSSA, STAG,ZAFIRO, FOXTROT, TEMSAH, SANHA, FOUKANDA, EL PASO, NEM-BA/LOMBA, JAMNAGAR, CABONEGRO, HELANG,WENCHANG, HELANG,etc...

28

Page 31: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

September 1988 - March 1994 BOUYGUES OFFSHORE� TLP project for the North Sea - Preliminary study.

� WYP Platform (Chevron) - Calculation of sub-structure.

� COHASSET Project (Canada) - Preliminary design of platform.

� MORSE Project (CEP&M) - Feasability study of a new platform concept.

� POS Project (IFREMER) - Feasibility study of oating structures (steel andconcrete).

� Transportation study of jacket 350m loaded onto two barges "in catamaran"(CEP&M).

� Motion analysis during sea transportation of the following platforms: TCHEN-DO, EDOP C&D, RSMC, TAKULA O, AFIA/ODUDU, COBO, KUTUBU,IME, BAGRE, N'KOSSA, CASABLANCA, TCHIBOUELA, PAMBI.

� Preliminary study for the RASCAS Project (French Navy).

� Hydrodynamic studies of miscellaneous concrete structures ( oating and gravitybased structures).

� DYNATOUR project (CEP&M).

� Mers profondes Project (CLAROM).

� NEMO II Project (DCAN) Phases 1 and 2.

� Principle user and instructor of the MOSES software package (Multi- Opera-tional Structural and Engineering Simulator).

1984 - 1986 C.G. DORIS CAMEROUN (Subsidiary of C.G. DORIS FRANCE)

Assistant Manager of the Oceanographic Department.Activities include Logistics and Positioning of Platforms.

Personal

Nationality: France

Languages

French and English

29

Page 32: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

R. Ray Nachlinger, Ph.D.

Summary of Qualifications

Thirty-one years of consulting experience in advanced analysis and design. Experience includes both thedesign and analysis of o�shore structures with an emphasis in Dynamics, Hydrodynamics, Ship Motions,Mooring Analysis, and Structural Analysis. Responsible for the development of over a dozen proprietarycomputer codes, which have become industry wide standards for the o�shore industry.

Education

1968 Ph.D. in Engineering MechanicsUniversity of Texas at Austin, USA.

1967 MS in Engineering Mechanics.University of Texas at Austin, USA.

1966 Bachelor of Engineering ScienceUniversity of Texas at Austin, USA.

Professional Experience

July 1978 - Present President, Ultramarine, Inc.

� Established Ultramarine, Inc. to provide consulting and analysis to the o�shoreindustry. Responsible for management of all aspects of business development,technical quality and �nancial administration.

� Transportation analysis of 3 jackets on a single barge and 3 decks on a singlebarge being transported from the Gulf of Mexico to Angola.

� Developed Software Modules for Marine Advisory System consisting of Ballastand Mooring Algorithms, Mooring Line Interpolation Table Generation for ShellOil Company's Auger TLP.

30

Page 33: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Performed wet tow analysis with stress calculation of highway tunnels to beinstalled under Boston Harbor.

� Launch, transportation and upending analysis of a Tripod in 652 ft. waterdepth.

� Performed transportation and launch analysis of both parts of the Delta Towerfor DORIS Engineering.

� Study to determine mooring system required to moor a 195 ft. oating dock inthe Atchafalaya River with two 320 ft. cargo barges connected.

� Transportation analysis of Deaerator Skid for Chevron's TAKULA WIP.

� Developed MOSES, Multi-Operational Structural Engineering Simulator.

� Technical consulting services rendered in developing a complete, consistent the-ory manual for COSMOS for Shell Development Company.

� Modi�cations to the OSCAR and OTIS programs for Shell Oil Company.

� Developed OSCAR II.

� Consultant to Shell Oil Company to assess the loads on large plates duringlaunch.

� Consultant to Shell Development to develop COSMOS, a computer program forthe analysis of TLP's.

� Consultant to Kaiser Steel Corporation to analyze stresses and fatigue of Tex-aco's Harvest jacket during tow from Korea to o�shore California.

� Consultant to Shell Oil Company to analyze launch of the Eureka jacket.

� Developed OTTO, a computer program to analyze stresses and fatigue in struc-tures under tow.

� Developed ISAAC, a computer program to perform computations for loadouts.

� Consultant to Shell O�shore, Inc. on mooring problems in 1000 to 2500 ft. ofwater.

� Consultant to Proteca of Venezuela on the design of a oating bridge over theOrinoco River.

� Developed PLAD, a computer program to automatically design metal buildings.

� Consultant to Kaiser Steel Corporation to perform engineering analysis for load-out and tow of Shell Oil Company's Eureka jacket.

� Consultant to Chevron to modify their existing structural dynamics software.

� Designed PLAD, a computer program to design electro-static precipitator cas-ings for the Lodge-Cottrell division of Dresser Industries.

� Consultant to Petro-Marine to simulate the dynamics of the Petrobras PCR-1jacket during upending.

� Added three dimensional di�raction theory hydrodynamics to OSCAR, anddeveloped OTIS, an interactive graphics program.

� Performed structural analysis of Richmond superstructure during lifting for

31

Page 34: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Vemar.

� Consultant to Brown & Root to improve their computer software for jacketupending.

� Consultant to J. Ray McDermott. Analyzed loss of the Nomorado jacket in theNorth Sea while under tow. Testi�ed on �ndings in court.

� Added mooring capabilities to OSCAR.

� Consultant to Raymond Technical Facilities. Designed and implemented a sys-tem to perform dynamic analysis of oating bridges. Analyzed the design ofthe Hood Canal replacement bridge.

� Developed OSCAR for Chevron. OSCAR combined PLAP and MARVAN intoone overall code.

� Developed MARVAN, a computer program to compute ship motions and hy-drostatics.

� Developed PLAP, a computer program to simulate jacket launch and upending.

Feb 1968 - Jan 1979 University of Houston, Houston, Texas

Assistant and Associate Professor of Mechanical Engineering.

� Taught graduate and undergraduate courses in Engineering Mechanics and Ap-plied Mathematics. Active in research in these areas.

� Consultant to Tennessee Gas Transmission Company. Developed PIPSYS, acomputer program to analyze pipe stresses.

