奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05 奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05 质量检验报告 Quality Inspection Report HK3006/W03 项目名称: Project Name: COBRE PANAMA 项目号: Project No.: DQ-140203- 501 CN0073 报告编号: Report No.: GFC-07-2016 Cobre-QC-03 Page 1 of 8 版本 Rev.: A/0 设备名称: Designation: FLOTATIO CELLS E630 SERIES & THIKENERS 图号: Drawing No.: OU600 FINLAND SERIES P2383-T10 SERIES DATE : 27 JULY 2016 合同号: Outotec Order No.: DQ-1402013-501 CN007311FL001 供应商: Supplier: HUAKAI HEAVY INDUSTRIES CO. LTD Nantong, Jiangsu Province P.R CHINA Origin CHINA Destination PANAMA CLIENT by OUTOTEC MINERA PANAMA SA / FQM CANADA 检验范围 Scope of Inspection Workshop Process 1. 最终检验 Final inspection 7.焊前组对对准检查 Fit-up & alignment check 13. 无损检测程序 NDE procedure 19.喷砂 Sandblasting 2. 中期检验 Interim (On Process) 8.焊接准备 Welding Edge preparation 14.放射线探伤 Radiographic test 20. 油漆检查 Check 1 st -2 nd coating 3. 文件检查 Documents check / Review 9. 焊缝图和焊缝追踪 Welding map & during welding 15.渗液探伤试验 Liquid penetration test 21. Final Top Coat & DFT 4. 材料追踪 Material certificate & traceability 10.焊后检测 Visual Checks after welding 16. 磁粉探伤试验 Magnetic particle test 22. Packing Inspections 5. 包装检验 Check of packing 11. Rubberlined by Others 17.超声波探伤试验 Ultrasonic test 23. Delivery Inspections 6. Delivery Surveillance 12. Pre-TRIAL Assembly 18.热处理报告 Heat treatment report 24. RELEASE REPORT EQUIPMENT ITEM: FLOTATION CELLS ( E630 ) 当前进展 Current Progress WEEK 03 ( JUNE 27-JULY 25 ) 编号 No. 项目名称 Project Name 项目号 Project No. Unit 材料收货 Materials Receiving 材料切割 Layout & Cutting 组对 Fitting Up & Jig 焊接 Welding 无损检测 NDT 预装配 Trial Assembly Visual & Dimensional 喷砂 Sand Blasting 1 COBRE PANAMA 14 CL (e630) 70% 50% 35% 35% 25% 30% 2 ND Set 35% 25% 2 8 IL (e630) Primer Mid Coat Top Coat DFT Rubber lined & Test FABRICATION STATUS (as a whole) 包装 Package 交工资料 MDR OUTOTEC QUALITY RELEASE 订单交货日期 PO Delivery Date 出货日期 Shipping Date 1 25% 25% 25% 35% 25% 20% ----- 5 0f 22 1 ST -Batch 24 JUL-16 2 HOLD POINT 1 ST DELIVERY DELIVERY ITEM Description No. of Packages No. Barge No. Container THK 40M 50M Parts & Accessories 21 6 3 x 40GP TC200 x 3units F30 Tank Parts 46 TC300 x 3units F20 Tank Parts 39 5 x 20GP TC300 x 1unit F10 Tank Parts 17 E630 x 3units F10 Tank Parts & Accessories 123 FREE ISSUE FRP Gratings boxes 6 Delivery Quality Issue: Two items packages mark as damage cargo ( Donut Launder Section ) deform Non-Conform items to be rectify by renew / re-fabricate damage section 2pcs Painting was still visible on corrosion / rusted remarks E630 Flanges & Holes Storage Sections & Item in packages with corrosion / rusted surface siteweld Improper Cleaning & Shipping Mark & Numbers on section remarks dealt QC Outotec project needto issued standard packages required procedure dealt QC

Upload: randy-randy

Post on 23-Jan-2018

114 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 1 of 8 版本 Rev.: A/0

设备名称:

Designation:

FLOTATIO CELLS E630 SERIES & THIKENERS

图号:

Drawing No.:

OU600 FINLAND SERIES

P2383-T10 SERIES DATE : 27 JULY 2016

合同号:

Outotec Order No.:

DQ-1402013-501 CN007311FL001

供应商:

Supplier:

HUAKAI HEAVY INDUSTRIES CO. LTD

Nantong, Jiangsu Province P.R CHINA

Origin CHINA Destination PANAMA CLIENT by OUTOTEC MINERA PANAMA SA / FQM CANADA

检验范围 Scope of Inspection – Workshop Process

1. 最终检验

Final inspection 7.焊前组对对准检查

Fit-up & alignment check

13. 无损检测程序

NDE procedure 19.喷砂

Sandblasting

2. 中期检验

Interim (On Process) 8.焊接准备

Welding Edge preparation

14.放射线探伤

Radiographic test 20. 油漆检查

Check 1st-2nd coating

3. 文件检查

Documents check / Review 9. 焊缝图和焊缝追踪 Welding

map & during welding 15.渗液探伤试验

Liquid penetration test 21. Final Top Coat & DFT

4. 材料追踪 Material certificate & traceability

10.焊后检测

Visual Checks after welding

16. 磁粉探伤试验

Magnetic particle test 22. Packing Inspections

5. 包装检验

Check of packing 11. Rubberlined by Others

17.超声波探伤试验

Ultrasonic test 23. Delivery Inspections

6. Delivery Surveillance 12. Pre-TRIAL Assembly 18.热处理报告

Heat treatment report 24. RELEASE REPORT

EQUIPMENT ITEM: FLOTATION CELLS ( E630 )

当前进展 Current Progress – WEEK 03 ( JUNE 27-JULY 25 )

编号No.

项目名称Project Name

项目号Project No.

Unit

材料收货Materials Receiving

材料切割Layout & Cutting

组对Fitting Up

& Jig

焊接Welding

无损检测NDT

预装配Trial

Assembly

Visual & Dimensional

喷砂

Sand Blasting

1 COBRE PANAMA

14 CL (e630) 70% 50% 35% 35% 25%

30%

2ND Set 35% 25%

2 8 IL (e630)

Primer

Mid Coat

Top Coat

DFT Rubber

lined & Test

FABRICATION STATUS

(as a whole)

包装

Package

交工资料MDR

OUTOTEC

QUALITY

RELEASE

订单交货日期PO Delivery

Date

出货日期Shipping

Date

1

25% 25% 25% 35% 25% 20%

----- 5 0f 22

1ST-Batch

24 JUL-16

2 HOLD POINT

1ST

DELIVERY

DELIVERY ITEM Description No. of Packages No. Barge No. Container

THK 40M – 50M Parts & Accessories 21 6

3 x 40GP TC200 x 3units F30 Tank Parts 46

TC300 x 3units F20 Tank Parts 39 5 x 20GP TC300 x 1unit F10 Tank Parts 17

E630 x 3units F10 Tank Parts & Accessories 123

FREE ISSUE FRP Gratings boxes 6

Delivery Quality Issue:

Two items packages mark as damage cargo ( Donut Launder Section ) – deform Non-Conform items to be rectify by renew / re-fabricate damage section – 2pcs Painting was still visible on corrosion / rusted remarks E630 – Flanges & Holes Storage Sections & Item in packages with corrosion / rusted surface – siteweld Improper Cleaning & Shipping Mark & Numbers on section – remarks dealt QC Outotec project needto issued standard packages required procedure dealt QC

Page 2: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 2 of 8 版本 Rev.: A/0

COBRE PANAMA PROJECT :

Flotation : E630 Fabrication Exclude Drive Mechanism

SET No.1 DELIVERY FT-1002+03+04+05+06 5 - Units Loadout 24 July ‘16

SET 2 PRE-TRIAL FT-2002+03+04+05+06 JIG 1 - Yes JIG 2- Yes Tank Mounted

SET 3 WORKSHOP FT-3002+03+04+05+06+07 Fabrication Yes Layout & Cutting

SET 4 WORKSHOP FT-4002+03+04+05+06+07 ------ ----- No Activity

1. Trial Assembly Bank Cells No. 2 …… On progress monitoring & inspection ( Level – Plumb – Height ) Bridge Sections ( 5units ) ……………. 100% Complete awaits for Mounting Trial Header Air-Water Pipes ……………... 95% Complete awaits Flange to Flange Trial Mounting Donut Launder (Center) ……………... 100% Complete On-Going Top Tank Mounting Connecting + Downflow Duct ……….. 90% Complete full welding w/ dealt Hot works bolt holes flange

