奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 1 of 8 版本 Rev.: A/0
设备名称:
Designation:
FLOTATIO CELLS E630 SERIES & THIKENERS
图号:
Drawing No.:
OU600 FINLAND SERIES
P2383-T10 SERIES DATE : 27 JULY 2016
合同号:
Outotec Order No.:
DQ-1402013-501 CN007311FL001
供应商:
Supplier:
HUAKAI HEAVY INDUSTRIES CO. LTD
Nantong, Jiangsu Province P.R CHINA
Origin CHINA Destination PANAMA CLIENT by OUTOTEC MINERA PANAMA SA / FQM CANADA
检验范围 Scope of Inspection – Workshop Process
1. 最终检验
Final inspection 7.焊前组对对准检查
Fit-up & alignment check
13. 无损检测程序
NDE procedure 19.喷砂
Sandblasting
2. 中期检验
Interim (On Process) 8.焊接准备
Welding Edge preparation
14.放射线探伤
Radiographic test 20. 油漆检查
Check 1st-2nd coating
3. 文件检查
Documents check / Review 9. 焊缝图和焊缝追踪 Welding
map & during welding 15.渗液探伤试验
Liquid penetration test 21. Final Top Coat & DFT
4. 材料追踪 Material certificate & traceability
10.焊后检测
Visual Checks after welding
16. 磁粉探伤试验
Magnetic particle test 22. Packing Inspections
5. 包装检验
Check of packing 11. Rubberlined by Others
17.超声波探伤试验
Ultrasonic test 23. Delivery Inspections
6. Delivery Surveillance 12. Pre-TRIAL Assembly 18.热处理报告
Heat treatment report 24. RELEASE REPORT
EQUIPMENT ITEM: FLOTATION CELLS ( E630 )
当前进展 Current Progress – WEEK 03 ( JUNE 27-JULY 25 )
编号No.
项目名称Project Name
项目号Project No.
Unit
材料收货Materials Receiving
材料切割Layout & Cutting
组对Fitting Up
& Jig
焊接Welding
无损检测NDT
预装配Trial
Assembly
Visual & Dimensional
喷砂
Sand Blasting
1 COBRE PANAMA
14 CL (e630) 70% 50% 35% 35% 25%
30%
2ND Set 35% 25%
2 8 IL (e630)
Primer
Mid Coat
Top Coat
DFT Rubber
lined & Test
FABRICATION STATUS
(as a whole)
包装
Package
交工资料MDR
OUTOTEC
QUALITY
RELEASE
订单交货日期PO Delivery
Date
出货日期Shipping
Date
1
25% 25% 25% 35% 25% 20%
----- 5 0f 22
1ST-Batch
24 JUL-16
2 HOLD POINT
1ST
DELIVERY
DELIVERY ITEM Description No. of Packages No. Barge No. Container
THK 40M – 50M Parts & Accessories 21 6
3 x 40GP TC200 x 3units F30 Tank Parts 46
TC300 x 3units F20 Tank Parts 39 5 x 20GP TC300 x 1unit F10 Tank Parts 17
E630 x 3units F10 Tank Parts & Accessories 123
FREE ISSUE FRP Gratings boxes 6
Delivery Quality Issue:
Two items packages mark as damage cargo ( Donut Launder Section ) – deform Non-Conform items to be rectify by renew / re-fabricate damage section – 2pcs Painting was still visible on corrosion / rusted remarks E630 – Flanges & Holes Storage Sections & Item in packages with corrosion / rusted surface – siteweld Improper Cleaning & Shipping Mark & Numbers on section – remarks dealt QC Outotec project needto issued standard packages required procedure dealt QC
奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 2 of 8 版本 Rev.: A/0
COBRE PANAMA PROJECT :
Flotation : E630 Fabrication Exclude Drive Mechanism
SET No.1 DELIVERY FT-1002+03+04+05+06 5 - Units Loadout 24 July ‘16
SET 2 PRE-TRIAL FT-2002+03+04+05+06 JIG 1 - Yes JIG 2- Yes Tank Mounted
SET 3 WORKSHOP FT-3002+03+04+05+06+07 Fabrication Yes Layout & Cutting
SET 4 WORKSHOP FT-4002+03+04+05+06+07 ------ ----- No Activity
1. Trial Assembly Bank Cells No. 2 …… On progress monitoring & inspection ( Level – Plumb – Height ) Bridge Sections ( 5units ) ……………. 100% Complete awaits for Mounting Trial Header Air-Water Pipes ……………... 95% Complete awaits Flange to Flange Trial Mounting Donut Launder (Center) ……………... 100% Complete On-Going Top Tank Mounting Connecting + Downflow Duct ……….. 90% Complete full welding w/ dealt Hot works bolt holes flange
2. Poor painting repair and touch up are still hard to dealt with Quality during final intervention of inspection 3. Un-satisfactory results dealt during Huakai Packing stages without proper internal team and lack of
