risto kulmala [email protected]
DESCRIPTION
O2: To take advantage of intelligent vehicles and infrastructure technologies to improve road safety (eSafety) Proposal for work plan v 2. Risto Kulmala [email protected]. Objectives (CEDR Strategic Plan). to inform NRAs of developments - PowerPoint PPT PresentationTRANSCRIPT
26-27 January 2006 Risto Kulmala VTT 1
VTT BUILDING AND TRANSPORT
O2: To take advantage of intelligent vehicles and infrastructure
technologies to improve road safety (eSafety)
Proposal for work plan v 2
Risto [email protected]
26-27 January 2006 Risto Kulmala VTT 2
VTT BUILDING AND TRANSPORT
Objectives (CEDR Strategic Plan)
• to inform NRAs of developments
• to alert NRAs to matters that will directly affect them
• to provide NRA information to the eSafety forum.
26-27 January 2006 Risto Kulmala VTT 3
VTT BUILDING AND TRANSPORT
Resources and expected outputs (CEDR SP)
• 2-3 CEDR members, 3-4 meetings/year, total of 20 person days/annum
• to gather information • to prepare progress reports• report back to CEDR for a total of approximately 20 person days per annum
• Progress reports shall be delivered twice a year until end of 2006, when the situation regarding eSafety shall be reassessed.
26-27 January 2006 Risto Kulmala VTT 4
VTT BUILDING AND TRANSPORT
Proposal for work plan - tasks
• Participation in eSafety Forum’s work and Implementation Road Map Working Group
• Agreement on priority systems to be promoted from the NRA point of view
• Agreement on overall strategy for NRAs in deployment and roll-out of eSafety systems
• Commence discussions with road operators (ASECAP) on common strategies related to eSafety
• Inform CEDR on eSafety developments• Recommend CEDR and NRA actions when/where necessary
26-27 January 2006 Risto Kulmala VTT 5
VTT BUILDING AND TRANSPORT
O2: Members of group
Belgium Flanders Eric KenisFinland Risto KulmalaGermany Fritz BolteNetherlands Govert SchremersPoland Piotr WiechSweden Eva BoëthiusSwitzerland Gerhard PetersenNorway Anders Godal Holt
26-27 January 2006 Risto Kulmala VTT 6
VTT BUILDING AND TRANSPORT
Priority systems
• Autonomous Vehicle Systems:• ESP• Blind spot monitoring• Adaptive head lights• Obstacle and collision warning• Lane departure warning
26-27 January 2006 Risto Kulmala VTT 7
VTT BUILDING AND TRANSPORT
Priority systems
• Infrastructure related Systems• eCall• Extended environmental information (extended FCD)
• Real-time Traffic and Travel Information• Dynamic traffic management• Local danger warning• Speed Alert
26-27 January 2006 Risto Kulmala VTT 8
VTT BUILDING AND TRANSPORT
Proposal for work plan – time table
• 1st meeting on 30 March 2006 at 9:00-11:30 in Copenhagen before the PG meeting
• Meeting of eSafety Implementation Road Maps Working Group on 7 April
• 2 other meetings, preferably piggybacking PG “Capacity…” meetings
• Progress reports • 06/2006, 12/2006 and 06/2007
26-27 January 2006 Risto Kulmala VTT 9
VTT BUILDING AND TRANSPORT
Implementation Road Maps WGTentative Plans
• Work to be continued in 2006-2008 i.e. WG remains active• Objective is to maintain and update the implementation
road map• Updating the present road map • Consider new priority systems• Simplified road map for decision makers• More concrete road maps for eSafety Forum SG
selected priority systems with timelines and responsibilities
26-27 January 2006 Risto Kulmala VTT 10
VTT BUILDING AND TRANSPORT
Implementation Road Maps WGPlan for 2006
• M1: Fix 1st WG meeting; Expand active membership in WG (esp. ASECAP, more car manufacturers, insurance)
• M2: Have plan approved at eSafety Forum SG• M3: Produce proposal for simplified road map• M4: Agree at WG on update content and procedure• M7: Produce proposal for draft updated road maps• M9: Agree at WG on new draft implementation road maps
and provide it to EC and SG• M11: Workshop on key issue for Implementation Road
Maps, e.g. incentives, common technical platform