2. Poor painting repair and touch up are still hard to dealt with Quality during final intervention of inspection 3. Un-satisfactory results dealt during Huakai Packing stages without proper internal team and lack of

project team to issue an Outotec Packing Procedure – Improvement still be dealt hard for Quality 4. Handling damage of cargo are still hard to controlled by Huakai during movement packing & transfer 5. Rubber Liners team are hard to control dealt by quality which they are not properly coordinate to QC-OT 6. Delivery practice in accordance to Export Structural Steel need improvement by Supplier

7. OUTOTEC Workshop Jig & Production Inspection :

QC WORKSHOP 3 WORKSHOP 2 WORKSHOP 1 Outotec

VI Upper Section 2unit FU Baffle Plate FU Bridge Section x5 FW Dealt QC

VI Donut Launder x2 FW Feedwell FW Gratings Deck FW -do-

VI Pipelined FW Feedbox FW Pipe Brackets FW -do-

VI Underflow Duct x5 FW Discharge Box FW Booster Cone FW -do- QC Legend : FW – Full welding on process, FU – Fit-up w/ Edge Preparation & Dimensional Checking as per drawing requirements, VI – Visual Inspection Include repair, rectification, grinding works, NDE – RT/UT/MT check. All visual rejection shall have value immediate repair as UC-PR-LOF-GAP-CUT-Poor OUTOTEC DEALT HARD TO IMPROVED HUAKAI QC

Fit-Up still minor improvement with improper edges preparation dealt by workshop team of HUAKAI Large GAP control due cutting, improper level still to be dealt not more than 3mm during Fit-Up Tack weld by Fit-up are still Not satisfactory, rejected to be removed dealt by HUAKAI QC Tankwall welding are stringent critical run requirement by weaving or string bead poor practice Non-conformance visual inspection during excavation wall weld gouging found with linear porosity Poor welding control to distribution of welding gas shielding protection to minimized porosity dealt QC Deformation of Tank plate during assemblies and mounting – repair required NDT-MT required to grinded weld on top section & Lifting Lug - witness required Tank Rim Pad Plate for mounting Bridge found to be deform not properly level – repair required Assembly process has been improved to be completed at workshop fit-up and welding prior trial Overhead welders HK105 & HK107 has been verified test qualification witness by OT – Accepted SAW + FCAW repair procedure still No WPS & PQR – Urgent Required Poor stop-start, poor surface profile, porosity, poor weld, incomplete weld, heavy weld – dealt QC All post weld by Huakai are category D far from level category C but cosmetics complete it accepted Pipe Welding are improved by GTAW + FCAW but work damage by improper surface grind & clean Grinding by Cosmetics are still hard to improve by Huakai as traditional practice dealt improvement No Release Report by Outotec Quality where QC dealt by Punch Listing & Improvement closed out

IMPROVEMENT FOUND BY HUAKAI

Process of section Upper Tank with Donut Launder Fit-up + Welding Dimensional checking found acceptance to level ±3mm control prior welding Blasting works are properly coordinated and results satisfactory with immediate repair Top coating works verify acceptable with +15% over coat during verification acceptance QUALITY CONTROL dealt by HUAKAI QC will immediately repair by visual & on the spot tolerance

Page 3: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 3 of 8 版本 Rev.: A/0

COBRE PANAMA PROJECT

MEETINGS Regular weekly MOM ( OUTOTEC Quality to HUAKAI Project / QC ) is basis of QC Information only. MOM – Week 30th by Outotec QC dealt with delivery conformance & 2nd Batch Pre-Trial Project meeting by Outotec – Negative information query to QC between Huakai & OTSH Project OUTOTEC QA/QC will incorporate every meeting on Health, Safety and Environment (HSE) at

regular per workshop & yard, Meeting on QUALITY ASSURANCE & CONTROL will be held every regular interval every FRIDAY under the Minutes of Meeting (MOM).

COORDINATION Meeting under by HUAKAI & OUTOTEC PROJECT Team has no direct copy of information PER monthly minimum purposed – No record of information plan & priority for production and quality in terms of Status of Project, Quality, Quantity, Technical Discussion, Progress of work, Delivery and Gant Chart scheduling and other remaining works.