project team to issue an Outotec Packing Procedure – Improvement still be dealt hard for Quality 4. Handling damage of cargo are still hard to controlled by Huakai during movement packing & transfer 5. Rubber Liners team are hard to control dealt by quality which they are not properly coordinate to QC-OT 6. Delivery practice in accordance to Export Structural Steel need improvement by Supplier
7. OUTOTEC Workshop Jig & Production Inspection :
QC WORKSHOP 3 WORKSHOP 2 WORKSHOP 1 Outotec
VI Upper Section 2unit FU Baffle Plate FU Bridge Section x5 FW Dealt QC
VI Donut Launder x2 FW Feedwell FW Gratings Deck FW -do-
VI Pipelined FW Feedbox FW Pipe Brackets FW -do-
VI Underflow Duct x5 FW Discharge Box FW Booster Cone FW -do- QC Legend : FW – Full welding on process, FU – Fit-up w/ Edge Preparation & Dimensional Checking as per drawing requirements, VI – Visual Inspection Include repair, rectification, grinding works, NDE – RT/UT/MT check. All visual rejection shall have value immediate repair as UC-PR-LOF-GAP-CUT-Poor OUTOTEC DEALT HARD TO IMPROVED HUAKAI QC
Fit-Up still minor improvement with improper edges preparation dealt by workshop team of HUAKAI Large GAP control due cutting, improper level still to be dealt not more than 3mm during Fit-Up Tack weld by Fit-up are still Not satisfactory, rejected to be removed dealt by HUAKAI QC Tankwall welding are stringent critical run requirement by weaving or string bead poor practice Non-conformance visual inspection during excavation wall weld gouging found with linear porosity Poor welding control to distribution of welding gas shielding protection to minimized porosity dealt QC Deformation of Tank plate during assemblies and mounting – repair required NDT-MT required to grinded weld on top section & Lifting Lug - witness required Tank Rim Pad Plate for mounting Bridge found to be deform not properly level – repair required Assembly process has been improved to be completed at workshop fit-up and welding prior trial Overhead welders HK105 & HK107 has been verified test qualification witness by OT – Accepted SAW + FCAW repair procedure still No WPS & PQR – Urgent Required Poor stop-start, poor surface profile, porosity, poor weld, incomplete weld, heavy weld – dealt QC All post weld by Huakai are category D far from level category C but cosmetics complete it accepted Pipe Welding are improved by GTAW + FCAW but work damage by improper surface grind & clean Grinding by Cosmetics are still hard to improve by Huakai as traditional practice dealt improvement No Release Report by Outotec Quality where QC dealt by Punch Listing & Improvement closed out
IMPROVEMENT FOUND BY HUAKAI
Process of section Upper Tank with Donut Launder Fit-up + Welding Dimensional checking found acceptance to level ±3mm control prior welding Blasting works are properly coordinated and results satisfactory with immediate repair Top coating works verify acceptable with +15% over coat during verification acceptance QUALITY CONTROL dealt by HUAKAI QC will immediately repair by visual & on the spot tolerance
奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 3 of 8 版本 Rev.: A/0
COBRE PANAMA PROJECT
MEETINGS Regular weekly MOM ( OUTOTEC Quality to HUAKAI Project / QC ) is basis of QC Information only. MOM – Week 30th by Outotec QC dealt with delivery conformance & 2nd Batch Pre-Trial Project meeting by Outotec – Negative information query to QC between Huakai & OTSH Project OUTOTEC QA/QC will incorporate every meeting on Health, Safety and Environment (HSE) at
regular per workshop & yard, Meeting on QUALITY ASSURANCE & CONTROL will be held every regular interval every FRIDAY under the Minutes of Meeting (MOM).
