Process Engineering Procedure
In
Oil, Gas & Petrochemical Projects
By A.R.Maddah
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
2/263
-
8/10/2019 Process Maddah
3/263
-
8/10/2019 Process Maddah
4/263
TERMINOLOGY
Company or Employer/Owner:
Refers to one of the related and/or affiliated companies of the Iranian ministryof petroleum such as National Iranian Oil Company (NIOC), National Iranian
Gas Company (NIGC), National Petrochemical Company (NPC), etc.
f a r a go st a r a nf a r a go st a r a n
2:\Engineering Company
-
8/10/2019 Process Maddah
5/263
-
8/10/2019 Process Maddah
6/263
-
8/10/2019 Process Maddah
7/263
2:\Engineering Company Accounting
Budget-&-Control
Construction Supervision
Engineering
Estimating
HR-Communication
Information Technology
Management
Procurement
Projects Proposals
Support-Services
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
8/263
2:\Engineering Company
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
9/263
2:\Engineering CompanyEngineering
Process
Mechanic
HSE
Civil-Structure-Architecture
Piping
Electrical
Instrument
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
10/263
3:\Process DepartmentProcess
Process Dept.Manager
Process Senior Engineer
Process Engineer
Process Senior Draftsman
Process Draftsman
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
11/263
3:\Process Department
Process Departments Activities in the following engineering stages:
1. Proposal Preparation (PP)
2. Feasibility Study (FS)
3. Basic Engineering (BE)
4. Detail Engineering (DE)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
12/263
A- Documented ActivitiesA- Documented Activities
B- Non Documented ActivitiesB- Non Documented Activities
f a r a go st a r a nf a r a go st a r a n
Process Departments Activities
3:\Process Department
-
8/10/2019 Process Maddah
13/263
A- Documented Activities (BE & DE)
Design Basis & Criteria
P&ID
BFD,PFD, UFD
Chemical & Utility Summary Table
Control Philosophy
Electrical Load Summary Table
Equipment Process D/S
CV, BDV, PSV Process D/S
ESD Concept / Block Diagram
Flare Load Summary TableBasic Design Package
Preliminary Operating Manual
Equipment List
Trip & Alarm Set Point
Stream Process Condition List
f a r a go st a r a nf a r a go st a r a n
3:\Process Department
-
8/10/2019 Process Maddah
14/263
A- Documented Activities Continued (DE only)
Preparation ofInsulation Schedule
Preparation of
Relief & Drainage Diagram
Preparation ofInterconnecting Diagrams
Preparation of
As Built P&IDs
Technical Bid Evaluation
f a r a go st a r a nf a r a go st a r a n
3:\Process Department
-
8/10/2019 Process Maddah
15/263
B- Non Documented Activities (BE & DE)
Hazop Study
Cooperation in Preparing
of Plot Plan
Project Information Gathering, site visit
Attending Project Meeting with ClientForeign Partner & Licensor
Process Simulation
Line Sizing &
Hydraulic Calculation
Equipment Sizing & Rating
Tie-in List
Information
Completion of LDT
f a r a go st a r a nf a r a go st a r a n
3:\Process Department
-
8/10/2019 Process Maddah
16/263
B- Non Documented Activities Continued (DE only)
Basic Package Endorsement
Cooperation with Inst. Dep.
For DCS / PLC Design
Completion of Equipment
and Instrument D/S
Heat Tracing Calculation
Vendors Bid Evaluation
Checking & Incorporating
Equipment Sizing & RatingModel Review
Cooperation with Piping Dep.
For Tie-in List, Special Items,
f a r a go st a r a nf a r a go st a r a n
3:\Process Department
-
8/10/2019 Process Maddah
17/263
ProjectEngineering
Procurement
Construction
Commissioning
EPCC
3:\Process Department
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
18/263
4:\Standards
1.Whatre standards?
2.Why do we apply standards?
-Improvement in qualification of design and operating condition-Increase of safety
-Decrease of design and selection of material
-Selection of proper way for procurement
-Work Uniformity
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
19/263
4:\Standard\International Standards
ANSI
AmericanNational StandardInstitute
API
American Petroleum Institute ASME
The American Society ofMechanical Engineers
ASTM
The American Society forTesting andMaterial
ISAThe Instrumentation System andAutomation Society
NACE
National Association ofCorrosion Engineers
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
20/263
NFPA
National Fire Protection Association
DIN
Deutshes Institute furNormung BSI
British Standards Institution
ISO
International Organization forStandardization
TEMATubularExchangerManufactures
AWWA
American WaterWorks Association
4:\Standard\International Standards
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
21/263
4:\Standard\International Standards\Iranian Standards
IPSIranian Petroleum Standard
NPCS
National Petrochemical Company Standard
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
22/263
API-RP-520: Sizing, Selection, and Installation Of Pressure-Relieving Devices
in Refinery
API-RP-521: Guide For Pressure-Relieving and Depressuring System
API-STD-2000: Venting Atmospheric and Low-Pressure Storage Tanks
API-RP-14E: Recommend Practice for Design and Installation of Offshore
Production Platform Piping System
API-STD-530: Calculation of Heat-Tube Thickness in Petroleum
API-TP-555: Process Analyzer
4:\Standard\International Standards\API
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
23/263
IPS-E-PR-750: Engineering Standard For Process Design of Compressor
IPS-E-PR-330: Engineering Standard For Process Design of Compressor Air
System
IPS-E-PR-440: Engineering Standard For Process Design of Piping System
IPS-E-PR-308: Engineering Standard For Process Design for Numbering
System
IPS-E-PR-700: Engineering Standard For Process Design for Process Design
of Crude Oil Electrostatic Desalter
4:\Standard\International Standards\IPS
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
24/263
NFPA 11: Foam Extinguishing System
NFPA 12: Standard on Carbon Dioxide Extinguishing System
NFPA 13: Standard for the Installation of Sprinkler System
NFPA 15: Standard for Water Spray Fixed System for Fire Protection
NFPA 72E: Automatic Fire Detector
NFPA 20: Standard for the Installation of Centrifugal Fire Pump
4:\Standard\International Standards\NFPA
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
25/263
4:\Standard\Iranian Standard Codes For Process
Drawing
IPS
IPS-E-PR-170 PFD Symbol Document Numbering
IPS-E-PR-230 P&ID Symbol
NPCS
NPCS-ES-PR-01 PFD/P&ID SYMBOLS
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
26/263
BFD
Simulation
PFD
UFD
Process Description
Heat & Material Balance
P&ID Process Design Criteria
5:\Process Activities
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
27/263
Line List
Stream Process Condition
Utility Consumption
Chemical Consumptions Data Summary
Technical bid Evaluation
Instrument Data Sheet
Equipment Data Sheet Process Data For Piping Special Item
5:\Process Activities
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
28/263
5:\Process Activities\Terminology
Process Units: Units which have direct roles in main process of plant.
Utility Units: Units which dont have direct roles in main process of plant
and are the producers of utility services which are utilized in ProcessUnits.
Operating Condition: It Specifies the Normal Condition (Of Pressure,Temp., Flow, Level,) in Which Equipments, piping and units work.
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
29/263
Definition:
These diagrams (BFD) are schematic documents representing whole process
of the project generally in different units which are introduced in blocks
containing the title of each unit.
Objective:
The objective of these diagrams is to basically show the sequence of the
process in a simple way.
Process
Engineer
Process Lead
Engineer
5:\Process Activities\BFD(BlockFlowDiagram)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
30/263
5:\Process Activities\BFD(BlockFlowDiagram)
Block Flow Diagram ofLPG Plant
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
31/263
BFD
Contract
Technical Proposal
Preliminary Eng. Study
5:\Process Activities\BFD(BlockFlowDiagram)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
32/263
PROCESS ACTIVITIES
BFD
5:\Process Activities\BFD(BlockFlowDiagram)
-
8/10/2019 Process Maddah
33/263
Definition:
Process Flow Diagram (PFD) mainly defines:
a) A schematic representation of the sequence of all relevant operations
occurring during a process and includes information considered
desirable for analysis.
b) The process presenting events which occur to the material(s) to convertthe feedstock(s) to the specified products.