HSE Safety Points – Continuously informed in terms of HSE in Workshop No.3 & Yard of HUAKAI OUTOTEC QA/QC INSPECTION Points

- Regular Walk Through, Surveillance & Monitoring - Weekly Report & Non-Conformance Record - Punch Listing activities performed under unsatisfactory - Manufacturer’s Data Record ( MDR ) Review

检验结果 Inspection results : - In-Process Fabrication

拒绝:

Rejection:

是的,见备注

Yes, see remarks 再检:

Re-Inspection:

是的,见第 4 部分

Yes, see section 4 通过:

Released:

是的 Yes

不是 No 不是 No 不是 No

This inspection, examination or testing carried out by Outotec or the customer shall not relieve the supplier of any of his obligations of expert manufacturing according to Outotec and specification. The supplier shall be solely responsible for accuracy, quality and completeness of his work and supply, subject to technical data and specifications.

时间:

Date: 27-JULY 2016

地点:

Place: RUGAO-NANTONG AREA – PR CHINA

检验员:

Inspector:

GRANDEO F. CERILLES

CHRIS CHEN XIN

供应商:

Supplier:

HUAKAI HEAVY INDUSTRIES – HKHI

Page 4: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 4 of 8 版本 Rev.: A/0

检验内容 Inspection in Detail & DELIVERY PREPARATION ( OUTOTEC PRODUCT – HUAKAI )

PROJECT : DUGALD RIVER PROJECT

PO No. : 4500924983

Ref. No. : P1071-F20

Contact PM : Mr. Johnny Tran

[email protected]

Fabrication History : Year 2013 - November

Client : MMG AUSTRALIA LTD.

C/O MMG DUGALD RIVER PTY. LTD

68 Km North of Cloncurry Off Burke

Development Road, Cloncurry QLD 4824

AUSTRALIA

Contact Client : Brad Brown & Peter Aylmore

[email protected]

[email protected]

Item

No.

of

Unit

OTSH

Number

Items of Descriptions No. of

Packages

STATUS

OK100

11

P1071F20

Tank Units Include Part & Accessories

ZINC CLEANERS BANK CELLS

Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,

Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,

Gratings, Brackets, Air Pipe Header & Spools, Water Pipe

Header & Spools, Rotor & Stator, Drive Rack, Motor Frame

Exclude Drive Mechanism accessories & parts

STORE

AT

HEJIA

OK100

5

P1071F20

Tank Units Include Part & Accessories

ZINC ROUGHER BANK CELLS

Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,

Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,

Gratings, Brackets, Air Pipe Header & Spools, Water Pipe

Header & Spools, Rotor & Stator, Drive Rack, Motor Frame

Exclude Drive Mechanism accessories & parts

STORE

AT

HEJIA

OK50

5

P1071F10

Tank Units Include Part & Accessories

LEAD ROUGHER BANK CELLS

Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,

Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,

Gratings, Brackets, Air Pipe Header & Spools, Water Pipe

Header & Spools, Rotor & Stator, Drive Rack, Motor Frame

Exclude Drive Mechanism accessories & parts

STORE

AT

HEJIA

PROJECT : COBRE PANAMA PROJECT

PO No. : 1824-0015

Ref. No. : 1P2383F10

Contact PM : Mr. Stewart Gillam

[email protected]

Mr. Chris Zhu

Fabrication History : Year 2016 - APRIL

Client : MINERA PANAMA S.A

C/O FIRST QUANTOM MINERALS LIMITED

PO Box 1407, West Perth

Western Australia 6872

Tel: 61893460100 / 61892262522

Contact Client : Hildon Wilson

[email protected]

Item

No.

of

Unit

OTSH

Number

Items of Descriptions

No. of

Packages

STATUS

E630

22

P2383F10

Tank (SECTIONS) Units Include Part & Accessories

Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster Cone,

Down Flow Duct, Donut Launder, Bridge-Stair-Hand Rails,

Gratings, Brackets, Air Pipe Header & Spools, Water Pipe

Header & Spools, Rotor & Stator

Exclude Drive Mechanism accessories & parts

5 OFF

5 TRIAL

E630 4 P2383F10 FEED BOX 1 OFF 1 FAB

E630 4 P2383F10 DISCHARGE BOX 1 OFF 1 FAB

Page 5: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 5 of 8 版本 Rev.: A/0

PROJECT : KANSANSHI MINING PROJECT

PO No. : 1824-0015

Ref. No. : 1P2383F10

Contact PM : Mr. Stewart Gillam

[email protected]