COORDINATION Meeting under by HUAKAI & OUTOTEC PROJECT Team has no direct copy of information PER monthly minimum purposed – No record of information plan & priority for production and quality in terms of Status of Project, Quality, Quantity, Technical Discussion, Progress of work, Delivery and Gant Chart scheduling and other remaining works.
HSE Safety Points – Continuously informed in terms of HSE in Workshop No.3 & Yard of HUAKAI OUTOTEC QA/QC INSPECTION Points
- Regular Walk Through, Surveillance & Monitoring - Weekly Report & Non-Conformance Record - Punch Listing activities performed under unsatisfactory - Manufacturer’s Data Record ( MDR ) Review
检验结果 Inspection results : - In-Process Fabrication
拒绝:
Rejection:
是的,见备注
Yes, see remarks 再检:
Re-Inspection:
是的,见第 4 部分
Yes, see section 4 通过:
Released:
是的 Yes
不是 No 不是 No 不是 No
This inspection, examination or testing carried out by Outotec or the customer shall not relieve the supplier of any of his obligations of expert manufacturing according to Outotec and specification. The supplier shall be solely responsible for accuracy, quality and completeness of his work and supply, subject to technical data and specifications.
时间:
Date: 27-JULY 2016
地点:
Place: RUGAO-NANTONG AREA – PR CHINA
检验员:
Inspector:
GRANDEO F. CERILLES
CHRIS CHEN XIN
供应商:
Supplier:
HUAKAI HEAVY INDUSTRIES – HKHI
奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 4 of 8 版本 Rev.: A/0
检验内容 Inspection in Detail & DELIVERY PREPARATION ( OUTOTEC PRODUCT – HUAKAI )
PROJECT : DUGALD RIVER PROJECT
PO No. : 4500924983
Ref. No. : P1071-F20
Contact PM : Mr. Johnny Tran
Fabrication History : Year 2013 - November
Client : MMG AUSTRALIA LTD.
C/O MMG DUGALD RIVER PTY. LTD
68 Km North of Cloncurry Off Burke
Development Road, Cloncurry QLD 4824
AUSTRALIA
Contact Client : Brad Brown & Peter Aylmore
Item
No.
of
Unit
OTSH
Number
Items of Descriptions No. of
Packages
STATUS
OK100
11
P1071F20
Tank Units Include Part & Accessories
ZINC CLEANERS BANK CELLS
Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,
Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,
Gratings, Brackets, Air Pipe Header & Spools, Water Pipe
Header & Spools, Rotor & Stator, Drive Rack, Motor Frame
Exclude Drive Mechanism accessories & parts
STORE
AT
HEJIA
OK100
5
P1071F20
Tank Units Include Part & Accessories
ZINC ROUGHER BANK CELLS
Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,
Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,
Gratings, Brackets, Air Pipe Header & Spools, Water Pipe
Header & Spools, Rotor & Stator, Drive Rack, Motor Frame
Exclude Drive Mechanism accessories & parts
STORE
AT
HEJIA
OK50
5
P1071F10
Tank Units Include Part & Accessories
LEAD ROUGHER BANK CELLS
Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,
Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,
Gratings, Brackets, Air Pipe Header & Spools, Water Pipe
Header & Spools, Rotor & Stator, Drive Rack, Motor Frame
Exclude Drive Mechanism accessories & parts
STORE
AT
HEJIA
PROJECT : COBRE PANAMA PROJECT
PO No. : 1824-0015
Ref. No. : 1P2383F10
Contact PM : Mr. Stewart Gillam
Mr. Chris Zhu
Fabrication History : Year 2016 - APRIL
Client : MINERA PANAMA S.A
C/O FIRST QUANTOM MINERALS LIMITED
PO Box 1407, West Perth
Western Australia 6872
Tel: 61893460100 / 61892262522
Contact Client : Hildon Wilson
Item
No.
