पचिम ेीय िड मे थित तघाती शत सपदा Reactive Power Resources in Western Region 2016 Issused on 23 rd December 2015 पचिम ेीय भार ेषण क, पोसोको, लॉट नं F-3, एम०आई०डी०सी० े, मरोल, अंधेरी (पूव), ंबई. पपन: 400 093 Western Regional Load Dispatch Centre, Plot No. F-3, MIDC Area, Marol, Andheri (East), MUMBAI. Pin:400 093

Upload: donhu

Post on 03-Jan-2017

228 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: Reactive Power Resource in Western Region 2016

पश्चिम क्षेत्रीय ग्रिड मे श्थित प्रततघाती शश्तत सम्पदा

Reactive Power Resources in

Western Region

2016

Issused on 23rd December 2015

पश्चिम क्षेत्रीय भार पे्रषण कें द्र, पोसोको, प्लॉट नं F-3, एम०आई०डी०सी० क्षेत्र, मरोल, अंधेरी (पूर्व), म ंबई. पपन: 400 093

Western Regional Load Dispatch Centre,

Plot No. F-3, MIDC Area, Marol, Andheri (East), MUMBAI. Pin:400 093

Page 2: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

2/208

Page 3: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

3/208

Preface

Reactive Power management is vital for maintaining voltage within the permissible band. The strategies include switching shunt capacitors, switching shunt reactors, ICT tap coordination, reactive power generation/absorption by generators, operation of hydro units in synchronous condenser mode as well as switching of l ight ly loaded and redundant EHV/UHV transmission lines. This hand book aims to compile the detai ls of the reactive power resources available for Reactive Power management in Western Regional Grid .

Following additions/changes were made to Reactive Power

Resource Document 2014

Relevant Extracts from 5.3, 13.6 of Transmission Planning Transient Over Voltage, Max/Min Voltage Limits etc.

Capabil ity Curve, Operating Limits and its brief explanation

Procedure for Reactive Capability Test of Generators

Empirical Formula for Estimated voltage rise during l ine charging

Top 5 lines having highest voltage rise based on Emprical formaula (765 & 400 kV)

Line length, Conductor type and SIL of 400 kV and 765 kV lines

Present Tap posit ions of ICTs

Revised List of Lines to be opened on high vo ltage

Substation wise reactive resources available

Screenshot and Display number of the SCADA tabular display prepared for Bus Reactor and SLR monitoring

Reactive Power Resources Summary

Upcoming Statcoms in WR

Over Voltage sett ings of 765 kV Lines

Suggestions/comments for improving the document are most welcome.

(General Manager) WRLDC, Mumbai

Page 4: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

4/208

Page 5: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

5/208

INDEX

Table of Contents Page Nos

1. Steady State, Emergency and Temporary Voltage Limits as per CEA Planning Criteria ....................................................................... 9

2. Fundamental of Reactive Power Management ............................ 11

2.1. IEGC Provisions for Reactive Power Management ............................... 12

2.2. Standard size of reactors ....................................................................... 13

2.3. Type of Load and its Reactive Consumption ......................................... 14

2.4. Load Variation due to Freq/Voltage ....................................................... 15

2.5. Change in Voltage by Taking/Removal of Reactor ................................ 16

3. Line Parameters of Different Conductors ..................................... 17

3.1. Line Parameters of Different Conductors ............................................... 17

3.2. MVAr generated by Different Conductors .............................................. 18

3.3. Emprical Formulas for Rise in Voltage upon Charging the Lines ........... 18

3.4. Lines having Highest Voltage Rise along the Line ................................. 19

4. Western Region Power Map ........................................................ 21

5. Bus Reactors in Western Region ................................................. 22

5.1. Bus Reactors at 765 kV ......................................................................... 22

5.2. Bus Reactors at 400kV .......................................................................... 23

6. Lines and Line Reactors in Western Region ................................ 26

6.1. 765kV Lines and Line Reactors ............................................................. 26

6.2. 400kV Lines and Line Reactors ............................................................. 30

7. Substation Wise Lines and Reactors ...................................... 63

7.1. 765 kV Substation Wise Lines and Reactors ......................................... 63

7.2. 400 kV Substation Wise Lines and Reactors ......................................... 69

8. Statistics of Elements in Western Region .............................. 128

8.1. 765 kV Elements .................................................................................. 128

8.2. 400 kV Elements .................................................................................. 128

8.3. 765 kV Substation wise LRs and BRs ................................................. 128

8.4. 400 kV Substation wise LRs and BRs ................................................. 129

9. Static and Dynamic Compensation in WR ............................. 135

Page 6: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

6/208

9.1. Fixed Series Compensators (FSC) ...................................................... 135

9.2. Dynamic Series Compensators (TCSC) .............................................. 135

9.3. Proposed STATCOMs in WR (2018-19) .............................................. 136

10. Inter-Connecting Transformers (ICTs) ................................ 137

10.1. 765/400kV Transformers ..................................................................... 137

10.2. 400/220kV Transformers ..................................................................... 138

10.3. 220/66kV Transformers in DNH and DD .............................................. 144

11. 400/220/33 kV Tertiary Reactors ............................................. 145

12. Hydro Station with Synchronous condenser Facility ................ 146

13. Capacitors Installed in Western Region ................................... 147

14. HVDC Filter in Western Region ............................................... 149

14.1. HVDC Bhadrâvati Back-to-Back .......................................................... 149

14.2. HVDC Chandrapur-Padghe Bipole ...................................................... 150

14.3. HVDC Mundra-Mohindergarh Bipole ................................................... 151

15. Reactive Power Capability Testing of Generator ..................... 152

15.1. Introduction .......................................................................................... 152

15.2. Capability Curve of Generator ............................................................. 152

15.3. Objectives ............................................................................................ 153

15.4. Regulatory Provisions .......................................................................... 154

15.5. Specific Requirements ......................................................................... 156

15.6. Detailed Procedure .............................................................................. 157

15.7. Commercial conditions ........................................................................ 158

15.8. Test Results of the testing at VSTPS Unit#4 ....................................... 162

15.9. Limits hit during MVAR Capability Testing of 210 MW Generators ...... 163

16. Ready Reckoner ...................................................................... 164

17. Lines to be opened on High Voltage .................................. 166

Annex-1: Short Circuit MVA of Substations ................................... 168

Short Circuit Fault MVA Level of EHV Buses in WR...................................... 168

Annex-2: Over Voltage Settings of 765 kV Lines ........................... 174

Annex-3: Capability Curve of Generators ...................................... 179

A. 830 MW Capacity Units ....................................................................... 179

a) CGPL Unit of 830 MW ......................................................................... 179

B. 685MW, 660MW and 600MW Capacity Units ...................................... 180

Page 7: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

7/208

a) GMR-Chhattisgarh 685MW .................................................................. 180

b) Mundra (APL) 660MW ......................................................................... 181

c) Sasan UMPP 660MW .......................................................................... 182

d) Sipat 660 MW ...................................................................................... 183

e) KSK 600MW ........................................................................................ 184

f) JPL Tamnar 600MW ............................................................................ 185

C. 500MW Capacity Units ........................................................................ 186

a) Vindhyachal 500 MW (Unit-7) .............................................................. 186

b) Vindhyachal 500MW (Unit-9) ............................................................... 187

c) Korba Unit 500MW ............................................................................. 188

d) Mouda 500MW .................................................................................... 189

e) Chandrapur 500MW ............................................................................ 190

f) Trombay 500MW (Unit-5) .................................................................... 191

g) Trombay-500MW (Unit-6) .................................................................... 192

D. 400MW, 330MW, 300MW and 270MW Capacity Units ....................... 193

a) DGEN 400 MW .................................................................................... 193

b) APL 330MW ......................................................................................... 194

c) EMCO 300MW ..................................................................................... 195

d) Balco 300MW ...................................................................................... 196

e) IEPL 270MW ........................................................................................ 197

E. 250MW Capacity Units ........................................................................ 198

a) Trombay 250 MW (Unit-8) ................................................................... 198

b) NSPCL 250MW ................................................................................... 199

F. Unit Capacity of 200 and below ........................................................... 200

a) NTPC Korba 200MW ........................................................................... 200

b) NTPC VSTPS 210MW ......................................................................... 201

c) NTPC Gandhar 224MW ....................................................................... 201

d) NTPC Kawas 116 MW ......................................................................... 202

e) NTPC Kawas 106 MW ......................................................................... 202

f) NTPC Gandhar 144MW ....................................................................... 203

g) Koradi 200MW ..................................................................................... 203

Page 8: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

8/208

h) SSP 200MW ........................................................................................ 204

i) Wanakbori 200MW .............................................................................. 205

Annex-4: WR SCADA Displays ..................................................... 206

A. WR SCADA (Alstom) LRs and BRs Displays ....................................... 206

Page 9: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

9/208

1. Steady State, Emergency and Temporary Voltage Limits as per CEA Planning Criteria

Temporary over voltage limits due to sudden load rejection:

I. 800kV system 1.4 p.u. peak phase to neutral (653 kV = 1 p.u.) II. 420kV system 1.5 p.u. peak phase to neutral (343 kV = 1 p.u.)

III. 245kV system 1.8 p.u. peak phase to neutral (200 kV = 1 p.u.) IV. 145kV system 1.8 p.u. peak phase to neutral (118 kV = 1 p.u.) V. 123kV system 1.8 p.u. peak phase to neutral (100 kV = 1 p.u.)

VI. 72.5kV system 1.9 p.u. peak phase to neutral (59 kV = 1 p.u.)

Switching over voltage limits

I. 800kV system 1.9 p.u. peak phase to neutral (653 kV = 1 p.u.) II. 420kV system 2.5 p.u. peak phase to neutral (343 kV = 1 p.u.)

Typical over voltage setting for 400 kV system

I. Stage-1: 110% , 5 second delay II. Stage-2: 150%, Instantaneous

Page 10: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

10/208

Typical over voltage setting for 765 kV system

I. Stage-1: 107% , 5 second delay II. Stage-2: 150%, Instantaneous

Page 11: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

11/208

2. Fundamental of Reactive Power Management

Page 12: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

12/208

2.1. IEGC Provisions for Reactive Power Management

6.6.1. Reactive power compensation should ideally be provided locally, by generating reactive power as close to the reactive power consumption as possible. The Regional Entities except Generating Stations are therefore expected to provide local VAr compensation/generation such that they do not draw VArs from the EHV grid, particularly under low-voltage condition. To discourage VAr drawals by Regional Entities except Generating Stations, VAr exchanges with ISTS shall be priced as follows:

The Regional Entity except Generating Stations pays for VAr drawal when voltage at the metering point is below 97%

The Regional Entity except Generating Stations gets paid for VAr return when voltage is below 97%

The Regional Entity except Generating Stations gets paid for VAr drawal when voltage is above103%

The Regional Entity except Generating Stations pays for VAr return when voltage is above 103% Provided that there shall be no charge/payment for VAr drawal/return by a Regional Entity except Generating Stations on its own line emanating directly from an ISGS. 6.6.2. The charge for VArh shall be at the rate of 10 paise/kVArh w.e.f. 3.5.2010, and this will be applicable between the Regional Entity, except Generating Stations, and the regional pool account for VAr interchanges. This rate shall be escalated at 0.5paise/kVArh per year thereafter, unless otherwise revised by the Commission.

Page 13: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

13/208

2.2. Standard size of reactors

Transformer TAP Changing Criteria

765/400 kV Transformers

Page 14: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

14/208

400/220 kV Transformers

2.3. Type of Load and its Reactive Consumption

A great many loads consume not only active but also reactive power. The Industry wise power factor is generally observed to be as follows:

INDUSTRY WISE POWER FACTOR(INDICATIVE FIGS)

Textiles 0.65/0.75 Chemical 0.75/0.85 Machine shop 0.4 / 0.65 Arc Welding 0.35/ 0.4 Arc Furnaces 0.7 / 0.9 Coreless induction furnaces and heaters 0.15/0.4 Cement plants 0.78/0.8 Garment factories 0.35/0.6 Breweries 0.75/0.8 Steel Plants 0.6 / 0.85 Collieries 0.65/0.85 Brick Works 0.6 / 0.75 Cold Storage 0.7 / 0.8 Foundries 0.5 / 0.7 Plastic molding plants 0.6 / 0.75 Printing 0.55/0.7

Page 15: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

15/208

Quarries 0.5 / 0.7 Rolling Mills (i.e., Paper, Steel, etc.) 0.3 / 0.75

Some typical values of reactive power consumption of individual loads are given below:

Induction motors 0.5 to 1.1 KVAr/KW, at rated output.

Uncontrolled rectifiers 0.3 KVAr/KW.

Controlled rectifiers usually consume much more KVAr/KW than uncontrolled ones and with dependence on the rectifier delay angle.

Arc furnaces around 1 KVAr/KW.

Both controlled rectifiers and arc furnaces of steel mills have a reactive power consumption characterized by a high average value and fast variations. Purely resistive loads, like filament lamps and electric heaters, do not, of course, consume reactive power.

The synchronous motor is the only type of individual load, which can produce reactive power. It consumes reactive power when under excited and produces reactive power when overexcited. Synchronous motors are usually operated overexcited and thus usually produce reactive power.

2.4. Load Variation due to Freq/Voltage

The –ve dQ/dF suggests that the MVAR demand from the load decreases as frequency rises.

Page 16: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

16/208

2.5. Change in Voltage by Taking/Removal of Reactor

The approximate percentage voltage rise/fall at a Bus due to Removal / Taking in of a reactor of capacity ‘Q’ MVAR is:

(Q x 100) ÷ (Fault MVA)

Example: Taking in / Removing a 80 MVAR bus reactor at 400kV Kolhapur bus

(Short Circuit level of about 10534 MVA and voltage of 410kV), the voltage at the

bus would fall / rise by 3.1 kV i.e. = 406.9 kV

FERRANTI EFFECT

Sebastian Pietro Innocenzo Adhemar Ziani de Ferranti (April 9, 1864 - January 13, 1930)

A long transmission line draws a substantial quantity of charging current. If such a line is open circuited or very lightly loaded at the receiving end, the voltage at receiving end may become greater than voltage at sending end.

400kV overhead transmission line would generate 55MVAR per

100KM as compared to 2200 MVAR generated by 400kV underground cable.

Typical Fault Level of Substation in Western region is tabulated as Annex-1

Page 17: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

17/208

3. Line Parameters of Different Conductors

3.1. Line Parameters of Different Conductors

Page 18: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

18/208

3.2. MVAr generated by Different Conductors

S No. Voltage

kV Type of Conductor MVAr generated per

ckt per 100 km line

1 765 Hexa Zebra 266

2 765 Quad Bersimis 235

3 400 Quad Bersimis 75

4 400 Triple Snow Bird 67

5 400 Quad ACSR Moose 73

6 400 Quad AAAC Moose 69

7 400 Twin ACSR Moose 55

3.3. Emprical Formulas for Rise in Voltage upon

Charging the Lines Charging attempt from End1 Rise in End1 Voltage VEnd1=SMVAEnd1*VpEnd1/(SMVA-Qnet) Rise in End2 Voltage VEnd2= VEnd1+Qnet*X/VpEnd1 Charging attempt from End-2 Rise in End2 Voltage VEnd2= SMVAEnd2* VpEnd2/(SMVA-Qnet) Rise in End1 Voltage VEnd1= VEnd2+Qnet*X/VpEnd2

SMVAEnd1/2-Short circuit MVA of End1 or End2 Substation VEnd1/2: Rise in End1 or End2 Voltage in kV VpEnd1/2: Precharging End1 or End2 Voltage in kV Qnet: Net MVAR= (No load MVAR of Line-LR MVAR at End1-LR MVAR at End2) May please note that above formulas are based on assumptions that all lines are in service. Example: Charging of 765 kV Aurangabad-Wardha- 1 (348 km, Hexa Zebra, End1 LR-240 MVAR, End2 LR-330 MVAR, No load MVAR generated by line for 348 km-926 MVAR, Reactance of the whole line in ohms-89 ohms on 100 MVA Base).

Page 19: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

19/208

Charging attempt from End1 (Aurangabad) SMVAEnd1 – 31994 MVA

VpEnd1 – 765 kV Rise in End1 Voltage VEnd1=SMVAEnd1*VpEnd1/(SMVA-Qnet)= 31994*765/(31994-(926-240-330))=774 kV Rise in End2 Voltage VEnd2= VEnd1+Qnet*X/VpEnd1=774+(926-240-330)*89/765=815 kV Charging attempt from End-2 SMVAEnd2 – 39793 MVA

VpEnd2 – 765 kV Rise in End2 Voltage VEnd2= SMVAEnd2* VpEnd2/(SMVA-Qnet)=39793*765/(39793-(926-240-330))=772 Rise in End1 Voltage VEnd1= VEnd2+Qnet*X/VpEnd2 =772+(926-240-330)*89/765=813 kV

3.4. Lines having Highest Voltage Rise along the Line

765 kV Lines *

S.No End-1 End-2 Id Km Conductor

Type

End-1 Short Ckt

MVA

End-2 Short Ckt

MVA

Rise/Dip in

Voltage along

the Line

1 Dharamjaygarh Jabalpur-PS 1 424 Hexa Zebra 40155 36636 79

2 Dharamjaygarh Jabalpur-PS 3 379 Hexa Zebra 40155 36636 55

3 Aurangabad-

PG Wardha 3 370 Hexa Zebra 31994 39793 51

4 Wardha Raipur-

PS(Durg) 1 370 Hexa Zebra 39793 32332 51

5 Dharamjaygarh Jharsuguda 1 303 Hexa Zebra 40155 24052 48

*Computations are based on above empirical formulas

Page 20: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

20/208

400 kV Lines *

S.No End-1 End-2 Id Km Conductor

Type

End-1 Short Ckt

MVA

End-2 Short Ckt

MVA

Rise/Dip in

Voltage along

the Line

1 Dhariwal Parli-PG 1 390 Twin ACSR

Moose 22048 21192 50

2 Sipat Ranchi 1 405 Twin ACSR

Moose 23393 17357 49

3 Parli-M Chandrapur-II 2 371 Twin ACSR

Moose 21033 33101 48

4 Raipur Wardha 1 371 Quad ACSR

Moose 27000 36770 34

5 Vindhyachal Jabalpur 4 389 Twin ACSR

Moose 39754 25308 29

Page 21: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

21/208

4. Western Region Power Map

Page 22: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

22/208

5. Bus Reactors in Western Region

5.1. Bus Reactors at 765 kV

Sr. No. Name of S/S Owner Nos of Reactor Total MVAR

Rated Voltage

1 Akola(2) MEGPTCL 3X80 240 800

2 Aurangabad-PG PGCIL 3X80 + 3X80 480 800

3 Bhopal-BDTCL BDTCL 3X80 240 800

4 Bilaspur PGCIL 3X80 240 800

5 Bina-PG PGCIL 3X80 + 3X80 480 800

6 Champa PGCIL - - -

7 Dharamjaygarh PGCIL 3X110 + 3X110 660 800

8 Dhule-BDTCL BDTCL 3X80 240 800

9 Gwalior PGCIL 3X80 240 800

10 Indore-PG PGCIL 3X80 + 3X80 480 800

11 Jabalpur-PS PGCIL 3X80 + 3X80 480 800

12 Koradi(III) MEGPTCL 3X80 240 800

13 Pune-

PG(Shikrapur) PGCIL 3x80 240 800

14 Raigarh-

PS(Kotra) PGCIL 3X80 240 800

15 Raipur-PS(Durg) PGCIL 3X80 240 800

16 Sasan SPL 3x80 240 800

17 Satna PGCIL 3X80 + 3X80 480 800

18 Seoni PGCIL 3X80 240 800

19 Sipat NTPC 3X80 240 800

20 Solapur PGCIL 3X80 240 800

21 Tamnar PGCIL 3X80 240 800

22 Tiroda MEGPTCL 3X80 240 800

23 Vadodora-PS PGCIL 3x80 240 800

24 Vindhyachal-PS PGCIL 3x80 240 800

25 Wardha PGCIL 3X80 + 3X110 570 800

Total 9X110+84X80 7710

Page 23: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

23/208

5.2. Bus Reactors at 400kV

S.No Substation Owner Nos of Reactor Total

MVAR Rated

Voltage

1 Amreli GETCO 1X50 + 1X125 175 420

2 APL-Mundra APL 2X80 + 1X125 285 420

3 Asoj GETCO 1X50 50 420

4 Aurangabad-PG PGCIL 1X125 125 420

5 Bableshwar MSETCL 2X80 160 420

6 Bachau PGCIL 1X63 + 1X125 188 420

7 Bhadrawati PGCIL 1X50 50 420

8 Bhatapara PGCIL 1X125 125 420

9 Bhopal-BDTCL BDTCL 1X125 125 420

10 Bhopal-MP MPPTCL 1X125 + 1x80 205 420

11 Bhusawal (Khadka) MSETCL 1X50 50 420

12 Bina-MP MPPTCL 1X50 50 420

13 Bina-PG PGCIL 1X63 63 420

14 Birsingpur MPPTCL 1X50 50 420

15 CGPL CGPL 1x63 63 420

16 Chhegaon MPPTCL 1x50 50 420

17 Chorania GETCO 1X50 + 1X125 175 420

18 Damoh PGCIL 1X63 + 1X125 188 420

19 Dehgam PGCIL 1X63 + 1X125 188 420

20 DGEN DGEN 1X125 125 420

21 Dhariwal DIL 1x80 80 420

22 Dhariwal-MS DIL 1x80 80 420

23 Dhule MSETCL 1X80 80 420

24 EMCO GMR 1X80 80 420

25 Essar_Mahan ESSAR 1X80 80 420

26 Gandhar NTPC 1X50 50 420

27 GMR-CG GMR 1x125 125 420

28 Gwalior PGCIL 3X125 375 420

29 Hadala GETCO 1X50 + 1X125 175 420

30 Indore-PG PGCIL 1X125 + 1X63 188 420

31 Itarsi PGCIL 2X125 + 1X50 300 420

32 Jabalpur PGCIL 1X125 + 1X63 188 420

33 Jabalpur (PS) PGCIL 2X125 250 420

34 Jaigad JPTL 2x50 100 420

35 Jetpur GETCO 1X50 + 1X63 113 420

36 JPL JPL 1x125 125 420

Page 24: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

24/208

S.No Substation Owner Nos of Reactor Total

MVAR Rated

Voltage

37 JP-Nigrie JPVL 1X125 125 420

38 Julwania MPPTCL 1x50 50 420

39 Kala PGCIL 1X80 80 420

40 Karad MSETCL 1X80 80 420

41 Kasor GETCO 1X50 + 1X125 175 420

42 Khandwa PGCIL 2X125 250 420

43 Kharghar MSETCL 1X80 80 420

44 Kolhapur MSETCL 1X80 80 420

45 Kolhapur-PG PGCIL 1x125 125 420

46 Koradi MSETCL 1X50 50 420

47 Kosamba GETCO 1X80 80 420

48 Lonikhand MSETCL 1X50 50 420

49 Magarawada PGCIL 1x80 80 420

50 Mansar GETCO 1x63 63 420

51 Mapusa PGCIL 1X50 50 420

52 MB Power MB Power 1x125 125 420

53 Mouda NTPC 1x80 80 420

54 Nagda MPPTCL 2X50 100 420

55 Nagothane MSETCL 1X80 80 420

56 Nandgaonpeth

Rattan India 1x80 80 420

57 Navsari PGCIL 1X63 63 420

58 Padghe MSETCL 1X80 80 420

59 Parli-M MSETCL 1X50 50 420

60 Parli-PG PGCIL 1X63 + 1X125 188 420

61 Pirana-PG PGCIL 1X125 125 420

62 Pithampur MPPTCL 1x50 50 420

63 Pune-PG PGCIL 1X50 50 420

64 Raigarh PGCIL 1X63 + 1X125 188 420

65 Raigarh-

PS(Kotra) PGCIL 1X80 80 420

66 Raipur PGCIL 1X125 + 1X80 205 420

67 Rajgarh PGCIL 1X125 125 420

68 Ranchodpura GETCO 1X50 + 1X125 175 420

69 RKM RKM 2x50 100 420

70 Sami APL 1X50 50 420

71 Satna PGCIL 1X50 + 1X63 113 420

72 Satpura MPPTCL 2X63 126 420

Page 25: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

25/208

S.No Substation Owner Nos of Reactor Total

MVAR Rated

Voltage

73 Seoni PGCIL 2x125 250 420

74 Shujalpur PGCIL 1X63 + 1X125 188 420

75 SKS SKS 1x50 50 420

76 Soja GETCO 1X50 + 1X80 130 420

77 Solapur-PG PGCIL 1X63 63 420

78 Tiroda MEGPTCL 2X80 160 420

79 Unosugen TPL 1X80 80 420

80 Varsana GETCO 1X50 + 1X125 175 420

81 Vindhyachal NTPC 1X63 + 1X50 113 420

82 Vindhyachal-IV NTPC 1X80 80 420

83 Vindhyachal-PS PGCIL 1X80 80 420

84 Wardha PGCIL 1X50 50 420

85 Warora ATIL 1x125 125 420

86 Zerda(Kansari) GETCO 1X50 + 1X125 175 420

Total 50x35+18x63+27x80+40x125 10249

Page 26: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

26/208

6. Lines and Line Reactors in Western Region

6.1. 765kV Lines and Line Reactors

S.No

End-1 End-2 Id Km Conduc

tor Type

SIL End1 LR End2 LR

MVAR S/W MVAR S/W

1 Akola(2)* Taptithanda* 1 219 Quad

Bersimis 2194 - - - -

2 Akola(2)* Taptithanda* 2 219 Quad

Bersimis 2194 - - - -

3 Akola(2)# Aurangabad-

PG# 1

Quad Bersimis

2194 240 Yes - -

4 Akola(2)# Aurangabad-

PG# 2

Quad Bersimis

2194 240 Yes - -

5 Aurangabad-

PG Wardha 1 348

Hexa Zebra

2470 240 - 330 Yes

6 Aurangabad-

PG Wardha 2 348

Hexa Zebra

2470 240 - 330 -

7 Aurangabad-

PG Wardha 3 370

Hexa Zebra

2470 240 - 330 Yes

8 Aurangabad-

PG Wardha 4 370

Hexa Zebra

2470 240 - 330 -

9 Aurangabad-

PG Solapur-PG 1 279

Hexa Zebra

2470 240 Yes 240 -

10 Aurangabad-

PG Solapur-PG 2 279

Hexa Zebra

2470 240 Yes 240 -

11 Bhopal-BDTCL

Indore-PG 1 176 Quad

Bersimis 2194 240 Yes 240 -

12 Bilaspur Seoni 1 333 Quad

Bersimis 2194 240 Yes 240 -

13 Bilaspur Seoni 2 335 Quad

Bersimis 2194 240 Yes 240 -

Page 27: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

27/208

S.No

End-1 End-2 Id Km Conduc

tor Type

SIL End1 LR End2 LR

MVAR S/W MVAR S/W

14 Bilaspur Dharamjayga

rh 1 89

Quad Bersimis

2194 240 Yes - -

15 Bina-PG Gwalior 1 235 Quad

Bersimis 2194 240 - 240 Yes

16 Bina-PG Gwalior 2 235 Quad

Bersimis 2194 240 - 240 Yes

17 Bina-PG Gwalior 3 231 Quad

Bersimis 2194 240 Yes 240 Yes

18 Bina-PG Indore 1 310 Quad

Bersimis 2194 240 Yes 240 -

19 Bina-PG Jabalpur-PS 1 230 Quad

Bersimis 2194 240 - 240 Yes

20 Bina-PG Jabalpur-PS 2 230 Quad

Bersimis 2194 240 - 240 Yes

21 Bina-PG Jabalpur-PS 3 236 Quad

Bersimis 2194 240 - 240 Yes

22 Dharamjayg

arh Ranchi 1 301

Quad Bersimis

2194 330 - 240 Yes

23 Dharamjayg

arh Ranchi 2 303

Quad Bersimis

2194 330 Yes - -

24 Dharamjayg

arh Raipur-

PS(Durg) 2 200

Quad Bersimis

2194 240 - - -

25 Dharamjayg

arh Jharsuguda 1 303

Hexa Zebra

2470 330 Yes - -

26 Dharamjayg

arh Jharsuguda 2 303

Hexa Zebra

2470 330 Yes - -

27 Dharamjayg

arh Jabalpur-PS 1 424

Hexa Zebra

2470 330 Yes 240 -

28 Dharamjayg

arh Jabalpur-PS 2 424

Hexa Zebra

2470 330 Yes 240 -

Page 28: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

28/208

S.No

End-1 End-2 Id Km Conduc

tor Type

SIL End1 LR End2 LR

MVAR S/W MVAR S/W

29 Dharamjayg

arh Jabalpur-PS 3 379

Hexa Zebra

2470 330 Yes 240 -

30 Dharamjayg

arh Jabalpur-PS 4 379

Hexa Zebra

2470 330 Yes 240 -

31 Dhule-BDTCL

Aurangabad-PG

1 192 Quad

Bersimis 2194 240 Yes - -

32 Gwalior Agra 1 129 Quad

Bersimis 2194 - - - -

33 Gwalior Agra 2 128 Quad

Bersimis 2194 - - - -

34 Gwalior Jaipur 1 304 Quad

Bersimis 2194 240 Yes 240 -

35 Gwalior Jaipur 2 311 Quad

Bersimis 2194 240 Yes 240 -

36 Jabalpur-PS Bhopal-BDTCL

1 260 Quad

Bersimis 2194 240 Yes 240 -

37 Kholpaur-

PG* Kudgi* 1 191

Hexa Zebra

2470 - - - -

38 Kholpaur-

PG* Kudgi* 2 191

Hexa Zebra

2470 - - - -

39 Koradi(III) Akola(2) 1 222 Quad

Bersimis 2194 240 Yes 240 -

40 Koradi(III) Akola(2) 2 222 Quad

Bersimis 2194 240 - 240 -

41 Pune-

PG(Shikrapur)