� Consultant to Shell Oil Company. Developed onboard computer program toassist in mating piles and jacket sections of the Cognac jacket.

� Consultant to Donhaiser, McClure & Associates. Assisted in the design of asemi-submersible and two mooring systems.

� Consultant to Brown & Root. Performed stress analysis of otation tanks duringinstallation of B.P. Forties Field jackets.

Additional Professional Activities

Registered Professional Engineer in the State of Texas

Publications

32

Page 35: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

"On Approximate Constitutive Equations for Nonlinear Viscoelasticity", with H. H. Calvit, Acta Mechanica7, 1969, pp. 768-778.

"The Bending of a Beam Made of a Fiber Reinforced Viscoelastic Material", with J. R. Leininger, AIAAJournal, Vol. 7, No. 10, 1969, pp. 2016-2017.

"A Constitutive Equation for Fiber Reinforced Viscoelastic Materials", with H. H. Calvit, Acta Mechanica9, 1970, pp. 49-53.

"Speed of Propagation of Acceleration Waves in a Binary Non-Reacting Mixture", with J. R. Leininger, TheJournal of the Acoustical Society of America, Vol. 49, No. 3, Part 2, March 1971, pp. 749-752.

"A note on Aging Materials", ZAMM, 51, 1971

"Some Results on a Fiber Reinforced Viscoelastic Beam", AIAA Journal, Vol. 9, No. 11, November 1971,pp. 2300-2301.

"On the Stability of a Viscoelastic Bar", with Carl Faust, ZAMM 52, 1972, pp. 179-181.

"On the Propagation of Acceleration Waves in a Binary, Non-Reacting Mixture", with J. R. Leininger,JASA, 53, No. 2, 1973.

"A Uniqueness Theorem for Rigid Heat Conductors with Memory", with L. T. Wheeler, Quarterly of Ap-plied Mathematics, Vol. XXXI, No. 3, 1973.

"On Wave Propagation and Uniqueness in One-Dimensional Elastic Bodies", with L. T. Wheeler, Journalof Elasticity, Vol. 4, No. 1, 1974.

"A Theorem on the Uniqueness of Solutions in Nonlinear Heat Condition", with R. P. Herrmann, Quarterlyof Applied Mathematics, October 1974.

"On the Determinacy of Motions for the Displacement Problem in the Dynamics of Elastic Bodies withViscosity", with L. T. Wheeler, ZAMM, Vol. 24, 1973.

"Wave Propagation and Uniqueness", with L. T. Wheeler, Proceedings of the 10th Anniversary Meeting ofthe Society of Engineering Science.

33

Page 36: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

"Wave Propagation and Uniqueness in One-Dimensional Simple Materials", with L. T. Wheeler, Journal ofMathematical Analysis and Applications, Vol. 48, No. 1, 1974.

"Uniqueness Theorems for Finite Elastodynamics", with L. T. Wheeler, Journal of Elasticity, Vol. 4, No. 1,1974.

"A Uniqueness Theorem for the General Theory of Heat Conduction with Finite Wave Speeds", with R. P.Herrmann, International Journal of Engineering Science, Vol. 12, 1974.

"On Uniqueness and Wave Propagation in Nonlinear Heat Conductor with Memory", with R. P. Herrmann,Journal of Mathematical Analysis and Applications, Vol. 50, No. 3, 1975.

"A Uniqueness Theorem for Nonlinear Heat Conduction in Chemically Reacting Media", with J. W. Nunziatoand P. Chen, Journal of Mathematical Analysis and Applications, Vol. 53, No. 1, January, 1976, pp. 137-144.

"Theorems on Wave Propagation and Uniqueness for a Class of Nonlinear Dissipative Materials", with J.Nunziato and L. Wheeler, Journal of Mathematical Analysis and Applications, Vol. 51, No. 2, August, 1975,pp. 449-460.

"Wave Propagations and Uniqueness Theorems for Elastic Materials with Internal State Variables", with J.Nunziato, International Journal of Engineering Science, Vol. 14, No. 2, January, 1976, pp. 31-38.

"On Thermal Instability in Rigid Heat Conductors with Non-linear Heat Generation", with P. J. Chen andJ. Nunziato, to appear in Quarterly of Applied Mathematics.

"On the Domain of Attraction for Steady States in Heat Conduction", with C. O. Horgan, to appear inInternational Journal of Engineering Science.

"On Stability in the Linear Theory of Heat Conducting, Chemically Reacting Media", with J. Nunziato,Proceedings of the 12th Meeting of the Society of Engineering Science, October, 1975.

"Ship Motions in Shallow Water", with A. C. McClure, Proceedings of the O�shore Technology Conference,May, 1976.

"On the Motion of Coupled Bodies in a Seaway", with A. C. McClure, Proceedings of Inter-ocean, June 1976.

"Stability of Uniform Temperature Fields in Linear Heat Conductors with Memory", with J. Nunziato, In-ternational Journal of Engineering Science, 1977.

34

Page 37: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

"Uniqueness and Stability in Adaptive Elasticity Theory", with S. C. Cowin, Journal of Elasticity.

"On the Directional Stability of Ships", International Shipbuilding Journal.

"Frequency Domain Analysis of Dynamic Response of Floating Bridges to Waves", with D. J. Engel, OceanStructural Dynamics Symposium '82 Proceedings, Oregon State University.

Professional Memberships

Dr. Nachlinger is a member of numerous professional organizations and honorary societies.

April 5, 2002

35

Page 38: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Allan R. Schultz

Summary of Qualifications

Has a wide variety of experience in bid solicitation, contract writing, conceptual and detail design, onshore/o�shore construction, transportation and installation of o�shore �xed and non-�xed structures includingFPSOs, TLPs, compliant and conventional platforms, jack-up rigs, pipelines, subsea equipment, SBMs, etc.as well as onshore project experience involving the component transport, site installation and constructionfor crude and gas processing and re�nery plants detailed as follows:

As Naval Architect, has been responsible for the design and analysis of steel structures installed, towed andlowered in deep waters in the Gulf of Mexico and elsewhere. Has served as Lead Naval Architect and/orProject Manager during the fabrication and installation of many platforms and associated facilities in waterdepths up to 260m and participated in analyses of compliant structures in water depths up to 488m and TLPstructures up to 45000 deadweight tonnes. Has carried out structural and marine analyses for many types ofvessels such as bulk carriers, tankers, FPSOs, cargo barges, crane barges, etc. Has carried out and developedtechniques for collision and allision reconstruction analysis having acted as a collision reconstruction expertfor various proprietor, underwriting and legal concerns on numerous cases.

