Projects References Page 1 ELECNOR GROUP SOLAR PV REFERENCES GROUND AND ROOF PLANTS

Upload: alberto-garcia-de-los-angeles

Post on 25-Jan-2017

119 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PV Experience

Projects References   Page  1  

ELECNOR GROUP

SOLAR PV REFERENCES

GROUND AND ROOF PLANTS

Page 2: PV Experience

Projects References   Page  2  

INDEX

1.   PV PROJECTS WORLD MAP LOCATION ........................................................................ 3  2.   PV PROJECTS INFORMATION ........................................................................................ 4  3.   PV PROJECTS LOCATIONS MAPS. ................................................................................ 61  PV PROJECTS IN SPAIN. LARGE SCALE ............................................................................. 61  INTERNATIONAL PV PROJECTS - EUROPE ........................................................................ 62  INTERNATIONAL PV PROJECTS – SOUTH AMERICA ....................................................... 63  INTERNATIONAL PV PROJECTS – NORTH AMERICA ....................................................... 64  INTERNATIONAL PV PROJECTS – AFRICA ........................................................................ 65  INTERNATIONAL PV PROJECTS – MIDDLE EAST ............................................................. 66  INTERNATIONAL PV PROJECTS – AUSTRALIA ................................................................. 67  

Page 3: PV Experience

Projects References   Page  3  

1. PV PROJECTS WORLD MAP LOCATION

USA:  58  MW

Argentina  23  MW

Abu  Dhabi:  0,5  MW

AUSTRALIA:  56  MW

Jordan:  2  MW

Spain:  209  MW

Italy:  14  MW

Portugal:  7  MW

France:  22  MW

Mauritania:  3  MW

Total:  392  MW

Page 4: PV Experience

Projects References   Page  4  

2. PV PROJECTS INFORMATION

PROJECT NAME GUERNSEY

LOCATION California (USA)

POWER INSTALLED 25.000 kWp 20.000 kW

TRACKING TECHNOLOGY Single Axis

ESTIMATED ENERGY PRODUCED 63.000 MWh/y

ACREAGE 146 Ac

PROMOTER PG&E

EPC ELECNOR

INVESTMENT 65.500.000 USD

FINANCIAL ENTITY PRIVATE FUNDS

CONSTRUCTION PERIOD AUG 2012 TO JULY 2013

Page 5: PV Experience

Projects References   Page  5  

PROJECT NAME Broookhaven National Laboratory Solar Farm

LOCATION MANORVILLE, Long island, NY

POWER INSTALLED 38,400 kWp 32.000kW

TRACKING TECHNOLOGY Fixed tilt racking

ESTIMATED ENERGY PRODUCED 67,200 MWh/y

ACREAGE 200 acres

PROMOTER Long Island Solar Farm, LLC (BP Solar & MetLife)

CONSTRUCTION COMPANY HAWKEYE

INVESTMENT 53,000,000 USD

FINANCIAL ENTITY PRIVATE FUNDS

CONSTRUCTION PERIOD Fall 2010 - Fall 2011

Page 6: PV Experience

Projects References   Page  6  

PROJECT NAME KAISER PERMANENTE PARKING STRUCTURE

LOCATION California (USA)

POWER INSTALLED 850 kWp 800 kW

TRACKING TECHNOLOGY Carport System

ESTIMATED ENERGY PRODUCED 1,200 kWh/y

ACREAGE 2,000,000 sqf

PROMOTER Kaiser

EPC ELECNOR

INVESTMENT 2,700,000 USD

FINANCIAL ENTITY PRIVATE FUNDS

CONSTRUCTION PERIOD Oct 2013 TO May 2014

Page 7: PV Experience

Projects References   Page  7  

PROJECT NAME VENTURA NAVAL BASE

LOCATION California (USA)

POWER INSTALLED 50 kWp 45 kW

TRACKING TECHNOLOGY Carport System

ESTIMATED ENERGY PRODUCED 80,000 kWh/y

ACREAGE 7,000 sqf

PROMOTER Ventura Naval Base

EPC ELECNOR-PDE

INVESTMENT 250,000 USD

FINANCIAL ENTITY PRIVATE FUNDS

CONSTRUCTION PERIOD Feb-15 to Jun-15

Page 8: PV Experience

Projects References   Page  8  

PROJECT NAME LOS ANGELES FEDERACL COURTHOUSE PV

LOCATION LOS ANGELES, CA.