Solapur-PG 1 270 Quad

Bersimis 2194 240 Yes 240 Yes

42 Raigarh-PS(Kotra)

Raipur-PS(Durg)

1 235 Hexa Zebra

2470 240 Yes 240 -

43 Raigarh-PS(Kotra)

Raipur-PS(Durg)

2 235 Hexa Zebra

2470 240 Yes 240 -

44 Raigarh-PS(Kotra)

Tamnar 1 48 Hexa Zebra

2470 - - - -

45 Raigarh-PS(Kotra)

Tamnar 2 48 Hexa Zebra

2470 - - - -

Page 29: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

29/208

S.No

End-1 End-2 Id Km Conduc

tor Type

SIL End1 LR End2 LR

MVAR S/W MVAR S/W

46 Raigarh-PS(Kotra)

Champa 1 96 Quad

Bersimis 2194 - - - -

47 Raipur-

PS(Durg) Champa 1 153

Quad Bersimis

2194 240 Yes - -

48 Sasan Satna 1 246 Quad

Bersimis 2194 240 - 240 -

49 Sasan Satna 2 243 Quad

Bersimis 2194 240 - 240 -

50 Sasan Vindhyachal-

PS 1 6

Quad Bersimis

2194 - - - -

51 Satna Gwalior 1 337 Quad

Bersimis 2194 240 Yes 240 -

52 Satna Gwalior 2 337 Quad

Bersimis 2194 240 Yes 240 -

53 Satna Bina-PG 1 274 Quad

Bersimis 2194 240 Yes 240 -

54 Satna Bina-PG 2 276 Quad

Bersimis 2194 240 Yes 240 -

55 Satna Vindhyachal-

PS 1 237

Quad Bersimis

2194 240 - 240 Yes

56 Satna Vindhyachal-

PS 2 237

Quad Bersimis

2194 240 - 240 Yes

57 Seoni Bina-PG 1 292 Quad

Bersimis 2194 240 Yes 240 -

58 Seoni Wardha 1 261 Quad

Bersimis 2194 240 Yes - -

59 Seoni Wardha 2 261 Quad

Bersimis 2194 240 Yes - -

60 Sipat Bilaspur 1 22 Quad

Bersimis 2194 240 Yes - -

61 Sipat Bilaspur 2 22 Quad

Bersimis 2194 240 Yes - -

62 Solapur Raichur 1 208 Quad

Bersimis 2194 240 Yes - -

63 Solapur Raichur 2 208 Quad

Bersimis 2194 240 Yes - -

Page 30: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

30/208

S.No

End-1 End-2 Id Km Conduc

tor Type

SIL End1 LR End2 LR

MVAR S/W MVAR S/W

64 Tiroda Koradi(III) 1 136 Quad

Bersimis 2194 240 Yes 240 Yes

65 Tiroda Koradi(III) 2 138 Quad

Bersimis 2194 240 Yes 240 Yes

66 Vadodora-

PS Indore-PG 1 293

Quad Bersimis

2194 240 - 240 Yes

67 Vadodora-

PS Dhule-BDTCL

1 268 Quad

Bersimis 2194 240 - 240 Yes

68 Wardha Raipur-

PS(Durg) 1 370

Hexa Zebra

2470 330 - 240 Yes

69 Wardha Raipur-

PS(Durg) 2 370

Hexa Zebra

2470 330 - 240 Yes

* 765 kV line charged at 400 kV, # Future Lines

16365

15060

Total 10920

6.2. 400kV Lines and Line Reactors

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

1 ACBIL Bilaspur 1 56 Twin

ACSR Moose

517 - - - -

2 ACBIL MCCPL 1 16 Twin

ACSR Moose

517 - - - -

3 Akola Aurangabad-PG 1 178 Twin

ACSR Moose

517 50 - 50 -

4 Akola Aurangabad-PG 2 178 Twin

ACSR Moose

517 50 - 50 -

Page 31: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

31/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

5 Akola Nandgaonpeth 1 117 Twin

ACSR Moose

517 - - - -

6 Akola Akola(2) 1 30 Twin

ACSR Moose

517 - - - -

7 Akola Akola(2) 2 30 Twin

ACSR Moose

517 - - - -

8 Akola(2) Nandgaonpeth 1 104 Twin

ACSR Moose

517 - - - -

9 Akola(2) Nandgaonpeth 2 104 Twin

ACSR Moose

517 - - - -

10 Amreli Hadala 1 165 Twin

ACSR Moose

517 - - - -

11 Amreli Chorania 1 164 Twin

ACSR Moose

517 - - - -

12 Amreli Jetpur 1 96 Twin

ACSR Moose

517 - - - -

13 Amreli Jetpur 2 96 Twin

ACSR Moose

517 - - - -

14 APL-Mundra Sami 1 282 Twin

ACSR Moose

517 - - 50 -

15 APL-Mundra Sami 2 282 Twin

ACSR Moose

517 - - 50 -

16 APL-Mundra Hadala 1 233 Twin

ACSR Moose

517 - - 63 -

Page 32: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

32/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

17 APL-Mundra Versana 1 84 Twin

ACSR Moose

517 - - - -

18 APL-Mundra Versana 2 84 Twin

ACSR Moose

517 - - - -

19 APL-Mundra Versana 3 84 Twin

ACSR Moose

517 - - - -

20 Asoj Chorania 1 177 Twin

ACSR Moose

517 - - - -

21 Asoj Chorania 2 166 Twin

ACSR Moose

517 50 - - -

22 Asoj Kosamba 1 122 Twin

ACSR Moose

517 - - - -

23 Asoj Wanakbori 1 76 Twin

ACSR Moose

517 - - - -

24 Aurangabad-

M(Waluj) Pune-PG 1 261

Twin ACSR Moose

517 50 - 50 Yes

25 Aurangabad-

M(Waluj) Pune-PG 2 261

Twin ACSR Moose

517 50 - 50 Yes

26 Aurangabad-

M(Waluj) Aurangabad-PG 1 54

Quad ACSR Moose

681 - - - -

27 Aurangabad-

M(Waluj) Aurangabad-PG 2 54

Quad ACSR Moose

681 - - - -

28 Aurangabad-

M(Waluj) Taptithanda 1 135

Twin ACSR Moose

517 - - - -

Page 33: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

33/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

29 Aurangabad-

M(Waluj) Deepnagar 2 185

Twin ACSR Moose

517 - - - -

30 Aurangabad-PG# Boisar# 1 327 Twin

ACSR Moose

517 80 Yes 80 -

31 Aurangabad-PG# Boisar# 2 327 Twin

ACSR Moose

517 80 Yes 80 -

32 Bableshwar Padghe 1 174 Twin

ACSR Moose

517 - - - -

33 Bableshwar Padghe 2 174 Twin

ACSR Moose

517 - - - -

34 Bableshwar Aurangabad-

M(Waluj) 1 131

Twin ACSR Moose

517 - - - -

35 Bableshwar# IB-Nasik# 1 72 Twin

ACSR Moose

517 - - - -

36 Bableshwar# IB-Nasik# 2 72 Twin

ACSR Moose

517 - - - -

37 Bachau Ranchodpura 1 282 Triple ACSR

Snowbird 626 - - 50 -

38 Bachau Ranchodpura 2 282 Triple ACSR

Snowbird 626 - - 50 -

39 Bachau Varsana 1 10 Twin

ACSR Moose

517 - - - -

40 Bachau Varsana 2 10 Twin

ACSR Moose

517 - - - -

Page 34: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

34/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

41 Bhadrawati Bhilai 1 322 Twin

ACSR Moose

517 50 - 80 -

42 Bhadrawati Raipur 1 333 Twin

ACSR Moose

517 50 - 80 -

43 Bhadrawati Raipur 2 346 Twin

ACSR Moose

517 63 - 50 Yes

44 Bhadrawati Raipur 3 346 Twin

ACSR Moose

517 63 - 63 -

45 Bhadrawati EMCO 1 28 Twin

ACSR Moose

517 - - - -

46 Bhadrawati EMCO 2 28 Twin

ACSR Moose

517 - - - -

47 Bhadrawati Parli-PG 1 388 Twin

ACSR Moose

517 63 - 63 -

48 Bhadrawati Dhariwal 1 15 Twin

ACSR Moose

517 63 - - -

49 Bhadrawati HVDC Ramagundam 1 178 Twin

ACSR Moose

517 50 - - -

50 Bhadrawati HVDC Ramagundam 2 178 Twin

ACSR Moose

517 50 - - -

51 Bhilai Raipur 1 13 Twin

ACSR Moose

517 - - - -

52 Bhilai Seoni 1 230 Twin

ACSR Moose

517 50 - - -

Page 35: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

35/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

53 Bhilai Bhatapara 1 93 Twin

ACSR Moose

517 - - 50 -

54 Bhilai Raita 1 56 Twin

ACSR Moose

517 - - - -

55 Bhilai Raita 2 56 Twin

ACSR Moose

517 - - - -

56 Bhilai Raita 3 56 Twin

ACSR Moose

517 - - - -

57 Bhopal Bina-MP 1 289 Twin

ACSR Moose

517 - - 50 -

58 Bhopal Bina-MP 2 273 Twin

ACSR Moose

517 - - 50 -

59 Bhopal Itarsi 1 98 Twin

ACSR Moose

517 - - - -

60 Bhopal Itarsi 2 98 Twin

ACSR Moose

517 - - - -

61 Bhopal Damoh 1 214 Twin

ACSR Moose

517 50 - - -

62 Bhopal Damoh 2 214 Twin

ACSR Moose

517 50 - - -

63 Bhopal-BDTCL Bhopal (MP) 1 9 Twin

ACSR Moose

517 - - - -

64 Bhopal-BDTCL Bhopal (MP) 2 9 Twin

ACSR Moose

517 - - - -

Page 36: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

36/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

65 Bhusawal (Khadka) Bableshwar 1 220 Twin

ACSR Moose

517 - - - -

66 Bhusawal (Khadka) Aurangabad-

M(Waluj) 1 238

Twin ACSR Moose

517 - - 50 -

67 Bhusawal (Khadka) Akola 1 182 Twin

ACSR Moose

517 50 - - -

68 Bhusawal (Khadka) Deepnagar 1 15 Twin

ACSR Moose

517 - - - -

69 Bhusawal (Khadka) Deepnagar 2 15 Twin

ACSR Moose

517 - - - -

70 Bina-MP JP-Bina 1 20 Twin

ACSR Moose

517 - - - -

71 Bina-MP Bina-PG 1 3 Twin

ACSR Moose

517 - - - -

72 Bina-MP Bina-PG 2 3 Twin

ACSR Moose

517 - - - -

73 Bina-MP Bina-PG 3 3 Twin

ACSR Moose

517 - - - -

74 Bina-MP Bina-PG 4 3 Twin

ACSR Moose

517 - - - -

75 Bina-PG Shujalpur 1 200 Twin

ACSR Moose

517 63 Yes 50 -

76 Bina-PG Shujalpur 2 200 Twin

ACSR Moose

517 63 Yes 50 -

Page 37: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

37/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

77 Bina-PG JP-Bina 1 20 Twin

ACSR Moose

517 - - - -

78 Birsingpur Katni 1 118 Twin

ACSR Moose

517 - - - -

79 Birsingpur Katni 2 118 Twin

ACSR Moose

517 63 - - -

80 Birsingpur Balco 1 236 Twin

ACSR Moose

517 50 - - -

81 Birsingpur Vandana 1 215 Twin

ACSR Moose

517 - - 50 -

82 CGPL Chorania 1 314 Triple ACSR

Snowbird 626 63 Yes 63 -

83 CGPL Mansar 1 224 Triple ACSR

Snowbird 626 63 Yes - -

84 CGPL Jetpur 1 334 Triple ACSR

Snowbird 626 63 Yes 63 -

85 CGPL Jetpur 2 334 Triple ACSR

Snowbird 626 63 Yes 63 -

86 CGPL Bachau 1 100 Triple ACSR

Snowbird 626 - - - -

87 CGPL Bachau 2 100 Triple ACSR

Snowbird 626 - - - -

88 Chakan Pune-PG 1 18 Twin

ACSR Moose

517 - - - -

Page 38: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

38/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

89 Chandrapur Bhadrawati 1 20 Twin

ACSR Moose

517 - - - -

90 Chandrapur Bhadrawati 2 20 Twin

ACSR Moose

517 - - - -

91 Chandrapur Bhadrawati 3 22 Twin

ACSR Moose

517 - - - -

92 Chandrapur Bhadrawati 4 22 Twin

ACSR Moose

517 - - - -

93 Chandrapur Khaparkheda 1 156 Twin

ACSR Moose

517 - - - -

94 Chandrapur Chandrapur-II 1 1 Twin

ACSR Moose

517 50 - - -

95 Chandrapur Chandrapur-II 2 1 Twin

ACSR Moose

517 50 - - -

96 Chandrapur Parli-M 3 371 Twin

ACSR Moose

517 50 - 50 -

97 Chandrapur-II Dhariwal 1 8 Twin

ACSR Moose

517 - - - -

98 Chandrapur-II Dhariwal 2 8 Twin

ACSR Moose

517 - - - -

99 Chhegaon Julwania 1 114 Twin

ACSR Moose

517 - - - -

100 Chorania Kosamba 1 Twin

ACSR Moose

517 50 - 63 -

Page 39: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

39/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

101 Chorania Kosamba 2 Twin

ACSR Moose

517 50 - 63 -

102 Damoh Birsinghpur 1 227 Twin

ACSR Moose

517 50 - - -

103 Damoh Birsinghpur 2 227 Twin

ACSR Moose

517 50 - - -

104 Damoh Katni 1 118 Twin

ACSR Moose

517 50 - - -

105 DB-Power Raigarh-PS(Kotra) 1 18 Twin

ACSR Moose

517 - - - -

106 DB-Power Raigarh-PS(Kotra) 2 18 Twin

ACSR Moose

517 - - - -

107 Dehgam Gandhar 1 157 Twin

ACSR Moose

517 - - - -

108 Dehgam Gandhar 2 157 Twin

ACSR Moose

517 - - - -

109 Dehgam Pirana-PG 1 56 Twin

ACSR Moose

517 - - - -

110 Dehgam Pirana-PG 2 56 Twin

ACSR Moose

517 - - - -

111 Dehgam Sami 1 152 Twin

ACSR Moose

517 - - - -

112 Dehgam Sami 2 152 Twin

ACSR Moose

517 - - - -

Page 40: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

40/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

113 Dehgam Ranchodpura 1 62 Twin

ACSR Moose

517 - - - -

114 Dehgam Ranchodpura 2 62 Twin

ACSR Moose

517 - - - -

115 Dehgam Wanakbori 1 68 Twin

ACSR Moose

517 - - - -

116 Dhariwal Parli-PG 1 390 Twin

ACSR Moose

517 - - 63 -

117 Dhule Bableshwar 1 170 Twin

ACSR Moose

517 - - - -

118 Dhule Bableshwar 2 170 Twin

ACSR Moose

517 - - - -

119 Dhule-BDTCL Dhule 1 18 Twin

ACSR Moose

517 - - - -

120 Dhule-BDTCL Dhule 2 18 Twin

ACSR Moose

517 - - - -

121 Gandhar Navsari 1 106 Twin

ACSR Moose

517 - - - -

122 Gandhar Navsari 2 106 Twin

ACSR Moose

517 - - - -

123 Gandhar Hazira 1 97 Twin

ACSR Moose

517 - - - -

124 Gandhar Hazira 2 97 Twin

ACSR Moose

517 - - - -

Page 41: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

41/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

125 Gandhar GPEC 1 13 Twin

ACSR Moose

517 - - - -

126 Gandhar Sugen 1 64 Twin

ACSR Moose

517 50 - - -

127 GPEC Kasor 1 98 Twin

ACSR Moose

517 - - - -

128 Hadala Versana 1 159 Twin

ACSR Moose

517 - - - -

129 Hadala Vadinar 1 113 Twin

ACSR Moose

517 - - - -

130 Hadala Vadinar 2 113 Twin

ACSR Moose

517 - - - -

131 Hadala Chorania 1 166 Twin

ACSR Moose

517 - - - -

132 IEPL Warora 1 150 Twin

ACSR Moose

517 - - - -

133 IEPL Koradi-II 2 94 Twin

ACSR Moose

517 - - - -

134 Indira Sagar Indore-MP 1 79 Quad ACSR Moose

681 - - - -

135 Indira Sagar Indore-MP 2 80 Quad ACSR Moose

681 - - 50 -

136 Indira Sagar Nagda 1 188 Twin

ACSR Moose

517 - - - -

Page 42: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

42/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

137 Indore-MP Indore-PG 1 50 Twin

ACSR Moose

517 - - - -

138 Indore-MP Indore-PG 2 50 Twin

ACSR Moose

517 - - - -

139 Indore-MP Nagda 1 108 Twin

ACSR Moose

517 - - - -

140 Indore-MP Asoj 1 289 Twin

ACSR Moose

517 50 - 50 -

141 Indore-MP Asoj 2 273 Twin

ACSR Moose

517 50 - 50 -

142 Indore-PG Pithampur 1 150 Twin

ACSR Moose

517 - - - -

143 Indore-PG Pithampur 2 150 Twin

ACSR Moose

517 - - - -

144 Itarsi Indore-MP 1 207 Twin

ACSR Moose

517 50 - 50 -

145 Itarsi Indore-MP 2 214 Twin

ACSR Moose

517 50 - 50 -

146 Itarsi Khandwa 1 197 Twin

ACSR Moose

517 50 Yes - -

147 Itarsi Khandwa 2 197 Twin

ACSR Moose

517 50 - - -

148 Jabalpur Itarsi 1 232 Twin

ACSR Moose

517 50 - 50 -

Page 43: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

43/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

149 Jabalpur Itarsi 2 232 Twin

ACSR Moose

517 50 - 50 -

150 Jabalpur Itarsi 3 234 Twin

ACSR Moose

517 50 Yes 50 -

151 Jabalpur Itarsi 4 234 Twin

ACSR Moose

517 50 Yes 50 -

152 Jabalpur Sasan 1 340 Twin

ACSR Moose

517 63 - 50 -

153 Jabalpur Jabalpur-PS 1 16 Quad ACSR Moose

681 - - - -

154 Jabalpur Jabalpur-PS 2 16 Quad ACSR Moose

681 - - - -

155 Jabalpur (PS) MB Power 1 246 Triple ACSR

Snowbird 626 50 - - -

156 Jabalpur (PS) MB Power 2 246 Triple ACSR

Snowbird 626 50 - - -

157 Jabalpur (PS) Jhabua Power 1 65 Twin

ACSR Moose

517 - - - -

158 Jabalpur (PS) Jhabua Power 2 65 Twin

ACSR Moose

517 - - - -

159 Jaigad New koyna 1 55 Twin

ACSR Moose

517 - - - -

160 Jaigad New koyna 2 55 Twin

ACSR Moose

517 - - - -

Page 44: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

44/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

161 Jejuri Koyna stage-IV 1 172 Twin

ACSR Moose

517 - - - -

162 JPL Raipur 1 258 Twin

ACSR Moose

517 - - 50 -

163 JPL Raipur 2 258 Twin

ACSR Moose

517 - - 50 -

164 JPL JPL_extn(Tamnar) 1 2 Twin

ACSR Moose

517 - - - -

165 JPL_extn(Tamnar) Tamnar-PS 1 10 Twin

ACSR Moose

517 - - - -

166 JPL_extn(Tamnar) Tamnar-PS 2 10 Twin

ACSR Moose

517 - - - -

167 JPL_extn(Tamnar) Tamnar-PS 4 10 Twin

ACSR Moose

517 - - - -

168 Kala Vapi 1 49 Twin

ACSR Moose

517 - - - -

169 Kala Vapi 2 52 Twin

ACSR Moose

517 - - - -

170 Kalwa Padghe 1 72 Twin

ACSR Moose

517 - - - -

171 Kalwa Padghe 2 72 Twin

ACSR Moose

517 - - - -

172 Kalwa Kharghar 1 28 Twin

ACSR Moose

517 - - - -

Page 45: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

45/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

173 Kalwa Pune-PG 1 104 Twin

ACSR Moose

517 - - - -

174 Karad Kolhapur 1 105 Twin

ACSR Moose

517 - - - -

175 Karad Kolhapur 2 105 Twin

ACSR Moose

517 - - - -

176 Karad Jaigad 1 111 Twin

ACSR Moose

517 - - - -

177 Karad Jaigad 2 111 Twin

ACSR Moose

517 - - - -

178 Karad New Koyna 1 72 Twin

ACSR Moose

517 - - - -

179 Karad New Koyna 2 72 Twin

ACSR Moose

517 - - - -

180 Karad Solapur-PG 1 299 Twin

ACSR Moose

517 50 - 80 Yes

181 Karad Lonikhand 1 161 Twin

ACSR Moose

517 80 - - -

182 Kasor Chorania 1 103 Twin

ACSR Moose

517 - - - -

183 Khandwa Dhule 1 262 Twin

ACSR Moose

517 50 - 50 -

184 Khandwa Dhule 2 262 Twin

ACSR Moose

517 50 - 50 -

Page 46: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

46/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

185 Khandwa Rajgarh 1 221 Twin

ACSR Moose

517 - - - -

186 Khandwa Rajgarh 2 221 Twin

ACSR Moose

517 - - - -

187 Kharghar Padghe 1 85 Twin

ACSR Moose

517 - - - -

188 Kolhapur Kolhapur-PG 1 39 Twin

ACSR Moose

517 - - - -

189 Kolhapur Kolhapur-PG 2 39 Twin

ACSR Moose

517 - - - -

190 Kolhapur Solapur-PG 1 220 Twin

ACSR Moose

517 - - 50 -

191 Kolhapur Solapur-PG 2 220 Twin

ACSR Moose

517 - - 50 -

192 Kolhapur-PG Mapusa 1 156 Twin

ACSR Moose

517 - - - -

193 Kolhapur-PG Mapusa 2 156 Twin

ACSR Moose

517 - - - -

194 Koradi Bhusawal 2 343 Twin

ACSR Moose

517 50 - 50 -

195 Koradi Satpura 1 149 Twin

ACSR Moose

517 - - 50 -

196 Koradi Bhilai 1 272 Twin

ACSR Moose

517 50 - 50 -

Page 47: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

47/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

197 Koradi Khaparkheda 1 10 Twin

ACSR Moose

517 - - - -

198 Koradi Khaparkheda 2 10 Twin

ACSR Moose

517 - - - -

199 Koradi Koradi-II 1 5 Twin

ACSR Moose

517 50 - - -

200 Korba (W) Korba-NTPC 1 14 Twin

ACSR Moose

517 - - - -

201 Korba (W) Raita 1 144 Twin

ACSR Moose

517 - - - -

202 Korba (W) Korba (W)-Ext 1 1 Twin

ACSR Moose

517 - - - -

203 Korba (W)-Ext Bhilai 1 220 Twin

ACSR Moose

517 - - 50 -

204 Korba (W)-Ext Marwa 1 60 Twin

ACSR Moose

517 - - - -

205 Korba-NTPC Bhilai 1 197 Twin

ACSR Moose

517 - - 50 -

206 Korba-NTPC Bhilai 2 192 Twin

ACSR Moose

517 - - 50 -

207 Korba-NTPC Raipur 1 212 Twin

ACSR Moose

517 - - 63 -

208 Korba-NTPC Raipur 2 212 Twin

ACSR Moose

517 - - 63 -

Page 48: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

48/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

209 Korba-NTPC Sipat 1 100 Twin

ACSR Moose

517 - - - -

210 Korba-NTPC Essar_Mahan 1 218 Twin

ACSR Moose

517 - - - -

211 Korba-NTPC Vindhyachal 2 289 Twin

ACSR Moose

517 - - 50 -

212 Korba-NTPC Bhatapara 1 124 Twin

ACSR Moose

517 - - - -

213 Korba-NTPC Balco 2 24 Twin

ACSR Moose

517 50 - - -

214 Korba-NTPC Vandana 1 18 Twin

ACSR Moose

517 50 - - -

215 Koyna stage-IV Lonikhand 1 183 Twin

ACSR Moose

517 - - - -

216 Koyna stage-IV New Koyna 1 14 Twin

ACSR Moose

517 - - - -

217 Koyna stage-IV New Koyna 2 14 Twin

ACSR Moose

517 - - - -

218 KSK Mahanadi Raipur 1 147 Twin

ACSR Moose

517 - - 50 -

219 KSK Mahanadi Raipur 2 150 Twin

ACSR Moose

517 - - 50 -

220 KSK Mahanadi RKM 1 104 Twin

ACSR Moose

517 - - - -

Page 49: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

49/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

221 KWPCL Raipur 1 18 Twin

ACSR Moose

517 - - 63 -

222 Lonikhand Jejury 1 48 Twin

ACSR Moose

517 - - - -

223 Lonikhand Chakan 1 37 Twin

ACSR Moose

517 50 - - -

224 Lonikhand Pune-PG 1 40 Twin

ACSR Moose

517 - - - -

225 Lonikhand-II Lonikhand 1 1 Twin

ACSR Moose

517 - - - -

226 Lonikhand-II Lonikhand 2 1 Twin

ACSR Moose

517 - - - -

227 Magarawada Kala 1 53 Twin

ACSR Moose

517 - - - -

228 Magarawada Kala 2 53 Twin

ACSR Moose

517 - - - -

229 Magarawada Navasari 1 126 Twin

ACSR Moose

517 - - - -

230 Magarawada Navasari 2 126 Twin

ACSR Moose

517 - - - -

231 Malwa Chhegaon 1 53 Twin

ACSR Moose

517 - - - -

232 Malwa Pithampur 1 136 Twin

ACSR Moose

517 - - - -

Page 50: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

50/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

233 Malwa Pithampur 2 136 Twin

ACSR Moose

517 - - - -

234 Malwa Julwania 1 170 Twin

ACSR Moose

517 - - - -

235 Mansar Chorania 1 94 Triple ACSR

Snowbird 626 - - 63 -

236 MCCPL Bilaspur 1 45 Twin

ACSR Moose

517 - - - -

237 Nagda Dehgam 1 331 Twin

ACSR Moose

517 50 - 50 -

238 Nagda Dehgam 2 331 Twin

ACSR Moose

517 50 - 50 -

239 Nagda Shujalpur 1 202 Twin

ACSR Moose

517 - - 63 Yes

240 Nagda Shujalpur 2 152 Twin

ACSR Moose

517 - - 63 Yes

241 Nandgaonpeth Koradi-II 1 140 Twin

ACSR Moose

517 - - - -

242 Navsari DGEN 1 105 Twin

ACSR Moose

517 - - - -

243 Navsari DGEN 2 105 Twin

ACSR Moose

517 - - - -

244 NSPCL Raipur 1 14 Twin

ACSR Moose

517 - - - -

Page 51: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

51/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

245 NSPCL Raipur 2 14 Twin

ACSR Moose

517 - - - -

246 Padghe Boisar 1 101 Twin

ACSR Moose

517 50 - - -

247 Padghe Nagothane 1 116 Twin

ACSR Moose

517 - - - -

248 Padghe Nagothane 2 116 Twin

