sandeep gupta cv
TRANSCRIPT
CURRICULUM VITAE
SANDEEP GUPTA Phone: 91-9793391901,7283900235 E-Mail: [email protected]
Intend to build career in highly technical environment with committed and dedicated people, which will
help me to explore myself fully and realize my potential. Willing to work as a key player in challenging
and creative environment.
Professional Education
B.Tech with Electronics & Communication: Uttar Pradesh Technical University, Lucknow from ANAND ENGINEERING COLLEGE, AGRA in 2005-2009
Professional Experience
Nearly 8 year’s experience in Oil & Gas and presently working As HDD ENGINEER,Sanmarg Projects Pvt Ltd. at Dahej Nagothane Ethane Pipeline Projects at Valsad in Surat.
Horizontal Direction Drilling Engineer in Reliance Gas Pipeline Limited through Sanmarg Project Private Limited at DNEPL Projects as a CSC.
Horizontal Directional Drilling Engineer/Planning Engineer worked with Punj Lloyd Oil & Gas (M) SDN. BHD Malaysia Gas Pipe line 36 “Diameter, Total 21 nos. HDD Crossing from 450mtrs to 1000mtrs (Approx.).
Horizontal Directional Drilling Sr. Engineer with worked with Hejian Solidkey Petroleum and Machinery China,working in Rajkot India.
Drilling services coordination/Operation Engineer. High motivated, HSE oriented.
Work with 250T,400T HDD RIG by Herrenknecht Germany and 300T HDD RIG by Dilong China.
Worked with Nokia Siemens Network as a Telecom Project Engineer in at Kolkata Region for 3G Aircel.
Work Experience
Project Title : Dahej Nogorthane Ethane Pipeline (4’’+12” dia. Ethane pipeline255KM)
CSC : Sanmarg Projects Pvt Ltd.
Contractor : Punj Lloyd Limited,Corrtech International Pvt Ltd,Trenchless Pvt Ltd
Client : Reliance Gas Pipeline limited at Valsad in Gujrat
Designation : HDD Engineer
Specialization : Horizontal Directional Drilling(HDD)
Period of Work : 01 March 2016 to Present
Work Experience
Project Title : Sabah Sarawak Gas Pipeline Project
Company : Punj Lloyd Oil & Gas(M) Sdn Bhd Malaysia
Client : Petronas Carigali Sdn Bhd Malaysia
Designation : HDD Engineer
Pipe dia x Length : 36”dia x 550 KMS
Period of Work : 14 July 2015 to 25 Nov 2015
Work Experience
Project Title : Saray Mathura Oil Project Pipeline(SMPL) Company : Hejian Solidkey Petroleum and Machinery China
Client : Indian Oil Corporation Limited
Designation : Sr HDD Engineer
Pipe dia : 28”dia + 3” Duct line
Period of Work : 16 Apr 2014 to April 2015
Work Experience
Project Title : Sabah Sarawak Gas Pipeline Project
Company : Punj Lloyd Oil & Gas(M) Sdn Bhd Malaysia
Client : Petronas Carigali Sdn Bhd Malaysia
Designation : HDD Drilling Engineer
Pipe dia x Length : 36”dia x 550 KMS
Period of Work : 16 Apr 2011 to 20 Nov 2013
Currently Employer (March 2016 to Continue)
Current Employer: Sanmarg Projects Private Limited. Designation: - HDD ENGINEER Responsibility for All kind of Pipeline Projects like as. – Cross Country Pipeline Projects, Mainline/
Horizontal Directional Drilling (HDD) in Gas/Product Pipeline & Trenchless Pipe Laying etc.
Responsible for Design Calculations (Load & Stress Calculations) of Horizontal Directional
Drilling(HDD) in Oil/Gas Pipeline Projects and related Survey works (Geotechnical & hydrological
Survey).
Site preparation, Mobilization/Demobilization of HDD equipment/manpower, Monitoring of pilot
Hole, Reaming, Pull back related HDD activities, restoration of HDD sites
Responsible for Stringing, Welding, Coating, Testing, Trenching, Lowering & River/Road Crossing
in Oil/Gas Pipeline Projects.
Responsible for Preparation of Job Procedures, Scheduling, Bill of Quantity (BOQ), Daily
Progressing Report (DPR), As built Drawing (ABD), Joint Measurement Sheet(JMS) & related
documentation in Pipeline Projects.
Responsible for preparation of Bill of Sub-Contractors and Client Billing.
Responsible for all Site Activity and proper co-ordination with Top Management.
Responsible for Managing Client queries/grievances & ensuring Client satisfaction.
Currently Employer (July 2015 to Nov 2015)
Current Employer: PUNJ LLOYD OIL AND GAS (M) SDN BHD MALAYSIA Designation: - HDD ENGINEER Responsibility:-
Preparing daily, weekly & monthly progress reports and co-ordination with site engineers
Liaise with Construction Manager/ Spread Foreman with respect to work activity schedule
Planning & co-ordination with site sub-ordinates
Site preparation, Mobilization/Demobilization of HDD equipment/manpower, Monitoring of pilot
Hole, Reaming, Pull back related HDD activities, restoration of HDD sites
Planning & Time Management
Initiates, implements & manages the equipment maintenance system with an emphasis on
planning/scheduling and preventive/predictive maintenance.
Preparation and execution Directional Drilling plans.