As Pipeline/Subsea Engineer, has carried out sophisticated computer modeling techniques to analyze allphases of pipeline installation, pipe-lay installation and pipeline pro�le analysis. This also included pipeto J-tube initiation analysis, abandonment and recovery procedures, pipeline route curve lay proceduresand pipeline davit lifts. Has also been actively involved in the approval of pipeline installation procedures,guidelines and criteria. Has carried out conceptual design for bid preparation and solicitation leading intoeventual contract management duties as well as detail subsea engineering related to subsea installations (i.e.manifolds, pipelines, tie-ins, umbilicals, etc.).

As Marine Surveyor and/or Advisor, has carried out marine warranty approval, technical inspection andinvestigation work for various marine industry proprietor, underwriting and legal concerns. This work hasinvolved design veri�cation and associated �eld inspection for marine warranty approval, damage investiga-tions and assessments of vessel (i.e. general cargo, tanker, barge, etc.) and �xed structures (i.e. platforms,docks, cranes, etc.), marine salvage feasibility assessments, salvage and wreck removal operations and cargoseafastening or damage assessment of improperly seafastened cargo. Also, has served as the Project Manag-er for numerous marine warranty projects and acted on numerous o�shore / onshore projects as a MarineAdvisor to various clients on various a marine related operations (i.e. load-outs, load-ins, towages, heavylifts, etc.).

Education

36

Page 39: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

1984 B.Sc. Degree in Naval Architecture and Marine EngineeringUniversity of New Orleans, New Orleans, Louisiana, USA.

Work Experience

1975 - 1980 Red Eagle, Inc. - Owners USA representative for local support and charteringof tow and supply boats in GOM.

1984 - 1990 Hudson Engineering Corporation (a McDermott Company) - Junior to Se-nior Naval Architect involved in fabrication/installation structural and marinedesign and/or analysis for o�shore �xed and non-�xed platforms, submarinepipelines, ship and barge shaped structures.

1990 - 2001 London O�shore Consultants, Inc. - Senior Naval Architect and Marine Survey-or doing o�shore project management, design, marine warranty survey review,casualty investigation, etc.

Major Project Work

� Exxon: Installation analyses for the Heritage and Harmony jackets for the Santa Barbara Channel o�shoreCalifornia in 1200 foot and 1075 foot water depth

� Shell Oil Company: Installation analyses for the "Bullwinkle" jacket for the Gulf of Mexico in 1350 footwater depth

� McDermott Articulated Barge: Preliminary design/development work to analyze the characteristics of anarticulated barge. Supervised the required model testing to prove the concept at O�shore TechnologyCorporation in Escondido, California. Supervisor for McDermott during model testing sponsored along withExxon Production Research, at Marin in Wageningen, Netherlands, to pre-qualify the articulated barge forlaunching of Exxon's 2500' CPT Base Section Jacket

� Shell O�shore Inc., U.S.A.: Loadout analysis of Boxer "A" Platform Green Canyon Block 19 in the Gulf ofMexico in 750 foot water depth

� Sohio Petroleum Company: Analysis and �eld support for Snapper Platform East Breaks Block 1655 in theGulf of Mexico in 863 foot water depth. Also served as Lead Naval Architect during the fabrication andinstallation of the Snipper Platform Ewing Bank Block 826A in the Gulf of Mexico in 481 foot water depth

� Mobil Oil Exploration & Production Southeast, Inc.: Installation analyses for 10.75 inch O.D. pipeline toGreen Canyon Block 18 in the Gulf of Mexico

37

Page 40: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Dugas Exploration and Production: Gas pipeline project to determine whether VLCC anchors are likely todrag and in cases where dragging occurs, to what depth the tanker anchors could penetrate thus causingpipeline damage in the Persian Gulf anchorage o� the coast of Dubai

� Texaco U.S.A.: Analysis and �eld support for Kilauea jacket on Green Canyon Block 6A in 616' water depth

� AEDC U.S.A. Inc.: Lead Naval Architect for Mississippi Canyon Block 486 Platform in 596' water depth inGulf of Mexico

� Petronas Gas SDN. BHD.: Conceptual/basic engineering for 8" export pipeline and CALM buoy ITB withsubsequent bid evaluations. Also, design/ installation engineering of 8" O.D. pipeline and CALM buoy forexport of LPG o�shore Miri, East Malaysia in the South China Sea

� Heidrun TLP - Conoco Norway: Design and consultancy work for A.R. Reinertsen regarding the subsea towand securing of subsea docking pipeline modules to the subsea template

� Frigg Area Development - Elf Aquitaine Norge: Company representative for call for tender compilation/issuanceand subsequent tender evaluation on Lille Frigg 10" high pressure / temperature production pipeline andFrostpipe 16" export pipeline along with engineering support on Lille Frigg A, B & C manifold templatesand Froy �eld jacket/pipelines

� Snorre - Saga Petroleum: Company representative assisting in approval of pipeline installation procedures,subsea tie-in and pigging equipment designs, etc. Review/approval of documents concerning marine op-erations and hull fabrication and attended for load-outs, load-ins and joining of hull nodes and pontoons.Carried out reviews of deck mating operations, barge veri�cations and concrete foundation template instal-lation veri�cation

� Cantarell Re-Development and Modernization Project - PEMEX: Deputy and Onsite Project Manager forMarine Warranty Survey tasks on EPC25, EPC22 and EPC1 as well as Marine Advisor to PEMEX andtheir numerous project contractors involved in the fabrication, load-out, transportation and installation ofover 25+ platform structures

Other MAJOR PROJECT WORK includes but not limited to:

� ALNG LNG Plant (Phase 1 Construction) - AMOCO/BP/PETROTRIN (Point Fortin,Trinidad)

� HOD - AMOCO Norway (North Sea)

� OSEBERG 2 - NORSK HYDRO (North Sea)

� MISSISSIPPI CANYON BLK 109 - BP AMERICA (Gulf of Mexico)