5:\Process Activities\PFD(ProcessFlowDiagram)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
34/263
-
8/10/2019 Process Maddah
35/263
Contents of PFD:
Including:
PFD shall comprise but not limited to the following items:
1. All process lines, utilities and operating conditions including item numberessential for material balance and heat and material balance.
2. Type and utility flow lines which are used continuously within the battery
limits.
3. Equipment diagrams to be arranged according to process flow, designation,
and equipment number.4. Simplified control instrumentation pertaining to control valves and the likes
to be involved in process flows
5:\Process Activities\PFD
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
36/263
5. Major process analyzers
6. Operating conditions around major equipment.
7. Heat duty for all heat transfer equipment.
8. Changing process conditions along individual process flow lines, such asflow rates, operating pressure & temperature, etc.
9. Material balance table.
5:\Process Activities\PFD
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
37/263
Excluding:
The following items are generally not be shown on PFD, except in specialcases:
1. Minor process lines which are not usually used in normal operation andminor equipment, such as block valves, safety/relief valves, etc.
2. Elevation of equipment.
3. All spare equipment.
4. Heat transfer equipment, pumps, compressor, etc., to be operated in parallelshall be shown as one unit.
5. Piping information such as size, orifice plates, strainers, and classificationinto hot or cold insulated of jacket piping.
5:\Process Activities\PFD
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
38/263
6. Pressure condition which must be determined by hydraulic calculation,such as discharge pressure of pump and compressor.
7. Instrumentation not related to automatic control.
8. Drivers of rotating machinery except where they are important for controlline of process condition.
9. Any dimensional information on equipment, such as internal diameter,height, length, and volume. Internals of equipment shall be shown only ifrequired for a clear understanding of the working of the equipment.
5:\Process Activities\PFD
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
39/263
GENERAL DRAFTING INSTRUCTIONS
1. ScalePFDs should not be drafted to scale. However, their size should be
compatible with that of equipment drawings.
2. Flow Direction
As a rule, PFDs should be drawn from the left to the right in accordancewith process flows.
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
40/263
-
8/10/2019 Process Maddah
41/263
c)All electrical, computer and instrument
signals
Thickness = 0.3 m
b) Secondary process lines and utility line
Thickness = 0.5 mm
a) Main process lines
Thickness = 0.8 mm
4. Kind Of Lines
As a rule, Process lines, utility lines, and loop lines for instrument should be
drawn according to IPS-E-PR-230 as follows:
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
42/263
5. Line Crossover
Where two lines cross each other, the horizontal line should be drawn as a
continuous line in all cases. This shall not apply to loop lines for instruments.
c) Where one main line crosses one loop linefor an instrument
b) Where one main line crosses onesecondary process and utility lines
a) Where two main process lines cross
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
43/263
6. Denotation of Lines at Battery Limit Tie-In Points
a) Process lines
From Item No. and/ To Item No. and/
or Dwg. No. or Dwg. No.
b) Utility lines COOLING WATER
Names of fluids should be given in parentheses above the utility lines.
Name of these fluids should be as abbreviation according to IPS-E-PR-308
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
44/263
7. Direction of Flow
The direction of flow should be indicated by arrows. In principle all flow
lines should be denoted by arrows located at the inlet of equipment, and at
the corners of the lines. Where a process line is long, however, the process
flow may be denoted by arrows located at intermediate points.
The number of arrows used to denote one process flow line is not
restricted. However, care should be taken not to clutter the drawing with
excessive arrows.
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
45/263
8. Division of PFD
Where a PFD must be divided into two or more sheets, it should be
divided at portions where division is easiest from the process standpoint
and each divided section should be drawn on a separate sheet.
9. Other Trains
Where there are two or more identical trains of process flows, one
representative train may be given in the PFD and the others omitted.
However, notations pointing out such omissions must be clearly indicated
in the titles of all relevant PFDs to avoid confusion.
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
46/263
10. Title
The title should be given in the title block at the lower right-hand corner of
the PFD.
11. Legend
The legend may be given in separate schematic drawing to which reference
shall be made if necessary.
12. SizeThe size of PFD should normally be A1 (594 mm 841 mm).
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
47/263
Minimum Information Requirements For Equipments
1. Designated streams
a) Stream numbers should be serially denoted by Decimal numbers.b) Fluid name.
c) Total flow rate.
d) Density and/or molecular mass (weight) if required.
e) Operating pressure and temperature if required.
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
48/263
5:\Process Activities\PFD\Drafting
2. Heat exchangers
a) Identification number and service name.
b) Operating heat duty.
c) Inlet and outlet temperatures on both shell and tube sides.
3. Furnaces
a) Identification number and service name.
b) Operating absorbed heat duty.
c) Inlet and outlet operating temperatures on tube side.
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
49/263
4. Reactors
a) Identification number and service name.
b) Inlet and outlet operation temperature.
c) Inlet and/or outlet pressure.
5. Columns
a) Identification number and service name.
b) Tray numbers, operating temperature and pressure for top and bottom trays
and also for special trays such as feed and draw-off, etc.
c) Trays shall be numbered from bottom to top.
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
50/263
6. Drums
a) Identification number and service name.
b) Operating temperature.
c) Operating pressure.
7. Pumps
a) Identification number and service name.
b) Normal operating capacity and differential pressure.
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
51/263
5:\Process Activities\PFD\Drafting
8. Compressors and blowers
a) Identification number and service name.
b) Normal operating capacity and differential pressure.
9. Tanks
a) Identification number and service name.
b) Operating temperature.
c) Operating pressure.
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
52/263
-
8/10/2019 Process Maddah
53/263
PFD Modification
1. First Issue (FI):
Release for proposal (Conclusion of estimate, study)
-Main equipment (Tagged)
-Main Process Lines
-Battery Limit
-Main control concept (control & switch)
-Package unit Limits
5:\Process Activities\PFD Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
54/263
2. Issued For Approval (IFA):
Release for Basic Engineering (Conclusion of fixed price bid)
In addition to contents 1.-Important valve ( isolation, manual control)
-Essential process shutdown circuits
-Important start up lines
-Definition of heat exchanger type
5:\Process Activities\PFD Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
55/263
3. Issued For Design (IFD):
Release for Basic Engineering Development (Conclusion of verification
Phase and Basic Eng.)
-Content as 1. & 2. however adjusted to the contract conditions
5:\Process Activities\PFD Modification
f a r a go st a r a nf a r a go st a r a n
4. Approved For Design (AFD):
Release for Detail Engineering (End of Basic Eng.)
-Crosscheck with P&ID, release detail engineering
-
8/10/2019 Process Maddah
56/263
5. Issued For Construction (IFC):
Release for Detail Engineering Development
-Crosscheck with P&ID, release for purchase of bulk material
5:\Process Activities\PFD Modification
f a r a go st a r a nf a r a go st a r a n
6. Approved For Construction (AFC):
Release for Construction phase (End of Detail Eng)
-Final issue of PFD in Detail phase
7. As Built (ASB):
End of construction
-Includes all of the changes in commissioning and construction phase
-
8/10/2019 Process Maddah
57/263
f a r a go st a r a nf a r a go st a r a n
PROCESS ACTIVITIES
BFD
PFD
5:\Process Activities\PFD
-
8/10/2019 Process Maddah
58/263
Heat and Material Balance Table:
The basis for preparation of this Table is process description accompanied by
the specified contract requirements such as separation percent or outlet
required pressure or any other specification of Feed and Products. This table is
generally prepared by process simulation soft wares like HYSYS, PROII and
etc.