ACSR Moose

517 - - - -

249 Padghe Pune-PG 1 96 Twin

ACSR Moose

517 - - - -

250 Parli-M Lonikhand-II 1 284 Twin

ACSR Moose

517 50 - 50 -

251 Parli-M Lonikhand-II 2 284 Twin

ACSR Moose

517 50 - 50 -

252 Parli-M Sholapur-M 1 182 Twin

ACSR Moose

517 50 - - -

253 Parli-M Chandrapur-II 1 357 Twin

ACSR Moose

517 50 - - -

254 Parli-M Chandrapur-II 2 371 Twin

ACSR Moose

517 50 - - -

255 Parli-M Parli-PG 1 5 Twin

ACSR Moose

517 - - - -

256 Parli-M Parli-PG 2 5 Twin

ACSR Moose

517 - - - -

Page 52: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

52/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

257 Parli-PG Pune-PG

(Shikrapur) 1 272

Twin ACSR Moose

517 50 - 50 -

258 Parli-PG Pune-PG

(Shikrapur) 2 272

Twin ACSR Moose

517 50 - 50 -

259 Parli-PG Solapur-PG 1 65 Twin

ACSR Moose

517 - - - -

260 Parli-PG Solapur-PG 2 65 Twin

ACSR Moose

517 - - - -

261 Pathadi Bilaspur-PS 1 31 Twin

ACSR Moose

517 - - - -

262 Pathadi Bilaspur-PS 2 31 Twin

ACSR Moose

517 - - - -

263 Pirana-T Pirana-PG 1 6 Twin

ACSR Moose

517 - - - -

264 Pirana-T Pirana-PG 2 6 Twin

ACSR Moose

517 - - - -

265 Pune-

PG(Shikrapur) Pune-PG 1 64

Twin ACSR Moose

517 - - 50 Yes

266 Pune-

PG(Shikrapur) Pune-PG 2 64

Twin ACSR Moose

517 - - 50 Yes

267 Raigarh India Bharath 1 110 Twin

ACSR Moose

517 - - - -

268 Raigarh Jharsuguda 2 125 Twin

ACSR Moose

517 - - - -

Page 53: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

53/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

269 Raigarh Rourkela 1 130 Twin

ACSR Moose

517 - - - -

270 Raigarh Sterlite 2 130 Twin

ACSR Moose

517 - - - -

271 Raigarh Raipur 1 217 Twin

ACSR Moose

517 - - 63 -

272 Raigarh KWPCL 1 217 Twin

ACSR Moose

517 - - - -

273 Raigarh Raigarh-PS(Kotra) 1 7 Twin

ACSR Moose

517 - - - -

274 Raigarh Raigarh-PS(Kotra) 2 7 Twin

ACSR Moose

517 - - - -

275 Raigarh KSK 1 119 Twin

ACSR Moose

517 - - - -

276 Raipur Wardha 1 371 Quad ACSR Moose

681 63 - 63 -

277 Raipur Wardha 2 371 Quad ACSR Moose

681 63 - 63 -

278 Raipur Raipur-PS(Durg) 1 22 Twin

ACSR Moose

517 - - - -

279 Raipur Raipur-PS(Durg) 2 22 Twin

ACSR Moose

517 - - - -

280 Raipur-PS(Durg) GMR-CG 1 65 Twin

ACSR Moose

517 - - - -

Page 54: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

54/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

281 Raipur-PS(Durg) GMR-CG 2 65 Twin

ACSR Moose

517 - - - -

282 Raita Marwa 1 141 Twin

ACSR Moose

517 - - - -

283 Raita Marwa 2 141 Twin

ACSR Moose

517 - - - -

284 Rajgarh Nagda 1 104 Twin

ACSR Moose

517 - - 50 -

285 Rajgarh Nagda 2 104 Twin

ACSR Moose

517 - - 50 -

286 Rajgarh Kasor 1 243 Twin

ACSR Moose

517 - - 50 -

287 Rajgarh Kasor 2 243 Twin

ACSR Moose

517 - - 50 -

288 Ranchodpura Zerda(Kansari) 1 140 Twin

ACSR Moose

517 - - - -

289 Ranchodpura Zerda(Kansari) 2 140 Twin

ACSR Moose

517 - - - -

290 Ranchodpura Chorania 1 103 Twin

ACSR Moose

517 - - - -

291 Ranchodpura Chorania 2 103 Twin

ACSR Moose

517 - - - -

292 RGPPL New Koyna 1 60 Twin

ACSR Moose

517 - - - -

Page 55: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

55/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

293 RGPPL New Koyna 2 60 Twin

ACSR Moose

517 - - - -

294 RGPPL Nagothane 1 136 Twin

ACSR Moose

517 - - - -

295 RGPPL Nagothane 2 136 Twin

ACSR Moose

517 - - - -

296 RKM Raigarh 1 6 Twin

ACSR Moose

517 - - - -

297 Satna Bina-PG 1 276 Twin

ACSR Moose

517 50 - 50 -

298 Satna Bina-PG 2 276 Twin

ACSR Moose

517 50 - 50 -

299 Satna Bina-PG 3 273 Twin

ACSR Moose

517 50 - 50 -

300 Satna Bina-PG 4 273 Twin

ACSR Moose

517 50 - 50 -

301 Satna JP-Nigrie 1 161 Twin

ACSR Moose

517 - - - -

302 Satna JP-Nigrie 2 161 Twin

ACSR Moose

517 - - - -

303 Satpura Indira sagar 1 189 Twin

ACSR Moose

517 - - - -

304 Satpura Itarsi 1 79 Twin

ACSR Moose

517 - - - -

Page 56: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

56/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

305 Satpura Astha 1 240 Twin

ACSR Moose

517 - - - -

306 Seoni Satpura 1 156 Twin

ACSR Moose

517 50 - - -

307 Seoni Khandwa 1 352 Quad AAAC Moose

643 80 - 80 Yes

308 Seoni Khandwa 2 352 Quad AAAC Moose

643 80 - 80 Yes

309 Sholapur-M Solapur-PG 1 178 Twin

ACSR Moose

517 - - - -

310 Sipat Raipur 1 149 Twin

ACSR Moose

517 - - - -

311 Sipat Raipur 2 149 Twin

ACSR Moose

517 - - - -

312 Sipat Raipur 3 149 Twin

ACSR Moose

517 - - - -

313 Sipat Ranchi 1 405 Twin

ACSR Moose

517 80 - - -

314 Sipat Ranchi 2 405 Twin

ACSR Moose

517 80 - - -

315 SKS Raigarh-PS(Kotra) 1 28 Twin

ACSR Moose

517 - - - -

316 SKS Raigarh-PS(Kotra) 2 28 Twin

ACSR Moose

517 - - - -

Page 57: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

57/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

317 Soja Wanakbori 1 95 Twin

ACSR Moose

517 - - - -

318 Soja Dehgam 1 41 Twin

ACSR Moose

517 - - - -

319 Soja Zerda 1 135 Twin

ACSR Moose

517 - - - -

320 Solapur-PG Solapur-NTPC 1 11 Twin

ACSR Moose

517 - - - -

321 Solapur-PG Solapur-NTPC 2 11 Twin

ACSR Moose

517 - - - -

322 SSP Dhule 1 236 Twin

ACSR Moose

517 - - 50 Yes

323 SSP Dhule 2 236 Twin

ACSR Moose

517 - - 50 Yes

324 SSP Asoj 1 83 Twin

ACSR Moose

517 - - - -

325 SSP Rajgarh 1 178 Twin

ACSR Moose

517 - - - -

326 SSP Rajgarh 2 178 Twin

ACSR Moose

517 - - - -

327 SSP Kasor 1 146 Twin

ACSR Moose

517 - - - -

328 Sugen Uno-Sugen 1 3 Twin

ACSR Moose

517 - - - -

Page 58: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

58/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

329 Sugen Pirana-T 1 212 Twin

ACSR Moose

517 - - 50 -

330 Taptithanda Deepnagar 1 203 Twin

ACSR Moose

517 - - - -

331 Taptithanda Bableshwar 1 127 Twin

ACSR Moose

517 - - - -

332 Taptithanda Bableshwar 2 127 Twin

ACSR Moose

517 - - - -

333 Tarapur-3&4 Padghe 1 91 Twin

ACSR Moose

517 - - - -

334 Tarapur-3&4 Padghe 2 91 Twin

ACSR Moose

517 - - - -

335 Tarapur-3&4 Boisar 1 21 Twin

ACSR Moose

517 - - - -

336 Tarapur-3&4 Boisar 2 21 Twin

ACSR Moose

517 - - - -

337 Tiroda Warora 1 219 Twin

ACSR Moose

517 - - - -

338 Tiroda Warora 2 219 Twin

ACSR Moose

517 - - - -

339 TRN Tamnar-PS 1 15 Twin

ACSR Moose

517 - - - -

340 TRN Tamnar-PS 2 15 Twin

ACSR Moose

517 - - - -

Page 59: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

59/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

341 Ukai Kosamba 1 81 Twin

ACSR Moose

517 - - - -

342 Ukai Kosamba 2 68 Twin

ACSR Moose

517 - - - -

343 Ukai Kosamba 3 68 Twin

ACSR Moose

517 - - - -

344 Uno-Sugen Pirana-T 1 209 Twin

ACSR Moose

517 - - 50 -

345 Vadodara-PS Pirana-PG 1 131 Quad ACSR Moose

681 - - - -

346 Vadodara-PS Pirana-PG 2 131 Quad ACSR Moose

681 - - - -

347 Vadodara-PS Asoj 1 14 Quad ACSR Moose

681 - - - -

348 Vadodara-PS Asoj 2 14 Quad ACSR Moose

681 - - - -

349 Vapi Boisar 1 91 Twin

ACSR Moose

517 - - - -

350 Vapi Sugen 1 118 Twin

ACSR Moose

517 - - - -

351 Vindhyachal Jabalpur 1 360 Twin

ACSR Moose

517 63 - 63 -

352 Vindhyachal Jabalpur 2 360 Twin

ACSR Moose

517 63 - 63 -

Page 60: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

60/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

353 Vindhyachal Jabalpur 4 389 Twin

ACSR Moose

517 63 - 63 -

354 Vindhyachal Satna 1 267 Twin

ACSR Moose

517 50 - 50 -

355 Vindhyachal Satna 2 267 Twin

ACSR Moose

517 50 - 50 -

356 Vindhyachal Satna 3 258 Twin

ACSR Moose

517 50 - 50 -

357 Vindhyachal Satna 4 258 Twin

ACSR Moose

517 50 - 50 -

358 Vindhyachal Sasan 3 20 Twin

ACSR Moose

517 63 Yes - -

359 Vindhyachal Mahan 1 41 Twin

ACSR Moose

517 50 - - -

360 Vindhyachal-III Vindhyachal-V 1 4 Quad ACSR Moose

681 - - - -

361 Vindhyachal-III Vindhyachal-V 2 4 Quad ACSR Moose

681 - - - -

362 Vindhyachal-IV Vindhyachal-V 1 4 Quad ACSR Moose

681 - - - -

363 Vindhyachal-IV Vindhyachal-V 2 4 Quad ACSR Moose

681 - - - -

364 Vindhyachal-IV Vindhyachal-PS 1 31 Twin

ACSR Moose

517 - - - -

Page 61: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

61/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

365 Vindhyachal-IV Vindhyachal-PS 2 31 Twin

ACSR Moose

517 - - - -

366 Vindhyachal-PS Sasan 1 8 Twin

ACSR Moose

517 - - - -

367 Vindhyachal-PS Sasan 2 8 Twin

ACSR Moose

517 - - - -

368 Vindhyachal-PS Rihand 1 35 Quad

Bersimis 692 - - - -

369 Vindhyachal-PS Rihand 2 28 Quad

Bersimis 692 - - - -

370 Wardha Parli-PG 1 337 Quad ACSR Moose

681 63 - 63 -

371 Wardha Parli-PG 2 337 Quad ACSR Moose

681 63 - 63 -

372 Wardha Akola 1 162 Twin

ACSR Moose

517 - - - -

373 Wardha Akola 2 162 Twin

ACSR Moose

517 - - - -

374 Wardha Mouda 1 124 Quad ACSR Moose

681 - - - -

375 Wardha Mouda 2 124 Quad ACSR Moose

681 - - - -

376 Wardha Warora 1 76 Twin

ACSR Moose

517 - - - -

377 Wardha Koradi-II 1 67 Quad ACSR Moose

681 - - - -

Page 62: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

62/208

Sl No

End-1 End-2 Id Km Conductor

Type SIL

End1 LR End2 LR

MVAR S/W MVAR S/W

378 Warora Chandrapur-II 1 45 Twin

ACSR Moose

517 - - - -

379 Warora Chandrapur-II 2 45 Twin

ACSR Moose

517 - - - -

380 Zerda(Kansari) Bhinmal 1 143 Twin

ACSR Moose

517 50 - 50 -

381 Zerda(Kansari) Kankroli 1 234 Twin

ACSR Moose

517 50 - - -

#Future Lines 50837 5120 Total 5359

Page 63: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

63/208

7. Substation Wise Lines and Reactors

7.1. 765 kV Substation Wise Lines and Reactors

Sr. No.

Name of S/S S/S

Owner Lines

ID

km Conductor Type

LRs LRs S/W

BRs

1 Akola(2)

MEGPTCL

Taptithanda* 1 222 Quad

Bersimis - -

1x240

Taptithanda* 2 222 Quad

Bersimis - -

Aurangabad-PG#

1 Quad

Bersimis 240 Yes

Aurangabad-PG#

2 Quad

Bersimis 240 Yes

Koradi(III) 1 222 Quad

Bersimis 240 -

Koradi(III) 2 222 Quad

Bersimis 240 -

Total MVAR

960 240

2 Aurangabad-

PG

PGCIL

Wardha 1 348 Hexa Zebra

240 -

2x240

Wardha 2 348 Hexa Zebra

240 -

Wardha 3 370 Hexa Zebra

240 -

Wardha 4 370 Hexa Zebra

240 -

Solapur 1 279 Hexa Zebra

240 Yes

Solapur 2 279 Hexa Zebra

240 Yes

Dhule-BDTCL 1 192 Quad

Bersimis - -

Akola(2)# 1 Quad

Bersimis - -

Akola(2)# 2 Quad

Bersimis - -

Total MVAR

1440 480

3 Bhopal-BDTCL

BDTCL

Indore-PG 1 176 Quad

Bersimis 240 Yes

1x240 Jabalpur-PS 1 260

Quad Bersimis

240 -

Total MVAR

480 240

4 Bilaspur PGCIL Seoni 1 333 Quad

Bersimis 240 Yes 1x240

Page 64: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

64/208

Sr. No.

Name of S/S S/S

Owner Lines

ID

km Conductor Type

LRs LRs S/W

BRs

Seoni 2 335 Quad

Bersimis 240 Yes

Dharamjaygarh 1 89 Quad

Bersimis 240 Yes

Sipat 1 22 Quad

Bersimis - -

Sipat 2 22 Quad

Bersimis - -

Total MVAR

720 240

5 Bina-PG

PGCIL

Gwalior 1 235 Quad

Bersimis 240 -

2x240

Gwalior 2 235 Quad

Bersimis 240 -

Gwalior 3 231 Quad

Bersimis 240 Yes

Indore 1 310 Quad

Bersimis 240 Yes

Jabalpur-PS 1 230 Quad

Bersimis 240 -

Jabalpur-PS 2 230 Quad

Bersimis 240 -

Jabalpur-PS 3 236 Quad

Bersimis 240 -

Satna 1 274 Quad

Bersimis 240 -

Satna 2 276 Quad

Bersimis 240 -

Seoni 1 292 Quad

Bersimis 240 -

Total MVAR

2400 480

6 Champa

PGCIL

Raigarh-PS(Kotra)

1 96 Quad

Bersimis - -

Raipur-PS(Durg) 1 153 Quad

Bersimis - -

Total MVAR

0 0

7 Dharamjaygar

h PGCIL

Ranchi 1 301 Quad

Bersimis 330 -

2x330

Ranchi 2 303 Quad

Bersimis 330 Yes

Raipur-PS(Durg) 2 200 Quad

Bersimis 240 -

Jharsuguda 1 303 Hexa Zebra

330 Yes

Jharsuguda 2 303 Hexa Zebra

330 Yes

Page 65: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

65/208

Sr. No.

Name of S/S S/S

Owner Lines

ID

km Conductor Type

LRs LRs S/W

BRs

Jabalpur-PS 1 424 Hexa Zebra

330 Yes

Jabalpur-PS 2 424 Hexa Zebra

330 Yes

Jabalpur-PS 3 379 Hexa Zebra

330 Yes

Jabalpur-PS 4 379 Hexa Zebra

330 Yes

Bilaspur 1 89 Quad

Bersimis - -

Total MVAR

2880 660

8 Dhule-BDTCL

BDTCL Aurangabad-PG 1 192

Quad Bersimis

240 Yes 240

Vadodora-PS 1 268 Quad

Bersimis 240 Yes

Total MVAR

480 240

9 Gwalior PGCIL

Bina-PG 1 235 Quad

Bersimis 240 Yes

240

Bina-PG 2 235 Quad

Bersimis 240 Yes

Bina-PG 3 231 Quad

Bersimis 240 Yes

Agra 1 129 Quad

Bersimis - -

Agra 2 128 Quad

Bersimis - -

Jaipur 1 304 Quad

Bersimis 240 Yes

Jaipur 2 311 Quad

Bersimis 240 Yes

Satna 1 337 Quad

Bersimis 240 -

Satna 2 337 Quad

Bersimis 240 -

Total MVAR

1680 240

10 Indore-PG

PGCIL

Bhopal-BDTCL 1 176 Quad

Bersimis 240 -

2x240 Bina-PG 1 310 Quad

Bersimis 240 -

Vadodora-PS 1 293 Quad

Bersimis 240 Yes

Total MVAR

720 480

11 Jabalpur-PS PGCIL Bina-PG 1 230 Quad

Bersimis 240 Yes 2x240

Page 66: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

66/208

Sr. No.

Name of S/S S/S

Owner Lines

ID

km Conductor Type

LRs LRs S/W

BRs

Bina-PG 2 230 Quad

Bersimis 240 Yes

Bina-PG 3 236 Quad

Bersimis 240 Yes

Dharamjaygarh 1 424 Hexa Zebra

240 -

Dharamjaygarh 2 424 Hexa Zebra

240 -

Dharamjaygarh 3 379 Hexa Zebra

240 -

Dharamjaygarh 4 379 Hexa Zebra

240 -

Bhopal-BDTCL 1 260 Quad

Bersimis 240 Yes

Total MVAR

1920 480

12 Kholpaur-PG*

PGCIL Kudgi* 1 191

Hexa Zebra

- - -

Kudgi* 2 191 Hexa Zebra

- -

Total MVAR

- -

13 Koradi(III)

MEGPTCL

Akola(2) 1 222 Quad

Bersimis 240 Yes

1x240 Akola(2) 2 222

Quad Bersimis

240 -

Tiroda 1 136 Quad

Bersimis 240 Yes

Tiroda 2 138 Quad

Bersimis 240 Yes

Total MVAR

960 240

14 Pune-

PG(Shikrapur)

PGCIL Solapur 1 270 Quad

Bersimis 240 Yes 1x240

15 Raigarh-PS(Kotra)

PGCIL

Raipur-PS(Durg) 1 235 Hexa Zebra

240 Yes

1x240

Raipur-PS(Durg) 2 235 Hexa Zebra

240 Yes

Tamnar 1 48 Hexa Zebra

- -

Tamnar 2 48 Hexa Zebra

- -

Champa 1 96 Quad

Bersimis - -

Total MVAR

480 240

Page 67: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

67/208

Sr. No.

Name of S/S S/S

Owner Lines

ID

km Conductor Type

LRs LRs S/W

BRs

16 Raipur-

PS(Durg)

PGCIL

Champa 1 153 Quad

Bersimis 240 Yes

1x240

Dharamjaygarh 2 200 Quad

Bersimis - -

Raigarh-PS(Kotra)

1 235 Hexa Zebra

240 -

Raigarh-PS(Kotra)

2 235 Hexa Zebra

240 -

Wardha 1 370 Hexa Zebra

240 Yes

Wardha 2 370 Hexa Zebra

240 Yes

Total MVAR

1200 240

17 Sasan SPL

Satna 1 246 Quad

Bersimis 240 -

1x240 Satna 2 243 Quad

Bersimis 240 -

Vindhyachal-PS 1 6 Quad

Bersimis - -

Total MVAR

480 240

18 Satna

PGCIL

Gwalior 1 337 Quad

Bersimis 240 Yes

2x240

Gwalior 2 337 Quad

Bersimis 240 Yes

Bina-PG 1 274 Quad

Bersimis 240 Yes

Bina-PG 2 276 Quad

Bersimis 240 Yes

Vindhyachal-PS 1 237 Quad

Bersimis 240 -

Vindhyachal-PS 2 237 Quad

Bersimis 240 -

Sasan 1 246 Quad

Bersimis 240 -

Sasan 2 243 Quad

Bersimis 240 -

Total MVAR

1920 480

19 Seoni PGCIL

Bilaspur 1 333 Quad

Bersimis 240 -

1x240

Bilaspur 2 335 Quad

Bersimis 240 -

Bina-PG 1 292 Quad

Bersimis 240 Yes

Wardha 1 261 Quad

Bersimis 240 Yes

Page 68: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

68/208

Sr. No.

Name of S/S S/S

Owner Lines

ID

km Conductor Type

LRs LRs S/W

BRs

Wardha 2 261 Quad

Bersimis 240 Yes

Total MVAR

1200 240

20 Sipat

NTPC Bilaspur 1 22

Quad Bersimis

240 Yes 1x240

Bilaspur 2 22 Quad

Bersimis 240 Yes

Total MVAR

480 240

21 Solapur PGCIL

Aurangabad-PG 1 279 Hexa Zebra

240 -

1x240

Aurangabad-PG 2 279 Hexa Zebra

240 -

Pune-PG(Shikrapur)

1 270 Quad

Bersimis 240 Yes

Raichur 1 208 Quad

Bersimis 240 Yes

Raichur 2 208 Quad

Bersimis 240 Yes

Total MVAR

1200 240

22 Tamnar

PGCIL

Raigarh-PS(Kotra)

1 48 Hexa Zebra

- - 1x240

Raigarh-PS(Kotra)

2 48 Hexa Zebra

- -

Total MVAR

240

23 Tiroda

MEGPTCL

Koradi(III) 1 136 Quad

Bersimis 240 Yes

1x240

Koradi(III) 2 138 Quad

Bersimis 240 Yes

Total MVAR

480 240

24 Vadodora-PS

PGCIL Indore-PG 1 293

Quad Bersimis

240 - 1x240

Dhule-BDTCL 1 268 Quad

Bersimis 240 -

Total MVAR

480 240

25 Vindhyachal-

PS

PGCIL

Sasan 1 6 Quad

Bersimis - -

1x240 Satna 1 237 Quad

Bersimis 240 Yes

Satna 2 237 Quad

Bersimis 240 Yes

Total MVAR

480 240

Page 69: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

69/208

Sr. No.

Name of S/S S/S

Owner Lines

ID

km Conductor Type

LRs LRs S/W

BRs

26 Wardha

PGCIL

Aurangabad-PG 1 348 Hexa Zebra

330 Yes

1x240+1x330

Aurangabad-PG 2 348 Hexa Zebra

330 -

Aurangabad-PG 3 370 Hexa Zebra

330 Yes

Aurangabad-PG 4 370 Hexa Zebra

330 -

Seoni 1 261 Quad

Bersimis - -

Seoni 2 261 Quad

Bersimis - -

Raipur-PS(Durg) 1 370 Hexa Zebra

330 -

Raipur-PS(Durg) 2 370 Hexa Zebra

330 -

Total MVAR

1980 570

* Charged at 400 kV, # Future Lines

7.2. 400 kV Substation Wise Lines and Reactors

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

1 ACBIL ACBIL

Bilaspur 1 56 Twin

ACSR Moose

- -

-

MCCPL 1 16 Twin

ACSR Moose

- -

Total - -

2 Akola MSET

CL

Aurangabad-PG

1 178 Twin

ACSR Moose

50 -

- Aurangabad-PG

2 178 Twin

ACSR Moose

50 -

Nandgaonpeth

1 117 Twin

ACSR Moose

- -

Page 70: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

70/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Akola(2) 1 30 Twin

ACSR Moose

- -

Akola(2) 2 30 Twin

ACSR Moose

- -

Bhusawal

(Khadka)

1 182 Twin

ACSR Moose

- -

Wardha 1 162 Twin

ACSR Moose

- -

Wardha 2 162 Twin

ACSR Moose

- -

Total 100

3 Akola(2)

MSETCL

Nandgaonpeth

1 104 Twin

ACSR Moose

- -

-

Nandgaonpeth

2 104 Twin

ACSR Moose

- -

Akola 1 30 Twin

ACSR Moose

- -

Akola 2 30 Twin

ACSR Moose

- -

Total -

4 Amreli GETC

O

Hadala 1 165 Twin

ACSR Moose

- -

1X50 + 1X125

Chorania

1 164 Twin

ACSR Moose

- -

Jetpur 1 96 Twin

ACSR Moose

- -

Jetpur 2 96 Twin

ACSR Moose

- -

Page 71: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

71/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Total - - 175

5 APL-

Mundra

APL

Sami 1 282 Twin

ACSR Moose

- -

2X80 + 1X125

Sami 2 282 Twin

ACSR Moose

- -

Hadala 1 233 Twin

ACSR Moose

- -

Versana 1 84 Twin

ACSR Moose

- -

Versana 2 84 Twin

ACSR Moose

- -

Versana 3 84 Twin

ACSR Moose

- -

Total - 285

6 Asoj GETC

O

Chorania

1 177 Twin

ACSR Moose

- -

1X50

Chorania

2 166 Twin

ACSR Moose

50 -

Kosamba

1 122 Twin

ACSR Moose

- -

Wanakbori

1 76 Twin

ACSR Moose

- -

Indore-MP

1 289 Twin

ACSR Moose

50 -

Indore-MP

2 273 Twin

ACSR Moose

50 -

SSP 1 83 Twin

ACSR Moose

- -

Page 72: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

72/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Vadodara-PS

1 14 Quad ACSR Moose

- -

Vadodara-PS

2 14 Quad ACSR Moose

- -

Total 150 50

7 Astha

MPPTCL

Satpura 1 240 Twin

ACSR Moose

- - -

Total -

8 Aurangabad-M(Waluj)

MSETCL

Pune-PG

1 261 Twin

ACSR Moose

50 -

-

Pune-PG

2 261 Twin

ACSR Moose

50 -

Aurangabad-PG

1 54 Quad ACSR Moose

- -

Aurangabad-PG

2 54 Quad ACSR Moose

- -

Taptithanda

1 135 Twin

ACSR Moose

- -

Deepnagar

2 185 Twin

ACSR Moose

- -

Bableshwar

1 131 Twin

ACSR Moose

- -

Bhusawal

(Khadka)

1 238 Twin

ACSR Moose

50 -

Total 150 -

9 Aurangabad

-PG PGCIL Boisar 1 327

Twin ACSR Moose

80 Yes 1X125

Page 73: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

73/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Boisar 2 327 Twin

ACSR Moose

80 Yes

Akola 1 178 Twin

ACSR Moose

50 -

Akola 2 178 Twin

ACSR Moose

50 -

Aurangabad-

M(Waluj) 1 54

Quad ACSR Moose

- -

Aurangabad-

M(Waluj) 2 54

Quad ACSR Moose

- -

Total 260 - 125

10 Bableshwar MSET

CL

Padghe 1 174 Twin

ACSR Moose

- -

2X80

Padghe 2 174 Twin

ACSR Moose

- -

Aurangabad-

M(Waluj) 1 131

Twin ACSR Moose

- -

IB-Nasik 1 72 Twin

ACSR Moose

- -

IB-Nasik 2 72 Twin

ACSR Moose

- -

Bhusawal

(Khadka)