� CRYSTAL - FREEPORT McMORAN (Gulf of Mexico)

� MAIN PASS SULPHUR MINE - FREEPORT McMORAN (Gulf of Mexico)

� EDOP, UBIT, ASASA, UNAM, OSO WELLHEAD, USARI & JADE Projects - MOBIL/NNPC (O�shoreNigeria)

38

Page 41: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� GARDEN BANKS BLK 191 - CHEVRON (Gulf of Mexico)

� GUPCO OCTOBER GAS & ZAFCO WARDA (Gulf of Suez, Egypt)

� MISKAR - BRITISH GAS TUNISIA (O�shore Tunisia)

� RAS LAFFAN - Ras La�an LNG Ltd. (Persian Gulf)

� ESCRAVOS - CHEVRON (O�shore Nigeria)

� QATARGAS UPSTREAM DEV.(3rd Train) - Qatar Liq. Gas Co. Ltd. (Persian Gulf)

� SEAHARVESTER GRAND ISLE 115 - British-Borneo Exploration, Inc. (Gulf of Mexico)

� ZAFIRO - Mobil Equatorial Guinea Ltd. (Equatorial Guinea, East Africa)

Damage and Casualty Investigations and/or Legal Expert

Also carried out damage and casualty investigations and/or acted as a legal expert on behalf of insuranceand legal interests involving �xed objects (SPM buoys, MBM sea berths, pipelines, docks, bridges, etc.)non-�xed objects (bulk carriers, tankers, jackup rigs,tugs, etc.) and cargo including but not limited to thefollowing major claims:

� "DAEDALUS", MBM PLEM damage with oil spill, Tumaco, Colombia

� "PRESIDENTE A.U. ILLIA", SPM damage with oil spill, Bahia Blanca, Argentina

� "SPORADES", SPM damage & investigation, Comodoro Rivadavia, Argentina

� "NEVADA", SPM hose damage & investigation with hose testing, Tuxpan, Mexico

� "GUADALUPE VICTORIA II", SPM damage & investigation, Rosarito, Mexico

� "OCEAN SUMMIT", pipeline damage by jackup rig, Gulf of Mexico

� "OCEAN KING", pipeline damage by jackup rig, Gulf of Mexico

� "COLUMBUS", Texaco Re�nery Dock allision, Las Minas Bay, Panama

� "ALLISON", dock allision, Aguadulce, Panama

� "MAUVILLA", tug/tow allision with Bayou Canot Bridge, Mobile, AL, USA

� "TOTONACA", jackup allision with platform, Gulf of Campeche, Mexico

� "BRIJ", dock allision, Galveston, TX, USA

39

Page 42: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� "BIG ORANGE I", workboat allision with platform, O�shore Bombay, India

� "JULIE L", dock allision, Panama City, Panama

� "SCAMPER", dock allision, Puerto Armuelles, Panama

� "DELTA QUEEN", allision with oating marina, Greenville, MS, USA

� "KETA LAGOON", dock allision, Houston, TX, USA

� "MSC LAURENCE", dock allision & marine investigation, Rio de Janeiro, Brazil

� "FANOULA", dock allision & marine investigation, Imbituba & Santos, Brazil

� "DB28" c/w "UCKA", collision reconstruction analysis / W. P. repair review and attendance through witnessdepositions to advise attorneys, O�shore LA, USA

� * 1 "NOORDAM" c/w "MOUNT YMITOS", collision reconstruction analysis, New Orleans, LA, USA

� "BLUE CLOUD" c/w "OMINA", collision reconstruction analysis, Caribbean Sea

"MAR CORAL", stability, strength & steel costing analyses to determine salvage feasibility, speed & angleof blow, Maracaibo, Venezuela

� * 2 "MARGARET SUE" c/w "COASTAL NEW YORK", collision repair investigation, Beaumont, TX, USA

� "PROTANK MERSEY", collision reconstruction analysis, Cameron, LA, USA

� "BONITA" c/w "ASEA ISLAND", collision reconstruction analysis, Gulf of Mexico

� "AMERICAN EXPLORER", collision investigation, Beaumont, TX, USA

� "FLORA" c/w "FORMOSA", collision reconstruction analysis, Gulf of Mexico

� "CHIOS DREAM" c/w "AURORA EMERALD", collision reconstruction analysis / W.P. Survey, PanamaCanal, Panama

� "WESTERN TEAM" c/w "TOGO BEAUTY", collision reconstruction analysis / W.P. Survey, Gatun Lake,Panama

� "JIN YI" c/w "JORITA", collision reconstruction analysis / W.P. Survey, Paci�c Ocean o�shore of Guatemala

� "CHALKIDON" c/w "CLIPPER CHEYENNE", collision reconstruction analysis / W.P. Survey, South ofMona Passage in Caribbean Sea

� "HARBEL TAPPER" c/w "OYLMPIC BREEZE", collision reconstruction analysis / W.P. Survey, Gulf ofMexico

� "A.H. PARAGGI" c/w "PETROBRAS XI", attendance to investigate reparations & provide advise to P&IClub during claim settlement, Macae, Brazil

40

Page 43: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� "IVAN SUSANIN" c/w "ANANGEL ENDEAVOR", collision reconstruction analysis, Mississippi River SWPass, Gulf of Mexico

� "ALMAS", crane damage, New Orleans, LA, USA

� "PROTEUS", allision with dolphin, Punto Fijo, Venezuela

� "TAKO INVADER", dock allision, Houston, TX, USA

� "SUGAR ISLAND", dock allision, Colon, Republic of Panama

� "NORSUL SOBRAL", allision with dock, barges & resulting oil spill, Parimaribo, Surinam

� "CSL ATLAS", dock landslide with surge damage to barges/loading arm & dock, Corpus Christi, TX, USA

� "KALLIO", crane boom failure with dock damage, Houston, TX, USA

� "TALARA", surge damage to loading arms/oil spill, Galena Park, TX, USA

� "OMNIPORT", dock, crane & loader allision damage, Greensport, TX, USA

� "WADAI", allision with gantry crane, Guadelupe, Lesser Antilles

� "BRAGE VIBEKE", transformer oil contamination, Houston, TX, USA

� "JOSEPH LYKES", stevedore casualty/cargo hold ladder/expert witness, Beaumont, TX, USA