POWER INSTALLED 280 KWdc 200 kW

TRACKING TECHNOLOGY Fixed Tilt System

ESTIMATED ENERGY PRODUCED 448 MWh/y

ACREAGE 200,000 sqf

PROMOTER MSF

EPC ELECNOR

INVESTMENT 900,000 USD

FINANCIAL ENTITY USA Goverment

CONSTRUCTION PERIOD 3 Months

Page 9: PV Experience

Projects References   Page  9  

PROJECT NAME MSF

LOCATION Moree (Australia)

POWER INSTALLED 70.00 MWp 56.00 MW

TRACKING TECHNOLOGY One Axis Horizontal Tracker

ESTIMATED ENERGY PRODUCED 155.000 MWh/y

ACREAGE 210 Ha

PROMOTER MSF

EPC ELECNOR

INVESTMENT 95,000,000 €

FINANCIAL ENTITY ARENA - CEFC

CONSTRUCTION PERIOD 19 Months

Page 10: PV Experience

Projects References   Page  10  

PROJECT NAME La Magascona y Magasquilla

LOCATION Trujillo (Cáceres-Spain)

POWER INSTALLED 34,56 MWp 30 MW

TRACKING TECHNOLOGY One axis horizontal

ESTIMATED ENERGY PRODUCED 60,00 MWh/y

ACREAGE 312 Ac

PROMOTER FOTOWATIO

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 215.000.000 €

FINANCIAL ENTITY BANCO SANTANDER

CONSTRUCTION PERIOD 16 months

Page 11: PV Experience

Projects References   Page  11  

PROJECT NAME Hoya de los Vicentes

LOCATION Jumilla (Murcia-Spain)

POWER INSTALLED 23,04 MWp 20 MW

TRACKING TECHNOLOGY One axis horizontal

ESTIMATED ENERGY PRODUCED 40,00 MWh/y

ACREAGE 180 Ac

PROMOTER LUZENTIA PROMOCIÓN Y MANTENIMIENTO RENOVABLE, S.A.

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 145.000.000 €

FINANCIAL ENTITY WEST LB - DEXIA

CONSTRUCTION PERIOD 10 months

Page 12: PV Experience

Projects References   Page  12  

PROJECT NAME EGM – Olmedilla

LOCATION Olmedilla (Cuenca-Spain)

POWER INSTALLED 11,52 MWp 10 MW

TRACKING TECHNOLOGY Fix structure

ESTIMATED ENERGY PRODUCED 16,50 MWh/y

ACREAGE 62 Ac

PROMOTER EGM PROYECTOS Y SISTEMAS ENERGÉTICOS, S.L

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 63.000.000 €

FINANCIAL ENTITY ROYAL BANK OF SCOTHLAND

CONSTRUCTION PERIOD 7 months

Page 13: PV Experience

Projects References   Page  13  

PROJECT NAME Argasol

LOCATION Almodovar del Campo (Ciudad Real-Spain)

POWER INSTALLED 11,52 MWp 10 MW

TRACKING TECHNOLOGY One axis horizontal

ESTIMATED ENERGY PRODUCED 20,00 MWh/y

ACREAGE 90 Ac

PROMOTER ARGASOL, S.L.

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 71.000.000 €

FINANCIAL ENTITY WEST LB

CONSTRUCTION PERIOD 7 months

Page 14: PV Experience

Projects References   Page  14  

PROJECT NAME Arroyo de San Serván

LOCATION Arroyo de San Serván (Badajoz-Spain)

POWER INSTALLED 11,52 MWp 10 MW

TRACKING TECHNOLOGY Fix structure

ESTIMATED ENERGY PRODUCED 16,50 MWh/y

ACREAGE 70 Ac

PROMOTER ALUMBRA SOLAR, S.L.