1 220 Twin

ACSR Moose

- -

Dhule 1 170 Twin

ACSR Moose

- -

Dhule 2 170 Twin

ACSR Moose

- -

Page 74: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

74/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Taptithanda

1 127 Twin

ACSR Moose

- -

Taptithanda

2 127 Twin

ACSR Moose

- -

Total - 160

11 Bachau PGCIL

Ranchodpura

1 282 Triple ACSR

Snowbird - -

1X63 + 1X125

Ranchodpura

2 282 Triple ACSR

Snowbird - -

Varsana 1 10 Twin

ACSR Moose

- -

Varsana 2 10 Twin

ACSR Moose

- -

CGPL 1 100 Triple ACSR

Snowbird - -

CGPL 2 100 Triple ACSR

Snowbird - -

Total - 188

12 Balco Balco

Birsingpur

1 236 Twin

ACSR Moose

- -

- Korba-NTPC

2 24 Twin

ACSR Moose

- -

Total -

13 Bhadrawati PGCIL

Bhilai 1 322 Twin

ACSR Moose

50 -

1X50 Raipur 1 333 Twin

ACSR Moose

50 -

Raipur 2 346 Twin

ACSR Moose

63 -

Page 75: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

75/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Raipur 3 346 Twin

ACSR Moose

63 -

EMCO 1 28 Twin

ACSR Moose

- -

EMCO 2 28 Twin

ACSR Moose

- -

Parli-PG 1 388 Twin

ACSR Moose

63 -

Dhariwal 1 15 Twin

ACSR Moose

63 -

Ramagundam

1 178 Twin

ACSR Moose

50 -

Ramagundam

2 178 Twin

ACSR Moose

50 -

Chandrapur

1 20 Twin

ACSR Moose

- -

Chandrapur

2 20 Twin

ACSR Moose

- -

Chandrapur

3 22 Twin

ACSR Moose

- -

Chandrapur

4 22 Twin

ACSR Moose

- -

Total 452 50

14 Bhatapara PGCIL

Bhilai 1 93 Twin

ACSR Moose

50 -

1X125

Korba-NTPC

1 124 Twin

ACSR Moose

- -

Total 50 125

Page 76: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

76/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

15 Bhilai

CSPTCL

Raipur 1 13 Twin

ACSR Moose

- - -

Seoni 1 230 Twin

ACSR Moose

50 -

-

Bhatapara

1 93 Twin

ACSR Moose

- -

Raita 1 56 Twin

ACSR Moose

- -

Raita 2 56 Twin

ACSR Moose

- -

Raita 3 56 Twin

ACSR Moose

- -

Bhadrawati

1 322 Twin

ACSR Moose

80 -

Koradi 1 272 Twin

ACSR Moose

50 -

Korba (W)-Ext

1 220 Twin

ACSR Moose

50 -

Korba-NTPC

1 197 Twin

ACSR Moose

50 -

Korba-NTPC

2 192 Twin

ACSR Moose

50 -

Total 330

16 Bhopal-BDTCL

BDTCL

Bhopal (MP)

1 9 Twin

ACSR Moose

- -

1X125

Bhopal (MP)

2 9 Twin

ACSR Moose

- -

Total - - 125

Page 77: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

77/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

17 Bhopal-MP

MPPTCL

Bina-MP 1 289 Twin

ACSR Moose

- -

1X125

Bina-MP 2 273 Twin

ACSR Moose

- -

Itarsi 1 98 Twin

ACSR Moose

- -

Itarsi 2 98 Twin

ACSR Moose

- -

Damoh 1 214 Twin

ACSR Moose

50 -

Damoh 2 214 Twin

ACSR Moose

50 -

Bhopal-BDTCL

1 9 Twin

ACSR Moose

- -

Bhopal-BDTCL

2 9 Twin

ACSR Moose

- -

Total 100 125

18 Bhusawal (Khadka)

MSETCL

Bableshwar

1 220 Twin

ACSR Moose

- -

1X50

Aurangabad-

M(Waluj) 1 238

Twin ACSR Moose

- -

Akola 1 182 Twin

ACSR Moose

50 -

Deepnagar

1 15 Twin

ACSR Moose

- -

Deepnagar

2 15 Twin

ACSR Moose

- -

Total 50 50

Page 78: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

78/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

19 Bilaspur PGCIL

ACBIL 1 56 Twin

ACSR Moose

- -

-

MCCPL 1 45 Twin

ACSR Moose

- -

Total -

20 Bina-MP

MPPTCL

JP-Bina 1 20 Twin

ACSR Moose

- -

1X50

Bina-PG 1 3 Twin

ACSR Moose

- -

Bina-PG 2 3 Twin

ACSR Moose

- -

Bina-PG 3 3 Twin

ACSR Moose

- -

Bina-PG 4 3 Twin

ACSR Moose

- -

Bhopal 1 289 Twin

ACSR Moose

50 -

Bhopal 2 273 Twin

ACSR Moose

50 -

Total 100 50

21 Bina-PG PGCIL

Shujalpur

1 200 Twin

ACSR Moose

63 Yes

1X63

Shujalpur

2 200 Twin

ACSR Moose

63 Yes

Bina-MP 1 3 Twin

ACSR Moose

- -

Bina-MP 2 3 Twin

ACSR Moose

- -

Page 79: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

79/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Bina-MP 3 3 Twin

ACSR Moose

- -

Bina-MP 4 3 Twin

ACSR Moose

- -

Satna 1 276 Twin

ACSR Moose

50 -

Satna 2 276 Twin

ACSR Moose

50 -

Satna 3 273 Twin

ACSR Moose

50 -

Satna 4 273 Twin

ACSR Moose

50 -

JP-Bina 1 20 Twin

ACSR Moose

- -

Total 326 63

22 Birsingpur

MPPTCL

Katni 1 118 Twin

ACSR Moose

- -

1X50

Katni 2 118 Twin

ACSR Moose

63 -

Balco 1 236 Twin

ACSR Moose

50 -

Vandana 1 215 Twin

ACSR Moose

- -

Total 113 50

23 Boisar PGCIL

Aurangabad-PG

1 327 Twin

ACSR Moose

80 -

-

Aurangabad-PG

2 327 Twin

ACSR Moose

80 -

Page 80: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

80/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Padghe 1 101 Twin

ACSR Moose

- -

Tarapur-3&4

1 21 Twin

ACSR Moose

- -

Tarapur-3&4

2 21 Twin

ACSR Moose

- -

Vapi 1 91 Twin

ACSR Moose

- -

Total 160 -

24 CGPL CGPL

Chorania

1 314 Triple ACSR

Snowbird 63 Yes

1x63

Mansar 1 224 Triple ACSR

Snowbird 63 Yes

Jetpur 1 334 Triple ACSR

Snowbird 63 Yes

Jetpur 2 334 Triple ACSR

Snowbird 63 Yes

Bachau 1 100 Triple ACSR

Snowbird - -

Bachau 2 100 Triple ACSR

Snowbird - -

Total 252 63

25 Chakan

MSETCL

Pune-PG

1 18 Twin

ACSR Moose

- -

-

Lonikhand

1 37 Twin

ACSR Moose

- -

Total - -

26 Chandrapur MSET

CL Bhadraw

ati 1 20

Twin ACSR Moose

- - -

Page 81: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

81/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Bhadrawati

2 20 Twin

ACSR Moose

- -

Bhadrawati

3 22 Twin

ACSR Moose

- -

Bhadrawati

4 22 Twin

ACSR Moose

- -

Khaparkheda

1 156 Twin

ACSR Moose

- -

Parli-M 3 371 Twin

ACSR Moose

50 -

Chandrapur-II

1 1 Twin

ACSR Moose

50 -

Chandrapur-II

2 1 Twin

ACSR Moose

50 -

Total 150 -

27 Chandrapur

-II MSET

CL

Dhariwal 1 8 Twin

ACSR Moose

- -

-

Dhariwal 2 8 Twin

ACSR Moose

- -

Chandrapur

1 1 Twin

ACSR Moose

- -

Chandrapur

2 1 Twin

ACSR Moose

- -

Parli-M 1 357 Twin

ACSR Moose

- -

Parli-M 2 371 Twin

ACSR Moose

- -

Page 82: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

82/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Warora 1 45 Twin

ACSR Moose

- -

Warora 2 45 Twin

ACSR Moose

- -

Total - -

28 Chhegaon

MPPTCL

Julwania 1 114 Twin

ACSR Moose

- -

1x50

Malwa 1 53 Twin

ACSR Moose

- -

Total - 50

29 Chorania GETC

O

Kosamba

1 230 Twin

ACSR Moose

50 -

1X50 + 1X125

Kosamba

2 230 Twin

ACSR Moose

50 -

Amreli 1 164 Twin

ACSR Moose

- -

Asoj 1 177 Twin

ACSR Moose

- -

Asoj 2 166 Twin

ACSR Moose

- -

CGPL 1 314 Triple ACSR

Snowbird 63 -

Hadala 1 166 Twin

ACSR Moose

- -

Kasor 1 103 Twin

ACSR Moose

- -

Mansar 1 94 Triple ACSR

Snowbird 63 -

Page 83: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

83/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Ranchodpura

1 103 Twin

ACSR Moose

- -

Ranchodpura

2 103 Twin

ACSR Moose

- -

Total 226 175

30 Damoh PGCIL

Birsinghpur

1 227 Twin

ACSR Moose

50 -

1X63 + 1X125

Birsinghpur

2 227 Twin

ACSR Moose

50 -

Katni 1 118 Twin

ACSR Moose

50 -

Bhopal 1 214 Twin

ACSR Moose

- -

Bhopal 2 214 Twin

ACSR Moose

- -

Total 150 188

31 DB-Power

DB-Power

Raigarh-PS(Kotr

a) 1 18

Twin ACSR Moose

- -

- Raigarh-PS(Kotr

a) 2 18

Twin ACSR Moose

- -

Total - -

32 Deepnagar MSET

CL

Aurangabad-

M(Waluj) 2 185

Twin ACSR Moose

- -

-

Bhusawal

(Khadka)

1 15 Twin

ACSR Moose

- -

Bhusawal

(Khadka)

2 15 Twin

ACSR Moose

- -

Page 84: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

84/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Taptithanda

1 203 Twin

ACSR Moose

- -

Total - -

33 Dehgam PGCIL

Gandhar 1 157 Twin

ACSR Moose

- -

1X63 + 1X125

Gandhar 2 157 Twin

ACSR Moose

- -

Pirana-PG

1 56 Twin

ACSR Moose

- -

Pirana-PG

2 56 Twin

ACSR Moose

- -

Sami 1 152 Twin

ACSR Moose

- -

Sami 2 152 Twin

ACSR Moose

- -

Ranchodpura

1 62 Twin

ACSR Moose

- -

Ranchodpura

2 62 Twin

ACSR Moose

- -

Wanakbori

1 68 Twin

ACSR Moose

- -

Nagda 1 331 Twin

ACSR Moose

50 -

Nagda 2 331 Twin

ACSR Moose

50 -

Soja 1 41 Twin

ACSR Moose

- -

Total 100 187

Page 85: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

85/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

34 DGEN DGEN

Navsari 1 105 Twin

ACSR Moose

- -

1X125

Navsari 2 105 Twin

ACSR Moose

- -

Total - 125

35 Dhariwal DIL

Parli-PG 1 390 Twin

ACSR Moose

- -

1x80

Bhadrawati

1 15 Twin

ACSR Moose

- -

Total - 80

36 Dhariwal-

MS

DIL

Chandrapur-II

1 8 Twin

ACSR Moose

- -

-

Chandrapur-II

2 8 Twin

ACSR Moose

- -

Total - -

37 Dhule-BDTCL

BDTCL

Dhule-MS

1 18 Twin

ACSR Moose

- -

-

Dhule-MS

2 18 Twin

ACSR Moose

- -

Total - -

38 Dhule-MS MSET

CL

Dhule-BDTCL

1 18 Twin

ACSR Moose

- -

1x80

Dhule-BDTCL

2 18 Twin

ACSR Moose

- -

Bableshwar

1 170 Twin

ACSR Moose

- -

Bableshwar

2 170 Twin

ACSR Moose

- -

Page 86: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

86/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Khandwa

1 262 Twin

ACSR Moose

50 -

Khandwa

2 262 Twin

ACSR Moose

50 -

SSP 1 236 Twin

ACSR Moose

50 Yes

SSP 2 236 Twin

ACSR Moose

50 Yes

Total 200 80

39 EMCO GMR

Bhadrawati

1 28 Twin

ACSR Moose

- -

1X80

Bhadrawati

2 28 Twin

ACSR Moose

- -

Total - 80

40 Essar_Mah

an

ESSAR

Korba-NTPC

1 218 Twin

ACSR Moose

- -

1X80

Vindhyachal

1 41 Twin

ACSR Moose

- -

Total - 80

41 Gandhar NTPC

Navsari 1 106 Twin

ACSR Moose

- -

1X50

Navsari 2 106 Twin

ACSR Moose

- -

Hazira 1 97 Twin

ACSR Moose

- -

Hazira 2 97 Twin

ACSR Moose

- -

GPEC 1 13 Twin

ACSR Moose

- -

Page 87: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

87/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Sugen 1 64 Twin

ACSR Moose

50 -

Dehgam 1 157 Twin

ACSR Moose

- -

Dehgam 2 157 Twin

ACSR Moose

- -

Total 50 50

42 GMR-CG GMR

Raipur-PS(Durg

) 1 65

Twin ACSR Moose

- -

1x125 Raipur-

PS(Durg)

2 65 Twin

ACSR Moose

- -

Total 125

43 GPEC GPEC

Kasor 1 98 Twin

ACSR Moose

- -

-

Gandhar 1 13 Twin

ACSR Moose

- -

Total - -

44 Gwalior PGCIL - - - - - - 3x125

Total - 375

45 Hadala GETC

O

Versana 1 159 Twin

ACSR Moose

- -

1X50 + 1X125

Vadinar 1 113 Twin

ACSR Moose

- -

Vadinar 2 113 Twin

ACSR Moose

- -

Chorania

1 166 Twin

ACSR Moose

- -

Amreli 1 165 Twin

ACSR Moose

- -

Page 88: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

88/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

APL-Mundra

1 233 Twin

ACSR Moose

63 -

Total 63 175

46 Hazira

ESSAR

Gandhar 1 97 Twin

ACSR Moose

- -

-

Gandhar 2 97 Twin

ACSR Moose

- -

Total - -

47 IEPL IEPL

Warora 1 150 Twin

ACSR Moose

- -

-

Koradi-II 1 94 Twin

ACSR Moose

- -

Total -

48 Indira Sagar

MPPTCL

Indore-MP

1 79 Quad ACSR Moose

- -

-

Indore-MP

2 80 Quad ACSR Moose

- -

Nagda 1 188 Twin

ACSR Moose

- -

Satpura 1 189 Twin

ACSR Moose

- -

Total - -

49 Indore-MP MPPT

CL

Indore-PG

1 50 Twin

ACSR Moose

- -

- Indore-

PG 2 50

Twin ACSR Moose

- -

Nagda 1 108 Twin

ACSR Moose

- -

Page 89: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

89/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Asoj 1 289 Twin

ACSR Moose

50 -

Asoj 2 273 Twin

ACSR Moose

50 -

Indira Sagar

1 79 Quad ACSR Moose

- -

Indira Sagar

2 80 Quad ACSR Moose

50 -

Itarsi 1 207 Twin

ACSR Moose

50 -

Itarsi 2 214 Twin

ACSR Moose

50 -

Total 250 - -

50 Indore-PG

PGCIL Indore-

MP 1 50

Twin ACSR Moose

- -

1X125 + 1X63

Indore-

MP 2 50

Twin ACSR Moose

- -

Pithamp

ur 1 150

Twin ACSR Moose

- -

Pithamp

ur 2 150

Twin ACSR Moose

- -

Total 188

51 Itarsi PGCIL

Indore-MP

1 207 Twin

ACSR Moose

50 -

2X125 + 1X50

Indore-MP

2 214 Twin

ACSR Moose

50 -

Khandwa

1 197 Twin

ACSR Moose

50 Yes

Page 90: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

90/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Khandwa

2 197 Twin

ACSR Moose

50 -

Bhopal 1 98 Twin

ACSR Moose

- -

Bhopal 2 98 Twin

ACSR Moose

- -

Jabalpur 1 232 Twin

ACSR Moose

50 -

Jabalpur 2 232 Twin

ACSR Moose

50 -

Jabalpur 3 234 Twin

ACSR Moose

50 -

Jabalpur 4 234 Twin

ACSR Moose

50 -

Satpura 1 79 Twin

ACSR Moose

- -

Total 400 300

52 Jabalpur PGCIL

Itarsi 1 232 Twin

ACSR Moose

50 -

1X125 + 1X63

Itarsi 2 232 Twin

ACSR Moose

50 -

Itarsi 3 234 Twin

ACSR Moose

50 Yes

Itarsi 4 234 Twin

ACSR Moose

50 Yes

Sasan 1 340 Twin

ACSR Moose

63 -

Page 91: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

91/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Jabalpur-PS

1 16 Quad ACSR Moose

- -

Jabalpur-PS

2 16 Quad ACSR Moose

- -

Vindhyachal

1 360 Twin

ACSR Moose

63 -

Vindhyachal

2 360 Twin

ACSR Moose

63 -

Vindhyachal

4 389 Twin

ACSR Moose

63 -

Total 452 188

53 Jabalpur

(PS)

PGCIL

MB Power

1 246 Triple ACSR

Snowbird 50 -

2X125

MB Power

2 246 Triple ACSR

Snowbird 50 -

Jhabua Power

1 65 Twin

ACSR Moose

- -

Jhabua Power

2 65 Twin

ACSR Moose

- -

Jabalpur 1 16 Quad ACSR Moose

- -

Jabalpur 2 16 Quad ACSR Moose

- -

Total 100 250

54 Jaigad MSET

CL

New koyna

1 55 Twin

ACSR Moose

- -

2x50

New koyna

2 55 Twin

ACSR Moose

- -

Page 92: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

92/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Karad 1 111 Twin

ACSR Moose

- -

Karad 2 111 Twin

ACSR Moose

- -

Total - 100

55 Jejuri

MSETCL

Koyna stage-IV

1 172 Twin

ACSR Moose

- -

-

Lonikhand

1 48 Twin

ACSR Moose

- -

Total - -

56 Jetpur

GETCO

Amreli 1 96 Twin

ACSR Moose

- -

1X50 + 1X63

Amreli 2 96 Twin

ACSR Moose

- -

CGPL 1 334 Triple ACSR

Snowbird 63 -

CGPL 2 334 Triple ACSR

Snowbird 63 -

Total 126 113

57 Jhabua Power

Jhabua Power

Jabalpur (PS)

1 65 Twin

ACSR Moose

- -

-

Jabalpur (PS)

2 65 Twin

ACSR Moose

- -

Total - -

58 JP-Bina Jaypee

Bina-MP 1 20 Twin

ACSR Moose

- -

-

Bina-PG 1 20 Twin

ACSR Moose

- -

Total - -

Page 93: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

93/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

59 JPL JPL

Raipur 1 258 Twin

ACSR Moose

- -

1x125

Raipur 2 258 Twin

ACSR Moose

- -

JPL_extn(Tamna

r) 1 2

Twin ACSR Moose

- -

Tamnar-PS

1 10 Twin

ACSR Moose

- -

Tamnar-PS

2 10 Twin

ACSR Moose

- -

Tamnar-PS

4 10 Twin

ACSR Moose

- -

Total 125

60 JPL_extn(T

amnar)

JPL

Tamnar-PS

1 10 Twin

ACSR Moose

- -

-

Tamnar-PS

2 10 Twin

ACSR Moose

- -

Tamnar-PS

4 10 Twin

ACSR Moose

- -

JPL 1 2 Twin

ACSR Moose

- -

Total - -

61 JP-Nigrie Jaypee

Satna 1 161 Twin

ACSR Moose

- -

1X125

Satna 2 161 Twin

ACSR Moose

- -

Total - 125

62 Julwania MPPT

CL Chhega

on 1 114

Twin ACSR Moose

- - 1x50

Page 94: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

94/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Malwa 1 170 Twin

ACSR Moose

- -

Total - 50

63 Kala PGCIL

Vapi 1 49 Twin

ACSR Moose

- -

1X80

Vapi 2 52 Twin

ACSR Moose

- -

Magarawada

1 53 Twin

ACSR Moose

- -

Magarawada

2 53 Twin

ACSR Moose

- -

Total - 80

64 Kalwa

MSETCL

Padghe 1 72 Twin

ACSR Moose

- -

-

Padghe 2 72 Twin

ACSR Moose

- -

Kharghar

1 28 Twin

ACSR Moose

- -

Pune-PG

1 104 Twin

ACSR Moose

- -

Total - -

65 Karad MSET

CL

Kolhapur 1 105 Twin

ACSR Moose

- -

1X80

Kolhapur 2 105 Twin

ACSR Moose

- -

Jaigad 1 111 Twin

ACSR Moose

- -

Jaigad 2 111 Twin

ACSR Moose

- -

Page 95: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

95/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

New Koyna

1 72 Twin

ACSR Moose

- -

New Koyna

2 72 Twin

ACSR Moose

- -

Solapur-PG

1 299 Twin

ACSR Moose

50 -

Lonikhand

1 161 Twin

ACSR Moose

80 -

Total 130 80

66 Kasor

GETCO

Chorania

1 103 Twin

ACSR Moose

- -

1X50 + 1X125

GPEC 1 98 Twin

ACSR Moose

- -

Rajgarh 1 243 Twin

ACSR Moose

50 -

Rajgarh 2 243 Twin

ACSR Moose

50 -

SSP 1 146 Twin

ACSR Moose

- -

Total 100 175

67 Katni

MPPTCL

Birsingpur

1 118 Twin

ACSR Moose

- -

- Birsingp

ur 2 118

Twin ACSR Moose

- -

Damoh 1 118 Twin

ACSR Moose

- -

Total - -

68 Khandwa PGCIL Dhule 1 262 Twin

ACSR Moose

50 - 2X125

Page 96: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

96/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Dhule 2 262 Twin

ACSR Moose

50 -

Rajgarh 1 221 Twin

ACSR Moose

- -

Rajgarh 2 221 Twin

ACSR Moose

- -

Itarsi 1 197 Twin

ACSR Moose

- -

Itarsi 2 197 Twin

ACSR Moose

- -

Seoni 1 352 Quad AAAC Moose

80 Yes

Seoni 2 352 Quad AAAC Moose

80 Yes

Total 260 250

69 Khaparkhed

a

MSETCL

Chandrapur

1 156 Twin

ACSR Moose

- -

- Koradi 1 10 Twin

ACSR Moose

- -

Koradi 2 10 Twin

ACSR Moose

- -

Total - -

70 Kharghar

MSETCL

Padghe 1 85 Twin

ACSR Moose

- -

1X80

Kalwa 1 28 Twin

ACSR Moose

- -

Total - 80

71 Kolhapur MSET

CL Kolhapur

-PG 1 39

Twin ACSR Moose

- - 1X80

Page 97: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

97/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Kolhapur-PG

2 39 Twin

ACSR Moose

- -

Sholapur-PG

1 220 Twin

ACSR Moose

- -

Sholapur-PG

2 220 Twin

ACSR Moose

- -

Karad 1 105 Twin

ACSR Moose

- -

Karad 2 105 Twin

ACSR Moose

- -

Total - 80

72 Kolhapur-

PG

PGCIL

Mapusa 1 156 Twin

ACSR Moose

- -

1x125

Mapusa 2 156 Twin

ACSR Moose

- -

Kolhapur 1 39 Twin

ACSR Moose

- -

Kolhapur 2 39 Twin

ACSR Moose

- -

Total - 125

73 Koradi MSET

CL

Bhusawal

2 343 Twin

ACSR Moose

50 -

1X50

Satpura 1 149 Twin

ACSR Moose

- -

Bhilai 1 272 Twin

ACSR Moose

50 -

Khaparkheda

1 10 Twin

ACSR Moose

- -

Page 98: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

98/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Khaparkheda

2 10 Twin

ACSR Moose

- -

Koradi-II 1 5 Twin

ACSR Moose

50 -

Total 150 50

74 Koradi-II

MSETCL

IEPL 2 94 Twin

ACSR Moose

- -

-

Koradi 1 5 Twin

ACSR Moose

- -

Nandgaonpeth

1 140 Twin

ACSR Moose

- -

Wardha 1 67 Quad ACSR Moose

- -

Total - -

75 Korba (W)

CSPTCL

Korba-NTPC

1 14 Twin

ACSR Moose

- -

- Raita 1 144 Twin

ACSR Moose

- -

Korba (W)-Ext

1 1 Twin

ACSR Moose

- -

Total - -

76 Korba (W)-

Ext

CSPTCL

Bhilai 1 220 Twin

ACSR Moose

- -

- Marwa 1 60 Twin

ACSR Moose

- -

Korba (W)

1 1 Twin

ACSR Moose

- -

Total -

Page 99: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

99/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

77 Korba-NTPC

NTPC

Bhilai 1 197 Twin

ACSR Moose

- -

-

Bhilai 2 192 Twin

ACSR Moose

- -

Raipur 1 212 Twin

ACSR Moose

- -

Raipur 2 212 Twin

ACSR Moose

- -

Sipat 1 100 Twin

ACSR Moose

- -

Essar_Mahan

1 218 Twin

ACSR Moose

- -

Vindhyachal

2 289 Twin

ACSR Moose

- -

Bhatapara

1 124 Twin

ACSR Moose

- -

Balco 2 24 Twin

ACSR Moose

50 -

Vandana 1 18 Twin

ACSR Moose

50 -

Korba (W)

1 14 Twin

ACSR Moose

- -

Total 100 -

78 Kosamba GETC

O

Asoj 1 122 Twin

ACSR Moose

- -

1X80

Chorania

1 230 Twin

ACSR Moose

63 -

Page 100: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

100/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Chorania

2 230 Twin

ACSR Moose

63 -

Ukai 1 81 Twin

ACSR Moose

- -

Ukai 2 68 Twin

ACSR Moose

- -

Ukai 3 68 Twin

ACSR Moose

- -

Total 126 80

79 Koyna

stage-IV

MSETCL

Lonikhand

1 183 Twin

ACSR Moose

- -

-

New Koyna

1 14 Twin

ACSR Moose

- -

New Koyna

2 14 Twin

ACSR Moose

- -

Jejuri 1 172 Twin

ACSR Moose

- -

Total - -

80 KSK

Mahanadi

KSK

Raipur 1 147 Twin

ACSR Moose

- -

-

Raipur 2 150 Twin

ACSR Moose

- -

RKM 1 104 Twin

ACSR Moose

- -

Raigarh 1 119 Twin

ACSR Moose

- -

Total - -

81 KWPCL KWPC

L Raipur 1 18

Twin ACSR Moose

- - -

Page 101: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

101/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Raigarh 1 217 Twin

ACSR Moose

- -

Total - -

82 Lonikhand

MSETCL

Jejuri 1 48 Twin

ACSR Moose

- -

1X50

Chakan 1 37 Twin

ACSR Moose

50 -

Pune-PG

1 40 Twin

ACSR Moose

- -

Karad 1 161 Twin

ACSR Moose

- -

Koyna stage-IV

1 183 Twin

ACSR Moose

- -

Lonikhand-II

1 1 Twin

ACSR Moose

- -

Lonikhand-II

2 1 Twin

ACSR Moose

- -

Total 50 50

83 Lonikhand-

II

MSETCL

Lonikhand

1 1 Twin

ACSR Moose

- -

-

Lonikhand

2 1 Twin

ACSR Moose

- -

Parli-M 1 284 Twin

ACSR Moose

50 -

Parli-M 2 284 Twin

ACSR Moose

50 -

Total 100 -

84 Magarawad

a PGCIL Kala 1 53

Twin ACSR Moose

- - 1x80

Page 102: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

102/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Kala 2 53 Twin

ACSR Moose

- -

Navasari 1 126 Twin

ACSR Moose

- -

Navasari 2 126 Twin

ACSR Moose

- -

Total - 80

85 Malwa

MPPTCL

Chhegaon

1 53 Twin

ACSR Moose

- -

-

Pithampur

1 136 Twin

ACSR Moose

- -

Pithampur

2 136 Twin

ACSR Moose

- -

Julwania 1 170 Twin

ACSR Moose

- -

Total - -

86 Mansar

GETCO

Chorania

1 94 Triple ACSR

Snowbird - -

1x63

CGPL 1 224 Triple ACSR

Snowbird - -

Total - 63

87 Mapusa PGCIL

Kolhapur-PG

1 156 Twin

ACSR Moose

- -

1X50

Kolhapur-PG

2 156 Twin

ACSR Moose

- -

Total - 50

88 Marwa CSPT

CL Korba

(W)-Ext 1 60

Twin ACSR Moose

- - -

Page 103: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

103/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Raita 1 141 Twin

ACSR Moose

- -

Raita 2 141 Twin

ACSR Moose

- -

Total - -

89 MB Power

MB Power

Jabalpur (PS)

1 246 Triple ACSR

Snowbird - -

1x125

Jabalpur (PS)