� "GL142", dredger mast contact damage with power lines, Freeport, TX, USA

� "DAKILA UNO", structural design of supports for collapsed pipe stow, Colon, Panama

� "DIANA", structural design of cargo supports, Houston, TX, USA

� "OCEAN VOYAGER", surge with dock and loading arm damage, Houston, TX, USA

� "CORPUS CHRISTI" & "GALLANT II", hatch cover testing/repair, Port Arthur/Houston, TX & NewOrleans, LA, USA

� "MTI 307", barge salvage, feasibility study, Davenport, IA, USA

� "TMI 11", cargo salvage from sunken barge, P&I site rep., O�shore Daytona Beach, FL, USA

� "TEXAS THUNDER", expert witness on yacht design/P.I. claim, Galveston, TX, USA

� "SAN MATEO", investigation of Tuna Boat Mast failure on manufacturer's warranty claim, review of mastdesign and sea trial testing of repaired mast, Iquique, Chile and Manta, Ecuador

� "IVER EXPLORER", 12" pipeline damage at MBM sea berth in San Jose, Guatemala

41

Page 44: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

* This signi�es those cases that went to a U.S. Federal District Court thus involving testimony and/or courtacceptance as an expert.

LANGUAGES

English, Spanish and Portuguese

42

Page 45: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

John Windus

Summary Of Qualifications

Twenty-eight years of o�shore construction and civil engineering experience, including twenty years of ex-perience in marine projects and eight years of work in onshore civil engineering. Marine experience includesanalysis, design, fabrication and installation of TLP's, �xed platforms, spars, FPSO's, semi-submersibles,construction vessels and the development of non-conventional solutions for o�shore oil and gas productioninstallations. Skills include hydrostatic and dynamic analysis, stability, kinematics, mooring, structuralanalysis and design and management, both project and corporate.

Education

1980 B.S. Ocean Engineering (with Honors)Florida Atlantic UniversityBoca Raton, Florida

1978 B.S. Civil Technology Empire State College (SUNY) Rochester, New York

1970 Drafting Certi�cate (2 yr.) in Architectural, Mechanical, Civil andElectrical DraftingAlfred State College (SUNY), Alfred, New York

Professional Experience

1999 - 2000 Vice President, Ultramarine Systems, Inc. Houston, Texas

� Dynamic analysis of the oating Hood Canal Bridge in Seattle, Washington.The analysis included seakeeping, mooring and dynamic structural analysis ofa multi-body system representing a 7,869-foot long oating bridge.

� Installation analysis for a 200 foot water depth tripod.

� Project Manager for unique highway bridge installation project in Chiapas,Mexico. Project entails using o�shore construction and installation techniquesto solve cost constraint problems in a remote location.

43

Page 46: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Development of a purpose built lift system to install pile cap beams for a drydock Land Level Transfer Facility for Bath IronWorks Shipyard. The lift systemis required to operate in shallow water with a signi�cant tide range.

1996 - 1999 Vice President and General Manager, Barnett & Casbarian, Inc. Houston,Texas

� Responsible for operation of the Houston o�ce. Direction and managementof design engineering, naval architecture, quality assurance activities includ-ing US Mineral Management Service certi�ed veri�cation and warranty marinesurveying along with o�ce administration.

� Project Manager, Marine Surveyor and Consultant for Exxon's DIANA DeepDraft Caisson Vessel.

� Concept design and detailed development of a unique system for removing andreplacing the spud cans on Global Marine, Inc.'s Labrador Jack-Up Drilling Rigin a remote location outside a vessel repair facility.

� Project Manager, Marine Surveyor and Certi�ed Veri�cation Agent for Chevron'sGENESIS spar platform.

� Project Manager for Global Industries' Hercules Pipelay Barge Conversion. De-tailed engineering for Atlantic Marine, Inc. and Alabama Shipyard, Inc. for thevessel lengthening and Forecastle house construction. Work included preparingshipyard drawings for steel and piping fabrication.

� Project Manager, Marine Surveyor, Consultant and Certi�ed Veri�cation Agentfor Shell's URSA TLP platform.

� Project Manager, Marine Surveyor, Consultant and Certi�ed Veri�cation Agentfor Elf's VIRGO platform.

� Marine Surveyor, Consultant and Certi�ed Veri�cation Agent for Amerada Hes-s's Baldpate Compliant Tower platform.

� Project Manager, Marine Surveyor, Consultant and Certi�ed Veri�cation Agentfor Shell's SPIRIT platform.

� Marine Surveyor, Consultant and CVA for Shell's RAM/POWELL TLP plat-form.

� Marine Surveyor, Consultant and Certi�ed Veri�cation Agent for Shell's MARSTLP platform.

1984 - 1996 Senior Section Leader, Naval Architecture, Hudson Engineering, Inc. (McDer-mott) Houston, Texas

� Managed and supervised e�orts of marine design teams. Responsible for marineengineering software and design methodologies used by department. Managedand administered a UNIX based computer network.

� Project Engineer for design of a 20-well drilling and production Spar for ChevronU.S.A., GOM, Green Canyon 205 in 2590 ft. of water depth. Responsible for

44

Page 47: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

marine analysis, mooring analysis, project supervision, forecasting and costestimating.

� Project Manager for preliminary design of a Spar for Amerada Hess's Baldpateproject, GOM Garden Banks 260 in 1655 ft. of water depth. Responsible formarine analysis, risers analysis, hull structure design and cost estimate.

� Conceptual design of a Truss-Spar concept for deepwater development.

� Conceptual design of installation mooring system using active tugboats and theDB 50's mooring and dynamic positioning capabilities for Shell's Ram/PowellTLP.

� Seakeeping and stability analysis of semi-submersible o�shore heavy lift vesselconcept. Design, construction and testing of scaled model of the concept

� Installation engineering, Exxon Alabaster Platform, Mississippi Canyon 397A,486 ft water depth.

� Conceptual design of installation mooring system for Shell's Mars TLP.

� Towing and maneuvering studies for Shell's AUGER TLP. Analysis and designfor the transportation of the hull, deck, and mated superstructure in the Gulfof Mexico and into and out of the port of Freeport, Texas. Project site supervi-sion and consultation for both the hull to deck mating and the tension tendoninstallation.