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 60.000.000 €

FINANCIAL ENTITY BANCO SANTANDER

CONSTRUCTION PERIOD 7 months

Page 15: PV Experience

Projects References   Page  15  

PROJECT NAME Zuera

LOCATION Zuera (Zaragoza-Spain)

POWER INSTALLED 9,94 MWp 9 MW

TRACKING TECHNOLOGY Polar (one axis + tilt)

ESTIMATED ENERGY PRODUCED 14,85 MWh/y

ACREAGE 80 Ac

PROMOTER TRATAMIENTO Y GENERACION DE ENERGÍA, S.L.

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 62.000.000 €

FINANCIAL ENTITY CAJA DE AHORROS DE LA INMACULADA DE ARAGÓN

CONSTRUCTION PERIOD 6 months

Page 16: PV Experience

Projects References   Page  16  

PROJECT NAME Zuera II

LOCATION Zuera (Zaragoza-Spain)

POWER INSTALLED 11.51 MWp 9.90 MW

TRACKING TECHNOLOGY One axis horizontal

ESTIMATED ENERGY PRODUCED 20,680 MWh/y

ACREAGE 41 Ac

PROMOTER DESARROLLOS AGRONÓMICOS INDUSTRIALES, S.L.

TURN KEY CONSTRUCTOR Elecnor

INVESTMENT 17,065,000 €

FINANCIAL ENTITY BBVA

CONSTRUCTION PERIOD 6 months

Page 17: PV Experience

Projects References   Page  17  

PROJECT NAME Campos Solares Lorca I

LOCATION Lorca (Murcia-Spain)

POWER INSTALLED 7,37 MWp 6,40 MW

TRACKING TECHNOLOGY One axis horizontal

ESTIMATED ENERGY PRODUCED 28,050 MWh/y

ACREAGE 100 Ac

PROMOTER PARQUES SOLARES DE TORREALVILLA, A.I.E.

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 97.000.000 €

FINANCIAL ENTITY WEST LB

CONSTRUCTION PERIOD 6 months

Page 18: PV Experience

Projects References   Page  18  

PROJECT NAME Guadarranque

LOCATION Guadarranque (Cádiz-Spain)

POWER INSTALLED 13,53 MWp 12,30 MW

TRACKING TECHNOLOGY One axis horizontal

ESTIMATED ENERGY PRODUCED 24,30 MWh/y

ACREAGE 130 Ac

PROMOTER ENDESA GENERACIÓN, S.A.

TURN KEY CONSTRUCTOR ELECNOR (BOS supplier)

INVESTMENT 27.000.000 €

FINANCIAL ENTITY --

CONSTRUCTION PERIOD 9 months

Page 19: PV Experience

Projects References   Page  19  

PROJECT NAME Campos Solares Lorca II

LOCATION Lorca (Murcia-Spain)

POWER INSTALLED 7,83 MWp 6,80 MW

TRACKING TECHNOLOGY One axis horizontal

ESTIMATED ENERGY PRODUCED 12,87 MWh/y

ACREAGE 48 Ac

PROMOTER PARQUES SOLARES DE MIRAS, A.I.E.

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 46.000.000 €

FINANCIAL ENTITY WEST LB

CONSTRUCTION PERIOD 6 months

Page 20: PV Experience

Projects References   Page  20  

PROJECT NAME Plasencia de Jalón

LOCATION Plasencia de Jalón (Zaragoza-Spain)

POWER INSTALLED 5 MWp 4 MW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 6,96 MWh/y

ACREAGE 35 Ac

PROMOTER TRATAMIENTO Y GENERACION DE ENERGÍA, S.L.