2 246 Triple ACSR

Snowbird - -

Total - 125

90 MCCPL ACBIL

Bilaspur 1 45 Twin

ACSR Moose

- -

-

ACBIL 1 16 Twin

ACSR Moose

- -

Total - -

91 Mouda NTPC

Wardha 1 124 Quad ACSR Moose

- -

1x80

Wardha 2 124 Quad ACSR Moose

- -

Total - 80

92 Nagda MPPT

CL

Dehgam 1 331 Twin

ACSR Moose

50 -

2X50

Dehgam 2 331 Twin

ACSR Moose

50 -

Shujalpur

1 202 Twin

ACSR Moose

- -

Shujalpur

2 152 Twin

ACSR Moose

- -

Page 104: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

104/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Indira Sagar

1 188 Twin

ACSR Moose

- -

Indore-MP

1 108 Twin

ACSR Moose

- -

Rajgarh 1 104 Twin

ACSR Moose

50 -

Rajgarh 2 104 Twin

ACSR Moose

50 -

Total 200 100

93 Nagothane

MSETCL

Padghe 1 116 Twin

ACSR Moose

- -

1X80

Padghe 2 116 Twin

ACSR Moose

- -

RGPPL 1 136 Twin

ACSR Moose

- -

RGPPL 2 136 Twin

ACSR Moose

- -

Total - 80

94 Nandgaonp

eth

Rattan India

Koradi-II 1 140 Twin

ACSR Moose

- -

1x80

Akola 1 117 Twin

ACSR Moose

- -

Akola(2) 1 104 Twin

ACSR Moose

- -

Akola(2) 2 104 Twin

ACSR Moose

- -

Total - 80

95 Navsari PGCIL DGEN 1 105 Twin

ACSR Moose

- - 1X63

Page 105: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

105/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

DGEN 2 105 Twin

ACSR Moose

- -

Gandhar 1 106 Twin

ACSR Moose

- -

Gandhar 2 106 Twin

ACSR Moose

- -

Total - 63

96 New koyna

MSETCL

Jaigad 1 55 Twin

ACSR Moose

- -

-

Jaigad 2 55 Twin

ACSR Moose

- -

Karad 1 72 Twin

ACSR Moose

- -

Karad 2 72 Twin

ACSR Moose

- -

Koyna stage-IV

1 14 Twin

ACSR Moose

- -

Koyna stage-IV

2 14 Twin

ACSR Moose

- -

RGPPL 1 60 Twin

ACSR Moose

- -

RGPPL 2 60 Twin

ACSR Moose

- -

Total - -

97 NSPCL NSPCL

Raipur 1 14 Twin

ACSR Moose

- -

-

Raipur 2 14 Twin

ACSR Moose

- -

Total - -

Page 106: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

106/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

98 Padghe

MSETCL

Boisar 1 101 Twin

ACSR Moose

50 -

1X80

Nagothane

1 116 Twin

ACSR Moose

- -

Nagothane

2 116 Twin

ACSR Moose

- -

Pune-PG

1 96 Twin

ACSR Moose

- -

Bableshwar

1 174 Twin

ACSR Moose

- -

Bableshwar

2 174 Twin

ACSR Moose

- -

Kalwa 1 72 Twin

ACSR Moose

- -

Kalwa 2 72 Twin

ACSR Moose

- -

Kharghar

1 85 Twin

ACSR Moose

- -

Tarapur-3&4

1 91 Twin

ACSR Moose

- -

Tarapur-3&4

2 91 Twin

ACSR Moose

- -

Total 50 80

99 Parli-M MSET

CL

Lonikhand-II

1 284 Twin

ACSR Moose

50 -

1X50

Lonikhand-II

2 284 Twin

ACSR Moose

50 -

Page 107: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

107/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Sholapur-M

1 182 Twin

ACSR Moose

50 -

Chandrapur-II

1 357 Twin

ACSR Moose

50 -

Chandrapur-II

2 371 Twin

ACSR Moose

50 -

Parli-PG 1 5 Twin

ACSR Moose

- -

Parli-PG 2 5 Twin

ACSR Moose

- -

Chandrapur

3 371 Twin

ACSR Moose

50 -

Total 300 50

100 Parli-PG PGCIL

Pune-PG

(Shikrapur)

1 272 Twin

ACSR Moose

50 -

1X63 + 1X125

Pune-PG

(Shikrapur)

2 272 Twin

ACSR Moose

50 -

Sholapur-PG

1 65 Twin

ACSR Moose

- -

Sholapur-PG

2 65 Twin

ACSR Moose

- -

Bhadrawati

1 388 Twin

ACSR Moose

63 -

Dhariwal 1 390 Twin

ACSR Moose

63 -

Parli-M 1 5 Twin

ACSR Moose

- -

Page 108: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

108/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Parli-M 2 5 Twin

ACSR Moose

- -

Wardha 1 337 Quad ACSR Moose

63 -

Wardha 2 337 Quad ACSR Moose

63 -

Total 352 188

101 Pathadi

LANCO

Bilaspur-PS

1 31 Twin

ACSR Moose

- -

-

Bilaspur-PS

2 31 Twin

ACSR Moose

- -

Total - -

102 Pirana-PG PGCIL

Dehgam 1 56 Twin

ACSR Moose

- -

1X125

Dehgam 2 56 Twin

ACSR Moose

- -

Pirana-T 1 6 Twin

ACSR Moose

- -

Pirana-T 2 6 Twin

ACSR Moose

- -

Vadodara-PS

1 131 Quad ACSR Moose

- -

Vadodara-PS

2 131 Quad ACSR Moose

- -

Total - 1x125

103 Pirana-T TPL

Pirana-PG

1 6 Twin

ACSR Moose

- -

-

Pirana-PG

2 6 Twin

ACSR Moose

- -

Page 109: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

109/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Sugen 1 212 Twin

ACSR Moose

50 -

Uno-Sugen

1 209 Twin

ACSR Moose

50 -

Total 100 -

104 Pithampur

MPPTCL

Indore-PG

1 150 Twin

ACSR Moose

- -

1x50

Indore-PG

2 150 Twin

ACSR Moose

- -

Malwa 1 136 Twin

ACSR Moose

- -

Malwa 2 136 Twin

ACSR Moose

- -

Total - 50

105 Pune-PG PGCIL

Aurangabad-

M(Waluj) 1 261

Twin ACSR Moose

50 Yes

1x50

Aurangabad-

M(Waluj) 2 261

Twin ACSR Moose

50 Yes

Chakan 1 18 Twin

ACSR Moose

- -

Kalwa 1 104 Twin

ACSR Moose

- -

Lonikhand

1 40 Twin

ACSR Moose

- -

Padghe 1 96 Twin

ACSR Moose

- -

Pune-PG(Shikrapur)

1 64 Twin

ACSR Moose

50 Yes

Page 110: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

110/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Pune-PG(Shikrapur)

2 64 Twin

ACSR Moose

50 Yes

Total 200 50

106 Pune-

PG(Shikrapur)

PGCIL

Pune-PG

1 64 Twin

ACSR Moose

- -

-

Pune-PG

2 64 Twin

ACSR Moose

- -

Parli-PG 1 272 Twin

ACSR Moose

50 -

Parli-PG 2 272 Twin

ACSR Moose

50 -

Total 100 -

107 Raigarh PGCIL

India Bharath

1 110 Twin

ACSR Moose

- -

1X63 + 1X125

Jharsuguda

2 125 Twin

ACSR Moose

- -

Rourkela 1 130 Twin

ACSR Moose

- -

Sterlite 2 130 Twin

ACSR Moose

- -

Raipur 1 217 Twin

ACSR Moose

- -

KWPCL 1 217 Twin

ACSR Moose

- -

Raigarh-PS(Kotr

a) 1 7

Twin ACSR Moose

- -

Raigarh-PS(Kotr

a) 2 7

Twin ACSR Moose

- -

Page 111: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

111/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

KSK 1 119 Twin

ACSR Moose

- -

RKM 1 6 Twin

ACSR Moose

- -

Total - 188

108 Raigarh-PS(Kotra)

PGCIL

DB-Power

1 18 Twin

ACSR Moose

- -

1X80

DB-Power

2 18 Twin

ACSR Moose

- -

Raigarh 1 7 Twin

ACSR Moose

- -

Raigarh 2 7 Twin

ACSR Moose

- -

SKS 1 28 Twin

ACSR Moose

- -

SKS 2 28 Twin

ACSR Moose

- -

Total - 80

109 Raipur PGCIL

Wardha 1 371 Quad ACSR Moose

63 -

1X125 + 1X80

Wardha 2 371 Quad ACSR Moose

63 -

Raipur-PS(Durg

) 1 22

Twin ACSR Moose

- -

Raipur-PS(Durg

) 2 22

Twin ACSR Moose

- -

Bhadrawati

1 333 Twin

ACSR Moose

80 -

Page 112: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

112/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Bhadrawati

2 346 Twin

ACSR Moose

50 Yes

Bhadrawati

3 346 Twin

ACSR Moose

63 -

Bhilai 1 13 Twin

ACSR Moose

- -

JPL 1 258 Twin

ACSR Moose

50 -

JPL 2 258 Twin

ACSR Moose

50 -

Korba-NTPC

1 212 Twin

ACSR Moose

63 -

Korba-NTPC

2 212 Twin

ACSR Moose

63 -

KSK Mahana

di 1 147

Twin ACSR Moose

50 -

KSK Mahana

di 2 150

Twin ACSR Moose

50 -

KWPCL 1 18 Twin

ACSR Moose

63 -

NSPCL 1 14 Twin

ACSR Moose

- -

NSPCL 2 14 Twin

ACSR Moose

- -

Raigarh 1 217 Twin

ACSR Moose

63 -

Total 771 205

Page 113: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

113/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

110 Raipur-

PS(Durg)

PGCIL

GMR-CG

1 65 Twin

ACSR Moose

- -

-

GMR-CG

2 65 Twin

ACSR Moose

- -

Raipur 1 22 Twin

ACSR Moose

- -

Raipur 2 22 Twin

ACSR Moose

- -

Total - -

111 Raita

CSPTCL

Marwa 1 141 Twin

ACSR Moose

- -

-

Marwa 2 141 Twin

ACSR Moose

- -

Bhilai 1 56 Twin

ACSR Moose

- -

Bhilai 2 56 Twin

ACSR Moose

- -

Bhilai 3 56 Twin

ACSR Moose

- -

Korba (W)

1 144 Twin

ACSR Moose

- -

Total - -

112 Rajgarh PGCIL

Nagda 1 104 Twin

ACSR Moose

- -

1X125 Nagda 2 104 Twin

ACSR Moose

- -

Kasor 1 243 Twin

ACSR Moose

- -

Page 114: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

114/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Kasor 2 243 Twin

ACSR Moose

- -

Khandwa

1 221 Twin

ACSR Moose

- -

Khandwa

2 221 Twin

ACSR Moose

- -

SSP 1 178 Twin

ACSR Moose

- -

SSP 2 178 Twin

ACSR Moose

- -

Total - 125

113 Ranchodpur

a

GETCO

Zerda(Kansari)

1 140 Twin

ACSR Moose

- -

1X50 + 1X125

Zerda(Kansari)

2 140 Twin

ACSR Moose

- -

Chorania

1 103 Twin

ACSR Moose

- -

Chorania

2 103 Twin

ACSR Moose

- -

Bachau 1 282 Triple ACSR

Snowbird 50 -

Bachau 2 282 Triple ACSR

Snowbird 50 -

Dehgam 1 62 Twin

ACSR Moose

- -

Dehgam 2 62 Twin

ACSR Moose

- -

Total 100 175

Page 115: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

115/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

114 RGPPL

RGPPL

New Koyna

1 60 Twin

ACSR Moose

- -

-

New Koyna

2 60 Twin

ACSR Moose

- -

Nagothane

1 136 Twin

ACSR Moose

- -

Nagothane

2 136 Twin

ACSR Moose

- -

Total - -

115 RKM RKM

Raigarh 1 6 Twin

ACSR Moose

- -

2x50 KSK

Mahanadi

1 104 Twin

ACSR Moose

- -

Total - 100

116 Sami APL

APL-Mundra

1 282 Twin

ACSR Moose

50 -

1x50

APL-Mundra

2 282 Twin

ACSR Moose

50 -

Dehgam 1 152 Twin

ACSR Moose

- -

Dehgam 2 152 Twin

ACSR Moose

- -

Total 100 50

117 Sasan SPL

Jabalpur 1 340 Twin

ACSR Moose

50 -

- Vindhya

chal 3 20

Twin ACSR Moose

- -

Vindhyachal-PS

1 8 Twin

ACSR Moose

- -

Page 116: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

116/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Vindhyachal-PS

2 8 Twin

ACSR Moose

- -

Total 50 -

118 Satna PGCIL

Bina-PG 1 276 Twin

ACSR Moose

50 -

1X50 + 1X63

Bina-PG 2 276 Twin

ACSR Moose

50 -

Bina-PG 3 273 Twin

ACSR Moose

50 -

Bina-PG 4 273 Twin

ACSR Moose

50 -

JP-Nigrie

1 161 Twin

ACSR Moose

- -

JP-Nigrie

2 161 Twin

ACSR Moose

- -

Vindhyachal

1 267 Twin

ACSR Moose

50 -

Vindhyachal

2 267 Twin

ACSR Moose

50 -

Vindhyachal

3 258 Twin

ACSR Moose

50 -

Vindhyachal

4 258 Twin

ACSR Moose

50 -

Total 400 113

119 Satpura MPPT

CL

Indira sagar

1 189 Twin

ACSR Moose

- -

2X63

Itarsi 1 79 Twin

ACSR Moose

- -

Page 117: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

117/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Astha 1 240 Twin

ACSR Moose

- -

Koradi 1 149 Twin

ACSR Moose

50 -

Seoni 1 156 Twin

ACSR Moose

- -

Total 50 126

120 Seoni PGCIL

Satpura 1 156 Twin

ACSR Moose

50 -

2x125

Khandwa

1 352 Quad AAAC Moose

80 -

Khandwa

2 352 Quad AAAC Moose

80 -

Bhilai 1 230 Twin

ACSR Moose

- -

Total 210 250

121 Sholapur-M

MSETCL

Sholapur -PG

1 178 Twin

ACSR Moose

- -

-

Parli-M 1 182 Twin

ACSR Moose

- -

Total - -

122 Shujalpur PGCIL

Bina-PG 1 200 Twin

ACSR Moose

50 -

1X63 + 1X125

Bina-PG 2 200 Twin

ACSR Moose

50 -

Nagda 1 202 Twin

ACSR Moose

63 Yes

Nagda 2 152 Twin

ACSR Moose

63 Yes

Page 118: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

118/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Total 226 188

123 Sipat NTPC

Raipur 1 149 Twin

ACSR Moose

- -

-

Raipur 2 149 Twin

ACSR Moose

- -

Raipur 3 149 Twin

ACSR Moose

- -

Ranchi 1 405 Twin

ACSR Moose

80 -

Ranchi 2 405 Twin

ACSR Moose

80 -

Korba-NTPC

1 100 Twin

ACSR Moose

- -

Total 160 -

124 SKS SKS

Raigarh-PS(Kotr

a) 1 28

Twin ACSR Moose

- -

1x50 Raigarh-PS(Kotr

a) 2 28

Twin ACSR Moose

- -

Total 50

125 Soja

GETCO

Wanakbori

1 95 Twin

ACSR Moose

- -

1X50 + 1X80

Dehgam 1 41 Twin

ACSR Moose

- -

Zerda 1 135 Twin

ACSR Moose

- -

Total - 130

126 Solapur-NTPC

NTPC Solapur-

PG 1 11

Twin ACSR Moose

- - -

Page 119: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

119/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Solapur-PG

2 11 Twin

ACSR Moose

- -

Total - -

127 Solapur-PG PGCIL

Solapur-NTPC

1 11 Twin

ACSR Moose

- -

1X63

Solapur-NTPC

2 11 Twin

ACSR Moose

- -

Karad 1 299 Twin

ACSR Moose

80 Yes

Kolhapur 1 220 Twin

ACSR Moose

50 -

Kolhapur 2 220 Twin

ACSR Moose

50 -

Parli-PG 1 65 Twin

ACSR Moose

- -

Parli-PG 2 65 Twin

ACSR Moose

- -

Sholapur-M

1 178 Twin

ACSR Moose

- -

Total 180 63

128 SSP SSNL

Dhule 1 236 Twin

ACSR Moose

- -

-

Dhule 2 236 Twin

ACSR Moose

- -

Asoj 1 83 Twin

ACSR Moose

- -

Rajgarh 1 178 Twin

ACSR Moose

- -

Page 120: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

120/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Rajgarh 2 178 Twin

ACSR Moose

- -

Kasor 1 146 Twin

ACSR Moose

- -

Total - -

129 Sugen TPL

Uno-Sugen

1 3 Twin

ACSR Moose

- -

-

Pirana-T 1 212 Twin

ACSR Moose

- -

Pirana-T 1 209 Twin

ACSR Moose

- -

Gandhar 1 64 Twin

ACSR Moose

- -

Sugen 1 3 Twin

ACSR Moose

- -

Vapi 1 118 Twin

ACSR Moose

- -

Total - -

130 Tamnar-PS PGCIL

JPL_extn(Tamna

r) 1 10

Twin ACSR Moose

- - -

JPL_extn(Tamna

r) 2 10

Twin ACSR Moose

- - -

JPL_extn(Tamna

r) 4 10

Twin ACSR Moose

- - -

TRN 1 15 Twin

ACSR Moose

- - -

TRN 2 15 Twin

ACSR Moose

- - -

Total - -

Page 121: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

121/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

131 Taptithanda

MEGPTCL

Deepnagar

1 203 Twin

ACSR Moose

- -

-

Bableshwar

1 127 Twin

ACSR Moose

- -

Bableshwar

2 127 Twin

ACSR Moose

- -

Aurangabad-

M(Waluj) 1 135

Twin ACSR Moose

- -

Total - -

132 Tarapur-

3&4

NPCIL

Padghe 1 91 Twin

ACSR Moose

- -

-

Padghe 2 91 Twin

ACSR Moose

- -

Boisar 1 21 Twin

ACSR Moose

- -

Boisar 2 21 Twin

ACSR Moose

- -

Total - -

133 Tiroda

MEGPTCL

Warora 1 219 Twin

ACSR Moose

- -

2X80

Warora 2 219 Twin

ACSR Moose

- -

Total - 160

134 TRN TRN

Tamnar-PS

1 15 Twin

ACSR Moose

- -

-

Tamnar-PS

2 15 Twin

ACSR Moose

- -

Total - -

Page 122: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

122/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

135 Ukai TPL

Kosamba

1 81 Twin

ACSR Moose

- -

- Kosamb

a 2 68

Twin ACSR Moose

- -

Kosamba

3 68 Twin

ACSR Moose

- -

Total -

136 Uno-Sugen TPL

Pirana-T 1 209 Twin

ACSR Moose

- -

1x80

Sugen 1 3 Twin

ACSR Moose

- -

Total - 80

137 Vadinar Essar

Hadala 1 113 Twin

ACSR Moose

- -

-

Hadala 2 113 Twin

ACSR Moose

- -

Total - -

138 Vadodara-

PS

PGCIL

Pirana-PG

1 131 Quad ACSR Moose

- -

-

Pirana-PG

2 131 Quad ACSR Moose

- -

Asoj 1 14 Quad ACSR Moose

- -

Asoj 2 14 Quad ACSR Moose

- -

Total - -

139 Vandana Vanda

na Vidyut

Birsingpur

1 215 Twin

ACSR Moose

50 - -

Page 123: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

123/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Korba-NTPC

1 18 Twin

ACSR Moose

- -

Total 50 -

140 Vapi PGCIL

Boisar 1 91 Twin

ACSR Moose

- -

-

Sugen 1 118 Twin

ACSR Moose

- -

Kala 1 49 Twin

ACSR Moose

- -

Kala 2 52 Twin

ACSR Moose

- -

Total - -

141 Varsana

GETCO

Bachau 1 10 Twin

ACSR Moose

- -

1X50 + 1X125

Bachau 2 10 Twin

ACSR Moose

- -

Total - 175

142 Vindhyachal NTPC

Jabalpur 1 360 Twin

ACSR Moose

63 -

1X63 + 1X50

Jabalpur 2 360 Twin

ACSR Moose

63 -

Jabalpur 4 389 Twin

ACSR Moose

63 -

Satna 1 267 Twin

ACSR Moose

50 -

Satna 2 267 Twin

ACSR Moose

50 -

Satna 3 258 Twin

ACSR Moose

50 -

Page 124: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

124/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Satna 4 258 Twin

ACSR Moose

50 -

Sasan 3 20 Twin

ACSR Moose

63 Yes

Mahan 1 41 Twin

ACSR Moose

50 -

Korba-NTPC

2 289 Twin

ACSR Moose

50 -

Vindhyachal-III

1 4 Quad ACSR Moose

- -

Vindhyachal-III

2 4 Quad ACSR Moose

- -

Total 552 113

143 Vindhyachal

-III

NTPC

Vindhyachal-V

1 4 Quad ACSR Moose

- -

-

Vindhyachal-V

2 4 Quad ACSR Moose

- -

Vindhyachal

1 4 Quad ACSR Moose

- -

Vindhyachal

2 4 Quad ACSR Moose

- -

Total - -

144 Vindhyachal

-IV NTPC

Vindhyachal-V

1 4 Quad ACSR Moose

- -

1X80 Vindhyachal-V

2 4 Quad ACSR Moose

- -

Vindhyachal-PS

1 31 Twin

ACSR Moose

- -

Page 125: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

125/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Vindhyachal-PS

2 31 Twin

ACSR Moose

- -

Total 80

145 Vindhyachal

-PS

PGCIL

Sasan 1 8 Twin

ACSR Moose

- -

1X80

Sasan 2 8 Twin

ACSR Moose

- -

Rihand 1 35 Quad

Bersimis - -

Rihand 2 28 Quad

Bersimis - -

Vindhyachal-IV

1 31 Twin

ACSR Moose

- -

Vindhyachal-IV

2 31 Twin

ACSR Moose

- -

Total - 80

146 Vindhyachal

-V

NTPC

Vindhyachal-IV

1 4 Quad ACSR Moose

- -

-

Vindhyachal-IV

2 4 Quad ACSR Moose

- -

Vindhyachal-III

1 4 Quad ACSR Moose

- -

Vindhyachal-III

2 4 Quad ACSR Moose

- -

Total - -

147 Wanakbori GSEC

L

Asoj 1 76 Twin

ACSR Moose

- -

-

Dehgam 1 68 Twin

ACSR Moose

- -

Page 126: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

126/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

Soja 1 95 Twin

ACSR Moose

- -

Total - -

148 Wardha PGCIL

Parli-PG 1 337 Quad ACSR Moose

63 -

1X50

Parli-PG 2 337 Quad ACSR Moose

63 -

Akola 1 162 Twin

ACSR Moose

- -

Akola 2 162 Twin

ACSR Moose

- -

Mouda 1 124 Quad ACSR Moose

- -

Mouda 2 124 Quad ACSR Moose

- -

Warora 1 76 Twin

ACSR Moose

- -

Koradi-II 1 67 Quad ACSR Moose

- -

Raipur 1 371 Quad ACSR Moose

63 -

Raipur 2 371 Quad ACSR Moose

63 -

Total 252 50

149 Warora MEGPTCL

Chandrapur-II

1 45 Twin

ACSR Moose

- -

1x125

Chandrapur-II

2 45 Twin

ACSR Moose

- -

Page 127: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

127/208

Sr. No.

Name of S/S

S/S Owner

Lines ID

Line Length (in km)

Conductor Type

LRs LRs S/W

BRs

IEPL 1 150 Twin

ACSR Moose

- -

Tiroda 1 219 Twin

ACSR Moose

- -

Tiroda 2 219 Twin

ACSR Moose

- -

Wardha 1 76 Twin

ACSR Moose

- -

Total - 125

150 Zerda(Kans

ari)

GETCO

Bhinmal 1 143 Twin

ACSR Moose

50 -

1X50

Kankroli 1 234 Twin

ACSR Moose

50 -

Ranchodpura

1 140 Twin

ACSR Moose

- -

Ranchodpura

2 140 Twin

ACSR Moose

- -

Total 100 50

Page 128: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

128/208

8. Statistics of Elements in Western Region

8.1. 765 kV Elements

765 kV S/S

765 kV

Lines

765/400 kV ICTS

765 kV Line Reactors in WR 765 kV Bus

Reactors in WR Total Reactors

& MVAR

240 MVAR 330 MVAR 240

MVAR 330

MVAR S/W Non S/W

S/W Non S/W

No. 26 69* 51 47 39 9 5 28 3 131

MVAR - - - 11280 9360 2970 1650 6720 990 32970

8.2. 400 kV Elements

400 kV

S/S 400 kV Lines

400/220 kV

ICTS

400 kV Lines Reactors in WR 400 kV Bus Reactors in WR

Total 50 MVAR 63 MVAR 80 MVAR 50 MVA

R

63 MVAR

80 MVAR

125 MVAR S/W

Non S/W

S/W Non S/W

S/W Non S/W

No. 150 381 199 10 122 9 34 5 9 35 18 28 41 311

MVAR - - - 500 6100 567 2142 400 720 1750 1134 2240 5125 20678

8.3. 765 kV Substation wise LRs and BRs

S.No

S/S

Line Reactors Bus Reactors Total LRs MVA

R

Total BRs MVA

R

Total S/W

MVAR at S/S

Total S/S

MVAR Resour

ces

240 MVAR

330 MVAR

240 MVA

R

330 MVA

R S/W

Non S/W

S/W

Non S/W

1 Akola(2) 2 2 0 0 1 0 960 240 720 1200

2 Aurangabad-PG 2 4 0 0 2 0 1440 480 960 1920

3 Bhopal-BDTCL 1 1 0 0 1 0 480 240 480 720

4 Bilaspur 3 0 0 0 1 0 720 240 960 960

5 Bina-PG 2 8 0 0 2 0 2400 480 960 2880

6 Champa 0 0 0 0 0 0 0 0 0 0

7 Dharamjaygarh 0 1 7 1 0 2 2880 660 2970 3540

8 Dhule-BDTCL 2 0 0 0 1 0 480 240 720 720

9 Gwalior 5 2 0 0 1 0 1680 240 1440 1920

10 Indore-PG 1 2 0 0 2 0 720 480 720 1200

11 Jabalpur-PS 4 4 0 0 2 0 1920 480 1440 2400

12 Kholpaur-PG* 0 0 0 0 0 0 0 0 0 0

13 Koradi(III) 3 1 0 0 1 0 960 240 960 1200

Page 129: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

129/208

S.No

S/S

Line Reactors Bus Reactors Total LRs MVA

R

Total BRs MVA

R

Total S/W

MVAR at S/S

Total S/S

MVAR Resour

ces

240 MVAR

330 MVAR

240 MVA

R

330 MVA

R S/W

Non S/W

S/W

Non S/W

14 Pune-

PG(Shikrapur) 1 0 0 0 1 0 240 240 480 480

15 Raigarh-PS(Kotra) 2 0 0 0 1 0 480 240 720 720

16 Raipur-PS(Durg) 3 2 0 0 1 0 1200 240 960 1440

17 Sasan 0 2 0 0 1 0 480 240 240 720

18 Satna 4 4 0 0 2 0 1920 480 1440 2400

19 Seoni 3 2 0 0 1 0 1200 240 960 1440

20 Sipat 2 0 0 0 1 0 480 240 720 720

21 Solapur 3 2 0 0 1 0 1200 240 960 1440

22 Tamnar 0 0 0 0 1 0 0 240 240 240

23 Tiroda 2 0 0 0 1 0 480 240 720 720

24 Vadodora-PS 0 2 0 0 1 0 480 240 240 720

25 Vindhyachal-PS 2 0 0 0 1 0 480 240 720 720

26 Wardha 0 0 2 4 1 1 1980 570 1230 2550

Total 47

39 9 5 28 3 2526

0 7710 21960 32970

8.4. 400 kV Substation wise LRs and BRs

S.No

S/S

Line Reactors Bus Reactors Total LRs

MVAR

Total BRs MVA

R

Total S/W MVAR at SS

Total S/S MVAR

Resources

50 MVAR 63 MVAR 80 MVAR 50 MVA

R

63 MVA

R

80 MVA

R

125 MVA

R S/W

Non S/W

S/W

Non S/W

S/W

Non S/W

1 ACBIL 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 Akola 0 2 0 0 0 0 0 0 0 0 100 0 0 100

3 Akola(2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Amreli 0 0 0 0 0 0 1 0 0 1 0 175 175 175

5 APL-

Mundra 0 0 0 0 0 0 0 0 2 1 0 285 285 285

6 Asoj 0 3 0 0 0 0 1 0 0 0 150 50 50 200

7 Astha 0 0 0 0 0 0 0 0 0 0 0 0 0 0

8 Auranga

bad-M(Waluj)