� Design and fabrication engineering of BP Exploration's Pompano, Viosca Knoll989 platform in 1,285 ft water depth, including launch analysis of articulatedlaunch barge. Supervision of loadout operations of jacket structure onto theHeerema H851 Launch Barge.

� Design, fabrication and installation engineering of BP Exploration's MississippiCanyon 109 platform in 1,020 ft water depth onsite supervision of launch andupending.

� Installation engineering, Texaco Tick Platform, Garden Banks 189A, 720 ftwater depth.

� Naval architect for analysis and design of a 12-leg spread mooring for Amo-co Yombo tanker-based FPSO unit. Performed frequency domain quasi-staticanalysis and time-domain mooring analysis, including technical and �nancialmanagement of model testing. Also supervised structural interfaces with pro-cess facilities.

� Seakeeping and 2-body mooring analysis of Amoco's semi-submersible/tankerbarge extended well-test system in 1,000 ft water depth, including supervisingsystem model testing.

� Installation of subsea drilling template of Conoco's TLWP Joliet Project in1,760 ft water depth, including o�shore supervision of marine installation. Thisincluded launch, otation of the template, and keelhauling under the John ShawSSDV.

� Design and installation engineering, SOHIO's Snapper Platform, 860 ft waterdepth, East Breaks 165, including operational planning and o�shore supervisionof marine installation.

45

Page 48: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Consulting naval architect for seakeeping and seafastening analysis for transat-lantic transportation of Chevron's Takula ALP Deck. Work included modeltesting and an inclining experiment.

� Lead engineer and naval architect for transportation analysis of Exxon's 3,100ft water depth compliant tower and articulated launch barge.

� Naval architect for otation and upending study of Marathon's self- oatingSteelhead Platform, Cook Inlet, Alaska.

� Analyst for parametric study of stability for transportation of Shell's Bullwinklejacket on articulated launch barge

� Naval architect for installation engineering required for production and drillingplatforms for the ARCO's Coal Oil Point Project.

1981 - 1984 Project Engineer, Raymond International, Inc. Houston, Texas

Engineering support for o�shore platform construction. Work also includeddesign, analysis, mooring, and construction of vessels involved in o�shore ex-ploration and construction.

1980 - 1981 Associate Engineer, Fluor Ocean Services, Inc. Houston, Texas

Analyzed and designed o�shore and onshore projects. Speci�c experience in-cludes detailed engineering checks of a platform deck optimization study, projectsurvey grid layout and general earthwork for a crude oil terminal, wave refrac-tion and shoaling study for a marine terminal, detailed design and computeranalysis of berthing and mooring structures of an LNG marine terminal, anddock utilization study for an existing crude oil terminal.

1975 - 1978 Senior Engineering Technician (Department of Environmental Conservation),State of New York Olean, New York

Inspected onsite drilling, production, and well-plugging operations in naturalgas and oil �elds to ensure compliance with environmental laws and regulations.

1970 - 1975 Engineering Technician (Department of Transportation), State of New YorkRochester, New York

Survey, design, and construction engineering for rural and urban highways with-in New York State.

Computer Software Capabilities

46

Page 49: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

MOSES, MAESTRO, FASTSHIP, Rhinoceros, AutoCAD, MathCAD, Microsoft O�ce 2000 and MicrosoftProject.

additional professional activities

American Petroleum Institutes Hull Structures Resource Group, American Petroleum Institutes FPSO TaskGroup

Patents And Publications

"An Economical Pile-Handling Technique Using Dynamic Upend", with R. Converse, S. Bhattacharjee, andJ. Chen, O�shore Technology Conference, 1990, paper OTC 6379. "Jacket Installation Design Criteria", withR. Gair, T. Mills and S. Bhattacharjee, The Second O�shore Symposium, The Society of Naval Architectsand Marine Engineers, 1991, pp. XVII-1 - XVII-9.

Professional Memberships

Society of Naval Architects and Marine Engineers Marine Technology Society

Awards Received

Florida Atlantic University, College of Engineering, 1980 Award for Outstanding Academic Achievement.

47

Page 50: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Associate Consultants

� Claudia A. Claro

� Nelson S. Galgoul

� Huang H. Tao

48

Page 51: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Claudia Albergaria Claro

Professional Experience

June 1996 to Present Director, SUPORTE Consultoria e Projetos Ltda.

May 1995 - May 1996 Senior Engineer, TECNITAS DO BRASIL

May 1984 - May 1995 Engineer in Training to Senior Engineer, PLANAVE S.A.

Education

1985 Civil Engineer, Universidade Federal do Rio de Janeiro

2000 M.Sc., Universidade Federal Fluminense

Additional Courses

� Legal Engineering and Inspections, 1996 - Universidade Federal Fluminense

� Computational Systems Analysis, 1994 - PUC - Pontifcie Universidade Catlica

� Ocean Engineering 1992 - COPPE - Universidade Federal do Rio de Janeiro

� O�shore Structural Engineering, 1987 - PETROBRAS

Main Activities in the Offshore Industry

49

Page 52: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� PETROBRAS project for installation of several gas lines and a seabed manifold in the - Roncador Field(Campos Basin);

� Loadout and design of the PETROBRAS �xed platform PGA-7;

� Conversion design and certi�cation of the PETROBRAS-X semisubmersible into a production unit - forPETROBRAS/ABS;

� Conversion design of the PETROBRAS -XIX semisubmersible, into a production unit, according to BVRules;

� Sea tow analyses of the nuclear plant components of Angra II, according to DnV Rules;

� Certi�cation of the loadout and transportation of the West Kokongo jacket - for Noble Denton;

� As built analysis of the PETROBRAS-VIII semisubmersible using SESAM, according to DnV Rules;

� As built analysis of over 20 �xed PETROBRAS platforms (water depths varying between 20 and 100m) inorder to establish inspection plans;

� Conversion design of the PETROBRAS - XX semisubmersible into a production unit, according to DnVRules;

� Detailed engineering design of the following two PETROBRAS �xed platforms: PPG-1B and PCM-9;

� Detailed engineering design of the following platforms for the Mexican Campeche Basin: ZAAP-A, ZAAP-B,ZAAP-C, KAX-TA, KU-C, KU-A, KU-S;

� Installation analyses of an 8-legged platform, 3 tripods and 3 bridges in the Akal GC �eld in the CampecheBasin, Mexico;

� Design of several subsea manifolds including the transportation and installation analyses in water depthsvarying between 600 and 1800m (PETROBRAS, Kvaerner and CBV/FMC);

� Basic design of a 6-legged platform (2 alternatives) for the South Pars �eld in the Persian Gulf (NIOC);

� Basic design of an alternative solution of a 150m water depth, 8 legged platform for a BP Trinidad & Tobagoproject.