of
Unit
OTSH
Number
Items of Descriptions
No. of
Packages
STATUS
E630
22
P2383F10
Tank (SECTIONS) Units Include Part & Accessories
Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,
Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,
Gratings, Brackets, Air Pipe Header & Spools, Water Pipe
Header & Spools, Rotor & Stator
Exclude Drive Mechanism accessories & parts
5 OFF
5 TRIAL
E630 4 P2383F10 FEED BOX 1 OFF 1 FAB
E630 4 P2383F10 DISCHARGE BOX 1 OFF 1 FAB
奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 5 of 8 版本 Rev.: A/0
PROJECT : KANSANSHI MINING PROJECT
PO No. : 1824-0015
Ref. No. : 1P2383F10
Contact PM : Mr. Stewart Gillam
Mr. Chris Zhu
Fabrication History : Year 2013 – APRIL
Client : KANSANSHI MINING PLC
C/O FIRST QUANTOM MINERALS LIMITED
PO Box 1407, West Perth
Western Australia 6872
Tel: 61893460100 / 61892262522
Contact Client : Hildon Wilson
Item
No.
of
Unit
OTSH
Number
Items of Descriptions No. of
Packages
STATUS
F30
TC200
3
P2383F30
Tank ( SECTIONS ) Units Include Part & Accessories
Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster
Cone, Down Flow Duct, Donut Launder, Bridge-Stair-Hand
Rails, Gratings, Brackets, Air Pipe Header & Spools, Water
Pipe Header & Spools, Rotor & Stator
Exclude Drive Mechanism accessories & parts
3 OFF
Yes
Deliver
F20
TC300
6
P2383F20
Tank ( SECTIONS ) Units Include Part & Accessories
Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster
Cone, Down Flow Duct, Donut Launder, Bridge-Stair-Hand
Rails, Gratings, Brackets, Air Pipe Header & Spools, Water
Pipe Header & Spools, Rotor & Stator
Exclude Drive Mechanism accessories & parts
3 OFF
Yes
Deliver
F10
TC300
10
P2383F10
Tank ( SECTIONS ) Units Include Part & Accessories
Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster
Cone, Down Flow Duct, Donut Launder, Bridge-Stair-Hand
Rails, Gratings, Brackets, Air Pipe Header & Spools, Water
Pipe Header & Spools, Rotor & Stator
Exclude Drive Mechanism accessories & parts
3 OFF
1 OFF
6
FOR
DELIVER
Item
No.
of
Unit
OTSH
Number
Items of Descriptions
No. of
Packages
STATUS
40M
THK40
1
1P2383F30
Tank ( PLATES ) Units Include Part & Accessories
Tank Plates, Floor Gore PL, Radial Beam, Columns, Overflow
Box, Underflow Cone (modified)
Parts
OFF
Bridge Sections include handrails, gratings, drive rack, drive
shaft, rake arm, feedwell, feed pipes, deflector cone
FOR
DELIVER
50M
THK50
2
1P2383F30
Tank ( PLATES ) Units Include Part & Accessories
Floor Gore PL, Radial Beam, Columns, Overflow Box
Underflow Cone (modified)
Parts
OFF
奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 6 of 8 版本 Rev.: A/0
Fig.01 Pre-Trial Monitoring & Inspections ( 2ND Set ) FT-2002+2003+2004
Fig.02 Workshop No.3/2/1 Inspection of items during assembly Fit-up + Fullwelding include bending & drilling holes
Fig.03 Workshop No.3 Jig section of Donut Launder & Upper Tank assembly during verification Fit-up+FW & Cosmetics
Fig.04 Yard item section waiting for minor refurbish cleaning & painting repair – TC300 for delivery Sept.01
Fig.05 Yard item section as Thickener 40M & 50M Parts & Accessories include items for TC300 Flotation – For Delivery
Fig.06 Yard item section of DUGALD River project as OK50 & OK100 Flotation include parts & accesoris – For Delivery
奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 7 of 8 版本 Rev.: A/0
Fig.07 KANSANSHI ITEMS
Fig.08 KANSANSHI ITEMS
Fig.09 KANSANSHI ITEMS
Fig.10 KANSANSHI ITEMS
奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05
奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05
质量检验报告
Quality Inspection Report – HK3006/W03
项目名称:
Project Name:
COBRE PANAMA
项目号:
Project No.:
DQ-140203-501 CN0073
报告编号:
Report No.:
GFC-07-2016
Cobre-QC-03
Page 8 of 8 版本 Rev.: A/0
Fig.11 KANSANSHI ITEMS – NOT ACCEPTABLE PRACTICE
Fig.12 KANSANSHI
Fig.13 KANSANSHI
Fig.14 PRODUCTION – NOT ACCEPTABLE PRACTICE
Fig.15 PRODUCTION