Prepare & maintains appropriate documentation of daily progress reports, maintenance
history/schedules, equipment installation, structural repairs, work orders, inventory.
Supervise directional drilling operations on the rig site.
Managing vendor relationships and building effective supply chain in attaining optimum
processes/services for the cost efficient development.
Monitoring all HDD activity Like Pilot hole, Reaming, Pulling and Preparation of its Log Sheet
verification.
Responsible for training on equipment, task procedure and work standards
Maintains safety, health, and environmental policies.
Drilling fluid calculations and building effective supply in attaining optimum processes/services for
the cost efficient development.
Previous Employer (May 2014 to May 2015)
Previous Employer: HEJIAN SOLIDKEY PETROLIUM AND MACHINERY CHINA Designation: - Sr HDD DRILLING ENGINEER Responsibility:-
Site preparation, Mobilization/Demobilization of HDD equipment/manpower, Monitoring of pilot
Hole, Reaming, Pull back related HDD activities, restoration of HDD sites
Planning & Time Management
Initiates, implements & manages the equipment maintenance system with an emphasis on
planning/scheduling and preventive/predictive maintenance.
Preparation and execution Directional Drilling plans.
Prepare & maintains appropriate documentation of daily progress reports, maintenance
history/schedules, equipment installation, structural repairs, work orders, inventory.
Supervise directional drilling operations on the rig site.
Managing vendor relationships and building effective supply chain in attaining optimum
processes/services for the cost efficient development.
Monitoring all HDD activity Like Pilot hole, Reaming, Pulling and Preparation of its Log Sheet
verification.
Responsible for training on equipment, task procedure and work standards
Maintains safety, health, and environmental policies.
Drilling fluid calculations and building effective supply in attaining optimum processes/services for
the cost efficient development.
Previous Employer (APR 2011 to DEC 2013)
Current Employer: PUNJ LLOYD OIL AND GAS (M) SDN BHD MALAYSIA
Designation: - HDD DRILLING ENGINEER
Responsibility:- Preparing daily, weekly & monthly progress reports and co-ordination with site engineers
Liaise with Construction Manager/ Spread Foreman with respect to work activity schedule
Planning & co-ordination with site sub-ordinates
Initiates, implements & manages the equipment maintenance system with an emphasis on
planning/scheduling and preventive/predictive maintenance.
Site preparation, Mobilization/Demobilization of HDD equipment/manpower, Monitoring of pilot
Hole, Reaming, Pull back related HDD activities, restoration of HDD sites
Planning & Time Management
Initiates, implements & manages the equipment maintenance system with an emphasis on
planning/scheduling and preventive/predictive maintenance.
Preparation and execution Directional Drilling plans.
Prepare & maintains appropriate documentation of daily progress reports, maintenance
history/schedules, equipment installation, structural repairs, work orders, inventory.
Supervise directional drilling operations on the rig site.
Managing vendor relationships and building effective supply chain in attaining optimum
processes/services for the cost efficient development.
Monitoring all HDD activity Like Pilot hole, Reaming, Pulling and Preparation of its Log Sheet
verification.
Responsible for training on equipment, task procedure and work standards
Maintains safety, health, and environmental policies.
Drilling fluid calculations and building effective supply in attaining optimum processes/services for
the cost efficient development.
Previous Employer (AUG 2009 to APR 2011)
Current Employer: NOKIA SIEMENS NETWORK For AIRCEL 2G/3G PROJECT
Designation: - PROJECT ENGINEER
Responsibility:-
Installation, Testing, Commissioning & Integration of ULTRA & FLEXI EDGE BTS.
Commissioning & Alignment of M/W Links (.3m, .6m, 1.2m,1.8m)
All alarm integration and testing from BSC and NOC
To take handover new sites and to made clear punch points operation
Fault Diagnosis at 18GC, 15 GC & 7 GC M/W links.
Responsible for Commissioning, AT and maintenance of Nokia BTS
Alarm monitoring and fault analysis.
Quality audit and Handover of sites after completion of the site AT.
Looking after all the Service affecting faults such as diversity, TRX fault, VSWR etc. Alarm testing and fault rectification of BTS.
Preventive maintenance & troubleshooting of different problems in Nokia BTS.
Quality checks for BTS site according to Nokia Check List.
Quality Checking & Acceptance test for newly commissioned sites in co ordination with Vendor.
Awards Punj Lloyd HDD Team of the year (2010-2011)
Training
Occupational 1ST Aid & basic fire-fighting training by OSH Training and Consultancy Sdn Bhd Malaysia.
Health, Safety and Environment training by Petronas Carigali Malaysia.
STRENGHTS:
Hard working and Compatible in any situation.
Trustworthy, reliable, positive attitude and confident.
Good Management and Leadership skills
Personal Details: Name : Sandeep Kumar Gupta Father’s Name : Shri P.L.Gupta Date of Birth : 03 JULY 1983. Gender : Male
Permanent Address : Y-2-C 120/1,
Trivenipuram, Jhunsi, Allahabad (U.P)INDIA Contact Numbers : +917283900235,+919793391901 Email address : [email protected]. Nationality : Indian. Marital Status : Married.
Language Known : English, Hindi & Malay. Interests : Photography, Travelling Passport Number : K0854144 (Valid up to 2022) Expected CTC : Negotiate
I hereby declare that all the information’s mentioned above are true to the best of my knowledge. Date : 03 FEB 2017 Place : India (SANDEEP KUMAR GUPTA)