� Basic design of an alternative solution of a 190m water depth, 8 legged platform for Libya using 4 cornersuction piles.

Personal Data

Age: 38 Citizenship: Brazilian

50

Page 53: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

LANGUAGES

Portuguese, English, Spanish

51

Page 54: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Nelson Szilard Galgoul

Education

1972 Civil Engineer, Federal University of Rio de Janeiro

1975 M.Sc., Federal University of Rio de Janeiro

1978 Dr.-Ing., Technical University of Munich

1985 Post Doctoral, Technical University of Munich

Professional Experience

since Jun. 86 SUPORTE as President

Jun. 79 - Dec. 88 NORONHA as Project Manager

Oct. 78 - Jun. 79 PROMON as Senior Engineer

Jun. 72 - May 76 NORONHA as Engineer

52

Page 55: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Main Activities in the Offshore Industry - Shallow waters (WD < 200m)

Structural design (static, hydrodynamic and equipment vibration analyses), foundation design and installa-tion analyses of the following �xed platforms:

� As project manager or responsible for the entire structural design: Carapeba-2 (87m water depth), Atum-3 (45m), Agulha-3 (17m), Camorim-7 (19m), PAS-11 (70m), 3rd Family Concept (150m), PGA-7 (37m),PGA-8 (37m) all in Brazil, IMP-F1 (56m) in Angola and ZAAP-A, ZAAP-B (85m), EKUA2, KU-A, KU-C,KU-S, KAX-TA and Akal GC in Mexico.

� As subcontractor conducting only parts of the following �xed platform jobs: In Brazil: Pargo-1A (101m - con-sultant), Pargo-1B (101m - Installation analyses - launch and upending), PVM-1 (80m - launch and upendinganalyses), PVM-2 (87m - launch and upending analyses), PVM-3 (81m - launch and upending analyses),PCP-1 (87m - launch and upending analyses), PCM-10 and PCM-11 (transportation analysis);PDO1 (20m -compressor vibration analyses); in Angola: PAM-F1 (90m - transportation and docking analyses), COBO-1(90m - transportation analysis); in Iran: F9A (58m), Aboozar complex (38m) and Nooroz complex (32m);in Ecuador: Basic design of 2 platforms for the Amistad �eld in the Gulf of Guaiaquil (40m).� Preparation ofdata-bases, considering a reassessment of foundation resistance, structural reanalysis, equipment vibrationproblems and strengthening of over 50 PETROBRAS platforms;

� Structural and installation design of several types of o�shore structures such as are booms (over 12 varyingbetween 45 and 90m long, subject to wind vibrations induced turbulance and vortex shedding and inertial vi-brations induced by vessel motions), manifolds (up to 500tons in 600m water depth, including all installationanalyses), modules (up to 1000tons), well head templates and other smaller o�shore structures;

� Development of software for o�shore applications (nonlinear soil-structure interaction including group andP- e�ects, spectral fatigue and dynamic analyses, pile capacity, wave equation pile driveability, etc.);

� Pile monitoring and foundation bearing capacity evaluation of 12 di�erent platforms installed in the Camposand Santos Basins;

� Design of a concrete platform to be installed in shallow waters (12m);

� General foundation evaluation of the Campos Basin Platforms based on soil investigations and pile monitoringprograms;

Main Activities in the Offshore Industry - Deep waters (WD > 200m)

� Conversion of semisubmersible drilling platforms into oating production systems - structural deck designwork on two eight legged semisubmersibles;

� Design of mooring systems for barges and tankers in water depths up to 1650m; /par� Pipelay design includinginplace and installation analyses in water depths up to 1000m. /par� Conceptual viability studies for deepwater production installations including the �eld layout, the Production facilities and the implementationcosts;

53

Page 56: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Ship vibration problems caused by truster cavitation - design and implementation of structural dampers;

� FPSO crane deck vibration problems - de�nition of cause and solution - P31 platform.

� Flare evaluation analyses on oating platforms, in order to detect the causes of cracks occurred during anocean tow from Asia to Brazil.

Main Activities in Onshore Structural Engineering

� Design of several RC and steel bridges (Rio-Niteri Bridge: 14km, Aparecida do Taboado Bridge 2.6km andseveral others);

� Central span of the a bridge over the Tocantins River, a 150m long steel arch;

� Design of several heavy foundations, considering dynamic e�ects due to machinary (compressors, turbines,etc.);

� Design of several RC towers up to 200m high considering wind vibrations due to turbulence and vortexshedding;

� Overall analysis and strenghthening of a 4500m long cable car transporter with seven intermidiate steel trusstowers for an MBR iron mine;

� Foundation design for the Angra 2 Nuclear Power Plant with over 200 piles;

� Project manager on several road projects, including topographical surveys, de�nition of alignment, compu-tation of volumes to be moved, etc.;

� Pile monitoring at many construction sites using both concrete and steel piles.

Other Activities

� Full Professor at the Fluminense Federal University (Lectures on o�shore struc-tures and dynamics of structures & Research);

� Associate Professor at Federal University of Rio de Janeiro (Lectures on non-linear problems in RC design and structural analysis - dynamics);

�Over 50 published papers on structural analysis and design of o�shore structures,RC structures and piled foundations.

Personal Data

54

Page 57: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Citizenship: Dual national (American/Brazilian)

LANGUAGES

Portuguese, German, Spanish, English, French

55

Page 58: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Huang Hai Tao

Summary of Qualifications

After graduating from SJTU, Mr. Huang Hai Tao was assigned to Shanghai Merchant Ship Design & Re-search Institute, a famous marine consultant company in China. He has participated in the design of morethan twenty ships, went through many projects from proposal design, bid document to �nal delivery of theship, and served as project engineer for several ships. He has carried out various naval architectural calcu-lations (such as hydrostatic calculation, stability calculation, resistance & propulsion calculation, structuralstrength calculation) during his stint with SJTU. He has also been involved in launch, inclination test, seatrial, mooring tests.