5:\Process Activities\PFD\H&M Balance
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
59/263
5:\Process Activities\PFD\H&M Balance
Contents :
Stream information: Stream No., name of stream, flow rate, composition.
Operating conditions: Operating temperature and pressure.
Basic physical properties: Molecular mass (weight), API gravity, Relative
Mass Density (Specific Gravity) or (Sp.Gr.), etc.
Data concerning hydraulic calculation: Density, viscosity, etc. if required
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
60/263
5:\Process Activities\PFD\H&M Balance
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
61/263
f a r a go st a r a nf a r a go st a r a n
PROCESS ACTIVITIES
H&M BALANCE
BFD
PFD
5:\Process Activities\H&M Balance
-
8/10/2019 Process Maddah
62/263
Definition:
These diagrams (UFD) are generally similar to Process Flow Diagrams but theyare related to the Utility parts (streams) of the process which give services to themain process lines for different purposes.
These diagrams are normally not simulated by softwares to reach the above-mentioned specifications of streams (To prepare Heat and Material Balance).
The Symbol Diagram of UFDs are the same as PFDs.
5:\Process Activities\UFD
(UtilityFlowDiagram)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
63/263
-
8/10/2019 Process Maddah
64/263
1.ModificationModification and revision is defined separately for every sheet of a UFD
FI , IFA , IFD , AFD , IFC , AFC , ABS
2.Revision
A new revision indicates the change of a document. The revision is defined by
number & alphabets, which by subsequent revision shall be consecutively raised
from a starting point.
Numbers Rev.1,2,
Alphabets Rev.A,B,
5:\Process Activities\UFD Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
65/263
f a r a go st a r a nf a r a go st a r a n
PROCESS ACTIVITIES
H&M BALANCE
BFD
PFD
UFD
5:\Process Activities\UFD
-
8/10/2019 Process Maddah
66/263
Output ofSimulation by
Process
Engineer
It is drawn
byDraftsman
Checked byProcess
Senior
Engineer
Approved by
Process Dep.
Manager
Process Lead Engineer
5:\Process Activities\PFD & UFD
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
67/263
5:\Process Activities\PFD\Drafting
f a r a go st a r a nf a r a go st a r a n
PFD, UFD, H&M Balance
Contract (Symbol & Legend)
Codes/ Std./ Eng. Practice
Licensor Comments
Final Doc. Of Equipment Vendor
Technical Proposal
Simulation ResultsBasic Design
Design Basis & Criteria
Preliminary Eng. Study
-
8/10/2019 Process Maddah
68/263
Purposes:
Decreasing of calculation time
Heat & Material Balance Table
Prediction of optimum arrangement of equipment for PFD
production
Pinch study
Designing of equipment
5:\Process Activities\Simulation (ND)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
69/263
Applications Cases:
Proposal Preparation (PP)
Feasibility Study (FS)
Basic Engineering (BE)
Detail Engineering (DE)
5:\Process Activities\Simulation (ND)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
70/263
Terminology:
Simulation
Design
Rating
5:\Process Activities\Simulation (ND)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
71/263
Simulations Software:o PRO /II
o HYSYS
o HEXTRAN
o HX-NET
o HTRI
o Visual Flow
o INPLANT
o PIPE-PHASEo Pipe Sys
o PROMAX
5:\Process Activities\Simulation (ND)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
72/263
f a r a go st a r a nf a r a go st a r a n
PROCESS ACTIVITIES
H&M BALANCE
BFD
PFD
UFD
SIMULATION
5:\Process Activities\Simulation
-
8/10/2019 Process Maddah
73/263
5:\Process Activities\Process Description
f a r a go st a r a nf a r a go st a r a n
Objective:
Process Description , describes technical information, that determines
operating conditions and explains major principles of plant process
Process Description is prepared at two stages :
1.Proposal Preparation (PP)
2.Basic Engineering (BE)
-
8/10/2019 Process Maddah
74/263
5:\Process Activities\Process Description
f a r a go st a r a nf a r a go st a r a n
1.Proposal Preparation (PP)
-After the study of bid documents from client, a short process descriptionwill prepared.
-This process description should be based on BFD
-In this stage , process description covers the minimum requirement toexplain major principles, operating condition and purpose of each defined
block in BFD
-
8/10/2019 Process Maddah
75/263
5:\Process Activities\Process Description
f a r a go st a r a nf a r a go st a r a n
2.Basic Engineering (BE)
-Preliminary process description (from client) will be completed during thisstage
-In order to prepare detailed process description , PFD,UFD and H&MBalance should be used to extract necessary data such as temperature,
pressure, operating condition and main process loop control.
-In addition , process description includes duty of each equipment, majorprinciples of plant or sub unit , feed and product condition to/from each unit.
-
8/10/2019 Process Maddah
76/263
5:\Process Activities\Process Description
f a r a go st a r a nf a r a go st a r a n
Process Description
Contract
Licensor Basic Design
Technical ProposalBFD , PFD ,UFD
-
8/10/2019 Process Maddah
77/263
f a r a go st a r a nf a r a go st a r a n
PROCESS ACTIVITIES
H&M BALANCE
BFD
PFD
UFD
SIMULATION
PROCESS DESCRIPTION
5:\Process Activities\Process Description
-
8/10/2019 Process Maddah
78/263
5:\Process Activities\Basic Design
f a r a go st a r a nf a r a go st a r a n
Basic Design (Design Basis)
This document shows the basic parameters that process engineers apply in
designing of plant.
-
8/10/2019 Process Maddah
79/263
5:\Process Activities\Basic Design
f a r a go st a r a nf a r a go st a r a n
Basic Design (Design Basis) Consists of below items,
1. Feed and Product Specification
- General Specification
- Plant Capacity
- Feed
- Product
-
8/10/2019 Process Maddah
80/263
5:\Process Activities\Basic Design
f a r a go st a r a nf a r a go st a r a n
Basic Design (Design Basis) Consists of below items,
2. Utility Specification
- HP,MP,LP Steam
- Plant & Instrument Air
- Nitrogen
- Water (Potable,Plant,DEMIN,)
- Fuel (Oil,Gas)
-
8/10/2019 Process Maddah
81/263
-
8/10/2019 Process Maddah
82/263
5:\Process Activities\Basic Design
f a r a go st a r a nf a r a go st a r a n
Basic Design (Design Basis) Consists of below items,
4. Emissions and Waste
- List of Expected Gaseous Emissions
- List of Expected Liquid Effluents
- List of Expected Solid Wastes
-
8/10/2019 Process Maddah
83/263
-
8/10/2019 Process Maddah
84/263
5:\Process Activities\Basic Design
f a r a go st a r a nf a r a go st a r a n
Basic Design (Design Basis) Consists of below items,
6. Environmental Data
- Site Data
Location, Elevation above Sea Level, Earthquake Spec.
and
- Climatic Data
Air Temperature, Air Humidity, Barometric Pressre,
Wind, Rain and Snow Fall
-
8/10/2019 Process Maddah
85/263
5:\Process Activities\Basic Design
f a r a go st a r a nf a r a go st a r a n
Process Design Basic
Contract Licensor Basic Design
Technical Proposal
-
8/10/2019 Process Maddah
86/263
f a r a go st a r a nf a r a go st a r a n
PROCESS ACTIVITIES
H&M BALANCE
BFD
PFD
UFD
SIMULATION
PROCESS DESCRIPTION
DESIGN BASIS
5:\Process Activities\Design Basis
-
8/10/2019 Process Maddah
87/263
Definition:
The Piping and Instrument Diagram (P&ID), based on the Process Flow
Diagram (PFD), represents the technical realization of a process by means ofgraphical symbols for equipment and piping together with graphical symbols
for process measurement and control functions.