0 3 0 0 0 0 0 0 0 0 150 0 0 150

9 Aurangabad-PG

0 2 0 0 2 0 0 0 0 1 260 125 285 385

10 Bablesh

war 0 0 0 0 0 0 0 0 2 0 0 160 160 160

Page 130: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

130/208

S.No

S/S

Line Reactors Bus Reactors Total LRs

MVAR

Total BRs MVA

R

Total S/W MVAR at SS

Total S/S MVAR

Resources

50 MVAR 63 MVAR 80 MVAR 50 MVA

R

63 MVA

R

80 MVA

R

125 MVA

R S/W

Non S/W

S/W

Non S/W

S/W

Non S/W

11 Bachau 0 0 0 0 0 0 0 1 0 0 0 63 63 63

12 Balco 0 0 0 0 0 0 0 0 0 0 0 0 0 0

13 Bhadraw

ati 0 4 0 4 0 0 1 0 0 0 452 50 50 502

14 Bhatapar

a 0 1 0 0 0 0 0 0 0 1 50 125 125 175

15 Bhilai 0 5 0 0 0 1 0 0 0 0 330 0 0 330

16 Bhopal-BDTCL

0 0 0 0 0 0 0 0 0 1 0 125 125 125

17 Bhopal-

MP 0 2 0 0 0 0 0 0 1 1 100 205 205 305

18 Bhusawa

l (Khadka)

0 2 0 0 0 0 1 0 0 1 100 175 175 275

19 Bilaspur 0 0 0 0 0 0 0 0 0 0 0 0 0 0

20 Bina-MP 0 2 0 0 0 0 1 0 0 0 100 50 50 150

21 Bina-PG 0 4 2 0 0 0 0 1 0 0 326 63 189 389

22 Birsingpu

r 0 1 0 1 0 0 1 0 0 0 113 50 50 163

23 Boisar 0 0 0 0 0 2 0 0 0 0 160 0 0 160

24 CGPL 0 0 4 0 0 0 0 1 0 0 252 63 315 315

25 Chakan 0 0 0 0 0 0 0 0 0 0 0 0 0 0

26 Chandra

pur 0 3 0 0 0 0 0 0 0 0 150 0 0 150

27 Chandra

pur-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0

28 Chhegao

n 0 0 0 0 0 0 1 0 0 0 0 50 50 50

29 Chorania 0 2 0 2 0 0 1 0 0 1 226 175 175 401

30 Damoh 0 3 0 0 0 0 0 1 0 1 150 188 188 338

31 DB-

Power 0 0 0 0 0 0 0 0 0 0 0 0 0 0

32 Deepnag

ar 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33 Dehgam 0 2 0 0 0 0 0 1 0 1 100 188 188 288

34 DGEN 0 0 0 0 0 0 0 0 0 1 0 125 125 125

35 Dhariwal 0 0 0 0 0 0 0 0 1 0 0 80 80 80

36 Dhariwal

-MS 0 0 0 0 0 0 0 0 1 0 0 80 80 80

37 Dhule-BDTCL

0 0 0 0 0 0 0 0 0 0 0 0 0 0

38 Dhule-

MS 2 2 0 0 0 0 0 0 1 0 200 80 180 280

39 EMCO 0 0 0 0 0 0 0 0 1 0 0 80 80 80

Page 131: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

131/208

S.No

S/S

Line Reactors Bus Reactors Total LRs

MVAR

Total BRs MVA

R

Total S/W MVAR at SS

Total S/S MVAR

Resources

50 MVAR 63 MVAR 80 MVAR 50 MVA

R

63 MVA

R

80 MVA

R

125 MVA

R S/W

Non S/W

S/W

Non S/W

S/W

Non S/W

40 Essar_M

ahan 0 0 0 0 0 0 0 0 1 0 0 80 80 80

41 Gandhar 0 1 0 0 0 0 1 0 0 0 50 50 50 100

42 GMR-CG 0 0 0 0 0 0 0 0 0 1 0 125 125 125

43 GPEC 0 0 0 0 0 0 0 0 0 0 0 0 0 0

44 Gwalior 0 0 0 0 0 0 0 0 0 3 0 375 375 375

45 Hadala 0 0 0 1 0 0 1 0 0 1 63 175 175 238

46 Hazira 0 0 0 0 0 0 0 0 0 0 0 0 0 0

47 IEPL 0 0 0 0 0 0 0 0 0 0 0 0 0 0

48 Indira Sagar

0 0 0 0 0 0 0 0 0 0 0 0 0 0

49 Indore-

MP 0 5 0 0 0 0 0 0 0 0 250 0 0 250

50 Indore-

PG 0 0 0 0 0 0 0 1 0 1 0 188 188 188

51 Itarsi 1 7 0 0 0 0 1 0 0 2 400 300 350 700

52 Jabalpur 2 2 0 4 0 0 0 1 0 1 452 188 288 640

53 Jabalpur

(PS) 0 2 0 0 0 0 0 0 0 2 100 250 250 350

54 Jaigad 0 0 0 0 0 0 2 0 0 0 0 100 100 100

55 Jejuri 0 0 0 0 0 0 0 0 0 0 0 0 0 0

56 Jetpur 0 0 0 2 0 0 1 1 0 0 126 113 113 239

57 Jhabua Power

0 0 0 0 0 0 0 0 0 0 0 0 0 0

58 JP-Bina 0 0 0 0 0 0 0 0 0 0 0 0 0 0

59 JPL 0 0 0 0 0 0 0 0 0 1 0 125 125 125

60 JPL_extn(Tamnar)

0 0 0 0 0 0 0 0 0 0 0 0 0 0

61 JP-Nigrie 0 0 0 0 0 0 0 0 0 1 0 125 125 125

62 Julwania 0 0 0 0 0 0 1 0 0 0 0 50 50 50

63 Kala 0 0 0 0 0 0 0 0 1 0 0 80 80 80

64 Kalwa 0 0 0 0 0 0 0 0 0 0 0 0 0 0

65 Karad 0 1 0 0 0 1 0 0 1 0 130 80 80 210

66 Kasor 0 2 0 0 0 0 1 0 0 1 100 175 175 275

67 Katni 0 0 0 0 0 0 0 0 0 0 0 0 0 0

68 Khandwa 0 2 0 0 2 0 0 0 0 2 260 250 410 510

69 Khapark

heda 0 0 0 0 0 0 0 0 0 0 0 0 0 0

70 Kharghar 0 0 0 0 0 0 0 0 1 0 0 80 80 80

71 Kolhapur 0 0 0 0 0 0 0 0 1 0 0 80 80 80

72 Kolhapur

-PG 0 0 0 0 0 0 0 0 0 1 0 125 125 125

Page 132: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

132/208

S.No

S/S

Line Reactors Bus Reactors Total LRs

MVAR

Total BRs MVA

R

Total S/W MVAR at SS

Total S/S MVAR

Resources

50 MVAR 63 MVAR 80 MVAR 50 MVA

R

63 MVA

R

80 MVA

R

125 MVA

R S/W

Non S/W

S/W

Non S/W

S/W

Non S/W

73 Koradi 0 3 0 0 0 0 1 0 0 0 150 50 50 200

74 Koradi-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0

75 Korba (W)

0 0 0 0 0 0 0 0 0 0 0 0 0 0

76 Korba

(W)-Ext 0 0 0 0 0 0 0 0 0 0 0 0 0 0

77 Korba-NTPC

0 2 0 0 0 0 0 0 0 0 100 0 0 100

78 Kosamb

a 0 0 0 2 0 0 0 0 1 0 126 80 80 206

79 Koyna

stage-IV 0 0 0 0 0 0 0 0 0 0 0 0 0 0

80 KSK

Mahanadi

0 0 0 0 0 0 0 0 0 0 0 0 0 0

81 KWPCL 0 0 0 0 0 0 0 0 0 0 0 0 0 0

82 Lonikhan

d 0 1 0 0 0 0 1 0 0 0 50 50 50 100

83 Lonikhan

d-II 0 2 0 0 0 0 0 0 0 0 100 0 0 100

84 Magaraw

ada 0 0 0 0 0 0 0 0 1 0 0 80 80 80

85 Malwa 0 0 0 0 0 0 0 0 0 0 0 0 0 0

86 Mansar 0 0 0 0 0 0 0 1 0 0 0 63 63 63

87 Mapusa 0 0 0 0 0 0 1 0 0 0 0 50 50 50

88 Marwa 0 0 0 0 0 0 0 0 0 0 0 0 0 0

89 MB

Power 0 0 0 0 0 0 0 0 0 1 0 125 125 125

90 MCCPL 0 0 0 0 0 0 0 0 0 0 0 0 0 0

91 Mouda 0 0 0 0 0 0 0 0 1 0 0 80 80 80

92 Nagda 0 4 0 0 0 0 2 0 0 0 200 100 100 300

93 Nagotha

ne 0 0 0 0 0 0 0 0 1 0 0 80 80 80

94 Nandgao

npeth 0 0 0 0 0 0 0 0 1 0 0 80 80 80

95 Navsari 0 0 0 0 0 0 0 1 0 0 0 63 63 63

96 New

koyna 0 0 0 0 0 0 0 0 0 0 0 0 0 0

97 NSPCL 0 0 0 0 0 0 0 0 0 0 0 0 0 0

98 Padghe 0 1 0 0 0 0 0 0 1 0 50 80 80 130

99 Parli-M 0 6 0 0 0 0 1 0 0 0 300 50 50 350

100 Parli-PG 0 2 0 4 0 0 0 1 0 1 352 188 188 540

101 Pathadi 0 0 0 0 0 0 0 0 0 0 0 0 0 0

102 Pirana-

PG 0 0 0 0 0 0 0 0 0 1 0 125 125 125

Page 133: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

133/208

S.No

S/S

Line Reactors Bus Reactors Total LRs

MVAR

Total BRs MVA

R

Total S/W MVAR at SS

Total S/S MVAR

Resources

50 MVAR 63 MVAR 80 MVAR 50 MVA

R

63 MVA

R

80 MVA

R

125 MVA

R S/W

Non S/W

S/W

Non S/W

S/W

Non S/W

103 Pirana-T 0 2 0 0 0 0 0 0 0 0 100 0 0 100

104 Pithamp

ur 0 0 0 0 0 0 1 0 0 0 0 50 50 50

105 Pune-PG 4 0 0 0 0 0 1 0 0 0 200 50 250 250

106 Pune-

PG(Shikrapur)

0 2 0 0 0 0 0 0 0 0 100 0 0 100

107 Raigarh 0 0 0 0 0 0 0 1 0 1 0 188 188 188

108 Raigarh-PS(Kotra

) 0 0 0 0 0 0 0 0 1 0 0 80 80 80

109 Raipur 1 4 0 7 0 1 0 0 1 1 771 205 255 976

110 Raipur-

PS(Durg) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

111 Raita 0 0 0 0 0 0 0 0 0 0 0 0 0 0

112 Rajgarh 0 0 0 0 0 0 0 0 0 1 0 125 125 125

113 Ranchod

pura 0 2 0 0 0 0 1 0 0 1 100 175 175 275

114 RGPPL 0 0 0 0 0 0 0 0 0 0 0 0 0 0

115 RKM 0 0 0 0 0 0 2 0 0 0 0 100 100 100

116 Sami 0 2 0 0 0 0 1 0 0 0 100 50 50 150

117 Sasan 0 1 0 0 0 0 0 0 0 0 50 0 0 50

118 Satna 0 8 0 0 0 0 1 1 0 0 400 113 113 513

119 Satpura 0 1 0 0 0 0 0 2 0 0 50 126 126 176

120 Seoni 0 1 0 0 0 2 0 0 0 2 210 250 250 460

121 Sholapur

-M 0 0 0 0 0 0 0 0 0 0 0 0 0 0

122 Shujalpu

r 0 2 2 0 0 0 0 1 0 1 226 188 314 414

123 Sipat 0 0 0 0 0 2 0 0 0 0 160 0 0 160

124 SKS 0 0 0 0 0 0 1 0 0 0 0 50 50 50

125 Soja 0 0 0 0 0 0 1 0 1 0 0 130 130 130

126 Solapur-NTPC

0 0 0 0 0 0 0 0 0 0 0 0 0 0

127 Solapur-

PG 0 2 0 0 1 0 0 1 0 0 180 63 143 243

128 SSP 0 0 0 0 0 0 0 0 0 0 0 0 0 0

129 Sugen 0 0 0 0 0 0 0 0 0 0 0 0 0 0

130 Tamnar 0 0 0 0 0 0 0 0 0 0 0 0 0 0

131 Taptithan

da 0 0 0 0 0 0 0 0 0 0 0 0 0 0

132 Tarapur-

3&4 0 0 0 0 0 0 0 0 0 0 0 0 0 0

133 Tiroda 0 0 0 0 0 0 0 0 2 0 0 160 160 160

Page 134: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

134/208

S.No

S/S

Line Reactors Bus Reactors Total LRs

MVAR

Total BRs MVA

R

Total S/W MVAR at SS

Total S/S MVAR

Resources

50 MVAR 63 MVAR 80 MVAR 50 MVA

R

63 MVA

R

80 MVA

R

125 MVA

R S/W

Non S/W

S/W

Non S/W

S/W

Non S/W

134 TRN 0 0 0 0 0 0 0 0 0 0 0 0 0 0

135 Ukai 0 0 0 0 0 0 0 0 0 0 0 0 0 0

136 UnoSuge

n 0 0 0 0 0 0 0 0 1 0 0 80 80 80

137 Vadinar 0 0 0 0 0 0 0 0 0 0 0 0 0 0

138 Vadodar

a-PS 0 0 0 0 0 0 0 0 0 0 0 0 0 0

139 Vandana 0 1 0 0 0 0 0 0 0 0 50 0 0 50

140 Vapi 0 0 0 0 0 0 0 0 0 0 0 0 0 0

141 Varsana 0 0 0 0 0 0 1 0 0 1 0 175 175 175

142 Vindhyac

hal 0 6 1 3 0 0 1 1 0 0 552 113 176 665

143 Vindhyac

hal-III 0 0 0 0 0 0 0 0 0 0 0 0 0 0

144 Vindhyac

hal-IV 0 0 0 0 0 0 0 0 1 0 0 80 80 80

145 Vindhyachal-PS

0 0 0 0 0 0 0 0 1 0 0 80 80 80

146 Vindhyac

hal-V 0 0 0 0 0 0 0 0 0 0 0 0 0 0

147 Wanakb

ori 0 0 0 0 0 0 0 0 0 0 0 0 0 0

148 Wardha 0 0 0 4 0 0 1 0 0 0 252 50 50 302

149 Warora 0 0 0 0 0 0 0 0 0 1 0 125 125 125

150 Zerda(Ka

nsari) 0 2 0 0 0 0 1 0 0 1 100 175 175 275

Total 10

122 9 34 5 9 35 18 28 41 1042

9 1024

9 1171

6 20678

Page 135: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

135/208

9. Static and Dynamic Compensation in WR

9.1. Fixed Series Compensators (FSC)

S.N Line Details kV Len (km)

FSC Location(

%)

Compensation

Agency Comments

1 Seoni-handwa-1 400 350 Khandwa 40% WRTS-2

2 Seoni-Khandwa-

2 400 350 Khandwa 40% WRTS-2

3 Rajgarh-Kasor-1 400 232 Rajgarh 25% WRTS-2

4 Rajgarh-Kasor-2 400 232 Rajgarh 25% WRTS-2

5 Raigarh-Raipur-1 400 220 Raipur (FSC)

40% WRTS-1

6 Raigarh-KWPCL-

Raipur-2 400 220

Raipur (FSC)

40% WRTS-1

Out of service since 11.04.2015

7 Raigarh-KSK-RKM-Raipur-3

400 220 Raipur 40% WRTS-1

Out of service since 28.7.13

8 Raigarh-KSK-

Raipur-4 400 220 Raipur 40% WRTS-1

Out of service since 24.7.13

9 Adani-Sami-1 400 434 Sami 40% APL

10 Adani-Sami-2 400 434 Sami 40% APL

11 Raipur-Wardha-1 400 371 Wardha 40% WRTS-1

12 Raipur-Wardha-2 400 371 Wardha 40% WRTS-1

9.2. Dynamic Series Compensators (TCSC)

S.N

Line Detail kV km Location Fixed,

Variable Agency

1 Raipur-Raigarh-I 400 217 Raipur

40% Fix, +15% / -

5% Dynamic

WRTS-1

Page 136: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

136/208

2 Raipur-KWPCL-

Raigarh-II 400 217 Raipur

40% Fix, +15% / -

5% Dynamic

WRTS-1

Out of service since

11.04.2015

9.3. Proposed STATCOMs in WR (2018-19)

S.No Location Dynamic

Compensation (STATCOM)

Mechanically Switched Compensation (MVAR)