In 1995, Mr. Huang Hai Tao joined Keppel FELS, where he was engaged in structural design & analysisfor o�shore platforms and ships. He has performed a wide variety of structural design and analysis usingStruCAD*3D, such as grillage, truss, equipment platform and foundation. He has also carried out the FEManalysis for the SAGA FPSO midship using SESAM for SAGA FPSO. He also has extensive experience incarrying out lifting analysis.

He joined Pelmatic NEG Pte Ltd, in 1997 and was involved in two conversion design of FSO and FPSO. Healso carried out the FEM analysis for the mooring turret of Ruby FPSO.

He joined Brown & Root in June 1999. He was attached to a oatover specialist from Brown & RootUK o�ce to assist in hydrodynamic analysis for BP Vietnam Lan Tay Platform. He has gained valuableexperience from this project. He is capable of performing the design calculations for barge transportationanalysis, mooring analysis, oatover analysis and many other hydrostatic and hydrodynamic analyses. Hehas also performed the structural analysis for Dong Hae jackets and topsides.

He joined Tero Marine (S) Pte Ltd in April 2001. He has been involved in structural analysis work of themooring systems and sea-fastening design work for heavy cargo transportation. He is very well conversantwith FEM analysis using di�erent software and uses STRUCAD-3D and STARDYNE for the work undertaken by Tero Marine. He is also familiar with the relevant rules and codes for structural design work.

Education

Sept. - July 1991 Shanghai Jiao Tong University (SJTU) BS, Naval Architecture Engineering BS,Electronic Engineering

56

Page 59: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

Professional Experience

April 2001 Tero Marine (S) Pte Ltd Senior Structural Engineer / Naval Architect

� He is involved in the structural and naval architectural aspects of the di�erentproject undertaken by Tero Marine. Currently he is involved in transportationand motion response analysis / sea-fastening design for Mammoet (S) Pte Ltdand fatigue life assessment for the hull of Ranger Oil FPSO.

June 1999 - March 2000 Brown and Root Far East Engineers Pte Ltd Structural Engineer / Naval Ar-chitect

� Dong Hae Project.

� In-place and earth quake structural analysis for Dong Hae jacket.

� Structural analysis for topsides.

� BP Vietnam Nam Con Son Gas Project, Lan Tay Platform.

� Topsides barge motion and stability analysis.

� Jacket barge motion and stability analysis.

� Floatover deck mating analysis and post processing of time domain results toobtain force history.

� Weight control for jacket and topside and reprogramming the input module forBrown and Root's weight control software.

� Generation of barge di�raction mesh model in AUTO Cad and conversion toinput format required by the 3D-Di�raction software.

� Generation of a subroutine for getting barge motion responses in time domainusing barge RAO, wave spectrum etc. as input.

� Generation of a subroutine in FORTRAN for Brown and Root's inhouse soft-ware, to predict 3 hour extreme responses using time domain results as input.

Oct. 1997 - Nov. 1998 Pelmatic Neg Pte Ltd Structural Engineer

� STAG FIELD DEVELOPMENT, conversion for a Floating Storage and O�-takeVessel.

� Structural design and calculations.

� Conversion of a Floating Production Storage and O�oading System for RubyField.

� Mooring table FEM analysis.

� Mooring shaft FEM analysis.

� Structural calculation for crane foundation.

57

Page 60: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Flare Tower design for John Zink.

� Structural analysis and optimization for are tower using STAAD-III.

May 1995 - Sept. 1997 Far East Levingston Shipbuilding Limited (FELS) Design Engineer

� Andrew development drilling facility for SANTA FE.

� Structural design and calculations using StruCAD*3D.

� Equipment foundation drawings.

� Lifting analysis for drilling module and substructure.

� Transportation analysis for drilling substructure.

� 7200-tonne integrated production deck.

� Equipment platform and foundation drawings for conversion of semi-sub rigPolyportia.

� Engineering associated with pontoon modi�cation.

� Engineering associated with column sponson modi�cation.

� Floating Production, Storage and O�oading (FPSO) vessel, Saga Varg.

� 3-D analysis of typical midship using SESAM.

� Lifting analyses for most blocks.

� Equipment foundation drawings.

� Mobile o�shore self-elevating drilling unit, GALAXY II.

� Sructural calculations.

� Lifting analyses.

� Structural drawings.

August 1991 - May 1995 Shanghai Merchant Ship Design & Research Institute (SDARI) Engineer

Participated in the design of the following projects.

� 23 trucks strait ferry

� 9.5m work boat

� 500 passengers luxurious strait ferry

� 1000 passengers coastal ship

� 4000 dwt general cargo ship

� 4700 dwt bunkering oil tanker

� 1500 dwt oil tanker

� 12000 dwt river & sea-through cargo ship

� 3200kw towing ship

58

Page 61: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

� Strait ferry for trucks carrying dangerous goods

� 600 dwt bunkering oil tanker

� Tourist ship for Yangtze River

� 1500m3 drag-suction dredger

� 3000 dwt self-unloading coal ship

� 8.5m totally-enclosed �re-proof lifeboat

� 7.5m totally-enclosed lifeboat

� 300t lifting ship

� 1750m3/h cutter-suction dredger

� 1000 dwt general cargo ship

� 5000 dwt general cargo ship

Computer Knowledge

Well conversant in the use of the following engineering software applications.

� STRUCAD-3D (FEM)

� STARDYNE (FEM)

� FEMAP ( FEM)

� SESAM (FEM)

� DNV Nauticus Hull (Ship Design)

� STAAD III (FEM)

� MOSES (Stability, Motion Response)

� AUTO Cad (2D Drafting / 3D Modeling)

Also, familiar with general purpose software like MS Excel and MS Word, and programming in FORTRAN.

Personal Particulars

Date of Birth: 15/06/1969

Nationality: P.R.China

59

Page 62: Statement of Qualification - Ultramarine.com eld. Study of FPSO yoke moored to a jacket with an export tanker side by side and in tandem. Conoco Phillips 2003. ... Statement of Qualification

NRIC No: S6978220E (Singapore PR)

60