5:\ Process Activities \P&ID
(Piping & Instrument Diagram)
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
88/263
Terminology:
Design Conditions: Design Pressure and Temperature are used to determine theminimum permissible thickness or Physical characteristics of each Equipment
or Piping item.
Low Level: A condition (Press,Temp, Flow, Liq. Level) in a process componentless than the minimum operating condition.
High Level: A condition (Press,Temp, Flow, Liq. Level) in a processcomponent in excess of the maximum operating condition.
5:\ Process Activities \P&ID\TerminologyTerminology
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
89/263
Control Valve: These are automatic valves used for controlling parameters like
Press., Temp., Flow rate, Their power medium is normally Instrument Air
(pneumatic actuators)
Failure: Improper performance of a device or equipment item that prevents
completion of its design function.
Fail Open / Closed (Control Valve): The safe position of a valve which will shift
to upon loss of the power medium.
Normal Position (Valve): The position of a valve in Normal Condition of the
process (N.O. , N.C.)
5:\ Process Activities \P&ID\TerminologyTerminology
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
90/263
5:\ Process Activities \P&ID\TerminologyTerminology
Plant Shutdown: The shutting in of all process stations of a Plant Production
process and all support equipment for the process.
Process Shutdown: The isolation of a given process station from the process
by closing appropriate SDVs to shut-in flow to the process station or divert
flow to another process station.
Shutdown Valve (SDV): An automatically operated Normally Closed valve
used for isolating a process station.
Emergency Shutdown System (ESD): A system of stations which when
activated initiate plant shutdown.
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
91/263
Flare: A means of safety disposing of waste gases through the use of
combustion. With a flare the combustion is carried out at the top of a pipe or
stack where a the burner and igniter are located.
Relief System: A system containing mechanical overpressure protection
devices (press. safety valves) on the equipment, relieving in to a collection /
disposal system.
5:\ Process Activities \P&ID\TerminologyTerminology
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
92/263
Pressure Safety Valve (PSV): A pressure relief device designed to open andrelieve excess pressure and to reclose and prevent the further flow of fluidafter normal conditions have been restored.
Depressurization: When metal exposed to fire on one side with vapor on theother side, the metal temp. may reach a level at which metal rupture due tostress may occur, even though the press. does not exceed the allowableoverpressure. An emergency depressurization (blow down) system is providedto avoid such an occurrence.
5:\ Process Activities \P&ID\TerminologyTerminology
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
93/263
Blow down Valve :
An automatically operated normally
open valve used to vent the pressure
from a process station on shutdown.
5:\Process Activities \P&ID\TerminologyTerminology
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
94/263
Drain System:
This is the configuration which drains liquids
from vessels or piping systems after
depressurization (via valves) in to a system
of vessel and piping.
5:\Process Activities \P&ID\TerminologyTerminology
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
95/263
Vent: A pipe or hatch on a vessel that opens to the atmosphere.
Battery Limit: Generally is used for showing the exact margin of a specific unit.
(Process or Utility Units)
5:\Process Activities \P&ID\TerminologyTerminology
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
96/263
Contents:
Piping System
Equipments
Control Items
Automatic and Manual Valves
All Item Numbers
All Item Required Information
Vent and Drain Systems
Notes
Packages
Tie-In Points
5:\Process Activities \P&ID\Contents
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
97/263
P&ID Symbols:P&ID Symbols:
P&ID Equipment SymbolsP&ID Equipment Symbols
P&ID General SymbolsP&ID General Symbols
P&ID Instrument Symbols (Typical HookP&ID Instrument Symbols (Typical Hook--Up)Up)
P&ID Instrument Symbols (Valve Symbol)P&ID Instrument Symbols (Valve Symbol)
5:\Process Activities \P&ID\Symbols
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
98/263
Gate valve (basic symbol)
Globe valve
Check valve (general)
Gate valve behind off
Angle valveBall valve
Four way valve
Gate valve with body bleed
Butterfly valve
Hydraulic control
Metering cock
Needle valve
Plug valveS=solenoid valve
R= Manual reset when indicated
Diaphragm valve
DESCRIPTIONSYMBOL
5:\Process Activities \P&ID\Symbols
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
99/263
Main process line (arrow indicates Direction of flow )
Heat traced pipe line
Underground pipeline
Existing line
Future line
Vendor package
Jackated or double containment pipeline
Line crossing (connected )
DescriptionSymbol
5:\Process Activities \P&ID\Symbols
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
100/263
5:\Process Activities \P&ID\Symbols
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
101/263
5:\Process Activities \P&ID\Symbols
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
102/263
Drafting
1. General rules
Drafting shall be in accordance with the requirements outlined in this Standard.The drafting must be of sufficiently high quality to maintain legibility when
the drawing is reduced to an A3 size sheet.
2. Drawings sheet sizes
Diagrams shall be shown on A0 size (841 mm 1189 mm) tracing paper. A1
size (591 mm 841 mm) may be used for simple P&IDs as per Companys
approval.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
103/263
3. Drawing title block
The following requirements shall be shown on the title block of each drawing (Next
Page):
- revision table;
- main Companys name (e.g., National Iranian Oil Company);
- name of Company Relevant Organization, (if any), (e.g., Refineries Engineering and
Construction);
- name of refinery or plant (in English and Persian words);
- Contractors name;
- drawing title;
- Companys project No.;
- Contractors job No. (optional);
- Contractors drawing No. (optional);
- Companys drawing No.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
104/263
Title block sizes and drawing dimensions shall be as follows
180 190
130 175
100 155
75 120
A0 = 841 1189
A1 = 594 841
A2 = 420 594
A3 = 297 420
TITLE BLOCK SIZE (INCLUDING REVISION
TABLE)WIDTH (mm) LENGTH (mm)
DRAWING DIMENSIONS
(mm mm)
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
105/263
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
106/263
4. Line widths
To obtain a clear representation, different line widths shall be used. Main flow
lines or main piping shall be highlighted.
The following line widths shall be applied:
0.8 mm for main process lines;
0.5 mm for other process lines; utility lines, and underground lines;
0.5 mm for graphical symbols for equipment and machinery, except valves
and fittings and piping accessories; 0.5 mm for rectangular boxes for illustrating Unit operations, process
equipment, etc.;
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
107/263
0.5 mm for subsidiary flow lines or subsidiary product lines and
for energy carrier lines and auxiliary system lines;
0.4 mm for class changes designation;
0.3 mm for graphical symbols for valves and fittings and pipingaccessories and for symbols for process measurement and
control functions, control and data transmission lines;
0.3 mm for all electrical, computer and instrument signals;
0.3 mm for reference lines;
Line widths of less than 0.3 mm shall not be used.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
108/263
5. Line spacing
The space between parallel lines shall not be less than twice the width of the
heaviest of these lines. A spacing of 10 mm and more is desirable between
flow lines.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
109/263
6. Direction of flow
In general, the main direction of flow proceeds from left to right and from
top to bottom. Inlet and outlet arrows are used for indicating the inlet and
outlet of flows into or out of the diagram.
Arrows are incorporated in the line for indicating the direction of the flows.If necessary for proper understanding, arrows may be used at the inlets to
equipment and machinery (except for pumps) and upstream of pipe
branches. If a diagram consists of several sheets, the incoming and outgoing
flow lines or piping on a sheet may be drawn in such a manner that the lines
continue at the same level when the individual sheets are horizontally
aligned.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
110/263
7. Connections
Connections between flow lines or pipelines shall be drawn as shown in
Figs. 1 and 2below:
Figs. 3 and 4 show two flow lines or pipelines, which are not connected:
Fig1 Fig2
Fig3 Fig4
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
111/263
8. Equipment Location Index
Piping & Instrument Diagrams shall be divided intoequivalent intervals (each in 50 mm) eitherin length or width.The intervals shall be designated with numbers from 1 to 23 in
length and alphabets from "A" to "P" in width. Equipmentlocation on each diagram shall be addressed by the relevantcoordinates where required. In upper right-hand area of theflow diagram under title of "Item Index" all main equipmentshall be listed by equipment number, alphabetically andnumerically and equipment location coordinates. In a separate
sheet apart from P&IDs, an "Item Index" shall be prepared tosummarize all equipment of the Unit/Plant with referenceP&IDs and equipment location.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
112/263
9. MINIMUM INFORMATION TO BE SHOWN ON P&ID DIAGRAMS
General
Each P&ID shall present all information as required herein below during
implementation of a project in detailed design phase. Extent of information
shown on each P&ID in the basic design stage shall be agreed by Company inadvance.