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 14.000.000 €

FINANCIAL ENTITY CAJA DE AHORROS DE LA INMACULADA DE ARAGÓN

CONSTRUCTION PERIOD 5 months

Page 21: PV Experience

Projects References   Page  21  

PROJECT NAME Siberia Solar

LOCATION Valdecaballeros (Badajoz-Spain)

POWER INSTALLED 11,82 MWp 10 MW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 16,6 MWh/y

ACREAGE 100 acres

PROMOTER ELECNOR SA

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 33.670.000 €

FINANCIAL ENTITY ELECNOR

CONSTRUCTION PERIOD 8 months

Page 22: PV Experience

Projects References   Page  22  

PROJECT NAME Malpartida

LOCATION Malpartida (Cáceres-Spain)

POWER INSTALLED 11,82 MWp 10 MW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 18,380 MWh/y

ACREAGE 110 acres

PROMOTER ELECNOR SA

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 32.000.000 €

FINANCIAL ENTITY BANCO SANTANDER

CONSTRUCTION PERIOD 8,5 months

PROJECT NAME ALGINET

Page 23: PV Experience

Projects References   Page  23  

LOCATION Alginet (Valencia – Spain)

POWER INSTALLED 1,96 kWp 1,8 kW

TRACKING TECHNOLOGY On roof

ESTIMATED ENERGY PRODUCED 2, 57 MWh/y

ACREAGE 7 Ac

PROMOTER CELEO

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 5.195.000 €

FINANCIAL ENTITY -

CONSTRUCTION PERIOD 4 months

Page 24: PV Experience

Projects References   Page  24  

PROJECT NAME ARQUITECTOS IV

LOCATION Huercal Overa (Almería)

POWER INSTALLED 0,96 MWp 0,80 MW

TRACKING TECHNOLOGY One axis tracker

ESTIMATED ENERGY PRODUCED 1,37 MWh/y

ACREAGE 10 Ac

PROMOTER CLAVE ARQUITECTURA

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 5.787.000 €

FINANCIAL ENTITY --

CONSTRUCTION PERIOD From January 2008 to June 2008

Page 25: PV Experience

Projects References   Page  25  

PROJECT NAME CLAVE ARQUITECTURA I

LOCATION Huercal Overa (Almería)

POWER INSTALLED 0,82 MWp 0,7 MW

TRACKING TECHNOLOGY One Axis (Powerligth)

ESTIMATED ENERGY PRODUCED 1,249 MWh/y

ACREAGE 8.3 Ac

PROMOTER CLAVE ARQUITECTURA

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 4,874,000 €

FINANCIAL ENTITY --

CONSTRUCTION PERIOD From September 2005 to February 2007

Page 26: PV Experience

Projects References   Page  26  

PROJECT NAME CLAVE ARQUITECTURA II

LOCATION Huercal Overa (Almería)

POWER INSTALLED 0,63 MWp 0,50 MW

TRACKING TECHNOLOGY One Axis (Powerligth)

ESTIMATED ENERGY PRODUCED 0,962 MWh/y

ACREAGE 5,6 Ac

PROMOTER CLAVE ARQUITECTURA

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 3.740.000 €

FINANCIAL ENTITY --

CONSTRUCTION PERIOD From April 2006 to May 2007

Page 27: PV Experience

Projects References   Page  27  

PROJECT NAME Carrascosa

LOCATION El Pozuelo (Cuenca)

POWER INSTALLED 1,18 MWp 1 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 1,39 MWh/y

ACREAGE Ac

PROMOTER NAVARRO GENERACIÓN

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 6.400.000 €

FINANCIAL ENTITY Banesto

CONSTRUCTION PERIOD From August 2007 to March 2008

Page 28: PV Experience

Projects References   Page  28  

PROJECT NAME Carrascosa

LOCATION Carrascosa de la Sierra (Cuenca)

POWER INSTALLED 1,18 MWp 1 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 1,391 MWh/y

ACREAGE 7,4 Ac

PROMOTER NAVARRO GENERACIÓN

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 6.400.000 €

FINANCIAL ENTITY Banesto

CONSTRUCTION PERIOD From August 2007 to March 2008

Page 29: PV Experience

Projects References   Page  29  

PROJECT NAME ABADÍAS

LOCATION Montearagón (Toledo)

POWER INSTALLED 1,40 MWp 1,20 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 1,02 MWh/y