Reactor Capacitor

1 765 kV Solapur ±300 MVAR 2x125 1x125

2 765 kV Gwalior ±200 MVAR 2x125 1x125

3 765 kV Satna ±300 MVAR 2x125 1x125

4 765 kV Aurangabad-PG ±300 MVAR 2x125 1x125

Page 137: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

137/208

10. Inter-Connecting Transformers (ICTs)

10.1. 765/400kV Transformers

Sl No Sub-Station Ckt ID

MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

1 Akola(2) 1 1500 765/400 MEGPTCL 12 11

2 Aurangabad-PG 1 1500 765/400 PGCIL 12 14

3 Aurangabad-PG 2 1500 765/400 PGCIL 12 14

4 Bhopal-BDTCL 1 1500 765/400 BDTCL 12 11

5 Bhopal-BDTCL 2 1500 765/400 BDTCL 12 11

6 Bilaspur 1 1500 765/400 PGCIL 12 12

7 Bilaspur 2 1500 765/400 PGCIL 12 12

8 Bilaspur 3 1500 765/400 PGCIL 12 12

9 Bina-PG 1 1000 765/400 PGCIL 11 11

10 Bina-PG 2 1000 765/400 PGCIL 11 11

11 Champa 1 1500 765/400 PGCIL 12 12

12 Dharamjaygarh 1 1500 765/400 PGCIL 12 12

13 Dharamjaygarh 2 1500 765/400 PGCIL 12 12

14 Dhule-BDTCL 1 1500 765/400 BDTCL 12 13

15 Dhule-BDTCL 2 1500 765/400 BDTCL 12 13

16 Gwalior 1 1500 765/400 PGCIL 12 12B

17 Gwalior 2 1500 765/400 PGCIL 12 12B

18 Indore-PG 1 1500 765/400 PGCIL 12 12

19 Indore-PG 2 1500 765/400 PGCIL 12 12

20 Jabalpur-PS 1 1500 765/400 PGCIL 12 12

21 Jabalpur-PS 2 1500 765/400 PGCIL 12 12

22 Koradi(III) 1 1500 765/400 MEGPTCL 12 12

23 Koradi(III) 2 1500 765/400 MEGPTCL 12 12

24 Pune-PG(Shikrapur) 1 1500 765/400 PGCIL 12 12

25 Pune-PG(Shikrapur) 2 1500 765/400 PGCIL 12 12

26 Raigarh-PS(Kotra) 1 1500 765/400 PGCIL 12 12

27 Raigarh-PS(Kotra) 2 1500 765/400 PGCIL 12 12

28 Raigarh-PS(Kotra) 3 1500 765/400 PGCIL 12 12

29 Raipur-PS(Durg) 1 1500 765/400 PGCIL 12 12

30 Sasan 1 1000 765/400 SPL 11 11

31 Sasan 2 1000 765/400 SPL 11 11

32 Satna 1 1000 765/400 PGCIL 11 12

33 Satna 2 1000 765/400 PGCIL 11 12

Page 138: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

138/208

Sl No Sub-Station Ckt ID

MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

34 Seoni 1 1500 765/400 PGCIL 12 6

35 Seoni 2 1500 765/400 PGCIL 12 6

36 Seoni 3 1500 765/400 PGCIL 12 6

37 Solapur 1 1500 765/400 PGCIL 12 12

38 Solapur 2 1500 765/400 PGCIL 12 12

39 Sipat 1 1000 765/400 NTPC 11 9

40 Sipat 2 1000 765/400 NTPC 11 9

41 Tamnar 1 1500 765/400 PGCIL 12 12

42 Tamnar 2 1500 765/400 PGCIL 12 12

43 Tamnar 3 1500 765/400 PGCIL 12 12

44 Tiroda 1 1500 765/400 MEGPTCL 12 11

45 Vadodora-PS 1 1500 765/400 PGCIL 12 12

46 Vadodora-PS 2 1500 765/400 PGCIL 12 12

47 Vindhyachal-PS 1 1500 765/400 PGCIL 12 12

48 Vindhyachal-PS 2 1500 765/400 PGCIL 12 12

49 Wardha 1 1500 765/400 PGCIL 12 12

50 Wardha 2 1500 765/400 PGCIL 12 12

51 Wardha 3 1500 765/400 PGCIL 12 12

Total 72500

10.2. 400/220kV Transformers

Sl No Sub-Station ID MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

1 Akola(2) 1 315 400/220 MSETCL 9b 8

2 Akola(2) 2 315 400/220 MSETCL 9b 8

3 Amreli 1 315 400/220 GETCO 9b 9

4 Amreli 2 315 400/220 GETCO 9b 9

5 Amreli 3 315 400/220 GETCO 9b 9

6 Astha 1 315 400/220 MPPTCL 9b 9b

7 Astha 2 315 400/220 MPPTCL 9b 9b

8 Asoj 1 500 400/220 GETCO 9 12

9 Asoj 2 500 400/220 GETCO 9 12

10 Asoj 3 315 400/220 GETCO 9b 12

11 Aurangabad-M(Waluj) 3 500 400/220 MSETCL 9 9

12 Aurangabad-M(Waluj) 1 315 400/220 MSETCL 9b 9

Page 139: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

139/208

Sl No Sub-Station ID MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

13 Aurangabad-M(Waluj) 2 315 400/220 MSETCL 9b 9

14 Aurangabad-PG 1 315 400/220 PGCIL 9b 9

15 Aurangabad-PG 2 315 400/220 PGCIL 9b 9

16 Bableshwar 3 500 400/220 MSETCL 9 9

17 Bableshwar 1 315 400/220 MSETCL 9b 9

18 Bableshwar 2 315 400/220 MSETCL 9b 9

19 Bachau 1 315 400/220 PGCIL 9b 9b

20 Bachau 2 315 400/220 PGCIL 9b 9b

21 Balco 1 315 400/220 BALCO 9b 9

22 Balco 2 315 400/220 BALCO 9b 9

23 Balco 3 315 400/220 BALCO 9b 9

24 Bhadrawati 1 315 400/220 PGCIL 9b 9b

25 Bhatapara 1 315 400/220 PGCIL 9b 9b

26 Bhatapara 2 315 400/220 PGCIL 9b 9b

27 Bhilai 1 315 400/220 PGCIL 9b 13

28 Bhilai 2 315 400/220 PGCIL 9b 13

29 Bhilai 3 315 400/220 PGCIL 9b 13

30 Bhopal-MP 1 315 400/220 MPPTCL 9b 9

31 Bhopal-MP 2 315 400/220 MPPTCL 9b 9

32 Bhopal-MP 3 315 400/220 MPPTCL 9b 9

33 Bhusawal (Khadka) 1 315 400/220 MSETCL 9b 12

34 Bina-MP 1 315 400/220 MPPTCL 9b 9

35 Bina-MP 2 315 400/220 MPPTCL 9b 9

36 Bina-MP 3 315 400/220 MPPTCL 9b 9

37 Bina-PG 1 315 400/220 PGCIL 9b 9b

38 Birsingpur 1 500 400/220 MPPTCL 9 11

39 Boisar 3 500 400/220 PGCIL 9 9

40 Boisar 1 315 400/220 PGCIL 9b 9

41 Boisar 2 315 400/220 PGCIL 9b 9

42 Chakan 1 315 400/220 MSETCL 9b 11

43 Chakan 2 315 400/220 MSETCL 9b 11

44 Chandrapur 1 315 400/220 MSETCL 9b 9

45 Chandrapur 2 315 400/220 MSETCL 9b 9

46 Chhegaon 1 315 400/220 MPPTCL 9b 9b

47 Chorania 1 500 400/220 GETCO 9 13

48 Chorania 2 500 400/220 GETCO 9 13

49 Damoh 1 315 400/220 PGCIL 9b 9

50 Damoh 2 315 400/220 PGCIL 9b 9

Page 140: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

140/208

Sl No Sub-Station ID MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

51 Dehgam 1 315 400/220 PGCIL 9b 12

52 Dehgam 2 315 400/220 PGCIL 9b 12

53 Deepnagar 1 500 400/220 MSETCL 9 10

54 Deepnagar 2 500 400/220 MSETCL 9 10

55 Dhule-MS 3 500 400/220 MSETCL 9 9

56 Dhule-MS 1 315 400/220 MSETCL 9b 11

57 Dhule-MS 2 315 400/220 MSETCL 9b 11

58 Gandhar 1 500 400/220 NTPC 9b 10

59 Gandhar 2 500 400/220 NTPC 9b 10

60 GPEC 1 500 400/220 GETCO 9 11

61 Gwalior 1 315 400/220 PGCIL 9b 9b

62 Gwalior 2 315 400/220 PGCIL 9b 9b

63 Gwalior 3 315 400/220 PGCIL 9b 9b

64 Hadala 1 315 400/220 GETCO 9b 9

65 Hadala 2 315 400/220 GETCO 9b 9

66 Hadala 3 315 400/220 GETCO 9b 9

67 Hazira 1 500 400/220 ESSAR 9 8

68 Hazira 2 500 400/220 ESSAR 9 8

69 Hazira 3 500 400/220 ESSAR 9 8

70 Indore-MP 1 315 400/220 MPPTCL 9b 13

71 Indore-MP 2 315 400/220 MPPTCL 9b 13

72 Indore-MP 3 315 400/220 MPPTCL 9b 13

73 Indore-MP 4 315 400/220 MPPTCL 9b 13

74 Itarsi 1 315 400/220 PGCIL 9b 11

75 Jabalpur 1 315 400/220 PGCIL 9b 11

76 Jabalpur 2 315 400/220 PGCIL 9b 11

77 Jejuri 1 500 400/220 MSETCL 9 9

78 Jejuri 2 500 400/220 MSETCL 9 9

79 Jetpur 4 500 400/220 GETCO 9 9b

80 Jetpur 1 315 400/220 GETCO 9b 9b

81 Jetpur 2 315 400/220 GETCO 9b 9b

82 Jetpur 3 315 400/220 GETCO 9b 9b

83 Jindal 1 315 400/220 JPL 9b 9

84 Jindal 2 315 400/220 JPL 9b 9

85 Kala 1 315 400/220 PGCIL 9b 9b

86 Kala 2 315 400/220 PGCIL 9b 9b

87 Kalwa 2 600 400/220 MSETCL 9 11

88 Kalwa 1 500 400/220 MSETCL 9 11

Page 141: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

141/208

Sl No Sub-Station ID MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

89 Kalwa 3 500 400/220 MSETCL 9 11

90 Karad 1 315 400/220 MSETCL 9b 8

91 Karad 2 315 400/220 MSETCL 9b 8

92 Karad 3 315 400/220 MSETCL 9b 8

93 Kasor 1 315 400/220 GETCO 9b 9

94 Kasor 2 315 400/220 GETCO 9b 9

95 Katni 1 315 400/220 MPPTCL 9b 9

96 Khandwa 1 315 400/220 PGCIL 9b 11

97 Khandwa 2 315 400/220 PGCIL 9b 11

98 Khaparkheda 1 500 400/220 MSETCL 9 7

99 Khaparkheda 2 500 400/220 MSETCL 9 7

100 Kharghar 2 500 400/220 MSETCL 9 11

101 Kharghar 1 315 400/220 MSETCL 9b 11

102 Kharghar 3 315 400/220 MSETCL 9b 11

103 Kolhapur 1 315 400/220 MSETCL 9b 9

104 Kolhapur 2 315 400/220 MSETCL 9b 9

105 Koradi 1 315 400/220 MSETCL 9b 7

106 Koradi 2 315 400/220 MSETCL 9b 7

107 Koradi-II 2 500 400/220 MSETCL 9 7

108 Korba (W) 1 500 400/220 CSEPTCL 9 12

109 Kosamba 1 315 400/220 GETCO 9b 8

110 Kosamba 2 315 400/220 GETCO 9b 8

111 Lonikhand 1 315 400/220 MSETCL 9b 13

112 Lonikhand 2 315 400/220 MSETCL 9b 13

113 Lonikhand 3 315 400/220 MSETCL 9b 13

114 Lonikhand-II 1 500 400/220 MSETCL 9 9

115 Lonikhand-II 2 500 400/220 MSETCL 9 9

116 Magarawada 1 315 400/220 PGCIL 9b 9b

117 Magarawada 2 315 400/220 PGCIL 9b 9b

118 Malwa 1 315 400/220 MPPTCL 9b 9b

119 Mansar 1 315 400/220 GETCO 9b 9b

120 Mansar 2 315 400/220 GETCO 9b 9b

121 APL-Mundra 1 315 400/220 APL 9b 9

122 APL-Mundra 2 315 400/220 APL 9b 9

123 Mapusa 1 315 400/220 PGCIL 9b 10

124 Mapusa 2 315 400/220 PGCIL 9b 10

125 Mapusa 3 315 400/220 PGCIL 9b 10

126 Marwa 1 315 400/220 CSEPTCL 9b 9b

Page 142: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

142/208

Sl No Sub-Station ID MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

127 Nagda 1 315 400/220 PGCIL 9b 11

128 Nagda 2 315 400/220 PGCIL 9b 11

129 Nagda 3 315 400/220 PGCIL 9b 11

130 Nagothane 3 500 400/220 MSETCL 9 8

131 Nagothane 1 315 400/220 MSETCL 9b 9

132 Nagothane 2 315 400/220 MSETCL 9b 9

133 Navsari 3 500 400/220 PGCIL 9 9

134 Navsari 1 315 400/220 PGCIL 9b 9

135 Navsari 2 315 400/220 PGCIL 9b 9

136 New koyna 2 500 400/220 MSETCL 9 11

137 New koyna 1 315 400/220 MSETCL 9b 11

138 NSPCL 1 315 400/220 PGCIL 9b 8

139 NSPCL 2 315 400/220 PGCIL 9b 8

140 Padghe 4 600 400/220 PGCIL 9 8

141 Padghe 1 315 400/220 PGCIL 9b 8

142 Padghe 2 315 400/220 MSETCL 9b 8

143 Padghe 3 315 400/220 MSETCL 9b 8

144 Parli-M 3 500 400/220 MSETCL 9 12

145 Parli-M 1 315 400/220 MSETCL 9b 12

146 Parli-M 2 315 400/220 MSETCL 9b 12

147 Pirana-PG 1 315 400/220 PGCIL 9b 10

148 Pirana-PG 2 315 400/220 PGCIL 9b 10

149 Pithampur 1 315 400/220 MPPTCL 9b 9b

150 Pithampur 2 315 400/220 MPPTCL 9b 9b

151 Pune-PG 1 315 400/220 PGCIL 9b 9

152 Pune-PG 2 315 400/220 PGCIL 9b 9

153 Pune-PG 3 315 400/220 PGCIL 9b 9

154 Raigarh 1 315 400/220 PGCIL 9b 13

155 Raigarh 2 315 400/220 PGCIL 9b 13

156 Raipur 1 315 400/220 PGCIL 9b 13

157 Raipur 2 315 400/220 PGCIL 9b 13

158 Raipur 3 315 400/220 PGCIL 9b 13

159 Raita 1 315 400/220 CSEPTCL 9b 9

160 Raita 2 315 400/220 CSEPTCL 9b 9

161 Rajgarh 1 315 400/220 PGCIL 9b 11

162 Rajgarh 2 315 400/220 PGCIL 9b 11

163 Ranchodpura 1 315 400/220 PGCIL 9b 9b

164 Ranchodpura 2 315 400/220 PGCIL 9b 9b

Page 143: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

143/208

Sl No Sub-Station ID MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

165 Ranchodpura 3 315 400/220 PGCIL 9b 9b

166 Satna 1 315 400/220 PGCIL 9b 9b

167 Satna 2 315 400/220 PGCIL 9b 9b

168 Satpura 1 500 400/220 MPPTCL 9 10

169 Seoni 1 315 400/220 PGCIL 9b 9

170 Seoni 2 315 400/220 PGCIL 9b 9

171 Sholapur-M 1 500 400/220 MSETCL 9 11

172 Sholapur-M 2 500 400/220 MSETCL 9 11

173 Solapur-PG 3 500 400/220 PGCIL 9 9

174 Solapur-PG 1 315 400/220 PGCIL 9b 9

175 Solapur-PG 2 315 400/220 PGCIL 9b 9

176 Shujalpur 1 315 400/220 PGCIL 9b 9b

177 Shujalpur 2 315 400/220 PGCIL 9b 9b

178 Soja 1 500 400/220 GETCO 9 11

179 Soja 2 500 400/220 GETCO 9 11

180 SSP 1 315 400/220 SSNL 9b 9b

181 SSP 2 315 400/220 SSNL 9b 9b

182 Sugen 1 315 400/220 TPL 9b 1

183 Sugen 2 315 400/220 TPL 9b 1

184 Sugen 3 315 400/220 TPL 9b 1

185 Ukai 1 315 400/220 GETCO 9b 9

186 Vapi 1 315 400/220 PGCIL 9b 12

187 Vapi 2 315 400/220 PGCIL 9b 12

188 Vapi 3 315 400/220 PGCIL 9b 12

189 Varsana 1 315 400/220 GETCO 9b 5

190 Varsana 2 315 400/220 GETCO 9b 5

191 Wanakbori 1 315 400/220 GETCO 9b 9

192 Wardha 3 500 400/220 PGCIL 9 9b

193 Wardha 1 315 400/220 PGCIL 9b 9b

194 Wardha 2 315 400/220 PGCIL 9b 9b

195 Warora 1 500 400/220 MEGPTCL 9 9

196 Warora 2 500 400/220 MEGPTCL 9 9

197 Zerda(Kansari) 1 315 400/220 PGCIL 9b 11

198 Zerda(Kansari) 2 315 400/220 PGCIL 9b 11

199 Zerda(Kansari) 3 315 400/220 PGCIL 9b 11

Total 71025

Page 144: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

144/208

10.3. 220/66kV Transformers in DNH and DD

Sl No Sub-Station Ckt ID

MVA Voltage Ratio

Owner Normal

Tap Position

Present Tap

Position

1 Khadoli 1 160 220/66 Electricity Dep of

DNH 9 9

2 Khadoli 2 160 220/66 Electricity Dep of

DNH 9 9

3 Kharadpada 1 100 220/66 Electricity Dep of

DNH 9 9

4 Kharadpada 2 100 220/66 Electricity Dep of

DNH 9 9

5 Kharadpada 3 100 220/66 Electricity Dep of

DNH 9 9

6 Kharadpada 4 100 220/66 Electricity Dep of

DNH 9 9

7 Magarwara 1 50 220/66 Electricity Dep of

DD 9 9

8 Magarwara 2 100 220/66 Electricity Dep of

DD 9 9

9 Magarwara 3 100 220/66 Electricity Dep of

DD 9 9

10 Magarwara 4 160 220/66 Electricity Dep of

DD 9 9

Page 145: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

145/208

11. 400/220/33 kV Tertiary Reactors

Sl. No.

Substation Owner Agency

Tertiary Reactor details (MVAR)

Rated Voltage in kV

Net MVAR capacity

1 Jabalpur PGCIL 2x25 33 50

2 Bina MPPTCL 2x25 33 50

3 Nagda MPPTCL 2x25 33 50

4 Indore MPPTCL 2x25 33 50

5 Bhopal MPPTCL 2x25 33 50

6 Satpura MPPTCL 2x25 33 50

7 Parli MSETCL 3x30 33 90

Sub Total(MVAR) 390

Page 146: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

146/208

12. Hydro Station with Synchronous condenser Facility

Sl No

Name of Station Capacity

MVA Nos of Units

Total Capacity

Ownership

1 RBPH 200 6 1200 NCA

2 Koyna(IV) 250 4 1000 MSEGCL

3 Ghatgar 125 2 250 MSEGCL

Page 147: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

147/208

13. Capacitors Installed in Western Region

State Constituent Installed Capacity in MVAR (31st -Dec-13)*

Gujarat

GETCO-11kV & Above 4880.5

Electricity Dept .Daman 5

Torrent Power -11kV & above 611.96

Madhya Pradesh

MPPTCL-132kV & Above 4572

MP Discom Poorva 11-33kV 397

MP Discom Madhya 11-33kV 1429.5

MP Discom Paschim 11-33kV 896

Maharashtra

MSETCL-132 kV & above 1745

Maha Discom -11-33 kV 4400

TATA Power -11kV and above 491.1

RIL -11kV and above 1353.61

BEST -11kV -33kV 213.58

Chattisgarh

CSPTCL-132kV and above 995

CS Discom 11-33kV 352.2

Goa

GED -11kV AND above 140.2

WR WR-11 Kv and above 22483.58

* Source WRPC monthly Report

Page 148: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

148/208

Capacitors installed nearby Indore area in Madhya Pradesh

Page 149: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

149/208

14. HVDC Filter in Western Region

14.1. HVDC Bhadrâvati Back-to-Back

SEQUENCE OF SWITCHING OF FILTERS AT BHADRAVATHI STATION A) Typical Sequence Of Switching ON *

SI.NO POWER RANGE

MIN NO.OF FILTERS REQUIRED ON EACH

SIDE C

TYPE D TYPE

1 MIN TO 400MW 2 1 1

2 400-550MW 3 1 2

3 550-700MW 4 1 3

4 700-850MW 5 1 4

5 850-950MW 6 1 5

6 950MW and ABOVE 7 1 6

B) Typical Sequence Of Switching OFF *

SI.NO POWER RANGE

MIN NO.OF FILTERS REQUIRED ON EACH

SIDE C TYPE D TYPE

1 900MW and LESS 6 1 5

2 AT 800MW 5 1 4

3 AT 650MW 4 1 3

4 AT 500MW 3 1 2

5 AT 350MW 2 1 1

* ALL 12 FILTERS ARE OF 106MVAR EACH

C TYPE IS 3rd HARMONIC FILTER ( 4 no)

D TYPE IS 11th & 13th HARMONIC FILTER ( 12 no)

Page 150: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

150/208

14.2. HVDC Chandrapur-Padghe Bipole

FROM TONAME OF

FILTERMVAR FROM TO FILTER MVAR

75 315 BASE 200 ADDED200 MVAR

0 75 BASE 200 ADDED200 MVR

345 450 NON BASE 120200+120

MVAR

500 570 NON BASE 120+80200+120+80

MVAR

WHEN POLE

-I OR II IN

SERVICE

915 1500 BASE 200ADDITIONAL

FILTER ADDED

200+200+200

MVAR510 910 NON BASE 80

ADDITIONAL

FILTER ADDED

200+120+

80 MVAR

930 990 BASE 200ADDITIONAL

FILTER ADDED

200+120+

80+200

MVAR

1000 1500 NON BASE 120

ADDITIONAL

FILTER ADDED IF

VOLTAGE IS

LOW.

200+120+

80+200+120

MVAR

BI-POLE IN

SERVICE

BI-POLE IN

SERVICE

AC FILTER ARRANGEMENT AT 500KV HVDC CHANDRAPUR AND PADGHE STATIONS

HVDC

POLE

STATUS

HVDC

POLE

STATUS

FITER STATUS

FOR BI-POLE

NON BASE 200ADDITIONAL

FILTER ADDED

BI-POLE

IN

SERVICE

FITER

STATUS FOR

BI-POLE

ADDITIONAL

FILTER ADDED

TOTAL

FILTERS IN

SERVICE

200 + 200

MVAR 315

AT 1500 NON BASE 200

TOTAL

FILTERS IN

SERVICE

POWER FLOW (MW) POWER FLOW (MW) CHANDRAPUR END

915

PADGHE END

ADDITIONAL

FILTER ADDED

IF VOLTAGE IS

LOW.

200+200+200+

200 MVAR

Page 151: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

151/208

14.3. HVDC Mundra-Mohindergarh Bipole

Page 152: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

152/208

15. Reactive Power Capability Testing of Generator

15.1. Introduction

Generator reactive capability is required to maintain proper system voltage levels, provide appropriate dynamic reserves and assure service reliability. This reactive capability must be validated in a uniform manner that assures the use of realistically attainable values when planning and operating the system or scheduling equipment maintenance. The validation techniques are functional and do not require special instrumentation or procedures. They are designed to demonstrate that the stated capability for the generating equipment can be obtained for continuous operation under expected operating conditions. To meet these requirements, these criteria are established for validating the reactive capability of generating equipment. These criteria define the methods by which ratings are to be established while recognizing the necessity of exercising judgment in their determination.

15.2. Capability Curve of Generator

Factors that limit the P & Q that a generating unit can deliver to the power system are: • Generator Capability curve ( determined by the machine design) • Voltage limits • Power system stability limits • The Minimum Excitation Limiter (MEL) • The Over Excitation Limiter (OEL)

Generator Capability Curve Limits Active Power:

It is limited by the prime mover capability to a value within the MVA rating. The driving torque available for the turbine imposes this limit. The turbine is usually sized to deliver rated P at rated power factor. This is the line BC in the capability diagram.

Page 153: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

153/208

Reactive Power: It is limited by two factors, like

• Field current limits are further classified as • Rotor Heating Limits: Exceeding the rotor temperature will shorten the life

of the insulation. Differential expansion, due to excessive temperature differences between the rotor copper and rotor iron components, may cause cracking of the rotor copper or insulation. Rotor Temperature indicator computes the temperature from the change in resistance of the rotor winding.

• Minimum Excitation Limiter: It acts to limit reactive-power flow into the generator to its set-point that is defined by the generator under-excited capability limit. During normal operation, the AVR keeps generator voltage at a preset value. When system conditions require m/c to absorb reactive power in excess of the MEL set point, the MEL interacts with AVR to increase terminal voltage until reactive power inflow is reduced below the setting.

• Stator-end region heating limit (arc CD): When the generator is operating at a leading power factor, the flux produced by the rotor is weaker and more flux is able to leak out from the ends of the stator core. When this flux leaks out from the ends of the stator core, it passes through the face of each lamination and causes large eddy currents to flow in these laminations. These eddy currents can cause excessive heating.

Capability curve of Generating Units in Western Region are enclosed in Annex-2

15.3. Objectives

To enable declaration of generator reactive power capability, to meet the mandatory requirements

To ensure voltage stability

To harness benefits in the upcoming ancillary services market to sell reactive power

(including sale of dynamic reserves). E. Region should get the market advantage

To empower, enlighten and boost the confidence of generating station operators

To reduce investments in capacitors, reactors and dynamic VAR devices like SVC, STATCOM etc.

To safeguard generators from unsafe operating conditions

Page 154: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

154/208

15.4. Regulatory Provisions The gross and net reactive capability will be determined within the power factor range at which the generating equipment is normally expected to operate as per the following standards / regulations: IEGC Part-5 and 6; Section 5.2 and 6.6 – Relevant extracts (5.2 k) All generating units shall normally have their automatic voltage regulators (AVRs) in operation. In particular, if a generating unit of over fifty (50) MW size is required to be operated without its AVR in service, the RLDC shall be immediately intimated about the reason and duration, and its permission obtained. (6.6) Reactive power compensation should ideally be provided locally, by generating reactive power as close to the reactive power consumption as possible. The Regional Entities except Generating Stations are therefore expected to provide local VAr compensation/generation such that they do not draw VArs from the EHV grid, particularly under low-voltage condition. (6) The ISGS and other generating stations connected to regional grid shall generate/absorb reactive power as per instructions of RLDC, within capability limits of the respective generating units, that is without sacrificing on the active generation required at that time. No payments shall be made to the generating companies for such VAr generation/absorption. CEA Technical Standards for Connectivity to Grid, Regulations 2007 – Relevant extracts (1) The excitation system for every generating unit :-

(a) Shall have state of the art excitation system; (b) Shall have Automatic Voltage Regulator (AVR). Generators of

100MW rating and above shall have AVR with digital control and two separate channels having independent inputs and automatic changeover; and

(c) The AVR of generator of 100MW and above shall include Power System Stabilizer (PSS)

(6) Generating Units located near load center, shall be capable of operating at rated output for power factor varying between 0.85 lagging (over-excited) to 0.95 leading (under-excited) and Generating Units located far from load centers shall be capable of operating at rated output for power factor varying between 0.9 lagging (over-excited) to 0.95 leading (under-excited). The above performance shall also be achieved with voltage variation of ± 5% of nominal, frequency variation of +3% and -5% and combined voltage and frequency variation of ± 5%. However, for gas turbines, the above performance shall be achieved for voltage variation of ± 5%. CEA Regulations -2010 on Technical Standards for Construction of Electrical Plants and Electrical Lines Extracts from Chapter-II, PART-B of the regulations

Page 155: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

155/208

CEA Regulations -2013 on Manual on Transmission Planning Criteria Extracts from Criteria for Simulation and Studies 13.6. For the purpose of load flow studies at planning stage, the nuclear generating units shall normally not run at leading power factor. To keep some margin at planning stage,the reactive power limits (Qmaxand Qmin) for generator buses may be taken as:

Notwithstanding above, during operation, following the instructions of the System Operator, the generating units shall operate at leading power factor as per their

Page 156: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

156/208

respective capability curves.

15.5. Specific Requirements

Scheduling of any tests shall first be coordinated with the system operator. System operators will assist in determining the amount of variation from scheduled voltage that is acceptable. When scheduling, the seasons and times of day that are conducive to the required Reactive Power capabilities shall be considered.

The overexcited reactive capability validation shall be conducted for a minimum of two

hours and leading (under excited) reactive power test for at least one hour. Data for the under-excited reactive capability validation may be recorded as soon as a limit is encountered. Steady Real and Reactive Power output should be maintained during the data collection interval. Data should be collected with all auxiliary equipment needed for normal operation in service.

For hydrogen-cooled generators, the hydrogen pressure should be at the maximum

operation pressure. If the maximum designed hydrogen pressure cannot be maintained for normal operation, then the reason for this condition shall be documented and the appropriate generator capability curve shall be used. Additional engineering evaluation may be required to ensure expected reactive capabilities are achievable.

When the maximum reactive power capabilities are validated, the reactive power at the

generator terminals i.e. the generator step-up transformer (GT) primary (LV side, after auxiliaries), and the GT secondary (HV side) shall be documented. The corresponding MW outputs shall also be recorded.

During the validation, the scheduled and actual voltages at the system bus and the

generator terminals shall also be recorded. In addition, the existing GT, UAT, ST tap setting shall be documented.

Reactive power testing for both over-excitation and under-excitation should be done at

rated load and at reducing loading levels. AVR should be in service If GT, ST, UAT taps are off-nominal, test should be repeated after changing the taps

(may be when the unit is under outage) It is to be ensured that over-excitation trip (V/f) does not occur until the generator

terminal voltage is above 108%. During the test, it is expected that generator terminal voltage may reach 105% and this should not cause tripping through V/f protection.

The load-drop compensation setting to be indicated.

Page 157: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

157/208

15.6. Detailed Procedure In order to obtain the steady state MVAR capability of a generating unit, perform the following tests. Operating conditions should be as close to normal as practicable, including loading, unit temperatures (field, etc.) and pressures (hydrogen, boi1er, etc.) . Tests should be performed during periods of operation which maximize the MVAR in/output of the machine. Therefore, testing should be performed during a period when system voltage is most advantageous to yield these results. When possible other synchronous machines or power system components should be used, to obtain the most advantageous terminal voltage during these tests..

Ensure that controls such as volts/hertz 1imiters and UELs (see B) are coordinated and at proper settings prior to testing to prevent unnecessary operation of volts/hertz relays or loss of excitation relays. . A. Lagging Reactive Capability Test

While operating in a steady state mode at near rated output, raise excitation in automatic voltage control mode until one of the following conditions occurs: 1) The 100% MVA rating of the machine is reached (reach capability curve) ; 2) Rated field current or field voltage is reached; 3) Terminal voltage limit is reached (105-llO%, depending on unit); 4) Generator temperature limits are reached (either stator winding or field winding); 5) The maximum/over excitation limiter is reached/alarms; 6) Maximum auxiliary bus voltage is reached. Hold unit at this level for a minimum of 15 minutes (30 minutes is a preferable duration) or till the temperature stabilizes then take the measurements outlined in C. Repeat the test at reduced loading (MW) level. B. Leading Reactive Capability Test

While operating in a steady state mode at almost rated load, lower excitation in automatic voltage control mode until one of the following conditions occurs: CAUTION - Determine first the expected MVAR limiting point, and do not proceed past that point. If this point is reached without activating the under-excitation limiters (UEL)/minimum excitation 1imiters (MEL) return to normal excitation and determine why the limiter is not functioning. Also, ensure that all transformer taps throughout the power plant are coordinated so the terminal voltage can reach the minimum (90-95%, depending on unit) without causing problems to the auxiliary power further in the plant.

1) UELs are activated; 2) 100% MVA rating is reached; 3) Generator temperature limits are reached;(either stator or field) 4) Minimum auxiliary bus voltage is reached; 5) Minimum terminal voltage is reached. Take measurements outlined in C

Page 158: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

158/208

C. Measurements & reporting: 1) Gross MW output at both test points; 2) Gross MVAR output limits of generator reached in leading and lagging modes 3) Generator terminal voltage at maximum positive and negative MVARs; 4) Actual field current at both test points; 5) Machine MVA rating, both original nameplate rating and tested rating, if different; 6) Generator rated terminal voltage and rated field current; 7) Auxiliary bus voltage at minimum and maximum points; 8) Ambient temperature before conducting the lagging and leading tests

D. The following machine parameters may be recorded for use during future testing ( in addition to values being reported) : 1) Generator field voltage; 2) Rotating exciter field current and voltage ( if appropriate) ; 3) Generator stator currents; 4) Field current. E. PRECAUTIONS: If the generator does not normally operate in these regions, strip chart recording of exciter quantities may be helpful for problem resolution. All relay targets on the generator protection and excitation system should be reset before testing. Some excitation systems transfer to manual or backup controllers if over-excitation is detected. If this happens, record the level at which it occurs and reset the control to automatic before placing the unit back in normal service. If the machine trips for any reason during these tests, specify what tripped and why it tripped. Correct the problem and retest the unit.

15.7. Commercial conditions

All efforts shall be made to carry out the test during the period when generation scheduled from the station is less than its declared capability (DC). However, any deviations of actual station generation (ex-bus) w.r.t the schedule due to the testing of the identified unit will be taken care of by making schedule station generation = actual station generation in order to insulate the concerned generating station from being subjected to any financial penalties under the existing UI mechanism .

The scheduled drawals of the beneficiaries of the station shall be deemed to have been revised accordingly, during the period of test.

GENERAL INFORMATION SHEET (To be filled in by the generator owner / operator)

Sl No Description Data

1 Date

2 Name of the Power Plant

3 Code/Number of the unit under test

Page 159: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

159/208

Sl No Description Data

4 Unit’s MCR (Pnom) (Motoring / Generator)

5 Unit’s Minimum Continuous Operation Loading Level

6 GeneratorsMachine Data

7 a Make

b Type

c Generator’s Nominal MVA

d Generator’s Nominal Terminal voltage and Voltage Range

e Generator Speed

f Generator Stator Current

g Nominal voltage of the generator high voltage side bus

h Type of generator cooling (direct air / water-air / water-hydrogen)

i Manufacturer specified Overexcited MVARs (Qmax +)

i Manufacturer specified Underexcited MVARs (Q max -)

j Nominal Power Factor of the Generator

j Generator Rated Field Current ( Amps) / Voltage (Volts)

8 Generators Excitation System

c Excitation System Rated Current ( Amps) / Voltage (Volts)

9 Step Up Transformer (GT)

a Nominal Primary LV Side

b Nominal Secondary HV Side

c GT impedance (%)

d X/R Ratio

e Nominal MVA

f Tap Position of GT and corresponding Voltage Ratio during the test

10 Unit Transformer (UT)

a Nominal Primary HV Side

b Nominal Secondary LV Side

c UT impedance (%)

d X/R Ratio

e Nominal MVA

Page 160: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

160/208

Sl No Description Data

f Tap Position of UT and corresponding Voltage Ratio during the test

11 Station Transformer (ST)

a Nominal Primary HV Side

b Nominal Secondary LV Side

c ST impedance (%)

d X/R Ratio

e Nominal MVA

f Tap Position of ST and corresponding Voltage Ratio during the test

12 Protection and Limiter Settings

a. V/f Limiter (Excitation System)

b. V/f Trip ( Generator Overfluxing)

c. Over excitation Limiter (Field Current Limiter)

d. Over excitation Limiter (Stator Current Inductive)

e. Over excitation Trip

f. Over Voltage Trip

g. Under excitation Limiter (Load angle limiter)

h. Under excitation Limiter (Stator Current Capacitive)

i. Underexcitation Trip/Loss of Excitation

j Undervoltage Trip

13 Stator Winding Temp Limit (specified by manufacturer)

a Alarm

b Trip

14 Field Winding Temp Limit (specified by manufacturer)

a Alarm

b Trip

Page 161: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

161/208

Data Sheets

Lead/Lag PF

Temperatures Gross

Generator output

Net output to system Voltage System

Station service Load

Gross Gross Net Net

Hydrogen Pressure

Gen Terminal Voltage

Auxilliary Bus

Voltage

Voltage (HV) Stator Field

Real Power

Reactive Power

Real Power

Reactive Power

Temp Temp

S.N Time °C °C MW MVAR MW MVAR (PSIA) kV kV kV MW MVAR

1

2

3

4

5

Average

By signing below, I as an authorized representative of the Generator listed in this form, certify that the data submitted for the Lagging & Leading Reactive Power Capability Tests accurately demonstrate the Reactive Lagging and Leading Power of the generator at the time of test.

Signature:…………….. Name:…………….

Date:

Page 162: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

162/208

15.8. Test Results of the testing at VSTPS Unit#4

NTPC Vindhyachal STPS Unit#4 was successful ly tes ted on 24 -04-2012

A

Test date 24.04.2012

Start time 10:14

End time 11:38

Unit 4 Vindhyachal

Gen terminal voltage

Gross

real

power

gross

reactive

power

Net

real

power

Net

reacti

ve

power

Hydrogen

pressure

Gen

terminal

voltage

Auxillia

ry bus

voltage

Gen

stator

slot

temp

Exitor

stator

slot

temp

Time MW MVAR MW MVAR KSC KV KV ºC ºC MW MVAR

10.1 209 30.5 192.1 -6.6 4.1 15.8 6.65 53.5 65 17.2 -14.5 *

10:14 209.1 30.5 192.1 -6.6 4.1 15.8 6.64 54 65.3 17.2 -14.5 104.5%vt

10:31 209.1 99.8 191.7 64.2 4.11 16.4 6.9 55 68 17.3 -15.4 105%vt

10:40 209.1 109.9 191.3 73.2 4.11 16.5 6.93 56 69 17.4 -15.4 106%vt

10:44 209.3 121.4 191 86.1 4.12 16.6 6.96 58 69.5 17.3 -15.6 106%vt

10:59 210.2 116.5 191.1 81.8 4.12 16.6 6.96 58.2 69.8 17.7 -16 106%vt

11:15 190.3 118 173.4 82.4 4.11 16.6 6.98 58.3 69.8 16.8 -15.7 106%vt

11:30 184.2 116.4 166.2 81.6 4.11 16.6 6.99 58 69 16.8 -15.7 106%vt

11:38 165.5 119.2 149.5 82.4 4.09 16.6 7 57 69 15.8 -15.4 106%vt

*

B

Test date 24.04.2012

Start time 12:09

End time 13:03

Unit 4 Vindhyachal

Hydrogen

pressure

Gross

real

power

gross

reactive

power

Net

real

power

Net

reacti

ve

power

pressure Gen

terminal

voltage

Auxillia

ry bus

voltage

Gen

statoer

slot

temp

Exitor

sator

slot

temp

Time MW MVAR MW MVAR KSC KV kV ºC ºC MW MVAR

12:09 170.3 -31 153.7 -67 4.04 15.4 6.4 53 65.6 15.9 -13.5

12:03 170.4 -30.8 154.5 -66 4.05 15.4 6.45 53 65.5 15.8 -13.4

12:21 188.5 -12.3 170.2 -48 4.03 15.4 6.5 53.5 65 16.5 -13.9

12:28 191.2 -21.7 174.5 -57.7 4.03 15.4 6.46 54 65 16.7 -13.8 MVAR

12:46 203.3 -19.3 185.8 -55 4.03 15.4 6.45 54.5 63 17.2 -14 MVAR

12:58 210.6 -15.2 192 -51 4.02 15.4 6.48 55 62 17.9 -14.3 MVAR

13:03 215.2 -13.4 197 -49 4.02 15.4 6.49 55 61 18 -14.1 MVAR

Lagging MVAR maximum capability test (at different MW laods)

In plant

auxilliary

power

In plant

auxilliary

power

Reason

for

touching

the limit

Lagging MVAR maximum capability test (at different MW laods)

Net output to

system

Gross generator

output

Gen terminal

voltage Temperature.

Temperature. Reason

for

touching

the limit

Gross generator

output

Net output to

system

Unit normal running parameter

Page 163: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

163/208

15.9. Limits hit during MVAR Capability Testing of 210

MW Generators

S.N Reg Station Date of Testing

Unit No.