Vendor supplied packages with an outline of the main components shall be
shown in a dashed/dotted box. Letter "PK" referring to package shall be
indicated adjacent to each equipment and instrument of the package.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
113/263
Equipment, instruments or piping which are traced or jacketed, shall be shown.
The identification number and service presentation shall be shown for eachpiece of equipment. This information shall be indicated in or adjacent to
towers, drums, heaters, tanks and heat exchangers, etc.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
114/263
-
8/10/2019 Process Maddah
115/263
A .Fixed Equipments, TanksThe following requirements shall be shown:
Drawing
a) all nozzles, manways, instrument connections, drains, vents, vortex breakers, and
safety/relief valve connections;b) all internals such as steam coils, air spargers, tank heaters and etc.
Equipment descriptiona) equipment item number (this number also appears adjacent to the tank);
b) service;
c) inside diameter and height;
d) nominal capacity, in (m);e) design pressure and temperature;f) indication of insulation.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
116/263
A .Fixed Equipments Vessels, Towers, DrumsThe following requirements shall be shown:
Drawing
a) changes of shell diameter (if any); b) top and bottom trays, and those trays which are necessary to locate feed, reflux and
product lines;
c) all draw-off trays with tray number;
d) all nozzles, manholes, instrument connections, drains, vents, pump-out and steam-out, vortex breakers, and safety/relief valve connections,sample connection
e) skirt or legs, top and bottom tangent lines;
f) elevations above base line to bottom tangent line of column or to bottom of horizontaldrum;
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
117/263
Drawing (For Vessels, Towers, Drums) :
g) the position of high high liquid level (HHLL), high liquid level (HLL), normal liquid
level (NLL), low liquid level (LLL) and low low liquid level (LLLL);
h) all flanged connections; [all connections whose purpose is not readily evident shallindicate the purpose (e.g., spare inlet, catalyst draw-off, etc.).];
i) catalyst beds, packings, demisters, chimney trays, distributors, grids, rotating discs,mixers, cyclones, tangential inlet and all other internals;
j) water drop-out boots;
k) maintenance blinds for the vessel nozzles.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
118/263
Important Notes (For Vessels, Towers, Drums) :
a) All nozzles and connections indicated on the equipment data sheet shall be shownin their correct positions.
b) All indications shall be such that the consistency in the dimensions is considered,although not necessarily to scale.
c) Numbering of the trays shall be from bottom to top.
d) Height of the vessel bottom tangent line shall be indicated.
Self standing : Skirt heightElevated vessel: Minimum required height shall be shown as "min. ....".
e) A valved drain for all columns and vessels shall be indicated.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
119/263
-
8/10/2019 Process Maddah
120/263
Equipment Description (For Vessels, Towers, Drums) :
The following requirements shall be described under equipment description:
a) vessel item number (this number will also appear adjacent to the vessel);
b) service; c) size [inside diameter(s) and tangent to tangent length];
d) design pressure (internal/external) and design temperature;
e) indication of insulation;
f) line number of vessel trim (this applies to LG & LC connections, vents, sample
connections, etc.);
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
121/263
A .Fixed EquipmentsFired Heaters, Boilers, Incinerators
The following requirements shall be shown:
Drawing
a) all nozzles, instrument connections, drains, vents and damper(s);
b) ducting arrangement including damper actuators where required;
c) waste heat recovery system (if present), such as economizer, air preheater,
forced draft fan, induced draft fan,etc.;
d) decoking connections;
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
122/263
Drawing
e) detail of one complete set of burners for each cell and total burner number requiredfor each type of burner;
f) tube coils schematically in correct relative positions and all skinpoint thermocouples;
h) logic diagram of shut down system (heat off sequence);
i) number of passes and control arrangement;
j) blow-down and steam-out connections;
k) testing facilities;
l) convection section (where applicable).
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
123/263
A .Fixed Equipments,Heat Exchangers, Coolers, ReboilersThe following requirements shall be shown:
a) all nozzles, instrument connections, drains and vents, chemical cleaning
connections and safety/relief valves as indicated on the equipment data sheet;
b) spectacle blinds for the isolation;
c) elevations required for process reason (e.g., reboilers, condensers, etc.);
d) the position of high liquid level (HLL), normal liquid level (NLL) and lowliquid level (LLL) for kettle type reboilers;
f) direction of flow in each side of exchanger.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
124/263
Important notes (For Heat Exchangers, Coolers, Reboilers)
Due considerations should be made for proper indication in the following requirements:
a) Generally, direction of flow shall be downflow for cooled media and upflow forheated media.
b) Isolation valves shall be provided on inlet and outlet lines where maintenance canbe performed on the exchanger with the Unit operating. Provision of by-passing isrequired for this case.
c) Shell and channel piping shall be provided with a valved vent connection and a drainconnection unless venting and draining can be done via other equipment.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
125/263
Important notes (For Heat Exchangers, Coolers, Reboilers)
e) An inlet and outlet, temperature indicator shall be provided on each exchanger (oneither shell or tube side) so that to facilitate checking of heat balance aroundexchanger.
Type of temperature indicator shall be as follows:
- A board mounted temperature indicator (TI) shall be provided at the inlet and outletof all shell and tube process/process exchanger.
- For water coolers, the water side outlet shall be provided with a local TI only. Theshell side in and out shall be provided with board mounted TIs.
- Thermowells (TWs) shall be provided between each shell side and tube side of thesame services when the exchangers are in series.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
126/263
Equipment description (For Heat Exchangers, Coolers, Reboilers)
a) equipment item number (this number also appears adjacent to the equipment);
b) service;
c) duty (kJ/s);
d) shell side design pressure and temperature;
e) tube side design pressure and temperature;
f) indication of insulation.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
127/263
B. Rotary MachineriesPumps
The following requirements shall be shown:
Drawing
a) all nozzles including instrument connections;
b) pump suction valve and strainer, and discharge valve and check valve. Provision of
wafer type check valve should be avoided unless otherwise specified;
c) pump drains and vents piping.
d) the type of pump;
e) pump auxiliary system connections such as, cooling water, seal oil and lube oil, steam,etc.;
h) pressure gage located on the discharge of each pump; the gage shall be installed
between the pump discharge nozzle and the check valve;
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
128/263
Equipment description (For pumps)
a) pump item number (this number also appears below the pump);
b) service;
c) capacity, (m/h, dm/h for injection pumps);
d) differential pressure, (kPa);
e) relative density (specific gravity) of pumped fluid at pumping temperature;
f) indication of insulation and tracing;
g) miscellaneous auxiliary piping (CW, seal oil, etc.).