ACREAGE 8.8 Ac

PROMOTER ABADÍAS 3

TURN KEY CONSTRUCTOR Atersa

INVESTMENT 7.600.000 €

FINANCIAL ENTITY BBVA

CONSTRUCTION PERIOD December 2007 to March 2008

Page 30: PV Experience

Projects References   Page  30  

PROJECT NAME AFA

LOCATION Cieza (Murcia)

POWER INSTALLED 3,11 MWp 2,70 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 4,05 MWh/y

ACREAGE 22,9 Ac

PROMOTER FLEXO ESTUDIO

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 17.696.000 €

FINANCIAL ENTITY Caja Círculo

CONSTRUCTION PERIOD From November 2005 to September 2007

Page 31: PV Experience

Projects References   Page  31  

PROJECT NAME DUMAR

LOCATION Torralba de Oropesa (Toledo)

POWER INSTALLED 0,70 MWp 0,63 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 0,847 MWh/y

ACREAGE 4,4 Ac

PROMOTER Aralba Solar II

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 3.828.000 €

FINANCIAL ENTITY Bancaja

CONSTRUCTION PERIOD July 2007 to February 2008

Page 32: PV Experience

Projects References   Page  32  

PROJECT NAME ESPARTOSA I y II

LOCATION Cieza (Murcia)

POWER INSTALLED 5,40 MWp 4,68 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 7,45 MWh/y

ACREAGE 29 Ac

PROMOTER IGS

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 29.700.000 €

FINANCIAL ENTITY Banco Santander

CONSTRUCTION PERIOD From December 2007 to June 2008

Page 33: PV Experience

Projects References   Page  33  

PROJECT NAME GEYPROMAN

LOCATION Alcázar de San Juan (Ciudad Real)

POWER INSTALLED 0,24 MWp 0,20 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 0,305 MWh/y

ACREAGE 1,5 Ac

PROMOTER GEIPROMÁN & SOC. de TRANSFORMACIONES AGRARIAS S. JOSÉ

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 1.250.000 €

FINANCIAL ENTITY Caja Castilla La Mancha

CONSTRUCTION PERIOD From January 2008 to June 2008

Page 34: PV Experience

Projects References   Page  34  

PROJECT NAME IGS

LOCATION Cieza (Murcia)

POWER INSTALLED 7,27 MWp 5,85 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 10,07 MWh/y

ACREAGE 37 Ac

PROMOTER IGS

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 40.000.000 €

FINANCIAL ENTITY Caja Murcia

CONSTRUCTION PERIOD From March 2007 to June 2008

Page 35: PV Experience

Projects References   Page  35  

PROJECT NAME LA LOSA I Y II

LOCATION Casas de Benítez (Cuenca)

POWER INSTALLED 0,24 MWp 0,20 MW

TRACKING TECHNOLOGY One axis (La Losa I)& Fixed La Losa II

ESTIMATED ENERGY PRODUCED 301 MWh/y

ACREAGE 1,93 Ac

PROMOTER NAVARRO GENERACIÓN

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 1.200.000 €

FINANCIAL ENTITY Private Found

CONSTRUCTION PERIOD From February 2005 to December 2007

Page 36: PV Experience

Projects References   Page  36  

PROJECT NAME Mercabio

LOCATION Almanzora (Almería)

POWER INSTALLED 0,13 MWp 0,10 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 0,191 MWh/y

ACREAGE 0,74 Ac

PROMOTER MERCABIO SOCIEDAD COOPERATIVA

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 740.000 €

FINANCIAL ENTITY Cajamar

CONSTRUCTION PERIOD From November 2006 to January 2007

Page 37: PV Experience

Projects References   Page  37  

PROJECT NAME Montiel

LOCATION Montiel (Ciudad Real)

POWER INSTALLED 0,83 MWp 0,70 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 1,02 MWh/y

ACREAGE 5,8 Ac

PROMOTER INVERSIONES EUROPEAS

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 4.500.000 €

FINANCIAL ENTITY Banca March

CONSTRUCTION PERIOD From January 2008 to June 2008

Page 38: PV Experience

Projects References   Page  38  

PROJECT NAME Rusticas

LOCATION Añover de Tajo (Toledo)