Limits Hit

Lagging PF Leading PF

Value of limit hit during test

Safe value of limit

Value of limit hit during test

Safe value of limit

1 WR Vindhyachal STPS

24.04.12 4 (210 MW) 16.6 kV

16.6 kV

-58 MVAR

-58 MVAR

2 ER Farakka TPS

13.09.11 3 (210 MW) 16.25 kV

16.25 kV

-25 MVAR

-25 MVAR

3 SR NCTPS-I Chennai

21.07.15 1 (210 MW) -- -- -- --

4 SR NCTPS-I Chennai

21.07.15 3 (210 MW) 132 MVAR

132 MVAR

-- --

5 SR Ramagundam TPS

12.06.15 2 (200 MW) -- -- 75o 75o

Page 164: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

164/208

16. Ready Reckoner

Page 165: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

165/208

Page 166: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

166/208

17. Lines to be opened on High Voltage

Dec'15

S.No. List of transmission lines Voltage relief(KV)

Gujarat: From end To end

1 400 kV Amreli-Chorania S/C 7 -

2 One circuit of 400KV CGPL-JetpurD/C - 7

3 One circuit of 400KV Ukai-Kosamba T/C 2 2

4 One circuit of 400 kV Chorania-Ranchodpura D/C 0.5 1

5 One circuit of 400 kV Ranchodpura-kansari D/C 0.5 4

6 400KV SSP-Kasor s/c - 3

7 One circuit of 400 kV Nagda-Dehgam D/C 2 1

8 One circuit of Ranchodpura- Dehgam D/C 1 -

9 400KV Wanakbori-Soja 1 1

10 One circuit of 400KV Chorania Kosamba D/C - 1

MadhyaPradesh:

1 One circuit of 765KV Dharamjaygarh-Jabalpur Q/C 7 9

2 One circuit of 765KV Jabalpur-Bina T/C 2 2

3 One circuit of 765KV Bina-Gwalior T/C 2 2

4 One circuit of 765 KV Satna-Bina D/C 4 3

5 400KV ISP-Nagda S/C 3 3

6 One circuit of 400KV Bhopal-Itarsi D/C 2 2

7 One circuit of 400KV Bina-Bhopal D/C - 1

8 One circuit of 400KV B’pur-Damoh D/C 4 6

9 One circuit of 400KV B’pur – Katni D/C 3 3

10 One circuit of 400KV Damoh-Bhopal D/C 2 1

11 400KV Katni-Damoh S/C - 1

12 One circuit of 400KV Khandwa-Rajgarh D/C 4 3

13 One circuit of 400KV Rajgarh-SSP D/C 3 3

14 One circuit of 400KV Sujalpur-Nagda D/C 3 -

15 One circuit of 400KV Bina-Sujalpur D/C 1 2

16 One circuit of 400KV Nagda-Rajgarh D/C 1 -

17 One circuit of 400KV Itarsi-Khandwa D/C 2 1

18 One circuit of 400KV Seoni-Khandwa D/C with FSC 3 2

19 One circuit of 400KV Seoni-Khandwa D/C without FSC 2 2

20 One circuit of 400KV Khandwa-Dhule D/C 2 2

Page 167: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

167/208

Maharashtra

1 One circuit of 765KV Wardha-Aurangabad Q/C 13 14

2 One circuit of 765KV Durg-Wardha D/C 11 10

3 One circuit of 765 KV Seoni-Wardha D/C 3 3

4 One circuit of 400KV Raipur-Wardha D/C 3 2

5 One circuit of Kolahapur(PG)-Mapusa D/C 10 15

6 One circuit of 400KV Karad-kolhapur D/C 5 4

7 One circuit of Kolhapur -Kolahapur(PG) D/C 2 1

8 One circuit of 400KV Sholapur-Kolhapur D/C 2 2

9 One circuit of 400KV SSP-Dhule D/C. 3 7

10 One circuit of 400KV C’pur-II-Parli D/C 3 3

11 400KV B’wati-Parli (PG) 2 2

12 One circuit of 400KV C’pur-Parli 2 2

13 400KV Deepnagar-Aurangabad 3 3

14 400KV Bhusawal-Aurangabad 4 2

15 One circuit of 400KV Jaigad-Karad D/C 3 4

16 One circuit of 400KV Jaigad-New Koyna D/C 2 2

17 400KV Karad-Lonikhand - 5

18 400KV Lonikhand- Koyna Stage IV. 3 3

19 One circuit of 400KV RGPPL-N’Thane D/C 4 4

20 One circuit of 400KV RGPPL-N’Koyna D/C 1 3

21 One circuit of 400KV Nagothane-padghe D/C - 2

Chhatisgarh

1 765KV Kotra-Champa-Durg 8 4

2 One circuit of 765KV Tamnar-Kotra D/C 3 -

3 One circuit of 765KV Kotra-Durg D/C 3 -

4 400KV Raipur-Raigarh-1 - 2

5 One circuit of 400KV Korba-Raipur circuit III and IV 2 2

6 One circuit of 400kV Raipur-Bhadrawati T/C 1 1

7 One circuit of 400KV Raita- Bhilai T/C - 1

Page 168: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

168/208

Annex-1: Short Circuit MVA of Substations

Short Circuit Fault MVA Level of EHV Buses in WR

765 kV Substations (As per Studies conducted on 16-Nov-15)

Sl. Nos

BUS kV

Three Phase Fault

Three phase fault current (kA)

Three phase fault MVA

1 Akola(2) 765 9 12149

2 Aurangabad-PG 765 24 31994

3 Bhopal-BDTCL 765 16 21724

4 Bilaspur 765 30 40196

5 Bina-PG 765 35 46874

6 Champa 765 15 19511

7 Dharamjaygarh 765 30 40155

8 Dhule-BDTCL 765 11 14119

9 Gwalior 765 33 43941

10 Indore-PG 765 18 23374

11 Jabalpur-PS 765 28 36636

12 Koradi(III) 765 9 12118

13 Pune-PG(Shikrapur) 765 9 11930

14 Raigarh-PS(Kotra) 765 23 30508

15 Raipur-PS(Durg) 765 24 32332

16 Sasan 765 33 44145

17 Satna 765 31 40731

18 Seoni 765 25 32657

19 Sipat 765 21 28124

20 Solapur 765 29 39003

21 Tamnar 765 20 26561

22 Tiroda 765 10 13330

23 Vadodora-PS 765 15 19701

24 Vindhyachal-PS 765 32 41955

25 Wardha 765 30 39793

Page 169: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

169/208

400 kV Substations (As per Studies conducted on 16-Nov-15)

Sl. Nos

BUS kV

Three Phase Fault

Three phase fault current (kA)

Three phase fault MVA

1 ACBIL 400 14 9910

2 Akola 400 29 20317

3 Akola(2) 400 28 19636

4 Amreli 400 13 8972

5 APL-Mundra 400 35 23962

6 Asoj 400 40 27543

7 Astha 400 6 4435

8 Aurangabad-M(Waluj) 400 30 20590

9 Aurangabad-PG 400 32 22231

10 Bableshwar 400 26 18326

11 Bachau 400 30 20885

12 Balco 400 23 15989

13 Bhadrawati 400 42 28803

14 Bhatapara 400 15 10101

15 Bhilai 400 40 27457

16 Bhopal-BDTCL 400 34 23308

17 Bhopal-MP 400 36 24669

18 Bhusawal (Khadka) 400 22 15323

19 Bilaspur 400 27 18394

20 Bina-MP 400 39 26952

21 Bina-PG 400 39 27075

22 Birsingpur 400 18 12575

23 Boisar 400 24 16475

24 CGPL 400 30 20495

25 Chakan 400 22 15415

26 Chandrapur 400 48 33446

27 Chandrapur-II 400 48 33101

28 Chhegaon 400 9 6125

29 Chorania 400 32 22446

30 Damoh 400 12 8444

31 DB-Power 400 32 22485

32 Deepnagar 400 22 15208

33 Dehgam 400 39 27150

34 DGEN 400 12 8451

Page 170: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

170/208

Sl. Nos

BUS kV

Three Phase Fault

Three phase fault current (kA)

Three phase fault MVA

35 Dhariwal 400 32 22048

36 Dhariwal-MS 400 24 16531

37 Dhule-BDTCL 400 13 9076

38 Dhule-MS 400 17 11856

39 EMCO 400 25 17662

40 Essar_Mahan 400 17 11820

41 Gandhar 400 28 19289

42 GMR-CG 400 15 10616

43 GPEC 400 23 15606

44 Gwalior 400 24 16444

45 Hadala 400 18 12502

46 Hazira 400 10 6948

47 IEPL 400 14 9972

48 Indira Sagar 400 18 12772

49 Indore-MP 400 31 21626

50 Indore-PG 400 29 20212

51 Itarsi 400 35 24430

52 Jabalpur 400 37 25308

53 Jabalpur (PS) 400 38 26054

54 Jaigad 400 20 13913

55 Jejuri 400 14 9983

56 Jetpur 400 13 8961

57 Jhabua Power 400 16 10799

58 JP-Bina 400 28 19547

59 JPL 400 31 21510

60 JPL_extn(Tamnar) 400 32 21923

61 JP-Nigrie 400 15 10616

62 Julwania 400 7 4696

63 Kala 400 15 10645

64 Kalwa 400 25 17592

65 Karad 400 24 16415

66 Kasor 400 18 12380

67 Katni 400 7 4780

68 Khandwa 400 20 14082

69 Khaparkheda 400 27 18806

70 Kharghar 400 20 13740

Page 171: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

171/208

Sl. Nos

BUS kV

Three Phase Fault

Three phase fault current (kA)

Three phase fault MVA

71 Kolhapur 400 15 10534

72 Kolhapur-PG 400 11 7713

73 Koradi 400 28 19397

74 Koradi-II 400 25 17244

75 Korba (W) 400 34 23390

76 Korba (W)-Ext 400 33 22632

77 Korba-NTPC 400 49 33973

78 Kosamba 400 19 12934

79 Koyna stage-IV 400 24 16482

80 KSK Mahanadi 400 24 16937

81 KWPCL 400 25 17448

82 Lonikhand 400 26 18038

83 Lonikhand-II 400 26 17848

84 Magarawada 400 26 18038

85 Malwa 400 26 17848

86 Mansar 400 14 9765

87 Mapusa 400 6 4069

88 Marwa 400 12 8495

89 MB Power 400 11 7276

90 MCCPL 400 14 9905

91 Mouda 400 13 9332

92 Nagda 400 24 16331

93 Nagothane 400 16 10865

94 Nandgaonpeth 400 22 14918

95 Navsari 400 20 13828

96 New koyna 400 25 17581

97 NSPCL 400 32 21879

98 Padghe 400 32 22461

99 Parli-M 400 30 21033

100 Parli-PG 400 31 21192

101 Pathadi 400 20 14197

102 Pirana-PG 400 28 19541

103 Pirana-T 400 26 18236

104 Pithampur 400 18 12539

105 Pune-PG 400 29 20401

106 Pune-PG(Shikrapur) 400 21 14530

Page 172: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

172/208

Sl. Nos

BUS kV

Three Phase Fault

Three phase fault current (kA)

Three phase fault MVA

107 Raigarh 400 44 30532

108 Raigarh-PS(Kotra) 400 43 30069

109 Raipur 400 38 26145

110 Raipur-PS(Durg) 400 31 21438

111 Raita 400 23 15643

112 Rajgarh 400 19 12955

113 Ranchodpura 400 31 21343

114 RGPPL 400 14 9897

115 RKM 400 22 15456

116 Sami 400 17 11729

117 Sasan 400 51 35295

118 Satna 400 37 25922

119 Satpura 400 24 16489

120 Seoni 400 32 22506

121 Sholapur-M 400 11 7462

122 Shujalpur 400 15 10463

123 Sipat 400 34 23393

124 SKS 400 27 18731

125 Soja 400 23 15812

126 Solapur-NTPC 400 25 17582

127 Solapur-PG 400 29 20427

128 SSP 400 20 13929

129 Sugen 400 29 20193

130 Taptithanda 400 20 13674

131 Tarapur-3&4 400 24 16550

132 Tiroda 400 23 15985

133 TRN 400 24 16895

134 Ukai 400 15 10390

135 Uno-Sugen 400 27 18896

136 Vadinar 400 10 7145

137 Vadodara-PS 400 37 25744

138 Vandana 400 25 17094

139 Vapi 400 18 12527

140 Varsana 400 31 21167

141 Vindhyachal 400 57 39754

142 Vindhyachal-IV 400 56 38637

Page 173: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

173/208

Sl. Nos

BUS kV

Three Phase Fault

Three phase fault current (kA)

Three phase fault MVA

143 Vindhyachal-PS 400 52 35735

144 Vindhyachal-V 400 54 37291

145 Wanakbori 400 23 16087

146 Wardha 400 53 36770

147 Warora 400 43 29509

148 Zerda(Kansari) 400 17 11751

Page 174: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

174/208

Annex-2: Over Voltage Settings of 765 kV Lines As on Dec-15

Sl No

End-1 End-2 Id

Length(in

Km)

Conductor

Type

End 1 Over

Voltage

Stage 1

End 1 Over

Voltage Stage 2

End 2 Over

Voltage

Stage 1

End 2 Over

Voltage

Stage 2

1 Akola(2)* Taptithanda*

1 219 Quad

Bersimis 110 %-5 Sec

150 %-0.15 Sec

110 %-10 Sec

150 %-0.1 Sec

2 Akola(2)* Taptithanda*

2 219 Quad

Bersimis 110 %-7 Sec

150 %-0.1 Sec

110 %-8 Sec

150 %-0.1 Sec

3 Akola(2)# Aurangabad-PG#

1 Quad

Bersimis - - - -

4 Akola(2)# Aurangabad-PG#

2 Quad

Bersimis - - - -

5 Aurangabad-PG

Wardha 1 348 Hexa Zebra

107 % -5 Sec

150 %-0.1 Sec

109 %-5 Sec

150 %-0.1 Sec

6 Aurangabad-PG

Wardha 2 348 Hexa Zebra

107 % -6 Sec

150 %-0.1 Sec

109 %-6 Sec

150 %-0.1 Sec

7 Aurangabad-PG

Wardha 3 370 Hexa Zebra

108 % -7 Sec

150 %-0.1 Sec

109 %-7 Sec

150 %-0.1 Sec

8 Aurangabad-PG

Wardha 4 370 Hexa Zebra

108 % -8 Sec

150 %-0.1 Sec

109 %-8 Sec

150 %-0.1 Sec

9 Aurangabad-PG

Solapur-PG

1 279 Hexa Zebra

108 % -5 Sec

150 %-0.1 Sec

108 % -5 Sec

150 %-0.1 Sec

10 Aurangabad-PG

Solapur-PG

2 279 Hexa Zebra

108 % -7 Sec

150 %-0.1 Sec

108 % -7 Sec

150 %-0.1 Sec

11 Bhopal-BDTCL

Indore-PG

1 176 Quad

Bersimis 110 % -5 Sec

140 %-0.1 Sec

107 % -5 Sec

150 %-0.1 Sec

12 Bilaspur Seoni 1 333 Quad

Bersimis 108 %-5 Sec

150 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

13 Bilaspur Seoni 2 335 Quad

Bersimis 108 %-7 Sec

150 %-0.1 Sec

108 %-7 Sec

150 %-0.1 Sec

14 Bilaspur Dharamjayga

rh 1 89

Quad Bersimis

109 %-5 Sec

150 %-0.1 Sec

108 %-5 Sec

150%-0.1 Sec

15 Bina-PG Gwalior 1 235 Quad

Bersimis 108 %-7 Sec

150 %-0.1 Sec

108 %-7 Sec

150 %-0.1 Sec

16 Bina-PG Gwalior 2 235 Quad

Bersimis 108 %-5 Sec

150 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

Page 175: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

175/208

Sl No

End-1 End-2 Id

Length(in

Km)

Conductor

Type

End 1 Over

Voltage

Stage 1

End 1 Over

Voltage Stage 2

End 2 Over

Voltage

Stage 1

End 2 Over

Voltage

Stage 2

17 Bina-PG Gwalior 3 231 Quad

Bersimis 109 %-8 Sec

150 %-0.1 Sec

109 %-8 Sec

150 %-0.1 Sec

18 Bina-PG Indore-

PG 1 310

Quad Bersimis

109 %-5 Sec

150 %-0.1 Sec

109 %-5 Sec

150 %-0.1 Sec

19 Bina-PG Jabalpu

r-PS 1 230

Quad Bersimis

108 %- 5 Sec

150 %-0.1 Sec

108 %- 5 Sec

150 %-0.1 Sec

20 Bina-PG Jabalpu

r-PS 2 230

Quad Bersimis

107 % -5 Sec

150 %-0.1 Sec

107 % -5 Sec

150 %-0.1 Sec

21 Bina-PG Jabalpu

r-PS 3 236

Quad Bersimis

108 %-7 Sec

150 %-0.1 Sec

108 %-7 Sec

150 %-0.1 Sec

22 Dharamjaygarh

Ranchi 1 301 Quad

Bersimis 108 %-5 Sec

150%-0.1 Sec

ERLDC ERLDC

23 Dharamjaygarh

Ranchi 2 303 Quad

Bersimis 108 %-7 Sec

150%-0.1 Sec

ERLDC ERLDC

24 Dharamjaygarh

Raipur-PS(Dur

g) 2 200

Quad Bersimis

107 %-5 Sec

150%-0.1 Sec

107%-7 Sec

150 %-0.1 Sec

25 Dharamjaygarh

Jharsuguda

1 303 Hexa Zebra

108 %-5 Sec

150%-0.1 Sec

ERLDC ERLDC

26 Dharamjaygarh

Jharsuguda

2 303 Hexa Zebra

108 %-7 Sec

150%-0.1 Sec

ERLDC ERLDC

27 Dharamjaygarh

Jabalpur-PS

1 424 Hexa Zebra

107 %-5 Sec

150%-0.1 Sec

108 %- 4 Sec

150 %-0.1 Sec

28 Dharamjaygarh

Jabalpur-PS

2 424 Hexa Zebra

107 %-7 Sec

150%-0.1 Sec

108 %- 5 Sec

150 %-0.1 Sec

29 Dharamjaygarh

Jabalpur-PS

3 379 Hexa Zebra

108 %-5 Sec

150%-0.1 Sec

108 %- 6 Sec

150 %-0.1 Sec

30 Dharamjaygarh

Jabalpur-PS

4 379 Hexa Zebra

108 %-7 Sec

150%-0.1 Sec

108 %- 7 Sec

150 %-0.1 Sec

31 Dhule-BDTCL

Aurangabad-

PG 1 192

Quad Bersimis

110 %-5 Sec

140 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

32 Gwalior Agra 1 129 Quad

Bersimis 108 %-5 Sec

150 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

33 Gwalior Agra 2 128 Quad

Bersimis 109 %-7 Sec

150 %-0.1 Sec

109 %-7 Sec

150 %-0.1 Sec

Page 176: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

176/208

Sl No

End-1 End-2 Id

Length(in

Km)

Conductor

Type

End 1 Over

Voltage

Stage 1

End 1 Over

Voltage Stage 2

End 2 Over

Voltage

Stage 1

End 2 Over

Voltage

Stage 2

34 Gwalior Jaipur 1 304 Quad

Bersimis 108 %-5 Sec

150 %-0.1 Sec

NRLDC NRLDC

35 Gwalior Jaipur 2 311 Quad

Bersimis 107 %-4 Sec

150 %-0.1 Sec

NRLDC NRLDC

36 Jabalpur-

PS Bhopal-BDTCL

1 260 Quad

Bersimis 108 %-5 Sec

150 %-0.1 Sec

110 %-5 Sec

150 %-0.1 Sec

37 Kholpaur

-PG* Kudgi* 1 191

Hexa Zebra

110 %-5 Sec

150 %-0.1 Sec

110 %-5 Sec

150 %-0.1 Sec

38 Kholpaur

-PG* Kudgi* 2 191

Hexa Zebra

110 %-7 Sec

150 %-0.1 Sec

110 %-7 Sec

150 %-0.1 Sec

39 Koradi(III

) Akola(2

) 1 222

Quad Bersimis

110 %-7 Sec

140 %-0.15 Sec

110 %-7 Sec

140 %-0.15 Sec

40 Koradi(III

) Akola(2

) 2 222

Quad Bersimis

110 %-5 Sec

140 %-0.15 Sec

110 %-5 Sec

140 %-0.15 Sec

41 Pune-

PG(Shikrapur)

Solapur-PG

1 270 Quad

Bersimis 107 % -5 Sec

150 %-0.1 Sec

107 % -5 Sec

150 %-0.1 Sec

42 Raigarh-PS(Kotra

)

Raipur-PS(Dur

g) 1 235

Hexa Zebra

108 %-5 Sec

150 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

43 Raigarh-PS(Kotra

)

Raipur-PS(Dur

g) 2 235

Hexa Zebra

107 %-7 Sec

150 %-0.1 Sec

107 %-7 Sec

150 %-0.1 Sec

44 Raigarh-PS(Kotra

) Tamnar 1 48

Hexa Zebra

108 %-5Sec

150 %-0.1 Sec

109 %-5Sec

150 %-0.1 Sec

45 Raigarh-PS(Kotra

) Tamnar 2 48

Hexa Zebra

109 %-6 Sec

150 %-0.1 Sec

109 %-7 Sec

150 %-0.1 Sec

46 Raigarh-PS(Kotra

)

Champa

1 96 Quad

Bersimis 108 %-5Sec

150 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

47 Raipur-

PS(Durg) Champ

a 1 153

Quad Bersimis

109 %-8 Sec

150 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

48 Sasan Satna 1 246 Quad

Bersimis 110 %-5 Sec

150 %-0.1 Sec

109 %-5 Sec

150 %-0.1 Sec

Page 177: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

177/208

Sl No

End-1 End-2 Id

Length(in

Km)

Conductor

Type

End 1 Over

Voltage

Stage 1

End 1 Over

Voltage Stage 2

End 2 Over

Voltage

Stage 1

End 2 Over

Voltage

Stage 2

49 Sasan Satna 2 243 Quad

Bersimis 110 %-7 Sec

150 %-0.1 Sec

108 %-7 Sec

150 %-0.1 Sec

50 Sasan Vindhyachal-

PS 1 6

Quad Bersimis

107 %-5 Sec

150 %-0.1 Sec

110 %-5 Sec

150 %-0.1 Sec

51 Satna Gwalior 1 337 Quad

Bersimis 109 %-5 Sec

150 %-0.1 Sec

109 %-5 Sec

150 %-0.1 Sec

52 Satna Gwalior 2 337 Quad

Bersimis 109 %-6 Sec

150 %-0.1 Sec

109 %-6 Sec

150 %-0.1 Sec

53 Satna Bina-PG

1 274 Quad

Bersimis 108 %-5 Sec

150 %-0.1 Sec

108 %-5 Sec

150 %-0.1 Sec

54 Satna Bina-PG

2 276 Quad

Bersimis 109 %-7 Sec

150 %-0.1 Sec

109 %-7 Sec

150 %-0.1 Sec

55 Satna Vindhyachal-

PS 1 237

Quad Bersimis

108 % -5 Sec

150 %-0.1 Sec

108 % -5 Sec

150 %-0.1 Sec

56 Satna Vindhyachal-

PS 2 237

Quad Bersimis

109 %- 7 Sec

150 %-0.1 Sec

109 %- 7 Sec

150 %-0.1 Sec

57 Seoni Bina-PG

1 292 Quad

Bersimis 108 %-7 Sec

150 %-0.1 Sec

108 %-7 Sec

150 %-0.1 Sec

58 Seoni Wardha 1 261 Quad

Bersimis 109%-5

Sec 150 %-0.1 Sec

109 %-5 Sec

150 %-0.1 Sec

59 Seoni Wardha 2 261 Quad

Bersimis 108 %-6 Sec

150 %-0.1 Sec

108 %-6 Sec

150 %-0.1 Sec

60 Sipat Bilaspu

r 1 22

Quad Bersimis

110 %-4 Sec

140 %-0.1 Sec

109 %-5Sec

150 %-0.1 Sec

61 Sipat Bilaspu

r 2 22

Quad Bersimis

110 %-4 Sec

140 %-0.1 Sec

108 %-7Sec

150 %-0.1 Sec

62 Solapur Raichur 1 208 Quad

Bersimis 109 %-5 Sec

150 %-0.1 Sec

109 %-5 Sec

150 %-0.1 Sec

63 Solapur Raichur 2 208 Quad

Bersimis 109 %-7 Sec

150 %-0.1 Sec

109 %-7 Sec

150 %-0.1 Sec

64 Tiroda Koradi(I

II) 1 136

Quad Bersimis

110 %-7 Sec

140 %-0.15 Sec

110 %-7 Sec

140 %-0.15 Sec

Page 178: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

178/208

Sl No

End-1 End-2 Id

Length(in

Km)

Conductor

Type

End 1 Over

Voltage

Stage 1

End 1 Over

Voltage Stage 2

End 2 Over

Voltage

Stage 1

End 2 Over

Voltage

Stage 2

65 Tiroda Koradi(I

II) 2 138

Quad Bersimis

110 %-5 Sec

140 %-0.15 Sec

110 %-5 Sec

140 %-0.15 Sec

66 Vadodor

a-PS Indore-

PG 1 293

Quad Bersimis

109 %-6 Sec

150 %-0.1 Sec

109 %-6 Sec

150 %-0.1 Sec

67 Vadodor

a-PS Dhule-BDTCL

1 268 Quad

Bersimis 108 %-5 Sec

150 %-0.1 Sec

110 %-5Sec

140 %-0.1 Sec

68 Wardha Raipur-PS(Dur

g) 1 370

Hexa Zebra

107 %-5 Sec

150 %-0.1 Sec

107 %-5 Sec

150 %-0.1 Sec

69 Wardha Raipur-PS(Dur

g) 2 370

Hexa Zebra

107 %-7 Sec

150 %-0.1 Sec

107 %-7 Sec

150 %-0.1 Sec

* 765 kV line charged at 400 kV, # Future Lines

16365

Page 179: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

179/208

Annex-3: Capability Curve of Generators

A. 830 MW Capacity Units

a) CGPL Unit of 830 MW

CGPL UMPP 830 MW unit

Page 180: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

180/208

B. 685MW, 660MW and 600MW Capacity Units

a) GMR-Chhattisgarh 685MW

Page 181: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

181/208

b) Mundra (APL) 660MW

Page 182: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

182/208

c) Sasan UMPP 660MW

Page 183: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

183/208

d) Sipat 660 MW

Page 184: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

184/208

e) KSK 600MW

Page 185: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

185/208

f) JPL Tamnar 600MW

Page 186: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

186/208

C. 500MW Capacity Units

a) Vindhyachal 500 MW (Unit-7)

Page 187: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

187/208

b) Vindhyachal 500MW (Unit-9)

Page 188: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

188/208

c) Korba Unit 500MW

Page 189: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

189/208

d) Mouda 500MW

Page 190: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

190/208

e) Chandrapur 500MW

Page 191: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

191/208

f) Trombay 500MW (Unit-5)

Page 192: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

192/208

g) Trombay-500MW (Unit-6)

Page 193: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

193/208

D. 400MW, 330MW, 300MW and 270MW Capacity Units

a) DGEN 400 MW

Page 194: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

194/208

b) APL 330MW

Page 195: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

195/208

c) EMCO 300MW

Page 196: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

196/208

d) Balco 300MW

Page 197: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

197/208

e) IEPL 270MW

Page 198: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

198/208

E. 250MW Capacity Units

a) Trombay 250 MW (Unit-8)

Page 199: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

199/208

b) NSPCL 250MW

Page 200: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

200/208

F. Unit Capacity of 200 and below

a) NTPC Korba 200MW

Page 201: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

201/208

b) NTPC VSTPS 210MW

c) NTPC Gandhar 224MW

Page 202: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

202/208

d) NTPC Kawas 116 MW

e) NTPC Kawas 106 MW

Page 203: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

203/208

f) NTPC Gandhar 144MW

g) Koradi 200MW

Page 204: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

204/208

h) SSP 200MW

Page 205: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

205/208

i) Wanakbori 200MW

Page 206: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

206/208

Annex-4: WR SCADA Displays

A. WR SCADA (Alstom) LRs and BRs Displays

Bus Reactors at 765 kV and 400 kV Substations

Page 207: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

207/208

Line Reactors at 765 kV Substations

Page 208: Reactive Power Resource in Western Region 2016

Reactive Power Resources in Western Region 2016

पश्चिम क्षेत्रीय भार पे्रषण केन्द्द्र , म ंबई

208/208

Feed back may be forwarded to the following Email IDs.

[email protected], [email protected],