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
129/263
B. Rotary Machineries, Air Fin Coolers
The following requirements shall be shown:
Drawing a) all nozzles and instrument connections;
b) blinds for the isolation;
c) any automatic control (fan pitch control or louver control) and any alarm (vibrationalarm, etc.);
d) configuration of inlet and outlet headers and the branches. Only one bundle andfan shall be shown; total number of fans and bundles shall be indicated. When
multiple bundles are required, headers arrangement as separate detailed sketchshall be indicated;
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
130/263
e) steam coil and condensate recovery system (if required);
f) isolation valves (if required); isolation valves shall be provided in corrosive andfouling services where individual bundles can be repaired and maintained with theUnit operating;.
g) valved vent and valved drain connection for each header, vent header should beconnected to closed system for volatile services;
h) a board mounted TI at inlet and outlet, (the TI will monitor the process side of eachair fin service). If multiple bundles to be used for fouled services, provide TWs on theoutlet of each bundle.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
131/263
Equipment description (For Air Fin Cooler)
a) equipment item number (this number will also appear adjacent to the equipment);
b) service;
c) duty (kJ/s);
d) tube side design pressure (internal and external) and design temperature.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
132/263
B. Rotary Machineries Compressors and BlowersDrawing
a) type of compressor or blower;
b) start-up facilities (i.e., inert gas purge system);
c) safety/relief valves;
d) suction and discharge valves;
e) suction strainer (filter) and discharge check valve;
f) suction and discharge pulsation dampener where required;
g) valved vents and casing drains;
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
133/263
Drawing (For Compressor and Blowers)
h) winterization (steam or electrical tracing on suction piping) where required;
i) lube and seal oil / sealing system and cooling water systems detail arrangement;
j) interstage coolers where required;
k) surge protection (where required);
l) inlet and outlet nozzles;
m)all instrument connections.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
134/263
Description for Compressors and Blowers
a) equipment item number and stage (this number also appears below thecompressor);
b) service:
c) capacity, (Nm/h);
d) suction pressure, and temperature, [kPa (g)], (C);
e) discharge pressure, and temperature, [kPa (g)], (C);
f) miscellaneous auxiliary piping (CW, lube, oil, seal oil / sealing system, etc.);
g) gas horse power, (kW).
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
135/263
B. Rotary Machineries Steam and Gas Turbine Drivers
Drawing
a) all nozzles and connections;
b) detail of all auxiliary systems for steam turbine drivers such as steam supply,condensate return, surface condenser and etc.;
c) detail of lube oil, cooling water, etc.;
d) all instrumentations such as PI, TI, etc.;
e) safety/relief valves; relief valves shall be located between the discharge nozzle andthe outlet isolation valve;
h) vent line to atmosphere at turbine exhaust; the vent is required for the start-up/testoperation of the turbine.
5:\Process Activities \P&ID\Drafting
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
136/263
1.ModificationModification and revision is defined separately for every sheet of a P&ID
FI, IFD , AFD , IFC , AFC , ABS
2.RevisionA new revision indicates the change of a document. The revision is defined by
number & alphabets, which by subsequent revision shall be consecutively raised
from a starting point.
Numbers Rev.1,2,
Alphabets Rev.A,B,
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
137/263
GeneralAs the P&I Diagram contains a large amount of plant design information, its revision
will have a great effect on the subsequent engineering works.
Accordingly for the purpose of minimizing the revisions and avoiding unnecessary
works, the steps for preparing the P&I Diagrams shall be established. The followingsteps should be realized in preparing the P&I Diagrams. Upon the information which
can be prepared as engineering work proceeds, steps 2, 3 and 4 may be combinedor extended to more steps as required.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
138/263
PFD Modification
1.First Issue (FI):
Through step 1, the basic design philosophy concerning those basic items for the
preparation of P&IDs such as mode of indication, applicable standards, numberingsystem, valve arrangement and those other basic items on which agreements
shall be made by the Company prior to the preparation of the P&ID should be
clarified.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
139/263
The basic items which should be taken into consideration in step 1 are listed hereinbelow but should not be limited to the following items:
a) Vellum and drafting
- size and vellum of drawing;
- title;- drafting;
- arrangement;- equipment description;
- interconnection.
b) Numbering System
- drawing No.;
- equipment No.;
- instrument tag No.;
- line No.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
140/263
c) Symbol
- equipment;
- piping components;- instrument symbol;
- process stream symbol;
- utility symbol.
d) Valve arrangement around equipment
- valve arrangement for drain, vent and purge;
- valve arrangement for steam-out;- sizes of the nozzles for installing the instruments;
- valve arrangement around the heater and exchanger;- valve arrangement around the pump and compressor;
- valve arrangement around the steam turbine.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
141/263
e) Piping
- piping classification standards;
- valve arrangement at the battery limit;- valve arrangement for drain, vent, purge and steam-out on piping;
- valve arrangement around the steam trap;
- valve arrangement around the sample point/sample connections;- blow-down;
- valve type selection criteria/standards;- strainer type selection standards;
- pipe line sizing
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
142/263
f) Instrumentation
- valve arrangement around the control valve;
- valve arrangement around the safety/relief valve;
- valve arrangement around other instruments;
- instrument type selection standards;- software linkage and DCS presentation.
g) Miscellaneous
- winterizing and heat conservation;
- recovery of steam condensate;
- disposal of drains and waste water effluent
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
143/263
\ A i i i
-
8/10/2019 Process Maddah
144/263
Results of hazard analysis and operability (HAZOP) study (if any) note :contractor shall
perform the HAZOP study (if required by the owner) using PFD, P&ID and plot plantogether with equipment data sheets and related safety equipment checklist.
Contractor shall provide information about the reported accidents in similar processunits in the world during HAZOP meetings.
The Contractor should prepare both the draft of the basic items for preparation of the P&IDiagrams and all necessary operation and safety features as mentioned above to
Companys review and approval before issuance of official revision of P&I Diagram forengineering start.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
5 \P A i i i
-
8/10/2019 Process Maddah
145/263
2. Issued For Design (IFD):
Release for Basic Engineering
Step 2,
The following information as minimum requirement shall be reviewed and completed at this
stage:
1) Equipment
- number of equipment;
- type of equipment;- equipment No. and name
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
5 \P A i i i
-
8/10/2019 Process Maddah
146/263
2) Piping
- size of main piping;
- winterizing/heat conservation requirement;- valve type;
- provision of drain and vent;
- provision of purge, steam-out, chemical injection and water injection connections andvalving;
- line No.;- utility services connected to each equipment, piping and packaged Unites.
3) Instrumentation
- type of instrument and location of the primary element;
- location and discharge destination of the safety/relief valve;- location, type and valve functioning (failure action) of the control valve;
- measurement and control method;- instrument tag No.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
147/263
5 \P A ti iti \ difi i
-
8/10/2019 Process Maddah
148/263
3. Approved For Design (AFD):
Release for End of Basic Engineering
Step 3,
The purpose of issuing the P&I Diagrams , is the Companys approval on the basis of
detailed design for piping layout.The minimum information which should be added on the P&ID at this stage shall be as
follows:
1) Equipment
- elevation of equipment;
- size of equipment;
- internal of equipment.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
5 \P A ti iti \P&ID M difi i
-
8/10/2019 Process Maddah
149/263
2) Piping
- line class;
- miscellaneous piping size (except around the safety/relief valve and control valve);- thermal and cold insulation;
- correct orientation of piping around equipment.
3) Instrumentation
- size of main control valves;
- additions and revisions on the basis of detailed design.
4) Vendors packaged uni ts
- The details of some available information concerning the Vendors shall be indicated.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
-
8/10/2019 Process Maddah
150/263
5 \P A ti iti \P&ID M difi i
-
8/10/2019 Process Maddah
151/263
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
2) Instrumentation
- sizes of the safety/relief valves;
- sizes of the control valves;- details concerning level transmitters and level gages;
- logic diagram for heaters, incinerators, compressors, and all other main equipment(where applicable).
- Consequences of details of cause and effect tables.
3) Vendors information
- The necessary information concerning the Vendors, equipment shall be indicated.
5 \P A ti iti \P&ID M difi ti
-
8/10/2019 Process Maddah
152/263
5. Approved For Construction (AFC):
End of Detail EngineeringStep 5,
The P&I Diagram shall be issued for construction after completion of the followingactivities:
- piping material table;- piping class and all relevant job specifications;
- all job specifications and standard drawings in relation to the preparation of P&I
Diagrams;- logic diagram of the main equipment;
- hydraulic of system;- size of all piping, valves and instrumentation components;
- vendors information.