POWER INSTALLED 2,50 MWp 2 MW

TRACKING TECHNOLOGY One Axis (Powerligth)

ESTIMATED ENERGY PRODUCED 3,56 MWh/y

ACREAGE 24 Ac

PROMOTER RUSTICAS

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 14.956.000 €

FINANCIAL ENTITY Barclays

CONSTRUCTION PERIOD February 2006 to February 2008

Page 39: PV Experience

Projects References   Page  39  

PROJECT NAME SERRANA II

LOCATION Cieza (Murcia)

POWER INSTALLED 2,39 MWp 2,07 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 3,30 MWh/y

ACREAGE 12 Ac

PROMOTER IGS

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 13.100.000 €

FINANCIAL ENTITY Caja Murcia

CONSTRUCTION PERIOD From December 2007 to June 2008

Page 40: PV Experience

Projects References   Page  40  

PROJECT NAME SOLIVAR MORATALLA

LOCATION Moratalla (Murcia)

POWER INSTALLED 2,22 MWp 1,71 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 3,03 MWh/y

ACREAGE 11 Ac

PROMOTER SOLIVAR MORATALLA

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 12.200.000 €

FINANCIAL ENTITY Caja Círculo

CONSTRUCTION PERIOD From February 2007 to June 2008

Page 41: PV Experience

Projects References   Page  41  

PROJECT NAME Fotonova & Solgomar

LOCATION Onda (Castellón)

POWER INSTALLED 0,84 MWp 0,70 MW

TRACKING TECHNOLOGY Fixed

ESTIMATED ENERGY PRODUCED 1,11 MWh/y

ACREAGE 5,18 Ac

PROMOTER FOTONOVA & SOLGOMAR

TURN KEY CONSTRUCTOR ATERSA

INVESTMENT 5.000.000 €

FINANCIAL ENTITY Caixanova

CONSTRUCTION PERIOD From January 2006 To October 2007

Page 42: PV Experience

Projects References   Page  42  

PROJECT NAME CENTRAL FOTOVOLTAICA DO MARL

LOCATION Lisboa (Portugal)

POWER INSTALLED 6,69 MWp 5,9 MW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 10,62 MWh/y

ACREAGE 20 Ac

PROMOTER MARL ENERGIA

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 31.000.000 €

FINANCIAL ENTITY Foment Invest/Caixa Capital

CONSTRUCTION PERIOD 7 months

Page 43: PV Experience

Projects References   Page  43  

PROJECT NAME CARTOCETO

LOCATION Cartoceto (PU - Marche - Italia)

POWER INSTALLED 910,8 kWp 900 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,02 MWh/y

ACREAGE 6 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.050.000 €

FINANCIAL ENTITY Credit Agricole Leaseing Italia

CONSTRUCTION PERIOD 3 months

Page 44: PV Experience

Projects References   Page  44  

PROJECT NAME FOSSOMBRONE A

LOCATION Fossombrone (PU – Marche - Italia)

POWER INSTALLED 598,00 kWp 500 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 0,66 MWh/y

ACREAGE 3,7 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 1.990.000 €

FINANCIAL ENTITY LEASINT

CONSTRUCTION PERIOD 2 months

Page 45: PV Experience

Projects References   Page  45  

PROJECT NAME FOSSOMBRONE B

LOCATION Fossombrone (PU – Marche - Italia)

POWER INSTALLED 910,8 kWp 900 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,01 MWh/y

ACREAGE 6 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.100.000 €

FINANCIAL ENTITY LEASINT

CONSTRUCTION PERIOD 3 months

Page 46: PV Experience

Projects References   Page  46  

PROJECT NAME AGUGLIANO

LOCATION Agugliano (AN – Marche - Italia)

POWER INSTALLED 1.495 kWp 1.400 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,76 MWh/y

ACREAGE 11 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 4.990.000 €

FINANCIAL ENTITY LEASINT

CONSTRUCTION PERIOD 4 months

Page 47: PV Experience

Projects References   Page  47  

PROJECT NAME FANO

LOCATION Fano (PU - Marche - Italia)