Mr. Chris Zhu

Fabrication History : Year 2013 – APRIL

Client : KANSANSHI MINING PLC

C/O FIRST QUANTOM MINERALS LIMITED

PO Box 1407, West Perth

Western Australia 6872

Tel: 61893460100 / 61892262522

Contact Client : Hildon Wilson

[email protected]

Item

No.

of

Unit

OTSH

Number

Items of Descriptions No. of

Packages

STATUS

F30

TC200

3

P2383F30

Tank ( SECTIONS ) Units Include Part & Accessories

Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster

Cone, Down Flow Duct, Donut Launder, Bridge-Stair-Hand

Rails, Gratings, Brackets, Air Pipe Header & Spools, Water

Pipe Header & Spools, Rotor & Stator

Exclude Drive Mechanism accessories & parts

3 OFF

Yes

Deliver

F20

TC300

6

P2383F20

Tank ( SECTIONS ) Units Include Part & Accessories

Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster

Cone, Down Flow Duct, Donut Launder, Bridge-Stair-Hand

Rails, Gratings, Brackets, Air Pipe Header & Spools, Water

Pipe Header & Spools, Rotor & Stator

Exclude Drive Mechanism accessories & parts

3 OFF

Yes

Deliver

F10

TC300

10

P2383F10

Tank ( SECTIONS ) Units Include Part & Accessories

Hatch Cover, Drain Spool, Stator Sets, Dart Sets, Booster

Cone, Down Flow Duct, Donut Launder, Bridge-Stair-Hand

Rails, Gratings, Brackets, Air Pipe Header & Spools, Water

Pipe Header & Spools, Rotor & Stator

Exclude Drive Mechanism accessories & parts

3 OFF

1 OFF

6

FOR

DELIVER

Item

No.

of

Unit

OTSH

Number

Items of Descriptions

No. of

Packages

STATUS

40M

THK40

1

1P2383F30

Tank ( PLATES ) Units Include Part & Accessories

Tank Plates, Floor Gore PL, Radial Beam, Columns, Overflow

Box, Underflow Cone (modified)

Parts

OFF

Bridge Sections include handrails, gratings, drive rack, drive

shaft, rake arm, feedwell, feed pipes, deflector cone

FOR

DELIVER

50M

THK50

2

1P2383F30

Tank ( PLATES ) Units Include Part & Accessories

Floor Gore PL, Radial Beam, Columns, Overflow Box

Underflow Cone (modified)

Parts

OFF

Page 6: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 6 of 8 版本 Rev.: A/0

Fig.01 Pre-Trial Monitoring & Inspections ( 2ND Set ) FT-2002+2003+2004

Fig.02 Workshop No.3/2/1 Inspection of items during assembly Fit-up + Fullwelding include bending & drilling holes

Fig.03 Workshop No.3 Jig section of Donut Launder & Upper Tank assembly during verification Fit-up+FW & Cosmetics

Fig.04 Yard item section waiting for minor refurbish cleaning & painting repair – TC300 for delivery Sept.01

Fig.05 Yard item section as Thickener 40M & 50M Parts & Accessories include items for TC300 Flotation – For Delivery

Fig.06 Yard item section of DUGALD River project as OK50 & OK100 Flotation include parts & accesoris – For Delivery

Page 7: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 7 of 8 版本 Rev.: A/0

Fig.07 KANSANSHI ITEMS

Fig.08 KANSANSHI ITEMS

Fig.09 KANSANSHI ITEMS

Fig.10 KANSANSHI ITEMS

Page 8: REPORT WEEK3

奥图泰(上海)冶金设备技术有限公司 Outotec Shanghai.Co., Ltd. 记录编号:OT-QR-14.05

奥图泰(苏州)冶金工艺设备有限公司 Outotec Suzhou Co., Ltd RN: OT-QR-14.05

质量检验报告

Quality Inspection Report – HK3006/W03

项目名称:

Project Name:

COBRE PANAMA

项目号:

Project No.:

DQ-140203-501 CN0073

报告编号:

Report No.:

GFC-07-2016

Cobre-QC-03

Page 8 of 8 版本 Rev.: A/0

Fig.11 KANSANSHI ITEMS – NOT ACCEPTABLE PRACTICE

Fig.12 KANSANSHI

Fig.13 KANSANSHI

Fig.14 PRODUCTION – NOT ACCEPTABLE PRACTICE

Fig.15 PRODUCTION