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
5 \P A ti iti \P&ID M difi ti
-
8/10/2019 Process Maddah
153/263
5:\Process Activities\P&ID Modification
f a r a go st a r a nf a r a go st a r a n
6. As Built (ASB):
End of construction
Step 6,
- The P&I Diagram as-built shall be prepared in accordance with the results of linechecking and the final edition of the field sketches.
- The specified piping and instrument take-off and branch points shall be observed
as strictly as possible and shall be implemented on the P&I Diagram.
-
8/10/2019 Process Maddah
154/263
5:\Process Activities\P&ID
-
8/10/2019 Process Maddah
155/263
5:\Process Activities\P&ID
Piping & Inst. Diagram (P&ID)
Contract
Codes/ Std./ Eng. Practice
Licensor Comments
Plot Plan
Technical Proposal
Process Calculation
Inst./Equipment
Piping Material Specification
Design Basis & Criteria
Licensor Basic Design
PFD
f a r a go st a r a nf a r a go st a r a n
5:\Process A ti iti \P&ID
-
8/10/2019 Process Maddah
156/263
f a r a go st a r a nf a r a go st a r a n
PROCESS ACTIVITIES
H&M BALANCE
BFD
PFD
UFD
SIMULATION
PROCESS DESCRIPTION
DESIGN BASIS
P&ID
5:\Process Activities\P&ID
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
157/263
5:\Process Activities\Design Criteria
SCOPE
PURPOSE
MECHANICAL DESIGN CONDITIONS
EQUIPMENT DESIGN CRITERIA
PIPING
f a r a go st a r a nf a r a go st a r a n
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
158/263
5:\Process Activities\Design Criteria
1.0 SCOPE
These design criteria cover the general requirements for the process design ofoil, gas
and petrochemical plants.
Cases or applications not specifically covered by these criteria shall be handled on an
individual basis. All applicable codes and standards shall apply to these cases.
f a r a go st a r a nf a r a go st a r a n
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
159/263
5:\Process Activities\Design Criteria
2.0 PURPOSE
Basic Engineering
The purpose of this document in BASIC Engineering is to: Standardize and group preferred options and alternatives.
Establish and correlate a source of basic information of typically multidiscipline interestsfor easy access and common reference.
Serve as minimum basic sizing criteria.
Detailed Engineering
The purpose of this document in DETAILED Engineering is to:
Clarify the options selected for equipment design during BASIC Engineering Define the minimum requirements for completion of DETAILED
Engineering
f a r a go st a r a nf a r a go st a r a n
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
160/263
5:\Process Activities\Design Criteria
3.0 MECHANICAL DESIGN
CONDITIONS
Design Pressure
Design Temperatures
f a r a go st a r a nf a r a go st a r a n
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
161/263
5:\Process Activities\Design Criteria
f a r a go st a r a nf a r a go st a r a n
3.1 Design Pressure
3.1.1 Pressure Vessel
The design pressure for pressure vessel (equipment fabricated according to ASME
VIII) shall generally be as follows:
MOP + 7%>69
MOP + 10%18 to 69
MOP + 1.8 bar1.7 to 18
3.5 barg0 to 1.7
Full Vacuum + 3.5 barg (if external pressure is
Atmosphere)
Under Vacuum
Minimum Design Pressure (barg)Maximum Operating
Pressure MOP(barg)
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
162/263
5:\Process Activities\Design Criteria
3.1.2 Compressors
Suction Side Design Pressure
The design pressure of the equipment and piping at the compressor suction should be
calculated based on table presented for pressure vessel. The MOP is the higherpressure of the following:
MOP = (Suction pressure + Discharge pressure)/2
f a r a go st a r a nf a r a go st a r a n
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
163/263
5:\Process Activities\Design Criteria
Discharge Side Design Pressure
Centrifugal Compressor
At the discharge of a centrifugal compressor:
MOP + 1 bar, for MOP 10 barg,
MOP + 10%, for MOP > 10 barg.
Reciprocating compressor
At the discharge of a reciprocating compressor:MOP + 2 bar, for MOP 20 barg
MOP + 10%, for MOP> 20 barg
*PSVs are required.
f a r a go st a r a nf a r a go st a r a n
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
164/263
3.1.3 Pumps
Centrifugal Pumps
Generally the pump circuit is designed for the shut-off pressure of the pump and whereno PSVs are provided for protection of the circuit. The shut-off pressure, or design
pressure, is the highest of the following:
Shutoff pressure = Normal suction pressure (NSP) + 1.25 of differential pressure atmaximum specified fluid density.
Or
Shutoff pressure = Maximum suction pressure (MSP) + differential pressure atmaximum specified fluid density.
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
165/263
Normal and Maximum suction pressure (MSP) is calculated as follows:
NSP = upstream equipment Operating pressure + NLL of upstream equipment
MSP = upstream equipment PSV set pressure (design pressure) + HHLL of upstreamequipment
Notes:
In the case of two pumps in series, the design pressure shall be determined using thedesign pressure of the first pump as the maximum suction pressure of the secondpump.
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
166/263
b) Positive Displacement Pumps
At discharge of positive displacement pumps:
MOP + 1 bar for MOP 10 barg
MOP + 10% for MOP > 10 barg
PSVs are required.
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
167/263
3.1.4 Heat Exchangers
The same method used for pressure vessel should be applied for heat exchangers.
If a control valve or block valve is installed downstream of a heat exchanger:
The design pressure of the exchanger = the upstream equipment design pressure.
If a control valve or block valve is installed upstream of an exchanger (No valve ondownstream of exchanger):
The design pressure of the exchanger = design pressure of the downstreamequipment at the entry point + 1.25 times the maximum pressure drop in the systembetween the inlet of the exchanger and the inlet of the downstream equipment + statichead (if any).
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
168/263
An exchanger on the discharge side of a gas driven compressor shall have a designpressure equal to or greater than the setting of the PSV for the system.
Exchanger operating under a vacuum shall be designed for full vacuum.
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
169/263
3.1.5 Storage Tanks
Atmospheric and near atmospheric tanks
- If the specific gravity of stored liquid is lower than 1.0, the design pressure ofatmospheric storage tanks with open vent or without gas blanketing shall be designed
full of water + 50 mm water column.
- If the specific gravity of stored liquid is higher than 1.0, the design pressure ofAtmospheric storage tanks (open vent or without gas blanketing) shall be designed fullofproduct + 50 mm product column.
For atmospheric storage tanks with gas blanketing, the design pressure of atmosphericstorage tanks shall be designed full of water + 150 mm water column and -50 mmwater column for vacuum condition.
API STD 2000 also describes the pressure and vacuum design requirement ofatmospheric tanks put in this category.
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
170/263
Other storage tanks (Spheroid, etc.)
Depending on the type of tank, higher design pressures could be specified. This shall
be treated on a case-by-case basis depending on tank type but if storage tank has a
design pressure higher the 1.0 barg, it categorized as pressure vessel (pressurized
storage tank).
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
171/263
3.1.6 Pipelines
For pipelines, the design pressure is a function of the MOP and a design factor which
depends on the location. Process Engineer determines the MOP only; normally it is thedesign pressure of the last equipment upstream of the pipeline plus the hydrostatic
pressure due to the pipeline profile.
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
172/263
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
173/263
3.2 Design Temperatures
- The design temperatures shall be generally specified as follows, for determination of
design temperature using the following table it is necessary to specify the lower andupper limit of operating temperature of the equipment
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
174/263
5:\Process Activities\Design Criteria
To be specified according to selected material and process
requirements.Above 343 C
Max. Op. Temp. + 25 C
orExceptional operating temp.Between 60 C and 343 C
85 C (min)
or
Exceptional operating temp.