POWER INSTALLED 999,52 kWp 900 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,14 MWh/y

ACREAGE 8,5 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.350.000 €

FINANCIAL ENTITY CARIFANO

CONSTRUCTION PERIOD 3 months

Page 48: PV Experience

Projects References   Page  48  

PROJECT NAME BARCHI 2

LOCATION Barchi (PU – Marche - Italia)

POWER INSTALLED 908,80 kWp 900 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,11 MWh/y

ACREAGE 7,5 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.230.000 €

FINANCIAL ENTITY CARIFANO

CONSTRUCTION PERIOD 4 months

Page 49: PV Experience

Projects References   Page  49  

PROJECT NAME SAN GIORGIO DI PESARO 1

LOCATION San Giorgio di Pesaro (AN - Marche - Italia)

POWER INSTALLED 999,52 kWp 900 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,09 MWh/y

ACREAGE 11 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.550.000 €

FINANCIAL ENTITY CARIFANO

CONSTRUCTION PERIOD 4 months

Page 50: PV Experience

Projects References   Page  50  

PROJECT NAME CASTELLEONE DI SUASA

LOCATION Castelleone di Suasa (AN – Marche - Italia)

POWER INSTALLED 680,8 kWp 600 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 0,78 MWh/y

ACREAGE 6,5 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 2.420.000 €

FINANCIAL ENTITY LEASINT

CONSTRUCTION PERIOD 3 months

Page 51: PV Experience

Projects References   Page  51  

PROJECT NAME SAN LORENZO IN CAMPO 3

LOCATION San Lorenzo in Campo (PU – Marche - Italia)

POWER INSTALLED 980,8 kWp 900 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,04 MWh/y

ACREAGE 9,1 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.230.000 €

FINANCIAL ENTITY LEASINT

CONSTRUCTION PERIOD 3 months

Page 52: PV Experience

Projects References   Page  52  

PROJECT NAME SAN SEVERINO MARCHE

LOCATION San Severino Marche (MC – Marche - Italia)

POWER INSTALLED 2.316 kWp 2.000 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 2,69 MWh/y

ACREAGE 11 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 8.200.000 €

FINANCIAL ENTITY LEASINT

CONSTRUCTION PERIOD 4 months

Page 53: PV Experience

Projects References   Page  53  

PROJECT NAME PERGOLA

LOCATION Pergola (PU - Marche - Italia)

POWER INSTALLED 996,84 kWp 900 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 1,2 MWh/y

ACREAGE 7,6 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.100.000 €

FINANCIAL ENTITY BNP PARIBAS LEASE GROUP

CONSTRUCTION PERIOD 3 months

Page 54: PV Experience

Projects References   Page  54  

PROJECT NAME FOSSOMBRONE TETTO

LOCATION Fossombrone (PU – Marche - Italia)

POWER INSTALLED 910,70 kWp 900 kW

TRACKING TECHNOLOGY On Roof

ESTIMATED ENERGY PRODUCED 1,12 MWh/y

ACREAGE 3,7 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 3.353.000 €

FINANCIAL ENTITY BNP PARIBAS LEASE GROUP

CONSTRUCTION PERIOD 4 months

Page 55: PV Experience

Projects References   Page  55  

PROJECT NAME CORRIDONIA

LOCATION Corridonia (MC – Marche - Italia)

POWER INSTALLED 4.641,84 kWp 4.392 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 6,87 MWh/y

ACREAGE 26,9 Ac

PROMOTER NOVAPOWER

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 10.443.000 €

FINANCIAL ENTITY -

CONSTRUCTION PERIOD From May to August 2011 (COD: 08/2011)

Page 56: PV Experience

Projects References   Page  56  

PROJECT NAME CAÑADA HONDA

LOCATION SAN JUAN – Argentina

POWER INSTALLED 22.393 kWp 20.000 kW

TRACKING TECHNOLOGY Fixed Structure and one-horizontal single axis tracker

ESTIMATED ENERGY PRODUCED 42.500 MWh/y

ACREAGE 75 Ac

PROMOTER EMGASUD

TURN KEY CONSTRUCTOR ELECNOR

INVESTMENT 80.000.000 USD

FINANCIAL ENTITY BICE

CONSTRUCTION PERIOD 18 months (UNDER CONSTRUCTION)

Page 57: PV Experience

Projects References   Page  57  

PROJECT NAME SANDOUVILLE

LOCATION ROUEN – France

POWER INSTALLED 10.442 kWp 9.206 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 10.715 MWh/y

ACREAGE 28 Ac

PROMOTER GESTAMP RENEWABLES

BOS CONSTRUCTOR ELECNOR

INVESTMENT 12.000.000 USD

FINANCIAL ENTITY DEUTCHE BANK

CONSTRUCTION PERIOD MAY 2012 TO NOV 2012

Page 58: PV Experience

Projects References   Page  58  

PROJECT NAME FLINS

LOCATION PARIS – France

POWER INSTALLED 11.393 kWp 9.200 kW

TRACKING TECHNOLOGY Fixed Structure

ESTIMATED ENERGY PRODUCED 10.262 MWh/y

ACREAGE 30 Ac

PROMOTER GESTAMP RENEWABLES

BOS CONSTRUCTOR ELECNOR

INVESTMENT 12.500.000 USD

FINANCIAL ENTITY DEUTCHE BANK

CONSTRUCTION PERIOD MAY 2012 TO NOV 2012

Page 59: PV Experience

Projects References   Page  59  

PROJECT NAME ZOUERATE

LOCATION Mauritania

POWER INSTALLED 3.000 kWp 2.500 kW

TRACKING TECHNOLOGY Fixed structure

ESTIMATED ENERGY PRODUCED 4.800 MWh/y

ACREAGE 7.2 Ha

PROMOTER SNIM

EPC ELECNOR

INVESTMENT 5.500.000 EUR

FINANCIAL ENTITY Multilateral Funding

CONSTRUCTION PERIOD MAR 2013 TO AUG 2013

Page 60: PV Experience

Projects References   Page  60  

PROJECT NAME AZRAQ

LOCATION Azraq (Jordan)

POWER INSTALLED 2.177 kWp 2.000 kW

TRACKING TECHNOLOGY 1MW Fixed structure; 1MW Axis Horizontal Tracker

ESTIMATED ENERGY PRODUCED 4.096 MWh/y

ACREAGE 5.39 Ha

PROMOTER Ministry of Energy and Mineral ResourcesS (MEMR)

EPC ATERSA (ELECNOR GROUP)

INVESTMENT 3.500.000 JD (Jordan Dinar)

FINANCIAL ENTITY Debt Swap Program between Jordan and Spain

CONSTRUCTION PERIOD 6 Months

Page 61: PV Experience

Projects References   Page  61  

3. PV PROJECTS LOCATIONS MAPS.

PV PROJECTS IN SPAIN. LARGE SCALE

Page 62: PV Experience

Projects References   Page  62  

INTERNATIONAL PV PROJECTS - EUROPE

Page 63: PV Experience

Projects References   Page  63  

INTERNATIONAL PV PROJECTS – SOUTH AMERICA

Pendiente de conexión

En operación

CAPACIDAD TOTAL: 23 MW

En construcción

PROYECTOS INTERNACIONALES EN SUDAMERICA

Cañada Honda 23 MW

Page 64: PV Experience

Projects References   Page  64  

INTERNATIONAL PV PROJECTS – NORTH AMERICA

TOTAL CAPACITY: 25 MW

NORTH AMERICA PV PROJECTS

Under Construction

Operation

Page 65: PV Experience

Projects References   Page  65  

Zouerate 3 MW

INTERNATIONAL PV PROJECTS – AFRICA

Operation Under construction

Page 66: PV Experience

Projects References   Page  66  

INTERNATIONAL PV PROJECTS – MIDDLE EAST

Azraq 2 MW

Operation Under construction

Page 67: PV Experience

Projects References   Page  67  

INTERNATIONAL PV PROJECTS – AUSTRALIA

Moree 56 MW

Operation Under construction