Between 0 C and 60 C
Higher Limit :
Min. Op. Temp.5 CBetween -29 C and 0 C
- 45 CBetween -39 C and -30 C
-100 CBetween -100 C and -40 C
Min. Op. Temp.Less than -100C
Lower Limit:
Design Temperature (C)Operating Temp. (C)
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
175/263
Notes:
- Exceptional operating temperature is to be considered for operations durationexceeding a total of 100 hours per year.
- 85 C is the minimum design temperature due to solar radiation.- The design temperature of equipment located downstream of air cooler or trim coolershall be specified as larger of:
Operating temperature +25 C
Or
Inlet operating temperature of upstream cooler
5:\Process Activities\Design Criteria
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
176/263
5:\ ocess c v es\ es g C e a
4.0 EQUIPMENT DESIGN
CRITERIA
Pump
Compressor
Heater
Vessel
Heat exchanger and Cooler
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
177/263
g
4.1 Pumps
All pumps, where their failure would cause a plant shutdown or unsafe conditions, shall
have a spare installed. One spare unit of a pump should be considered unless stated
otherwise.
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
178/263
g
- The minimum margin between the normal and rated flow for a pump shall be asfollows:
+15% of normal flowReciprocating and rotary
+30% of normal flowMetering
+20% of normal flowChemical Injection
+10% of normal flowLoading / Transfer
+10% of normal flowExport (continuous operation)
+10% of normal flowUtility+10% of normal flowOther Process
+25% of normal flowReflux, pump around and reboiler pumps
Rated FlowType of pump
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
179/263
g
- The static head used in calculating the suction pressure is measured from either:
The lowest operating liquid level in the suction vessel if this will initiate a shutdown ofthe pump when that level is reached (e.g. LSLL),
or,
The bottom tangent line for vertical vessels or the bottom invert line for horizontalvessels if no level-initiated pump shutdown is in place,
to one of the following lower elevations:
-
8/10/2019 Process Maddah
180/263
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
181/263
g
- The equivalent length and frictional line losses may be calculated using theappropriate Line-sizing program. otherwise, the suction line equivalent length may beestimated from the pipe diameter d (inches) as follows:
Pumping temperature < 150 C, Le= 8d + 30 m
Pumping temperature 150 C, Le= 12d + 30 m
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
182/263
g
- Suction line sizing for reciprocating pumps shall take into account acceleration head
by:
Ha = L V N C / 9.8 K
L suction pipe length, m
V suction velocity, m/s
N,C constant from GPSA
K Cp/Cv
Ha acceleration loss, m
Reciprocating pumps shall have pulsation dampers on the suction and discharge side
where liquid pulsation should be minimized from process and operation view points.
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
183/263
g
4.2 Compressors
- All compressors, where their failure would cause a plant shut-down or unsafeconditions, shall have a spare installed. One spare unit of a compressor should beconsidered unless stated otherwise.
- Normally a 10% margin on maximum capacity will be used for sizing of compressors.
- The variation of gas compositions, molecular weight, Cp/CV, etc., and the operatingconditions (mainly suction and discharge temperature, pressure, and flowrate) shall betaken into account to determine the sizing case.
- Corrosive compounds in the gas (such as sulfur oxides, hydrogen sulfides, acidiccompounds, chlorides, etc.), are to be specified by the Process Engineer as these may
determine the selection of materials by the vendor.
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
184/263
g
- The following table gives an approximate value of the polytropic efficiency ofcentrifugal compressors:
0.7712700-340000
0.74850-12700
0.63170-850
Average Polytropic Eff ic iencyNominal Capacity
(m3/hr)
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
185/263
g
4.3 Heaters
- The design margin on Fired Heaters and Furnaces is 10% on heat duty.
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
186/263
4.4 Vessels
- The basis of sizing is the critical or terminal velocity VT (m/s), calculated from:
VT = K [(l -g)/ g]
where
l , g = liquid density, vapor density (kg/m3)
For vertical vessel vapor velocity shall be less than terminal velocity. The factor 0.85 isrecommended to calculated vapor velocity from terminal velocity.
For horizontal vessel higher vapor velocity may be used to meet acceptable L/D, butliquid droplet separation shall be checked. The upper limit of vapor velocity forhorizontal vessels is re-entrainment velocity.
-
8/10/2019 Process Maddah
187/263
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
188/263
K = 3.6 m/s
CD = Exp (8.411 2.243 X + 0.273 X2 1.865 10-2 X3 + 5.20110-4 X4)
Where
X = Ln ( )
Dp is assumed as follows:
General services: 200 micron
Flare K.O. drum: 600 micron
Note: Dp, m , kg/m3 , cp
K value without Mist Eliminator:
D
P
C
D
2
V
VL3PV
8 )(D1013.0
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
189/263
- The following hold up should be considered for vessel sizing:
200 mm minimum, butmust allow for time
required to close ESD orXV or stop pump
200 mm minimum, butmust allow for time
required to close ESD orXV or stop pump
Vessel Tangent
Line to LLLL
at least 2 minutes
with 200 mm minimum
at least 2 minutes
with 200 mm minimumLLLL to LLL
determined by the following table
with a 350 mm
minimum
determined by the following table
with a 350 mm minimumLLL to HLL
at least 2 minutes
with 200 mm minimum
at least 2 minutes
with 200 mm minimumHLL to HHLL
Horizontal VesselsVertical VesselsLevels
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
190/263
- The minimum liquid hold-up times between LLL and HLL are as follows:
Greater volume of5 (below normal interface level) or10
(between water HLL-LLL)
Water Boot:
5 (with a pump)
3 (without a pump)Other Drums:
10Atmospheric De-Gassing Drum
5 (with or without a pump)c) Product to Exchanger or Storage Tank
5b) Product to other Column
5a) Product to next Process
Fractionation Tower Bottoms:
5Reflux Drum
10 (with or without a pump)b) to other Equipment:
10a) to a Heater
Feed Surge Drum:
Time (minutes)Service
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
191/263
- The following design criteria shall be used for nozzle sizing:
Inlet Nozzle:Horizontal No demister pad mVm2 1000
Vertical No demister pad mVm2 1500Horizontal / Vertical Demister pad mVm2 6000
Horizontal / Vertical Demister pad gVg2 3750
Gas outlet nozzle:
gVg2 3750Liquid outlet nozzle:
V 1 m/secLiquid outlet nozzle
The minimum nozzle diameter shall be 50 mm (2 in.).
Where:
is fluid density in kg/m3V is fluid velocity in m/sec
-
8/10/2019 Process Maddah
192/263
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
193/263
- Number of Manways shall be determined according to the followings:
Vessels
A single manway shall be provided for vessel length or height less than 6 m.
For other vessels (length or height > 6 m), a minimum of two manways shall be
provided; one manway each 6 m for longer or taller vessel.
If vessel is equipped with internals (baffle, etc.), one manway shall be provided foreach compartment.
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
194/263
- Number of Manways shall be determined according to the followings:
Trayed Columns
Manways shall be provided at the top, below the bottom tray, at the feed tray and
At any other tray at which removable internals are located.
Manways shall also be provided at intermediate points so that the maximum spacing ofmanways does not exceed 15 trays. This shall be reviewed on a case-by-case basis.Tray spacing with manway between internal shall be at least 900 mm.
-
8/10/2019 Process Maddah
195/263
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
196/263
- The drain specification shall be determined on the following basis:
a) Drain Location
The drain of the vessel shall be connected:
To the outlet line at low point for vertical vessel
Directly on the vessel for horizontal vessel
Directly on the vessel for vertical vessels, where the outlet line extends inside the
vessel
5:\Process Activities\Design Criteria
-
8/10/2019 Process Maddah
197/263
b) Drain Sizes
Vent and drain diameter shall be determined as follows:
46V>420
44220 < V 420 or D > 6000
4375 &